H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas
|
|
- Helen Watkins
- 5 years ago
- Views:
Transcription
1 H. H. HOWELL, INC. Wildcat Field Bee County, Texas API # RRC Permit # GAU letter, RRC Letter #SC-5794 = 1000 isolate RRC approval 450. Ground Elevation (note correction) 295.1' (Rig KB to GL =6.7 ) Rig KB =302 Location: 2200 FNL & 16,850 FWL of J.M. Uranga Grant, Abstract 68 X: Y: Legal: 500 FNEL & 660 FSL of Oil, Gas and Mineral Lease dated December 7th, 2012, from R.W. Dirks, in his capacity as Trustee of the Dirks Family Mineral Trust, Lessor and Inland Ocean, Inc., Lessee, recorded by Memorandum in Volume 949, Page 515 of the Official Public Records of Bee County, covering (72.4) acres, more or less, (also called acres), being the Northwest 72.4 acres, not including the most northwesterly ten (10) acres, or Section 4 of the W.G. Ragley Subdivision of the Chittim-Miller Ranch, of the J.M. Uranga Grant, Abstract 68, Bee County, Texas, as shown by plat of said subdivision in Book L-2, Page 392 of the Deed Records, Bee County, Texas. Permit Depth: 4300'; Primary Objectives: Hockley-1 ~3080 ; Pettus Secondary Objectives: 1 st Yegua ~4180. Directions: The drill-site is 0.6 miles northwest of Tuleta. From the Tuleta US-181 intersection with Main Street, proceed north on US-181, 0.4 miles to oil lease road on left (west). Turn left (west) onto oil lease road and location is northwest 0.1 miles. Daily Drilling Reports : Prepare Proposed Location Plat to stake location : King and Petrus Surveyors stake location : Confirming rig availability : Receive preliminary survey plat. Agree to move location further south; discover pipeline near desired location : Arranging surveyors to re-stake, and avoid the pipeline issue : Re-survey and stake location. Prep to build road and pad : Receive Survey Plat; preparing expedited W-1 for RRC permit : Execute Drilling Contract (Scorpion Drilling) : Receive GAU Letter (see above) : Operator and Engineer coordinating location site work : Continue site work : Receive RRC Exception Letter to set short surface casing (450 - see above) : Continue site work : Receive RRC Drilling Permit (see above) & 31-13: Shut-down for Easter weekend : Working on location. Preliminary Drilling Report/Tuleta 1
2 Drilling Reports Page 2 of : Hutco Construction Co. completed construction of location. Ordered frac tank to collect water in preparation for move-in of Scorpion rig on Monday, April 15th or a few days later : Ready to receive the rig, which has been delayed in Duval? County, but is expected in a matter of days, possibly this weekend : This AM, moving in rig; expect to spud within next 48 hours : This 7:00 AM, prep to spud. Expect to spud & drill surface hole in next 24 hours : [1] This 7:00 AM, prep to run surface 470. Spud and drilled 470 in last 24 hrs. Mud: native. Bit #1-S: 12-1/4 surface hole bit surface. Summary: R/U, raise derrick & drill & set rat & mouse holes. Drill F/ 0 T/ 230. Replace M/U line. Drill F/ 230 T/ 470. Wiper trip T/ bit. Circ. & POOH. W/O & R/U csg crew. Expect to run & set surface casing and drill casing shoe in next 24 hours : [2] This 7:00 AM, 714. Made 244 in last 24 hrs. Mud: 9.0#, Visc: 36. Bit #2: 7-7/8 Rock bit 470. Deviation survey: 1/4 500'; Summary: R/S & Safety Meeting (S/M): Running csg. ; R/U csg crew & run surface csg.; Circ w/ rig pump; R/U cementers & cmt.(see below). WOC & dig cellar; Spot wellhead & N/U; R/S & S/M Testing BOP & csg. ; N/U BOP; Test BOP T/ 500 psi; OK. L/D DP, set kelly back & P/U elevators; GIH & tag cmt.; Test csg T/ 800 psi, OK. Drill cmt, float equipment & 5 of new hole; Test shoe 10# mud equivalent, OK. Mud loggers equipment not working, troubleshooting. Drilling F/ 475 T/ , ¼ degrees; Drilling F/ 540 T/ 714. NOTE: Cement detail Lead: 93 sks, 38 bbl, 12.3#, yield 2.33; Tail: 92 sks, 19 bbl, 15.6#, yield 1.18; Displace w/ 27 bbl water; Had 20 bbl cmt returns. Expect to continue drilling in next 24 hours : [3] This 7:00 AM, Made 1296 in last 24 hrs. Mud: 9.5#, Visc: 36. Bit #2: 7-7/8 Rock bit 470. Deviation survey: 1/4 500'; 1/4 987'; 1/4 1970'; Mud logger: Max gas 187 units, Trip gas 777 units. Possible Catahoula Possible Frio Summary: R/S & S/M Making connections. Drilling F/ 714 T/ Survey 987. Drilling F/ 1029 T/ Level derrick. Drilling F/ Rig service & safety meeting making connections. Circulate. Pump slug & set kelly back. Wiper trip. Pick up Kelly. Circulate. Drilling F/ 1720 T/ Expect to continue drilling Frio formation & possible bit trip in next 24 hours : [4] This 7:00 AM, Made 475 in last 24 hrs. Mud: 9.3#, Visc: 34, WL: 6. Bit #2: 7-7/8 Rock bit 470. Deviation survey: 1/4 500'; 1/4 987'; 1/4 1970'; Mud logger: Max gas 130 units, Trip gas 398 units. Summary: R/S & S/M Wireline surveys ; Survey, Drill, Swivel locked up, set Kelly back; POOH; repair std pipe & spinners. GIH; R/S & S/M Lock out/tag out procedures ; P/U kelly to circ; circulate (398 units); drill; repair kelly spinners, drill.
3 Drilling Reports Page 3 of : [5] This 7:00 AM, Made 545 in last 24 hrs. Mud: 9.3#, Visc: 36. WL: 6. Bit #2: 7-7/8 Rock bit 470, 2860 ; Bit #3: 7-7/8 HTC Rock bit Deviation survey: 1/4 500'; 1/4 987'; 1/4 1970'; 1/4 2970'. Mud logger: Max gas 50 units, Trip gas 198 units. Summary: R/S & S/M Personal protection equipment ; drill; unload 25 joints DP; Drill; Circulate; slug & set back Kelly; R/S & S/M Personal protection equipment. POOH for Bit Trip; P/U kelly; S/D & wait out storm. Jet water from pit & cond mud. Drill; Survey; Drill : [6] This 7:00 AM, Made 670 in last 24 hrs. Mud: 9.5#, Visc: 42. WL: 9.4 Bit #3: 7-7/8 HTC Rock bit Deviation survey: 1/4 500'; 1/4 987'; 1/4 1970'; 1/4 2970'. Mud logger: Max gas 1264 units Hockley 1 Show (see below). Show #1 (ML#2): Hockley 1 Sand ; excellent drill break, multi lobed; upper sand lobe has max gas 1,264 units above background of 45 units with mud cut from ; 25% light white/blue fluorescence w/ some bright yellow specks; good crush cut; sheen of oil w/ yellow fluorescence on the pits. Lower sand lobe is less obvious, but still carried +300 units, with max 750 units at Summary: R/S & S/M Slip & trip hazards ; Drilling; Troubleshoot pressure loss; Check surface equipment & pump softline. Set kelly back. R/S & S/M Slip & trip hazards. POOH for washout, 1 std, washout on slip area. Circ.; Drilling; Circ out; Drilling : [7] This 7:00 AM, circulating prep to 4300 TD. Made 600 in last 24 hrs. Mud: 9.6#, Visc: 50. WL: 6.0 Bit #3: 7-7/8 HTC Rock bit 2860 out Deviation survey: 1/4 500'; 1/4 987'; 1/4 1970'; 1/4 2970'; 1/4 3970'; 1/4 4300'. Summary: R/S & S/M Person protection equipment. ; Drilling F/ 3700 T/ 4001 ; Drop 3970, ¼ degrees. Hard rain; Pump water off top of pits; Circ & cond mud. Drilling F/ 4001 T/ R/S & S/M Person protection equipment. Drilling F/ 4032 T/ Change out saver sub & rerun M/U cable. Drilling F/ 4190 T/ Circ & 4300, ¼ degrees. Wiper trip : [8] This 7:00 AM, GIH w 4300 TD. Made 0 in last 24 hrs. Mud: 9.6#, Visc: 43. WL: 6.0 Bit #3: 7-7/8 HTC Rock bit 2860 out Deviation survey: 1/4 500'; 1/4 987'; 1/4 1970'; 1/4 2970'; 1/4 3970'; 1/4 4300'. Summary: R/S & S/M Logging. Circ & cond mud. Set back kelly & POOH T/ log. R/U loggers & GIH w/ logging tool T/ 1200, tool problems, retrieve tool. GIH & run Baker Hughes- High Definition Induction Log, Compensated Z- Densilog; Compensated Neutron Log, Gamma Ray Log, TTRM Sub from 4,310 to 453 log on 6:00pm 04/30/13. R/S & S/M Logging. Continue logging w/ Baker Hughes- Formation Multi-Tester and Baker Hughes- Sidewall cores. R/D loggers. GIH w/ BHA. Logs indicate productive Hockley #1 and Pettus sands, with additional possible zones of interest. Awaiting sidewall core analysis to make recommendation to run pipe.
4 Drilling Reports Page 4 of : [9] This 7:00 AM, run production 4300 TD. Made 0 in last 24 hrs. Mud: 9.6#, Visc: 43. WL: 6.0 Bit #3: 7-7/8 HTC Rock bit 2860 out Deviation survey: 1/4 500'; 1/4 987'; 1/4 1970'; 1/4 2970'; 1/4 3970'; 1/4 4300'. Summary: R/S & S/M Tripping pipe. GIH T/ shoe; Circ.; GIH T/ 2000 ; Circ.; GIH T/ btm & P/U kelly T/ circ.; Circ & W/O csg.; Circ & unload & strap production casing. R/S & S/M Running csg. ; Pump slug; Set kelly back; L/D DP. R/U csg crew & run production csg : [10] This 7:00 AM, rigging down; production casing 4300 TD. Summary: Run 4,276 landed depth of 4-1/2 J-55, 10.5# production casing Cemented (with good 55 bbls returns) using 480 sx Class A 12.5# Lead with 490 sx class H 14.5# Tail, displaced w/ 67.5 bbl KCl water. Scorpion Drilling released at 2:00 PM. Daily Completion Reports : Back dragging location and leveling drilling pits. Waiting on completion rig : Location is ready to receive completion rig : Completion rig is delayed; may be delayed until after Memorial Day (Monday) : Continue to wait for completion rig; now expected Monday : Moving in completion rig (has been rain delayed) : Making bit & scraper run. In last 24 hours: MIRU WOR. NU BOP. MI pump, tk & load of 2% KCL. 4:00pm SDFD. Tbg scheduled to AOL tomorrow AM : Shut down for weekend. In last 24 hours: Make up bit & scraper. TIH to Circ w/ KCL. TOOH. RU GE WL to run cased hole logs: CBL-GR-NL- VDL from TD 1000 and 100 below & above Surface 453. Re-ran log w/ 750 psi. RD WL. Closed blanks. 6:00 p.m. Shut down for weekend : Shut down for weekend : Prep to perforate for completion in Pettus sand : This AM, SI waiting on swab rig. In last 24 hours, PU Arrowset packer, entry guide, and 118 jts of 2 3/8 tbg. RIH to 3,858 & set pkr in 10K of compression. ND BOPs. Tested pkr & csg to 500#, tested ok. NU tree and bolted up flange. RU swab & made one pull from RU perf & RIH. Perforated F/ 3,954 T/ 3,956. POOH. RD perf & PU swab Pulled to Continued swabbing a total of 7 runs recovering total 12 bbls of 14.5 bbl load, with no feed in. Shut-in well for night. PM update: 24 hour Shut-in tubing pressure = 250# : This AM, 36-hour SITP 375#. Rigging-up swab rig : This AM, 12-hour SITP 225#. Opened well & tagged 3300, recovered ¾ bbl black-emulsified oil & drill filtrate water; strong oil odor. Will continue swabbing today and monitor fluid content. In last 24 hours, SITP 375# (36-hour). Opened well up & GIH w swab. Tagged 3300 & recovered ¾ bbl water (still lack 2.5 bbl to recover 100% load). Continued swabbing every hour, recovering ½ bbl water per run. Last swab was a 2 hour delay and recovered ¾ bbl water, w/ very slight blow. SIFN.
5 Drilling Reports Page 5 of : This AM, bled pressure to 0#, GIH w swab tag 3480 recover ¼ bbl fluid. R/U for pump-in treatment. In last 24 hours, made 6 swabs recovering total of 1.75 bbls of very dark, emulsified fluid : This AM, well shut-in for evaluation. In last 24 hours, R/U pump tk. Pumped 55 gals of xylene. No pressure on wellbore. Pumped 55 more gals of xylene. No pressure on wellbore. RU pump trk, pumped 14 bbls of 2% KCL water. Pressure went T/ bpm. SWI for 30 min. Opened well, pressure 0#. Pumped 2 bbls of KCL wtr. Pressure went T/ 1000#. Pumped 3 more 1 bpm, 900#. ISNP 400#, went T/ 0#. RU swab & started in hole. Pulled 8 swab runs, recovering KCl water and then KCl water and xylene to recover total 13.5 bbls for the day. No oil or tail gas. Well on vac. RDMO swab unit. Shut well in for evaluation : Shut down for weekend : Shut-in w/ 40#. Having fluid samples analyzed and evaluating well : Shut-in w/ 50#. Waiting on swab rig : Shut-in w/ 65#. R/U swab unit. Bled well down. RIH w/ swab & tag First run recovered 2.75 bbl fluid. Continued total of 6 runs w/ limited entry recovering 4 bbls total fluid. Left well open on 10/64 choke to rig tank : Wellhead pressure 0# on 10/64 w/ slight blow. RIH w/ swab & tag First run recovered 0.75 bbl fluid. Continued total of 4 runs w/ limited entry recovering bbls total fluid. Shut-in 12:00 pm. Took sample. Subject to fluid analysis, plan to add 3 more feet of perforations in Pettus, evaluate, and if insufficient test results, then proceed to Hockley #1 sand : SITP 180#; opened well. RU swab unit & E/L unit. RIH w/ 1 11/16 strip gun; 4 SPF; 0 phase to Ran strip log. Correlate logs & perforated ELM (Pettus sand). POOH. RD E/L unit. TP 180 psi. Opened to swab tank. Bled to 0 psi. RIH w/ swab, FL Deepest swab to Made 2 runs, rec d 3 bbls w/ trace of oil on run # 1 and gas cut fluid. Made 4 1 hour runs, rec d 1 bbl no oil or gas, ¼ BPH entry. Installed 8/64 choke. Opened to swab tank : 8:00 a.m. Well had light blow on 8/64 choke with 0 psi. Initial swab tagged fluid at 3000 and recovered 10% oil cut. Made 1 hour feed in checks, 5 runs total. Total recovery for the day 2.75 bbls; with decreasing cut oil, down to 1% cut oil on final swab. Released swab unit & MOL. Note: Pettus has tested non-commercial; plan to recomplete in Hockley #1 sand : Prep to recomplete in Hockley #1 sand : 7:00 a.m. RU WOR & guide lines & RD tree. RU BOP. Release pkr & circulate well. POOH w/ tbg laying down 27 jts. POOH w/ tbg standing up. RU PLPS W/L to run JB & GR to W/L set 3910 & dump bailed 20 cmt on BP. RD W/L. TIH w/ Arrow-set pkr & /- tested to 500 psi. Set w/ 9K com. ND BOP & NU tree. Swabbed down to :45 p.m. SDFD : 7:00 a.m. RU PLPS w/ pack off and lubricator. Pkr GIH w/ 13 4 JSPF 1 11/16 evolution gun and perforate 3113 to :15 a.m., no blow. POOH w/ W/L & RD. RU to swab. 1300, pulled from 2300, rec d 3.3 bbls. 2000, pulled from seating nipple. Rec d 3.3 bbls. 8 bbls in tbg recovered 7 bbls total. Wait ½ hr. 2700, no rec. Wait 1 hr. 2700, no rec. Wait 2 hrs Pulled from seating nipple, rec 1 bbl 20% oil cut. Wait 2 hrs, 2900, 100% oil. Wait 2 hrs, 2900, 50% oil cut (w/ load water). 5:00 p.m. SDFD.
6 Drilling Reports Page 6 of : Testing Hockley #1 sand production rate w/ swab rig to size production equipment : This AM swabbed 1-1/2 bbl 100% oil since overnight. Continue swabbing oil, establishing rate, and evaluating options to increase rate. Summary from yesterday: Swab Run Pulled from: Recovered: Wait: bbls oil 1 hr ¼ bbl oil 2 hr ¼ bbl 40% wtr. 2½ hrs ¼ bbl 40% wtr. 2½ hrs no recovery. 5:00 p.m. Put well on an 8/64 choke & left to tank overnight. SDFD : Shut down for weekend : Shut down for weekend : This AM, well had slight blow. GIH w swab to tag Made 2 swab runs recovering 4.5 bbls oil, no water. Will proceed today to add upper lobe of Hockley #1 sand : This AM, well 120# on 8/64 choke making 47 mcf. Go in hole w/ swab to tag 2200, pulled from 3000 recover 2 bbls (load) water. Will continue swabbing and evaluating for suitcase frac. Locating a 114 pumping unit and working on electricity. In last 24 hours, after 2 swab runs recovering 4.5 bbls oil, no water (see above report), Loaded hole with 10 bbls FSW. Go in hole and Perforate Hockley #1 upper sand Swab as follows: Swab Run Pulled from: Recovered: Wait: 1 full bbls 30% oil bbls 30% oil bbls 5% oil fair tail gas bbls 2% oil slight tail gas no recovery. Note : Heavy afternoon rain hampered final swabbing: last 2 swabs reported no recovery. Left well open on 8/64 choke. SDFD : Continue evaluating current perforations and expecting a quote from Halliburton for a 25K# foam frac : This AM, well 135# on 8/64 choke making 52 mcfpd. Fluid level 2550, pulled from 3000, recovering 2 bbls (filtrate) water w/ trace oil. Will continue swabbing to dry-up filtrate water, improve oil rate. Also working on gas connection : This AM, well 120# on 8/64 choke making 47 mcfpd and unloaded ¼ bbl fluid overnight (on its own). Fluid level 2600, pulled from 3000, recovering 2 bbls (filtrate) darker water w/ 50% oil cut. This is first time well has free flowed fluid and continues to improve. Still working frac proposal and pipeline costs. Will swab today and if we dry up all water, will release swab rig and leave well flowing over the weekend : This AM, well flowing FTP 120# on 8/64 ; produced 0.25 bbl oil : This AM, well flowing FTP 120# on 8/64 ; produced 1.00 bbl oil : This AM, well flowing FTP 120# on 8/64 ; produced 3.00 bbls oil; GIH & swabbed another 4 bbls oil.
8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250
DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28
MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move
More information02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00
DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University
More informationDrilling & Completion Summary
API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,
More informationDAILY DRILLING REPORT
UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED
More informationGulftex Energy III LP DAILY COMPLETION REPORT
07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28
MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:
More informationH. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas
H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB
More informationDATE: 01/03/ DAILY COMPLETION REPORT
DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY
More informationExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #
6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main
More informationCompletion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00
Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217
More informationPartner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig
: 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.
More information3/25/15 University DC 1H Devonian Completion
3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped
More informationAthlon Energy Operating LLC
Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB
More informationCNL, CCL, GR, CBL. RDMO
Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.
More informationView Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013
Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,
More informationDaily Drilling Summary Report
Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report
More informationDATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS
DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud
More informationOPERATIONS SUMMARY REPORT
Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int
More informationEP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017
6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion
More informationEP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017
1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original
More informationElevation Resources LLC
FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i
More informationDAILY DRILLING REPORT DATE : 08/01/2012
DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:
More informationPRODUCTION HYDRAULIC PACKER FIELD TEST
DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose
More informationPROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..
DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks
More informationEndeavor Energy Resources, LP. DAILY DRILLING REPORT
Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment
More informationElevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:
FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar
More informationCallon Petroleum Company Drilling Report
LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP
More informationLEE NAK GUI TCP SERVICE COORDINATOR APPS
Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers
More information19,683 8,
General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg
More informationbbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P
Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI
More informationCasing Scraper. Service Equipment. Features
Casing Scraper The Casing Scraper is a spring type, mechanical casing scraper, featuring a large by-pass area between the blades to allow circulation of debris. The body is constructed of the highest quality
More informationDaily Activity Report
605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Submitted
More informationAPACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00
More information2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford
2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014
More informationCompletion Solutions Inc.
Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both
More informationMOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES
MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University
More informationSCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth
SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95
More informationIntervention Barriers
Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective
More informationDaily Drilling Report
Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG
More informationMLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations
MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014
More informationISOLATION/UNIVERSAL TOOLS
ISOLATION/UNIVERSAL TOOLS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:
More informationAtlas Copco Oil and Gas Rigs. The Predator Advantage
Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing
More informationGeneral Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN
UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate
More informationDaily Drilling Report
Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES
More informationCasing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas
Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing
More informationRig 1 Sky top 4 Axle Carrier 6500 Drilling Depth
Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping
More informationDrilling & Completion Summary - Ascending
UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion
More informationCoil Tubing Intervention in MultiLateral Wells from a Semi-submersible
Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible Ragan Stonier (Lead CE, AusBU) 5 th March 2009 Agenda Overview Where, what, why??? Preparation Rig challenges, interfaces Engineering
More informationLarge Scale CO 2 Flood Begins Along Texas Gulf Coast (Technical Challenges in Re-Activating an Old Oil Field)
1 Large Scale CO 2 Flood Begins Along Texas Gulf Coast (Technical Challenges in Re-Activating an Old Oil Field) Darrell Davis, Mark Scott, Adam Robinson, Kris Roberson, Bill Freeman Denbury Resources Inc.
More informationPlug & Abandonment Light Drilling Workover Well Intervention
Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE
More informationComposite Plugs. Index
Composite Plugs Downhole Isolation Tools - Multi-Stage Operations Index Rapid Mill Ball Drop... 1-2 Rapid Mill Flo-Back Flapper... 3-4 Series (Ball Drop, Bridge, Flo-Back, Flo-Back with Bio-Ball)... 5-6
More informationThru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x
Services Gun Shot Coiled Phasing Density Gun Size Explosive Tubing Slick Line Tubing Wireline Deep Big Hole Gun Type (Degrees) (SPF)Max (inches) Type Conveyed Conveyed Conveyed Conveyed Penetrating Thru
More informationOn May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4.
PA IDC Report #2 If the scope of this request had been broader and additional items evaluated the findings may have been different. Please receive and file this report. II. TIMELINE On January 14, 2015,
More informationT-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators.
T-2 On-Off Tool Classic Oilfield s T-2 On-Off Tool enables the tubing string to be disconnected above a packer for zonal isolation, tubing retrieval, and temporary zone abandonment. The tool contains an
More informationMcKissick 200mt. Stabbing board
MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #
More informationLOC 400 Drilling Rig
TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP
More informationDaily Drilling Report
Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM
More informationWell Completions. Thursday, 4 July 13
Well Completions Well Completions Well Completions Components and Functionality Components and Functionality Components and Functionality Xmas Tree & Wellhead Open-Hole Completion Open-Hole Completion
More informationService Tools Catalog
Service Tools Catalog www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. TABLE OF CONTENTS P/N Product Description Page Type P
More informationDETAILS OF THE EXPRESSION OF INTEREST(EOI)
DETAILS OF THE EXPRESSION OF INTEREST(EOI) for offering A Commercially Viable Technology for Exploitation of High Pour Point(HPP) and High Viscous(HV) Crude in Oil India Limited(OIL) 1.0 Expression of
More informationOIL AND GAS DOCKET NO. 8A
OIL AND GAS DOCKET NO. 8A-0277586 THE APPLICATION OF HUNT OIL COMPANY TO CONSOLIDATE VARIOUS STRAWN FIELDS AND TO ADOPT FIELD RULES FOR THE PROPOSED ANNE TANDY (STRAWN) FIELD, KING COUNTY, TEXAS HEARD
More informationRig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading
Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80
More informationCase Histories Gas Lifting Gas Wells
Case Histories Gas Lifting Gas Wells Boots Rouen US Land Gas Lift Schlumberger Continuous Lift 2 RR A relatively low ratio of gas is injected continuously into the producing fluid column to aerate or lighten
More informationThe Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager
The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion
More informationDrilling & Down-hole Completion Tools
HYDRAULIC SET PRODUCTION PACKER MODEL: WC-HP-1 & WC-HPL-1[Large Bore] PRODUCT No.: WC-20101 & WC-20112 HP-1 is an industry standard, fully hydrostatic, hydraulic set and shear release single string retrievable
More informationOklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:
Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A API No.: 35017248570000 OTC Prod. Unit No.: 017-217813
More informationHigh Energy Gas Fracturing Test
DOERMOTC - 020131 High Energy Gas Fracturing Test Final Report for the Period April 10, 2000 August 31, 2000 Date Published: February 27, 2001 R. Schulte PREPARED FOR THE UNITED STATES DEPARTMENT OF ENERGY
More informationDaily Drilling Report
Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204
More information5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.
MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b
More informationUpdate on Tractor Conveyed Ballistics Including API RP-67 Revision
Update on Tractor Conveyed Ballistics Including API RP-67 Revision BRIAN SCHWANITZ WELLTEC MENAPS 3 DECEMBER, 2013 MENA Perforating Symposium Outline: The Downhole Tractor - Briefly Tractors in the Industry
More informationPage of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB
More informationOIL AND GAS DOCKET NO
OIL AND GAS DOCKET NO. 01-0266452 THE APPLICATION OF ANADARKO E&P COMPANY LP TO AMEND THE TEMPORARY FIELD RULES FOR THE BRISCOE RANCH (EAGLEFORD) FIELD, DIMMIT, MAVERICK, WEBB AND ZAVALA COUNTIES, TEXAS
More informationWho are we? Private Alberta corporation, created in 2005 Business model is to use Waterless Drilling Technology (WDT) to grow our reserve base as an
RC Energy Inc. Who are we? Private Alberta corporation, created in 2005 Business model is to use Waterless Drilling Technology (WDT) to grow our reserve base as an Exploration & Production(E&P) company
More informationWLTC Retrievable Bridge Plug
service Tools WLTC Retrievable Bridge Plug The WLTC Retrievable Bridge Plug is designed to perform all tasks normally required of a tubing run packer-type bridge plug and can be quickly converted to run
More informationCOMMITMENT TO EXCELLENCE
PERFORMANCE DRIVEN OPERATIONS IN TEXAS AND OKLAHOMA COMMITMENT TO EXCELLENCE Basin Drilling, LP 1121 ESE Loop 323 Suite 218 Tyler, Texas 75701 (903) 561-8211 (903) 561-5844 fax www.basindrilling.com About
More informationFOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)
FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH
More informationGEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD
Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity
More informationCOMPREHENSIVE OVERVIEW
COMPREHENSIVE OVERVIEW stingercanada.com 3 About Stinger 5 Ball Launchers 10 Frac Stacks 17 Buffalo Heads 18 Isolation Tools Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary
More informationAbout Cobra Downhole Motors
February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationHYDRAULIC WORKOVER SERVICES
HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well
More informationAbout Cobra Downhole Motors
October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationRe: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:
MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:
More informationCompletion Tools Catalog
Completion Tools Catalog www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. TABLE OF CONTENTS P/N Description Page P/N Description
More informationReimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications
Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of
More informationCasing Drilling Technology Implementation In Petrom
Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga
More informationJTC ENERGY GROUP, LLC. Jarmon #1D
JTC ENERGY GROUP, LLC Commercial Salt Water Disposal Permit Jarmon #1D (Re-entry of Existing Wellbore API# 177-31597) Summary JTC Energy Group, LLC is offering for sale the Permit for a Commercial Salt
More informationComparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE
Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE - 114191 C. A. Rubio P. A. Agudelo: Weatherford Colombia Limited J. E. Peñaloza: Meta Petroleum Limited Houston
More information