APACHE CORPORATION. Daily Land - Orig Comp Report

Size: px
Start display at page:

Download "APACHE CORPORATION. Daily Land - Orig Comp Report"

Transcription

1 APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE Operator APACHE CORPORATION API GL ,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int % 1. Report No 1 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor JAMES LANHAM / BRIAN GRAY Engineer / Geologist TIM ORSAK Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast CP AFE Description: County RIG PHONE NO Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 15,7 15,7 4,948,3.32 RUNNING 5.5 PRODUCTION CASIN 6: SH SAFETY MEETING / RIG UP CASING TOOLS / RUN PRODUCTION CASING FINISH RUNNING CASING / CIRCULATE BOTTOMS UP / RIG UP AND CEMENT CASING / NIPPLE DOWN AND SET SLIPS. From To Duration Operation Description 11:3AM 12:PM.5 SAFETY MEETING WITH BUTCH'S CASING CREW. 12:PM 1:3PM 1.5 RIG UP CASING TOOLS 24 HR Operational Comments 1:3PM 12:AM 1.5 RUN 5.5 PRODUCTION CASING (: SHOE DEPTH =8,213'). CASING DETAILS ON NEXT REPORT. Remarks :-6: RUN 5.5 PRODUCTION CASING (6: SHOE DEPTH =12,998'). CASING DETAILS ON NEXT REPORT. Directional Information Initial Deviation Max Dev Max Dogleg 2, deg at 11, deg at 8,766 Casing / Tubing Information Objective Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H ,119. Returns at Surface INTERMEDIATE J-55 8,5.7 5,333.1 Company Name No of People Hours Today Cum / Event HORIZON MUD SDS BUTCH'S CASING DIVISON DDC.. ENVIORMENTAL DRILLING S PATTERSON-UTI DRILLING Personnel Total: BULKS Product QTY DIESEL, MUD 5,329. DIESEL, RIG FUEL 1,68. 1

2 APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 45, 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 12,917 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 13,617 13, CONTRACT SUPERVISION 5, 2,83 2,83 47,917 CONSULTANTS 186, EQUIPMENT RENTAL 4, 734 FORMATION STIMULATION 2,731, 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 4, 2,731, 15, 6, 1, 1, 6,5 247,5 Total Intangible Cost 4,43, 15,7 15,7 4,387, OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 15,7 15,7 4,948,3 2

3 APACHE CORPORATION Page 1 of 4 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE Operator APACHE CORPORATION API GL ,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int % 1. Report No 2 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor JAMES LANHAM / BRIAN GRAY Engineer / Geologist TIM ORSAK Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast CP AFE Description: County RIG PHONE NO Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 15,7 429, ,622 4,518, RIGGING DOWN AND REPARING RIG TO W Objective TRIP IN HOLE WITH PRODUCTION CASING AND SET SHOE AT 15,875', CEMENT CASING, NIPPLE DOWN BOP, SET SLIPS AND INSTALL TA CAP. RIG RELEASED AT 23:59 HOURS ON WALK RIG TO UNIVERSITY 244 4HU. From To Duration Operation Description 24 HR Operational Comments 12:AM 9:3AM 9.5 RUN 5 ½ CASING AS FOLLOWS; TEST FLOAT EQUIPMENT 1-FLOAT SHOE = ,875 1-#2 5 ½ HC-11 TXP BTC CSG JT = FLOAT COLLAR = , LATCH SUB = , #2 5 ½ HC-11 TXP BTC CSG JT = ORIO VALVE = , #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2, MARKER JT = , #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2, MARKER JOINT = , #2 5 ½ HC-11 BTC TXP CSG, JT, = 3, MARKER JOINT = , #2 5 ½ HC-P11 BTC TXP CSG, JT,=45, 5,99.1 TOTAL PIPE RAN = 15, ,875 43' OFF BOTTOM WITH 4.33 STICK UP RAN 93 CENTRALIZERS / NOTIFIED T.R.C. WITH PRODUCTION CEMENT 14: ON AND TALKED TO IVY WASHED LAST JOINT IN USING CRT TOOL AND GOT ALL THE WAY DOWN UNTIL ELEVATORS WERE JUST ABOVE SPIDERS (ABOUT 15,91' OR 1' OFF BOTTOM) WENT TO PICK UP TO GET OFF CRT AND COULD NOT GET BACK DOWN. MADE SEVERAL ATTEMPTS BOTH WITH AND WITHOUT PUMPS TO GET BACK TO BOTTOM BUT WAS LOOSING ABOUT 3'-5' ON EVERY STROKE AND PICK UP WAS INCREASING WITH EACH ATTEMPT FROM 26, ON FIRST T/ 33, ON LAST TRY.,ALSO TRIED TO ROTATE UP T/ 1, DRILL TORQUE (CASING MAKE UP TORQUE = 12,5) BUT COULD NOT ROTATE. DICESION WAS MADE TO LAY ONE JOINT DOWN (43' FROM T.D.) AND CEMENT. 9:3AM 1:3AM 1. CIRCULATE OVER ONE BOTTOMS UP 856 STROKES 1:3AM 11:AM.5 SAFETY MEETING WITH CREST 11:AM 12:PM 1. RIG UP CEMENT IRON 12:PM 4:PM 4. TEST LINES TO 6 PSI. PUMP 1 BBL GXT SPACER. PUMP FIRST STAGE LEAD W/ 525 SKS (225 BBLS) 5/5 POZ H AT 11.9 WT,2.4 YD, TAIL W/ 171 SKS (487 BBLS) CLASS H PLUS AT 13.2 WT, 1.63 YD. DISPLACE W/ 352 BBLS FW WITH BIOCIDE AT 7 BPM. FCP AT 3 BPM WAS 29 PSI. BUMP PLUG AT 15:38 HS 12/2/14 W/ 35 PSI GOOD CIRCULATION THOUGH OUT JOB, BUMPED PLUGFLOATS HELD GOT 46 BBL, / 76 SX TO SURFACE 4:PM 5:3PM 1.5 RIG DOWN CREST CEMENT IRON. 5:3PM 12:AM 6.5 NIPPLE DOWN BELL NIPPLE; RIG DOWN KATCH KAN; NIPPLE DOWN BOPS. RAISE BOP SET SLIPS WITH PRODUCTION CASING IN FULL TENSION. MAKE ROUGH CUT ON CASING, LAY DOWN CASING.MAKE FINAL CUT ON CASING. INSTALL TA CAP AND TORQUE UP. RELEASE RIG ON 12/2/14 23:59 HOURS. Remarks :-6: RIG DOWN AND PREPARE RIG TO WALK. Directional Information Initial Deviation Max Dev Max Dogleg 2, deg at 11, deg at 8,766 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H ,119. Returns at Surface INTERMEDIATE J-55 8,5.7 5,333.1 PRODUCTION P 11, P-11 15, , ,97.21 Returns at Surface 1

4 APACHE CORPORATION Page 2 of 4 Daily Land - Orig Comp Report Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING SDS DDC.. BUTCH'S CASING DIVISON HORIZON MUD CREST PUMPING ENVIORMENTAL DRILLING S Personnel Total: BULKS Product QTY DIESEL, MUD. DIESEL, RIG FUEL. 2

5 APACHE CORPORATION Page 3 of 4 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 1,4 CRT TOOL 74 CASING CREW 1,2 CASING CREW 74 CASING CREW 45, 2,6 2,6 76 CEMENT AND CEMENTING SERVICES 1,275 FLOAT EQUIPMENT 76 CEMENT AND CEMENTING SERVICES 112,499 CEMENT 5.5 CASING 76 CEMENT AND CEMENTING SERVICES 17,945 ORIO VALVE AND TECH 76 CEMENT AND CEMENTING SERVICES 6,323 WELLHEAD SLIPS AND CAP 76 CEMENT AND CEMENTING SERVICES 17, 147,42 147,42 24,4 22, COMPANY LABOR 15, 15, 717 CONTRACT LABOR 3,23 NIPPLE DOWN BOP/NIPPLE UP CAP 717 CONTRACT LABOR 1,955 SET SLIPS AND CUT CASING 717 CONTRACT LABOR 128, 4,978 4, CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 13,617 25,5 39, CONTRACT SUPERVISION 5, 2,83 4, 6,83 43,917 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS -15,876 OBM DIESEL 725 DRILLING FLUIDS MUD ADDITIVES 725 DRILLING FLUIDS 731 EQUIPMENT RENTAL ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 1 SAT PHONE & INTERNET 731 EQUIPMENT RENTAL 525 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 64 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 65 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 4,472 SOLIDS CONTROL 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 175 H2S MONITORING 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 228 OBM CONTAINMENT 731 EQUIPMENT RENTAL 125 ROTATING HEAD 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET -15, EQUIPMENT RENTAL 4, 7,619 7, ,23 16, , FORMATION STIMULATION 2,731, 2,731, 737 FUEL AND POWER -33,89 RIG DIESEL 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 1, 6,5 247,5 Total Intangible Cost 4,43, 15,7 16, ,472 4,226, OTHER SUBSURFACE EQUIPMENT 1, 1, 3

6 APACHE CORPORATION Page 4 of 4 Daily Land - Orig Comp Report 714 PRODUCTION CASING 336, 269, ,149 66, BTX-XP 11 #2 CASING 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 15, 2, Total Tangible Cost 561, 269, , ,851 Total: 4,964, 15,7 429, ,622 4,518,378 4

7 APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE Operator APACHE CORPORATION API GL ,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int % 1. Report No 5 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor CHARLES GRAVES Engineer / Geologist MICHAEL LYON Field SPRABERRY (TREND AREA State County Event Code LCM Event Type LAND-ORIG COMP Objective RIG Name RIG PHONE NO RIG Fax No Tool Pusher AFE #: Status Comment Summary 24 HR Forecast CP AFE Description: AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 533,354 4,14 537,368 4,426, WOF RU PETROPLEX. LOAD BS TO 15 PSI, TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 35 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO 95 PSI. FLUSHED CSG W/ 35 BBLS TFW ( CORROSION, BIOCIDE, SCALE) WOF From To Duration Operation Description 24 HR Operational Comments 4:3PM 6:3PM 2. MIRU PETROPLEX. LOAD BS TO 15 PSI. TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 35 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO 95 PSI. FLUSHED CSG W/ 35 BBLS TFW ( CORROSION, BIOCIDE, SCALE) Directional Information Initial Deviation Max Dev Max Dogleg 2, deg at 11, deg at 8,766 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H ,119. Returns at Surface INTERMEDIATE J-55 8,5.7 5,333.1 PRODUCTION P 11, P-11 15, , ,97.21 Returns at Surface Company Name No of People Hours Today Cum / Event SDS PATTERSON-UTI DRILLING ENVIORMENTAL DRILLING S DDC.. HORIZON MUD Personnel Total: ,45. BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL. 1

8 APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 2,6 2,6 24,4 76 CEMENT AND CEMENTING SERVICES 17, 147,42 147,42 22, CHEMICALS (WSS) 1,5 BIO, SCALE, CORRISION 79 COMPANY LABOR 15, 15, 711 COMPANY SUPERVISION 5 CHARLES GRAVES 717 CONTRACT LABOR 128, 4,978 4, CONTRACT DRILLING-DAY/TURNKEY 2, 9,117 9, CONTRACT SUPERVISION 5, 15,383 15, ,23 19,883 34, DIRECTIONAL DRILLING 725 DRILLING FLUIDS -15,876-15, EQUIPMENT RENTAL 4, 27, ,82 372,198 FRAC TANK 734 FORMATION STIMULATION 2,731, 2,731, 737 FUEL AND POWER -33,89-33, ENGR/ GEOLOGICAL-CONTRACTORS/CON 749 LOGGING 15, 6,5 6,5 765 SITE PREPARATION 6, 143,5 6, 767 SALT WATER DISPOSAL 1, 1, 774 TRUCKING AND HAULING 1, ,3 WINCH TRUCK 776 TUBULAR INSPECTION/TESTING 6,5 6,5 777 WATER 247,5 247, PUMP TRUCK SERVICE 8 1,264 2,64 PETROPLEX Total Intangible Cost 4,43, 264,25 4,14 268,219 4,134, OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 269, , TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 66,851 15, 2, Total Tangible Cost 561, 269, , ,851 Total: 4,964, 533,354 4,14 537,368 4,426,632 2

9 Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/23/215 Report Number: 7 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 217. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $3,415 Cum Field Est To Date (Cost): $565,213 Current Status: 24 Hour Forecast: SUSPEND REPORTS UNTIL FRAC DATE SECURE 24 Hour Summary: INSTALL FRAC TREE/STACK Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. BOPS PP NU FRAC TREE / STACK Printed Date: 7/24/215 Printed Time: 9:46 AM

10 Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/24/215 Report Number: 8 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 218. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $3,415 Cum Field Est To Date (Cost): $568,628 Current Status: 24 Hour Forecast: RIG UP FRAC AND MAINTENANCE EQUIPMENT 24 Hour Summary: RIG UP FRAC AND MAINTENANCE EQUIPMENT Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. RU_RD PP RIG UP FRAC AND MAINTENANCE EQUIPMENT Printed Date: 7/25/215 Printed Time: 9:45 AM

11 Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/25/215 Report Number: 8 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 219. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $11,435 Cum Field Est To Date (Cost): $576,648 Current Status: 24 Hour Forecast: RIG UP FRAC AND MAINTENANCE EQUIPMENT 24 Hour Summary: RIG UP FRAC AND MAINTENANCE EQUIPMENT Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. RU_RD PP RIG UP FRAC AND MAINTENANCE EQUIPMENT Printed Date: 7/26/215 Printed Time: 9:45 AM

12 Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/26/215 Report Number: 9 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 22. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $12,725 Cum Field Est To Date (Cost): $589,373 Current Status: 24 Hour Forecast: BEGIN STAGE FRAC 24 Hour Summary: RIG UP FRAC AND MAINTENANCE EQUIPMENT Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. RU_RD PP RIG UP AND MAINTENANCE EQUIPMENT Printed Date: 7/27/215 Printed Time: 9:45 AM

13 Page 1 of 2 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/27/215 Report Number: 1 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 221. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,1 Cum Field Est To Date (Cost): $68,473 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: BEGIN STAGE FRAC: FRAC STAGES 1 THRU 2 Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : 7: Stim, MIRU, MIRU RU_RD PP FINISH RIG UP AND MAINTENANCE 15 MIN SAFETY MEETING BEFORE START FRAC 7:15 12: Stim, STAGE 1, STIMULATION STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 48 BBLS HCl, 543 BBLS Slickwater, 1258 BBLS Linear Gel, BBLS, 23734# 1 Mesh, 18978# 4/7, #, #, TOTAL PROP = 42712#, TOTAL LTR = 6736 BBLS. AVG PRES = 6486 PSI, MAX PRES = 7634, AVG RATE = 71.7 BPM, MAX RATE = 73.1 BPM, ISIP = 3846 PSI, FG =.8784 PSI/FT. 3 HRS LATE ON START DUE TO FRAC, RESTRAINTS & FUELING 12:45 18: Stim, STAGE 2, CHANGE-OVER PERF PP PERF STAGE 2: RU RENEGADE & LUBRICATOR. LOAD & TEST LUBRICATOR TO 7,75 PSI. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4 SPF. 2-1 FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 6 SPF.PUMP PLUG AND GUNS DN W/ 291 BBLS ,345 PSI. SET 15,583'. PERF'D MIDDLE 15,558' - 15,46'; 15,522' - 15,524'; 15,498' - 15,5'; 15,468' - 15,47'; 15,434' - 15,435'; 15,48' - 15,49'.TOTAL 48 HOLES. POOH RUNNING CCL LOG. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER SAFETY MEETING 18:22 18:34.2 Stim, STAGE 2, STIMULATION WOO PP CHANGE OVER TIME 18:34 21: Stim, STAGE 3, PERFORATE STIM PP FRAC STAGE 2: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4893 BBLS Slickwater, 137 BBLS Linear Gel, BBLS, 23846# 1 Mesh, 19176# 4/7, #, #, TOTAL PROP = 4322#, TOTAL LTR = 6578 BBLS. AVG PRES = 7474 PSI, MAX PRES = 9344, AVG RATE = 7.4 BPM, MAX RATE = 71.2 BPM, ISIP = 3741 PSI, FG =.8666 PSI/FT. Printed Date: 7/28/215 Printed Time: 9:46 AM

14 Page 2 of 2 Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details 21:26 23: Stim, STAGE 3, CHANGE-OVER PERF PP PERF STAGE 3: RU RENEGADE & LUBRICATOR. LOAD & TEST LUBRICATOR TO 7,75 PSI. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4 SPF. 2-1 FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 6 SPF.PUMP PLUG AND GUNS DN W/ 34 BBLS ,939 PSI. SET 15,37'. PERF'D MIDDLE 15,35' - 15,352'; 15,328' - 15,33'; 15,298' - 15,3'; 15,268' - 15,27'; 15,238' - 15,239'; 15,212' - 15,213'.TOTAL 48 HOLES. POOH RUNNING CCL LOG. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER SAFETY MEETING 23:55 :.8 Stim, STAGE 3, CHANGE-OVER WOO PP CHANGE OVER TIME, WAIT ON CACTUS TO TIGHTEN BONNET FLANGE ON FLOW CROSS Printed Date: 7/28/215 Printed Time: 9:46 AM

15 Page 1 of 2 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/28/215 Report Number: 11 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 222. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $2,65 Cum Field Est To Date (Cost): $629,123 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 3 THRU 7 : 1: Stim, STAGE 3, STIMULATION WOO PN CONTINUE CHANGE OVER TIME, CACTUS TO FIX BONNET ON FLOW CROSS 1:1 3: Stim, STAGE 4, PERFORATE STIM PP FRAC STAGE 3: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4765 BBLS Slickwater, 1633 BBLS Linear Gel, BBLS, 23868# 1 Mesh, 18847# 4/7, #, #, TOTAL PROP = 42715#, TOTAL LTR = 6762 BBLS. AVG PRES = 565 PSI, MAX PRES = 721, AVG RATE = 71 BPM, MAX RATE = 72.5 BPM, ISIP = 3745 PSI, FG =.8676 PSI/FT. 3:25 5:3 2.8 Stim, STAGE 4, PERFORATE PERF PP PERF STAGE 4: RU RENEGADE & LUBRICATOR. LOAD & TEST LUBRICATOR TO 7,75 PSI. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4 SPF. 2-1 FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 6 SPF.PUMP PLUG AND GUNS DN W/ 318 BBLS ,859 PSI. SET 15,15183'. PERF'D MIDDLE 15,156' - 15,158'; 15,128' - 15,13'; 15,98' - 15,1'; 15,68' - 15,7'; 15,4' - 15,41'; 15,8' - 15,9'.TOTAL 48 HOLES. POOH RUNNING CCL LOG. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER 5:3 5:42.2 Stim, STAGE 4, CHANGE-OVER WOO PP CHANGE OVER TIME 5:42 7:3 1.8 Stim, STAGE 4, STIMULATION STIM PP FRAC STAGE 4: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4839 BBLS Slickwater, 1385 BBLS Linear Gel, BBLS, 23596# 1 Mesh, 18952# 4/7, #, #, TOTAL PROP = 42548#, TOTAL LTR = 6566 BBLS. AVG PRES = 6376 PSI, MAX PRES = 797, AVG RATE = 73.1 BPM, MAX RATE = 74.1 BPM, ISIP = 3898 PSI, FG =.8855 PSI/FT. 7:3 1: Stim, STAGE 5, CHANGE-OVER PERF PP PERF STAGE 5: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 312 BBLS 18. 4,26 PSI. SET 14,983'. PERF'D MIDDLE 14,958' - 14,96'; 14,926' - 14,928'; 14,894' - 14,896'; 14,862' - 14,864'; 14,826' - 14,827'; 14,798' - 14,799';14,766'- 14,767'; 14,734'- 14,735'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING. 1:2 1:4.33 Stim, STAGE 5, STIMULATION WOO PP CHANGE OVER TIME. Printed Date: 7/29/215 Printed Time: 9:45 AM

16 Page 2 of 2 1:4 13: Stim, STAGE 6, PERFORATE STIM PP FRAC STAGE 5: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5718 BBLS Slickwater, 1759 BBLS Linear Gel, BBLS, 28438# 1 Mesh, 28178# 4/7, #, #, TOTAL PROP = 56616#, TOTAL LTR = 7813 BBLS. AVG PRES = 6419 PSI, MAX PRES = 6989, AVG RATE = 8.5 BPM, MAX RATE = 82.1 BPM, ISIP = 4234 PSI, FG =.9248 PSI/FT. 13:8 15: Stim, STAGE 6, CHANGE-OVER PERF PP PERF STAGE 6: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 273 BBLS ,68 PSI. SET 14,712'. PERF'D MIDDLE 14,684' - 14,686'; 14,654' - 14,656'; 14,624' - 14,626'; 14,594' - 14,596'; 14,564' - 14,565'; 14,532' - 14,533'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 15:33 15:39.1 Stim, STAGE 6, STIMULATION WOO PP CHANGE OVER TIME. 15:39 17: Stim, STAGE 7, PERFORATE STIM PP Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 475 BBLS Slickwater, 1994 BBLS Linear Gel, BBLS, 23754# 1 Mesh, 198# 4/7, #, #, TOTAL PROP = 42834#, TOTAL LTR = 6366 BBLS. AVG PRES = 638 PSI, MAX PRES = 744, AVG RATE = 7.4 BPM, MAX RATE = 72.1 BPM, ISIP = 4349 PSI, FG =.9383 PSI/FT. 17:3 19:3 2. Stim, STAGE 7, CHANGE-OVER PERF PP PERF STAGE 7: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 254 BBLS ,279 PSI. SET 14,59'. PERF'D MIDDLE 14,484' - 14,486'; 14,452' - 14,454'; 14,424' - 14,426'; 14,394' - 14,396'; 14,364' - 14,365'; 14,338' - 14,339'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:3 19:53.38 Stim, STAGE 7, STIMULATION WOO PP CHANGE OVER TIME 19:53 21: Stim, STAGE 8, PERFORATE STIM PP Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4741 BBLS Slickwater, 1322 BBLS Linear Gel, BBLS, 2364# 1 Mesh, 1898# 4/7, #, #, TOTAL PROP = 4262#, TOTAL LTR = 6341 BBLS. AVG PRES = 621 PSI, MAX PRES = 6647, AVG RATE = 7.36 BPM, MAX RATE = 71.3 BPM, ISIP = 415 PSI, FG =.8995 PSI/FT. 21:45 23:45 2. Stim, STAGE 8, CHANGE-OVER PERF PP PERF STAGE 8: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 251 BBLS ,138 PSI. SET 14,39'. PERF'D MIDDLE 14,284' - 14,286'; 14,252' - 14,254'; 14,22' - 14,222'; 14,188' - 14,19'; 14,156' - 14,157'; 14,12' - 14,121'; 14,92' - 14,93'; 14,6' - 14,61'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 23:45 23:52.12 Stim, STAGE 8, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 7/29/215 Printed Time: 9:45 AM

17 Page 1 of 2 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/29/215 Report Number: 12 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 223. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $22,449 Cum Field Est To Date (Cost): $651,572 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC 8 THRU 11 : 1: Stim, STAGE 8, STIMULATION STIM PP Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 566 BBLS Slickwater, 1767 BBLS Linear Gel, BBLS, 28662# 1 Mesh, 28646# 4/7, #, #, TOTAL PROP = 5738#, TOTAL LTR = 772 BBLS. AVG PRES = PSI, MAX PRES = 6911, AVG RATE = 8.6 BPM, MAX RATE = 82.3 BPM, ISIP = 3937 PSI, FG =.895 PSI/FT. 1:52 3: Stim, STAGE 9, CHANGE-OVER PERF PP PERF STAGE 9: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 212 BBLS ,191 PSI. SET 14,34'. PERF'D MIDDLE 14,1' - 14,12'; 13,98' - 13,982'; 13,95' - 13,952'; 13,92' - 13,89'; 13,892' - 13,891'; 13,86' - 13,861'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 3:57 4:12.25 Stim, STAGE 9, STIMULATION WOO PP CHANGE OVER TIME 4:12 5: Stim, STAGE 1, PERFORATE STIM PP FRAC STAGE 9: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 451 BBLS Slickwater, 1458 BBLS Linear Gel, BBLS, 23919# 1 Mesh, 18832# 4/7, #, #, TOTAL PROP = 42751#, TOTAL LTR = 6195 BBLS. AVG PRES = 679 PSI, MAX PRES = 6687, AVG RATE = 72.1 BPM, MAX RATE = 73.6 BPM, ISIP = 429 PSI, FG =.913 PSI/FT. 5:55 7: Stim, STAGE 1, CHANGE-OVER PERF PP PERF STAGE 1: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 195 BBLS 17. 4,15 PSI. SET 13,84'. PERF'D MIDDLE 13,81' - 13,812'; 13,78' - 13,782'; 13,75' - 13,752'; 13,72' - 13,722'; 13,69' - 13,691'; 13,664' - 13,665'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING: 7:42-7:57 7:57 8:15.3 Stim, STAGE 1, STIMULATION WOO PP CHANGE OVER TIME. 8:15 1: Stim, STAGE 11, PERFORATE STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5212 BBLS Slickwater, 1213 BBLS Linear Gel, BBLS, 23898# 1 Mesh, 18988# 4/7, #, #, TOTAL PROP = 42886#, TOTAL LTR = 6644 BBLS. AVG PRES = 5964 PSI, MAX PRES = 6596, AVG RATE = 69.4 BPM, MAX RATE = 7.7 BPM, ISIP = 41 PSI, FG =.8992 PSI/FT. Printed Date: 7/3/215 Printed Time: 9:46 AM

18 Page 2 of 2 1:43 19: Stim, STAGE 11, CHANGE-OVER PERF PN GREASE FRAC VALVES: ( 1:43-11:17 ). RENEGADE DN GREASE PUMP: ( 11:17-17:32) PERF STAGE 11: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 253 BBLS ,331 PSI. SET 13,635'. PERF'D MIDDLE 13,61' - 13,612'; 13,578' - 13,58'; 13,546' - 13,548'; 13,514' - 13,516'; 13,482' - 13,483'; 13,45' - 13,451'; 13,418'- 13,419'; 13,386-13,387'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:25 19:5.42 Stim, STAGE 11, STIMULATION WOO PP CHANGE OVER TIME 19:5 21: Stim, STAGE 12, PERFORATE STIM PP FRAC STAGE 11:Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5569 BBLS Slickwater, 1934 BBLS Linear Gel, BBLS, 2881# 1 Mesh, 27952# 4/7, #, #, TOTAL PROP = 56762#, TOTAL LTR = 7794 BBLS. AVG PRES = 6298 PSI, MAX PRES = 6745, AVG RATE = 8.1 BPM, MAX RATE = 82 BPM, ISIP = 3955 PSI, FG =.8928 PSI/FT. 21:52 23: Stim, STAGE 12, PERFORATE PERF PP PERF STAGE 12: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 224 BBLS ,422 PSI. SET 13,364'. PERF'D MIDDLE 13,336' - 13,338'; 13,34' - 13,36'; 13,266' - 13,268'; 13,24' - 13,242'; 13,28' - 13,29'; 13,176' - 13,177'; 13,146'- 13,147'; 13,112-13,113'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 23:36 :.4 Stim, STAGE 12, CHANGE-OVER WOO PP CHANGE OVER TIME Printed Date: 7/3/215 Printed Time: 9:46 AM

19 Page 1 of 3 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/3/215 Report Number: 13 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 224. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,18 Cum Field Est To Date (Cost): $67,752 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC 12 THRU 18 : :3.5 Stim, STAGE 12, CHANGE-OVER WOO PP CHANGE OVER TIME :3 2: Stim, STAGE 13, PERFORATE STIM PP STAGE 12: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5433 BBLS Slickwater, 294 BBLS Linear Gel, BBLS, 28464# 1 Mesh, 28417# 4/7, #, #, TOTAL PROP = 56881#, TOTAL LTR = 7775 BBLS. AVG PRES = 644 PSI, MAX PRES = 7444, AVG RATE = 79.8 BPM, MAX RATE = 81.1 BPM, ISIP = 3734 PSI, FG =.8672 PSI/FT. 2:1 3: Stim, STAGE 13, CHANGE-OVER PERF PP PERF STAGE 13: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 25 BBLS ,919 PSI. SET 13,87'. PERF'D MIDDLE 13,56' - 13,58'; 13,32' - 13,34'; 13,2' - 13,4'; 12,969' - 12,971'; 13,942' - 12,943'; 12,914' - 12,915'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 3:5 3:59.15 Stim, STAGE 13, STIMULATION WOO PP CHANGE OVER TIME 3:59 5: Stim, STAGE 14, PERFORATE STIM PP STAGE 13: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4463 BBLS Slickwater, 1477 BBLS Linear Gel, BBLS, 2378# 1 Mesh, 18938# 4/7, #, #, TOTAL PROP = 42646#, TOTAL LTR = 6169 BBLS. AVG PRES = 6359 PSI, MAX PRES = 7518, AVG RATE = 71 BPM, MAX RATE = 71.9 BPM, ISIP = 41 PSI, FG =.8994 PSI/FT. 5:46 7: Stim, STAGE 14, CHANGE-OVER PERF PP PERF STAGE 14: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 24 BBLS PSI. SET 12,887'. PERF'D MIDDLE 12,86' - 12,862'; 12,83' - 12,832'; 12,798' - 12,8'; 12,766' - 12,768'; 12,732' - 12,733'; 12,74' - 12,75'; 12,67'- 12,671'; 12,638'- 12,639'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING: 7:27-7:41 7:41 7:53.2 Stim, STAGE 14, STIMULATION WOO PP CHANGE OVER TIME. Printed Date: 7/31/215 Printed Time: 9:46 AM

20 Page 2 of 3 7:53 9: Stim, STAGE 14, STIMULATION STIM PP FRAC STAGE 14: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4721 BBLS Slickwater, 1234 BBLS Linear Gel, BBLS, 23548# 1 Mesh, 19138# 4/7, #, #, TOTAL PROP = 42686#, TOTAL LTR = 6183 BBLS. AVG PRES = 5945 PSI, MAX PRES = 698, AVG RATE = 66.1 BPM, MAX RATE = 72.6 BPM, ISIP = 4141 PSI, FG =.9147 PSI/FT. 9:54 11: Stim, STAGE 15, PERFORATE PERF PP PERF STAGE 15: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 186 BBLS PSI. SET 12,611'. PERF'D MIDDLE 12,588' - 12,59'; 12,556' - 12,558'; 12,524' - 12,526'; 12,496' - 12,498'; 12,462' - 12,463'; 12,428' - 12,429'; 12,396'- 12,397'; 12,364'- 12,365'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 11:33 11:45.2 Stim, STAGE 15, CHANGE-OVER WOO PP CHANGE OVER TIME. 11:45 14: Stim, STAGE 16, PERFORATE STIM PP FRAC STAGE 15: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5627 BBLS Slickwater, 1696 BBLS Linear Gel, BBLS, 28628# 1 Mesh, 284# 4/7, #, #, TOTAL PROP = 5728#, TOTAL LTR = 7533 BBLS. AVG PRES = 6265 PSI, MAX PRES = 6764, AVG RATE = 79 BPM, MAX RATE = 8.8 BPM, ISIP = 3991 PSI, FG =.8976 PSI/FT. 14:1 15: Stim, STAGE 16, PERFORATE PERF PP PERF STAGE 16: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 149 BBLS PSI. SET 12,34'. PERF'D MIDDLE 12,314' - 12,316'; 12,284' - 12,286'; 12,25' - 12,252'; 12,224' - 12,226'; 12,194' - 12,195'; 12,164' - 12,165'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 15:39 15:56.29 Stim, STAGE 16, STIMULATION WOO PP CHANGE OVER TIME 15:56 17: Stim, STAGE 17, PERFORATE STIM PP FRAC STAGE 16: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 431 BBLS Slickwater, 1534 BBLS Linear Gel, BBLS, 2381# 1 Mesh, 18842# 4/7, #, #, TOTAL PROP = 42652#, TOTAL LTR = 68 BBLS. AVG PRES = 5932 PSI, MAX PRES = 6568, AVG RATE = 69.6 BPM, MAX RATE = 7.9 BPM, ISIP = 3781 PSI, FG =.8735 PSI/FT. 17:42 19: Stim, STAGE 17, CHANGE-OVER PERF PP PERF STAGE 17: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 157 BBLS PSI. SET 12,142'. PERF'D MIDDLE 12,114' - 12,116'; 12,82' - 12,84'; 12,48' - 12,5'; 12,18' - 12,2'; 11,986-11,987'; 11,954' - 11,955'; 11,922'- 11,923'; 11,892'- 11,893'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:12 19:31.32 Stim, STAGE 17, STIMULATION WOO PP CHANGE OVER TIME 19:31 21: Stim, STAGE 18, PERFORATE STIM PP STAGE 17. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4377 BBLS Slickwater, 1625 BBLS Linear Gel, BBLS, 2388# 1 Mesh, 18796# 4/7, #, #, TOTAL PROP = 42676#, TOTAL LTR = 6183 BBLS. AVG PRES = 6398 PSI, MAX PRES = 7331, AVG RATE = 7.9 BPM, MAX RATE = 72.1 BPM, ISIP = 3727 PSI, FG =.8672 PSI/FT. Printed Date: 7/31/215 Printed Time: 9:46 AM

21 Page 3 of 3 21:22 22: Stim, STAGE 18, PERFORATE PERF PP PERF STAGE 18: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 127 BBLS PSI. SET 11,865'. PERF'D MIDDLE 11,838' - 11,84'; 11,81' - 11,812'; 11,78' - 11,782'; 11,75' - 11,752'; 11,722' - 11,723'; 11,69' - 11,691'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 22:52 22:58.1 Stim, STAGE 18, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 7/31/215 Printed Time: 9:46 AM

22 Page 1 of 3 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/31/215 Report Number: 14 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 225. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $2,28 Cum Field Est To Date (Cost): $691,32 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE 19 THRU 23 : :45.75 Stim, STAGE 18, STIMULATION STIM PP STAGE 18; Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4377 BBLS Slickwater, 1625 BBLS Linear Gel, BBLS, 2388# 1 Mesh, 18796# 4/7, #, #, TOTAL PROP = 42676#, TOTAL LTR = 6183 BBLS. AVG PRES = 6398 PSI, MAX PRES = 7331, AVG RATE = 7.9 BPM, MAX RATE = 72.1 BPM, ISIP = 3727 PSI, FG =.8672 PSI/FT. :45 2: Stim, STAGE 19, PERFORATE PERF PP PERF STAGE 19: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 161 BBLS PSI. SET 11,665'. PERF'D MIDDLE 11,64' - 11,642'; 11,68' - 11,61'; 11,576' - 11,578'; 11,542' - 11,544'; 11,512-11,513'; 11,48' - 11,481'; 11,448'- 11,449'; 11,414'- 11,415'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 2:21 2:39.3 Stim, STAGE 19, CHANGE-OVER WOO PP CHANGE OVER TIME 2:39 4: Stim, STAGE 19, STIMULATION STIM PP STAGE 19. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4377 BBLS Slickwater, 1625 BBLS Linear Gel, BBLS, 2388# 1 Mesh, 18796# 4/7, #, #, TOTAL PROP = 42676#, TOTAL LTR = 6183 BBLS. AVG PRES = 6398 PSI, MAX PRES = 7331, AVG RATE = 7.9 BPM, MAX RATE = 72.1 BPM, ISIP = 3727 PSI, FG =.8672 PSI/FT. 4:36 6: Stim, STAGE 2, CHANGE-OVER PERF PP PERF STAGE 2: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 94 BBLS PSI. SET 11,391'. PERF'D MIDDLE 11,366' - 11,368'; 11,34' - 11,342'; 11,36' - 11,38'; 11,276' - 11,278'; 11,242-11,243'; 11,216' - 11,217'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 6:1 6:27.28 Stim, STAGE 2, STIMULATION WOO PP CHANGE OVER TIME 6:27 9: Stim, STAGE 21, PERFORATE STIM PN STAGE FRAC 2: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4677 BBLS Slickwater, 1226 BBLS Linear Gel, BBLS, 2392# 1 Mesh, 19174# 4/7, #, #, TOTAL PROP = 4376#, TOTAL LTR = 621 BBLS. AVG PRES = 5683 PSI, MAX PRES = 628, AVG RATE = 71.3 BPM, MAX RATE = 72.3 BPM, ISIP = 465 PSI, FG =.969 PSI/FT. UNIVERSAL CHANGE OUT BLEED OFF VALVE: DOWN TIME :52. ( 6:27-7:19 ). Printed Date: 8/1/215 Printed Time: 9:46 AM

23 Page 2 of 3 9:31 11: Stim, STAGE 21, CHANGE-OVER PERF PP PERF STAGE 21: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 113 BBLS PSI. SET 11,191'. PERF'D MIDDLE 11,161' - 11,163'; 11,136' - 11,138'; 11,16' - 11,18'; 11,76' - 11,78'; 11,5-11,51'; 11,16' - 11,17'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER GREASE FRAC VALVES: ( 9:31-1: ). SAFETY MEETING: ( 11:3-11:45 ). 11:45 12:3.3 Stim, STAGE 21, STIMULATION WOO PP CHANGE OVER TIME 12:3 13: Stim, STAGE 22, PERFORATE STIM PP FRAC STAGE 21: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4713 BBLS Slickwater, 1175 BBLS Linear Gel, BBLS, 23248# 1 Mesh, 19198# 4/7, #, #, TOTAL PROP = 42446#, TOTAL LTR = 625 BBLS. AVG PRES = 6141 PSI, MAX PRES = 729, AVG RATE = 69.2 BPM, MAX RATE = 71.3 BPM, ISIP = 3994 PSI, FG =.8991 PSI/FT. 13:55 15: Stim, STAGE 22, CHANGE-OVER PERF PP PERF STAGE 22: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 12 BBLS PSI. SET 1,991'. PERF'D MIDDLE 1,966' - 1,968'; 1,936' - 1,938'; 1,96' - 1,98'; 1,879' - 1,881'; 1,846' - 1,847'; 1,816' - 1,817'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 15:28 15:43.25 Stim, STAGE 22, STIMULATION WOO PP CHANGE OVER TIME 15:43 17: Stim, STAGE 23, PERFORATE STIM PP STAGE FRAC 22: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4453 BBLS Slickwater, 143 BBLS Linear Gel, BBLS, 2434# 1 Mesh, 1954# 4/7, #, #, TOTAL PROP = 4388#, TOTAL LTR = 69 BBLS. AVG PRES = 6248 PSI, MAX PRES = 7331, AVG RATE = 68.7 BPM, MAX RATE = 7.2 BPM, ISIP = 3869 PSI, FG =.8842 PSI/FT. 17:31 19: Stim, STAGE 23, PERFORATE PERF PP PERF STAGE 23: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 98 BBLS PSI. SET 1,796'. PERF'D MIDDLE 1,766' - 1,768'; 1,736' - 1,738'; 1,74' - 1,76'; 1,676' - 1,678'; 1,646' - 1,647'; 1,616' - 1,617'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:5 19:23.3 Stim, STAGE 23, CHANGE-OVER WOO PP CHANGE OVER TIME 19:23 21: Stim, STAGE 24, PERFORATE STIM PP STAGE 23. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 433 BBLS Slickwater, 1394 BBLS Linear Gel, BBLS, 23958# 1 Mesh, 1832# 4/7, #, #, TOTAL PROP = 4199#, TOTAL LTR = 5846 BBLS. AVG PRES = 5976 PSI, MAX PRES = 671, AVG RATE = 7.7 BPM, MAX RATE = 72.1 BPM, ISIP = 3923 PSI, FG =.894 PSI/FT. 21:8 22: Stim, STAGE 24, CHANGE-OVER PERF PP PERF STAGE 24: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 58 BBLS PSI. SET 1,591'. PERF'D MIDDLE 1,566' - 1,568'; 1,532' - 1,534'; 1,56' - 1,58'; 1,476' - 1,478'; 1,446' - 1,447'; 1,416' - 1,417'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. Printed Date: 8/1/215 Printed Time: 9:46 AM

24 Page 3 of 3 22:53 23:.12 Stim, STAGE 24, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/1/215 Printed Time: 9:46 AM

25 Page 1 of 3 Legal Well Name: UNIVERSITY 244 3HM API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/1/215 Report Number: 15 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 226. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,6 Cum Field Est To Date (Cost): $71,632 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC 24 THRU 29 : :48.8 Stim, STAGE 24, STIMULATION STIM PP STAGE 24. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 439 BBLS Slickwater, 1447 BBLS Linear Gel, BBLS, 23972# 1 Mesh, 19524# 4/7, #, #, TOTAL PROP = 43496#, TOTAL LTR = 5927 BBLS. AVG PRES = 6112 PSI, MAX PRES = 6852, AVG RATE = 7.7 BPM, MAX RATE = 72.1 BPM, ISIP = 395 PSI, FG =.8884 PSI/FT :48 2:3 1.7 Stim, STAGE 25, PERFORATE PERF PP PERF STAGE 25: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 85 BBLS PSI. SET 1,391'. PERF'D MIDDLE 1,364' - 1,366'; 1,334' - 1,336'; 1,32' - 1,34'; 1,27' - 1,272'; 1,234' - 1,235'; 1,26' - 1,27'; 1,174' - 1,175'; 1,142' - 1,143'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 2:3 2:37.13 Stim, STAGE 25, STIMULATION WOO PP CHANGE OVER TIME 2:37 5: Stim, STAGE 26, PERFORATE STIM PP STAGE 25. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 439 BBLS Slickwater, 1447 BBLS Linear Gel, BBLS, 23972# 1 Mesh, 19524# 4/7, #, #, TOTAL PROP = 43496#, TOTAL LTR = 5927 BBLS. AVG PRES = 6112 PSI, MAX PRES = 6852, AVG RATE = 7.7 BPM, MAX RATE = 72.1 BPM, ISIP = 395 PSI, FG =.8884 PSI/FT. 5:12 6: Stim, STAGE 26, CHANGE-OVER PERF PP PERF STAGE 26: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 76 BBLS PSI. SET 1,18'. PERF'D MIDDLE 1,88' - 1,9'; 1,62' - 1,64'; 1,28' - 1,3'; 1,2' - 1,4'; 9,972' - 9,973'; 9,942' - 9,943'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 6:47 7:12.42 Stim, STAGE 26, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/2/215 Printed Time: 9:45 AM

26 Page 2 of 3 7:12 8: Stim, STAGE 26, STIMULATION STIM PP STAGE 26 - Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4413 BBLS Slickwater, 1438 BBLS Linear Gel, BBLS, 23712# 1 Mesh, 18996# 4/7, #, #, TOTAL PROP = 4278#, TOTAL LTR = 5951 BBLS. AVG PRES = 5631 PSI, MAX PRES = 69, AVG RATE = 69.2 BPM, MAX RATE = 7.8 BPM, ISIP = 3763 PSI, FG =.8718 PSI/FT. 8:57 1: Stim, STAGE 27, CHANGE-OVER PERF PP PERF STAGE 27: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 6 BBLS PSI. SET 9,917'. PERF'D MIDDLE 9,892' - 9,894'; 9,862' - 9,864'; 9,832' - 9,834'; 9,796' - 9,798'; 9,772' - 9,773'; 9,742' - 9,743'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING: (1:29-1:42 ). 1:42 11:.3 Stim, STAGE 27, STIMULATION WOO PP CHANGE OVER TIME 11: 13: 2. Stim, STAGE 28, PERFORATE STIM PP STAGE 27 - Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4681 BBLS Slickwater, 1884 BBLS Linear Gel, BBLS, 23686# 1 Mesh, 19162# 4/7, #, #, TOTAL PROP = 42848#, TOTAL LTR = 6649 BBLS. AVG PRES = 513 PSI, MAX PRES = 6437, AVG RATE = 66.8 BPM, MAX RATE = 69.9 BPM, ISIP = 3929 PSI, FG =.8912 PSI/FT. 13: 14: Stim, STAGE 28, CHANGE-OVER PERF PP PERF STAGE 28: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 52 BBLS PSI. SET 9,724'. PERF'D MIDDLE 9,692' - 9,694'; 9,662' - 9,664'; 9,634' - 9,636'; 9,62' - 9,64'; 9,572' - 9,573'; 9,538' - 9,539'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 14:38 14:53.25 Stim, STAGE 28, STIMULATION WOO PP CHANGE OVER TIME 14:53 16: Stim, STAGE 29, PERFORATE STIM PP STAGE 28 - Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4499 BBLS Slickwater, 132 BBLS Linear Gel, BBLS, 2361# 1 Mesh, 18984# 4/7, #, #, TOTAL PROP = 42594#, TOTAL LTR = 5895 BBLS. AVG PRES = 5735 PSI, MAX PRES = 639, AVG RATE = 68.7 BPM, MAX RATE = 7.2 BPM, ISIP = 3929 PSI, FG =.8912 PSI/FT. 16:41 18: Stim, STAGE 29, CHANGE-OVER PERF PP PERF STAGE 29: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 58 BBLS PSI. SET 9,517'. PERF'D MIDDLE 9,492' - 9,494'; 9,462' - 9,464'; 9,432' - 9,434'; 9,42' - 9,44'; 9,368' - 9,369'; 9,342' - 9,343'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 18:18 18:3.2 Stim, STAGE 29, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/2/215 Printed Time: 9:45 AM

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Submitted

More information

On May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4.

On May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4. PA IDC Report #2 If the scope of this request had been broader and additional items evaluated the findings may have been different. Please receive and file this report. II. TIMELINE On January 14, 2015,

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi Ballistics on Tractor Conveyance Brian Schwanitz- VP Welltec MENAPS 2011, Abu Dhabi Outline Tractor Activity with Ballisticservices Tractor and Ballistic Safe Sub Operation Addressable Switches and Related

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x Services Gun Shot Coiled Phasing Density Gun Size Explosive Tubing Slick Line Tubing Wireline Deep Big Hole Gun Type (Degrees) (SPF)Max (inches) Type Conveyed Conveyed Conveyed Conveyed Penetrating Thru

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE - 114191 C. A. Rubio P. A. Agudelo: Weatherford Colombia Limited J. E. Peñaloza: Meta Petroleum Limited Houston

More information

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil WIF Categorization Exercise Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil WIF Well Integrity Workshop, May 26, 2011 Category Principles & Colours Category Principle

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A API No.: 35017248570000 OTC Prod. Unit No.: 017-217813

More information

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8 -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8 12UNF Each 6 Vendor Item UOM Qty Uniexcel Sumitomo Sumitomo 7" OD Pup Joint 35 PPF P110-5 ft Long PTB007 Pin X Box Ea 9 7" Integral Cross Over 24" OAL 35ppf VAM TOP Pin x NSCC Box materal AISI Ea 1 USED ITEM 7" Integral

More information

DSI THRU-TUBING INC. Bear Claw Composite Bridge & Frac Plug Systems. Proof in Performance

DSI THRU-TUBING INC. Bear Claw Composite Bridge & Frac Plug Systems. Proof in Performance DSI THRU-TUBING INC Bear Claw Composite Bridge & Frac Plug Systems Proof in Performance Proof in Performance www.dsithrutubing.com CANADA Toll Free Dispatch 855-346-9788 3300, 205 5th Ave SW Calgary T2P

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Composite Plugs. Index

Composite Plugs. Index Composite Plugs Downhole Isolation Tools - Multi-Stage Operations Index Rapid Mill Ball Drop... 1-2 Rapid Mill Flo-Back Flapper... 3-4 Series (Ball Drop, Bridge, Flo-Back, Flo-Back with Bio-Ball)... 5-6

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

FRAC STACKS stingercanada.com

FRAC STACKS stingercanada.com FRAC STACKS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy 11 Red Deer County,

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A API No.: 35051237310000 OTC Prod. Unit No.: 051-212434

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field

1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field 1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field Land critical 7 intermediate casing at near horizontal through notorious

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

ISOLATION/UNIVERSAL TOOLS

ISOLATION/UNIVERSAL TOOLS ISOLATION/UNIVERSAL TOOLS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy

More information

SPE Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation

SPE Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation SPE-184878 Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation D. Cuthill, W. Yang, & J. Hardesty, GEODynamics, Inc. OUTLINE Slide

More information

Drilling & Down-hole Completion Tools

Drilling & Down-hole Completion Tools HYDRAULIC SET PRODUCTION PACKER MODEL: WC-HP-1 & WC-HPL-1[Large Bore] PRODUCT No.: WC-20101 & WC-20112 HP-1 is an industry standard, fully hydrostatic, hydraulic set and shear release single string retrievable

More information

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013 Abandonment BAS-3 Frisia Zout B.V. 4 December 213 Contents BAS-3 status Definitieve afsluiting van caverne BAS-3 verdere plannen Algemene aandachtspunten 2 BAS-3 Start Item Description Well diagram version

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

COMPREHENSIVE OVERVIEW

COMPREHENSIVE OVERVIEW COMPREHENSIVE OVERVIEW stingercanada.com 3 About Stinger 5 Ball Launchers 10 Frac Stacks 17 Buffalo Heads 18 Isolation Tools Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

JTC ENERGY GROUP, LLC. Jarmon #1D

JTC ENERGY GROUP, LLC. Jarmon #1D JTC ENERGY GROUP, LLC Commercial Salt Water Disposal Permit Jarmon #1D (Re-entry of Existing Wellbore API# 177-31597) Summary JTC Energy Group, LLC is offering for sale the Permit for a Commercial Salt

More information

HYDRAULIC WORKOVER SERVICES

HYDRAULIC WORKOVER SERVICES HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

GLOBAL DRILLING SOLUTIONS, INC STOCK LIST

GLOBAL DRILLING SOLUTIONS, INC STOCK LIST GLOBAL DRILLING SOLUTIONS, INC STOCK LIST Item Description Qty in Stock Lighting Equipment LED Flood Light. IECEX Certificed. Explosion proof / Zone & ; Ex d IIB T Gb; IP. / Rated voltage: 00 00VAC, 0/0Hz.

More information

TABLE OF CONTENT. Description

TABLE OF CONTENT. Description TABLE OF CONTENT Description Page OQLH Liner Hanger Packer Combo 1 Set Liner Packer Hydraulic or Mechanical Set 2 Quartus QLG Liner Extension Assembly 3 Quartus Liberty Liner Hangers Single & Dual Cone

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14 Downhole Tools Fangmann Energy Services GmbH & Co. KG Hohe Brietzer Tannen Weg 14 10 49661 29410 Cloppenburg Salzwedel Tel.: Tel.: +49 +49 (0)4471 (0)3901 98008-0 8363-0 Fax: Fax: +49 +49 (0)4471 (0)3901

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

COILED TUBING TOOLS SALE RENTAL - LEASE

COILED TUBING TOOLS SALE RENTAL - LEASE COILED TUBING TOOLS SALE RENTAL - LEASE GTECH Energy Services LLC 67 Pinepath Pl. Spring, Texas 77381 PH: 713-703-2959 Fax: 713-510-1802 sales@gtechenergyservices.com SALES@GTECHENERGYSERVICES.COM 1 PRODUCT

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

2/7-2IS OPEN HOLE WIRELINE LOGGING SUMMARY

2/7-2IS OPEN HOLE WIRELINE LOGGING SUMMARY /7-IS OPEN HOLE WIRELINE LOGGING SUMMARY LOG TYPE RUN # DATE INTERVAL LOGGED (T) INTERVAL LOGGED (B) BIT SIZE BHT TIME ELAPSED S/CIRC (hrs) MUD WEIGHT (ppg) MUD TYPE REMARS DIL/LSS/GR 9/7/89 3465 879 7.5

More information

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators.

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators. T-2 On-Off Tool Classic Oilfield s T-2 On-Off Tool enables the tubing string to be disconnected above a packer for zonal isolation, tubing retrieval, and temporary zone abandonment. The tool contains an

More information

Field Overview. Central West Ecuadorian Basin Discovered in 1994 OOIP: 1,605 MBbls Maximum production rate: 65,200 bopd in year 2007 IPS-12-03

Field Overview. Central West Ecuadorian Basin Discovered in 1994 OOIP: 1,605 MBbls Maximum production rate: 65,200 bopd in year 2007 IPS-12-03 Dynamic Underbalance Perforating in Mature Fields in Ecuador Rafael Rodriguez, Robert Peňaranda - REPSOL YPF Byron Corella, Marcia Benavides Schlumberger Field Overview 320000 340000 360000 380000 Tivacuno

More information