1 Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: AFE DHC: $31,6 Days from Spud: 1 Rig Supervisor Mark Mullinix Daily Costs: $85,55 Field Name: PENWELL Rig Supervisor Mike Willberg This AFE DHC to $85,55 Sec/Twn/Rng: Tool Pusher: ( ) - This AFE CWC to $85,55 Start Depth(ft): Formation: Total Project Costs: $389,9 Ending 124 RKB to MSL: 2926 RKB to Total w/ Assoc AFEs $389,9 TVD: RKB to LMF: RKB to CHF: Daily Mud Costs: $5, Rig Company: CapStar Drilling 24 Hr. Footage: 124 Develop To: Cum Mud Costs: $5, CapStar Rig #22 Location University Land Abstract: 24-Hour Summary/Remarks: MOVE IN AND RIG UP CAPSTAR RIG #22. SPUD WELL AT 17: HRS ON 6/3/211. DRILL SURFACE FROM - 124' '/HR) WITH DOWN TIME FOR THREE WIRELINE SURVEYS. LAST SURVEY AT 996' - 1 DEG. NOTIFIED TRRC OF INTENT TO 6 HOURS 6/28/11. JOB # TRIP OUT OF HOLE SPUD 11" HOLE AT 19:3 HRS ON 6/2/211. DC: $85,55. CWC: $85,55. Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 1 6/3/ /1/ /1/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 7/1/ J Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e 1 1 1% 25 BBL = 15 SXS 25 Circulated No.1 Spacer, 3,, FRESH WATER,,, No.2 Tail,, 45,.125PPS D13,94.PPSD93,.1%D21 3.PPS D42, Class C, 1.34, 14.8 No.3 Displacement, 62.59,, FRESH WATER,,, BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: 6/29/211 Last BOP Drill Date: 7/1/211 BOP Test Due: 7/1/211 Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand //....%.%.%.% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks.. Hours Summary ( Daily / Cumulative ) Drilling 9. 9 Rotatin 9. 9 Trips Circulatin.5 1 Down.5 1 Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: MOVE RIG FROM EPSAU 825 TO EPSAU 826. NOTIFIED TRRC OF INTENT TO MOVE 6 HRS NIH 6/28/11. JOB # : DRILL NEW 11" SURFACE HOLE FROM ' TO 471'. SPUD WELL AT 17: HRS ON 6/3/ : ' -.5 DEG : 4. 2 DRILL F/ 471' TO 91' : ' -.75 DEG : DRILL F/ 91' TO 124' :.5 5 CIRCULATE HOLE CLEAN : ' - 1 DEG :.5 6 TOOH TO RUN SURFACE CASING :3.5 8 REPAIR HYDROLIC LEAK ON BOOM : 1. 6 FINISH TOOH TO RUN SURFACE CASING Total: 24. Drilling Data Hook Load: 72 Pick Up: 74 Slack Off: 7 Over Pull: 2 ROP: Pres on Bot: 844 Press Off Bot: 844 Kickoff Depth: 124 WOB: 45 Rotary RPM: 1 Motor RPM: Torque: BHA Hours: 9. Crew Status: Remarks: Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/1/ Trips 9 $85,55 $85,55 $846, Powered by Production Access Page 1 of 2 7/6/211

2 Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 1 1 6/3/21 11" Varel HE4JMRS Date 6/3/21 Jets 14 / 14 / 14 / / / / / TFA.45 Char / Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 B-55-F / / / Personnel Data Company Service Qty. Hours Company Service Qty. Hours Sierra Engineering Mark Mullinix Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/1/ Trips 9 $85,55 $85,55 $846, Powered by Production Access Page 2 of 2 7/6/211

3 Drilling Report Report No: 2 Report 7/2/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 2 Rpt T. Activity: 2 - Drilling Operation Spud Date: 6/3/211 API Code: AFE DHC: $31,6 Days from Spud: 2 Rig Supervisor Mark Mullinix Daily Costs: $41,75 Field Name: PENWELL Rig Supervisor Mike Willberg This AFE DHC to $127,3 Sec/Twn/Rng: Tool Pusher: ( ) - This AFE CWC to $127,3 Start Depth(ft): 124 Formation: Total Project Costs: $389,9 Ending 175 RKB to MSL: 2926 RKB to Total w/ Assoc AFEs $389,9 TVD: RKB to LMF: RKB to CHF: Daily Mud Costs: $ Rig Company: CapStar Drilling 24 Hr. Footage: 51 Develop To: Cum Mud Costs: $5, CapStar Rig #22 Location University Land Abstract: 24-Hour Summary/Remarks: RIG UP AND RUN 8 5/8" CASING. RAN 24 JOINS OF 8 5/8", 24#, J-55, ST&C, 8RD SURFACE CASING MIX AND PUMP TAIL CEMENT: 45 SXS CLASS C WITH 125 BL/SK D13,.1 BL/SK D BL/SK D42. MIXED AT 14.8 PPG WITH A YIELD OF 1.35 CUFT/SK FOR 63 CUFT. CIRCULATED 25BBL / 15 SXS OF CEMENT TO SURFACE. PLUG 13:48 ON 7/1/11. ELEVATION LANDING JT /8", 24#, J-55, ST&C FLOAT COLLAR 1.2 SHOE JOINT 43.5 GUIDE SHOE.9 TOTAL CENTRALIZERS: 8 RG WERE RUN ON 13, 935, , 31, 175, BASKET - 1 RAN ON 54 WAIT ON CEMENT, BACK OFF NIPPLE UP BOPE. TEST BOP BLIND RAMS. TRIP IN THE HOLE, DRILL CEMENT 2 FT IN TO SHOE, TEST BOPE, DRILL FROM 124 TOTAL DEPTH OF /HR) WITH DOWN TIME FOR RIG SERVICE. DC: $ CWC: $127,3. Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 4 7/2/ /2/ /2/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 7/1/ J Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e 1 1 1% 25 BBL = 15 SXS 25 Circulated No.1 Spacer, 3,, FRESH WATER,,, No.2 Tail,, 45,.125PPS D13,94.PPSD93,.1%D21 3.PPS D42, Class C, 1.34, 14.8 No.3 Displacement, 62.59,, FRESH WATER,,, BOP Test and Inspection Dates Last BOP Test: 7/2/211 Days Since BOP Tested: Last Inspection: 6/29/211 Last BOP Drill Date: 7/2/211 BOP Test Due: 7/2/211 Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand //....%.%.%.% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks.. Hours Summary ( Daily / Cumulative ) Drilling.75 1 Rotatin.75 1 Trips Circulatin 1. 2 Down. 1 Other Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/2/ Drilling 9 $41,75 $127,3 $846, Powered by Production Access Page 1 of 2 7/6/211

4 Drilling Report Report No: 2 Report 7/2/211 : EPSAU 826 Operations Start Hrs Code Remarks Start Depth End Depth Run 6: SAFETY MEETING. RIG UP AND RUN 24 JOINTS 8 5/8" 24# J-55 ST&C R8 CASING ' NIH 124' 9: 1. 5 CIRCULATE HOLE CLEAN. SAFETY MEETING WITH SCHLUMBERGER NIH 1: RIG UP SCHLUMBERGER. PEASURE TEST SCHLUMBERGER. SHUT DOWN, PUMPS ON PUMP NIH TRUCK WERE OVER PRESSURED TO 1,6 PSI. SHUT DOWN FOR INSTRUCTIONS FROM SCHLUMBERGER OFFICE. 11: WAIT ON SCHLUMBERGER ORDERS AND NEW PUMP TRUCK FROM MIDLAND YARD NIH 12: CEMENT SURFACE CASING. MIX AND PUMP TAIL CEMENT: 45 SXS CLASS C WITH 125 BL/SK NIH D13,.1 BL/SK D BL/SK D42. MIXED AT 14.8 PPG WITH A YIELD OF 1.35 CUFT/SK FOR 63 CUFT. CIRCULATED 25BBL / 15 SXS OF CEMENT TO SURFACE. PLUG 13:48 ON 7/1/11. 13: WAIT ON CEMENT. RIG DOWN SCHLUMBERGER NIH 19: BACK OUT LANDING JOINT. NIPPLE UP BOPE NIH 1:.5 15 TEST BOP BLIND RAMS. 25 PSI LOW. 1 PSI HIGH. OK NIH 1: PICK UP BIT 2. TRIP IN THE HOLE NIH 3: DRILL CEMENT, PLUG, COLLAR AND 2' OF CEMENT IN SHOE NIH 4: TEST BOP PIPE RAMS 25 PSI LOW, 1 PSI HIGH. TEST ANNULAR 75 PSI. ALL OK : DRILL CEMENT AND FLOAT SHOE : DRILL FR/ 124 TO Total: 24. Drilling Data Hook Load: 65 Pick Up: 65 Slack Off: 65 Over Pull: ROP: 68. Pres on Bot: 68 Press Off Bot: 68 Kickoff Depth: 175 WOB: 15 Rotary RPM: 1 Motor RPM: Torque: BHA Hours:.75 Crew Status: Remarks: Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 2 2 7/2/211 7 Caprock DSX616S Date 7/3/211 Jets 12 / 12 / 12 / 12 / 12 / 12 / / TFA.66 Char 2 / 2 / WT / NO / A / / 1 / TD Drilling Assembly Component Qty Length OD ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter Sub - Bit Drill collar Stab - IB Drill collar Stab - IB Drill collar Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 B-55-F /126 / / Personnel Data Company Service Qty. Hours Company Service Qty. Hours Sierra Engineering Mark Mullinix Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/2/ Drilling 9 $41,75 $127,3 $846, Powered by Production Access Page 2 of 2 7/6/211

5 Drilling Report Report No: 3 Report 7/3/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 3 Rpt T. Activity: 2 - Drilling Operation Spud Date: 6/3/211 API Code: AFE DHC: $31,6 Days from Spud: 3 Rig Supervisor Mark Mullinix Daily Costs: $7,4 Field Name: PENWELL Rig Supervisor Mike Willberg This AFE DHC to $197,7 Sec/Twn/Rng: Tool Pusher: ( ) - This AFE CWC to $197,7 Start Depth(ft): 175 Formation: Total Project Costs: $389,9 Ending 3266 RKB to MSL: 2926 RKB to Total w/ Assoc AFEs $389,9 TVD: RKB to LMF: RKB to CHF: Daily Mud Costs: $ Rig Company: CapStar Drilling 24 Hr. Footage: 2191 Develop To: Cum Mud Costs: $5, CapStar Rig #22 Location University Land Abstract: 24-Hour Summary/Remarks: DRILL FROM 175 TOTAL DEPTH OF /HR)WITH DOWN TIME FOR RIG REPAIR AND FOUR SURVEYS.LAST SURVEY AT DEG. DC: $74.2. CWC: $21,5. Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 8 7/3/ /3/ /3/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 7/1/ J Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e 1 1 1% 25 BBL = 15 SXS 25 Circulated No.1 Spacer, 3,, FRESH WATER,,, No.2 Tail,, 45,.125PPS D13,94.PPSD93,.1%D21 3.PPS D42, Class C, 1.34, 14.8 No.3 Displacement, 62.59,, FRESH WATER,,, BOP Test and Inspection Dates Last BOP Test: 7/2/211 Days Since BOP Tested: 1 Last Inspection: 6/29/211 Last BOP Drill Date: 7/3/211 BOP Test Due: 7/2/211 Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand //....%.%.%.% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks.. Hours Summary ( Daily / Cumulative ) Drilling Rotatin Trips. 3 Circulatin. 2 Down. 1 Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: 6. 2 DRILL F/ 175' TO 1489' THROUGH ROTATING HEAD WITH SRTONG FLOW STARTING AT 117' : ' DEG :3.5 1 SERVICE RIG : DRILL F/ 1489' TO 1935' THROUGH ROTATING HEAD WITH FLOW : ' - 1 DEG : DRILL F/ 1935' TO 2381' THROUGH ROTATING HEAD WITH FLOW : ' -.75 DEG : DRILL F/ 2381' TO 2823' : ' -.75 DEG : DRILL F/ 2823' TO 3266' Total: 24. Drilling Data Hook Load: 97 Pick Up: 1 Slack Off: 94 Over Pull: 3 ROP: Pres on Bot: 825 Press Off Bot: 825 Kickoff Depth: 3266 WOB: 12 Rotary RPM: 15 Motor RPM: Torque: BHA Hours: Crew Status: Remarks: Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/3/ Drilling 1 $7,4 $197,7 $846, Powered by Production Access Page 1 of 2 7/6/211

6 Drilling Report Report No: 3 Report 7/3/211 : EPSAU 826 Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 2 2 7/2/211 7 Caprock DSX616S Date 7/3/211 Jets 12 / 12 / 12 / 12 / 12 / 12 / / TFA.66 Char 2 / 2 / WT / NO / A / / 1 / TD Drilling Assembly Component Qty Length OD ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter Sub - Bit Drill collar Stab - IB Drill collar Stab - IB Drill collar Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 B-55-F /138 / / Personnel Data Company Service Qty. Hours Company Service Qty. Hours Sierra Engineering Mark Mullinix Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/3/ Drilling 1 $7,4 $197,7 $846, Powered by Production Access Page 2 of 2 7/6/211

7 Drilling Report Report No: 4 Report 7/4/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 4 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: AFE DHC: $31,6 Days from Spud: 4 Rig Supervisor Mark Mullinix Daily Costs: $48,7 Field Name: PENWELL Rig Supervisor Mike Willberg This AFE DHC to $246,4 Sec/Twn/Rng: Tool Pusher: ( ) - This AFE CWC to $246,4 Start Depth(ft): 3266 Formation: Total Project Costs: $389,9 Ending 3984 RKB to MSL: 2926 RKB to Total w/ Assoc AFEs $389,9 TVD: RKB to LMF: RKB to CHF: Daily Mud Costs: $17,55 Rig Company: CapStar Drilling 24 Hr. Footage: 718 Develop To: Cum Mud Costs: $22,55 CapStar Rig #22 Location University Land Abstract: 24-Hour Summary/Remarks: DRILL FROM 3266 TOTAL DEPTH OF 3984 TD /HR) WITH DOWN TIME FOR RIG SERVICE AND THREE SURVEYS.LAST SURVEY AT DEG. CIRCULATE HOLE CLEAN. TOOH TO RUN CASING. Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 8 7/3/ /3/ /3/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 7/1/ J Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e 1 1 1% 25 BBL = 15 SXS 25 Circulated No.1 Spacer, 3,, FRESH WATER,,, No.2 Tail,, 45,.125PPS D13,94.PPSD93,.1%D21 3.PPS D42, Class C, 1.34, 14.8 No.3 Displacement, 62.59,, FRESH WATER,,, BOP Test and Inspection Dates Last BOP Test: 7/2/211 Days Since BOP Tested: 2 Last Inspection: 6/29/211 Last BOP Drill Date: 7/3/211 BOP Test Due: 7/2/211 Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand /25/ % 74.%.%.% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks.. Hours Summary ( Daily / Cumulative ) Drilling 9. 4 Rotatin 9. 4 Trips 4. 7 Circulatin Down. 1 Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ' - 1 DEG : DRILL F/ 3266' TO 3776' : ' -.75 DEG :.5 7 SERVICE RIG : DRILL F/ 3776' TO 3984' 163 HOURS 7/3/ : CIRCULATE HOLE CLEAN WHILE MIXING 3 BBL, 13#, PILL. WELL FLOWING 14 TO 25 BBL PER :15 MINUTE PUMP 13# PILL 15 STROKES TO DISPLACE HOLE VOLUMN AND DRILL PIPE CAPACITY. WELL CONTINUED TO FLOW AND CUT PILL TO 1.9#, THEN CO2 AND WATER FLOW BLEW PILL OUT OF THE HOLE. REGAINED CONTROL OF FLOW WITH CONSTANT CIRCULATION OF 1# BRINE AT 55 STROKES. KILLED CO2 KICK AND REDUCED WATER FLOW TO 148 BBL PER MINUTE. 23: LOST CIRCULATION. FILLED HOLE THROUGH FILL-UP LINE. REGAINED RETURNS BY PUMPNIG THROUGH DRILL STEM BY PUMP 38 VIS AND PAPER SWEEP. 1: CIRCULATE HOLE CLEAN : 4. 6 TRIP OUT OF THE HOLE TO RUN CASING Total: 24. Drilling Data Hook Load: 16 Pick Up: 11 Slack Off: 12 Over Pull: 4 ROP: Pres on Bot: 1 Press Off Bot: 1 Kickoff Depth: 3984 WOB: 28 Rotary RPM: 1 Motor RPM: Torque: BHA Hours: Crew Status: Remarks: Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/4/ Trips 13 $48,7 $246,4 $846, Powered by Production Access Page 1 of 2 7/6/211

8 Drilling Report Report No: 4 Report 7/4/211 : EPSAU 826 Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 2 2 7/2/211 7 Caprock DSX616S Date 7/3/211 Jets 12 / 12 / 12 / 12 / 12 / 12 / / TFA.66 Char 2 / 2 / WT / NO / A / / 1 / TD Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 B-55-F /14 / / Personnel Data Company Service Qty. Hours Company Service Qty. Hours Sierra Engineering Mark Mullinix Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/4/ Trips 13 $48,7 $246,4 $846, Powered by Production Access Page 2 of 2 7/6/211

9 Drilling Report Report No: 5 Report 7/5/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 5 Rpt T. Activity: 1 - Rig Up & Tear Down Operation Spud Date: 6/3/211 API Code: AFE DHC: $31,6 Days from Spud: 5 Rig Supervisor Mark Mullinix Daily Costs: $143,5 Field Name: PENWELL Rig Supervisor Mike Willberg This AFE DHC to $389,9 Sec/Twn/Rng: Tool Pusher: ( ) - This AFE CWC to $389,9 Start Depth(ft): 3984 Formation: Total Project Costs: $389,9 Ending 3984 RKB to MSL: 2926 RKB to Total w/ Assoc AFEs $389,9 TVD: RKB to LMF: RKB to CHF: Daily Mud Costs: $7,6 Rig Company: CapStar Drilling 24 Hr. Footage: Develop To: Cum Mud Costs: $3,15 CapStar Rig #22 Location University Land Abstract: 24-Hour Summary/Remarks: SAFETY MEETING, RIG UP CASING CREW. RUN 93 JOINTS 5 ½" 15.5#, J55, LT&C CASING TO 3984 ELEVATION GUIDE /2", 15.5#, J55, LT&C FLOAT 3897 PACKER 18.7 FIRST /2", 15.5#, J55, LT&C MARKER JOINT MARKER ½", 15.5#, J55, LT&C SECOND 94 MARKER JOINT ½", 15.5#, J55, LT&C PACKER ½", 15.5#, J55, LT&C FLOAT COLLAR ½", 15.5#, J55, LT&C FLOAT SHOE.91 TOTAL = SET AT: WITH 15 REGULAR CENT.AND 15 TURBOS RUN FROM 3963 TO 2613.CENT AND TURBO E/O JT FROM 392 TO 2844, CENT AND TURBO E/SECOND JT. FROM 2757 TO WAIT ON SCHLUMBERGER TRUCKS AND TO DELIVER CEMENT MIX AND PUMP LEAD CEMENT: 5 SXS CLASS 'C' NaCI, WITH 27.52PPSD132,6% D2,.2%D65,.5%D112,.2% D46, 3.PPS D42,.125PPS D13. MIXED AT 12.4PPG, YIELD 2.17 FT3/SK, 876 CU.FT TAIL 3SKS, CLASS 'C', WITH 3%D %D65. 2%DO67, 3PPSDO42,.125PPSD13, MIXED AT 15.2 PPG, YIELD 1.31 FT3/SK,393 CU.FT, TOTAL CEMENT OF 1467 CU.FT CIRCULATED 13 SKS = 5 BBLS TO PIT. NIPPLE DOWN BOPE, SET SLIPS, RELEASE 9:PM 7/4/11, RIG DOWN. DC.: $143,5. CWC: $389,9. Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 8 7/3/ /3/ /3/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 7/1/ J Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e 1 1 1% 25 BBL = 15 SXS 25 Circulated No.1 Spacer, 3,, FRESH WATER,,, No.2 Tail,, 45,.125PPS D13,94.PPSD93,.1%D21 3.PPS D42, Class C, 1.34, 14.8 No.3 Displacement, 62.59,, FRESH WATER,,, Production 7/5/ J Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e 1 3 1% TILL WASH UP. 45% WITH 5 BBL = 5 Circulated No.1 Spacer, 4,, FRESH WATER,,, No.2 Lead,, 5, 35/65 POZ + Naci,27.52pps d132,6%d2, 2.% d65,.5% D112,.2% D46, 3.PPS D42,.125PPS D13, Class C, 2.17, 12.4 No.3 Tail,, 3, 35 D174, 1.1% D65,.2% D67, 3.PPS D42,.125PPSD13, Class C, 1.31, 15.2 No.4 Displacement, 92.89,, FRESH WATER,,, BOP Test and Inspection Dates Last BOP Test: 7/2/211 Days Since BOP Tested: 3 Last Inspection: 6/29/211 Last BOP Drill Date: 7/3/211 BOP Test Due: 7/2/211 Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/5/ Rig Up & Tear Down 13 $143,5 $389,9 $846, Powered by Production Access Page 1 of 2 7/6/211

10 Drilling Report Report No: 5 Report 7/5/211 : EPSAU 826 Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand /25/ % 74.%.%.% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks.. Hours Summary ( Daily / Cumulative ) Drilling. 4 Rotatin. 4 Trips. 7 Circulatin Down. 1 Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: SAFETY MEETING WITH CASING CREW. RIG UP AND RUN 93 JOINTS 5 1/2" 15.5# J-55 LT&C R NIH CASING ' 3984'. 9: CIRCULATE OUT GAS. WAIT ON PACKER NIH 11: FINISH RUNNING PRODUCTION CASING NIH 12: CIRCULATE OUT GAS. WAIT ON SCLUMBERGER TRUCKS AND TAIL CEMENT. SAFETY NIH MEETING WITH SCHLUMBERGER. CIRCULATED H2S SATURATED, BRACKISH WATER. (BLACK WATER) 1 TO 15 PPM H2S ON MONITOER. CLEARED LOCATION OF PERSONEL WHILE ALARMS WERE ON. 16: RIG UP SCHLUMBERGER CEMENT HEAD NIH 16: CIRCULATE THROUGH SCHLUMBERGER HEAD, CIRCULATE OUT GAS. CIRCULATED H2S NIH SATURATED, BRACKISH WATER. (BLACK WATER) 1 TO 15 PPM H2S ON MONITOER. CLEARED 18: LOCATION OF PERSONEL WHILE ALARMS WERE ON CEMENT PREDUCTION CASING. MIX AND PUMP LEAD CEMENT: 5 SXS CLASS 'C' NaCI, WITH NIH 27.52PPSD132,6% D2,.2%D65,.5%D112,.2% D46, 3.PPS D42,.125PPS D13. MIXED AT 12.4PPG, YIELD 2.17 FT3/SK, 876 CU.FT. TAIL 3SKS, CLASS 'C', WITH 3%D %D65. 2%DO67, 3PPSDO42,.125PPSD13, MIXED AT 15.2 PPG, YIELD 1.31 FT3/SK,393 CU.FT, TOTAL CEMENT OF 1467 CU.FT CIRCULATED 13 SKS = 5 BBLS TO PIT. FLOAT HELD. SET PACKERS AT 255 PSI BOTTOM PACKER AND 275 PSI TOP PACKER. 19: NIPPLE DOW BOPE. SET 213 HRS. RELEASE RIG AT 213 HRS. 7/4/11. CUT OFF NIH PRODUCTION CASING. CUT OFF LENGTH = 15.5' 21: 9. 1 RIG DOWN TO MOVE CAPSTAR RIG 22 FROM EPSAU 826 TO EPSAU NIH Total: 24. Drilling Data Hook Load: 16 Pick Up: 11 Slack Off: 12 Over Pull: 4 ROP:. Pres on Bot: 1 Press Off Bot: 1 Kickoff Depth: 3984 WOB: 28 Rotary RPM: 1 Motor RPM: Torque: BHA Hours:. Crew Status: Remarks: Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 B-55-F /14 / / Personnel Data Company Service Qty. Hours Company Service Qty. Hours Sierra Engineering Mark Mullinix Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 7/5/ Rig Up & Tear Down 13 $143,5 $389,9 $846, Powered by Production Access Page 2 of 2 7/6/211

11 9/13/211 Daily Cost: $ Work Type: Completion County, St.: ECTOR, TX Project Cost: $ Operator:rgen Resources Corpora Supervisor: This AFE Cost: $389,9 Total with Assoc: $389,9 Daily Detail : Duran Trucking moved pipe racks and 153 joints of 2 7/8" J-55 Tubing to location, set racks and unloaded tubing. 9/13/211 43EPSAU826 EPSAU 826 Stand By $ $ Page 1 of 1 9/13/211 4:45 PM

12 9/17/211 Daily Cost: $1, Work Type: Completion County, St.: ECTOR, TX Project Cost: $1, Operator:rgen Resources Corpora Supervisor: Ken Lewis This AFE Cost: $39,9 Total with Assoc: $39,9 Daily Detail : Move 3 frac tanks - 2 from 825 and 1 from 824, will fill with Brine. Daily Cost Details Cost Type Code Vendor Remarks Daily Exp Cum Exp IDC - F&C - CEMENT & S Cat Trucking Frersh water Hauling $ $ IDC - F&C - STIMULATIO BNB Consulting Supervision $ $1, IDC - F&C - STIMULATIO BTI Frac Valve $ $1, IDC - F&C - STIMULATIO Cat Trucking Water hauling $1, $1, IDC - F&C - STIMULATIO Duran Trucking haul tubing $ $1, IDC - F&C - STIMULATIO Mico Services, LLC Mico Hauling $ $1, IDC - F&C - STIMULATIO Mico Services, LLC Gas Buster Flowback Tank $ $1, IDC - F&C - STIMULATIO Mico Services, LLC Frac Tanks $ $1, IDC - F&C - STIMULATIO TRM-Energy Services, I Frac Tank $ $1, Total for IDC: $1, $1, Daily / Well Cumulative Total: $1, Total Project Cost: $1, 9/17/211 43EPSAU826 EPSAU 826 Ken Lewis Prep for Acid/Frac $1, $1, Page 1 of 1 9/19/211 1:54 PM

13 9/21/211 Daily Cost: $ Work Type: Completion County, St.: ECTOR, TX Project Cost: $1, Operator:rgen Resources Corpora Supervisor: This AFE Cost: $39,9 Total with Assoc: $39,9 Daily Detail : MOVE WORKOVER UNIT TO WELL, R/U, TALLY TUBING, GET READY TO TIHW TUBING, BIT AND SCRAPPER. 9/21/211 43EPSAU826 EPSAU 826 Rig Up $ $1, Page 1 of 1 9/21/211 1:41 PM

14 9/22/211 Daily Cost: $24,5 Work Type: Completion County, St.: ECTOR, TX Project Cost: $25,5 Operator:rgen Resources Corpora Supervisor: Ken Lewis This AFE Cost: $414,95 Total with Assoc: $414,95 Daily Detail : P/U BIT, SUB AND SCRAPPER, TIHW 12 JTS OF TUBING, TAG ½ OF 12TH JOINT OUT 3,891 FT, R/U PETROPLEX ACIDIZING, PUMP 4 GAL PICKLE ACID SOLUTION, FOLLOWED BY 82 BBL S OF 5% KCL, PUMP AT 2 BPM, ROTATE AND RECIPROCATE TUBING, START 1, GALS OF 15% ACID, CIRCULATE TO SPOT, SHUT DOWN. R/D PETROPLEX, R/U TO PULL TUBING, POUR 5 GALS OF CORROSION INHIBITOR DOWN TUBING AND 1 GALS DOWN CASING, TOHW TUBING LAYING DOWN, SHUTDOWN TO WAIT ON WIRELINE, FORKLIFT ON LOCATION, SEPARATE 12 JTS USED AND PLACE ON SEPARATE RACK, MOVE 33 ADDITIONAL JOINTS TO ADDITIONAL RACK, INSTALL FRAC STACK, PRESSURE STACK ABOVE FRAC VALVE TO 4, PSI HELD, OPEN FRAC VALVE TEST CASING AND FRAC STACK TO 3,8 PSI HELD, SHUTDOWN TO WAIT ON WIRELINE, R/U RENEGADE WIRELINE, TEST LUBRICATOR TO 2,5 PSI HELD, OPEN FRAC VALVE, TIHW WITH WIRELINE CCL, GAMA, AND 4 1 FT PERFORATING GUN LOADED WITH TITAN SDP 22.7 GRAM CHARGES, LOADED 3 SPF, 12 DEG PHASING. TAG, LOG BACK UP TIE INTO 2 SHORT JOINTS (2,627 & 2,91 FT), GO BACK TO TAG, PULL UP, PRESSURE CASING TO 1, PSI, SHOT GUN, PRESSURE TO 7 PSI, TOHW WIRELINE, ALL SHOTS FIRED, CLOSE FRAC VALVE, WAIT ON WIRELINE BLANK CONNECTION, OPEN CASING PSI, START PUMPING DISPLACEMENT, 5 PSI INSTANTLY, CONTINUE TO GAIN 2 BPM 2,5 PSI, BREAK TO 1,2 PSI, INCREASE RATE TO 4.5 BPM 1,2 PSI, PUMP 25 BBL S OF DISPLACEMENT, SHUT DOWN, ISIP 9 PSI, SECURE WELL AND SHUTDOWN FOR DAY. DC:$24,5 CC:$25,5 CWC:$438, CMOL:KL Daily Cost Details Cost Type Code Vendor Remarks Daily Exp Cum Exp IDC - F&C - CEMENT & S Cat Trucking Frersh water Hauling $ $ IDC - F&C - STIMULATIO BNB Consulting Supervision $1, $25,5 IDC - F&C - STIMULATIO BTI Flowback manifold $ $25,5 IDC - F&C - STIMULATIO BTI Frac Valve $ $25,5 IDC - F&C - STIMULATIO BTI Flowback Hand $ $25,5 IDC - F&C - STIMULATIO Cat Trucking Water hauling $ $25,5 IDC - F&C - STIMULATIO Complete Energy Servic Kill Truck $2,5 $25,5 IDC - F&C - STIMULATIO Crown Port-a-Pot $ $25,5 IDC - F&C - STIMULATIO Duran Trucking Fork lift $ $25,5 IDC - F&C - STIMULATIO Lucky Well Service Workover Unit $6, $25,5 IDC - F&C - STIMULATIO Mico Services, LLC Mico Hauling $ $25,5 IDC - F&C - STIMULATIO Mico Services, LLC Gas Buster Flowback Tank $15 $25,5 IDC - F&C - STIMULATIO Mico Services, LLC Frac Tanks $15 $25,5 IDC - F&C - STIMULATIO Permian Services Light Tower $ $25,5 IDC - F&C - STIMULATIO PetroPlex Acidizing Pickle and spot $4,45 $25,5 IDC - F&C - STIMULATIO Remegade Wireline Perforating $7,8 $25,5 IDC - F&C - STIMULATIO TRM-Energy Services, I Frac Tank $5 $25,5 9/22/211 43EPSAU826 EPSAU 826 Ken Lewis Perforate & Breakdown $24,5 $25,5 Page 1 of 2 9/22/211 2:2 PM

15 9/23/211 Daily Cost: $63,8 Work Type: Completion County, St.: ECTOR, TX Project Cost: $88,85 Operator:rgen Resources Corpora Supervisor: Ken Lewis This AFE Cost: $478,75 Total with Assoc: $478,75 Daily Detail : SICP PSI, R/U SLB, START ACID, 377 START, 5 BBL S ACID - 9 BALLS, 3.5 BPM 1,29 PSI, BROKE INCREASED RATE TO 1 BPM 1166 PSI, DROP ALL BALLS, START FLUSH, 18 BALLS ON, BALL OUT SHUTDOWN, SURGE BALLS OFF, RESTART, 54 BALLS ON BALL OUT, SHUTDOWN SURGE, RESTART FINISH FLUSH, ISIP=989 PSI, 5 MIN=843 PSI, 1 MIN=799PSI, 15 MIN=758, SHUTDOWN, AFTER 3 MINS, OPEN 543 PSI. MIN RATE=3.5 BPM, MAX RATE 1 BPM, MAX PRESS=3,965 PSI, MIN PRESS=377 PSI. SURGE OFF ANY BALLS, START FRAC, PREFLUSH PSI, SPACER - 1,36 9 BPM. 2# PPA ON PERF S BPM, 3 # PPA ON PERF S BPM, 4# PPA ON PERF BPM, SHUTDOWN, TRY TO RESTART. MAX PRESSURE, SHUTDOWN. R/U TO FLOW BACK, OPEN TO RESERVE PIT, OPEN FLOW TO PIT, INCREASING RATE AS PRESSURE PERMITS, FLOW CONTINUING WITH LITTLE FLUID, R/D AND RELEASE SLAB AND RENEGADE WIRELINE, CONTINUE FLOW TO PIT, STARTED RECOVERING MORE FLUID, FORMATION GAS, AND CONSIDERABLE SAND, WHILE CONTINUING TO FLOW, SET UP SERVICE PROVIDERS FOR TOMORROW TO CLEAN OUT THE HOLE, FLOW STOPPED, R/U TO RUN TUBING, REOPENED MINIMAL FLOW WITH DECREASING WATER TILL ONLY GAS, SECURE WELL AND SHUTDOWN FOR DAY. DC:$63,33 CC:$88,38 CWC:$541,61 CMOL:KL Daily Cost Details Cost Type Code Vendor Remarks Daily Exp Cum Exp IDC - F&C - CEMENT & S Cat Trucking Frersh water Hauling $5 $5 IDC - F&C - STIMULATIO BNB Consulting Supervision $1, $88,35 IDC - F&C - STIMULATIO BTI Flowback manifold $ $88,35 IDC - F&C - STIMULATIO BTI Frac Valve $ $88,35 IDC - F&C - STIMULATIO BTI Flowback Hand $ $88,35 IDC - F&C - STIMULATIO Cat Trucking Water hauling $ $88,35 IDC - F&C - STIMULATIO Complete Energy Servic Kill Truck $2,5 $88,35 IDC - F&C - STIMULATIO Crown Port-a-Pot $ $88,35 IDC - F&C - STIMULATIO Duran Trucking Fork lift $ $88,35 IDC - F&C - STIMULATIO Lucky Well Service Workover Unit $5, $88,35 IDC - F&C - STIMULATIO Mico Services, LLC Mico Hauling $ $88,35 IDC - F&C - STIMULATIO Mico Services, LLC Gas Buster Flowback Tank $15 $88,35 IDC - F&C - STIMULATIO Mico Services, LLC Frac Tanks $15 $88,35 IDC - F&C - STIMULATIO Permian Services Light Tower $ $88,35 IDC - F&C - STIMULATIO Remegade Wireline Perforating $3,5 $88,35 IDC - F&C - STIMULATIO Schlumberger Pressure Acid ball out and frac $49, $88,35 IDC - F&C - STIMULATIO TRM-Energy Services, I Frac Tank $5 $88,35 IDC - F&C - STIMULATIO V & F Trucking vaccum truks $1,5 $88,35 Total for IDC: $63,8 $88,85 9/23/211 43EPSAU826 EPSAU 826 Ken Lewis Frac $63,8 $88,85 Page 1 of 2 9/23/211 1:56 AM

16 9/27/211 Daily Cost: $9,4 Work Type: Completion County, St.: ECTOR, TX Project Cost: $115,25 Operator:rgen Resources Corpora Supervisor: Ken Lewis This AFE Cost: $55,15 Total with Assoc: $55,15 Daily Detail : 8 PSI SITP, PSI ON CASING, BLOW DOWN TO RESERVE PIT, HIGH H2S CAUSED BY NO WIND FORCED PERSONNEL TO MOVE TO EDGE OF LOCATION, WELL BLEW DOWN, R/U TO SWAB, TAGGED FLUID ON 1ST 1.2 FT FROM SURFACE, PULLED 1,5 FT ALL OIL, LITTLE FOLLOW ON FLOW, H2S STILL A ISSUE, CONTINUED TO MAKE SWAB RUNS, 1,8 FT; 2,2 FT; 3, FT; 3,2 FT, 3,5 FT, OIL CUT 1%, SHUTDOWN FOR 1 MINS, 8TH 3,3 FT STILL 1% CUT - LIMITED FLUID ENTRY DUE TO FAILED HYDRAULIC FRACTURING EFFORTS. LOAD TUBING WITH 2 BBL S OF 1# BRINE, RELEASE AND EQUALIZE PACKER, DUMP 5 GALS OF CORROSION INHIBITOR DOWN CASING, TOHW TUBING LAYING DOWN. L/D PACKER. PUMP 16 BBL S OF 1# BRINE TO FULLY LOAD AND PUMP ADDITIONAL 24 BBL S TO PLACE ON VACUUM. R/D AND MOVE TO EPSAU 168. DC: $9,4 CC:$112,5 CWC: $511,8 CMOL:KL Personnel Data Company Service Qty. Hours Company Service Qty. Hours BNB Consulting Justin Bynum 1. Totals 1.. Daily Cost Details Cost Type Code Vendor Remarks Daily Exp Cum Exp IDC - F&C - CEMENT & S Cat Trucking Frersh water Hauling $ $5 IDC - F&C - STIMULATIO BNB Consulting Supervision $1, $114,75 IDC - F&C - STIMULATIO BTI Flowback Hand $ $114,75 IDC - F&C - STIMULATIO BTI Flowback manifold $ $114,75 IDC - F&C - STIMULATIO BTI Frac Valve $ $114,75 IDC - F&C - STIMULATIO Cat Trucking Water hauling $ $114,75 IDC - F&C - STIMULATIO Complete Energy Servic Kill Truck $2,5 $114,75 IDC - F&C - STIMULATIO Crown Port-a-Pot $5 $114,75 IDC - F&C - STIMULATIO Duran Trucking Fork lift $ $114,75 IDC - F&C - STIMULATIO Globe Energy Services Packer rental and Service $ $114,75 IDC - F&C - STIMULATIO Globe Energy Services Packer rental and service $ $114,75 IDC - F&C - STIMULATIO Lucky Well Service Workover Unit $4, $114,75 IDC - F&C - STIMULATIO Mico Services, LLC Mico Hauling $ $114,75 IDC - F&C - STIMULATIO Mico Services, LLC Gas Buster Flowback Tank $15 $114,75 IDC - F&C - STIMULATIO Mico Services, LLC Frac Tanks $15 $114,75 IDC - F&C - STIMULATIO Permian Services Light Tower $5 $114,75 IDC - F&C - STIMULATIO Remegade Wireline Perforating $ $114,75 IDC - F&C - STIMULATIO Schlumberger Pressure Acid ball out and frac $ $114,75 IDC - F&C - STIMULATIO TRM-Energy Services, I Frac Tank $5 $114,75 IDC - F&C - STIMULATIO V & F Trucking vaccum truks $1, $114,75 Total for IDC: $9,4 $115,25 9/27/211 43EPSAU826 EPSAU 826 Ken Lewis Swab & RD $9,4 $115,25 Page 1 of 2 9/27/211 1:23 PM

17 9/29/211 Daily Cost: $ Work Type: Completion County, St.: ECTOR, TX Project Cost: $115,25 Operator:rgen Resources Corpora Supervisor: Gary Chastain This AFE Cost: $55,15 Total with Assoc: $55,15 Daily Detail : NIPPLE DOWN BOP AND NIPPLE UP GOAT HEAD FOR FRAC. DC: $. CC: $115,25 CWC $511,8 CMOL: KL Personnel Data Company Service Qty. Hours Company Service Qty. Hours BNB Consulting Justin Bynum 1. Totals 1.. 9/29/211 43EPSAU826 EPSAU 826 Gary Chastain NU Frac Stack $ $115,25 Page 1 of 1 9/29/211 11:4 AM

18 9/3/211 Daily Cost: $119,3 Work Type: Completion County, St.: ECTOR, TX Project Cost: $234,55 Operator:rgen Resources Corpora Supervisor: Gary Chastain This AFE Cost: $624,45 Total with Assoc: $624,45 Daily Detail : SICP 6 PSI. HELD PJSM. RIGG UP, PRESSURE TEST LINES TO 5 PSI RIGUP RENEGADE WIRE LINE, SET 51/2" PRODRILL 6K 3769', 3 ' ABOVE ZONE 2 TOP PERF, 125' BELOW ZONE 4 BOTTOM PERF, PRESSURE TEST LUBRICATOR TO 25 PSI INSTALL WL ADAPTOR CAP AND TEST FRAC STACK AND PLUG TO 4 PSI TESTS HELD. PERF 4 INTERVALS FROM 354' TO 3644' AS FOLLOWS.WITH 4" GUN LOADED WITH TITAN 22.7 GM CHARGES ON 12 DEG. PHASING PRESSURE WELBORE TO 1 PS DROPPED TO 3 AFTER PERFORATING Page 1 of ' TO 3513' 2.67 SHOTS/FT' FOR A TOTAL OF 24 HOLES.4 DIAMETER ' TO 3545' 2.63 SHOTS/FT FOR A TOTAL OF 22 SHOTS..32 DIAMETER ' TO 3598' 2.4 SHOTS/FT. FOR A TOTAL OF 12 SHOTS.32 DIAMETER ' TO 3644' 2.89 SHOTS.FT. FOR A TOTAL OF 81 SHOTS.32 DIAMETER SPOT 1 GAL(24, BBL) OF 15% ACID FOLLOWED BY 61 BBLS WATER TO PLACE BOTTOM OF ACID@ 3644' BALL OUT ACID JOB: 2 GAL (48 BBLS.) OF 15% ACID WITH 2 BALLS SPACED THROUGH 8. BBLS/MIN.AVERAGE TREATING PRESSURE 748 PSI VERY LITTLE BALL ACTION,, NO BALL OUT AND DISPLACE TO TOP PERFS. W/ 9..4 BBLS WATER. R/U SCHLUMBERGER. FRAC SAN ANDRES7t (ZONE 4) PERFS (354'-3616') IN SINGLE STAGE 9 -STEP PUMP USING SCHLUMBERGER N2 AND SCHLUMBERGER CLEARFRAC XT- 15-4Q FOR A COMBINED RATE OF 2. BPM. PUMPED A TOTAL OF 58,5 LBS 16/3 JORDAN-UNIMIM PROP, 2725 GALS OF SCHLUMBERGER CLEARFRACXT 3377 GALS OF 2% KCL, 25 GALS OF F-15, 23 MSCF OF N2 I STEPS N2 /FLUID SLURRY VOL Name Rate (bbl/min) Fluid Name Fluid Volume gals Prop. Type and Mesh Avg Treating PSI 1. Preflush 9.2 5% F gals 755 PSI 2. Spacer 12,1 2% KCL 4Q 399 gals 123 PSI 3. Pad 12. ClearFRAC XT-15 4Q 75 gals 1533 PSI 9/3/211 43EPSAU826 EPSAU 826 Gary Chastain Ballout Acid & Frac $119,3 $234,55 9/3/211 11:36 AM

19 9/3/ PPA 12.7 ClearFRAC XT-15 4Q 114 gals 16/3 Jordan-Unimin LB 1559 PSI PPA 13. ClearFRAC XT-15 4Q 155 gals 16/3 Jordan-Unimin LB 1433 PSI PPA 13.2 ClearFRAC XT-15 4Q 1866 gals 16/3 Jordan-Unimin LB 1359 PSI PPA 13.5 ClearFRAC XT-15 4Q 229 gals 16/3 Jordan-Unimin LB 1319 PSI PPA 13.7 ClearFRAC XT-15 4Q 185 gals 16/3 Jordan-Unimin LB 1329 PSI 9. Flush 4. 2% KCL 4Q 2426 gals 988 PSI ISIP PSI, 5 MIN - 988, 1 MIN - 889, 15 MIN BBLS OF LOAD. AVG TREATING PSI- 132 PSI, AVG INJECTION RATE 2.1, MAX TREATING PSI- 138 PSI. OPENED WELL ON A 12/64 CHOKE AT 6: PM WITH 65 PSI ON CASING: DAILY COST- $ 11,3 CUMULATIVE COST- $234,55 CMOL GC CUMULATIVE WELL COST $631,1 UPCOMING: FLOW BACK Personnel Data Company Service Qty. Hours Company Service Qty. Hours BNB Consulting Justin Bynum 1. Totals 1.. Daily Cost Details Cost Type Code Vendor Remarks Daily Exp Cum Exp IDC - F&C - CEMENT & S Cat Trucking Frersh water Hauling $ $5 IDC - F&C - STIMULATIO BNB Consulting Supervision $1, $234,5 IDC - F&C - STIMULATIO BTI Flowback manifold $ $234,5 IDC - F&C - STIMULATIO BTI Flowback Hand $ $234,5 IDC - F&C - STIMULATIO BTI Frac Valve $2,5 $234,5 IDC - F&C - STIMULATIO Cat Trucking Water hauling $ $234,5 IDC - F&C - STIMULATIO Complete Energy Servic Kill Truck $2,5 $234,5 IDC - F&C - STIMULATIO Crown Port-a-Pot $5 $234,5 IDC - F&C - STIMULATIO Duran Trucking Fork lift $ $234,5 IDC - F&C - STIMULATIO Globe Energy Services Packer rental and Service $ $234,5 IDC - F&C - STIMULATIO Globe Energy Services Packer rental and service $ $234,5 IDC - F&C - STIMULATIO Lucky Well Service Workover Unit $4, $234,5 IDC - F&C - STIMULATIO Mico Services, LLC Frac Tanks $15 $234,5 IDC - F&C - STIMULATIO Mico Services, LLC Gas Buster Flowback Tank $15 $234,5 IDC - F&C - STIMULATIO Mico Services, LLC Mico Hauling $ $234,5 IDC - F&C - STIMULATIO Permian Services Light Tower $5 $234,5 IDC - F&C - STIMULATIO Remegade Wireline Perforating $19, $234,5 9/3/211 43EPSAU826 EPSAU 826 Gary Chastain Ballout Acid & Frac $119,3 $234,55 Page 2 of 3 9/3/211 11:36 AM

20 1/1/211 Daily Cost: $5,95 Work Type: Completion County, St.: ECTOR, TX Project Cost: $24,5 Operator:rgen Resources Corpora Supervisor: Gary Chastain This AFE Cost: $634,85 Total with Assoc: $634,85 Daily Detail : PUT WELL ON FLOW BACK 18 ON 14/64" 625 PSI. FLOWED AND RECOVERED 575 OF 71 BBLS. LOAD WATER. & P BBLS OIL IN 12 HRS. PRESSURE DROPPED TP 25 PSI ON 18/64" CHOKE. Up coming: Continue Flow Back DC $595, CC: $24,5 CWC $637,5: CMOL, GC Personnel Data Company Service Qty. Hours Company Service Qty. Hours BNB Consulting Justin Bynum 1. Totals 1.. Daily Cost Details Cost Type Code Vendor Remarks Daily Exp Cum Exp IDC - F&C - EQUIPMENT BTI Flowback Hand $ $2,45 IDC - F&C - EQUIPMENT BTI Frac Valve $2,5 $2,45 IDC - F&C - EQUIPMENT Crown Port-a-Pot $5 $2,45 IDC - F&C - EQUIPMENT Globe Energy Services Packer rental and Service $ $2,45 IDC - F&C - EQUIPMENT Globe Energy Services Packer rental and service $ $2,45 IDC - F&C - EQUIPMENT Mico Services, LLC Frac Tanks $15 $2,45 IDC - F&C - EQUIPMENT Mico Services, LLC Gas Buster Flowback Tank $15 $2,45 IDC - F&C - EQUIPMENT Mico Services, LLC Mico Hauling $ $2,45 IDC - F&C - EQUIPMENT Permian Services Light Tower $5 $2,45 IDC - F&C - HAULING & Cat Trucking Water hauling $ $2,5 IDC - F&C - HAULING & Cat Trucking Frersh water Hauling $ $2,5 IDC - F&C - HAULING & Complete Energy Servic Kill Truck $1,5 $2,5 IDC - F&C - HAULING & Duran Trucking Fork lift $ $2,5 IDC - F&C - HAULING & V & F Trucking vaccum truks $1, $2,5 IDC - F&C - SPECIAL SE Renegade Wireline Perforating $ $ IDC - F&C - SPECIAL SE TRM-Energy Services, I Frac Tank $ $ 1/1/211 43EPSAU826 EPSAU 826 Gary Chastain Flow Back $5,95 $24,5 Page 1 of 4 1/3/211 2:11 PM

21 1/1/211 Flow Test Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 4: PM 4: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 5: PM 6: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 6: PM 7: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 7: PM 8: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 8: PM 9: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 9: PM 1: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 1: PM 11: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! 1/1/211 43EPSAU826 EPSAU 826 Gary Chastain Flow Back $5,95 $24,5 Page 3 of 4 1/3/211 2:11 PM

22 1/1/211 Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 11: PM 12: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 12: AM 1: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 2: AM 3: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 3: AM 4: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 4: AM 5: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 5: AM 6: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! 1/1/211 43EPSAU826 EPSAU 826 Gary Chastain Flow Back $5,95 $24,5 Page 4 of 4 1/3/211 2:11 PM

23 1/2/211 Daily Cost: $4,45 Work Type: Completion County, St.: ECTOR, TX Project Cost: $244,95 Operator:rgen Resources Corpora Supervisor: Gary Chastain This AFE Cost: $634,85 Total with Assoc: $634,85 Daily Detail : CONTINUED ON FLOW 25 PSI. WELL PRODUCED LESS AND LESS FLUID AND MORE. GAS.; PRESSURE INCREASED TO 4 PSI THEN DROPPED BACK TO 25 PSI WITH NO FLUID PRODUCTION. SHUT WELL IN. PRODUCED 48 BBLS WATER AND NO OIL. IN 15 HR. 71 BBL LOAD RECOVERED PLUS 345 BBLS. FOR A TOTAL OF 1 5 BBLS OF WATER. UP COMING: WAIT ON RIG. DC: $445: CC: $24495, CWC:$641,1 CMOL GC Personnel Data Company Service Qty. Hours Company Service Qty. Hours BNB Consulting Justin Bynum 1. Totals 1.. Daily Cost Details Cost Type Code Vendor Remarks Daily Exp Cum Exp IDC - F&C - EQUIPMENT BTI Flowback Hand $ $4,9 IDC - F&C - EQUIPMENT BTI Frac Valve $2,5 $4,9 IDC - F&C - EQUIPMENT Crown Port-a-Pot $5 $4,9 IDC - F&C - EQUIPMENT Globe Energy Services Packer rental and Service $ $4,9 IDC - F&C - EQUIPMENT Globe Energy Services Packer rental and service $ $4,9 IDC - F&C - EQUIPMENT Mico Services, LLC Mico Hauling $ $4,9 IDC - F&C - EQUIPMENT Mico Services, LLC Gas Buster Flowback Tank $15 $4,9 IDC - F&C - EQUIPMENT Mico Services, LLC Frac Tanks $15 $4,9 IDC - F&C - EQUIPMENT Permian Services Light Tower $5 $4,9 IDC - F&C - HAULING & Cat Trucking Water hauling $ $3,5 IDC - F&C - HAULING & Cat Trucking Frersh water Hauling $ $3,5 IDC - F&C - HAULING & Duran Trucking Fork lift $ $3,5 IDC - F&C - HAULING & V & F Trucking vaccum truks $1, $3,5 IDC - F&C - SPECIAL SE Renegade Wireline Perforating $ $ IDC - F&C - SPECIAL SE TRM-Energy Services, I Frac Tank $ $ IDC - F&C - STIMULATIO Schlumberger Pressure Acid ball out and frac $ $234,5 IDC - F&C - COMPLETIO Lucky Well Service Workover Unit $ $ IDC - RESERVOIR TESTI BTI flow back Flowback manifold $1, $2, IDC - DRILLING OVERH Chastain Consulting Supervision $ $ Total for IDC: $4,45 $245,55 Daily / Well Cumulative Total: $4,45 Total Project Cost: $245,55 1/2/211 43EPSAU826 EPSAU 826 Gary Chastain Flow Back $4,45 $244,95 Page 1 of 3 1/3/211 2:13 PM

24 1/2/211 Flow Test Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 7: AM 8: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 8: AM 9: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 9: AM 1: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 1: AM 11: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 11: AM 12: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 11: AM 12: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 12: PM 1: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! 1/2/211 43EPSAU826 EPSAU 826 Gary Chastain Flow Back $4,45 $244,95 Page 2 of 3 1/3/211 2:13 PM

25 1/2/211 Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 1: PM 2: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 2: PM 3: PM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate 4 15 Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! Start Time End Time Tubing Size Tubing Depth Perf 1 Perf 2 Perf 3 Oil Gravity Chlorides 6: AM 7: AM Flow Period Choke Size FTP FCP Oil Rate Gas Rate Water Rate Gas Inj Inj Pressure Initial Rate Final Rate Volumes Oil Gas Water Gas Inj Daily Total Oil Total Gas Total Water GOR Rates #Num! 1/2/211 43EPSAU826 EPSAU 826 Gary Chastain Flow Back $4,45 $244,95 Page 3 of 3 1/3/211 2:13 PM

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A 4.2 Formation Multi-Test (FMT) Analysis Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A summary 6. DRILL STEM TESTING A dual

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi Ballistics on Tractor Conveyance Brian Schwanitz- VP Welltec MENAPS 2011, Abu Dhabi Outline Tractor Activity with Ballisticservices Tractor and Ballistic Safe Sub Operation Addressable Switches and Related

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

Composite Plugs. Index

Composite Plugs. Index Composite Plugs Downhole Isolation Tools - Multi-Stage Operations Index Rapid Mill Ball Drop... 1-2 Rapid Mill Flo-Back Flapper... 3-4 Series (Ball Drop, Bridge, Flo-Back, Flo-Back with Bio-Ball)... 5-6

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

HYDRAULIC WORKOVER SERVICES

HYDRAULIC WORKOVER SERVICES HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

ISOLATION/UNIVERSAL TOOLS

ISOLATION/UNIVERSAL TOOLS ISOLATION/UNIVERSAL TOOLS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET. RKB-MSL: 18m RIG: WEST ALPHAk FORMATION PRESSURE SO<PSIA) SOXPSIA) HP(PSIA) NORMAL TEST ,1 5776,3

SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET. RKB-MSL: 18m RIG: WEST ALPHAk FORMATION PRESSURE SO<PSIA) SOXPSIA) HP(PSIA) NORMAL TEST ,1 5776,3 Well 7-9 Formation Pressures (RFT) r i WELL NO: 7-9 PRESSURE UNITS: PSIA SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET RKB-MSL: 8m RIG: WEST ALPHAk PAGE OF: WITNESSED BY: BAa & TOR DATE: -9 RUN* A TEST* DEPTH

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

WLTC Retrievable Bridge Plug

WLTC Retrievable Bridge Plug service Tools WLTC Retrievable Bridge Plug The WLTC Retrievable Bridge Plug is designed to perform all tasks normally required of a tubing run packer-type bridge plug and can be quickly converted to run

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

TAM-J. Highest reliability multiple-set inflatable packer system available. Element sizes for 2-3/8 tubing through 30 casing

TAM-J. Highest reliability multiple-set inflatable packer system available. Element sizes for 2-3/8 tubing through 30 casing TAM-J Multiple Set In f l ata b l e Packer System Highest reliability multiple-set inflatable packer system available Element sizes for 2-3/8 tubing through 30 casing Easy conversion to straddle tool ISO

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

Special Features. u By-pass below upper slips to wash. debris when valve is opened. u By-pass is opened before upper slips.

Special Features. u By-pass below upper slips to wash. debris when valve is opened. u By-pass is opened before upper slips. Quality We Know Downhole. ASI-X Packer The D&L ASI-X Packer is the most versatile of the mechanically set retrievable packers and may be used in any production application. The ASI-X Packer is suited for

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

Casing Scraper. Service Equipment. Features

Casing Scraper. Service Equipment. Features Casing Scraper The Casing Scraper is a spring type, mechanical casing scraper, featuring a large by-pass area between the blades to allow circulation of debris. The body is constructed of the highest quality

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Submitted

More information