Current Depth. Proposed TD. Current Operation

Size: px
Start display at page:

Download "Current Depth. Proposed TD. Current Operation"

Transcription

1 Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University F Andrews Move In; Rig Up 11,1' $186,355 $186,355 $1,252,726 $186,355 $2,793,476 1/19/15 Rig Mo Sendero Rig #3University F Andrews Move In; Rig Up 11,1' $26,919 $213,274 $1,252,726 $213,274 $2,793,476 1/2/15 Rig Mo Sendero Rig #3University F Andrews Move In; Rig Up 11,1' $3,196 $216,47 $1,252,726 $216,47 $2,793,476 Cum Drilling Cost Dry Hole AFE All Costs Total AFE 1/21/15 Sendero Rig #3University F Andrews 1/2/15 1:3 PM Spud 11,1' $38,223 $254,693 $1,252,726 $254,693 $2,793,476 1/21/15 1 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 1 DRILLING 1,24 11,1' $38,223 $254,693 $1,252,726 $254,693 $2,793,476 1/22/15 2 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 2 Cement surface casing 1,668 11,1' $99,348 $354,41 $1,252,726 $354,41 $2,793,476 1/23/15 3 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 3 Drill Cement and shoe 1,668 11,1' $75,715 $429,755 $1,252,726 $429,755 $2,793,476 1/24/15 4 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 4 Drilling Ahead 3,332 11,1' $24,218 $453,973 $1,252,726 $453,973 $2,793,476 1/25/15 5 Sendero Rig #3University F Andrews 1/2/15 1:3 PM ,725 11,1' $27,119 $481,92 $1,252,726 $481,92 $2,793,476 1/26/15 6 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 6 Running Casing 5,59 11,1' $51,25 $532,342 $1,252,726 $532,342 $2,793,476 1/27/15 7 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 7 TIH 5,59 11,1'. $161,673 $694,15 $1,252,726 $694,15 $2,793,476 1/28/15 8 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 8 Drilling ahead 6,51 11,1' $29,911 $723,926 $1,252,726 $723,926 $2,793,476 1/29/15 9 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 9 Drilling ahead 7,446 11,1' $38,369 $762,295 $1,252,726 $762,295 $2,793,476 1/3/15 1 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 1 Drilling Ahead 8,617 11,1' $26,161 $788,456 $1,252,726 $788,456 $2,793,476 1/31/15 11 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 11 Trip for bit and motor 9,163 11,1' $32,215 $82,671 $1,252,726 $82,671 $2,793,476 2/1/15 12 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 12 Drilling 9,837 11,1' $26,936 $847,67 $1,252,726 $847,67 $2,793,476 2/2/15 13 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 13 Trip for directional tools 1,37 11,1' $21,815 $869,422 $1,252,726 $869,422 $2,793,476 2/3/15 14 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 14 Drilling 1,46 11,1' $54,527 $923,949 $1,252,726 $923,949 $2,793,476 2/4/15 15 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 15 Circulate for logs 1,96 11,1' $36,395 $96,344 $1,252,726 $96,344 $2,793,476 2/5/15 16 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 16 Logging 1,96 11,1' $38,725 $999,69 $1,252,726 $999,69 $2,793,476 2/6/15 17 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 17 Wash and ream 1,96 11,1' $4,333 $1,39,42 $1,252,726 $1,39,42 $2,793,476 2/7/15 18 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 18 Rig up loggers 1,96 11,1' $39,712 $1,79,114 $1,252,726 $1,79,114 $2,793,476 2/8/15 19 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 19 Rig up lay down machine 1,96 11,1' $54,8 $1,133,914 $1,252,726 $1,133,914 $2,793,476 2/9/15 2 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 2 Run 5 1/2 production casing 1,96 11,1' $18,67 $1,152,584 $1,252,726 $1,152,584 $2,793,476 2/1/15 21 Sendero Rig #3University F Andrews 1/2/15 1:3 PM 21 Rig down 11,1'. $33,932 $1,186,516 $1,252,726 $1,416,36 $2,793,476

2 THREE RIVERS OPERATING COMPANY Estimated Costs and Authorization for Expenditure (AFE) Cost Center County Andrews Date 5/13/214 Well Name University F 1541 State Texas AFE No Legal Desc BLK 1 Sec 15 Depth 11,1' AFE Type D&C Field South Andrews API# Budget Year 214 Objective CLFK, SPBY, WFMP, PENN, MISS, DVNNWI % 1% Est Start Date 8/5/214 Description D&C to 11,1' to test CLFK, SPBY, WFMP, PENN, MISS, DVNN, WC Sub Acct Intangible Costs Dry Hole Completion Total 1 Legal & Title Opinion $15, $15, 11 Staking & Permitting $3,5 $3,5 12 Location Roads Damages $55, $15, $7, 13 Rig Mobilization $55, $55, 14 Rig Daywork $337,5 $41,25 $378,75 15 Rig Footage 16 Power & Fuel $42,5 $42,5 17 Water & Water Well $52,5 $4, $92,5 18 Mud Chemicals & Fluids $71, $71, 19 Mud Cuttings & Water Disposal $15,5 $45, $6,5 11 Bits, Reamer, Stabilizers $68,5 $2,5 $71, 111 Directional Tools & Service 112 Cement & Cementing Services $57, $65, $122, 113 Mud Logging $15,5 $15,5 114 Open Hole Logging $35, $35, 115 Form Eval - Well Testing DST 116 Tubular Inspection $1, 2,5 $12,5 118 Cased Hole Logging, Perf & Svs $65, $65, 119 Frac Tanks $55, $55, 12 Csg Crews & Tools-Drive Hammer $29,75 15, $44, Formation Evaluation 122 Formation Stimulatn Acid Frac $45, $45, 123 Transportation $22, $8,5 $3,5 124 Flowback Contractor $3, $3, 125 Kill Trucks $13,5 $13,5 126 Equipment Rental $27,5 $4, $67,5 127 Contract Labor & Serivces $1,52 $8,5 $19,2 128 Wellsite Consultant $29,55 $33, $62, Company Supervision & Labor $5, $3, $8, 13 Overhead 131 Unanticipated MajExp Fishing 132 Environmental & Safety Costs $12,6 $12,6 133 Insurance $4,85 $4, Other Specialized Services $1,5 $8, $9,5 135 Misc Supplies & Materials $2,5 $5, $7,5 199 Contingency $42,5 $4, $82,5 Intangible Subtotal $1,21,725 $985,75 $2,7,475

3 THREE RIVERS OPERATING COMPANY Estimated Costs and Authorization for Expenditure (AFE) Cost Center County Andrews Date 5/13/214 Well Name University F 1541 State Texas AFE No Legal Desc BLK 1 Sec 15 Depth 11,1' AFE Type D&C Field South Andrews API# Budget Year 214 Objective CLFK, SPBY, WFMP, PENN, MISS, DVNNWI % 1% Est Start Date 8/5/214 Description D&C to 11,1' to test CLFK, SPBY, WFMP, PENN, MISS, DVNN, WC Sub Acct Tangible Costs Dry Hole Completion Facilities Total 2 Drive Pipe Conductor Casing 21 Surface Casing $63,251 63, Intermediate Casing $144, 144, 23 Liner Casing 24 Subs Flt Eqpt Centralizers Etc $4,25 4,25 25 Wellhead / Tree $14,5 $12, 26,5 26 Sub Surface Equipment $1, 1, 27 Production Casing $165, 165, 28 Tubing $5, 5, 29 Rods $55, 55, 21 Downhole Pumps $1, 1, 213 Pumping Unit & Jet Pumps 75, 75, 214 Engines & Motors 215 Sales Gathering Line 216 Separation Equipment 2, 2, 217 Oil Treating Heating Equipment 218 Gas Treating Dehy Equipment 219 Tanks Walkways & Stairs 5, 5, 22 Meters & Meter Runs 5, 5, 221 Electrical Equip Install 35, 35, 222 Flowlines 2, 2, 223 Piping & Valves 18, 18, 224 Surface Pumps 5, 5, 225 Automation Telemetry Equipment 5, 5, 226 Site - Roads Fences Gates Cattleguards 5, 5, 227 Installation Costs 1, 1, 132 Environmental & Safety Costs 135 Misc Supplies & Materials 5, 5, 199 Contingency $5, 5, Tangible Subtotal $231,1 $32, $253, $786,1 Total AFE Costs $1,252,726 $1,287,75 $253, $2,793,476 Company Interest Approved by Date Three Rivers Operating Company 1.% Prepared by Drilling Prepared by Operations Operations Approved Engineering Approved Geology Approved Land Approved Management Approved Date Date Date Date Date Date Date Gross AFE Dry Hole $1,252,726 Net AFE Dry Hole $1,252,726 Gross AFE Completion & Facilities $1,54,75 Net AFE Completion & Facilities $1,54,75 Gross AFE Total $2,793,476 Net AFE Total $2,793,476

4 3ROCII MATERIAL TRANSFER Date: MT # From Location: (Property Name) From AFE#: Hauled By: To Location: (Property Name) To AFE#: Remarks: CONDITION UNIT ITEM DESCRIPTION (A,B,C,D,E) JOINTS QUANTITY PRICE TOTAL Condition: A-New: B- Used/Premium C- New or used, but rquires re-work: STATE TAX D- New or used, sub-grade E- Junk COUNTY TAX TOTAL Issued By: DATE: Approved By: DATE:

5 3ROCII MATERIAL TRANSFER Date: MT # From Location: (Property Name) From AFE#: Hauled By: To Location: (Property Name) To AFE#: Remarks: CONDITION UNIT ITEM DESCRIPTION (A,B,C,D,E) JOINTS QUANTITY PRICE TOTAL Condition: A-New: B- Used/Premium C- New or used, but rquires re-work: STATE TAX D- New or used, sub-grade E- Junk COUNTY TAX TOTAL Issued By: DATE: Approved By: DATE:

6 3ROCII Water & Disposal Tracker WELL University F 1541 AFE# Please contact any of the following people for water delivery or fluid disposal : BASIC J.J : or consult the on-call list sent weekly by JEFF SHAMBLIN BRINE RIG WATER HAULED IN DATE DSM CALLING for SERVICE WATER VOLUME HAULED IN (BBLS) PERSON CONTACTED FOR WATER REQUEST, or whomever "on-call") CONTRACTOR DELIVERING WATER (Company Name) WATER SOURCE CONTRACTOR REPRESENTATIVE DELIVERING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) RIG WATER DISPOSAL DATE DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL (i.e Kent, Joe, Chris, Jon, or whomever "on-call") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number 1/26/15 17: Anthony Polk 5. Polo Camacho Carnalitos Trucking RBJ and Associates LLC Raul Ramirez 2165/21651 $1,72. Make room to jet working pits 1/26/15 17: Anthony Polk 5. Polo Camacho Carnalitos Trucking RBJ and Associates LLC Uriel Maldonado 2158/21581 $1,72. Make room to jet working pits 1/26/15 17: Anthony Polk 5. Polo Camacho Carnalitos Trucking RBJ and Associates LLC Jesus De Leon 21153/21154 $1,72. Make room to jet working pits Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $. 15. $5,16.

7 3ROCII Water & Disposal Tracker WELL AFE# University F FRESH WATER RIG WATER HAULED IN DATE DSM CALLING BBLS PERSON CONTACTED FOR WATER REQUEST PUT NAME OF WHO YOU CALLED CONTRACTOR WATER SOURCE CONTRACTOR REPRESENTATIVE DELIVERING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) WATER DISPOSAL DATE DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL (i.e Kent, Joe, Chris, Jon, or whomever "on-call") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) ULED IN (BBLS) HAULED IN ($). SPOSED (BBLS) $. F DISPOSAL ($). $.

8 3ROCII Water & Disposal Tracker WELL AFE# University F WATER WELL METER WATER METER TRACKER SERIAL # NO METER ON PUMP WATER VOLUME DATE METER START - METER END PUMPED IN WATER WELL RECEIVE WATER FROM WATER LINE SUPPLIER PERSON OPERATING METER TOTAL BBLS PUMPED COST PER BBL $.4 XBBLS PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) RIG WATER DISPOSAL DATE DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL JJ or whomever "oncall") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $.. $.

9 3ROCII Water & Disposal Tracker WELL AFE# University F TRANSFER PITS WATER VOLUME DATE TRUCKING CO HAULING HAULED IN INVOICE NUMBER FRESH WATER OR BRINE COMPANY REP TOTAL BBLS HAULED Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) RIG WATER DISPOSAL DATE DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL JJ or whomever "oncall") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $.. $.

10 University F 1541 AFE# DATE: 1/21/15 University F 1541 AFE# DATE: 1/25/15 University F 1541 AFE# DATE: 2/7/15 CSG SET /21/215 CSG SET 559 1/25/215 CSG SET 1947 Surf Csg Size, wt, grade Int Csg Size, wt, grade Prod Csg Size, wt, grade 13 3/8, 54.5# J-55 LTC 8 5/8, 32#, HCK-55/J-55 LTC 5 1/2", 2# L-8, LTC Item # Centr. Top Item # Centr. Top Item # Centr. Top TX SHOE SHOE Centr SHOE Centr F.C Centr Float Float Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr bad Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Out Out

11 University F 1541 AFE# DATE: 1/21/15 University F 1541 AFE# DATE: 1/25/15 University F 1541 AFE# DATE: 2/7/15 CSG SET /21/215 CSG SET 559 1/25/215 CSG SET 1947 Surf Csg Size, wt, grade Int Csg Size, wt, grade Prod Csg Size, wt, grade 13 3/8, 54.5# J-55 LTC 8 5/8, 32#, HCK-55/J-55 LTC 5 1/2", 2# L-8, LTC Item # Centr. Top Item # Centr. Top Item # Centr. Top

12 University F 1541 AFE# DATE: 1/21/15 University F 1541 AFE# DATE: 1/25/15 University F 1541 AFE# DATE: 2/7/15 CSG SET /21/215 CSG SET 559 1/25/215 CSG SET 1947 Surf Csg Size, wt, grade Int Csg Size, wt, grade Prod Csg Size, wt, grade 13 3/8, 54.5# J-55 LTC 8 5/8, 32#, HCK-55/J-55 LTC 5 1/2", 2# L-8, LTC Item # Centr. Top Item # Centr. Top Item # Centr. Top

13 Well Name University F 154 THREE RIVERS OPERATING COMPANY II LLC. County SPUD DATE: 1/2/15 AFE #: Rig Release WI % H or K Drilling Time AFE AMNT Intangible Dr GEN ACCT SUB ACCT INTANGIBLE DRILLING COSTS D Keep Legal & Title Opinion D Keep Staking & Permitting D Keep Location Roads Damages D Keep Rig Mobilization D Keep Rig Daywork / Footage D Hide Rig Turnkey D Keep Power & Fuel D Keep Water & Water Well D Keep Mud Chemicals & Fluids D Keep Mud Cuttings & Water Disposal D Keep Bits, Reamer, Stabilizers D Keep Directional Tools & Service D Keep Cement & Cementing Services D Keep Mud Logging D Keep Open Hole Logging D Hide Form Eval - Well Testing DST D Keep Tubular Inspection D Hide Cased Hole Logging, Perf & Svs D Keep Frac Tanks D Keep Csg Crews & Tools-Drive Hammer D Hide Formation Evaluation D Hide Formation Stimulatn Acid Frac D Keep Transportation D Hide Flowback Contractor D Hide Kill Trucks D Keep Equipment Rental D Keep Contract Labor & Serivces D Keep Wellsite Consultant D Keep Company Supervision & Labor D Hide Overhead D Hide Unanticipated MajExp Fishing D Keep Environmental & Safety Costs D Keep Insurance D Keep Other Specialized Services D Keep Misc Supplies & Materials D Keep Contingency.. Hide Temperature Survey D.. Keep SUB-TOTAL INTANGIBLE DRILLING COSTS D.. Tangible Drilling TANGIBLE DRILLING COSTS

14 D Hide Drive Pipe Conductor Casing D Keep Surface Casing D Keep Intermediate Casing D Hide Liner Casing D Keep Subs Flt Eqpt Centralizers Etc D Keep Wellhead / Tree D Keep Sub Surface Equipment.. Hide D.. Keep SUB-TOTAL TANGIBLE DRILLING COSTS C.. Intangible Completion INTANGIBLE COMPLETION COSTS C Hide Legal & Title Opinion C Hide Staking & Permitting C Keep Location Roads Damages C Hide Rig Mobilization C Keep Completion Rig C Hide Rig Turnkey C Hide Power & Fuel C Keep Water & Water Well C Hide Mud Chemicals & Fluids C Keep Mud Cuttings & Water Disposal C Keep Bits, Reamer, Stabilizers C Hide Directional Tools & Service C Keep Cement & Cementing Services C Keep Tubular Inspection C Keep Cased Hole Logging, Perf & Svs C Keep Frac Tanks C Keep Csg Crews & Tools-Drive Hammer C Hide Formation Evaluation C Keep Formation Stimulatn Acid Frac C Keep Transportation C Keep Flowback Contractor C Keep Kill Trucks C Keep Equipment Rental C Keep Contract Labor & Serivces C Keep Wellsite Consultant C Keep Company Supervision & Labor C Hide Overhead C Hide Unanticipated MajExp Fishing C Hide Environmental & Safety Costs C Hide Insurance C Keep Other Specialized Services C Keep Misc Supplies & Materials C Keep Contingency.. Hide C.. Keep SUB-TOTAL INTANGIBLE COMPLETION COSTS C.. Tangible Completion TANGIBLE COMPLETION COSTS C Hide Subs Flt Eqpt Centralizers Etc

15 C Keep Wellhead / Tree C Keep Sub Surface Equipment C Keep Production Casing C Keep Tubing C Keep Rods C Keep Downhole Pumps.. Hide C.. Keep SUB-TOTAL TANGIBLE COMPLETION COSTS F.. Production Equipment PRODUCTION EQUIPMENT F Keep Pumping Unit & Jet Pumps F Hide Engines & Motors F Hide Sales Gathering Line F Keep Separation Equipment F Hide Oil Treating Heating Equipment F Hide Gas Treating Dehy Equipment F Keep Tanks Walkways & Stairs F Keep Meters & Meter Runs F Keep Electrical Equip Install F Keep Flowlines F Keep Piping & Valves F Keep Surface Pumps F Keep Automation Telemetry Equipment F Keep Site - Roads Fences Gates Cattleguards F Keep Installation Costs F Hide Environmental & Safety Costs F Keep Misc Supplies & Materials F Keep Contingency.. Hide F.. Keep SUB-TOTAL PRODUCTION EQUIPMENT.. Totals TOTALS.. Keep GRAND TOTAL.. Keep Dry Hole Total.. Keep Completion Total.. Keep Facility Total

16 Andrews DATE 1/18/215 1/19/215 1/2/215 1/21/215 1/22/215 1/2/ DAYS 1 PLANNED 1% ' ' ' ' ' 11,1' $2,793,476 ACTUAL ' ' ' ' ' AFE AMNT EST. CUM. 1/18/215 1/19/215 1/2/215 1/21/215 1/22/215 1/2/215 $15, $15, $15, $3,5 $3,5 $3,5 $55, $55, $55, $55, $78,25 $78,25 $337,5 $331,937 $11,8 $11,8 $3,196 $1,141 $ $ $42,5 $39,142 $9,633 $52,5 $23,68 $1,5 $71, $7,44 $21 $15,5 $216 $216 $68,5 $58,22 $1, $ $34, $57, $77,229 $15,5 $15,6 $35, $56,289 $ $ $1, $5,27 $ $ $ $1,38 $6 $6 $6 $29,75 $17,28 $ $ $ $22, $9,554 $425 $465 $ $ $ $ $27,5 $31,555 $1,295 $1,83 $1,295 $1,52 $2,197 $455 $29,55 $57,5 $2,5 $2,5 $2,5 $5, $ $ $ $12,6 $16,7 $12,6 $4,85 $4,85 $4,85 $1,5 $1,5 $1,5 $2,5 $4 $42,5 $ RIG MOVE & RIG UP TRACKING End Date Day 1 $1,21,725 $1,5,761 $186,355 $26,919 $3,196 $ $ $35,171 AFE AMNT EST. CUM. 1/18/215 1/19/215 1/2/215 1/21/215 1/22/215 1/2/215

17 $ $ $63,251 $49,712 $144, $85,547 $ $ $4,25 $2,61 $14,5 $98 $ $24,898 $3,53 $226,1 $163,675 $ $ $ $ $ $3,53 AFE AMNT EST. CUM. 1/18/215 1/19/215 1/2/215 1/21/215 1/22/215 1/2/215 $ $ $ $ $15, $ $ $ $41,25 $ $ $ $ $ $4, $ $ $ $45, $ $2,5 $ $ $ $65, $63,919 $2,5 $ $65, $ $55, $ $15, $16,945 $ $ $45, $ $8,5 $ $3, $ $13,5 $ $4, $ $8,5 $ $33, $ $3, $ $ $ $ $ $ $ $ $ $8, $ $5, $ $4, $ $985,75 $8,864 $ $ $ $ $ $ AFE AMNT EST. CUM. 1/18/215 1/19/215 1/2/215 1/21/215 1/22/215 1/2/215 $ $

18 $12, $3,918 $1, $ $165, $145,8 $5, $ $55, $ $1, $ $32, $148,926 $ $ $ $ $ $ AFE AMNT EST. CUM. 1/18/215 1/19/215 1/2/215 1/21/215 1/22/215 1/2/215 $75, $ $ $ $ $ $2, $ $ $ $ $ $5, $ $5, $ $35, $ $2, $ $18, $ $5, $ $5, $ $5, $ $1, $ $ $ $5, $ $5, $ $258, $ $ $ $ $ $ $ AFE AMNT EST. CUM. 1/18/215 1/19/215 1/2/215 1/21/215 1/22/215 1/2/215 $2,793,476 $1,399,226 $186,355 $26,919 $3,196 $ $ $38,223 $1,247,726 $1,169,436 $186,355 $26,919 $3,196 $ $ $38,223 $1,287,75 $229,79 $ $ $ $ $ $ $258, $ $ $ $ $ $ $

19 1/21/215 1/22/215 1/23/215 1/24/215 1/25/215 1/26/215 1/27/215 1/28/ ,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 1/21/215 1/22/215 1/23/215 1/24/215 1/25/215 1/26/215 1/27/215 1/28/215 $14,75 $14,75 $14,75 $14,75 $14,75 $14,75 $14,75 $14,75 $7,66 $13,756 $5, $1,53 $1,6 $4,488 $12,667 $95 $773 $11, $3,297 $3,97 $43,744 $33,485 $1,2 $1,2 $1,2 $1,2 $1,2 $1,2 12 $13,946 $1,952 $6 $6 $6 $6 $6 $6 $6 $6 $9,32 $7,978 $45 $5,144 $1,295 $1,36 $1,36 $1,36 $1,36 $1,36 $1,36 $1,36 $465 $823 $454 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $1,16 $45,916 $75,437 $19,87 $21,854 $48,435 $75,218 $29,911 $38,369 1/21/215 1/22/215 1/23/215 1/24/215 1/25/215 1/26/215 1/27/215 1/28/215

20 $49,712 $85,547 $2,61 $1,11 $278 $4,348 $5,265 $2,815 $98 $53,432 $278 $4,348 $5,265 $2,815 $86,455 $ $ 1/21/215 1/22/215 1/23/215 1/24/215 1/25/215 1/26/215 1/27/215 1/28/215 1/21/215 1/22/215 1/23/215 1/24/215 1/25/215 1/26/215 1/27/215 1/28/215

21 1/21/215 1/22/215 1/23/215 1/24/215 1/25/215 1/26/215 1/27/215 1/28/215 1/21/215 1/22/215 1/23/215 1/24/215 1/25/215 1/26/215 1/27/215 1/28/215 $99,348 $75,715 $24,218 $27,119 $51,25 $161,673 $29,911 $38,369 $99,348 $75,715 $24,218 $27,119 $51,25 $161,673 $29,911 $38,369

22 1/29/215 1/3/215 1/31/215 2/1/215 2/2/215 2/3/215 2/4/215 2/5/ ,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 1/29/215 1/3/215 1/31/215 2/1/215 2/2/215 2/3/215 2/4/215 2/5/215 $14,75 $14,75 $14,75 $14,75 $14,75 $14,75 $14,75 $14,75 $4,95 $3,76 $3,861 $8,32 $11,555 $8,5 $8,5 $17, $8,5 $8,5 $1,2 $1,2 $1,2 $1,2 $1,2 $1,2 $21,263 $3,75 $6 $6 $6 $6 $6 $6 $6 $6 $1,92 $725 $1,36 $1,36 $1,36 $1,36 $1,36 $1,36 $1,36 $1,36 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $1,5 $13 $13 $4 $23,576 $3,29 $25,231 $2, $54,527 $36,395 $38,725 $4,333 1/29/215 1/3/215 1/31/215 2/1/215 2/2/215 2/3/215 2/4/215 2/5/215

23 $2,585 $1,925 $1,75 $1,815 $2,585 $1,925 $1,75 $1,815 $ $ $ $ 1/29/215 1/3/215 1/31/215 2/1/215 2/2/215 2/3/215 2/4/215 2/5/215 1/29/215 1/3/215 1/31/215 2/1/215 2/2/215 2/3/215 2/4/215 2/5/215

24 1/29/215 1/3/215 1/31/215 2/1/215 2/2/215 2/3/215 2/4/215 2/5/215 1/29/215 1/3/215 1/31/215 2/1/215 2/2/215 2/3/215 2/4/215 2/5/215 $26,161 $32,215 $26,936 $21,815 $54,527 $36,395 $38,725 $4,333 $26,161 $32,215 $26,936 $21,815 $54,527 $36,395 $38,725 $4,333

25 2/6/215 2/7/215 2/8/215 2/9/215 2/1/215 2/11/215 2/12/215 2/13/ ,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 2/6/215 2/7/215 2/8/215 2/9/215 2/1/215 2/11/215 2/12/215 2/13/215 $14,75 $14,75 $14,75 $14,75 $5,5 $3,197 $19,332 $1, $11,64 $21,8 $6 $6 $6 $6 $425 $1,36 $1,36 $1,36 $1,36 $2,5 $2,5 $2,5 $2,5 $1,71 $1,515 $39,712 $54,8 $18,67 $33,932 $ $ $ $ 2/6/215 2/7/215 2/8/215 2/9/215 2/1/215 2/11/215 2/12/215 2/13/215

26 2/6/215 2/7/215 2/8/215 2/9/215 2/1/215 2/11/215 2/12/215 2/13/215 $63,919 $16,945 $ $ $ $8,864 $ $ $ $ 2/6/215 2/7/215 2/8/215 2/9/215 2/1/215 2/11/215 2/12/215 2/13/215

27 $3,918 $145,8 $ $ $ $148,926 $ $ $ $ 2/6/215 2/7/215 2/8/215 2/9/215 2/1/215 2/11/215 2/12/215 2/13/215 2/6/215 2/7/215 2/8/215 2/9/215 2/1/215 2/11/215 2/12/215 2/13/215 $39,712 $54,8 $18,67 $263,722 $ $ $ $ $39,712 $54,8 $18,67 $33,932 $ $ $ $ $ $ $ $229,79 $ $ $ $

28 2/14/215 2/15/215 2/16/215 2/17/215 2/18/215 2/19/215 2/2/215 2/21/ ,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 2/14/215 2/15/215 2/16/215 2/17/215 2/18/215 2/19/215 2/2/215 2/21/215 2/14/215 2/15/215 2/16/215 2/17/215 2/18/215 2/19/215 2/2/215 2/21/215

29 2/14/215 2/15/215 2/16/215 2/17/215 2/18/215 2/19/215 2/2/215 2/21/215 2/14/215 2/15/215 2/16/215 2/17/215 2/18/215 2/19/215 2/2/215 2/21/215

30 2/14/215 2/15/215 2/16/215 2/17/215 2/18/215 2/19/215 2/2/215 2/21/215 2/14/215 2/15/215 2/16/215 2/17/215 2/18/215 2/19/215 2/2/215 2/21/215

31 2/22/215 2/23/215 2/24/215 2/25/215 2/26/215 2/27/215 2/28/215 3/1/ ,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 2/22/215 2/23/215 2/24/215 2/25/215 2/26/215 2/27/215 2/28/215 3/1/215 2/22/215 2/23/215 2/24/215 2/25/215 2/26/215 2/27/215 2/28/215 3/1/215

32 2/22/215 2/23/215 2/24/215 2/25/215 2/26/215 2/27/215 2/28/215 3/1/215 2/22/215 2/23/215 2/24/215 2/25/215 2/26/215 2/27/215 2/28/215 3/1/215

33 2/22/215 2/23/215 2/24/215 2/25/215 2/26/215 2/27/215 2/28/215 3/1/215 2/22/215 2/23/215 2/24/215 2/25/215 2/26/215 2/27/215 2/28/215 3/1/215

34 3/2/215 3/3/215 3/4/215 3/5/215 3/6/215 3/7/215 3/8/215 3/9/ ,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 11,1' 3/2/215 3/3/215 3/4/215 3/5/215 3/6/215 3/7/215 3/8/215 3/9/215 3/2/215 3/3/215 3/4/215 3/5/215 3/6/215 3/7/215 3/8/215 3/9/215

35 3/2/215 3/3/215 3/4/215 3/5/215 3/6/215 3/7/215 3/8/215 3/9/215 3/2/215 3/3/215 3/4/215 3/5/215 3/6/215 3/7/215 3/8/215 3/9/215

36 3/2/215 3/3/215 3/4/215 3/5/215 3/6/215 3/7/215 3/8/215 3/9/215 3/2/215 3/3/215 3/4/215 3/5/215 3/6/215 3/7/215 3/8/215 3/9/215

37 3/1/215 Additional 12/5/212 12/6/212 12/7/212 12/8/212 5 Costs ,1' 1' 3/1/215 Additional DRILLING COMMENTS 12/5/212 12/6/212 12/7/212 12/8/212 $ $ 3/1/215 Additional DRILLING COMMENTS 12/5/212 12/6/212 12/7/212 12/8/212

38 $ $ 3/1/215 Additional COMPLETION COMMENTS 12/5/212 12/6/212 12/7/212 12/8/212 $ $ $ $ $ $ 3/1/215 Additional COMPLETION COMMENTS 12/5/212 12/6/212 12/7/212 12/8/212

39 $ $ $ $ $ $ 3/1/215 Additional COMPLETION COMMENTS 12/5/212 12/6/212 12/7/212 12/8/212 $ $ $ $ $ $ 3/1/215 Additional COMMENTS 12/5/212 12/6/212 12/7/212 12/8/212 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

40 12/9/212 12/1/212 12/11/212 12/12/212 12/13/212 12/14/212 12/15/212 12/16/ /9/212 12/1/212 12/11/212 12/12/212 12/13/212 12/14/212 12/15/212 12/16/212 12/9/212 12/1/212 12/11/212 12/12/212 12/13/212 12/14/212 12/15/212 12/16/212

41 12/9/212 12/1/212 12/11/212 12/12/212 12/13/212 12/14/212 12/15/212 12/16/212 12/9/212 12/1/212 12/11/212 12/12/212 12/13/212 12/14/212 12/15/212 12/16/212

42 12/9/212 12/1/212 12/11/212 12/12/212 12/13/212 12/14/212 12/15/212 12/16/212 12/9/212 12/1/212 12/11/212 12/12/212 12/13/212 12/14/212 12/15/212 12/16/212

43 12/17/212 12/18/212 12/19/212 12/2/212 12/21/212 12/22/212 12/23/212 12/24/ /17/212 12/18/212 12/19/212 12/2/212 12/21/212 12/22/212 12/23/212 12/24/212 12/17/212 12/18/212 12/19/212 12/2/212 12/21/212 12/22/212 12/23/212 12/24/212

44 12/17/212 12/18/212 12/19/212 12/2/212 12/21/212 12/22/212 12/23/212 12/24/212 12/17/212 12/18/212 12/19/212 12/2/212 12/21/212 12/22/212 12/23/212 12/24/212

45 12/17/212 12/18/212 12/19/212 12/2/212 12/21/212 12/22/212 12/23/212 12/24/212 12/17/212 12/18/212 12/19/212 12/2/212 12/21/212 12/22/212 12/23/212 12/24/212

46 12/25/212 12/26/212 12/27/212 12/28/212 12/29/212 12/3/212 12/31/212 1/1/ /25/212 12/26/212 12/27/212 12/28/212 12/29/212 12/3/212 12/31/212 1/1/213 12/25/212 12/26/212 12/27/212 12/28/212 12/29/212 12/3/212 12/31/212 1/1/213

47 12/25/212 12/26/212 12/27/212 12/28/212 12/29/212 12/3/212 12/31/212 1/1/213 12/25/212 12/26/212 12/27/212 12/28/212 12/29/212 12/3/212 12/31/212 1/1/213

48 12/25/212 12/26/212 12/27/212 12/28/212 12/29/212 12/3/212 12/31/212 1/1/213 12/25/212 12/26/212 12/27/212 12/28/212 12/29/212 12/3/212 12/31/212 1/1/213

49 1/2/213 1/3/213 1/4/213 1/5/213 1/6/213 1/7/213 1/8/213 1/9/ /2/213 1/3/213 1/4/213 1/5/213 1/6/213 1/7/213 1/8/213 1/9/213 1/2/213 1/3/213 1/4/213 1/5/213 1/6/213 1/7/213 1/8/213 1/9/213

50 1/2/213 1/3/213 1/4/213 1/5/213 1/6/213 1/7/213 1/8/213 1/9/213 1/2/213 1/3/213 1/4/213 1/5/213 1/6/213 1/7/213 1/8/213 1/9/213

51 1/2/213 1/3/213 1/4/213 1/5/213 1/6/213 1/7/213 1/8/213 1/9/213 1/2/213 1/3/213 1/4/213 1/5/213 1/6/213 1/7/213 1/8/213 1/9/213

52 1/1/213 1/11/213 1/12/213 1/13/213 1/14/213 1/15/213 Additional Costs 1/1/213 1/11/213 1/12/213 1/13/213 1/14/213 1/15/213 Additional 1/1/213 1/11/213 1/12/213 1/13/213 1/14/213 1/15/213 Additional

53 1/1/213 1/11/213 1/12/213 1/13/213 1/14/213 1/15/213 Additional $ $ $ $ $ $ $ 1/1/213 1/11/213 1/12/213 1/13/213 1/14/213 1/15/213 Additional

54 $ $ $ $ $ $ $ 1/1/213 1/11/213 1/12/213 1/13/213 1/14/213 1/15/213 Additional $ $ $ $ $ $ $ 1/1/213 1/11/213 1/12/213 1/13/213 1/14/213 1/15/213 Additional $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

55 1' COMPLETION COMMENTS COMPLETION COMMENTS COMPLETION COMMENTS

56 COMPLETION COMMENTS COMPLETION COMMENTS

57 COMPLETION COMMENTS COMMENTS

58 Depth (ft) Depth (ft) Drilling Days vs Depth Depth vs Cumulative Cost 5 UNIVERSITY F UNIVERSITY F 1541 (1,5) Planned Depth vs Days Actual Depth vs Days (1,5) Cumulative Planned Cost vs Depth Cumulative Cost Spud Date - (3,5) (3,5) (5,5) (5,5) (7,5) (7,5) (9,5) (9,5) (11,5) (11,5) (13,5) Days (13,5) - $2, $4, $6, $8, $1,, $1,2, $1,4, Cumulative Cost

59 WELL NAME: OPERATIONS: CONTRACTOR: MIRU COSTS: THREE RIVERS OPERATING II RIG MOVE & RIG UP REPORT AFE # : AFE 11,1' AFE DAYS 2 LAST BOP TEST COUNTY: STATE: DATE (Start of DAY: University F 1541 Andrews Texas Rig Move): 1/18/15 (MD): (TVD): PROGRESS: Move In; Rig Up SUPV: Ronnie McWhirter Sendero Rig #3 MOVE DAY 1 Cost MOVE DAY 2 ##### Cost MOVE DAY 3 ##### Cost $3,196 AFE Dry Hole $: $1,21,725 MOVE DAY 4 Cost $ RIG MOVE- RIG UP- DAY 1 START END HRS 6: 7: 13. Move Rig from Parmer #1 To University F #1541, 33.2 Mile move, sub set, derrick pinned to floor, 5% yard set in 7: 6: 11. Shut down for dark, Morning tour working on part of yard and maintenance to rig and motors AFE Dry Hole $: (COB) MOVE DAY 5 Cost $ $1,252,726 CUM MIRU COST: $216, RIG MOVE- RIG UP- DAY 2 START END HRS 6: 1: 16. Finish rig up to spud, raise derrick, set in yard, rig up floor and yard, haul water, shut dsown water trucks, unload surf. Casing on racks 1: 6: 8. Wait on water to spud, work on getting mouse hole shuck set Date 1/19/ RIG MOVE- RIG UP- DAY 3 START END HRS 6: 12:3 6.5 Wait on water to spud, Mix and pump hi vis sweep to clean mouse hole to set shuck Date 1/2/ START END HRS 6: 7: 1. 7: 8: 1. 8: 9: 1. 9: 1: 1. 1: 11: 1. 11: 12: 1. 12: 13: 1. 13: 14: 1. 14: 15: 1. 15: 16: 1. 16: 17: 1. 17: 18: 1. 18: 19: 1. 19: 2: 1. 2: 21: 1. 21: 22: 1. 22: 23: 1. 23: : 1. : 1: 1. 1: 2: 1. 2: 3: 1. 3: 4: 1. 4: 5: 1. 5: 6: START END HRS 6: 7: 1. 7: 8: 1. 8: 9: 1. 9: 1: 1. 1: 11: 1. 11: 12: 1. 12: 13: 1. 13: 14: 1. 14: 15: 1. 15: 16: 1. 16: 17: 1. 17: 18: 1. 18: 19: 1. 19: 2: 1. 2: 21: 1. 21: 22: 1. 22: 23: 1. 23: : 1. : 1: 1. 1: 2: 1. 2: 3: 1. 3: 4: 1. 4: 5: 1. 5: 6: RIG MOVE- RIG UP- DAY 4 RIG MOVE- RIG UP- DAY 5 Date 1/21/15 Date 1/22/15

60 WELL NAME: OPERATIONS: CONTRACTOR: PSI: 175 DRILLING MECHANICS PICK UP WEIGHT SLACK OFF WEIGHT ROTATING WEIGHT TORQUE ON BOTTOM TORQUE OFF BOTTOM BIT NO AFE # : AFE 11,1' AFE DAYS 1 Spud Date 1/2/15 1:3 PM LAST BOP TEST COUNTY: STATE: DATE: DAY: Andrews Texas 1/21/15 University F 1541 DRILLING Sendero Rig #3 SPM: 95/ PLAN 165 (MD): SUPV: THREE RIVERS OPERATING II DAILY DRILLING REPORT TOTAL GPM: 124 Ronnie McWhirter BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES (TVD): 124 AFE Dry Hole $: $1,21,725 DAILY COST: $38,223 CASING STRINGS PROGRESS: AFE Dry Hole $: (COB) CUM DRLG COST: ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft 13 3/ J-55 STC MUD MIXED DISTRIBUTION MW 8.4 GEL RU/RD Cum Mud $21 TOTAL (Daily/cum) WOB ROP ACTIVITY RPM START END HRS FROM TO (M lbs) (fph) 12:3 1: Pick up and make up BHA #1 1:3 6: Spud well, drill from 4 TO : 6: Drill from 331 to $1,252,726 $254,693 SIZE 17 1/2 VIS 28 SALTGEL DRLG MFG ULTERRA PV LIME REAM/WASH TYPE U616S YP CAUSTIC SURVEY SER. NO GELS SODA ASH TRIP 1 1 NOZZLES 9X16 ph 9. BARITE RIG SERVICE TFA WL PAPER CIRC & COND OUT HP/HT RUN CSG/CMT IN 4 GC WOC FOOTAGE 12 CL NU/TST BOP HOURS 16.5 Ca RIG REPAIR FT/HR 73 Sand LOG hp/dia inch Solids FISHING/STUCK IMP FORCE DC Anlr Vel DP Anlr Vel Oil % CORE DST KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $21 MISC C/O, WELD HEAD 1 Wait on water to spud, hauled water to reserve pits, mix and pump heavy vis sweep to wash mouse hole shuck down, water sand water line going at 6:3 pm, shut water trucks down Spud well at 1:3 PM, Operations next reo=port, drill 17 1/2" surface hole, set 13 3/8 casing and cement 17.5 DAILY AVG SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION BIT BIT SUB WASTE DISPOSAL SITE: MOTOR DAILY YDS SOLID - 1 BBLS LIQUID 1 SHOCK SUB WELL CUM SOLID - TOTAL DRILLED GAS 1 CUM LIQUID 1 REAMER TRUE SHOT 6 X 8" DRILL COLLARS GAS Background Gas: Connection gas: Trip Gas: Max Gas: Units DC SIZE X O SUB 2.1 8"x6" 14 X 6" DRILL COLLARS JARS 4 X 6" DRILL COLLARS DP SIZE 4 1/2" AZIMUTH ACCIDENTS NONE Start Received End Consumed FUEL (gals) BHA LENGTH DRILL PIPE WEIGHT OF BHA WEIGHT OF BHA (below jars) ,22 Pump #1 Pump #2 SLOW PUMP RATES PSI SPM PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 PZ PZ

61 WELL NAME: OPERATIONS: CONTRACTOR: PSI: AFE # : Spud Date /2/15 1:3 PM AFE 11,1' AFE DAYS LAST BOP TEST 1 1// COUNTY: STATE: DATE: Day Andrews Texas 1/22/15 (MD): SUPV: TOTAL GPM: 1668 Ronnie McWhirter 595 (TVD): 1668 AFE Dry Hole $: $1,21,725 DAILY COST: $99,348 BIT NO 1 MW 8.6 GEL 65 RU/RD SIZE 17.5 VIS 28 SALTGEL DRLG 6 MFG ULTERRA PV LIME 4 REAM/WASH TYPE U616S YP CAUSTIC SURVEY SER. NO GELS SODA ASH 6 TRIP 4.5 NOZZLES 9X16 ph 9. BARITE RIG SERVICE TFA WL PAPER 21 CIRC & COND 1 OUT 1668 HP/HT MF-55 6 RUN CSG/CMT 11 IN 4 GC WOC FOOTAGE 1628 CL 16 NU/TST BOP HOURS 22.5 Ca 48 RIG REPAIR FT/HR hp/dia inch IMP FORCE 72 #DIV/! Sand Solids Oil % LOG FISHING/STUCK CORE DC Anlr Vel DST DP Anlr Vel KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $4,488 MISC I TD Cum Mud $4,75 TOTAL (Daily/cum) 24 WOB ROP ACTIVITY RPM START END HRS FROM TO (M lbs) (fph) 6: 12: Drill from 124 to : 1: Circulate 1: 4: Trip out of hole for casing (556) Rig up lay down machine, lay down motor, reamer, and true shot tools Rig up casing crews, safety meeting with all crews Wait on float collar 4: 5: :3 6:3 1. 6:3 8: 1.5 8: 2: :3 3:3 1. 3:3 6: DRILLING MECHANICS University F 1541 Cement surface casing Sendero Rig #3 SPM: 95/95 THREE RIVERS OPERATING II DAILY DRILLING REPORT CASING STRINGS PICK UP WEIGHT 115 PLAN ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft SLACK OFF WEIGHT J-55 STC - $29.75 ROTATING WEIGHT 11 - $. TORQUE ON BOTTOM - $. TORQUE OFF BOTTOM - $. BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED DISTRIBUTION Run 13 3/8 surface casing Rig down casing crews, rig up Halliburton cementers Cement surface casing Drill from 124 to 1668, circulate, cond. Hole, spot pill, trip out of hole for casing Rig up lay down/ pick up machine, lay down motor, shock sub, true shot and reamer Safety meeting with casing crews, rig up casing crews, wait on float collar, ( summit delivered buttress thread collar instead of 8 round )run 13 3/8 surface casing Ran 38 joints, 1671 feet overall, set at 1668 KB, 13 3/8" 54.5# J-55 CASING PROGRESS: AFE Dry Hole $: (COB) CUM DRLG COST: 428 $1,252,726 $354,41 2 Next report. Finish cement casing, woc, nipple up bope, trip in hole drill Cement report on tomorrows report 24. DAILY AVG SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION AZIMUTH BIT BIT SUB WASTE DISPOSAL SITE: MOTOR DAILY YDS SOLID - 1 BBLS LIQUID 1 SHOCK SUB WELL CUM SOLID - 1 CUM LIQUID 1 REAMER TRUE SHOT TOTAL DRILLED GAS 6 X 8" DRILL COLLARS GAS Units DC SIZE X O SUB 2.1. Background Gas: 8" X6" 14 X 6" DRILL COLLARS Connection gas: JARS Trip Gas: DP SIZE 4 X 6" DRILL COLLARS Max Gas: 4 1/2"... ACCIDENTS FUEL (gals). Start 4229 BHA LENGTH SLOW PUMP RATES NONE Received 4 DRILL PIPE PSI SPM End 7434 WEIGHT OF BHA 67,783 Pump #1 Consumed 795 WEIGHT OF BHA (below jars) Pump #2 PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 PZ PZ

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #: MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:

More information

SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET. RKB-MSL: 18m RIG: WEST ALPHAk FORMATION PRESSURE SO<PSIA) SOXPSIA) HP(PSIA) NORMAL TEST ,1 5776,3

SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET. RKB-MSL: 18m RIG: WEST ALPHAk FORMATION PRESSURE SO<PSIA) SOXPSIA) HP(PSIA) NORMAL TEST ,1 5776,3 Well 7-9 Formation Pressures (RFT) r i WELL NO: 7-9 PRESSURE UNITS: PSIA SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET RKB-MSL: 8m RIG: WEST ALPHAk PAGE OF: WITNESSED BY: BAa & TOR DATE: -9 RUN* A TEST* DEPTH

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A 4.2 Formation Multi-Test (FMT) Analysis Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A summary 6. DRILL STEM TESTING A dual

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

Daily Drilling Report

Daily Drilling Report Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

MANUFACTURING. PD Impact Tools

MANUFACTURING. PD Impact Tools PD Impact Tools Upper Connector MANUFACTURING Drive Mandrel Female Spline Bearing Female Spline PD Impact Tools optimize your drilling operations. Knocker Housing Knocker Pressure Piston Hydraulic Mandrel

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

St. Clair River Replacement Project Execution Plan. Appendix 1 Contractor s Drilling Execution Plan

St. Clair River Replacement Project Execution Plan. Appendix 1 Contractor s Drilling Execution Plan St. Clair River Replacement Project Execution Plan Appendix 1 Contractor s Drilling Execution Plan Contractor s Drilling Execution Plan Enbridge will follow the Canadian Association of Petroleum Producers

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation 2/5/2013 Roger L. Schultz TTS Drilling Solutions Presentation Overview Frictional Forces, Vibratory

More information

Drillmec HH-300 spec.

Drillmec HH-300 spec. Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

ISOLATION/UNIVERSAL TOOLS

ISOLATION/UNIVERSAL TOOLS ISOLATION/UNIVERSAL TOOLS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Megaton Impact Tools optimize your drilling operations. Megaton Impact Tools Ulti-Torq high-torque, double shoulder connections Involute spline design High-strength steel developed

More information

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009NTCE-04-01 DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information