1 Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION SPUD DATE API DFS: STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) RIG DOWN. SURFACE 2, $0 / $0 24 HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) RIG DOWN AND MOVE RIG. NO $241,553 / $241,553 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG ft ft 18,944 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: RIG DOWN. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP I-O-B-G-R SURVEY DATA - LAST 10 Survey Name: Survey Tool: Survey Company: LAST SURVEY@ N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS DENS(ppg) CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL FC PH/PM OIL/WAT Pf/Mf WPS Cl ES Ca LIME LIME / / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO CONTINENTAL-EMSCO TOTAL 0 ITEM RIG DOWN/LOWER 0100AM/PREP TO LOWER DERRIK. HOURS DUR (hr) PHASE 12:00-00: MIRU 01 P - RU/RD E - RIG DOWN MUD ADDITIVES USED UNITS ITEM USED UNITS CODE SUB DESCRIPTION COMMENTS OPERATION DETAILS RIG DOWN FLOOR,TOPDRIVE,CATWALK,PITS AND MAKE READY FOR TRUCKS. (PEFORMED YEARLY INSPECTION ON MUD PUMPS AND SENT IN SLIPS,BAILS,ELEVATORS,BAIL EXTENSIONS AND TONGS IN FOR INSPECTION. LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/XX/2017 XX:XX CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:WOC - RIG DOWN. DAYS SINCE LAST LTA: XXX DAYS DAYS SINCE LAST RECORDABLE IN REGION: XX DAYS. DAYS SINCE LAST FIRST AID: XXX DAYS ( WEST TEXAS ) DAYS SINCE LAST SPILL: XXX DAYS ( WEST TEXAS ) HOURS SINCE SPUD - XXX CASING STRINGS SET: 20" CONDUCTOR 120' 9 5/8'' 5061' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14 S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS- - FLOAT SUB -11 5/8'' STEEL BLADE STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = XXXX' TOTAL FOOTAGE-XXXX' - DRLG HRS- XX- TOTAL ROP- XX' FPH - TOTAL HRS ON MTR- XX - REASON FOR PULLING BIT -(XXXXX) ( BIT GRADE 2-2.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 2/27/2017 8:33:31AM Page 1 of 1

2 Date: 02/26/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 2 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION SPUD DATE API DFS: STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) RIG UP MISC. EQUIPMENT,WASH DERRIK AND SUBS. SURFACE 2, $0 / $0 24 HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) SET RIG AND CONTINUE TO RIG UP. 2/26/2017 NO $25,454 / $267,007 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG ft ,061.0 ft 18,944 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: RIG DOWN,MOVE RIG AND SET IN PLACE. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP I-O-B-G-R SURVEY DATA - LAST 10 Survey Name: Survey Tool: Survey Company: LAST SURVEY@ N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS DENS(ppg) CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL FC PH/PM OIL/WAT Pf/Mf WPS Cl ES Ca LIME LIME / / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO CONTINENTAL-EMSCO TOTAL 0 ITEM RIG UP MISC. EQUIPMENT,WASH DERRIK AND SUBS. HOURS DUR (hr) PHASE 00:00-00: MIRU 01 P - RU/RD E - RIG DOWN MUD ADDITIVES USED UNITS ITEM USED UNITS CODE SUB DESCRIPTION COMMENTS OPERATION DETAILS CONITNUE RIGGING DOWN BACKYARD AND FLOOR,LOWER 01: AM.PREP TO LOWER DERRIK.HOLD PJSM WITH TRUCKS,MOVE RIG TO NEW LOCATION WHILE RIGGING DOWN MISC. EQUIPMENT.MOVE ANADARKO TRAILERS TO NEW LOCATION,MUD PIPES,TUBULARS,GEN SET,CATWALK.LOWER DERRIK,BREAK DOWN,REMOVE DRAWWORKS. SET IN-40% RIGGED DOWN-95% RIGGED UP-5% 46 MILE MOVE.MOVING WITH AVEEDA TRUCKING. EST. SPUD DATE: /28/2017 7:43:23AM Page 1 of 2

3 Date: 02/26/2017 DFS: LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/XX/2017 XX:XX CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:WOC - RIG DOWN/MOVING RIG. DAYS SINCE LAST LTA: XXX DAYS DAYS SINCE LAST RECORDABLE IN REGION: XX DAYS. DAYS SINCE LAST FIRST AID: XXX DAYS ( WEST TEXAS ) DAYS SINCE LAST SPILL: XXX DAYS ( WEST TEXAS ) HOURS SINCE SPUD - XXX CASING STRINGS SET: 20" CONDUCTOR 120' 9 5/8'' 5061' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14 S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS- - FLOAT SUB -11 5/8'' STEEL BLADE STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = XXXX' TOTAL FOOTAGE-XXXX' - DRLG HRS- XX- TOTAL ROP- XX' FPH - TOTAL HRS ON MTR- XX - REASON FOR PULLING BIT -(XXXXX) ( BIT GRADE 2-2.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 2/28/2017 7:43:23AM Page 2 of 2

4 Date: 02/27/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 3 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION SPUD DATE API DFS: STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) RIG UP. SURFACE 2, $0 / $0 24 HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) RIG UP,WELD ON CONDUCTOR,FILL PITS WITH FRESH WATER,PREP TO SPUD 2/27/2017 NO $38,677 / $305,684 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG ft ,061.0 ft 18,944 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: MOVE RIG AND RIG UP. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP I-O-B-G-R SURVEY DATA - LAST 10 Survey Name: Survey Tool: Survey Company: LAST SURVEY@ N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS DENS(ppg) CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL FC PH/PM OIL/WAT Pf/Mf WPS Cl ES Ca LIME LIME / / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO CONTINENTAL-EMSCO TOTAL 0 ITEM STRING OUT DERRIK AND PREP TO RAISE. MUD ADDITIVES USED UNITS ITEM USED UNITS COMMENTS OPERATION DETAILS HOURS DUR (hr) PHASE CODE SUB DESCRIPTION 00:00-07: MIRU 01 P - RU/RD B - RIG UP WASH ON DERRIK AT OLD LOCATION/RIG UP BACKYARD AT NEW LOCATION. 07:00-00: MIRU 01 P - RU/RD B - RIG UP LOAD OUT SUBS,DERRIK,SET MATTING BOARDS,SET SUBS,FINISH MOVING TUBULARS,SET SUBS AT NEW LOCATION AND WAIT FOR DERRIK,CREW HOUSES AND OTHER EQUIPMENT TO ARRIVE,WAS 11:30 AM EQUPMENT WAS STUCK BEHIND A WRECK IN ORLA ON U.S 285 HIGHWAY.DERRIK SHOWED UP TO 14:45PM.PIN DERRIK TO FLOOR,INSTALL DOG HOUSES AND PIN DERRIK TOGETHER,INSTALLL MONKEY BOARD AND MAKE READY TO BE RAISED,SET TRANSFER TANK. SET IN-95% RIGGED DOWN-100% RIGGED UP-65% MOVED-95% 46 MILE MOVE.MOVING WITH AVEEDA TRUCKING. EST. SPUD DATE: /28/2017 8:17:40AM Page 1 of 2

5 Date: 02/27/2017 DFS: LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/XX/2017 XX:XX CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:WOC - RIG DOWN/MOVING RIG. DAYS SINCE LAST LTA: XXX DAYS DAYS SINCE LAST RECORDABLE IN REGION: XX DAYS. DAYS SINCE LAST FIRST AID: XXX DAYS ( WEST TEXAS ) DAYS SINCE LAST SPILL: XXX DAYS ( WEST TEXAS ) HOURS SINCE SPUD - XXX CASING STRINGS SET: 20" CONDUCTOR 120' 9 5/8'' 5061' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14 S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS- - FLOAT SUB -11 5/8'' STEEL BLADE STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = XXXX' TOTAL FOOTAGE-XXXX' - DRLG HRS- XX- TOTAL ROP- XX' FPH - TOTAL HRS ON MTR- XX - REASON FOR PULLING BIT -(XXXXX) ( BIT GRADE 2-2.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 2/28/2017 8:17:40AM Page 2 of 2

6 Date: 02/28/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 4 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION SPUD DATE 03/02/2017 API DFS: STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) FINISH RIGGING UP MISC.EQUIPMENT. SURFACE 2, $0 / $0 24 HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) SH RIGGING UP,WELD ON CONDUCTOR,MIXED SPUD MUD,PU BHA, SPUD WE 2/28/2017 NO $48,723 / $354,407 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG usft ,071.0 usft 18,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: RAISE DERRIK AND SUB,RIG UP. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP I-O-B-G-R SURVEY DATA - LAST 10 Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@0 N/S 0.0 E/W 0.0 MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS DENS(ppg) CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL FC PH/PM OIL/WAT Pf/Mf WPS Cl ES Ca LIME LIME / / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO CONTINENTAL-EMSCO TOTAL 0 ITEM FINISH RIGGING UP MISC.EQUIPMENT WELD ON CONDUCTOR. HOURS DUR (hr) PHASE 00:00-00: MIRU 01 P - RU/RD B - RIG UP MUD ADDITIVES USED UNITS ITEM USED UNITS CODE SUB DESCRIPTION COMMENTS OPERATION DETAILS STRING OUT LINES ON DERRIK,HOOK UP ELECTRICAL,RUN DRILL LINE TO FLOOR,HOLD PJSM,RAISE 09:00 AM,MAKE SUB READY TO RAISE AND HOLD PSJM,RAISE 12:30PM,SET STAIRS,FLOWLINE,WALKING FEET,RIG UP SEPERATOR,FLARE AND PANIC LINES,FILL PITS WITH FRESH WATER,RIG UP IGNITOR,CHOKES,H2S EQUIPMENT,SET CEMENT WATER TANKS,BRINE TANK AND BAR BINS,RIG UP FLOOR AND MUD LINES.CHANGE OIL IN MUD PUMPS,TROUBLESHOOT TOPDRIVE AND DRAWWORKS,SPOOL UP DRAWWORKS,UNHANG BLOCKS AND CALIBRATE,PU HANDLING TOOLS,RU BELLS AND ELEVATORS/CATWALK. EST. SPUD DATE: /3/2017 7:44:25AM Page 1 of 2

7 Date: 02/28/2017 DFS: LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/XX/2017 XX:XX CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:WOC - RIG UP. DAYS SINCE LAST LTA: XXX DAYS DAYS SINCE LAST RECORDABLE IN REGION: XX DAYS. DAYS SINCE LAST FIRST AID: XXX DAYS ( WEST TEXAS ) DAYS SINCE LAST SPILL: XXX DAYS ( WEST TEXAS ) HOURS SINCE SPUD - XXX CASING STRINGS SET: 20" CONDUCTOR 120' 9 5/8'' 5061' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14 S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS- - FLOAT SUB -11 5/8'' STEEL BLADE STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = XXXX' TOTAL FOOTAGE-XXXX' - DRLG HRS- XX- TOTAL ROP- XX' FPH - TOTAL HRS ON MTR- XX - REASON FOR PULLING BIT -(XXXXX) ( BIT GRADE 2-2.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 3/3/2017 7:44:25AM Page 2 of 2

8 Date: 03/01/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 5 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION SPUD DATE 03/02/2017 API DFS: STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) SPUD WELL: 120'. SURFACE 2, , $9908 / $ HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) DRILL AND SURVEY IN SURFACE HOLE/SERVICE RIG. 3/1/2017 NO $52,220 / $406,627 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG usft ,071.0 usft 18,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: FINISH RIGGING UP,WELD ON CONDUCTOR AND NIPPLE UP DIVERTER,PU BHA. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP 1/ ULTERRA / U616S / I-O-B-G-R SURVEY DATA - LAST 10 Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@0 N/S 0.0 E/W 0.0 MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS DENS(ppg) 8.3 CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL %SAND/MBT FC PH/PM Pf/Mf Cl Ca LIME 00: / / 9.50/ / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO CONTINENTAL-EMSCO TOTAL 0 MUD ADDITIVES ITEM USED UNITS ITEM USED UNITS ENGINEER 4 EACH GEL # BAG SODA ASH 15 50# BAG TRANSPORTATION 4800 EACH DRLG F/120'-952'. FPH.) HOURS DUR (hr) PHASE 00:00-06: MIRU 01 P - RU/RD B - RIG UP 06:00-20: MIRU 01 P - RU/RD B - RIG UP 20:00-21: MIRU 01 P - RU/RD B - RIG UP 21:00-00: MIRU 01 P - RU/RD B - RIG UP CODE SUB DESCRIPTION COMMENTS OPERATION DETAILS FINISH RIGGING UP FLOOR,CHANGE OUT SAVER SUB,PU HANDLING TOOLS,RIG UP BAILS AND ELEVATORS.RUN TRANSFER TANK LINE. WELD ON CONDUCTOR,NIPPLE UP RISER ON ANN.RUN PVC LINES FROM SHAKER SLIDES,WASHOUT WATER LINES,PU ANNULAR AND NIPPLE UP,RIG UP HCR,RUN DIVERTER LINE,DRESS OUT SHAKERS,MIX SPUD MUD,LAYOUT AND TALLY BHA./UNLOAD 9 7/8" CASING,REBUILD 4" ON MUD PUMP,RUN PUMPS OUT,INSTALL MOUSEHOLE.FUNCTION DIVERTER SYSTEM AND TEST MUD LINES T/3000 PSI,PERFORM PRE-SPUD INSPECTION. HOLD PRE-SPUD MEETING/DISCUSS OVERVIEW OF WELL.FILL HOLE AND CHECK FOR LEAKS. P/U BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB. 3/3/2017 7:50:11AM Page 1 of 2

9 Date: 03/01/2017 DFS: LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/XX/2017 XX:XX CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:WOC - MIXING SPUD MUD/RIG UP DIVERTER. DAYS SINCE LAST LTA: XXX DAYS DAYS SINCE LAST RECORDABLE IN REGION: XX DAYS. DAYS SINCE LAST FIRST AID: XXX DAYS ( WEST TEXAS ) DAYS SINCE LAST SPILL: XXX DAYS ( WEST TEXAS ) HOURS SINCE SPUD - XXX CASING STRINGS SET: 20" CONDUCTOR 120' 9 5/8'' 5061' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE-XXXX' - DRLG HRS- XX- TOTAL ROP- XX' FPH - TOTAL HRS ON MTR- XX - REASON FOR PULLING BIT -(XXXXX) ( BIT GRADE X-X.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 3/3/2017 7:50:11AM Page 2 of 2

10 Date: 03/02/2017 DFS: 1 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 6 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 3, , , SPUD DATE 03/02/2017 API STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) DRLG 3250'. SURFACE 2, , $5705 / $15, HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) DRILL AND SURVEY IN SURFACE HOLE,TD SURFACE,CIRC. HOLE CLEAN,TOOH 3/2/2017 NO $72,821 / $479,448 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG usft ,073.0 usft 18,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: DRILL AND SURVEY IN SURFACE HOLE,SERVICE RIG. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP 1/ ULTERRA / U616S / SURVEY DATA I-O-B-G-R , X-I-TD 5073 Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@3222 N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS , , , , , , , , , , , , , , , , , , DENS(ppg) 10.2 CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL %SAND FC OIL/WAT WPS ES LIME 00: / / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO DRILLING CONTINENTAL-EMSCO DRILLING TOTAL 753 MUD ADDITIVES ITEM USED UNITS ITEM USED UNITS ENGINEER 1 EACH GEL # BAG MF GAL SODA ASH 5 50# BAG TRANSPORTATION 3600 EACH SAPP STICKS 40 EACH ROT. F/3250'-3811'. 93 FPH.) COMMENTS 3/4/2017 7:43:15AM Page 1 of 2

11 Date: 03/02/2017 OPERATION DETAILS DFS: 1 HOURS DUR (hr) 3.50 PHASE 00:00-03:30 DRLSUR 02 P - DRILL - B - ACTUAL CODE SUB DESCRIPTION MOTOR/TURBINE - VERTICAL DRLG F/120'- 600' ( 480'@ 137FPH ) WOB -20/30 - TD RPM MTR RPM SPM 130- GPM PP DIFF TORQUE 12K - MW IN 8.6 PPG,VIS-35. SPUD 12:01 AM ON :30-04: DRLSUR 05 P - CIRC & A - CONDITION COND MUD MUD / CLG / HTG 04:00-17: DRLSUR 02 P - DRILL - B - ACTUAL MOTOR/TURBINE - VERTICAL R F/120'-600'. RECYLCE 7 TIMES TO GET SURVEY. DRLG F/600'- 2663' ( 2063'@ 158FPH ) WOB -20/30 - TD RPM -70- MTR RPM SPM 160- GPM PP DIFF TORQUE 12K - MW IN 10.5 PPG,VIS-28. R F/600'-2395'. S F/2395'-2445'. TF-220M. R F/2445'-2520'. S F/2520'-2570'. TF-205M. R F/2570'-2663'. 17:00-17: DRLSUR 07 P - LUB A - DAILY RIG (RIG SERVICE SERVICE) 17:30-00: DRLSUR 02 P - DRILL - B - ACTUAL MOTOR/TURBINE - VERTICAL BEGAN 2395'. SERVICE RIG. DRLG F/2663'- 3250' ( 587'@ 90 FPH ) WOB -20/30 - TD RPM -70- MTR RPM SPM 160- GPM PP DIFF TORQUE 12K - MW IN 10.5 PPG,VIS-28. R F/2663'-2932'. S F/2932'-2977'. TF-210. R F/2977'-3250'. LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/XX/2017 XX:XX CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:MAKING CONNECTION. HOURS SINCE SPUD - 24 CASING STRINGS SET: 20" CONDUCTOR 120' 9 5/8'' 5061' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE-XXXX' - DRLG HRS- XX- TOTAL ROP- XX' FPH - TOTAL HRS ON MTR- XX - REASON FOR PULLING BIT -(XXXXX) ( BIT GRADE X-X.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 3/4/2017 7:43:15AM Page 2 of 2

12 Date: 03/03/2017 DFS: 2 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 7 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 5, , , SPUD DATE 03/02/2017 API STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) 5073'. BELL CANYON 2, , $1941 / $17, HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) TOOH,RIG UP AND RUN CASING,CEMENT CASING. 3/3/2017 NO $54,021 / $533,470 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG usft ,073.0 usft 18,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: DRILL AND SURVEY IN SURFACE HOLE,TD SURFACE,CIRC. HOLE CLEAN,TOOH. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP 1/ ULTERRA / U616S / SURVEY DATA I-O-B-G-R , X-I-TD 5073 Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@5004 N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS , , , , , , , , , , , , , , DENS(ppg) 10.3 CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL %SAND FC OIL/WAT WPS ES LIME 00: / /1.0/ / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO DRILLING CONTINENTAL-EMSCO DRILLING TOTAL 544 MUD ADDITIVES ITEM USED UNITS ITEM USED UNITS ENGINEER 1 EACH SALTWATER GEL # LIME 1 50# BAG SODA ASH 7 50# BAG WALL-NUT MEDIUM 2 50 # TOOH F/5073'-BHA L/D BHA CLEAN RIG FLOOR/RIG UP CASING CREW. HOURS DUR (hr) PHASE 00:00-16:00 DRLSUR 02 P - DRILL - B - ACTUAL CODE SUB DESCRIPTION MOTOR/TURBINE - VERTICAL 16:00-16: DRLSUR 07 P - LUB A - DAILY RIG (RIG SERVICE SERVICE) 16:30-22: DRLSUR 02 P - DRILL - B - ACTUAL MOTOR/TURBINE - VERTICAL 22:00-00: CSGSUR 05 P - CIRC & F - HOLE COND MUD CLEANING/HIGH VIS PILL COMMENTS OPERATION DETAILS DRLG F/3250'- 4546' (1296'@ 81 FPH ) WOB -40- TD RPM -50- MTR RPM SPM 160- GPM PP DIFF TORQUE 12K - MW IN 10.2 PPG,VIS-28.CIRC. STEEL PITS. R F/3250'-3470'. S F/3470'-3505'. TF-HS. R F/3505'-3829'. S F/3829'-3869'. TF-20R. R F/3869'-4008'. S F/4008'-4058'. TF-45R. R F/4058'-4187'. S F/4187'-4232'. TF-67R. R F/4232'-4546'. SERVICE RIG. DRLG F/4546'- 5073' (527'@ 95 FPH ) WOB -40- TD RPM -50- MTR RPM SPM 160- GPM PP DIFF TORQUE 12K - MW IN 10.2 PPG,VIS-28.CIRC. STEEL PITS. R F/4546'-5073'. PUMP 2-40 BBLS HIGH VIS SWEEP AND CIRCULATE HOLE CLEAN. CALCULATED WASHOUT-45%.PUMP 45 BBLS 12.0 PPG. 3/4/2017 8:01:38AM Page 1 of 2

13 Date: 03/03/2017 DFS: 2 LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/02/ :01 CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:H2S SAFETY. HOURS SINCE SPUD - 48 CASING STRINGS SET: 20" CONDUCTOR 120' 9 5/8'' 5073' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE-4953' - DRLG HRS TOTAL ROP- 111' FPH - TOTAL HRS ON MTR REASON FOR PULLING BIT -(9 5/8" CASING POINT) ( BIT GRADE 1-2.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 3/4/2017 8:01:38AM Page 2 of 2

14 Date: 03/04/2017 DFS: 3 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 8 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 5, , SPUD DATE 03/02/2017 API STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) NIPPLE DOWN DIVERTER. BELL CANYON 2, $3224 / $20, HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) WELD ON WELLHEAD,NIPPLE UP BOPS AND TEST,PU BHA,TIH. 3/4/2017 NO $182,139 / $715,608 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG usft ,073.0 usft 18,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: TOOH L/D BHA,RIG UP AND RUN CASING,CEMENT CASING,NIPPLE DOWN DIVERTER. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP I-O-B-G-R 1/ ULTERRA / U616S / X-I-TD 5073 SURVEY DATA - LAST 10 Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@5004 N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS , , , , , , , , , , DENS(ppg) 10.3 CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL %SAND FC OIL/WAT WPS ES LIME 00: / /1.0/ / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO CONTINENTAL-EMSCO TOTAL 0 MUD ADDITIVES ITEM USED UNITS ITEM USED UNITS ENGINEER 1 EACH SALTWATER GEL # LIME 1 50# BAG BARITE BULK 7 100#SK DEFOAMER 2 5 GAL SODA ASH 2 50# BAG CEDAR FIBER 6 40# NIPPLE DOWN DIVERTER WELD ON WELLHEAD AND TEST TO 1300 PSI NIPPLE UP BOPS. COMMENTS 3/8/2017 8:12:40AM Page 1 of 2

15 Date: 03/04/2017 OPERATION DETAILS DFS: 3 HOURS DUR (hr) PHASE CODE SUB DESCRIPTION 00:00-03: CSGSUR 06 P - D - CASING/LINER TOOH F/5073'-BHA.FILLING HOLE WITH TRIP TANK. 03:00-05: CSGSUR 06 P - D - CASING/LINER 05:00-06: CSGSUR 12 P - RUN A - RIG UP/ RIG CASING & DOWN CASING CEMENT EQUIP 06:00-12: CSGSUR 12 P - RUN A - RIG UP/ RIG CASING & DOWN CASING CEMENT EQUIP 12:30-14: CSGSUR 05 P - CIRC & A - CONDITION COND MUD MUD / CLG / HTG 14:00-17: CSGSUR 12 P - RUN E - CEMENTING CASING & PRIMARY CEMENT 17:30-20: CSGSUR 05 P - CIRC & A - CONDITION COND MUD MUD / CLG / HTG 20:30-22: CSGSUR 12 P - RUN E - CEMENTING CASING & PRIMARY CEMENT 22:00-22: CSGSUR 12 P - RUN B - RIG UP/ RIG CASING & DOWN CEMENT CEMENT EQUIP 22:30-00: CSGSUR 14 P - NU A - NIPPLE UP / BOPE NIPPLE DOWN L/D BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB. RIG UP FRANKS CASING CREW,HOLD PJSM. M/U WEATHERFORD SHOE - 1 JT OF 9 5/8'' 40# J-55- BTC -WEATHERFORD FLOAT COLLAR -AND TEST FLOATS.OK. RUN 90 JTS 9 5/8'' 40# J-55 BTC - WEATHERFOED DV TOOL- 29 JTS. 9 5/8" 40# J-55 BTC.RIH T/ 5073'.PU EXTRA JOINT AND TAG BTTM.1/2' IN,L/D JOINT. ( 5073' - FLOAT 5027', DV 1211'. RAN BOWSPRING CENT 5' ABOVE SHOE - 5' ABOVE FLOAT COLLAR- CENT FOR NEXT THREE CONNS - CENT EVERY 4TH JOIONT TO CONDUCTOR.TOTAL JOINTS RAN 120.THREAD LOCKED SHOE TRACK AND DV TOOL.) FILL PIPE AND CIRC. CASING CAPACITY WHILE RIGGING DOWN CASING CREW AND RIGGING UP CEMENTERS. SWAP & TEST LINES T/ 3000 PSI.,1ST STAGE- PUMP 30 BBLS. OF FRESH WATER SPACER, PUMP LEAD CEMENT 441 BBLS (1014 SX) OF 12# CLASS "C" PREMIUM PLUS 2.44 YLD., WITH 0.66% SODIUM METASILICATE, 3.58% SODIUM CHLORIDE & 0.19% POWDERED DEFOAMER,0.75% LOW TEMP RETARDER,14.31 GALS/SX MIXING WATER, FOLLOWED W/ TAIL CMT. 71 BBLS (298 SX.) OF 14.8# CLASS "C" PREMIUM PLUS 1.33 YLD.,0.19% POWDERED DEFOAMER,0.24% LOW TEMP RETARDER,MIXING WATER 6.32 GALS/SX, SHUT DOWN & DROP BTTM PLUG & DISPLACE CEMENT WITH 300 BBLS OF FRESH WATER AND 76 BBLS OF BRINE WATER,,BUMPED PLUG 500 OVER TO 1600 PSI, BLED BACK 2 BBLS, FLOATS HOLDING.FULL RETURNS THROUGHOUT JOB.DROPPED OPENING BOMB AND LET FALL FOR 10 MINS.,OPEN DV TOOL W/660 PSI,CIRC 10 BBLS.SHUT DOWN AND HAND OVER TO RIG. CIRCULATE BETWEEN 6 BPM.NO GAINS OR LOSSES.PUMP CALIPER SWEEP.WASHOUT 20%. SWAP & TEST LINES T/ 3000 PSI.,2ND STAGE- PUMP 30 BBLS. OF FRESH WATER SPACER, PUMP LEAD CEMENT 268 BBLS (598 SX) OF 12# CLASS "C" PREMIUM PLUS 2.44 YLD., WITH 0.66% SODIUM METASILICATE, 3.57% SODIUM CHLORIDE & 0.19% POWDERED DEFOAMER,0.75% LOW TEMP RETARDER,14.31 GALS/SX MIXING WATER,SHUT DOWN & DROP CLOSING PLUG & DISPLACE CEMENT WITH 92 BBLS OF FRESH WATER,BUMPED PLUG 1500 OVER TO 2250 PSI, BLED BACK 1 BBLS, FLOATS HOLDING.FULL RETURNS THROUGHOUT JOB.165 BBLS OF CEMENT BACK AT SURFACE. RIG DOWN CEMENTERS/FLUSH FLOWLINE AND CONDUCTOR W/SUGAR WATER. NIPPLE DOWN DIVERTER,FLOWLINE,HCR VALVE,HYDRAULIC LINES,PU DIVERTER AND CUT OFF CASING. LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/02/ :01 CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:H2S SAFETY. HOURS SINCE SPUD - 72 CASING STRINGS SET: 20" CONDUCTOR 120' ' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE-4953' - DRLG HRS TOTAL ROP- 111' FPH - TOTAL HRS ON MTR REASON FOR PULLING BIT -(9 5/8" CASING POINT) ( BIT GRADE 1-2.) TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 3/8/2017 8:12:40AM Page 2 of 2

16 Date: 03/05/2017 DFS: 4 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 9 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 5, , SPUD DATE 03/02/2017 API STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) INSTALL ROT.HEAD. BELL CANYON 2, $900 / $21, HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) DRILL AND SURVEY IN INT. HOLE SECTION,SERVICE RIG. 3/5/2017 NO $61,904 / $770,687 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG ,073.0 usft ,550.0 usft 3/5/ ,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: NIPPLE DOWN DIVERTER,WELD ON WELLHEAD AND TEST,NIPPLE UP BOPS AND TEST,INSTALL WEAR BUSHING,PU BHA,TIH,TEST CASING,DRILL OUT,DRILL AND SURVEY IN INT. HOLE SECTION. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP 2/ BAKER HUGHES / T / SURVEY DATA I-O-B-G-R Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@5477 N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS , , , DENS(ppg) 9.3 CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL %SAND FC OIL/WAT WPS ES LIME 00: / /1.0/ / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO DRILLING CONTINENTAL-EMSCO DRILLING TOTAL 628 MUD ADDITIVES ITEM USED UNITS ITEM USED UNITS ENGINEER 1 EACH ROT. AND SLIDE F/5500'-6689'. 198 FPH.) COMMENTS OPERATION DETAILS HOURS DUR (hr) PHASE CODE SUB DESCRIPTION 00:00-02: CSGSUR 14 P - NU BOPE A - NIPPLE UP / NIPPLE DOWN CONTINUE TO NIPPLE DOWN ANNULAR/CONDUCOTR,PU AND MAKE ROUGH CUT ON CASING/LAYOUT CUTOFF JOINT/LAYOUT ANNULAR. 02:00-04: CSGSUR 24 P - A - WELLHEAD SURFACE/ SUBSURFAC E EQPMT INSTALLATION 04:00-08: CSGSUR 14 P - NU A - NIPPLE UP / BOPE NIPPLE DOWN 08:00-11: CSGSUR 15 P - TEST A - TESTING BOP 11:30-12: CSGSUR 14 P - NU A - NIPPLE UP / BOPE NIPPLE DOWN 12:00-15: CSGSUR 06 P - D - CASING/LINER 15:00-17: CSGSUR 06 P - D - CASING/LINER 17:00-18: CSGSUR 02 P - DRILL - F - CEMENT IN ACTUAL CASING/SHOE 18:00-20: CSGSUR 06 P - D - CASING/LINER 20:00-20: CSGSUR 12 P - RUN D - PRESSURE CASING & TEST CEMENT 20:30-21: CSGSUR 02 P - DRILL - F - CEMENT IN ACTUAL CASING/SHOE 21:30-23: DRLIN1 02 P - DRILL - B - ACTUAL MOTOR/TURBINE - VERTICAL 23:30-00: DRLIN1 05 P - CIRC & A - CONDITION COND MUD MUD / CLG / HTG MAKE FINAL CUT ON CASING,INSTALL CAMERON 9 5/8" SOW X 11" 5K WELL HEAD AND TEST TO 1300 PSI.(TEST MUD LINES,FLOOR VALVES BACK TO PUMPS.250L/5000H.5 MINS.EACH TEST.) NIPPLE UP BOPS AND CHOKE LINE/KILL LINE,TURNBUCKLES,FLOWLINE,INSTALL MOUSEHOLE. (TEST CHOKE MANIFOLD 250L/5000H.5 MINS.EACH TEST.) PJSM WITH BOP TESTER,RIG UP AND TEST LOWER AND UPPER PIPE RAMS,BLIND RAMS,HCR,KILL LINE 250L/5000H,ANNULAR 250L/3000H.HELD EACH TEST 5 MINS.RIG DOWN TESTER. INSTALL WEAR BUSHING,CHECK VALVE ALIGNMENT ON BOPS,CHOKE MANIFOLD,RIG UP HALLIBUTON ROT.HEAD AND ORBIT VALVE EQUIP/LINES AND CLOSE CASING VALVE. PU BHA #2-8 3/4'' BAKER T607FX ( 7-14 JETS -TFA=1.0) BAKER 7'' ULTRA XL 45/RS 7'' 7/ /8'' STAB - NMPDC- PIN X PIN SUB - LANDING SUB - CENTRAL SUB - GAP SUB - NMDC - NMDC- SHOCK SUB. (LAYED DOWN FIRST PREMIERE GAP SUB PICKED UP DUE TO IT BEING SENT OUT TO RIG WITH SMALL GASH ON FACE OF BOX.)TEST TOOLS.OK. TIH F/BHA-1211'. TAG DRILL CEMENT F/1200'-1211'. DRILL OUT DV 1211'.WOB-15-20,RPM-25,SPM-96, PSI-900,TRQ-6K.CIRC. BTTMS.UP. TIH F/1211'-5020'. TEST CASING T/1500 PSI.OK. DRILL CEMENT F/5020'-5027'.DRILL FLOAT 5027',DRILL CEMENT,DRILL 5073'.WOB-10-15,RPM-25,SPM-96, PSI-900,TRQ-6K. DRLG F/5073'- 5500' (427'@ 213 FPH ) WOB TD RPM -70- MTR RPM SPM 150- GPM PP DIFF TORQUE 10K - MW IN 9.3 PPG,VIS-28.CIRC. RESERVE PIT. PULL TRIP NIPPLE AND INSTALL ROT.HEAD. 3/6/2017 8:05:29AM Page 1 of 2

17 Date: 03/05/2017 DFS: 4 LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/02/ :01 CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:WORKING WITH HIGH PSI. HOURS SINCE SPUD - 72 CASING STRINGS SET: 20" CONDUCTOR 120' ' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE-4953' - DRLG HRS TOTAL ROP- 111' FPH - TOTAL HRS ON MTR REASON FOR PULLING BIT -(9 5/8" CASING POINT) ( BIT GRADE 1-2). BHA #2-8 3/4'' BAKER T607FX ( 7-14 JETS -TFA=1.0) BAKER 7'' ULTRA XL 45/RS 7'' 7/ ,RPG /8'' STAB - NMPDC- PIN X PIN SUB - LANDING SUB - CENTRAL SUB - GAP SUB - NMDC - NMDC- SHOCK SUB /2'' DCS - X-0 SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE- XXX' - DRLG HRS - XXX' TOTAL ROP - XXX' FPH - TOTAL HRS ON MTR -XXX - REASON FOR PULLING BIT -(XXXXXX') (BIT GRADE X-X). TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 3/6/2017 8:05:29AM Page 2 of 2

18 Date: 03/06/2017 DFS: 5 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 10 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 8, , , SPUD DATE 03/02/2017 API STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) DRLG 8470'. BRUSHY CANYON 2, , $6937 / $28, HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) DRILL AND SURVEY,SERVICE RIG. 3/6/2017 NO $59,323 / $830,010 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG ,073.0 usft ,550.0 usft 3/5/ ,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: DRILL AND SURVEY,SERVICE RIG. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP 2/ BAKER HUGHES / T / SURVEY DATA I-O-B-G-R , Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@8345 N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS , , , , , , , , , , , , , , , , DENS(ppg) 9.3 CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL %SAND FC OIL/WAT WPS ES LIME 00: / /1.0/ / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO DRILLING CONTINENTAL-EMSCO DRILLING TOTAL 544 MUD ADDITIVES ITEM USED UNITS ITEM USED UNITS ENGINEER 1 EACH SALTWATER GEL # LIME 2 50# BAG BARITE BULK #SK COMMENTS ROT. F/8470'-8801'. 66 FPH.) GAINED 1500 PSI. OFF 66 SPM CIRC. HOLE CLEAN/TOOH. HOURS DUR (hr) 9.00 PHASE 00:00-09:00 DRLIN1 02 P - DRILL - B - ACTUAL CODE SUB DESCRIPTION MOTOR/TURBINE - VERTICAL 09:00-09: DRLIN1 07 P - LUB A - DAILY RIG (RIG SERVICE SERVICE) 09:30-00: DRLIN1 02 P - DRILL - B - ACTUAL MOTOR/TURBINE - VERTICAL OPERATION DETAILS DRLG F/5500'- 7171' (1671'@ 185 FPH ) WOB TD RPM -70- MTR RPM SPM 150- GPM PP DIFF TORQUE 10K - MW IN 9.3 PPG,VIS-28.CIRC. RESERVE PIT. R F/5500'-6633'. S F/6633'-6668'. R F/6668'-7171'. SERVICE RIG. DRLG F/7171' ' 68 FPH ) WOB TD RPM -30- MTR RPM SPM 130- GPM PP DIFF TORQUE 12K - MW IN 9.3 PPG,VIS-28.CIRC. RESERVE PIT. R F/7171' /7/ :33:06AM Page 1 of 2

19 Date: 03/06/2017 DFS: 5 LOVING COUNTY DIRECTIONS: FROM DOWNTOWN MENTONE, TEXAS TRAVEL EAST ON 302 FOR 7 MILES, TURN RIGHT (GATE A-11) GO 3 MILES TO T, TURN LEFT GO 3 MILES TO T, TURN RIGHT CROSS CATTLE GUARD GO 5/10 MILES TURN RIGHT GO 2OO TURN RIGHT ONTO LEASE ROAD TO SITE. GATE A-11 IS ALSO 1.5 MILES WEST OF DRILLING YARD RIG RELEASED FROM SEAHAWK H ON 12:00PM. SPUD WELL ON 02/02/ :01 CAT 3 INSPECTION ON 5'' DP PERFORMED ON 12/06/ JTS ON LOCATION. 7 JOINTS SENT IN AND JUNKED DUE TO WASHOUTS AND SLIP CUTS. CLEAN AND VISUAL INSPECTION ON 4'' XT-39 DP PERFORMED ON 10/14/2016,144 BOXES REFACED,80 PINS REFACED,100 JOINTS W/THREAD SERVICE, 4 BAD JOINTS SENT IN ON 1/15/ JOINTS ON LOCATION. SAFETY MTG:MAKING CONNECTION. HOURS SINCE SPUD CASING STRINGS SET: 20" CONDUCTOR 120' ' 7'' 11550'. KOP 10850'. XXXXX' 4 1/2" 18944'. BHA #1-12 1/4'' ULTERRA (U616S) 6-14'S JETS (TFA=.90 ) MPAC 7 3/4'' 4/ RPG 1.50 W/ 11 5/8'' STAB NS-11 5/8'' NON-MAG STAB - NMPC - MULESHOE SUB - NMDC- NMDC- 8'' SHOCK SUB - X-O SUB /2'' DCS - X-O SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE-4953' - DRLG HRS TOTAL ROP- 111' FPH - TOTAL HRS ON MTR REASON FOR PULLING BIT -(9 5/8" CASING POINT) ( BIT GRADE 1-2). BHA #2-8 3/4'' BAKER T607FX ( 7-14 JETS -TFA=1.0) BAKER 7'' ULTRA XL 45/RS 7'' 7/ ,RPG /8'' STAB - NMPDC- PIN X PIN SUB - LANDING SUB - CENTRAL SUB - GAP SUB - NMDC - NMDC- SHOCK SUB /2'' DCS - X-0 SUB '' HWDP - TOTAL = ' TOTAL FOOTAGE- XXX' - DRLG HRS - XXX' TOTAL ROP - XXX' FPH - TOTAL HRS ON MTR -XXX - REASON FOR PULLING BIT -(XXXXXX') (BIT GRADE X-X). TARGET LINE: 11465' TVD 89.7 INC, VS NO ACCIDENTS, NEAR MISSES, OR SPILLS. 3/7/ :33:06AM Page 2 of 2

20 Date: 03/07/2017 DFS: 6 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 11 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION , , , SPUD DATE 03/02/2017 API STATE COUNTY DIVISION TEXAS LOVING US SOUTHERN REGION CURRENT STATUS FORMATION ELEV. DIESEL MUD LOST(DAY/CUM) DLRG 10070'. BRUSHY CANYON 2, , $2086 / $30, HR FORECAST LAST SAFETY MEETING ACC LST 24 HRS? WELL COST(DAY/CUM) DRILL TO KOP,TOOH,L/D D.C'S AND BHA,PU CURVE BHA. 3/7/2017 NO $65,197 / $902,032 LAST CASING LKOFF NEXT CASING LAST BOP TEST AUTH TMD/AUTH COST SUPERVISOR/DRILLING ENG ,073.0 usft ,550.0 usft 3/5/ ,954 ft/ $7,711, TOM GARCIA/BOBBY WEST OPERATE SUMMARY: DRILL AND SURVEY,TROUBLSHOOT PSI GAUGE,SERVICE RIG. BITS/ BIT OPERATIONS BIT/RUN SIZE MANFU/TYPE SERIAL# JETS OR TFA WOB RPM GPM/PP DHRPM DEPTH I/O FTG HRS ROP 2/ BAKER HUGHES / T / SURVEY DATA I-O-B-G-R , Survey Name: Openwire Survey Tool: MWD+IFR1 Survey Company: PREMIER DIRECTIONAL DRILL LAST SURVEY@9958 N/S E/W MD INCL AZIMUTH TVD SECTION DLS MD INCL AZIMUTH TVD SECTION DLS , , , , , , , , , DENS(ppg) 9.3 CGas / BGas MUD DATA TGas / MUD LOST WATER LOST 0.00 TIME FV PV/YP GELS WL/HTHP %LGS/T.SOL %SAND FC OIL/WAT WPS ES LIME 00: / /1.0/ / / PUMP/HYDRAULICS NO. MAKE OF PUMP STK(in) LNR(in) PUMP OPERATION SPM PRESS.(psi) GPM AV DC AV DP 1 CONTINENTAL-EMSCO DRILLING CONTINENTAL-EMSCO DRILLING TOTAL 544 MUD ADDITIVES ITEM USED UNITS ITEM USED UNITS ENGINEER 1 EACH SALTWATER GEL 4 50 # LIME 9 50# BAG DEFOAMER 2 5 GAL TRANSPORTATION 900 EACH '-10640'. 95 FPH.) HOURS DUR (hr) 5.00 PHASE 00:00-05:00 DRLIN1 02 P - DRILL - B - ACTUAL CODE SUB DESCRIPTION MOTOR/TURBINE - VERTICAL 05:00-06: DRLIN1 08 Z - RIG A - GENERAL RIG REPAIR EQUIPMENT 06:00-10: DRLIN1 02 P - DRILL - B - ACTUAL MOTOR/TURBINE - VERTICAL 10:30-11: DRLIN1 07 P - LUB A - DAILY RIG (RIG SERVICE SERVICE) 11:00-00: DRLIN1 02 P - DRILL - B - ACTUAL MOTOR/TURBINE - VERTICAL COMMENTS OPERATION DETAILS DRLG F/8470' ' 66 FPH ) WOB TD RPM -30- MTR RPM SPM 130- GPM PP DIFF TORQUE 12K - MW IN 9.3 PPG,VIS-28.CIRC. RESERVE PIT. R F/8470'-8801'. WHILE DRILLING 8801' DRILL STRING PRESSURED UP,PICKED UP OFF BTTM AFTER SLOWING PUMPS DOWN TO 60 SPM AND OBSERVED A GAIN OF 1500 PSI.DECISION MADE TO TOOH FOR MOTOR,PUMP 50 BBLS SLUG AND PREP TO TOOH. AFTER PUMPING SLUG STANDPIPE PRESSURE ON TOTCO READING 800 PSI WITH 2" BLEED OFF VALVE WIDE OPEN.CHOKE PANEL GAUGE READING 0 PSI.CLOSED 2" BLEED OFF VALVE AND BROUGHT PUMPS BACK ON TO DRILLING STOKES AND OBSERVED TOTCO STILL READING 400 PSI. HIGHER,CHOKE PANEL READING CORRECT PRESSURE. CHANGED OUT PRECISIONS STAND PIPE PRESSURE GAUGE AND ALL PRESSURES BACK TO NORMAL. DRLG F/8801' ' 76 FPH ) WOB TD RPM -30- MTR RPM SPM 130- GPM PP DIFF TORQUE 12K - MW IN 9.3 PPG,VIS-28.CIRC. RESERVE PIT. R F/8801'-9143'. SERVICE RIG. DRLG F/9143' ' 71 FPH ) WOB TD RPM MTR RPM SPM GPM PP DIFF TORQUE 12-15K - MW IN 9.3 PPG,VIS-28.CIRC. RESERVE PIT.BGG-450. R F/9143'-10039'. S F/10039'-10070'. TF-70M. 3/8/2017 7:56:03AM Page 1 of 2

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

RIG DESCRIPTION. Rig Name SEDLAR 160. Built 2007

RIG DESCRIPTION. Rig Name SEDLAR 160. Built 2007 Services de Forage 205 Appendice 6 RIG DESCRIPTION ITEM EQUIPMENT QTY DESCRIPTION SECTION A GENERAL RIG CHARACTERISTICS General Rig Name SEDLAR 60 Model and Type Owner Designer Trailer mounted-self elevation

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A API No.: 35017248570000 OTC Prod. Unit No.: 017-217813

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #: MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements AADE-03-NTCE-49 Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements Copyright 2003 AADE Technical Conference

More information