1 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: Well User ID : 43UNIV Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT Acres : 0 Dlg Rig Rel Date: Spud Date : 12/24/2010 AFE Type : Exploration Drlg/Comp 760 ft. from N line and 700 ft. from W line AFE # : Operated : PB No WI : 1 NRI : 0.75 AFE DHC : $2,796,100 AFE Total: $6,315,550 AFE Develop To: 0 Proposed Depth : 8600 Activity Date : 12/19/2010 Days Since Spud : Hr. Footage Made : 0 Current Depth : 0 Rig Company : Rig Name: Activity : 01 - Rig Up & Tear Down Weather: Remarks: SET SUB BASE RAISING RAMS, REMOVE CATWALK, SET OUT STAIRWAYS, RD BLOCKS AND DRILLING LINE. REPAIR SHAKERS AND CENTRIFUGE.RELEASE AND RETURN 4" RENTAL DP, HWDP, AND HANDLING TOOLS, HP ROTATING HEAD, ORBIT VALVES AND UNUSED 4-1/2" UFJ CASING.RD MOVE AND SET UP ALL CAMP TRAILERS, SEWR AND WATER SYSTEMS. BREAK OUT PUMP LINES,FLOWLINES AND MUD MIXING EQUIPMENT. Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: MR RIG DOWN CAMP TRAILERS AND MOVE 0 0 NIH Total: DC : $225,707 Cum. DHC : $225,707 Total Well Cost: $225,707 Activity Date : 12/20/2010 Days Since Spud : Hr. Footage Made : 0 Current Depth : 0 Rig Company : Rig Name: Activity : 01 - Rig Up & Tear Down Weather: Remarks: LOWER SUB BASE AND DERRISCK. MOVE AND SPOT SHAKER PIT. MOVE BOPE, MUD SILOS, KOOMY UNIT, AND ASSORTED PIPEING,HOSES, AND TOOLS TO NEW LOCATION. IE MILLER RIG MOVEING COMPANY 80% RIGGED DOWN AND 80% MOVED OFF. 50% RIGGED UP. Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: LOWER SUB BASE RAISING RAMS, REMOVE CATWALK, SET OUT STAIRWAYS, RD 0 0 NIH BLOCKS AND DRILLING LINE. REPAIR SHAKERS AND CENTRIFUGE LOWER DERRRICK - 80% R/D OFF UNIVERSITY H - 25% R/U ON UNIVERSITY NIH 20 #1H % RIGGED UP 0 0 NIH Total: DC : $26,207 Cum. DHC : $251,914 Total Well Cost: $251,914 Report Date : Wednesday, January 05, 2011 Powered by Production Access 2

2 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 12/21/2010 Days Since Spud : Hr. Footage Made : 0 Current Depth : 0 Rig Company : Rig Name: Activity : 01 - Rig Up & Tear Down Weather: Remarks: MOVED AND SPOTTED PITS,PUMPS,GENERATORS,WATER TANKS,GAS -SEPERATORS,. SET DERRICK (2nd STAGE) ON TRUCKS. ALL 100% MOVED AND SPOTTED. AND 60% RIGGED UP Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: MOVED AND SPOTTED PITS,PUMPS,GENERATORS,WATER TANKS,GAS - SEPERATORS,. SET DERRICK (2nd STAGE) ON TRUCKS. ALL 100% MOVED AND SPOTTED. AND 60% RIGGED UP 0 0 NIH Total: DC : $26,562 Cum. DHC : $278,476 Total Well Cost: $278,476 Activity Date : 12/22/2010 Days Since Spud : Hr. Footage Made : 0 Current Depth : 0 Rig Company : Rig Name: Activity : 01 - Rig Up & Tear Down Weather: Remarks: CONTINUE MOVING RIG. HOOKING UP PUMPS AND PITS. MOVE IN AND SET SUB BASE AND PIN DERRICK TO SUB BASE. ALL EQUIPMENT IS ON THIS LOCATION.CHANGE OUT GENERATOR MOTOR #1 CHANGE OUT KELLY HOSE 75% RIGGED UP. Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: CONTINUE MOVING RIG. HOOKING UP PUMPS AND PITS. MOVE IN AND SET SUB BASE AND PIN DERRICK TO SUB BASE. ALL EQUIPMENT IS ON THIS LOCATION.CHANGE OUT GENERATOR MOTOR #1 CHANGE OUT KELLY HOSE 75% RIGGED UP. 0 0 NIH Total: DC : $27,707 Cum. DHC : $306,183 Total Well Cost: $306,183 Activity Date : 12/23/2010 Days Since Spud : Hr. Footage Made : 0 Current Depth : 0 Rig Company : Rig Name: Activity : 01 - Rig Up & Tear Down Weather: Remarks: RAISE DERRICK AND SUB BASE. SET IN MUD GAS SEPERATORS. REMOVE RAISING RAMS.SET CATWALK, HOOKING UP ELEC.,.WATER, AND HYDRAULINC LINES. RIGGING UP FLOOR Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: RAISE DERRICK AND SUB BASE. SET IN MUD GAS SEPERATORS. REMOVE RAISING 0 0 NIH RAMS HOOKING UP ELEC. AND HYDRAULINC LINES. 0 0 NIH RIGGING UP FLOOR 0 0 NIH Total: DC : $72,601 Cum. DHC : $378,784 Total Well Cost: $378,784 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 2 of 12

3 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 12/24/2010 Days Since Spud : Hr. Footage Made : 247 Current Depth : 317 Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: RIG UP FLOOR -WELD ON CONDUCTOR AND FLOW LINE -SET CATWALK, - INSTALL MOUSE HOLE - CHECK PUMPS - NOTIFIED RRC OF INTENT OF SPUD TIME SET CATWALK, P/U AND M/U BHA #1 AS FOLLOWS: 12-1/4" DB PDC BIT 5/12S,4/11s, WEATHERFORD 8" LE /8 LOBE, 4 STAGE, FLOAT SUB, X-OVER, 2EA 8" SHOCK SUBS, 2 EA 8" DCs,12-1/4 3 PT ROLLER REAMER, 4 EA 8" DCs, X-OVER, 12 EA. 6-1/2" DCs, X-OVER. ROTARY DRILL FROM 70' TO 317' - WOB = 5-10K,TD RPM 50-60,TORQUE = 1000, PP = 750#, SPM = 100 stks, 569 GAL/MIN.- MOTOR RPM =91 rpm Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: RIG UP FLOOR -WELD ON CONDUCTOR AND FLOW LINE -SET CATWALK, - INSTALL NIH MOUSE HOLE - CHECK PUMPS - NOTIFIED RRC OF INTENT OF SPUD TIME SET CATWALK, 20: RIG REPAIR ON BRAKES : P/U AND M/U BHA #1 AS FOLLOWS: 12-1/4" DB PDC BIT 5/12S,4/11s, WEATHERFORD " LE /8 LOBE, 4 STAGE, FLOAT SUB, X-OVER, 2EA 8" SHOCK SUBS, 2 EA 8" DCs,12-1/4 3 PT ROLLER REAMER, 4 EA 8" DCs, X-OVER, 12 EA. 6-1/2" DCs, X-OVER 0: ROTARY DRILL FROM 70' TO 317' - WOB = 5-10K,TD RPM 50-60,TORQUE = 1000, PP = #, SPM = 100 stks, 569 GAL/MIN.- MOTOR RPM =91 rpm Total: DC : $49,598 Cum. DHC : $428,382 Total Well Cost: $428,382 Activity Date : 12/25/2010 Days Since Spud : 1 24 Hr. Footage Made : 693 Current Depth : 1010 Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: ROTARY DRILL FROM 313' TO10' -WOB = 8-10K,PP = 250#, STKS/MIN = 100, 570 GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 50 RPMS DEVIATION 256' =.78 degrees 497' =.77 degrees MUD WEIGHT = 9.9# IN/OUT WHILE PICKING UP FIRST STAND OF 5" DP TO DRILL DOWN UPPER RAILING ON TOP DRIVE HIT PIN ON GUIDE RAIL BENDNING TOP FRAME AND KNOCKING STABILIZER OFF RAIL, PULL OFF RAIL AND STRAIGHTEN. RIG WATCH NOT WORKING HALF THE TIME. MERRY CHRISTMAS Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: DEVIATION 256' =.78 DEGREES : ROTARY DRILL FROM 317' TO 550' : DEVIATION 497' =.77 degrees : ROTARY DRILL FROM 550' TO 713' -WOB = 8-10K,PP = 1160#, STKS/MIN = 100, GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 50 RPMS 14: WHILE PICKING UP FIRST STAND OF 5" DP TO DRILL DOWN UPPER RAILING ON TOP DRIVE HIT PIN ON GUIDE RAIL BENDNING FRAME AND KNOCKING STABILIZER OFF RAIL, 23: ROTARY DRILL FROM 713' TO 1010' Total: DC : $28,912 Cum. DHC : $457,294 Total Well Cost: $457,294 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 3 of 12

4 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 12/26/2010 Days Since Spud : 2 24 Hr. Footage Made : 1360 Current Depth : Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: ROTARY DRILL FROM 1010' TO 2370' (1360') ROP = 61'/HR -WOB = 8-10K,PP = 250#, STKS/MIN = 100, 570 GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 60 RPMS 2370 DEVIATION SURVEY : 750' =.85 DEGREES 1250' =.45 DEGREES 1700' =.66 degrees 2225' =.98 degrees MUD WEIGHT = 9.9# IN/OUT MINIMUM LOSSES TO FORMATION <2 BBLS Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: DEVIATION 750' =.85 DEGREES : ROTARY DRILL FROM 1010' TO 1283' -WOB = 8-10K,PP = 1218#, STKS/MIN = 100, GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 60 RPMS 10: SERVICE TOP DRIVE, CROWN : DEVIATION 1250' =.45 DEGREES : ROTARY DRILL FROM 1283' TO 1759' -WOB = 8-10K,PP = 1218#, STKS/MIN = 100, GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 60 RPMS 21: DEVIATION 1700' =.66 degrees : ROTARY DRILL FROM 1759' TO 2250 '- WOB = 10-15K, : DEVIATION 2225' =.98 degrees : ROTARY DRILL FROM 2250' TO 2370' -WOB = K,PP = 1940#, STKS/MIN = 100, GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 60 RPMS Total: DC : $28,912 Cum. DHC : $486,206 Total Well Cost: $486,206 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 4 of 12

5 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 12/27/2010 Days Since Spud : 3 24 Hr. Footage Made : 610 Current Depth : 2980 Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: ROTARY DRILL FROM 2370 TO 2980' (610') ROP = 27'/HR -WOB = 4-5K,PP =1550, STKS/MIN = 80, 455 GALS/MIN, MOTOR RPM = 73,TOP DRIVE RPM = 60 RPMS - TORQUE = 2300'/# DEVIATION SURVEY : 2745' = 3.54 degrees 2835' = 3.4 degrees 2930' = 3.70 degrees MUD WEIGHT = 10# IN/OUT Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILL FROM 2370' TO 2780' -WOB = 18K,PP = 1934#, STKS/MIN = 100, GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 60 RPMS 13: RIG SERVICE : DEVIATION 2745' = 3.54 degrees : ROTARY DRILL FROM 2780' TO 2873' -WOB = 6K,PP = 1977#, STKS/MIN = 100, GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 60 RPMS 22: DEVIATION 2835' = 3.4 degrees : ROTARY DRILL FROM 2873' TO 2968' -WOB = 6K,PP = 2300#, STKS/MIN = 100, GALS/MIN, MOTOR RPM = 91,TOP DRIVE RPM = 60 RPMS 5: DEVIATION 2930' = 3.70 degrees : ROTARY DRILL FROM 2968' TO 2980' - WOB = 4, STKS/MIN = Total: DC : $26,350 Cum. DHC : $512,556 Total Well Cost: $512,556 Activity Date : 12/28/2010 Days Since Spud : 4 24 Hr. Footage Made : 186 Current Depth : 3166 Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: ROTARY DRILL FROM 2980 TO 3166' (186') ROP = 11'/HR WOB = 4-5K,PP =1550, STKS/MIN = 110, 626 GALS/MIN, MOTOR RPM = 100,TOP DRIVE RPM = 60 RPMS - TORQUE = 2600'/#. DEVIATION SURVEYS: 3032' = 1.54 degrees 3125' = 2.45 degrees MUD WEIGHT IN/OUT = 10.0# Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILL FROM 2980 TO 3062' - WOB = 5, STKS/MIN = : DEVIATION 3032' = 1.54 degrees : SERVICE TOP DRIVE CROWN AND BLOCKS : ROTARY DRILL FROM 3062 TO 3109' - WOB = 8, STKS/MIN = : PUMP #1 BELTS SLIPPING, SWITCH TO P[UMP #2 LINER WENT OUT. CHANGED OVER TO PUMP #1 - CIRCULATING ON WELL AT 40 STROKES (228 GALS/MIN) AND ROTAQTING STRING AT 19 RPMS. WORKING ON PUMP #2. 2: ROTARY DRILL FROM 3109' TO 3150' - WOB = 7, STKS/MIN = : DEVEATION 3125' = 2.45 degrees : ROTARY DRILL FROM 3150' TO 3166' -WOB =6K, STKS = 110 =626 GALS, 100 MOTOR RPMS, 60 TD RPMS Total: DC : $27,350 Cum. DHC : $539,906 Total Well Cost: $539,906 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 5 of 12

6 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 12/29/2010 Days Since Spud : 5 24 Hr. Footage Made : 288 Current Depth : 3454 Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: ROTARY DRILL FROM 3166 TO 3454' (288') ROP = 13.5'/HR WOB = 5-15K,PP =2000, STKS/MIN = 104, 592 GALS/MIN, MOTOR RPM = 95,TOP DRIVE RPM = 80 RPMS - TORQUE = 4100/#. DEVIATION SURVEYS: 3191' = 1.01 degrees 3320 =.76 degrees MUD WEIGHT IN/OUT = 10.0# Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILL FROM 3166' TO 3250' - WOB = 5-6K, PP = 2884, 100 RPM MOTOR, STKS/MIN, 626 GALS/MIN. - DEVIATION PROBLEM 13: DEVIATION 3191' = 1.01 degrees : ROTARY DRILL FROM 3250' TO 3351 ' - WOB = 5-6K, PP = 2884, 100 RPM MOTOR, STKS/MIN, 584 GALS/MIN RPMS TOP DRIVE. 21: DEVIATION 3320 =.76 degrees : RIG PUMP REPAIR AND 4" VALVE REPAIR : ROTARY DRILL FROM 3351' TO 3454' - WOB = 10-15K, PP = 2174, 100 RPM MOTOR, STKS/MIN, 584 GALS/MIN RPMS = TOP DRIVE. Total: DC : $62,474 Cum. DHC : $602,380 Total Well Cost: $602,380 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 6 of 12

7 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 12/30/2010 Days Since Spud : 6 24 Hr. Footage Made : 677 Current Depth : 4131 Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: ROTARY DRILL FROM 3454' TO 4131' (677') ROP = 30.8'/HR WOB = 5-15K,PP =2300, STKS/MIN = 104, 592 GALS/MIN, MOTOR RPM = 95,TOP DRIVE RPM = 80 RPMS - TORQUE = 4100/#. DEVIATION SURVEYS: 3320' =.76 degrees 3510' =.42 degrees 3700' = 1.26 degrees MUD WEIGHT IN/OUT = 10.0# Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILLING FROM 3454' TO 3542' - WOB = 15K - PP = 2175#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 9: DEVIATION 3510' =.42 degrees : ROTARY DRILLING FROM 3542' TO 3638' - WOB = 15K - PP = 2175#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 13: RIG SERVICE : ROTARY DRILLING FROM 3638' TO 3732' - WOB = 15K - PP = 2345#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 15: DEVIATION 3700' = 1.26 degrees : ROTARY DRILLING FROM 3732' TO 3923' - WOB = 15K - PP = 2345#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 22: DEVIATION 3880' =.81 degrees : ROTARY DRILLING FROM 3923' TO 4112' - WOB = 15K - PP = 2247#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 4: DEVIATION 4070' =..46 degrees : ROTARY DRILLING FROM 4112' TO 4131' - WOB = 15K - PP = 2247#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 Total: DC : $115,924 Cum. DHC : $718,304 Total Well Cost: $718,304 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 7 of 12

8 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 12/31/2010 Days Since Spud : 7 24 Hr. Footage Made : 739 Current Depth : 4870 Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: ROTARY DRILL FROM 4131' TO 4870' (739') ROP = 33'/HR WOB = 5-15K,PP =2300, STKS/MIN = 104, 592 GALS/MIN, MOTOR RPM = 95,TOP DRIVE RPM = 80 RPMS - TORQUE = 4100/#. DEVIATION SURVEYS: 4070' = 0.46 degrees 4269' =.54 degrees 4556' = 1.58 degrees MUD WEIGHT IN/OUT = 10.0# LITHOLOGY : 70% ANHYDRITE. 10% LIMESTONE, 10% SHALE, 10% SALT Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILLING FROM 4131' TO 4300' - WOB = 15K - PP = 2247#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 11: SERVICE RIG AND TOP DRIVE : DEVIATION 4269' =.54 degrees : ROTARY DRILLING FROM 4300' TO 4586' - WOB = 15K - PP = 2247#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 20: DEVIATION 4556' = 1.58 degrees : ROTARY DRILLING FROM 4586' TO 4870' - WOB = 15K - PP = 2247#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 Total: DC : $30,380 Cum. DHC : $748,684 Total Well Cost: $748,684 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 8 of 12

9 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 1/1/2011 Days Since Spud : 8 24 Hr. Footage Made : 200 Current Depth : 5070 Rig Company : Rig Name: Activity : 08 - Rig Repair Weather: Remarks: ROTARY DRILL FROM 4870' TO 5070' (200') ROP = 28'/HR WOB = 15K,PP =2300, STKS/MIN = 104, 592 GALS/MIN, MOTOR RPM = 95,TOP DRIVE RPM = 80 RPMS - TORQUE = 4100/#. TD WELL 5070'. CIRCULATE HOLE CLEAN - POOH - L/D 8" DCs AND BHA #1 REPAIR CATWALK (PRAGMA) ELECTRICAL) DEVIATION SURVEYS: 4842' =.95 degrees MUD WEIGHT IN/OUT = 10.0# LITHOLOGY : 0% ANHYDRITE. 30% LIMESTONE, 30% SHALE, 40% SALT Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: DEVIATION 4842' =.95 degrees : ROTARY DRILLING FROM 4870' TO 4965' - WOB = 15K - PP = 2247#, TD TORQUE = #, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 10: SERVICE RIG AND TOP DRIVE : ROTARY DRILL FROM 4965' TO 5070' - WOB = 15K - PP = 2247#, TD TORQUE = 5100#, STKS/MIN = 104, GAL/MIN = 592, MOTOR RPM = 95, RPM TOP DRIVE = 81 14: PUMP 50 BBLS OF HV MUD AND CIRCULATE WELL : POOH WITH DP AND 6.5" DCs TO DERRICK : L/D ALL 8" DCs AND BHA # : REPAIR ON CATWALK -PRAGMA - ELECTRCAL NIH Total: DC : $27,360 Cum. DHC : $776,044 Total Well Cost: $776,044 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 9 of 12

10 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 1/2/2011 Days Since Spud : 9 24 Hr. Footage Made : 0 Current Depth : 5070 Rig Company : Rig Name: Activity : 01 - Rig Up & Tear Down Weather: Remarks: RIG REPAIR ON PAGMAR RIG DOWN ELEVATORS, RIG UP 18' BAILS, ELEVATORS, HELD PJSM, RAN IN HOLE WITH 112 JTS OF 9-5/8" 40# L-80 LTC CSG. FILLING PIPE EVERY 30 JTS. - TAGGED TD AT 5071' - PICKED UP 3'. CIRCULATE AND CONDITION HOLE. HELD PJSM - INSTALLED CMT. HEAD - PSI TEST LINES TO 3000# OK - MIX 1400 sxs OF LEAD CMT. AT 12.8#/GAL, 300 sxs OF TAIL CMT. AT 14.8#/GAL. PLUG DOWN AT 22:00 CIRCULATED 200 SXS OF CMT.BUMP PLUG - RELEASE PSI - FLOAT HELD. WOC - 6 HRS CUT-OFF CONDUCTOR" POOH AND LAY DOWN - MAKE RUFF CUT AND PREP TO INSTALL 11" 5M X 9-5/8" SOW AND WELD. Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: RIG REPAIR ON PAGMAR NIH 9: RIG DOWN ELEVATORS, RIG UP 18' BAILS, ELEVATORS, HELD PJSM, NIH 11: RAN IN HOLE WITH 112 JTS OF 9-5/8" 40# L-80 LTC CSG. FILLING PIPE EVERY NIH JTS. - TAGGED TD AT 5071' - PICKED UP 3'. 16: CIRCULATE AND CONDITION HOLE NIH 18: HELD PJSM - INSTALLED CMT. HEAD - PSI TEST LINES TO 3000# OK - MIX 1400 sxs OF NIH LEAD CMT. AT 12.8#/GAL, 300 sxs OF TAIL CMT. AT 14.8#/GAL. PLUG DOWN AT 22:00 CIRCULATED 200 SXS OF CMT.BUMP PLUG - RELEASE PSI - FLOAT HELD 22: WAIT ON CEMENT NIH 4: CUT-OFF CONDUCTOR" POOH AND LAY DOWN - MAKE RUFF CUT AND INSTALL 11" NIH 5M X 9-5/8" SOW AND WELD. Total: DC : $96,119 Cum. DHC : $872,163 Total Well Cost: $872,163 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 10 of 12

11 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 1/3/2011 Days Since Spud : Hr. Footage Made : 0 Current Depth : 5070 Rig Company : Nabors Drilling USA LP Rig Name: Nabors Rig #F-25 Activity : 06 - Trips Weather: Remarks: CUT-OFF 20'" POOH AND LAY DOWN - MAKE RUFF CUT ON 9-5/8" AND INSTALL 11" 5M X 9-5/8"' SOW AND WELD. NSTALL DSA 5000#/10,000#, NIPPLE UP BOP WITH NEW RINGS, NIPPLE UP ROTATING HEAD, INSTALL COFLEX HOSE TO CHOKE MANIFOLD, INSTALL ACUMULATOR LINES ON BOP AND TEST. P/U AND M/U AND INSTALL TEST PLUG, FILL WITH FRESH WATER - TEST HYDRILL TO 250 LOW/ 2500 HIGH (OK) TEST BOTH SETS OF PIPE RAMS, BLINDS, CHOKE MANIFOLD AND COFLEX HOSE TO 2503 LOW/ 5000# HIGH AND ALL MANUAL VALVES. ON BOPS SAME - (ALL OK) - TEST ACCUMULATOR OK. P/U AND FAB 12-3/4" NIPPLE FROM ROTATING HEAD TO FLOWLINE. P/U AND M/U BHA #2 AS FOLLOWS : REED 8-3/4" PDC MSF813M W/4-15s, 6-3/4" PATHFINDER MOTOR 7/8 LOBE 5 STAGE, FLOAT SUB -W/FLOAT, 2 EA. 6.5" SHOCK SUBS, 1 EA 6.5" DC, 3PT ROLLER REAMER, 2 EA. 6.5" DCs,STABILIZER 8-5/8",18 EA. 6.5" DCs, X-OVER.. TRIP IN HOLE OUT OF DERRICK Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: CUT-OFF 20'" POOH AND LAY DOWN - MAKE RUFF CUT ON 9-5/8" AND INSTALL 11" 5M NIH X 9-5/8"' SOW AND WELD. 12: INSTALL DSA 5000#/10,000#, NIPPLE UP BOP WITH NEW RINGS, NIPPLE UP NIH ROTATING HEAD, INSTALL COFLEX HOSE TO CHOKE MANIFOLD, INSTALL ACUMULATOR LINES ON BOP AND TEST. 17: P/U AND M/U AND INSTALL TEST PLUG, FILL WITH FRESH WATER - TEST HYDRILL TO NIH 250 LOW/ 2500 HIGH (OK) TEST BOTH SETS OF PIPE RAMS, BLINDS, CHOKE MANIFOLD AND COFLEX HOSE TO 2503 LOW/ 5000# HIGH AND ALL MANUAL VALVES. ON BOPS SAME - (ALL OK) - TEST ACCUMULATOR OK. 20: P/U AND FAB 12-3/4" NIPPLE FROM ROTATING HEAD TO FLOWLINE NIH 0: P/U AND M/U BHA #2 AS FOLLOWS : REED 8-3/4" PDC MSF813M W/4-15s, 6-3/4" PATHFINDER MOTOR 7/8 LOBE 5 STAGE, FLOAT SUB -W/FLOAT, 2 EA. 6.5" SHOCK SUBS, 1 EA 6.5" DC, 3PT ROLLER REAMER, 2 EA. 6.5" DCs,STABILIZER 8-5/8",18 EA. 6.5" DCs, X-OVER. 5: TRIP IN HOLE OUT OF DERRICK Total: DC : $58,015 Cum. DHC : $930,178 Total Well Cost: $930,178 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 11 of 12

12 605 Richard Arrington Blvd. Daily Activity Report Activity Date : 1/4/2011 Days Since Spud : Hr. Footage Made : Rig Company : Rig Name: Activity : 02 - Drilling Weather: Remarks: FINISH TIH-TAG TOP OF 4943' WASH & DRILL SHOE TRACK-TEST CSG TO 2500# OK 1060 Current Depth : 6130 ROTARY DRILL FROM 5070' TO 6130' (1060') FPH WOB = 9K - TD RPM = 50, P.P. = 1994#, 100 STKS/MIN = 569 gal/min. TD TORQUE = 4770-/#- 165 RPM MOTOR DEVIATION SURVEYS: 5113' INC ' INC ' INC..49 NO LOSSES AT REPORT TIME LITHOLOGY: 10% LIMESTONE 10% SHALE 80% SAND Next Day: Operations Start Hrs Code Remarks Start Depth End Depth Run 6: INSTALL BELL NIPPLE : FINISH TIH-TAG TOP OF 4943' : WASH & DRILL SHOE TRACK-TEST CSG TO 2500# OK : DRILL 100 SPM 1800# TORQUE 3000#- 5140' : DEVIATION 5113' INC : ROTARY DRILL FROM 5140' TO 5338' - WOB = 9K - TD RPM = 50, P.P. = 1994#, STKS/MIN = 569 gal/min. TD TORQUE = 4770-/#- 165 RPM MOTOR 14: DEVIATION 5306' INC : ROTARY DRILL FROM 5338' TO 5811 ' - WOB = 9K - TD RPM = 50, P.P. = 1994#, STKS/MIN = 569 gal/min. TD TORQUE = 3740-/#- 165 RPM MOTOR 22: DEVIATION 5782' INC : ROTARY DRILL FROM 5811 ' ' WOB = 9K - TD RPM = 50, P.P. = 1994#, STKS/MIN = 569 gal/min. TD TORQUE = 3740-/#- 165 RPM MOTOR 3: INSTALL ROTATING HEAD RUBBER AND BEARING AND OILER : ROTARY DRILL FROM 6096'- 6130' WOB = 13K - TD RPM = 50, P.P. = 1994#, STKS/MIN = 569 gal/min. TD TORQUE = 4800-/#- 165 RPM MOTOR Total: DC : $77,740 Cum. DHC : $1,007,918 Total Well Cost: $1,007,918 Report Date : Wednesday, January 05, 2011 Powered by Production Access Page 12 of 12

13 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 18 Report 1/5/2011 Well Name: UNIVERSITY #1H Surface Location: 760 FNL, 700 FWL / Bottom Hole Location: 760 FNL, 660 FEL - Winkler, TX Report No: 18 Rpt T. Activity: 02 - Drilling AFE #: PB Operation AFE Total: $6,315,550 Spud Date: 12/24/2010 API Code: AFE DHC: $2,796,100 Days from Spud: 12 Rig Supervisor MITCH LEE Daily Costs: $30,329 Field Name: WILDCAT Rig Supervisor ROY KIMBEL This AFE DHC to $1,038,247 Sec/Twn/Rng: 48 / / Tool Pusher: ( ) - This AFE CWC to $1,038,247 Start Depth(ft): 6130 Formation: Total Project Costs: $1,038,247 Ending 7270 RKB to MSL: 2789 RKB to 0 Total w/ Assoc AFEs $1,038,247 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $2,219 Rig Company: 24 Hr. Footage: 1140 Develop To: 0 Cum Mud Costs: $35,594 Rig Name: Location UNIVERSITY LANDS Abstract: 24-Hour Summary/Remarks: ROTARY DRILL FROM 6130' TO 7270' (1140')-- (53) FPH WOB = 9-17K - TD RPM = 50, P.P. = 1900#, 100 STKS/MIN = 569 gal/min. TD TORQUE = 6000-/#- 165 RPM MOTOR DEVIATION SURVEYS: 6163' - INC '- INC ' - INC NO LOSSES AT REPORT TIME LITHOLOGY: 60% LIMESTONE, 40% SAND Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 23 1/5/ /5/ /5/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 1/1/ N Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e SXS OF LEAD, 300 SXS TAIL Circulated No.1 Wash, 50, 0, FRESH WATER,, 0, 0 No.2 Lead, 0, 1400, 35/65 POZ WITH D903, D132, D020, D130, D044, D046, D013, Class C, 1.96, 12.8 No.3 Tail, 0, 300, NEAT - D903, D013, D130, Class C, 1.33, 14.8 No.4 Displacement, 373, 0, BRINE 10#,, 0, 0 BOP Test and Inspection Dates Last BOP Test: 1/2/2011 Days Since BOP Tested: 3 Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /1/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotatin Trips Circulatin Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILL FROM 6130' -6192' WOB = 17K - TD RPM = 50, P.P. = 1800#, 100 STKS/MIN = gal/min. TD TORQUE = 4700-/#- 165 RPM MOTOR 7: DEVIATION 6163' INC : ROTARY DRILL FROM 6192' -6667' WOB = 17K - TD RPM = 50, P.P. = 1900#, 100 STKS/MIN = gal/min. TD TORQUE = 5800-/#- 165 RPM MOTOR 16: DEVIATION SURVEY 6636' INC : RIG SERVICE : ROTARY DRILL FROM 6667' WOB = 17K - TD RPM = 50, P.P. = 1900#, 100 STKS/MIN = gal/min. TD TORQUE = 5800-/#- 165 RPM MOTOR 2: DEVIATION 7144' = 1.16 degrees : ROTARY DRILL FROM 7173' ' WOB = 18K - TD RPM = 50, P.P. = 1900#, 100 STKS/MIN = gal/min. TD TORQUE = 5800-/#- 165 RPM MOTOR Total: Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/5/ Drilling 9.1 $30,329 $1,038,247 $6,315,550 Powered by Production Access Page 1 of 2 1/5/2011

14 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 18 Report 1/5/2011 Well Name: UNIVERSITY #1H Drilling Data Hook Load: 190 Pick Up: 170 Slack Off: 188 Over Pull: 25 ROP: Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: 15 Rotary RPM: 50 Motor RPM: 165 Torque: 5900 BHA Hours: 0.00 Crew Status: Remarks: Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 2 2 1/2/ /4 REED PDC MSF813M Date Jets 15 / 15 / 15 / 15 / 0 / 0 / 0 / 0 TFA 0.68 Char / / / / / / / Drilling Assembly Component Qty Length OD ID Avg Tot Length Remarks Bit - Core - PDC REED MSF-813-M 4-15S Motor PATHFINDER 6-3/4" 7/8 LOBE 5 STAGE Sub - Float Sub - Shock Drill collar Stab - Roller Reamer Drill collar Stab - Undergauge Drill collar Sub - XO Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 D-1650&DC /0 0/0 0/0 2 D-1650&DC /0 0/0 0/0 Drilling Breaks and Shows BGRD 20 Trip Gas: Surv Gas: Conn Gas: 43 Peak Gas: 37 Shale %: 0.0 Sand %: 40.0 Others %: 60.0 Shale Den: 0.0 D'Exp: 0.0 Depth: Pore 0.0 H2S: 0.0 Cir. Temp: 0.0 Desc: 60% LIMESTONE, 40% SAND Personnel Data Company Service Qty. Hours Company Service Qty. Hours New Tech Consultant Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/5/ Drilling 9.1 $30,329 $1,038,247 $6,315,550 Powered by Production Access Page 2 of 2 1/5/2011

15 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 19 Report 1/6/2011 Well Name: UNIVERSITY #1H Surface Location: 760 FNL, 700 FWL / Bottom Hole Location: 760 FNL, 660 FEL - Winkler, TX Report No: 19 Rpt T. Activity: 06 - Trips AFE #: PB Operation AFE Total: $6,315,550 Spud Date: 12/24/2010 API Code: AFE DHC: $2,796,100 Days from Spud: 13 Rig Supervisor MITCH LEE Daily Costs: $40,181 Field Name: WILDCAT Rig Supervisor ROY KIMBEL This AFE DHC to $1,078,428 Sec/Twn/Rng: 48 / / Tool Pusher: ( ) - This AFE CWC to $1,078,428 Start Depth(ft): 7270 Formation: Total Project Costs: $1,078,428 Ending 7555 RKB to MSL: 2789 RKB to 0 Total w/ Assoc AFEs $1,078,428 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $4,325 Rig Company: 24 Hr. Footage: 285 Develop To: 0 Cum Mud Costs: $39,919 Rig Name: Location UNIVERSITY LANDS Abstract: 24-Hour Summary/Remarks: ROTARY DRILL FROM 7270' ' WOB = 18K - TD RPM = 50, P.P. = 1900#, 100 STKS/MIN = 569 gal/min. TD TORQUE = 5800-/#- 165 RPM MOTOR PUMP 50 BBL HV SWEEP CIRCULATE & CONDITION HOLE TOOH & LD BHA # 2 MU 8.75 BIT, SMITH PDC MSI813,ROTARY STEERABLE,MWD COLLAR, 8 5/8 STABILIZER W/ FLOAT, XO, 2 NMDC'S, XO NSTALL ROTATING RUBBER TEST TOOLS & TIH W/ DP NO LOSSES AT REPORT TIME LITHOLOGY: 60% LIMESTONE 40% SAND Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 23 1/5/ /5/ /5/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 1/1/ N Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e SXS OF LEAD, 300 SXS TAIL Circulated No.1 Wash, 50, 0, FRESH WATER,, 0, 0 No.2 Lead, 0, 1400, 35/65 POZ WITH D903, D132, D020, D130, D044, D046, D013, Class C, 1.96, 12.8 No.3 Tail, 0, 300, NEAT - D903, D013, D130, Class C, 1.33, 14.8 No.4 Displacement, 373, 0, BRINE 10#,, 0, 0 BOP Test and Inspection Dates Last BOP Test: 1/2/2011 Days Since BOP Tested: 4 Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /1/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotatin Trips Circulatin Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILL FROM 7270' ' WOB = 18K - TD RPM = 50, P.P. = 1900#, 100 STKS/MIN = gal/min. TD TORQUE = 5800-/#- 165 RPM MOTOR 15: PUMP 50 BBL HV SWEEP CIRCULATE & CONDITION HOLE : TOOH WITH 72 STANDS DP : LD BHA # : MU 8.75 BIT, SMITH PDC MSI813,ROTARY STEERABLE,MWD COLLAR, 8 5/8 STABILIZER W/ FLOAT, XO, 2 NMDC'S, XO 5: INSTALL ROTATING RUBBER, TEST TOOLS & TIH W/ DP Total: Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/6/ Trips 9.1 $40,181 $1,078,428 $6,315,550 Powered by Production Access Page 1 of 2 1/6/2011

16 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 19 Report 1/6/2011 Well Name: UNIVERSITY #1H Drilling Data Hook Load: 205 Pick Up: 205 Slack Off: 190 Over Pull: 20 ROP: Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: 15 Rotary RPM: 50 Motor RPM: 165 Torque: 5900 BHA Hours: 0.00 Crew Status: Remarks: Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 2 3 1/2/ Smith MIS Date 1/6/2011 Jets 15 / 15 / 15 / 15 / 0 / 0 / 0 / 0 TFA 0.68 Char 1 / 1 / NO / NO / A / 0 / 1 / BHA Drilling Assembly Component Qty Length OD ID Avg Tot Length Remarks Bit - Core - PDC REED MSF-813-M 4-15S Motor PATHFINDER 6-3/4" 7/8 LOBE 5 STAGE Sub - Float Sub - Shock Drill collar Stab - Roller Reamer Drill collar Stab - Undergauge Drill collar Sub - XO BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 3 3 1/6/ Smith MIS Date Jets 14 / 14 / 14 / 14 / 13 / 13 / 0 / 0 TFA 0.86 Char / / / / / / / Drilling Assembly Component Qty Length OD ID Avg Tot Length Remarks Bit - Core - PDC SMITH PDC MSI813 Motor - steerable PATHMAKER PUSH ROTARY STEERABLE MWD / LWD - tool MWD COLLAR Stab - IB /8 IB STABILIZER W/ FLOAT Sub - XO XO Monel NMDC'S Sub - XO XO Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 D-1650&DC /0 0/0 0/0 2 D-1650&DC /0 0/0 0/0 Drilling Breaks and Shows BGRD 20 Trip Gas: Surv Gas: Conn Gas: 40 Peak Gas: 35 Shale %: Sand %: 40.0 Others %: 60.0 Shale Den: 0.0 D'Exp: 0.0 Depth: 0.0 Pore 0.0 H2S: 0.0 Cir. Temp: 0.0 Desc: 60% LIMESTONE, 40% SAND Personnel Data Company Service Qty. Hours Company Service Qty. Hours New Tech Consultant Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/6/ Trips 9.1 $40,181 $1,078,428 $6,315,550 Powered by Production Access Page 2 of 2 1/6/2011

17 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 20 Report 1/7/2011 Well Name: UNIVERSITY #1H Surface Location: 760 FNL, 700 FWL / Bottom Hole Location: 760 FNL, 660 FEL - Winkler, TX Report No: 20 Rpt T. Activity: 02 - Drilling AFE #: PB Operation AFE Total: $6,315,550 Spud Date: 12/24/2010 API Code: AFE DHC: $2,796,100 Days from Spud: 14 Rig Supervisor MITCH LEE Daily Costs: $100,145 Field Name: WILDCAT Rig Supervisor ROY KIMBEL This AFE DHC to $1,178,573 Sec/Twn/Rng: 48 / / Tool Pusher: ( ) - This AFE CWC to $1,178,573 Start Depth(ft): 7555 Formation: Total Project Costs: $1,452,907 Ending 7840 RKB to MSL: 2789 RKB to 0 Total w/ Assoc AFEs $1,452,907 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $7,745 Rig Company: Nabors Drilling 24 Hr. Footage: 285 Develop To: 0 Cum Mud Costs: $47,664 Rig Name: Nabors Rig #F- Location UNIVERSITY LANDS Abstract: 24-Hour Summary/Remarks: TIH W/ DP PU DP TO MAKE UP F/ DC'S RIG SERVICE RU WIRELINE & RUN GYRO,RD WIRELINE WAKE UP ROTARY STEERABLE & PROGRAM TOOL ROTARY DRILL FROM 7555' ' WOB = 19K - TD RPM = 90, P.P. = 1000#, 85 STKS/MIN = 483 gal/min. TD TORQUE = /# NO LOSSES AT REPORT TIME LITHOLOGY: 50% LIMESTONE 30% SAND 20% SHALE Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 28 1/7/ /7/ /7/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 1/1/ N Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e SXS OF LEAD, 300 SXS TAIL Circulated No.1 Wash, 50, 0, FRESH WATER,, 0, 0 No.2 Lead, 0, 1400, 35/65 POZ WITH D903, D132, D020, D130, D044, D046, D013, Class C, 1.96, 12.8 No.3 Tail, 0, 300, NEAT - D903, D013, D130, Class C, 1.33, 14.8 No.4 Displacement, 373, 0, BRINE 10#,, 0, 0 BOP Test and Inspection Dates Last BOP Test: 1/2/2011 Days Since BOP Tested: 5 Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /1/ % 0.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotatin Trips Circulatin Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: TIH W/ DP : PU DP TO MAKE UP F/ DC'S : RIG SERVICE : RU WIRELINE & RUN GYRO,RD WIRELINE : WAKE UP ROTARY STEERABLE & PROGRAM TOOL : ROTARY DRILL FROM 7555' ' WOB = 19K - TD RPM = 90, P.P. = 1000#, 85 STKS/MIN = gal/min. TD TORQUE = /# Total: Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/7/ Drilling 9 $100,145 $1,178,573 $6,315,550 Powered by Production Access Page 1 of 2 1/10/2011

18 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 20 Report 1/7/2011 Well Name: UNIVERSITY #1H Drilling Data Hook Load: 205 Pick Up: 215 Slack Off: 195 Over Pull: 35 ROP: Pres on Bot: 1050 Press Off Bot: 1035 Kickoff Depth: 7600 WOB: 15 Rotary RPM: 90 Motor RPM: 0 Torque: BHA Hours: 0.00 Crew Status: Remarks: Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 2 2 1/2/ /4 Smith MSI-813 JE Date 1/6/2011 Jets 15 / 15 / 15 / 15 / 0 / 0 / 0 / 0 TFA 0.68 Char 1 / 1 / NO / NO / A / 0 / 1 / BHA BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 3 2 1/6/ /4 Smith MSI-813 JE Date Jets 12 / 12 / 12 / 12 / 13 / 13 / / 0 TFA 0.70 Char / / / / / / / Drilling Assembly Component Qty Length OD ID Avg Tot Length Remarks Bit - Core - PDC SMITH PDC MSI813 Motor - steerable PATHMAKER PUSH ROTARY STEERABLE MWD / LWD - tool MWD COLLAR Sub - XO XO Stab - IB /8 IB STABILIZER W/ FLOAT Monel NMDC'S Sub - XO XO Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 D-1650&DC /430 50/580 60/690 2 D-1650&DC /0 0/0 0/0 Drilling Breaks and Shows BGRD 62 Trip Gas: 221 Surv Gas: Conn Gas: 100 Peak Gas: 112 Shale %: 20.0 Sand %: 30.0 Others %: 50.0 Shale Den: 0.0 D'Exp: 0.0 Depth: 0.0 Pore 0.0 H2S: 0.0 Cir. Temp: 0.0 Desc: 50% LIMESTONE, 30% SAND, SHALE 20% Personnel Data Company Service Qty. Hours Company Service Qty. Hours New Tech Consultant Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/7/ Drilling 9 $100,145 $1,178,573 $6,315,550 Powered by Production Access Page 2 of 2 1/10/2011

19 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 21 Report 1/8/2011 Well Name: UNIVERSITY #1H Surface Location: 760 FNL, 700 FWL / Bottom Hole Location: 760 FNL, 660 FEL - Winkler, TX Report No: 21 Rpt T. Activity: 02 - Drilling AFE #: PB Operation AFE Total: $6,315,550 Spud Date: 12/24/2010 API Code: AFE DHC: $2,796,100 Days from Spud: 15 Rig Supervisor MITCH LEE Daily Costs: $102,073 Field Name: WILDCAT Rig Supervisor ROY KIMBEL This AFE DHC to $1,280,646 Sec/Twn/Rng: 48 / / Tool Pusher: ( ) - This AFE CWC to $1,280,646 Start Depth(ft): 7840 Formation: Brushy Canyon Total Project Costs: $1,452,907 Ending 8282 RKB to MSL: 2789 RKB to 0 Total w/ Assoc AFEs $1,452,907 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $10,314 Rig Company: Nabors Drilling 24 Hr. Footage: 442 Develop To: 0 Cum Mud Costs: $57,978 Rig Name: Nabors Rig #F- Location UNIVERSITY LANDS Abstract: 24-Hour Summary/Remarks: ROTARY DRILL FROM 7840' TO 7904' WOB = 19K - TD RPM = 90, P.P. = 1000#, 85 STKS/MIN = 483 gal/min. TD TORQUE = /# LOST PULSE REPROGRAM MWD TOOL ROTARY DRILL FROM 7904' T 7936' WOB = 19K - TD RPM = 90, P.P. = 1000#, 85 STKS/MIN = 483 gal/min. TD TORQUE = 12000/# RIG SERVICE WORK ON PUMPS ROTARY DRILL FROM 7936' TO 8282' WOB = 20K - TD RPM = 90, P.P. = 1250#, 100 STKS/MIN = 570 gal/min. TD TORQUE = 13000/# NO LOSSES AT REPORT TIME LITHOLOGY: 30% LIMESTONE 60% SAND 10% SHALE Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 41 1/8/ /8/ /8/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 1/1/ N Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e SXS OF LEAD, 300 SXS TAIL Circulated No.1 Wash, 50, 0, FRESH WATER,, 0, 0 No.2 Lead, 0, 1400, 35/65 POZ WITH D903, D132, D020, D130, D044, D046, D013, Class C, 1.96, 12.8 No.3 Tail, 0, 300, NEAT - D903, D013, D130, Class C, 1.33, 14.8 No.4 Displacement, 373, 0, BRINE 10#,, 0, 0 BOP Test and Inspection Dates Last BOP Test: 1/2/2011 Days Since BOP Tested: 6 Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /7/ % 1.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotatin Trips Circulatin Down Other Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/8/ Drilling 9 $102,073 $1,280,646 $6,315,550 Powered by Production Access Page 1 of 2 1/10/2011

20 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 21 Report 1/8/2011 Well Name: UNIVERSITY #1H Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROTARY DRILL FROM 7840' TO 7904' WOB = 19K - TD RPM = 90, P.P. = 1000#, 85 STKS/MIN = gal/min. TD TORQUE = /# 8: LOST PULSE REPROGRAM MWD TOOL : ROTARY DRILL FROM 7904' T 7936' WOB = 19K - TD RPM = 90, P.P. = 1000#, 85 STKS/MIN = gal/min. TD TORQUE = 12000/# 11: RIG SERVICE : WORK ON PUMPS : ROTARY DRILL FROM 7936' TO 8282' WOB = 20K - TD RPM = 90, P.P. = 1250#, 100 STKS/MIN = gal/min. TD TORQUE = 13000/# Total: Drilling Data Hook Load: 205 Pick Up: 215 Slack Off: 185 Over Pull: 35 ROP: Pres on Bot: 1180 Press Off Bot: 1035 Kickoff Depth: 7600 WOB: 19 Rotary RPM: 90 Motor RPM: 0 Torque: BHA Hours: 0.00 Crew Status: Remarks: Daily Bits BH Bit Date In Size Manufa Type Serial In Out Ftg Tot Ftg Hrs Tot ROP WO RPM MRPM Torq 3 2 1/6/ /4 Smith MSI-813 JE Date Jets 12 / 12 / 12 / 12 / 13 / 13 / / 0 TFA 0.70 Char / / / / / / / Drilling Assembly Component Qty Length OD ID Avg Tot Length Remarks Bit - Core - PDC SMITH PDC MSI813 Motor - steerable PATHMAKER PUSH ROTARY STEERABLE MWD / LWD - tool MWD COLLAR Sub - XO XO Stab - IB /8 IB STABILIZER W/ FLOAT Monel NMDC'S Sub - XO XO Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM GPM Press. Slow Pump Rates/Pres. 1 D-1650&DC /480 50/580 60/690 2 D-1650&DC /0 0/0 0/0 Drilling Breaks and Shows BGRD 25 Trip Gas: Surv Gas: Conn Gas: 40 Peak Gas: 50 Shale %: 10.0 Sand %: 60.0 Others %: 30.0 Shale Den: 0.0 D'Exp: 0.0 Depth: 0.0 Pore 0.0 H2S: 0.0 Cir. Temp: 0.0 Desc: 30% LIMESTONE, 60% SAND, SHALE 10% Personnel Data Company Service Qty. Hours Company Service Qty. Hours New Tech Consultant Totals Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/8/ Drilling 9 $102,073 $1,280,646 $6,315,550 Powered by Production Access Page 2 of 2 1/10/2011

21 Drilling Report 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. 605 Richard Arrington Blvd. Report No: 22 Report 1/9/2011 Well Name: UNIVERSITY #1H Surface Location: 760 FNL, 700 FWL / Bottom Hole Location: 760 FNL, 660 FEL - Winkler, TX Report No: 22 Rpt T. Activity: 06 - Trips AFE #: PB Operation AFE Total: $6,315,550 Spud Date: 12/24/2010 API Code: AFE DHC: $2,796,100 Days from Spud: 16 Rig Supervisor MITCH LEE Daily Costs: $68,328 Field Name: WILDCAT Rig Supervisor ROY KIMBEL This AFE DHC to $1,348,974 Sec/Twn/Rng: 48 / / Tool Pusher: ( ) - This AFE CWC to $1,348,974 Start Depth(ft): 8282 Formation: Total Project Costs: $1,452,907 Ending 8382 RKB to MSL: 2789 RKB to 0 Total w/ Assoc AFEs $1,452,907 TVD: 0 RKB to LMF: 0 RKB to CHF: 0 Daily Mud Costs: $22,498 Rig Company: Nabors Drilling 24 Hr. Footage: 100 Develop To: 0 Cum Mud Costs: $80,475 Rig Name: Nabors Rig #F- Location UNIVERSITY LANDS Abstract: 24-Hour Summary/Remarks: ROTARY DRILL FROM 8282' TO 8289' WOB = 20K - TD RPM = 90, P.P. = 1250#, 100 STKS/MIN = 570 gal/min. TD TORQUE = 13000/# LOST SENSOR NO COMMUNICATION WITH ROTARY STEERABLE PUMP SLUG TOOH STAND BACK DIRECTIONAL TOOLS XO ROTARY STEERABLE & MONEL TIH RIG REPAIR SENSOR WOULD NOT LET RIG RUN FINISH TIH TO 8289' ROTARY DRILL FROM 8289' TO 8382' WOB = 20K - TD RPM = 90, P.P. = 1550#, 95 STKS/MIN = 535 gal/min. TD TORQUE = 13000/# ROTARY STEERABLE PROBLEMS CIRCULATE BTMS UP & PUMP SLUG TOOH NO LOSSES AT REPORT TIME LITHOLOGY: 60% LIMESTONE 30% SAND 10% SHALE Weather Time Wind Dir Wind Knots Sky Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Inclinatio Azimuth Des Azi TVD Vert N/S(+/-) E/W(+/-) DLS 45 1/9/ /9/ /9/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole TD Shoe Surface 1/1/ N Reciprocate Bump Plug Fluid Returns Cement Top Stag Distanc Rotate Pressure Hold Description Fill% Circ.Vol ft. Determined e SXS OF LEAD, 300 SXS TAIL Circulated No.1 Wash, 50, 0, FRESH WATER,, 0, 0 No.2 Lead, 0, 1400, 35/65 POZ WITH D903, D132, D020, D130, D044, D046, D013, Class C, 1.96, 12.8 No.3 Tail, 0, 300, NEAT - D903, D013, D130, Class C, 1.33, 14.8 No.4 Displacement, 373, 0, BRINE 10#,, 0, 0 BOP Test and Inspection Dates Last BOP Test: 1/2/2011 Days Since BOP Tested: 7 Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /7/ % 1.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotatin Trips Circulatin Down Other Date Report No Depth Report Time Activity MW Daily Costs Cum Costs AFE 1/9/ Trips 9 $68,328 $1,348,974 $6,315,550 Powered by Production Access Page 1 of 2 1/10/2011

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500 SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A 4.2 Formation Multi-Test (FMT) Analysis Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A summary 6. DRILL STEM TESTING A dual

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Superintendent Rig Checklist

Superintendent Rig Checklist Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

Drillmec HH-300 spec.

Drillmec HH-300 spec. Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable

More information

COMMITMENT TO EXCELLENCE

COMMITMENT TO EXCELLENCE PERFORMANCE DRIVEN OPERATIONS IN TEXAS AND OKLAHOMA COMMITMENT TO EXCELLENCE Basin Drilling, LP 1121 ESE Loop 323 Suite 218 Tyler, Texas 75701 (903) 561-8211 (903) 561-5844 fax www.basindrilling.com About

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information