1 Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI Pecos Rig Up 9,5' $255,774 $255,774 $1,845,8 $255,774 $3,456,15 1/5/14 Rig Mo Patterson UTI Pecos Rig Up 9,5' $2,3 $275,84 $1,845,8 $275,84 $3,456,15 1/6/14 Rig Mo Patterson UTI Pecos Rig Up 9,5' $6,748 $282,552 $1,845,8 $282,552 $3,456,15 Cum Drilling Cost Dry Hole AFE All Costs Total AFE 1/7/14 Patterson UTI Pecos 1/6/214 23:3: PM Spud 9,5' $36,128 $318,68 $1,845,8 $318,68 $3,456,15 1/7/14 1 Patterson UTI Pecos 1/6/214 23:3: PM 1 Drilling 158 9,5' $36,128 $318,68 $1,845,8 $318,68 $3,456,15 1/8/14 2 Patterson UTI Pecos 1/6/214 23:3: PM 2 Drilling 693 9,5' $13,143 $421,823 $1,845,8 $421,823 $3,456,15 1/9/14 3 Patterson UTI Pecos 1/6/214 23:3: PM 3 W.O.C 925 9,5' $94,621 $516,444 $1,845,8 $516,444 $3,456,15 1/1/14 4 Patterson UTI Pecos 1/6/214 23:3: PM 4 P.O.O.H 925 9,5'.6 $27,121 $543,565 $1,845,8 $543,565 $3,456,15 1/11/14 5 Patterson UTI Pecos 1/6/214 23:3: PM 5 Drilling 2,21 9,5' $43,323 $586,888 $1,845,8 $586,888 $3,456,15 1/12/14 6 Patterson UTI Pecos 1/6/214 23:3: PM 6 Drilling 3,59 9,5' $29,832 $616,72 $1,845,8 $616,72 $3,456,15 1/13/14 7 Patterson UTI Pecos 1/6/214 23:3: PM 7 Drilling 5,16 9,5' $31,56 $648,226 $1,845,8 $648,226 $3,456,15 1/14/14 8 Patterson UTI Pecos 1/6/214 23:3: PM 8 Drilling 5,936 9,5' $64,631 $712,857 $1,845,8 $712,857 $3,456,15 1/15/14 9 Patterson UTI Pecos 1/6/214 23:3: PM 9 Reaming 5,976 9,5' $3,37 $743,227 $1,845,8 $743,227 $3,456,15 1/16/14 1 Patterson UTI Pecos 1/6/214 23:3: PM 1 TIH w/ vertical drilling assembly 6,396 9,5' $56,451 $799,678 $1,845,8 $799,678 $3,456,15 1/17/14 11 Patterson UTI Pecos 1/6/214 23:3: PM ' 6,493 9,5' $34,84 $833,761 $1,845,8 $833,761 $3,456,15 1/18/14 12 Patterson UTI Pecos 1/6/214 23:3: PM 12 Circulating 7,155 9,5' $56,654 $89,416 $1,845,8 $89,416 $3,456,15 1/19/14 13 Patterson UTI Pecos 1/6/214 23:3: PM 13 Cement Operations 7,155 9,5' 2.5 $215,548 $1,15,963 $1,845,8 $1,15,963 $3,456,15 1/2/14 14 Patterson UTI Pecos 1/6/214 23:3: PM 14 7,155 9,5' 2.5 $94,949 $1,2,912 $1,845,8 $1,2,912 $3,456,15 1/21/14 15 Patterson UTI Pecos 1/6/214 23:3: PM 15 Drilling ahead 7,355 9,5' $53,958 $1,254,87 $1,845,8 $1,254,87 $3,456,15 1/22/14 16 Patterson UTI Pecos 1/6/214 23:3: PM 16 Drilling 8,444 9,5' $34,84 $1,288,954 $1,845,8 $1,288,954 $3,456,15 1/23/14 17 Patterson UTI Pecos 1/6/214 23:3: PM 17 Drilling 9,21 9,5' $22,764 $1,491,718 $1,845,8 $1,491,718 $3,456,15 1/24/14 18 Patterson UTI Pecos 1/6/214 23:3: PM 18 L/D Bit 9,517 9,5' $85,366 $1,577,84 $1,845,8 $1,577,84 $3,456,15 1/25/14 19 Patterson UTI Pecos 1/6/214 23:3: PM 19 L/D DP 9,515 9,5'.7 $92,517 $1,669,61 $1,845,8 $1,848,194 $3,456,15 1/26/14 2 Patterson UTI Pecos 1/6/214 23:3: PM 2 Rigging Down 9,5' $31,196 $1,7,797 $1,845,8 $1,884,4 $3,456,15
2 THREE RIVERS OPERATING COMPANY Estimated Costs and Authorization for Expenditure (AFE) Cost Center County Pecos Date 8/4/214 Well Name State TX AFE No Legal Desc 198' FEL & 198' FSL Depth 9,5' AFE Type D&C Field Wolfbone API# Budget Year 214 Objective Canyon,Bonespring,Lnrd, Wlfmp WI % 1% Est Start Date 9/25/214 Description D&C a 93' test of the Wolfbone trend area Sub Acct Intangible Costs Dry Hole Completion Total 1 Legal & Title Opinion $15, $15, 11 Staking & Permitting $3,5 $3,5 12 Location Roads Damages $15, $9, $159, 13 Rig Mobilization $125, $125, 14 Rig Daywork / Footage $325, $42,5 $367,5 15 Rig Turnkey 16 Power & Fuel $72, $72, 17 Water & Water Well $1, $5, $15, 18 Mud Chemicals & Fluids $15, $15, 19 Mud Cuttings & Water Disposal $5, $15, $2, 11 Bits, Reamer, Stabilizers $65, $2,5 $67,5 111 Directional Tools & Service $175, $175, 112 Cement & Cementing Services $115, $5, $165, 113 Mud Logging $25, $25, 114 Open Hole Logging $11, $11, 115 Form Eval - Well Testing DST 116 Tubular Inspection $5, $5, 118 Cased Hole Logging, Perf & Svs $1, $1, 119 Frac Tanks 12 Csg Crews & Tools-Drive Hammer 2, $2, 121 Formation Evaluation $5, $5, 122 Formation Stimulatn Acid Frac $55, $55, 123 Transportation $1, $1, 124 Flowback Contractor $3, $3, 125 Kill Trucks $1, $1, 126 Equipment Rental $5, $1, $15, 127 Contract Labor & Serivces $1, $5, $15, 128 Wellsite Consultant $3, $1, $4, 129 Company Supervision & Labor $3, $3, 13 Overhead 131 Unanticipated MajExp Fishing 132 Environmental & Safety Costs $2,5 $2,5 133 Insurance $5, $5, 134 Other Specialized Services $8, $8, 135 Misc Supplies & Materials $5, $5, 199 Contingency $74,8 $44,35 $119,15 Intangible Subtotal $1,57,8 $931,35 $2,52,15
3 THREE RIVERS OPERATING COMPANY Estimated Costs and Authorization for Expenditure (AFE) Cost Center County Pecos Date 8/4/214 Well Name State TX AFE No Legal Desc 198' FEL & 198' FSL Depth 9,5' AFE Type D&C Field Wolfbone API# Budget Year 214 Objective Canyon,Bonespring,Lnrd, Wlfmp WI % 1% Est Start Date 9/25/214 Description D&C a 93' test of the Wolfbone trend area Sub Acct Tangible Costs Dry Hole Completion Facilities Total 2 Drive Pipe Conductor Casing 21 Surface Casing $65, 65, 22 Intermediate Casing $21, 21, 23 Liner Casing 24 Subs Flt Eqpt Centralizers Etc 5, 5, 25 Wellhead / Tree $1, 1, 26 Sub Surface Equipment $1, 1, 27 Production Casing $19, 19, 28 Tubing $6, 6, 29 Rods $5, 5, 21 Downhole Pumps $1, 1, 213 Pumping Unit & Jet Pumps 9, 9, 214 Engines & Motors 2, 2, 215 Sales Gathering Line 216 Separation Equipment 1, 1, 217 Oil Treating Heating Equipment 15, 15, 218 Gas Treating Dehy Equipment 219 Tanks Walkways & Stairs 6, 6, 22 Meters & Meter Runs 5, 5, 221 Electrical Equip Install 222 Flowlines 5, 5, 223 Piping & Valves 25, 25, 224 Surface Pumps 1,5 1,5 225 Automation Telemetry Equipment 6,5 6,5 226 Site - Roads Fences Gates Cattleguards 6, 6, 227 Installation Costs 5, 5, 132 Environmental & Safety Costs 135 Misc Supplies & Materials 5, 5, 199 Contingency Tangible Subtotal $275, $335, $344, $954, Total AFE Costs $1,845,8 $1,266,35 $344, $3,456,15 Company Interest Approved by Date Three Rivers Operating Company 1% Prepared by Drilling Prepared by Operations Operations Approved Engineering Approved Geology Approved Land Approved Management Approved Date Date Date Date Date Date Date Gross AFE Dry Hole $1,845,8 Net AFE Dry Hole $1,845,8 Gross AFE Completion & Facilities $1,61,35 Net AFE Completion & Facilities $1,61,35 Gross AFE Total $3,456,15 Net AFE Total $3,456,15
4 3ROCII MATERIAL TRANSFER Date: 1/6/214 MT # From Location: (Property Name) From AFE#: Hauled By: To Location: (Property Name) Fort Worth Pipe To AFE#: Remarks: Fort Worth Pipe (Malcom Hall) Truck Number 2473 New pipe CONDITION UNIT ITEM DESCRIPTION (A,B,C,D,E) JOINTS QUANTITY PRICE TOTAL /8" 54.5# J-55 LTC A Condition: A-New: B- Used/Premium C- New or used, but rquires re-work: STATE TAX D- New or used, sub-grade E- Junk COUNTY TAX TOTAL Issued By: Isaac Ramos Approved By: DATE: 1/6/214 DATE:
5 3ROCII MATERIAL TRANSFER Date: 1/6/214 MT # From Location: (Property Name) From AFE#: Three Rivers () To Location: (Property Name) To AFE#: Fort Worth Pipe Hauled By: Remarks: Fort Worth Pipe (Malcom Hall) Truck Number 2473 Hauled back excess pipe due to sufficient footage on location CONDITION UNIT ITEM DESCRIPTION (A,B,C,D,E) JOINTS QUANTITY PRICE TOTAL Casing 13-3/8" 54.5# J-55 LTC A Condition: A-New: B- Used/Premium C- New or used, but rquires re-work: STATE TAX D- New or used, sub-grade E- Junk COUNTY TAX TOTAL Issued By: Isaac Ramos Approved By: DATE: 1/6/214 DATE:
6 3ROCII Water & Disposal Tracker WELL AFE# Please contact any of the following people for water delivery or fluid disposal : BASIC J.J : or consult the on-call list sent weekly by JEFF SHAMBLIN BRINE RIG WATER HAULED IN DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED IN (BBLS) PERSON CONTACTED FOR WATER REQUEST, or whomever "on-call") CONTRACTOR DELIVERING WATER (Company Name) WATER SOURCE CONTRACTOR REPRESENTATIVE DELIVERING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) RIG WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL (i.e Kent, Joe, Chris, Jon, or whomever "on-call") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $. $
7 3ROCII Water & Disposal Tracker WELL AFE# FRESH WATER DATE TIME DSM CALLING BBLS PERSON CONTACTED FOR WATER REQUEST PUT NAME OF WHO YOU CALLED CONTRACTOR RIG WATER HAULED IN WATER SOURCE CONTRACTOR REPRESENTATIVE DELIVERING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) 1/5/14 5:56pm Isaac Ramos 25 Rito Gomez Cinco Oilfield Service, LLC Frac Pit Joel Augustine $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 25 Rito Gomez Cinco Oilfield Service, LLC Frac Pit Eduardo Calderon $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 25 Rito Gomez Cinco Oilfield Service, LLC Frac Pit Alejandro Flores $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 25. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Leon C Rogers $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 1. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Leon C Rogers $69 Reserve water 1/5/14 5:56pm Isaac Ramos 875. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Alejandro Flores $63.75 Reserve water 1/5/14 5:56pm Isaac Ramos 875. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Eduardo Calderon $63.75 Reserve water 1/5/14 5:56pm Isaac Ramos 875. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Joel Augustine $63.75 Reserve water WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL (i.e Kent, Joe, Chris, Jon, or whomever "on-call") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) ULED IN (BBLS) HAULED IN ($) SPOSED (BBLS) $3, F DISPOSAL ($). $
8 3ROCII Water & Disposal Tracker WELL AFE# WATER WELL METER WATER METER TRACKER SERIAL # NO METER ON PUMP DATE TIME METER START - METER END WATER VOLUME COST PER BBL PURPOSE (i.e. rig water, cementing, transfer from last well, WATER WELL RECEIVE WATER FROM WATER LINE SUPPLIER PERSON OPERATING METER TOTAL BBLS PUMPED PUMPED IN $.4 XBBLS etc...) 1/5/14 6:32pm University Lands Isaac Ramos 979 $391.6 Reserve Water 1/6/14 3:25pm University Lands Isaac Ramos 979 $391.6 Reserve Water 1/7/14 9:am University Lands Isaac Ramos 979 $391.6 Reserve Water 1/8/14 1:3am University Lands Isaac Ramos 979 $391.6 Reserve Water 1/9/14 1:3pm University Lands Isaac Ramos 979 $391.6 Reserve Water 1/1/14 2:15pm University Lands Isaac Ramos 979 $391.6 Reserve Water 1/11/14 1:25am University Lands Isaac Ramos 979 $391.6 Reserve Water 1/12/14 1:45am 215 University Lands Isaac Ramos 979 $391.6 Reserve Water 1/13/14 8:am University Lands Isaac Ramos 979 $391.6 Reserve Water 1/14/14 7:3am University Lands Isaac Ramos 979 $391.6 Reserve Water 1/15/14 6:pm University Lands Isaac Ramos 1963 $785.2 Reserve Water 1/16/14 6:pm University Lands Richard Nicholson 1/17/14 6:pm University Lands Richard Nicholson 1/18/14 3:pm University Lands Richard Nicholson 1/19/14 9:p.m University Lands Richard Nicholson $661.6 Reserve Water 1/2/14 3:p.m University Lands Richard Nicholson 1/24/14 11:am University Lands Richard Nicholson 1/25/14 12:p.m University Lands Richard Nicholson RIG WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL JJ or whomever "oncall") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $5, $
9 3ROCII Water & Disposal Tracker WELL AFE# TRANSFER PITS WATER VOLUME DATE TIME TRUCKING CO HAULING HAULED IN INVOICE NUMBER FRESH WATER OR BRINE COMPANY REP TOTAL BBLS HAULED Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) RIG WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL JJ or whomever "oncall") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $. $
10 AFE# DATE: 1/1/14 CSG SET 952 Prod Csg Size, wt, grade Item # Centr. Top SHOE Centr FC Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr Centr
11 AFE# DATE: 1/1/14 CSG SET 952 Prod Csg Size, wt, grade Item # Centr. Top
12 AFE# DATE: 1/1/14 CSG SET 952 Prod Csg Size, wt, grade Item # Centr. Top
13 Well Name SPUD DATE: :3: Rig Release H or K Drilling Time 129 Intangible D GEN ACCT SUB ACCT D Keep D Keep D Keep D Keep D Keep D Hide D Keep D Keep D Keep D Keep D Keep D Keep D Keep D Keep D Keep D Hide D Keep D Hide D Keep D Keep D Hide D Hide D Keep D Hide D Hide D Keep D Keep D Keep D Keep D Hide D Hide D Keep D Keep D Hide D Keep D Keep Hide D.. Keep D.. Tangible Drilling
14 D Keep D Keep D Keep D Hide D Keep D Keep D Keep Hide D.. Keep C.. Intangible Completion C Hide C Hide C Keep C Hide C Keep C Hide C Hide C Keep C Hide C Keep C Keep C Hide C Keep C Hide C Keep C Hide C Keep C Keep C Keep C Keep C Keep C Keep C Keep C Keep C Keep C Hide C Hide C Hide C Hide C Hide C Keep C Keep C Keep Hide C.. Keep C.. Tangible Completion C Keep
15 C Keep C Keep C Keep C Keep C Keep C Keep Hide C.. Keep F.. Production Equipment F Keep F Keep F Hide F Keep F Keep F Hide F Keep F Keep F Hide F Keep F Keep F Keep F Keep F Keep F Keep F Hide F Keep F Hide Hide F.. Keep.. Totals.. Keep.. Keep.. Keep.. Keep
16 THREE RIVERS OPERATING COMPANY II LLC. County Pecos DATE 1/5/214 1/6/214 AFE #: DAYS PLANNED WI % 1% ' ' AFE AMNT $3,456,15 ACTUAL ' ' INTANGIBLE DRILLING COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214 Legal & Title Opinion $15, $15, $15, Staking & Permitting $3,5 $3,5 $3,5 Location Roads Damages $15, $15, $15, Rig Mobilization $125, $6, $6, Rig Daywork / Footage $325, $37,23 $13,76 $13,76 Rig Turnkey $ $ Power & Fuel $72, $72,837 $1,714 Water & Water Well $1, $38,751 Mud Chemicals & Fluids $15, $24,754 Mud Cuttings & Water Disposal $5, $ Bits, Reamer, Stabilizers $65, $52,983 Directional Tools & Service $175, $81, Cement & Cementing Services $115, $119,11 Mud Logging $25, $17,6 Open Hole Logging $11, $ Form Eval - Well Testing DST $ $ Tubular Inspection $5, $6,64 Cased Hole Logging, Perf & Svs $ $ Frac Tanks $ $6,6 $3 $3 Csg Crews & Tools-Drive Hammer $ $36,313 Formation Evaluation $ $ Formation Stimulatn Acid Frac $ $ Transportation $ $27,734 Flowback Contractor $ $ Kill Trucks $ $ Equipment Rental $5, $37,235 $3,47 Contract Labor & Serivces $1, $18,671 Wellsite Consultant $3, $55, $2,5 $2,5 Company Supervision & Labor $3, $ Overhead $ $ Unanticipated MajExp Fishing $ $ Environmental & Safety Costs $2,5 $ Insurance $5, $ Other Specialized Services $ $ Misc Supplies & Materials $ $9,376 Contingency $74,8 $9,313 RIG MOVE SUB-TOTAL INTANGIBLE DRILLING COSTS $1,57,8 $1,473,511 $255,774 $2,3 TANGIBLE DRILLING COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214
17 Drive Pipe Conductor Casing $ $31,52 Surface Casing $65, $3,793 Intermediate Casing $21, $15,255 Liner Casing $ $ Subs Flt Eqpt Centralizers Etc $ $3,64 Wellhead / Tree $ $2,596 Sub Surface Equipment $ $8,535 SUB-TOTAL TANGIBLE DRILLING COSTS $275, $227,285 $ $ INTANGIBLE COMPLETION COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214 Legal & Title Opinion $ $ Staking & Permitting $ $ Location Roads Damages $9, $ Rig Mobilization $ $ Completion Rig $42,5 $ Rig Turnkey $ $ Power & Fuel $ $ Water & Water Well $5, $ Mud Chemicals & Fluids $ $ Mud Cuttings & Water Disposal $15, $ Bits, Reamer, Stabilizers $2,5 $ Directional Tools & Service $ $ Cement & Cementing Services $5, $ Tubular Inspection $ $ Cased Hole Logging, Perf & Svs $1, $ Frac Tanks $ $ Csg Crews & Tools-Drive Hammer $2, $ Formation Evaluation $5, $ Formation Stimulatn Acid Frac $55, $ Transportation $1, $ Flowback Contractor $3, $ Kill Trucks $1, $ Equipment Rental $1, $ Contract Labor & Serivces $5, $ Wellsite Consultant $1, $ Company Supervision & Labor $ $ Overhead $ $ Unanticipated MajExp Fishing $ $ Environmental & Safety Costs $ $ Insurance $ $ Other Specialized Services $8, $ Misc Supplies & Materials $5, $ Contingency $44,35 $ SUB-TOTAL INTANGIBLE COMPLETION COSTS $931,35 $ $ $ TANGIBLE COMPLETION COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214 Subs Flt Eqpt Centralizers Etc $5, $
18 Wellhead / Tree $1, $ Sub Surface Equipment $1, $4,65 Production Casing $19, $178,593 Tubing $6, $ Rods $5, $ Downhole Pumps $1, $ SUB-TOTAL TANGIBLE COMPLETION COSTS $335, $183,243 $ $ PRODUCTION EQUIPMENT AFE AMNT EST. CUM. 1/5/214 1/6/214 Pumping Unit & Jet Pumps $9, $ Engines & Motors $2, $ Sales Gathering Line $ $ Separation Equipment $1, $ Oil Treating Heating Equipment $15, $ Gas Treating Dehy Equipment $ $ Tanks Walkways & Stairs $6, $ Meters & Meter Runs $5, $ Electrical Equip Install $ $ Flowlines $5, $ Piping & Valves $25, $ Surface Pumps $1,5 $ Automation Telemetry Equipment $6,5 $ Site - Roads Fences Gates Cattleguards $6, $ Installation Costs $5, $ Environmental & Safety Costs $ $ Misc Supplies & Materials $5, $ Contingency $ $ SUB-TOTAL PRODUCTION EQUIPMENT $344, $ $ $ TOTALS AFE AMNT EST. CUM. 1/5/214 1/6/214 GRAND TOTAL $3,456,15 $1,884,4 $255,774 $2,3 Dry Hole Total $1,845,8 $1,7,797 $255,774 $2,3 Completion Total $1,266,35 $183,243 $ $ Facility Total $344, $ $ $
19 E & RIG UP TRACKING End Date Day 1 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/ ' ' ' 9,5' 9,5' 9,5' 9,5' 9,5' ' ' ' 158' 693' 925' 925' 2,21' 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 $5,16 $1,75 $17,2 $17,2 $17,2 $17,2 $15,57 $26,5 $5,426 $7,675 $1,216 $4,196 $84 $7,6 $35 $35 $3,6 $31,529 $3,3 $1,2 $113 $187 $6 $3 $3 $8,66 $6,47 $772 $538 $897 $7,68 $1,7 $925 $1,88 $1,275 $1,65 $4,375 $938 $1,563 $2,5 $2,5 $2,5 $2,5 $3,938 $6,748 $ $ $36,128 $71,641 $62,627 $27,121 $43,323 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214
20 $31,52 $3,793 $1,2 $ $ $ $ $31,52 $31,993 $ $ 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214
21 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 $6,748 $ $ $36,128 $13,143 $94,621 $27,121 $43,323 $6,748 $ $ $36,128 $13,143 $94,621 $27,121 $43,323
22 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/ ,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 3,59' 4,48' 5,936' 5,976' 6,396' 6,465' 7,155' 7,155' 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $21,79 $8,75 $8,342 $3,735 $5,257 $3,445 $11,814 $9 9 $5,168 $55 $11,5 $17, $8,5 $8,5 $8,5 $1,1 $1,1 $1,1 $1,1 $1,1 $1,1 $1,1 $1,1 $2,14 $3 $3 $3 $3 $3 $3 $3 $3 $15,97 $6,25 $829 $784 $1,7 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1, $3 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $634 $2,712 $2,864 $5,876 $2,761 $5,132 $3,99 $5,15 $5,7 $29,832 $31,56 $64,631 $3,37 $56,451 $34,84 $56,654 $62,697 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214
23 $15,255 $2,596 $ $ $ $ $ $ $ $152,851 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214
24 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 $29,832 $31,56 $64,631 $3,37 $56,451 $34,84 $56,654 $215,548 $29,832 $31,56 $64,631 $3,37 $56,451 $34,84 $56,654 $215,548
25 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/ ,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 7,155' 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $8,94 $1,797 $1,676 $1,676 $1,676 $6,326 $17,1 $43,444 $9,742 $22,515 $4,5 $8,5 $8,5 $8,5 $8,5 $5,11 $37,381 $1,1 $1,1 $1,1 $1,1 $1,1 $2,64 $1,2 $3 $3 $3 $3 $3 $3 $3 $11,737 $1,93 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,472 $3, $3 $5,299 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $8,742 $7,856 $4,95 $3,99 $18,433 $7,761 $8,192 $2,836 $86,414 $53,958 $34,84 $22,764 $85,366 $9,113 $31,196 $ 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214
26 $2,44 $8,535 $8,535 $ $ $ $ $2,44 $ $ 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214
27 $178,593 $4,65 $ $ $ $ $ $178,593 $4,65 $ 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 $94,949 $53,958 $34,84 $22,764 $85,366 $271,11 $35,846 $ $94,949 $53,958 $34,84 $22,764 $85,366 $92,517 $31,196 $ $ $ $ $ $ $178,593 $4,65 $
28 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/ ,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214
29 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214
30 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214
31 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/ ,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214
32 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214
33 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214
34 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/ ,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214
35 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214
36 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214
37 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional Costs 9,5' 9,5' 9,5' 9,5' 9,5' 1' 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional DRILLING COMMENTS $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional DRILLING COMMENTS
38 $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMPLETION COMMENTS $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMPLETION COMMENTS
39 $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMPLETION COMMENTS $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMMENTS $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
40 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/ /5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212
41 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212
42 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212
43 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/ /13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212
44 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212
45 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212
46 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/ /21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212
47 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212
48 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212
49 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/ /29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213
50 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213
51 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213
52 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/ /6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213
53 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213
54 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213
55 1/14/213 1/15/213 Additional Costs 1' COMPLETION COMMENTS 1/14/213 1/15/213 Additional COMPLETION COMMENTS 1/14/213 1/15/213 Additional COMPLETION COMMENTS
56 1/14/213 1/15/213 Additional COMPLETION COMMENTS $ $ $ 1/14/213 1/15/213 Additional COMPLETION COMMENTS
57 $ $ $ 1/14/213 1/15/213 Additional COMPLETION COMMENTS $ $ $ 1/14/213 1/15/213 Additional COMMENTS $ $ $ $ $ $ $ $ $
58 Depth (ft) Depth (ft) Drilling Days vs Depth Depth vs Cumulative Cost 5 Well Name 5 Well Name Planned Depth vs Days Actual Depth vs Days Cumulative Planned Cost vs Depth (1,5) (1,5) Cumulative Cost Spud Date - (3,5) (3,5) (5,5) (5,5) (7,5) (7,5) (9,5) (9,5) (11,5) Days (11,5) - $2, $4, $6, $8, $1,, $1,2, $1,4, $1,6, $1,8, $2,, Cumulative Cost
59 WELL NAME: OPERATIONS: CONTRACTOR: MIRU COSTS: THREE RIVERS OPERATING II RIG MOVE & RIG UP REPORT AFE # : AFE 9,5' AFE DAYS 2 LAST BOP TEST COUNTY: STATE: DATE (Start of DAY: Pecos Texas Rig Move): 1/4/14 1 (MD): (TVD): PROGRESS: Rig Up SUPV: AFE Dry Hole AFE Dry Hole $: (COB) Patterson UTI rig:47 Isaac Ramos $: $1,57,8 $1,845,8 MOVE DAY 1 MOVE DAY 2 MOVE DAY 3 MOVE DAY 4 MOVE DAY 5 CUM MIRU Cost $255,774 Cost $2,3 Cost $6,748 Cost $ Cost $ COST: $282,552 TIME START END HRS RIG MOVE- RIG UP- DAY 1 6: 6:3.5 Working on preparing derrick to lay over. 6:3 7:.5 First Trans Pecos truck arrived on location at 6:3, Held pre tour safety meeting with trucking company. 7: 19: 12. Move in tubulars, rig components and set in working pits and substructure. Last truck shut down at 19:hrs due to day light. 19: 6: 11. Morning tour digged ditches around working pits and sub and rigged up working pits. 9% MOVED, 2% RIGGED UP, 1 % ON OLD LOCATION 24. TIME START END HRS RIG MOVE- RIG UP- DAY 2 6: 6:3.5 Digging and cleaning ditches. 6:3 7:.5 Held pre-job safety meeting with Patterson and Trans Pecos Personnal. Trucks arrived at 6:3am on location. 7: 6: 23. Move in; Rig up with rig crews and trucks, derrick on sub structure at 11: am, smashed drilling line while lifting derrick. Raised A-legs and string up blocks, and slip and cut drlg line. Set in an back yard and rigging up. Raised derrick at 15:3 hrs. and continued to rig up with rig crews. Released trucks at 15:hrs. 1% moved, 85 % rigged up Estimated spud in at 15:hrs / Date 1/5/14 Water meter= TIME START END HRS 6: 15: 9. RIG MOVE- RIG UP- DAY 3 Rig up rig floor;install mouse hole and rat hole and picked up swivel and kelly and torqued up and set back. Install rotary chain, Pick up and rig up ST-8 and continue rigging up rig floor. Date 1/6/14 Water meter=
60 WELL NAME: OPERATIONS: CONTRACTOR: PSI: DRILLING MECHANICS PICK UP WEIGHT SLACK OFF WEIGHT ROTATING WEIGHT TORQUE ON BOTTOM TORQUE OFF BOTTOM BIT NO TIME START END HRS FROM TO 15: 17: 2. 17: 18: 1. 18: 22: 4. 22: 23: 1. 23: 23: THREE RIVERS OPERATING II DAILY DRILLING REPORT AFE # : AFE 9,5' AFE DAYS 3 Spud Date 1/6/214 23:3: PM LAST BOP TEST COUNTY: STATE: DATE: DAY: Pecos Texas 1/7/14 Drilling Patterson UTI rig:47 SPM: N/A N/A PLAN 95 (MD): SUPV: TOTAL GPM: BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES (TVD): 158 Isaac Ramos AFE Dry Hole $: $1,57,8 DAILY COST: 588 $36,128 CASING STRINGS PROGRESS: AFE Dry Hole $: (COB) CUM DRLG COST: ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft 13 3/ J-55 STC MUD MIXED TIME DISTRIBUTION MW 8.4 GEL 45 RU/RD Cum Mud $7,675 TOTAL (Daily/cum) WOB ROP (M lbs) (fph) Test True Shot survey tool 23:3 6: Spud in and Drill from 8' to 158' (78') $1,845,8 $318,68 SIZE 17 1/2 VIS 34 SALTGEL DRLG MFG Ulterra PV LIME REAM/WASH TYPE TCI YP CAUSTIC SURVEY SER. NO GTX-C19 GELS SODA ASH TRIP NOZZLES 3X18 ph 7. BARITE RIG SERVICE TFA.746 WL N/C PAPER 6 CIRC & COND OUT 158 HP/HT RUN CSG/CMT IN GC WOC FOOTAGE 158 CL NU/TST BOP HOURS 6.5 Ca RIG REPAIR 1 1 FT/HR 24 Sand LOG hp/dia inch Solids FISHING/STUCK IMP FORCE DC Anlr Vel DP Anlr Vel Oil % CORE DST KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $7,675 MISC C/O, WELD HEAD ACTIVITY Weld on conductor and install flow line and turn buckles. Begin day work at 3: pm Mix spud mud and Load pipe rack strap and caliper 8" and 6" and make up BHA #1. Wait on Bit sub, Bit sub on location was stamped 6 5/8" box and was not correct called Air Drilling Solution to send out another bit sub. Bit sub arrived at 1:pm and made up bit. Re spool drilling line due to loose wraps on drum. RPM water meter= DAILY AVG SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION Bit Ulterra 17.5 GTX-C9 Bit Sub 6-5/8B X 7-5/8B WASTE DISPOSAL SITE: 8" Shock Sub DAILY YDS SOLID - 1 BBLS LIQUID /2" 3-Pnt Reamer 9.1 WELL CUM SOLID - 1 CUM LIQUID 1 True Shot survey tool 1-8" Drill Collar TOTAL DRILLED GAS GAS Units DC SIZE Background Gas: 8" Connection gas: Trip Gas: Max Gas: DP SIZE 4.5 AZIMUTH ACCIDENTS NONE Start Received End Consumed FUEL (gals) BHA LENGTH DRILL PIPE WEIGHT OF BHA WEIGHT OF BHA (below jars) Pump #1 Pump #2 SLOW PUMP RATES PSI SPM PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco Emsco
61 WELL NAME: OPERATIONS: CONTRACTOR: PSI: 1145 DRILLING MECHANICS AFE # : AFE 9,5' AFE DAYS 4 Spud Date 1/6/214 23:3: PM LAST BOP TEST COUNTY: STATE: DATE: Day Pecos Texas 1/8/14 Drilling Patterson UTI rig:47 SPM: 15 THREE RIVERS OPERATING II DAILY DRILLING REPORT (MD): SUPV: TOTAL GPM: 693 (TVD): 693 Isaac Ramos AFE Dry Hole $: $1,57,8 DAILY COST: 63 $13,143 CASING STRINGS PROGRESS: PICK UP WEIGHT 7 PLAN ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft SLACK OFF WEIGHT J-55 STC - $ ROTATING WEIGHT 7 - $ TORQUE ON BOTTOM - $ TORQUE OFF BOTTOM - $ BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED TIME DISTRIBUTION BIT NO 1 MW 9.1 GEL 1 RU/RD AFE Dry Hole $: (COB) CUM DRLG COST: SIZE 17.5 VIS 32 SALTGEL DRLG 21 MFG Ulterra PV 2 LIME REAM/WASH TYPE TCI YP 4 CAUSTIC SURVEY SER. NO GTX-C19 GELS 2,4 SODA ASH TRIP NOZZLES 3X18 ph 9. BARITE RIG SERVICE TFA WL N/C paper 4 CIRC & COND OUT IN FOOTAGE HP/HT GC CL 45 RUN CSG/CMT WOC NU/TST BOP HOURS 27.5 Ca 12 RIG REPAIR 3 FT/HR hp/dia inch 25 #DIV/! Sand Solids 1 LOG FISHING/STUCK IMP FORCE Oil % CORE DC Anlr Vel DST DP Anlr Vel KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $1,216 MISC Cum Mud $8,891 TOTAL (Daily/cum) 24 TIME WOB ROP ACTIVITY RPM START END HRS FROM TO (M lbs) (fph) 6: 1: Drill from 158' to 217' (59) rop 14.8, wob 25, gpm 63, rpm 95, spm 75/75, spp 647 psi : 11: Lay down kelly and change out swivel packing due to broken grease zert. 11: 12: Repair cracked weld on flow line (re weld). 12: 19: Drill from 217' to 372' (155) rop 2.6, wob 25, gpm 63, rpm 95, spm 75/75, spp 169 psi :3 2: Attempted to drill Pason not tracking work on drill o-matic. 2: 21: Drill from 372' to 42' (3) rop 3, wob 3, gpm 63, rpm 95, spm 75/75, spp 1145 psi : 21: Pason showing zero weight on bit, checked weight indicator, depleted pumped up. 21:3 6: Drill from 42' to 693 (291) rop 34.2, wob 35, gpm 63, rpm 95, spm 75/75, spp 1145 psi $1,845,8 $421,823 2 water meter= DAILY AVG SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION AZIMUTH Bit Ulterra 17.5 GTX-C Bit Sub 6-5/8B X 7-5/8B WASTE DISPOSAL SITE: 8" Shock Sub DAILY YDS SOLID - 1 BBLS LIQUID /2" 3-Pnt Reamer 9.1 WELL CUM SOLID - 1 CUM LIQUID 1 True Shot survey tool " Drill Collar 31.7 TOTAL DRILLED GAS 17-1/2" 3-Pnt Reamer 9.12 GAS Units DC SIZE 4-8"Dc's Background Gas: 6"-8" X-O 3.8 Connection gas: 15-6" Dc's Trip Gas: DP SIZE Max Gas: 4.5" ACCIDENTS FUEL (gals) Start 7248 BHA LENGTH SLOW PUMP RATES Received DRILL PIPE PSI SPM End 6288 WEIGHT OF BHA 53 Pump #1 Consumed 96 WEIGHT OF BHA (below jars) Pump #2 PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco Emsco
62 WELL NAME: OPERATIONS: CONTRACTOR: PSI: 1437 DRILLING MECHANICS AFE # : AFE 9,5' AFE DAYS 5 Spud Date 1/6/214 23:3: PM LAST BOP TEST COUNTY: STATE: DATE: Day Pecos Texas 1/9/14 (MD): SUPV: TOTAL GPM: 925 (TVD): 925 Isaac Ramos AFE Dry Hole $: $1,57,8 DAILY COST: 63 $94,621 BIT NO 1 MW 9.3 GEL 1 RU/RD SIZE 17.5 VIS 34 SALTGEL DRLG 1 MFG Ulterra PV LIME REAM/WASH TYPE TCI YP CAUSTIC SURVEY SER. NO GTX-C19 GELS SODA ASH TRIP 3 NOZZLES 3X18 ph 9. BARITE RIG SERVICE 1 TFA.746 WL PAPER 3 CIRC & COND 1 OUT 925 HP/HT RUN CSG/CMT 7 IN GC WOC 1.5 FOOTAGE HOURS CL Ca NU/TST BOP RIG REPAIR.5 FT/HR hp/dia inch IMP FORCE 25 #DIV/! Sand Solids Oil % LOG FISHING/STUCK CORE DC Anlr Vel DST DP Anlr Vel KICK BIT # 1 DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $ MISC 4 1 BT M 6 1 NO TD Cum Mud $8,891 TOTAL (Daily/cum) 24 17:3 18: : 2: : 21: : 22: : 1: : 1: :3 2: :3 4: : 4: :3 6: W.O.C Patterson UTI rig:47 SPM: 15 THREE RIVERS OPERATING II DAILY DRILLING REPORT CASING STRINGS PROGRESS: Updated TRRC Audrey Operator #2 at 5:44am/ water meter= DAILY AVG SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION AZIMUTH Bit Ulterra 17.5 GTX-C Bit Sub 6-5/8B X 7-5/8B WASTE DISPOSAL SITE: 8" Shock Sub DAILY YDS SOLID - BBLS LIQUID 17-1/2" 3-Pnt Reamer WELL CUM SOLID - CUM LIQUID True Shot survey tool " Drill Collar 31.7 TOTAL DRILLED GAS 17-1/2" 3-Pnt Reamer 9.12 GAS Units DC SIZE 4-8"Dc's Background Gas: 6"-8" X-O 3.8 Connection gas: 18-6" Dc's Trip Gas: DP SIZE Max Gas: 4.5" ACCIDENTS FUEL (gals) Start 6288 BHA LENGTH SLOW PUMP RATES NO Received DRILL PIPE PSI SPM End 5329 WEIGHT OF BHA 65 Pump #1 Consumed 959 WEIGHT OF BHA (below jars) Pump #2 PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco Emsco AFE Dry Hole $: (COB) CUM DRLG COST: 232 $1,845,8 $516,444 PICK UP WEIGHT 86 PLAN ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft SLACK OFF WEIGHT J-55 STC - $33.29 ROTATING WEIGHT /8 32 J-55 LTC - $2.7 TORQUE ON BOTTOM - $ TORQUE OFF BOTTOM - $ BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED TIME DISTRIBUTION TIME WOB ROP ACTIVITY RPM START END HRS FROM TO (M lbs) (fph) 6: 8: Drill from 693' to 77' :3 9: Rig service: Grease traveling blocks, checked crown-o-matic, brake linkage 9:3 1: Adjust linkage and brake band rollers. 1: 17: Drill from 77' to 925' TD at 5:3 PM/ Circulate: Pumped viscous sweep and circulated hole clean. Trip: P.O.O.H to run 13 3/8" surface casing. Lay down bha: Break bit and laydown reamers, shock sub, true shot, bit. Rig up Permian casing crew and lay down truck and held pre-job safety meeting. Run 22 jts of 13-3/8" 54.5# J-55 STC and landed at 925 ft. and Rig down casing crew. Circulate bottoms up. Rig up cementers while circulating hole at a reduced pump rate. Cmt: Test lines to 3 psi, 2 bbl gel spacer, Lead cmt: 49 sx, 12.9#, 1.85 Yield, 9.69 gal/sx Tail cmt: 335 sx, 14.8#, 1.35 Yield, 6.26 gal/ sx. Shut down and drop plug at and displaced with 137 bbls fresh water, last 1 bbls circulating pressure 275 psi at 3 bpm. Landed plug and pressured up to 85 psi. at 3:5 am/ Circulated 87 bbls (264 sx) into reserve. 1% returns during cmt job, released pressure and received back 1 bbl floats held. Rig down Halliburton cementers. W.O.C 3
63 WELL NAME: AFE # : Spud Date /6/214 23:3: PM AFE 9,5' AFE DAYS LAST BOP TEST 6 1/9/14 COUNTY: STATE: DATE: Day Pecos Texas 1/1/14 OPERATIONS: (MD): PROGRESS: P.O.O.H 925 (TVD): 925 CONTRACTOR: SUPV: AFE Dry Hole AFE Dry Hole $: (COB) Patterson UTI rig:47 Isaac Ramos $: $1,57,8 PSI: SPM: TOTAL GPM: DAILY COST: CUM DRLG COST: $27,121 DRILLING MECHANICS BIT NO 2 MW 8.4 GEL RU/RD SIZE 11 VIS 28 SALTGEL DRLG MFG Ulterra PV LIME REAM/WASH TYPE 813M YP CAUSTIC SURVEY SER. NO 2645 GELS SODA ASH TRIP 5 NOZZLES 8X16 ph 7. BARITE RIG SERVICE TFA OUT WL HP/HT CIRC & COND RUN CSG/CMT IN 925 GC WOC 2.5 FOOTAGE CL 15 NU/TST BOP 11.5 HOURS Ca 32 RIG REPAIR FT/HR hp/dia inch IMP FORCE #DIV/! #DIV/! Sand Solids Oil % LOG FISHING/STUCK CORE DC Anlr Vel DST DP Anlr Vel KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $4,196 MISC 5 TIME START END HRS FROM TO 6: 8: :3 12: : 2: : 2: :3 23: : 1: : 3: : 3: :3 5: : 6: THREE RIVERS OPERATING II DAILY DRILLING REPORT CASING STRINGS Cum Mud $13,87 TOTAL (Daily/cum) 24 $1,845,8 $543,565 PICK UP WEIGHT PLAN ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft SLACK OFF WEIGHT J-55 STC - $33.29 ROTATING WEIGHT J-55 LTC - $2.7 TORQUE ON BOTTOM - $ TORQUE OFF BOTTOM - $ BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED TIME DISTRIBUTION ACTIVITY W.O.C Cut off conductor and rough cut csg, remove cut off and made final cut and installed and weld on 13-5/8" 3M X 13-3/8" SOW and test to 5 psi (good). N/U B.O.P Test B.O.P and casing 25 psi low and 1 psi high. Finish N/U panic lines and fabricate 6" line from manifold to gas seperator. Strap and caliper BHA #2 and P/U Pheonix 8" mtr.16 rev/gal.. bend, true shot damaged on face on pin end, lay down and run 1- stand and 1-jt. Of drill pipe, test mtr ok. T.I.H with BHA #2 tag cmt at 883'. Test B.O.P pipe rams 25 psi low and 1 psi high. Drill cmt and float equipment from 883' to 925'. P.O.O.H to pick up up True Shot Survey tool. RPM 4 WOB ROP (M lbs) (fph) water meter= DAILY AVG SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION AZIMUTH Ulterra 11" 813M Mud mtr.16, WASTE DISPOSAL SITE: 8" Shock Sub DAILY YDS SOLID - 1 BBLS LIQUID 1 11"-1/16 3-PNT REAMER WELL CUM SOLID - 1 CUM LIQUID 1 True Shot survey tool 1-8" Drill Collar 31.7 TOTAL DRILLED GAS 11"-1/16 3-PNT REAMER 7.21 GAS Units DC SIZE 4-8"Dc's 9.12 Background Gas: 6"-8" X-O 3.8 Connection gas: 21-6" DC'S Trip Gas: DP SIZE Max Gas: 4.5 ACCIDENTS FUEL (gals) Start 5329 BHA LENGTH SLOW PUMP RATES Received DRILL PIPE PSI SPM End 529 WEIGHT OF BHA Pump #1 Consumed 3 WEIGHT OF BHA (below jars) Pump #2 PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco Emsco
Current Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University
More informationPartner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig
: 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28
MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move
More information8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250
DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28
MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:
More information19,683 8,
General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg
More information02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00
DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University
More informationGulftex Energy III LP DAILY COMPLETION REPORT
07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM
More informationDAILY DRILLING REPORT DATE : 08/01/2012
DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:
More informationDATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS
DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud
More informationDAILY DRILLING REPORT
UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED
More informationAPACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00
More informationCallon Petroleum Company Drilling Report
LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP
More informationDaily Drilling Summary Report
Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well
More informationMLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations
MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014
More informationDrilling & Completion Summary
API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int
More informationGeneral Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN
UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate
More information3/25/15 University DC 1H Devonian Completion
3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014
More informationDaily Drilling Report
Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG
More informationEndeavor Energy Resources, LP. DAILY DRILLING REPORT
Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment
More informationDaily Drilling Report
Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report
More informationPage of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB
More informationDaily Activity Report
605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT
More informationExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #
6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main
More informationOPERATIONS SUMMARY REPORT
Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:
More informationDaily Drilling Report
Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing
More informationCompletion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00
Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217
More informationEP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017
6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion
More informationbbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P
Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels
More informationReport No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE
Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well
More informationH. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas
H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i
More informationEND OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:
UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of
More informationWell Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:
Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.
More informationLOC 400 Drilling Rig
TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP
More informationDATE: 01/03/ DAILY COMPLETION REPORT
DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY
More informationDaily Drilling Report
Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204
More informationView Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013
Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,
More informationSpud meeting with Periscope Connect electric lines, r/u v-door install shak
Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect
More informationEP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017
1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original
More informationCNL, CCL, GR, CBL. RDMO
Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:
More informationDAILY DRILLING REPORT DATE : 04/20/2011
DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539
More informationPROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..
DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks
More informationElevation Resources LLC
FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20
More information1042 FNL, 1935 FEL - ECTOR, TX
Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:
More informationIdeco - H25 Information Document
Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig
More informationMcKissick 200mt. Stabbing board
MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #
More informationElevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:
FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar
More informationCasing Drilling Technology Implementation In Petrom
Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga
More informationDAILY OPERATIONS REPORT Date:
OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:
More informationAthlon Energy Operating LLC
Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB
More information5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.
MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b
More informationDrilling & Completion Summary - Ascending
UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion
More informationMOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES
MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October
More informationRotary Snubbing Technology Option for Long Reach
Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results
More information4.7 Formation Temperature
4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and
More informationPATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL
PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL
More informationAbout Cobra Downhole Motors
February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationAtlas Copco Oil and Gas Rigs. The Predator Advantage
Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India
More informationAbout Cobra Downhole Motors
October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationINNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE
INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation
More informationSCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth
SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@
More informationPlug & Abandonment Light Drilling Workover Well Intervention
Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE
More informationDRILLING BARGE SS AMEQ CASPIAN SEA
DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months
More informationH. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas
H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB
More informationRig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading
Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80
More informationPRODUCTION HYDRAULIC PACKER FIELD TEST
DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose
More informationMaersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced
Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore
More informationRig 1 Sky top 4 Axle Carrier 6500 Drilling Depth
Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL
More informationAADE 01-NC-HO-54. Abstract
AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling
More informationSchede tecniche Corsair 300 PDB
Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015
More informationDRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.
DRILL PIPE CARE DRILL PIPE INTRODUCTION Box End Hardbanding Tapered Shoulder Tong Area Weld DEFINITION The drillpipe connects the rig surface equipment with the bottomhole assembly and the bit, both to
More informationRENTAL TOOL SERVICES. Megaton Impact Tools
Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the
More informationFOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)
FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH
More information44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network
Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits
More informationCasing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas
Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing
More informationVibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation
Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation 2/5/2013 Roger L. Schultz TTS Drilling Solutions Presentation Overview Frictional Forces, Vibratory
More informationReimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications
Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of
More informationAn Introduction to Dilution-Based Dual Gradient (DBDG) Drilling
An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved
More informationVDD 200 Super Single Rig - Automated Pipehandling System
Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles
More informationLEE NAK GUI TCP SERVICE COORDINATOR APPS
Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers
More informationVDD 370 Super Single Rig - Automatic Pipehandling System
Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles
More informationDaily Drilling Report
Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS
More informationCompletion Solutions Inc.
Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL
More informationDrillmec HH-300 spec.
Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable
More informationRe: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:
MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:
More informationFidmash. Coiled Tubing and Pressure Pumping Equipment
Fidmash Coiled Tubing and Pressure Pumping Equipment Table of Contents Coiled Tubing Equipment Coiled tubing units (CTU) Skid mounted CTU... 5 Land-based CTU... 5 Pressure control equipment Blowout preventer...