OPERATIONS SUMMARY REPORT

Size: px
Start display at page:

Download "OPERATIONS SUMMARY REPORT"

Transcription

1 Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1, A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 335, A RU CONTINUE TO MOVE IN RIG. (ALL 4 CREWS ON LOCATION). RECIEVED MUD PITS, DERRICK, PARTS HOUSES, PIPE RACKS, ETC. ALERTED BARRY TRRC ON RIG MOVE AND INTENT TO 15:30 HRS ON 10/22/10. DATE: 10/23/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 370, A RU CONTINUE TO MOVE IN RIG. ASSEMBLED DERRICK. RUN ELECTRIC LINES AND INSTALL LIGHTS. SET SUB AND PONY. CRANES ARRIVED ON LOCATION. REMAINDER OF SUB WILL BE SET SET WITH CRANES ON SATURDAY MORNING. DRAWWORKS ARRIVED LATE THIS EVENING. DATE: 10/24/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 387, A RU BEGAN RAINING EARLY MORNING SATURDAY. LOCATION COVERED IN WATER. CRANES COULD NOT RU DUE TO EXCESSIVE LIGHTNING. CRANE OPERATORS ISSUED SAFETY CONCERNS ABOUT RU UNTIL LOCTIONS DRIED OUT. NOTING THAT THE BACKYARD WAS VERY SOFT BY RESERVE PIT, WHICH IS WHERE ONE CRANE WOULD BE SPOTTED. BRANTLEY WAS CONCERNED ABOUT TRUCK AVAILABILITY WITH DELAY. BRANTLEY DROPPED REMAING LOADS THAT HAD ARRIVED AT TEXAS ENERGY YARD IN BIG LAKE. THE CRANE OPERATORS AGAIN STRESSED SAFETY ISSUES AND WANTED TO WAIT UNTIL MONDAY TO ALLOW LOCATION TO DRY. VISITED WITH BARNEY AND WE WILL SET FINISH RU MONDAY MORNING. CREWS CONTINUED TO WORK THE REST OF THE DAY HOOKING UP LINES TO MOTORS AND CONTINUE TO HOOK UP ELECTRICAL LINES TO PITS AFTER THE RAINS SUBSIDED. BY 18:00 HRS CREWS WERE LEAVING. LOCATIONS WAS STILL DRYING SLOWLY AND WATER WAS STILL STANDING IN BACK YARD. WE WILL ADDRESS LOCATION AGAIN IN THE MORNING. DATE: 10/25/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 404, A RU CONTINUE TO RIG UP. WELDERS ON LOCATION TO CONTINUE FABRICATION ON RIG. CONTINUE TO HOOK UP ELECTRICAL LINES AND AIR LINES ON EQUIPMENT. THE LOCATION STILLED HAD WATER STANDING EARLY IN THE DAY BUT HAS DRIED OUT THROUGHOUT THE DAY. IT IS STILL A LITTLE SOFT IN THE BACKYARD BUT SHOULD BE OK BY MONDAY MORNING FOR CRANE USE. THE CRANES ARE ON LOCATION. CRANE OPERATORS AND TRUCKS ARE SUPPOSED TO BE ON LOCATION BY 7AM. IF ALL GOES WELL THE DERRICK SHOULD BE RAISED MONDAY AFTERNOON. FINAL RIG UP SHOULD ALLOW US TO STILL SPUD PRIOR TO 8AM ON WEDNESDAY OCTOBER 27.

2 Today's Date: 10/26/2010 DATE: 10/26/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 445, A RU CONTINUE TO RIG UP. ROTARY TABLE, DRAWWORKS, FLOOR MOTORS, DERRICK SET ON RIG FLOOR. THE YARD HAS BEEN SET. DERRICK WILL BE RAISED THIS TUESDAY MORNING. RIG UP WILL CONTINUE WITH INTENTION OF SPUDDING WEDNESDAY MORNING.

3 Today's Date: 10/28/2010 DATE: 10/28/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 498, A RU CONTINUE TO RIG UP. WELD ON CONDUCTOR & HOOK UP FLOWLINE. WAITING ON NEW KELLY HOSE. CURRENTLY PREPARING TO MIX SPUD MUD AND RIG INSPECTION.

4 Today's Date: 10/29/2010 DATE: 10/29/2010 DSS: 1 DEPTH: 0 MUD WT: 8.40 CUM COST TO DATE: 525, A RU CONTINUE TO RIG UP D BH MAKE UP BHA #1. BIT (HTC GTX CP11H 17 1/2"), BIT SUB W/FLOAT, 1 DRILL COLLAR D DR DRILLED FROM 40' TO 89' FPH). WOB ALL, RPM 90, GPM 1535, PP :45 HRS ON 10/28/ Q OT WORK ON WT INDICATOR. SERVICE TECHNICIAN IS IN ROUTE. WORK ON AIR LINES & ST 80. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS.

5 Today's Date: 11/1/2010 DATE: 10/30/2010 DSS: 2 DEPTH: 427 MUD WT: 8.50 CUM COST TO DATE: 551, K OT WAITING ON SERVICE HAND TO REPAIR WT INDICATOR D DL DRILLED FROM 87' TO 138' FPH). WOB 10, RPM 90, GPM D RS RIG SERVICE 4.75 D DL DRILLED FROM 138' TO 289' FPH). WOB 20, RPM 90, GPM D SU 242'. INC 0.78* D DL DRILLED FROM 289' TO 350' FPH). WOB 22, RPM 90, GPM K RR REPAIR HOSE ON SWIVEL D DL DRILLED FROM 350' TO 427' FPH). WOB 25, RPM 90, GPM PU WT 56K, SO WT 54K, ROT WT 55K. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS. DATE: 10/31/2010 DSS: 3 DEPTH: 802 MUD WT: 8.50 CUM COST TO DATE: 619, D DL DRILLED FROM 427' TO 555' FPH). WOB 30, RPM 90, GPM D SU 505'. INC 0.35* D DL DRILLED FROM 555' TO 802' FPH). WOB 35, RPM 90, GPM 780. ALERTED TRRC OPERATOR JJN ON CEMENT JOB D SU 752'. INC 0.52* D TR TOH D BH LD BHA ASSEMBLY K RR CHANGE OUT AIR DRUM ON DRAWWORKS D RS RU CSG CREW & LAYDOWN MACHINE D RC RUN 21 JTS (808.64') OF 13 3/8", K55, BUTTRESS & STC CSG. 802'.. RUNNING ORDER SHOE, ONE SHOE JT, ONE FLOAT COLLAR (41.63'), 13 JTS BUTTRESS (496.39'), ONE XO JT (35.32'), 6 JTS STC (235.30') D RS RD LAYDOWN MACHINE, CASING CREW, & STABBING BOARD D RS SAFETY MEETING & RU HALLIBURTON SERVICES. FULL CREWS, NO REPORTED ACCIDENTS, SAFETY MEETINGS HELD. DATE: 11/1/2010 DSS: 4 DEPTH: 802 MUD WT: 9.40 CUM COST TO DATE: 679, D CM CEMENTED WITH HALLIBURTON AS FOLLOWS: TEST LINES TO 2500 PSI. PUMP 20 BBLS FRESH WATER SPACER FOLLOWED BY LEAD CEMENT (138 BBLS) 420 SXS ECONOCEM 12.9 PPG, YIELD 1.84, MIX WATER 9.92 GAL/SK, TAIL CEMENT (81 BBLS) 340 SXS HALCEM + 1.6% 14.8 PPG, YIELD 1.34, MIX WATER 6.38 GAL/SK, DROPPED PLUG & DISPLACED WITH 118 BBLS FRESH WATER. PLUG LANDED ON 900 PSI. FLOATS HELD. CIRC 120 BBLS LEAD (366 SXS) CEMENT TO PITS D WC WAIT ON CEMENT. BEGAN JETTING AND CLEANING PITS. REMOVE DRESSER SLEEVE FROM FLOWLINE 6.50 D NC CUT OFF CONDUCTOR, MAKE ROUGH CUT ON 13 3/8" CSG (35.4') AND SLIP. LAYOUT CONDUCTOR. MAKE FINAL CUT AND DRESS 13 3/8" CSG. SLIP ON 13 5/8' S0W X 13 5/8" 5000 CSG HEAD WITH 2" LPO AND 5000 PSI BALL VALVE. TEST WELLHEAD TO 2500 PSI. OK D NU NU 13 5/8" 5000 PSI BOP (MUD CROSS, BLIND RAMS, PIPE RAMS, ANNULAR, & CHOKE MANIFOLD. NU SPACER SPOOLS AND ROTATING HEAD D TB TEST BOP. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS.

6 Today's Date: 11/3/2010 DATE: 11/3/2010 DSS: 6 DEPTH: 2,213 MUD WT: CUM COST TO DATE: 786, D DL DRILLED FROM 877' TO 1052' FPH). WOB 10/15, RPM 70, GPM 760, MRPM D OT BLEW POPOFF ON #2, REPLACE NAIL AND BLEW POPOFF ON #1 PUMP. REPLACE NAIL AND RESUME DRLG. POPOFF BLEW WHILE TRYING TO INCREASE PUMP STRUCKS ON BOTH PUMPS D DL DRILLED FROM 1052' TO 1203' FOH), WOB 15, RPM 85, GPM 760, PP D SU 1153'. INC 0.5* D DL DRILLED FROM 1203' TO 1487' FPH). WOB 15, RPM 75, GPM 658, MRPM D RS SERVICE RIG D DL DRILLED FROM 1487' TO 1740' FPH). WOB 15, RPM 80, GPM 638, MRPM D SU 1691'. INC 0.64* D DL DRILLED FROM 1740' TO 2213' FPH). WOB 15, RPM 80, GPM 638, PP PU WT 107K, SO WT, 103, ROT WT 105K, 2213' SPM, PUMP # SPM. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS.

7 Today's Date: 11/4/2010 DATE: 11/4/2010 DSS: 7 DEPTH: 3,410 MUD WT: 9.80 CUM COST TO DATE: 812, D DL DRILLED FROM 2213' TO 2244'. (124.0 FPH). WOB 20, RPM 80, GPM 638, MRPM D SU 2195'. INC ).45* D DL DRILLED FROM 2244' TO 2782' FPH). WOB 25, RPM 80, GPM 538, PP D RS RIG SERVICE 0.50 D SU 2702'. INC 0.42* D DL DRILLED FROM 2782' TO 3111' FPH). WOB 25/30, RPM 80, GPM 638, MRPM D SU 3111'. INC 1.50* D DL DRILLED FROM 3111' TO 3410' FPH). WOB 28, GPM 638, MRPM 102, PP ROT WT 124K, PU RT 125K, SO WT 120K, MORNING TOUR SHORT 2 HANDS, DAYS WORKED OVER ON 4 HR SHIFTS TO COMPLETE CREW.

8 Today's Date: 11/5/2010 DATE: 11/5/2010 DSS: 8 DEPTH: 4,238 MUD WT: CUM COST TO DATE: 1,003, D DL DRILLED FROM 3410' TO 3795' FPH). WOB 28, RPM 80, MRPM 102, GPM D RS SERVICE RIG D SU 3715'. INC 2.17* D DL DRILLED FROM 3795' TO 3981' FPH). WOB 15, RPM 80, GPM 638, MRPM D SU 3902'. INC 1.0* D DL DRILLED FROM 3981' TO 4238'. 54.1FPH). WOB 28, RPM 80, GPM 638, MRPM 102, PP D CA CIRC. PUMP 20 BBL HI VIS SWEEP, SPOTTED 40 BBLS HI VIS SWEEP ON BOTTOM D TR DROP TOTCO, TOH TO 8" DC'S. PU WT 145K, SO WT 140K, ROT WT 145K. SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS.

9 Today's Date: 11/8/2010 DATE: 11/6/2010 DSS: 9 DEPTH: 4,238 MUD WT: 8.70 CUM COST TO DATE: 1,112, D LD LAYDOWN 8" DC'S, REAMERS, SHOCK SUB, DRLG MOTOR, BIT D RS HOLD SAFETY MEETING & RIG UP CSG CREW D RC RUN 106 JTS (4,243.41') OF 9 5/8" 40# J55 LTC CSG AND SET AT 4,223'. HOLE STAYED FULL AND NO PROBLEMS ENCOUNTERED WHILE RUNNING CSG. MIKE JOHNSON (SAFETY REP) ON LOCATION TODAY D CA CIRCULATE AND HOLD SAFETY MEETING D RS RU HALLIBURTON 2.50 D CM CEMENT WITH HALLIBURTON AS FOLLOWS: TEST LINES TO 5000 PSI. PUMP 30 BBLS FRESH WATER SPACER, 630 SXS LEAD (277 BBLS) ECONOCEM C + 0.2% ECONOLITE + 0.4% HR 601, & 175 SXS TAIL (42 BBLS) HALCEM C + 0.4% HALAD R9, DROPPED PLUG & DISPLACED WITH 316 BBLS FRESH FINAL PRESSURE OF 950 PSI. BUMPED PLUG WITH :51 HRS. CIRC 109 SXS (48 BBLS CEMENT TO SURFACE D OT FLUSH BOPE AND FLOWLINE D NU ND BOP, SET SLIPS W/ 64K WT D NU REMOVE 13 5/8" SPOOL, NU11"5K X 13 5/8" 5K B SECTION, DSA & BOP 0.50 D TB TEST WH 1300 PSI 1.50 D NU FINISH NU CHOKE LINE, KILL LINE & FLOWLINE 1.00 D TB PICK UP TEST PLUG 0.00 D FULL CREWS, NO ACCIDENTS REPORTED, SAFETY MEETING HELD DATE: 11/7/2010 DSS: 10 DEPTH: 4,812 MUD WT: 8.80 CUM COST TO DATE: 1,151, D TB TEST BOPS D OT INSTALL WEAR BUSHING 4.75 D TR MAKE UP BHA #3, VAREL VMR 211, MOTOR 6 3/4", 7/8 LOBE, 5.0 STG, RPG, 2 DC'S, IBS, DC, IBS, 14 DCS, JARS, 3 DCS, R-TOOL. TIH TO 4125' D CA MAKE UP KELLY AND CIRC TO FILL DRILL PIPE 0.25 D LD PU 2 JTS DP & TAG 4175'. TAG FLOAT 4182' D DC DRILL OUT CMT, FC, SHOE TRACK & FS 4.75 D DR DRILL F/ 4238' TO 4657' ( 88 FPH ) WOB 20, GPM 565, ROT 45, MRPM 94, 0.50 D SU 4578' INC..15? 2.50 D DR DRILL F/ 4657' TO 4812' ( 62 FPH ) WOB 20, GPM 565, ROT 70, MRPM D FULL CREWS, NO ACCIDENTS REPORTED, SAFETY MEETINGS HELD 100% SHALE, BBG 60 P/U 135, S/O 130, ROT 135 SPR #1 PUMP 52 SPM 310 PSI DATE: 11/8/2010 DSS: 11 DEPTH: 5,822 MUD WT: 8.80 CUM COST TO DATE: 1,188, Page 1 of 2

10 Today's Date: 11/8/2010 DATE: 11/8/2010 DSS: 11 DEPTH: 5,822 MUD WT: 8.80 CUM COST TO DATE: 1,188, D DL DRILLED FROM 4812' TO 5161' FPH). WOB 25, RPM 68, GPM 565 GPM, MRPM 127. FORMATION CHANGE TO LIMESTONE/SAND D RS SERVICE RIG 0.50 D SU 5080'. INC 0.76* 0.25 K RR RIG MECHANIC ON LOCATION TO WORK ON MUD PUMP ENGINES. (THROTTLE ON #1 PUMP WASN'T GETTING ENOUGH TO BRING PUMP UP TO FULL STROKES) D DL DRILLED F/ 5161' TO 5665' ( 48 FPH ) WOB 25-30, ROM 69, GPM 565, MRPM D SU 5586' INC..38? 4.50 D DL DRILLED F/ 5665' TO 5822' ( 35 FPH ) WOB 25-30, RPM 69, GPM 565, MRPM % SHALE, 30% DOLOMITE, BGG D DAY LIGHTS SHORT ONE HAND, NO ACCIDENTS REPORTED, SAFETY MEETINGS HELD P/U WT. 155, S/O 148, ROT 153 SPR 68 #2 PUMP PSI 70% SHALE, 30% DOLOMITE, BGG 100 Page 2 of 2

11 Today's Date: 11/9/2010 DATE: 11/9/2010 DSS: 12 DEPTH: 5,822 MUD WT: 8.85 CUM COST TO DATE: 1,237, D DL DRILLED FROM 5822' TO 5980' FPH) WOB 35, RPM 75, GPM 565, MRPM 128. HELD SAFETY MEETING ON TRIPPING, AND AWARENESS, 3.00 D SU RU SCIENTIFIC & RUN GYRO. GYRO 5897' D TR TOH TO PU DIRECTIONAL TOOLS. SLM 0.50 D OT ELEVATORS HUNG UP IN OVERSIZED TOOL JT W/ HARDBAND. SET JT IN MOUSEHOLE AND BREAK OUT ELEVATORS D TR CONTINUE TOH. SLM = 5981' D RS SAFETY MEETING & RU LD MACHINE TO LD DC'S D BH LD BHA #3, PICK UP 18 JTS OF DP 0.25 D RS RD LD MACHINE 1.00 D TR TOH W/ 6 STDS OF DP, HUNG ELEVATORS ON TOOL JT DUE TO HARDBANDING TO THICK 2.00 D BH PICK UP BHA #4, 8 3/4" ULTERRA Z28 RDS W/ 3-18'S, 6 3/4" TITAN MTR, NMFC, NMDC, UBHO SUB, NMFC, 0.50 D OT TEST MWD 0.50 D TR TIH W/ BHA # D FULL CREWS, NO ACCIDENTS REPORTED, SAFETY MEETINGS HELD

12 Today's Date: 11/10/2010 DATE: 11/10/2010 DSS: 13 DEPTH: 6,461 MUD WT: CUM COST TO DATE: 1,287, D TR TIH TO 5910' D OT MAKE UP KELLY AND WASH 65' TO BOTTOM D DR DRILL ROTATE FROM 5980' TO 6068' FPH). WOB 30, RPM 40, GPM 500, MRPM D SU 6015'. INC AZ D DR DRILL ROTATE FROM 6068' TO 6162' FPH). WOB 30, RPM 40, GPM 500, MRPM D SU 6109'. INC AZ D DS DRILL SLIDE FROM 6162' TO 6225' FPH). WOB 30, GPM 502, MRPM 140, TF HS D SU 6172'. INC AZ D RS SERVICE RIG D DS DRILL SLIDE FROM 6225' TO 6256' 62.0 FPH). WOB 30, GPM 502, MRPM 140, TF 359M 0.25 D SU 6203' INC. AZ D DS DRILL SLIDE FROM 6256' TO 6288' 28.0 FPH). WOB 30, GPM 502, MRPM 140, TF 10R 0.25 D SU 6235' INC. AZ D DS DRILL SLIDE FROM 6288' TO 6319' 41 FPH). WOB 30, GPM 502, MRPM 140, TF 10R 0.25 D SU 6266' INC. AZ D DS DRILL SLIDE FROM 6319' TO 6351' 32 FPH). WOB 30, GPM 502, MRPM 140, TF 30R 0.25 D SU 6298' INC. AZ D DS DRILL SLIDE FROM 6351' TO 6382' 41 FPH). WOB 30, GPM 502, MRPM 140, TF 10R 0.25 D SU 6329' INC. AZ D DS DRILL SLIDE FROM 6382' TO 6414' 32 FPH). WOB 30, GPM 502, MRPM 140, TF 10R 0.25 D SU 6361' INC. AZ D DS DRILL SLIDE FROM 6414' TO 6446' 32 FPH). WOB 30, GPM 502, MRPM 140, TF 0R 0.25 D SU 6393' INC. AZ D DS DRILL SLIDE FROM 6446' TO 6461' 15 FPH). WOB 30, GPM 502, MRPM 140, TF 0R 1.00 D CI CIRC HIGH VIS SWEEP SLUG DP W/ BW 1.00 D TR TOH TO PICK UP 2.38 MOTOR 0.00 D FULL CREWS, NO ACCIDENTS REPORTED, SAFETY MEETINGS HELD 90% SHALE, 10% LIMESTONE, BGG 24

13 Today's Date: 11/11/2010 DATE: 11/11/2010 DSS: 14 DEPTH: 6,730 MUD WT: CUM COST TO DATE: 1,328, D TR CONTINUE TOH TO CHANGE OUT MOTOR D BH CHANGE OUT MOTOR & ADJUST TO 2.38 & TEST MWD & MOTOR D TR TIH 0.75 D DS DRILL SLIDE FROM 6461' TO 6478' FPH). WOB 30, GPM 491, MRPM 137, TF-OR D SU 6424'. INC AZ D DS DRILL SIDE FROM 6478' TO 6510' FPH). WOB 30, GPM 491, MRPM 137, TF-OR D SU 6456'. INC AZ D DS DRILL SLIDE FROM 6510' TO 6541' FPH). WOB 40, GPM 491, MRPM 137, TFO-OR D RS RIG SERVICE 0.25 D SU 6487'. INC AZ D DS DRILL SLIDE FROM 6541' TO 6572' FPH). WOB 30, GPM 379, MRPM 106, TF-OR D SU 6518'. INC AZ D DS DRILL SLIDE FROM 6572' TO 6604' FPH). WOB 30, GPM 379, MRPM 106, TF-OR D SU 6550'. INC AZ DISCUSSED OPTIONS WITH RON & DECISION TO CONTINUE SLIDING WAS GIVEN D DS DRILL SLIDE FROM 6604' TO 6635' FPH). WOB 30, GPM 379, MRPM 106, TF-OR. 6" & 8" DC'S INSPECTED. 3 CRACKED BOXES ON 6" COLLAR, 1 DAMAGED PIN. 2 DAMAGED PINS ON 8" DC'S D SU 6581'. INC AZ D DS DRILL SLIDE FROM 6635' TO 6667' FPH). WOB 30, GPM 379, MRPM 106, TF-OR D SU 6613'. INC AZ D DS DRILL SLIDE FROM 6667' TO 6698' FPH). WOB 30, GPM 379, MRPM 106, TF-OR D SU 6644'. INC AZ D DS DRILL SLIDE FROM 6698' TO 6730' FPH). WOB 30, GPM 379, MRPM 106, TF-OR D SU 6676'. INC AZ PU WT 130, SO WT 125, ROT WT 127 LITH: 100% SHALE, BGG 73 UNITS. CREW CHANGE OUTS, FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS.

14 Today's Date: 11/12/2010 DATE: 11/12/2010 DSS: 15 DEPTH: 6,949 MUD WT: 8.90 CUM COST TO DATE: 1,382, D DS DRILL SLIDE FROM 6730' TO 6761' FPH). WOB 30, GPM 368, MRPM 92, TF-OR D SU 6707'. INC AZ D DS DRILL SLIDE FROM 6761' TO 6792' FPH). WOB 40, GPM 368, MRPM 92, TF-OR D SU 6738'. INC AZ D DS DRILL SLIDE FROM 6792' TO 6823' FPH). WOB 40, GPM 393, MRPM 110, TF-OR D SU 6769'. INC AZ D DS DRILL SLIDE FROM 6823' TO 6855' FPH). WOB 35, GPM 393, MRPM 110, TF-OR D SU 6801'. INC AZ D DS DRILL SLIDE FROM 6855' TO 6886' FPH). WOB 35, GPM 417, MRPM 116, TF-OR D SU 6832'. INC AZ D DS DRILL SLIDE FROM 6886' TO 6918' FPH). WOB 35, GPM 392, MRPM 110, TF-OR D SU 6864'. INC AZ D DS DRILL SLIDE FROM 6918' TO 6949' FPH). WOB 35, GPM 392, MRPM 110, TF-OR D SU 6895'. INC AZ D PL PUMP TRIP SLUG D TR TOH FOR LATERAL ASSEMBLY D BH PU UP LATERAL MOTOR, (BITS-HUGHES 408 FX, 6 1/2" MOTOR 7/8, 5.0 STG, 1.74 BH, 5.3 BIT TO BEND, 0.28 RPG, NMDC, PULSER SUB NM FC, 6 JTS DP, R-TOOL). BIT TO SENSOR 49', BIT TO GAMMA 40'. MWD FAILED I CJ DOWNLOAD DATA FROM ORIGINAL MWD AND CHANGE OUT BATTERIES. MAKE UP NEW MWD D TR TIH WITH LATERAL ASSEMBLY. PU WT 130, SO WT 127, ROT WT 125. LITH: 100% SHALE, BGG 53 UNITS. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS.

15 Today's Date: 11/15/2010 DATE: 11/13/2010 DSS: 16 DEPTH: 7,358 MUD WT: 8.90 CUM COST TO DATE: 1,420, D TR CONTINUE TIH I OT TROUBLESHOOT MWD RFD (RIG FLOOR DISPLAY) 1.00 D DS DRILL SLIDE FROM 6949' TO 6964' FPH). WOB 35, GPM 392, MRPM 110, TF-90L 0.25 D DR DRILL ROTATE FROM 6964' TO 6982' FPH). WOB 25, GPM 392, RPM 40, PP D SU 6933'. INC AZ D DS DRILL SLIDE FROM 6982' TO 6997' FPH). WOB 35, GPM 491, MRPM 137, TF-90L D DR DRILL ROTATE FROM 6997' TO 7013' FPH). WOB 25, GPM 565, RPM 40, PP D SU 6964'. INC AZ D DS DRILL SLIDE FROM 7013' TO 7028' FPH). WOB 35, GPM 565, MRPM 158, PP I OT CHANGE OUT MWD TRANSDUCER D DR DRILL ROTATE FROM 7028' TO 7076' FPH). WOB 25, GPM 565, RPM 70, PP D SU 7027'. INC AZ D DS DRILL SLIDE FROM 7076' TO 7091' FPH). WOB 35, GPM 565, MRPM 158, TFO-0R D DR DRILL ROTATE FROM 7091' TO 7139' FPH). WOB 25, GPM 565, RPM 70, PP D SU 7090'. INC AZ I OT CHANGE OUT MWD TRANSDUCER CABLE. MIKE JOHNSON -EOG SAFETY REP ON LOCATION FOR RIG INSPECTION D DR DRILL ROTATE FROM 7139' TO 7202'. 126 FPH). WOB 25, GPM 565, RPM 70, PP D RS SERVICE RIG D SU 7153'. INC AZ I OT CHANGE OUT ALL MWD SURFACE EQUIPMENT D DR DRILL ROTATE FROM 7202' TO 7265' FPH). WOB 25, GPM 565, RPM 70, PP D SU 7216'. INC AZ D DS DRILL SLIDE FROM 7265' TO 7273' FPH). WOB 35, GPM 565, MRPM 158, TFO D DR DRILL ROTATE FROM 7273' TO 7327' FPH). WOB 25, GPM 565, RPM 70, PP D SU 7278'. INC AZ D DR DRILL ROTATE FROM 7327' TO 7358' FPH). WOB 25, GPM 565, RPM 70, MRPM I OT TROUBLE SHOOT MWD. PUMP TRIP SLUG I TR TOH TO CHANGE OUT MWD I TR CHANGE OUT MWD AND TEST. PU WT 135, SO WT 125, ROT WT 129. LITH: 100% SHALE, BGG 124U, HI GAS 470 UNITS, TRIP GAS 230 UNITS. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS. DATE: 11/14/2010 DSS: 17 DEPTH: 8,454 MUD WT: 8.90 CUM COST TO DATE: 1,458, Page 1 of 5

16 Today's Date: 11/15/2010 DATE: 11/14/2010 DSS: 17 DEPTH: 8,454 MUD WT: 8.90 CUM COST TO DATE: 1,458, D TR CONTINUE TIH D WA WAH & REAM FROM 6700' TO 6869' D LD LD 4 JTS DP THAT WAS USED TO WASH WITH D TR CONTINUE TIH. NO FILL D DR DRILL ROTATE FROM 7358' TO 7389' FPH). WOB 25, GPM 565, RPM 70, PP D SU 7340'. INC AZ D DS DRILL SLIDE FROM 7389' TO 7406' FPH). WOB 30, GPM 565, MRPM 158, TFO-160R D DR DRILL ROTATE FROM 7406' TO 7452' FPH). WOB 25, RPM 70, GPM 565, PP D SU 7403'. INC AZ D DR DRILL ROTATE FROM 7452' TO 7515' FPH). WOB 25, GPM 565, RPM 70, PP D SU 7466'. INC AZ D DS DRILL SLIDE FROM 7515' TO 7535' FPH). WOB 30, GPM 565, MRPM 158, TFO-100R D DR DRILL ROTATE FROM 7535' TO 7577' FPH). WOB 25, RPM 70, GPM 565, PP D SU 7528'. INC AZ D DS DRILL SLIDE FROM 7577' TO 7597' FPH). WOB 30, GPM 565, MRPM 158, TFO-90R D DR DRILL ROTATE FROM 7597' TO 7609' FPH). WOB 25, RPM 70, GPM 565, PP D SR SERVICE RIG D DR DRILL ROTATE FROM 7609' TO 7640' FPH).. WOB 25, RPM 70, GPM 565, MRPM D SU 7591'. INC AZ D DR DRILL ROTATE FROM 7640' TO 7702' FPH). WOB 25, RPM 70, GPM 565, PP D SU 7653'. INC AZ D DR DRILL ROTATE FROM 7702' TO 7765' FPH). WOB 25, RPM 70, GPM 565, MRPM D SU 7716'. INC AZ D DR DRILL ROTATE FROM 7765' TO 7828' FPH). WOB 25, RPM 70, GPM 565, PP D SU 7779'. INC AZ D DR DRILL ROTATE FROM 7828' TO 7890' FPH). WOB 25, GPM 565, RPM 70, MRPM D SU 7841'. INC AZ D DS DRILL SLIDE FROM 7890' TO 7910' FPH). WOB 30, GPM 565, MRPM 141, TFO-90R D DR DRILL ROTATE FROM 7910' TO 7953' FPH). WOB 25, GPM 565, RPM 70, PP D SU 7904'. INC AZ D DR DRILL ROTATE FROM 7953' TO 8016' FPH). WOB 25, RPM 70, GPM 501, MRPM D SU 7967'. INC AZ D DR DRILL ROTATE FROM 8016' TO 8078' FPH). WOB 25, GPM 501, RPM 70, MRPM D SU 8029'. INC AZ D DS DRILL SLIDE FROM 8078' TO 8098' FPH). WOB 30, GPM 501, MRPM 140, TFO-70R D DR DRILL ROTATE FROM 8098' TO 8141' FPH). WOB 25, GPM 501, RPM 70, PP D SU 8092'. INC AZ D DR DRILL ROTATE FROM 8141' TO 8203' FPH). WOB 25, GPM 501, RPM 70, MRPM D SU 8155'. INC AZ D DR DRILL ROTATE FROM 8203' TO 8266' FPH). WOB 25, GPM 501, RPM 70, PP D SU 8217'. INC AZ D DS DRILL SLIDE FROM 8266' TO 8286' FPH). WOB 30, GPM 501, MRPM 140, TFO-110R D DR DRILL ROTATE FROM 8286' TO 8329' FPH). WOB 25, RPM 70, GPM 501, PP D SU 8280'. INC AZ D DR DRILL ROTATE FROM 8329' TO 8391'. 124 FPH). WOB 25, RPM 70, GPM 501, MRPM D SU 8342'. INC AZ Page 2 of 5

17 Today's Date: 11/15/2010 DATE: 11/14/2010 DSS: 17 DEPTH: 8,454 MUD WT: 8.90 CUM COST TO DATE: 1,458, D DR DRILL ROTATE FROM 8391' TO 8454'. 126 FPH). WOB 25, RPM 70, GPM 501, PP PU WT 135, SO WT 125, ROT WT 129, OFF BOTTOM BACKLASH 1 1/2 RNDS, LITH: 100% SHALE, BGG 215U, MAX GAS 7896'. TRIP GAS 122U. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS. DATE: 11/15/2010 DSS: 18 DEPTH: 9,873 MUD WT: 9.00 CUM COST TO DATE: 1,499, Page 3 of 5

18 Today's Date: 11/15/2010 DATE: 11/15/2010 DSS: 18 DEPTH: 9,873 MUD WT: 9.00 CUM COST TO DATE: 1,499, D SU 8405'. INC AZ D DS DRILL SLIDE FROM 8454' TO 8474' FPH). WOB 25, GPM 565, MRPM 158, TFO-150R D DR DRILL ROTATE FROM 8474' TO 8516' FPH). WOB 25, GPM 565, RPM 70, PP D SU 8467'. inc AZ D DR DRILL ROTATE FROM 8516' TO 8578' FPH). WOB 25, RPM 70, GPM 565, MRPM D SU 8529'. INC AZ D DR DRILL ROTATE FROM 8578' TO 8640' FPH). WOB 25, GPM 525, RPM 70, MRPM D SU 8591'. INC AZ D DS DRILL ROTATE FROM 8640' TO 8702' FPH). WOB 25, GPM 525, RPM 70, PP D SU 8653'. INC AZ D DR DRILL ROTATE FROM 8702' TO 8763'. 122 FPH). WOB 25, GPM 525, RPM 70, PP PUMP HI VIS SWEEP. ADDING DYNA DRILL LUBRICANT. LIMIT CIRC TO STEEL PITS D SU 8714'. INC AZ D DS DRILL SLIDE FROM 8763' TO 8783' FPH). WOB 30, GPM 525, MRPM 147, TFO-120R D DR DRILL ROTATE FROM 8783' TO 8825' FPH). WOB 25, GPM 525, RPM 70, MRPM D SU 8776'. INC AZ D DR DRILL ROTATE FROM 8825' TO 8886'. ( 122 FPH). WOB 25, GPM 525, RPM 70, PP D SU 8837'. INC AZ D DR DRILL ROTATE FROM 8886' TO 8947' FPH). WOB 25, GPM 525, RPM 70, PP PUMP 20 BBLS HIVIS SWEEP D SU 8898'. INC AZ D DR DRILL ROTATE FROM 8947' TO 9009' FPH). WOB 25, GPM 525, RPM 70, MRPM D SU 8960'. INC AZ D DR DRILL ROTATE FROM 9009' TO 9070' FPH). WOB 25, GPM 525, RPM 70, PP D SU 9021'. INC 90.5*@ AZ D DS DRILL SLIDE FROM 9070' TO 9090' FPH). WOB 25, GPM 525, MRPM 147, TFO-110R D DR DRILL ROTATE FROM 9090' TO 9132' FPH). WOB 25, GPM 525, RPM 70, PP PUMPED 20 BBL HI VIS SWEEP. CONTINUE ADDING DYNA DRILL. LUBRICANT AT 1.5% 0.50 D RS SERVICE RIG D SU 9083'. INC AZ D DR DRILL ROTATE FROM 9132' TO 9193' FPH). WOB 25, GPM 525, RPM 70, MRPM D SU 9144'. INC AZ D DR DRILL ROTATE FROM 9193' TO 9255'. 124 FPH). WOB 25, GPM 525, RPM 70, PP D SU 9206'. INC AZ D DS DRILL SLIDE FROM 9255' TO 9275' FPH). WOB 25, GPM 525, MRPM 147, TFO-80R D DR DRILL ROTATE FROM 9275' TO 9316' FPH). WOB 25, GPM 525, RPM 70, PP D SU 9267'. INC AZ D DR DRILL ROTATE FROM 9316' TO 9379'. 126 FPH). WOB 25, GPM 525, RPM 70, PP D SU 9328'. (INC AZ D DR DRILL ROTATE FROM 9379' TO 9439'. 120 FPH). WOB 25, GPM 525, RPM 70, MRPM D SU 9390'. INC AZ D DR DRILL ROTATE FROM 9439' TO 9500'. 122 FPH). WOB 25, GPM 525, TRPM 217, PP D SU 9451'. INC AZ D DS DRILL SLIDE FROM 9500' TO 9520' FPH). WOB 25, GPM 525, MRPM 147, TFO-90R D DR DRILL ROTATE FROM 9520' TO 9562' FPH). WOB 25, GPM 525, TRPM 217, PP D SU 9513'. INC AZ Page 4 of 5

19 Today's Date: 11/15/2010 DATE: 11/15/2010 DSS: 18 DEPTH: 9,873 MUD WT: 9.00 CUM COST TO DATE: 1,499, D DR DRILL ROTATE FROM 9562' TO 9623'. 122 FPH). WOB 25, GPM 525, TRPM 217, PP D SU 9574'. INC AZ AZ D DS DRILL SLIDE FROM 9623' TO 9643' FPH). WOB 25, GPM 525, MRPM 147, TFO-90R D DR DRILL ROTATE FROM 9643' TO 9685' FPH). WOB 25, GPM 525, TRPM 217, PP D SU 9636'. INC AZ D DR DRILL ROTATE FROM 9685' TO 9747' FPH). WOB 25, GPM 525, TRPM 217, PP D SU 9698'. INC AZ D DR DRILL ROTATE FROM 9747' TO 9810' FPH). WOB 25, GPM 525, RPM 70, SPM D SU 9761'. INC AZ D DR DRILL ROTATE FROM 9810' TO 9873' FPH). WOB 25, GPM 525 TRPM 217, PP PU WT 175, SO WT 125, ROT WT 150, BACKLASH 2RNDS. LITH: 100% SHALE. BGG 417U, MAX GAS 8848'. 9841' SPM. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS. Page 5 of 5

20 Today's Date: 11/16/2010 DATE: 11/16/2010 DSS: 19 DEPTH: 11,259 MUD WT: 9.20 CUM COST TO DATE: 1,542, D SU 9824'. INC AZ D DR DRILL ROTATE FROM 9873' TO 9936' FPH). WOB 25, GPM 516, TRPM 214, PP D SU 9918'. INC AZ D DR DRILL ROTATE FROM 9936' TO 9999' FPH). WOB 25, GPM 516, TRPM 214, SPM 105. PUMP 20 BBL HI VIS SWEEP D SU 9950'. INC AZ D DS DRILL SLIDE FROM 9999' TO 1019' FPH). WOB 35, GPM 516, MRPM 144, TFO-120R D DR DRILL ROTATE FROM 1019' TO 10062' FPH). WOB 25, GPM 516, TRPM 214, PP D SU 10,013'. INC AZ D DR DRILL ROTATE FROM 10062' TO 10125' FPH). WOB 25, GPM 516, MRPM 144, PP D SU 10,076'. INC AZ D DR DRILL ROTATE FROM 10,125' TO 10,188' FPH). WOB 25, GPM 491, TRPM 207, PP PUMP 15 BBL HIVIS SWEEP, 10 BBLS BRINE WATER, 15 BBLS HI VIS SWEEP D SU 10,139'. INC AZ D DR DRILL ROTATE FROM 10,188' TO 10,251'. 126 FPH). WOB 25, GPM 491, TRPM 207, SPM D SU 10,202'. INC AZ D DR DRILL ROTATE FROM 10,251' TO 10,314' FPH). WOB 25, GPM 491, TRPM 207, PP D SU 10,265'. INC AZ D DR DRILL ROTATE FROM 10,314' TO 10,377' FPH). WOB 25, GPM 491, TRPM 207, SPM 100. PUMP 15 BBL HIVIS/ 10.8 PPG SWEEP D SU 10,328'. INC AZ D DS DRILL SLIDE FROM 10,377' TO 10,392' FPH). WOB 50, GPM 491, MRPM 137, TFO D DR DRILL ROTATE FROM 10,392' TO 10,440' FPH). WOB 25, GPM 491, TRPM 207, PP D SU 10,391'. INC AZ D DR DRILL ROTATE FROM 10,440' TO 10,502' FPH). WOB 25, GPM 491, TRPM 207, SPM D SU 10,453'. INC AZ D DR DRILL ROTATE FROM 10502' TO 10,565' FPH). WOB 25, GPM 491, TRPM 207, PP D SR SERVICE RIG D SU 10,516'. INC AZ D DR DRILL ROTATE FROM 10565' TO 10,628' FPH). WOB 25, GPM 491, TRPM 207, SPM 100. PUMP 15 BBL HIVIS, 10 BBL BRINE WATE, 15 BBL 10.8 PPG D SU 10,579'. INC AZ D DR DRILL ROTATE FROM 10,628' TO 10,692'. (64' * (85.3 FPH). WOB 25, GPM 491, TRPM 207, PP D SU 10,643'. INC AZ D DS DRILLSLIDE FROM 10,692' TO 10,702' FPH). WOB 50, GPM 491, MRPM 137, TFO D DR DRILL ROTATE FROM 10,702' TO 10,754' FPH). WOB 50, GPM 491, TRPM 207, PP D SU 10,705'. INC AZ D DR DRILL ROTATE FROM 10,754' TO 10,818' FPH). WOB 25, GPM 491, TRPM 207, SPM D SU 10,769'. INC AZ D DR DRILL ROTATE FROM 10,818' TO 10,881' FPH). WOB 25, GPM 491, TRPM 207, PP PUMPED 20 BBL HIVIS 10.6 PPG D SU 10,832'. INC AZ D DR DRILL ROTATE FROM 10,881' TO 10,944' FPH). WOB 25, GPM 491, TRPM 207, SPM D SU 10,895'. INC AZ D DS DRILL SLIDE FROM 10,944' TO 10,959' FPH). WOB 50, GPM 491, MRPM 137, TFO D DR DRILL ROTATE FROM 10,959' TO 11,007' FPH). WOB 25, GPM 491, TRPM 207, PP Page 2 of 3

21 Today's Date: 11/16/2010 DATE: 11/16/2010 DSS: 19 DEPTH: 11,259 MUD WT: 9.20 CUM COST TO DATE: 1,542, D SU 10,958'. INC AZ D DR DRILL ROTATE FROM 11,007' TO 11,070' FPH). WOB 25, GPM 491, TRPM 207, SPM 100. PUMPED 15 BBLS HIVIS SWEEP, 10 BBLS BRINE WATER, 15 BBLS HIVIS 10.6 PPG SWEEP D SU 11,021'. INC AZ D DR DRILL ROTATE FROM 11,070' TO 11,133' FPH). WOB 25, GPM 491, TRPM 207, PP PUMPED 20 BBL HIVIS 10.6 PPG SWEEP D SU 11,084'. INC AZ D DS DRILL SLIDE FROM 11,133' TO 11,148' FPH). WOB 50, GPM 491, RPM 137, TFO D DR DRILL ROTATE FROM 11,148' TO 11,196' FPH). WOB 25, GPM 491, TRPM 207, SPM D SU 11,147'. INC AZ D DR DRILL ROTATE FROM 11,196' TO 11,259' FPH). WOB 25, GPM 491, TRPM 207, PP PUMP 15 BBL HIVSI SWEEP, 10 BBLS BRINE WATER, 15 BBLS HIVIS 10.6 PPG SWEEP D SU 11,210'. INC AZ PU WT 186, SO WT 110, ROT WT 156, TORQ 2 RNDS OF BOTTOM. LITH: 100% SHALE, BGG 862U, MAX 10,878'. FULL CREWS, SAFETY MEETINGS HELD, NO REPORTED ACCIDENTS. Page 3 of 3

22 Today's Date: 11/17/2010 DATE: 11/17/2010 DSS: 20 DEPTH: 11,759 MUD WT: 9.20 CUM COST TO DATE: 1,590, D DR DRILL ROTATE FROM 11259' TO 11322'. 126 FPH). WOB 25, GPM 491, TRPM 207, PP D SU 11273'. INC INC AZ D DR DRILL ROTATE FROM 11322' TO 11385' FPH). WOB 25, GPM 491, TRPM 207, SPM D SU 11336'. INC AZ D DS DRILL SLIDE FROM 11385' TO 11405' FPH). WOB 50, GPM 491, MRPM 137, TFO-170L D DR DRILL ROTATE FROM 11405' TO 11448' FPH). WOB 25, GPM 491, TRPM 207, PP PUMP 15 BBL HIVIS SWEEP, 10 BBLS BRINE WATER, 15 BBLS 10.6 PPG HIVIS SWEEP D SU 11399'. INC AZ D DR DRILL ROTATE FROM 11448' TO 11511'. 126 FPH). WOB 25, GPM 491, TRPM 207, SPM D CA CIRC OUT HI VIS SWEEPS D TR TOH TO CHANGE OUT BIT & BHA D BH PU BHA #7. 8 3/4" QD308HX, 6 1/2" MOTOR 1.75*, 7/8 LOBE, 5.0 STAGE, 6.5' BIT TO BEND, RPG 0.28, MONEL, FLEX MONEL, RT TOOL, 1 JT DP, RTOOL, 25 JTS DP (911.48'), AFITATOR, SHOCK SUB D OT TEST MOTOR & MWD D TR TIH & WASH 30' TO BOTTOM WITH NO FILL D DR DRILL ROTATE FROM 1151 TO 11570, 59 FT, AVG FPH, WOB 25, GPM 491, RPM D SU SURVEY & CONNECTION AT 11521, 89.5 DEG, AZM 0.50 D DR DRILL ROTATE FROM TO 11633, 63 FT, 126 FPH, WOB 25, GPM 491, RPM D SU SURVEY & CONNECTION AT 11584, 90.5 DEG, 1.78 AZM 0.75 D DS DRILL SLIDE FROM TO 11649, 16 FT, 21.3 FPH, WOB 50, GPM 491, TFO 170L 0.75 D DR DRILL ROTATE FROM TO 11696, 47 FT, AVG FPH, WOB 25, GPM 491, RPM D SU SURVEY & CONNECTION AT 11647, 89.9 DEG, 3.13 AZM 0.50 D DR DRILL ROTATE FROM TO 11759, 63 FT, AVG FPH, WOB 25, GPM 491, 70 RPM PICK UP 195, SLACK OFF 100, ROT WT TO 4 ROUNDS LITH 100% SHALE AT 11650', BACKGROUND 950, FORM GAS 1788, TRIP GAS 1825 FULL CREWS SAFETY MEETING HELD, NO ACC DENTS

23 Today's Date: 11/19/2010 DATE: 11/18/2010 DSS: 21 DEPTH: 12,830 MUD WT: 9.70 CUM COST TO DATE: 1,633, D SU SURVEY & CONNECTION AT 11700', 89.4 DEG, 3.38 AZM 0.75 D DR DRILL ROTATE FROM 11759' TO 11822', 63 FT, AVG 84 FPH, WOB 25, 467 GPM, 70 RPM 0.25 D SU SURVEY & CONNECTION AT 11773', DEG, 3.84 AZM 1.25 D DR DRILL ROTATE FROM 11822' TO 11885', 63 FT, AVG 50.4 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY & CONNECTION AT 11836', DEG, 3.42 AZM 0.75 D DS DRILL SLIDE TO 11905, 20 FT, AVG FPH, WOB 40, 466 GPM, TFO 100L 0.75 D DR DRILL ROTATE FROM 11905' TO 11948', 43 FT, AVG 57.33', WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY & CONNECTION AT 11899', DEG, 1.64 AZM 0.75 D DR DRILL ROTATE FROM 11948' TO 12011', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY & CONNECTION AT 11962, DEG, 1.5 AZM 1.25 D DR DRILL ROTATE FROM 12011' TO 12074', 63 FT, AVG 50.4 FPH, WOB 25, 466 GPM, 70 RPM 1.00 D SR SERVICE RIG AND REPAIR PUMP OILER 0.25 D SU SURVEY AND CONNECTION AT 12025', DEG, 1.33 AZM 0.50 D DR DRILL ROTATE FROM 12074' TO 12137', 63 FT, AVG FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12088', DEG, 2.26 AZM 1.25 D DS DRILL SLIDE 12137' TO 12157', 20 FT, AVG 16.0 FPH, WOB 50, 466 GPM, TFO 90L 1.00 D DR DRILL ROTATE FROM 12157' TO 12200', 43 FT, AVG 43 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12151', DEG,1.59 AZM 0.75 D DR DRILL ROTATE FROM 12200' TO 12263', 63 FT, AVG 84 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12214', DEG, 0.97 AZM 1.25 D DR DRILL ROTATE FROM 12263' TO 12326', 63 FT, AVG 50.4 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12277', DEG, 0.97 AZM 0.75 D DR DRILL ROTATE FROM 12326' TO 12389', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12340', DEG, AZM 0.75 D DR DRILL ROTATE FROM 12389' TO 12452', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12403', 89.6 DEG, AZM 0.75 D DR DRILL ROTATE FROM 12452' TO 12515', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12466', DEG,.16 AZM 0.75 D DR DRILL ROTATE FROM 12515' TO 12578', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12528', DEG, AZM 0.75 D DR DRILL ROTATE FROM 12578' TO 12641', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12592', DEG, AZM 1.50 D SR SERVICE RIG, CHANGE OUT SWAB ON PUMP # D DR DRILL ROTATE FROM 12641' TO 12704', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12655', 90.1 DEG, AZM 0.75 D DR DRILL ROTATE FROM 12704' TO 12767', 63 FT, AVG 84.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12718', DEG, AZM 0.75 D DS DRILL SLIDE 12767' TO 12779', 12 FT, AVG 16.0 FPH, WOB 50, 466 GPM, TFO D DR DRILL ROTATE FROM 12767' TO 12830', 51 FT, AVG 68.0 FPH, WOB 25, 466 GPM, 70 RPM 0.25 D SU SURVEY AND CONNECTION AT 12781', DEG, AZM LITH - 100% SHALE BACKGROUND GAS - 491, FORM GAS FULL CREWS, SAFETY MEETINGS HELD, NO ACCIDENTS DATE: 11/19/2010 DSS: 22 DEPTH: 13,776 MUD WT: 9.40 CUM COST TO DATE: 1,746, Page 1 of 2

24 Today's Date: 11/19/2010 DATE: 11/19/2010 DSS: 22 DEPTH: 13,776 MUD WT: 9.40 CUM COST TO DATE: 1,746, D DR DRILL ROTATE FROM 12830' TO 12893', 63', AVG 84 FPH, WOB 25K, 466 GPM, 70 RPM 0.25 D SU SURVEY & 12844', DEG, AZM 1.00 D DR DRILL ROTATE FROM 12893' TO 12956', 63', AVG 63 FPH, WOB 25K, 466 GPM, 70 RPMDRILL ROTATE 0.25 D SU SURVEY & 12907', DEG, AZM 1.00 D DR DRILL ROTATE FROM 12893' TO 12956', 63', AVG 63 FPH, WOB 25K, 466 GPM, 70 RPM 0.25 D SU SURVEY & 12970', DEG, AZM 1.00 D DR DRILL ROTATE FROM 13019' TO 13082', 63', AVG 63 FPH, WOB 25K, 466 GPM, 70 RPM 0.25 D SU SURVEY & 13033', DEG, AZM 0.75 D DR DRILL ROTATE FROM 13082' TO 13145', 63', AVG 84 FPH, WOB 25K, 466 GPM, 60 RPM 0.25 D SU SURVEY & 13096', DEG, AZM 1.00 D DR DRILL ROTATE FROM 13145' TO 13208', 63', AVG 63 FPH, WOB 25K, 466 GPM, 60 RPM 0.25 D SU SURVEY & 13159', DEG, AZM 1.25 D DR DRILL ROTATE FROM 13208' TO 13271', 63', AVG FPH, WOB 25K, 466 GPM, 60 RPM 0.25 D SU SURVEY & 13222', DEG, AZM 1.25 D DS DRILL SLIDE FROM 13271' TO 13291', 20', AVG 16 FPH, WOB 50K, 466 GPM, TFO 90R 0.75 D DR DRILL ROTATE FROM 13291' TO 13334', 43', AVG FPH, WOB 25K, 466 GPM, 60 RPM 0.50 D SR SERVICE RIG 0.25 D SU SURVEY & 13285', DEG, AZM 1.50 D DR DRILL ROTATE FROM 13334' TO 13397', 63', AVG FPH, WOB 25K, 466 GPM, 60 RPM 0.25 D SU SURVEY & 13348', DEG, AZM 1.75 D DR DRILL ROTATE FROM 13397' TO 13460' FPH, WOB 25K, 466 GPM, 60 RPM MRPM D SU SURVEY & 13411' *, AZ D DR DRILL ROTATE FROM 13460' TO 13523' FPH. WOB 25, 466 GPM, RPM 60, PP D SU SURVEY & 13474' AZ D DR DRILL ROTATE FROM 13523' TO 13586' FPH. WOB 25, 466 GPM, RPM 60,MRPM D SU SURVEY & CONNECTION 13537'. INC AZ D DR DRILL ROTATE FROM 13586' TO 13650', 64', AVG 64 FPH, WOB 25K, 466 GPM, 60 RPM 0.25 D SU SURVEY & 13601' DEG, AZM D SR RIG REPAIR CHANGE OUT SWAB 1.50 D DR DRILL ROTATE FROM 13650' TO 13713', 63', AVG 42 FPH, WOB 25K, 466 GPM, 60 RPM 0.25 D SU SURVEY & 13664', DEG, AZM 1.00 D DS DRILL SLIDE FROM 13713' TO 13729', 16', AVG 16 FPH, WOB 50K, 466 GPM, TFO 110R 1.00 D DR DRILL ROTATE FROM 13729' TO 13776', 47', AVG 47 FPH, WOB 25K, 466 GPM, 60 RPM 0.25 D SU SURVEY & LITH - 100% SHALE, BACKGROUND GAS - 281, FORM GAS FULL CREWS, ONE ACCIDENTS REPORT TO FOLLOW Page 2 of 2

25 Today's Date: 11/22/2010 DATE: 11/20/2010 DSS: 23 DEPTH: 14,155 MUD WT: 9.05 CUM COST TO DATE: 1,816, D DR DRILL ROTATE FROM 13776' TO 13839', 63', AVG 31.5 FPH, WOB 25 K, 466 GPM, 60 RPM 0.25 D SU SURVEY & CONNECTION AT 13790', DEG, AZM 1.25 D DR DRILL ROTATE FROM 13839' TO 13902', 63', AVG 50.4 FPH, WOB 25 K, 466 GPM, 60 RPM 0.25 D SU SURVEY & CONNECTION AT 13853', DEG, AZM 1.50 D DS DRILL SLIDE FROM TO 13922, 20', AVG FPH, WOB 60K, 466 GPM, TFO 140R 1.00 D DR DRILL ROTATE FROM 13902' TO 13965', 43', AVG 43.0 FPH, WOB 25 K, 466 GPM, 60 RPM 0.25 D SU SURVEY & CONNECTION AT 13916', DEG, AZM 1.50 D DR DRILL ROTATE FROM 13965' TO 14028', 63', AVG 42.0 FPH, WOB 25 K, 466 GPM, 60 RPM 0.25 D SU SURVEY & CONNECTION AT 13979', 94 DEG, AZM 1.25 D DS DRILL SLIDE FROM TO 14059, 31', AVG 24.8 FPH, WOB 60K, 466 GPM, TFO 160R 1.00 D SR SERVICE RIG AND HOOK UP MUD LINE 0.50 D DR DRILL ROTATE FROM 14059' TO 14091', 32', AVG 64.0 FPH, WOB 25 K, 466 GPM, 60 RPM 0.25 D SU SURVEY & CONNECTION AT 14042', DEG, AZM 1.25 D DS DRILL SLIDE FROM TO 14116, 25', AVG 20.0 FPH, WOB 60K, 466 GPM, TFO 180R 0.75 D DR DRILL ROTATE FROM 14116' TO 14155' FPH. WOB 25, GPM 466, RPM D SU 14106' * AZ D CA TD OF 14155'. WE DRILLED THRU FAULT THAT BEGAN PUSHING INC UP. DESPITE ATTEMPTS TO SLIDE DOWN INCLINATION STILL CLIMBED TO 96.02*. ORDERS GIVEN TO TD WELL. PUMPED 2 HIVIS 40 BBLS EACH AND CIRC OUT SWEEPS. MIXED AND SPOTTED 400 BLL LUBRICITY PILL FROM 14155' TO 6000'. PUMP TRIP SLUG D TR TOH WITH 10 STDS OF DRILL PIPE D RS RIG UP LD MACHINE. HOLD SAFETY MEETING ON LAYING DOWN DP D LD TOH LAYING DOWN DRILL PIPE. NO PROBLEMS ENCOUNTERED WHILE TRIPPING THRU LATERAL. PU WT 225, SO WT 75, ROT WT 165. BACKLASH 6 RNDS. LITH: 100% SHALE. BGG 250U. FULL CREWS, SAFTY MEETINGS HELD, NO REPORTED ACCIDENTS. DATE: 11/21/2010 DSS: 24 DEPTH: 14,155 MUD WT: 9.30 CUM COST TO DATE: 1,857, D LD TOH. LAY DOWN DP. ALERTED TRRC (OPERATOR JPW) OF INTENT TO RUN PRODUCTION CSG K RR REPAIR MASTER CLUTCH ON DRUM. FRESH WATER TANKS. 500 PPM 61*. RON WELCH, EOG FIELD SUPT. ON LOCATION FOR CSG JOB D LD CONTINUE TOH LAYING DOWN DP D BH LD FLEX COLLAR, MONEL, MOTOR, BIT D TR TIH WITH 10 STDS DP K RR CLUTCH OVERHEATING. WAITING ON MECHANIC. FULL CREWS, SAFETY MEETING HELD (LD DP & AWARENESS), NO REPORTED ACCIDENTS. DATE: 11/22/2010 DSS: 25 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 1,900, Page 1 of 2

26 Today's Date: 11/22/2010 DATE: 11/22/2010 DSS: 25 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 1,900, K RR WAIT ON MECHANIC K RR BREAK DOWN CLUTCH ASSEMBLY. INSIDE BEARING FAILED. WAIT ON NEW BEARING. BEARING 12:15 PM ON 11/21/ D OT BREAKOUT KELLY D LD LD 30 JTS DP & PULL WEAR BUSHING D RS HOLD SAFETY MEETING AND RIG UP CASING CREW D RC PU & BEGIN RUNNING 333 JTS ( ') OF 5 1/2", 17#, HCP110, LTC CSG WITH A FLOATATION COLLAR K RR RIG REPAIR, REPLACED AIR LINE ON DRAWORKS 1.00 D RC TIH W/ 5 12", 17#, HCP110, LTC CSG 1.25 K RR SHUT DOWN TO LET DRAWORKS COOL WHILE WAITING ON MECHANIC, PROBLEMS WITH CLUTCH ON DRAWORKS, ( 51 JTS CSG RAN ) FULL CREWS, NO ACCIDENTS Page 2 of 2

27 Today's Date: 11/23/2010 DATE: 11/23/2010 DSS: 26 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,281, K RR RIG REPAIR. WAIT ON MECHANIC. MECHANIC ON 07:30 HRS D RC CONTINUE TO RUN 5 1/2" CSG. RAN A TOTAL OF ' OF 5 1/2" 17# HCP110 LT&C CSG D OT CONTINUE TO FILL CSG W/ CUT BRINE FROM SURFACE TO FLOTATION COLLAR 0.25 D OT PRESSURED UP ON CSG TO 2100# TO OPEN FLOTATION COLLAR 0.25 D OT LET FLUID FROM ABOVE FLOTATION COLLAR TO TRANFER TO BELOW COLLAR 0.50 D OT CONTINUE TO FILL CSG W/ CUT BRINE

28 Today's Date: 11/24/2010 DATE: 11/24/2010 DSS: 27 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,449, D OT DROPED FLOATATION PLUG AND CIRC WELL 0.50 D CM HALLIBURTON SERVICES HELD A PRE-JOB SAFETY MEETING 2.75 D CM HALLIBURTON SERVICES CEMENTED 5 1/2" CSG W/10 BBLS FW, 50 BBLS TUNED SPACER 111, 5 BBLS FW, LEAD SK ECONOCEM SYSTEM MIX AT 12.4 PPG, TAIL SK VERSACEM SYSTEM MIX AT 14.4 PPG, DISPLACED W/ BBLS FW. BUMPED PLUG W/ 3280#. CHECKED FLOATS, CHECKS HELD. AVG RATE PUMPED - 8 BPM. FULL RETURNS THROUGHOUT JOB D NU ND BOPE AND CAMERON SET SLIPS W/ 125 PT. SET OUT BOP AND NU 11" 5 X 7" 10 TBG SPOOL, PACKED OFF AND TESTED TO 5000#. INSTALLED 7" X 2 3/8" TBG HANGER AND NU 7" 10 CAP FLANGE. JET AND CLEAN STEEL PITS. RELEASED PATTERSON RIG #9 AT 18:30, 11/23/2010

29 Today's Date: 12/2/2010 DATE: 12/2/2010 DSS: 29 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,454, C OT MI&RUCU. SPOT CAT WALK, PIPE SLIDE, & TUBING RACKS. ND TREE CAP & NU 7-1/16" 10K X 5K SPOOL & 5K BOP C OT WELL SHUT IN AND PREP TO OFF LOAD TUBING AND RUN SAME.

30 Today's Date: 12/6/2010 DATE: 12/3/2010 DSS: 30 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,469, C OT WELL SHUT IN. SAFETY MEETING EQUIPMENT ON LOCATION 2.50 C OT OFF LOAD & TALLEY 468 JTS OF RENTAL 2-7/8" 7.9# P-110 PH-6 TUBING C OT OFF LOAD 3.5 BOWEN POWER SWIVEL AND TANK. (BASIC ENERGY) C TR PU 4-3/4" SEALED BEARING BIT, BIT SUB, 167 JT TUBING TO 5202' C TR CONTINUE RIH W/ TUBING AND SWIVEL AND RECORD TAKE 7 TORQUE & DRAG READINGS AS FOLLOWS: DEPTH, STATIC WT, PU WT, SO WT, ROT STATIC, ROT PU, ROT SO, ST TRQ, PU TRQ, SO TOQ K 34K 32K 34K (72 RPM) 34K 32K 1000 FT# RDS BACK TORQUE 6103' 38K 40K 38K 39K (76 RPM) 40K 38K RDS BACK TORQUE 6754' 43K 45K 39K 43K(74 RPM) 45K 41K RDS BACK TORQUE 7284' 37K 43K 38K 37K (76 RPM) 41K 38K /2 RD BACKTORQUE 8278' 38K 45K 35K 40K (72 RPM) 41K 38K RD BACK TORQUE 8895' 33K 50K 34K 40K (70 RPM) 42K 38K RDS BACK TORQUE 9486' 36K 52K 31K 40K (80 RPM) 43K 36K C OT 5 RDS BACK TORQUE SHUT DOWN FOR NIGHT. SWI. WILL RESUMME TORQUE & DRAG READINGS.

31 Today's Date: 12/6/2010 DATE: 12/4/2010 DSS: 31 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,485, C OT WELL SHUT IN. SAFETY MEETING ON SETTING BACK & PU SWIVEL C TR RIH W/ BIT FROM 9486 TO 14,098 K.B. ABLE TO PUSH BIT TO 11,410' & NECESSARY TO ROTATE AND PUSH BIT TO PBTD. PERFORMED TORQUE & DRAG READING AS FOLLOWS: DEPTH ST DRAG SLACK RPM STAT DRAG SO FT LBS FT LB FT LB RDS WT. WT OFF ROT. ROT. ROT. STATION DRG SO 10,075' 36K 64K 32K 76 54K 56K 48K ,695' 40K 67K 30K 72 48K 52K 44K ,285' 28K 72K 14K 70 50K 60K 44K ,903' 43K 74K K 54K 42K ,495' 50K 76K K 58K 46K ,085' 44K 78K K 60K 46K ,580' 46K 82K K 60K 42K ,076' 43K 83K K 60K 40K TAGGED 14,078' (TBG TALLEY) 14,098' KB C OT WELL SHUT IN. WILL CIRCULATE FRICTION REDUCER FLUID 14,076'

32 Today's Date: 12/6/2010 DATE: 12/5/2010 DSS: 32 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,504, C OT WELL SHUT IN. SAFETY MEETING ON CIRCULATING LINES & SECURING HOSE CONNECTIONS 2.50 C CI CIRCULATE TANK (ROLL TAND) ADDING 40 GALS BJ FRW-14 FRICTION REDUCER INTO 450 BBLS FW C CI CIRCULATE 14,076' W/ 320 BBLS FW W/ 2 gpt FRW-14. OVER CIRCULATE +/- 30 BBLS C TR POOH W/ BIT TO 5202' LAY DLOWN 86 JTS OF TUBING TO 11,420' AND STAND REMAINDER OF TUBING IN DERRICK C OT SHUT WELL IN. PREP TO RUN T & D READINGS THIS A.M.

33 Today's Date: 12/7/2010 DATE: 12/7/2010 DSS: 34 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,537, C OT WELL SHUT IN. SAFETY MEETING 3.00 C TR RIH W/ BIT FROM 13,085' TO 14,076', STRING STOPPED FALL AT 13,200' REQUIRING ROTATION TO PBTD. RUN TORQUE & DRAG AS FOLLOWS: DEPTH STAT DRAG SO ROT DRAG SO STAT DRAG SO RPM RD BACK WT. WT. WT. ST WT RT WT RT WT TRQ TRQ TRQ 13,580' 20K 62K 0 44K 48K 40K ,076' 24K 64K 38K 44K 48K 40K C CI RU RISING STAR & PUMP 750 GALS TRIPLE INH 7-1/2% HCL & DISPLACE W/ 350 BBLS 2% KCL 3 BPM.DOWN 2-7/8" TUBING C TR POOH TO RUN LOGS. LD 1st 90 JTS OF TUBING. DRAG FROM 55K TO 65K OFF BOTTOM C OT SHUT WELL IN FOR NIGHT. WILL RUN GR/CCL THIS A.M.

34 Today's Date: 12/9/2010 DATE: 12/8/2010 DSS: 35 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,548, C OT WELL SHUT IN C WY RUN E&P PRODUCTION. RIH W/ GR/CBL LOG LOG STOPPED FALL IN 6875' (+/- 81 DEGREES) AND LOG F/ 6875' W/ CBL TO 2200' W/ +/ PULLED GR TO SURFACE. RD & MO WIRELINE EQUIPMENT C OT SHUT WELL IN FOR N IGHT. WILL PU TCP GUNS THIS A.M. DATE: 12/9/2010 DSS: 36 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,566, C OT WELL SHUT IN C OT HELD SAFETY MEETING ON GAS MIGRATION. WO HALLIBURTON C TR PU 3-3/4" HALLIBURTON TCP GUNS(3' X 6 SPF, 18 HOLES.42' HOLES 60 DEGREE PHASED & RIH ON 453 JTS OF 2-7/8" 7.6# P-110 TUBING & TAG 14,096'. RAN TUBING TO BOTTOM W/ NO ROTATION. LAS 1000' TUBING SLIDING FROM 20K TO 40K ON EACH JT C PF PU OFF BOTTOM 10' W/ BOTTOM OF 14,086' & TOP OF GUN AT 114,083'. (HOLE FULL) SHUT IN TUBING & PUMP ON ANNULUS PRESS INCREASED TO 1750 PSIG AND GAUGE AND HOSE INDICATED SMALL DEFLECTION IN PRESSURE & PUMP ACTION. INCREASE TO 3000 PSIG & POP OFF ON PUM RELEASED. REPRESSURED ANNULUS TO 3000 PSIG & PRESS BLED DOWN TO 2000 PSIG W/ WELL BORE ISOLATED IN 20 MIN. PERFORATION CONFIRMED C TR POOH & LD 222 JTS 2-7/8" 7.9# PH-6 P-110 TUBING TO +/-7300'. SDFN C OT WELL SHUT IN. WILL FINISH LD WORKSTRING RELEASE TODAY.

35 Today's Date: 12/10/2010 DATE: 12/10/2010 DSS: 37 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,589, C OT WELL SHUT IN C TR FINISH POOH LAYING DOWN RENTAL TUBING. ALL SHOTS FIRED ON HALLIBURTON TPC GUNS C OT LOAD OUT RENTAL STRING FOR RETURN TO SMITH TOOLS. OFF LOAD AND TALLEY PRODUCTION TUBING. LOAD OUT AND RETURN POWER SWIVEL, PUMP, & TANK C OT WELL SHUT IN. WILL RUN PACKER THIS A.M. PACKER COULD NOT BE DELIVERED TODAY.

36 Today's Date: 12/13/2010 DATE: 12/11/2010 DSS: 38 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,601, C OT WELL SHUT IN C TR TALLEY & RUN SN + 1 JT 2-7/8" 6.4# J-55 EUE TBG, 2-7/8" PERFED 4' SUB, & HALLIBURTON PLS PACKER FULL BORED JTS 2-7/8" 6.5# J-55 EUE TBG + 8' PUP SUB + 1 JT 2-7/8" TUBING & LAND ON SOLID HANGER W/ 6488'. (NOTE: WHEN PICKING UP TUBING PARAFIN INSIDE TUBING MADE RABBITING TUBING DIFFICULT & NOT TIME PROHIBITED) 1.00 C NU ND BOPE & NU 7-1/16" TREE W/ 1-9/16' WING VALVE. LOAD ANNULUS AND TEST PACKER & ANNULUS TO 500 PSIG. OK 2.50 C WY RUN SLICK LINE UNIT & RIH W/ GAUGE RING '. (WL MEASUREMENT). PU BH RECORDERS & RECORDERS IN SEAT NIPPLE, SETTING PLUG FAILED ON FIRST ATTEMPT REQUIRING SECOND ATTEMPT TO LEAVE RECORDERS IN SEAT NIPPLE. RD WIRELINE UNIT C ST RU RISING STAR SERVICES. TEST LINES TO 8000 PSIG. LOAD TUBING W/ 7 BFW. BREAK DOWN 14,083' TO 14,086' W/ 20 BFW & 2 BPM CONSTANT DOWN 2-7/8" TUBING. PRESSURE INCREASE TO 5060 PSIG 17 BBLS IN PERFS & DROPPED BACK TO 5020 PSIG LAST 3 BBLS. ISIP 4280, 5 MIN. 2360, 10 MIN, 1960, & 15 MIN PSIG. INSTALL TUBING RECORDERS. RD&MO RISING STAR C OT RD&MOCU. WELL SHOT IN C OT WELL SHUT IN ON 30 DAY PITA TEST.

37 Today's Date: 1/4/2011 DATE: 1/4/2011 DSS: 40 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,878, C WY RU ARC PRESSURE DATA. PULL BOTOOM HOLE RECORDERS. 1st RUN DID NOT RELEASE RECORDERS. 2nd RUN LATCHED ONTO TO RCORDERS AND POOH/LD C OT RODE NABORS #454 TO LOCATION. RU NABORS C NU ND WELLHEAD. NU BOP AND FUNICTION TEST C TR RELEASE HES PACKER. POOH/LD 201 JOINTS 2 7/8" TUBING. SHUT WELL IN C OT RD FLOOR AND TOOLS. PREP TO RU FRAC STACK C OT WELL SHUT IN AND SECURED. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

38 Today's Date: 1/5/2011 DATE: 1/5/2011 DSS: 41 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 2,929, C OT WELL SHUT IN. HOLD PRE-JOB SAFETY MEETING C NU ND BOP C NU NU BTI FRAC STACK AND PRESSURE TEST TO 10,000 PSI. NO LEAKS. PRESSURE TESTS GOOD C OT RD NABORS #454 AND MOVE TO ROCKER B LOCATION C OT WELL SHUT IN AND SECURED. CURRENT ACRIVITY: PREP FOR FRAC OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

39 Today's Date: 1/6/2011 DATE: 1/6/2011 DSS: 42 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,232, C OT HOLD PRE-JOB SAFETY MEETING. FINISH RUNNING FLOW LINES. RU WATER TRANSFER LINES. START TO CIRCULATE FRAC 15:00 HRS. CURRENT ACTIVITY: CIRCULATE FRAC PIT. FINISH RUNNING FLOW LINES AND WATER TRANSFER LINES. FILL WORKING TANKS. PREP LOCATION FOR FRAC OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

40 Today's Date: 1/7/2011 DATE: 1/7/2011 DSS: 43 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,240, C OT WELL SHUT IN AND SECURED. PREP LOCATION FOR FRAC OPERATIONS. CONTINUE TO ROLL FRAC PIT. FINISH INSTALLING FLOWLINES. START FILL ACID TANKS WITH WATER. CURRENT ACTIVITY: PREP LOCATION FOR FRAC OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

41 Today's Date: 1/10/2011 DATE: 1/8/2011 DSS: 44 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,265, C OT PREP LOCATION FOR FRAC OPERATIONS. RU E&P WIRELINE AND STS 10 K LUBRICATOR. FINISH LAYING WATER TRANSFER LINES AND FILL WORKING FRAC TANKS. AVERAGE RATE WHILE FILLING TANKS 81 BPM. HALLIBURTON START MOVING SAND MASTERS TO LOCATION. FILL ACID TANKS WITH WATER FOR HALLIBURTON. CURRENT ACTIVITY: PREP LOCATION FOR FRAC OPERATIONS ON DATE: 1/9/2011 DSS: 45 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,274, C OT PREP LOCATION FOR FRAC OPERATIONS. HALLIBURTON START TO SPOT EQUIPMENT. DATE: 1/10/2011 DSS: 46 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,287, C OT PREP FOR FRAC OPERATIONS. HES MIX ACID AND FILL SAND MASTERS. CURRENT ACTIVITY: RU HALLIBURTON AND START FRAC OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

42 Today's Date: 1/11/2011 DATE: 1/11/2011 DSS: 47 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,312, C OT MOVE IN RIG UP HALLIBURTON FRA EQUIPMENT. TEST ALL SURFACE EQUIPMENT TO 9000 PSI. TEST GOOD. PERFORM PUMP TEST ON ALL EQUIPMENT. HOLD PRE JOB SAFETY MEETING C PF PERFORM INJECTION TEST PRIOR TO PERFORATING. UNABLE TO BREAKDOWN FORMATION. RATE ESTABLISHED WAS PSI. PUMP DOWN 3000 GALS 7 1/2% HCL PSI AND FLUSH WITH 260 BBLS WATER. FORMATION 5600 PSI. INCREASSE RATE TO PSI. START PLUG AND GUN RUN. MAX RATE PSI. SET FRAC 14,053'. TEST TO 4000 PSI. TEST GGOD. PERF CLUSTER 14,040.5'. PUMP PSI. PERFORATE CLUSTER 13,393' AND CLUSTER 13,868'. FLUSH TO TOP PERF PSI. PULL OUT OF HOLE AND LD GUNS. TOTAL FLUID PUMPED: 144 BBLS 7 1/2% HCL AND 820 BBLS TREATED FRESH WATER C OT LOAD ALL FRAC EQUIPMENT LINES WITH 10# BRINE. PUMP 10 BBLS 10# BRINE INTO WELL, SHUT WELL IN AND LOAD REMAINING FRAC STACK WITH 10# BRINE C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: FRAC OPERATIONS TO 07:00 HRS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

43 Today's Date: 1/12/2011 DATE: 1/12/2011 DSS: 48 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,333, C OT WELL SHUT IN AND SECURED. HOLD PRE-JOB SAFTEY MEETING C ST FRAC STAGE #1 14,040.5' TO 13,869'. 54 HOLES. MAX RATE 80.9 BPM. AVG RATE 80 BPM. MAX PSI 6419 AVG PSI TOTAL SAND PUMPED 301,348# WHITE 30/70 MAX CONC 4.1 PPG ISIP 2250 FG.77 PSI. TOTAL LOAD 9345 BBLS C PF PERF STAGE #2. 54 HOLES TOTAL. RIH SET 13,820'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 13,763', SPOTTED 3000 GALS 15% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 2900 PSI. AFTER PERFORATING CLUSTER 13,663' & CLUSTER 13,563', PUMPED REMAINING PSI C ST FRAC STAGE #2 13,563' TO 13,766'. 54 HOLES. MAX RATE 81.7 BPM. AVG RATE 80.5 BPM. MAX PSI 6274 AVG PSI TOTAL SAND PUMPED 302,012# WHITE 30/70 MAX CONC 4.1 PPG ISIP 2539 FG.81 PSI. TOTAL LOAD 5911 BBLS C PF PERF STAGE #3. 54 HOLES TOTAL. RIH SET 13,513'.(WITH PUMP DOWN RING) RING FAILED AND HAD TO RE-SPOT 1000 GALS 15% HCL. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 13,453', SPOTTED 3000 GALS 15% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3720 PSI. AFTER PERFORATING CLUSTER 13,363' & CLUSTER 13,263', PUMPED REMAINING PSI C ST FRAC STAGE #3 13,453' TO 13,266'. 54 HOLES. MAX RATE 83 BPM. AVG RATE 82 BPM. MAX PSI 6415 AVG PSI TOTAL SAND PUMPED 259,020# WHITE 30/70 MAX CONC 3.2 PPG ISIP 2306 FG.77 PSI. TOTAL LOAD 5594 BBLS C PF PERF STAGE #4. 54 HOLES TOTAL. RIH SET 13,213'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 13,163', SPOTTED 3000 GALS 15% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 2720 PSI. AFTER PERFORATING CLUSTER 13,063' & CLUSTER 12,963', PUMPED REMAINING PSI. SHUT WELL IN AND SECURE WELL C OT FLUSH ALL SURFACE EQUIPMENT AND FILL LINES WITH BRINE WATER. WELL SHUT IN AND SECURED C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: FRAC OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

44 Today's Date: 1/13/2011 DATE: 1/13/2011 DSS: 49 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,358, C OT WELL SHUT IN AND SECURED. HOLD PRE-JOB SAFETY MEETING. PREP EQUIPMENT FOR FRAC OPERATIONS C ST FRAC STAGE #4 12,963' TO 13,166'. 54 HOLES. MAX RATE 82.5 BPM. AVG RATE 78 BPM. MAX PSI 7099 AVG PSI TOTAL SAND PUMPED 36,317# WHITE 30/70 (22,000# IN FORMATION ONLY( MAX CONC 1.3 PPG ISIP 2375 FG.79 PSI. TOTAL LOAD 2942 BBLS. NOTE: SCREENED OUT WITH 1# ON FORMATION. 22,000# IN FORMAITON. APPEARED TO BE NEAR WELLBORE RESTRICTION. FLOWED BACK TO CLEAN UP ENOUGH TO GET SUFFICIENT RATE FOR PUMP DOWN ON STAGE #5. PUMPED 500 BBLS SLICK 45 BPM C PF PERF STAGE #5. 54 HOLES TOTAL. RIH SET 12,913'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 12,863', SPOTTED 3000 GALS 15% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 5440 PSI. AFTER PERFORATING CLUSTER 112,763' & CLUSTER 12,663', PUMPED REMAINING PSI C ST FRAC STAGE #5 12,663' TO 12,866'. 54 HOLES. MAX RATE 82.1 BPM. AVG RATE 80.3 BPM. MAX PSI 6717 AVG PSI TOTAL SAND PUMPED 276,691# WHITE 30/50 MAX CONC 3.5 PPG ISIP 2426 FG.79 PSI. TOTAL LOAD 8113 BBLS. NOTE: SCREENED OUT WITH 1# ON FORMATION. 9000# IN FORMATION. FLOWED BACK WELL. RESUMED JOB WITH LINEAR GEL AND INCREASED MAX PRESSURE TO 7500 PSI. PLACED 250,000# 30/50 SAND IN FORMATION. WENT TO FLUSH WITH 3# ON FORMATION. APPEARS ISSUSE WITH WERE RELATED TO LEAK OFF. HAD TO RAISE MAX PSI IN ORDER TO GET LEAK OFF CONTROLLED & INITIATE A PRIMARY FRACTURE C PF PERF STAGE #6. 54 HOLES TOTAL. RIH SET 12,613'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 12,563', SPOTTED 3000 GALS 15% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4950 PSI. AFTER PERFORATING CLUSTER 12,763' & CLUSTER 12,663', PUMPED REMAINING PSI C ST FRAC STAGE #6 12,563' TO 12,366'. 54 HOLES. MAX RATE 82 BPM. AVG RATE 78 BPM. MAX PSI 7846 AVG PSI TOTAL SAND PUMPED 349,600# WHITE 30/50 MAX CONC 4 PPG ISIP 2480 FG.80 PSI. TOTAL LOAD 11,876 BBLS. NOTE: SCREENED OUT WITH 1.5# ON FORMATION. (HES EQUIPMENT PROBLEM, DROPPED 10BPM MAX PSI). FLOWED BACK WELL. RESUMED JOB WITH NUMEROUS LINEAR GEL SWEEPS AND SAND SLUGS. FINALLY GOT BACK TO 80 BPM AND PUMPED STAGE AS DESIGNED C PF PERF STAGE #7. 54 HOLES TOTAL. RIH SET 12,313'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 12,263', SPOTTED 3000 GALS 15% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 30 6 BPM 6321 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 12,163' & CLUSTER 12,063', PUMPED REMAINING PSI C OT LOAD ALL SURFACE EQUIPMENT AND FRAC STACK WITH BRINE WATER. WELL SHUT IN AND SECURED C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: FRAC OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

45 Today's Date: 1/14/2011 DATE: 1/14/2011 DSS: 50 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,381, C OT WELL SHUT IN AND SECURED. HOLD PRE-JOB SAFETY MEETING. PREP EQUIPMENT FOR FRAC OPERATIONS C ST FRAC STAGE #7 12,263' TO 112,063'. 54 HOLES. MAX RATE 83.5 BPM. AVG RATE 82.5 BPM. MAX PSI 6628 AVG PSI TOTAL SAND PUMPED 316,800# WHITE 30/50 MAX CONC 4 PPG ISIP 2536 FG.8 PSI. TOTAL LOAD 5745 BBLS. NOTE: PUMPED ENIRE STAGE WITH LINEAR GEL FLUID C PF PERF STAGE #8. 54 HOLES TOTAL. RIH SET 12,013'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 11,963', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4250 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 11,863' & CLUSTER 11,763', PUMPED REMAINING PSI C ST FRAC STAGE #8 11,963' TO 11,763'. 54 HOLES. MAX RATE 82.5 BPM. AVG RATE 81.5 BPM. MAX PSI 6522 AVG PSI TOTAL SAND PUMPED 337,100# WHITE 40/70 MAX CONC 4 PPG ISIP 2871 FG.85 PSI. TOTAL LOAD 5809 BBLS. NOTE: PUMPED ENIRE STAGE WITH LINEAR GEL FLUID AND 40/70 SAND C PF PERF STAGE #9. 54 HOLES TOTAL. RIH SET 11,713'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 11,663', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4318 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 11,563' & CLUSTER 11,463', PUMPED REMAINING PSI C ST FRAC STAGE #9 11,463' TO 11,666'. 54 HOLES. MAX RATE 81.6 BPM. AVG RATE 81 BPM. MAX PSI 6709 AVG PSI TOTAL SAND PUMPED 338,000# WHITE 40/70 MAX CONC 4 PPG ISIP 2648 FG.82 PSI. TOTAL LOAD 5625 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 11,413'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 11,353', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3548 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 11,263' & CLUSTER 11,163', PUMPED REMAINING PSI C OT LOAD ALL SURFACE EQUIPMENT AND FRAC STACK WITH BRINE WATER. WELL SHUT IN AND SECURED C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: FRAC OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

46 Today's Date: 1/17/2011 DATE: 1/15/2011 DSS: 51 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,405, Page 1 of 4 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

47 Today's Date: 1/17/2011 DATE: 1/15/2011 DSS: 51 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,405, C ST HELD PREJOB SAFETY MEETING FRAC STAGE #10 11,163' TO 11,356'. 54 HOLES. MAX RATE 82.7 BPM. AVG RATE 80.8 BPM. MAX PSI 5313 AVG PSI TOTAL SAND PUMPED 257,940# WHITE 40/70 79,443# WHITE 30/70 MAX CONC 4.3 PPG ISIP 2837 FG.85 PSI. TOTAL LOAD 5531 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 11,113'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 11,053', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4981 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 10,963' & CLUSTER 10,863', PUMPED REMAINING PSI C ST FRAC STAGE #11 11,053' TO 10,866'. 54 HOLES. MAX RATE 81.6 BPM. AVG RATE 81.3 BPM. MAX PSI 5128 AVG PSI TOTAL SAND PUMPED 239,800# WHITE 40/70 98,386# WHITE 30/70 MAX CONC 4.1 PPG ISIP 2848 FG.86 PSI. TOTAL LOAD 5600 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 10,815'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 10,763', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4301 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 10,653' & CLUSTER 10,563', PUMPED REMAINING PSI C ST FRAC STAGE #12 10,763' TO 10,566'. 54 HOLES. MAX RATE 81 BPM. AVG RATE 81 BPM. MAX PSI 5275 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 MAX CONC 4.4 PPG ISIP 2536 FG.81 PSI. TOTAL LOAD 5546 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 10,513'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 10,463', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3018 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 10,353' & CLUSTER 10,263', PUMPED REMAINING PSI C ST FRAC STAGE #13 10,463' TO 10,266'. 54 HOLES. MAX RATE 82.4 BPM. AVG RATE 80.3 BPM. MAX PSI 6332 AVG PSI TOTAL SAND PUMPED 339,720# WHITE 30/70 MAX CONC 4.1 PPG ISIP 2419 FG.79 PSI. TOTAL LOAD 5580 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 10,213'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 10,163', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3126 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 10,053' & CLUSTER 9,963', PUMPED REMAINING PSI C ST FRAC STAGE #14 9,963' TO 10,166'. 54 HOLES. MAX RATE 81.2 BPM. AVG RATE 80.6 BPM. MAX PSI 6061 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 and 81,316# WHITE 30/70 MAX CONC 4.1 PPG ISIP 2575 FG.82 PSI. TOTAL LOAD 5488 BBLS. Page 2 of 4 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

48 Today's Date: 1/17/2011 DATE: 1/15/2011 DSS: 51 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,405, C PF PERF STAGE # HOLES TOTAL. RIH SET 9,913'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 9,863', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4470 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 9,763' & CLUSTER 9,653', PUMPED REMAINING PSI C OT LOAD ALL SURFACE EQUIPMENT AND FRAC STACK WITH BRINE WATER. WELL SHUT IN AND SECURED C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: FRAC OPERATIONS DATE: 1/16/2011 DSS: 52 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,458, C ST HELD PREJOB SAFETY MEETING FRAC STAGE #1 9,653' TO 9,866'. 54 HOLES. MAX RATE 82 BPM. AVG RATE 82 BPM. MAX PSI 5140 AVG PSI TOTAL SAND PUMPED 303,281# WHITE 40/70 MAX CONC 4.0 PPG ISIP 2484 FG.80 PSI. TOTAL LOAD 5316 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 9,613'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 9,563', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3142 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 9,463' & CLUSTER 9,363', PUMPED REMAINING PSI C ST FRAC STAGE #16 9,363' TO 9,566'. 54 HOLES. MAX RATE 82 BPM. AVG RATE 82 BPM. MAX PSI 4819 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 MAX CONC 4.0 PPG ISIP 2499 FG.80 PSI. TOTAL LOAD 5306 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 9,313'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 9,263', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3113 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 9,163' & CLUSTER 9,063', PUMPED REMAINING PSI C ST FRAC STAGE #17 9,063' TO 9,266'. 54 HOLES. MAX RATE 83 BPM. AVG RATE 81 BPM. MAX PSI 5161 AVG PSI TOTAL SAND PUMPED # WHITE 40/ # WHITE 30/70 MAX CONC 4.0 PPG ISIP 2406 FG.79 PSI. TOTAL LOAD 5327 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 9,013'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 8,963', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3444 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 8,863' & CLUSTER 8,763', PUMPED REMAINING PSI. SHUT WELL IN AND SECURE WELL C OT RE-HEAD WIRLEINE AND PREP LOCATION FOR FRAC OPERATIONS C OT HALLIBURTON UNLOAD SAND TRUCKS. CURRENT ACTIVITY: WELL SHUT IN AND SECURED. RESUME FRAC OPERATIONS MONDAY Page 3 of 4 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

49 Today's Date: 1/17/2011 DATE: 1/17/2011 DSS: 53 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,470, C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: FRAC OPERATIONS. 7 STAGES LEFT TO FRAC. Page 4 of 4 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

50 Today's Date: 1/18/2011 DATE: 1/18/2011 DSS: 54 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,492, Page 1 of 3 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

51 Today's Date: 1/18/2011 DATE: 1/18/2011 DSS: 54 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,492, C OT WELL SHUT IN AND SECURED. HOLD PRE-JOB SAFETY MEETING. PREP EQUIPMENT FOR FRAC OPERATIONS C ST FRAC STAGE #18 8,763' TO 8,966'. 54 HOLES. MAX RATE 83.5 BPM. AVG RATE 82.5 BPM. MAX PSI 6189 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 MAX CONC 4.0 PPG ISIP 2391 FG.79 PSI. TOTAL LOAD 5344 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 8,713'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 8,663', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4,813 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 8,563' & CLUSTER 8,463', PUMPED REMAINING PSI C ST FRAC STAGE #19 8,463' TO 8,666'. 54 HOLES. MAX RATE 85.4 BPM. AVG RATE 82.4 BPM. MAX PSI 6419 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 MAX CONC 3.9 PPG ISIP 2538 FG.81 PSI. TOTAL LOAD 5199 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 8,413'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 8,363', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 30 2 BPM 6,503' PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 8,263' & CLUSTER 8,163', PUMPED REMAINING PSI C ST FRAC STAGE #20 8,163' TO 8,366'. 54 HOLES. MAX RATE 83.1 BPM. AVG RATE 81.3 BPM. MAX PSI 6126 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 MAX CONC 4.1 PPG ISIP 2473 FG.80 PSI. TOTAL LOAD 5228 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 8,013'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 8,063', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 4333 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 7,963' & CLUSTER 7,863', PUMPED REMAINING PSI C ST FRAC STAGE #21 8,063' TO 8,066'. 54 HOLES. MAX RATE 85.5 BPM. AVG RATE 81.8 BPM. MAX PSI 6916 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 MAX CONC 4 PPG ISIP 2575 FG.82 PSI. TOTAL LOAD 5208 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 7,813'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 7,763', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 3605 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 7,663' & CLUSTER 7,563', PUMPED REMAINING PSI C ST FRAC STAGE #22 7,563' TO 7,766'. 54 HOLES. MAX RATE 84.6 BPM. AVG RATE 81.4 BPM. MAX PSI 6226 AVG PSI TOTAL SAND PUMPED # WHITE 40/70 MAX CONC 4 PPG ISIP 2732 FG.84 PSI. Page 2 of 3 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

52 Today's Date: 1/18/2011 DATE: 1/18/2011 DSS: 54 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 3,492, TOTAL LOAD 5249 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 7,513'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 7,463', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 2807 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 7,363' & CLUSTER 7,263', PUMPED REMAINING PSI C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: FRAC OPERATIONS Page 3 of 3 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

53 Today's Date: 1/19/2011 DATE: 1/19/2011 DSS: 55 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,081, C OT WELL SHUT IN AND SECURED. HOLD PRE-JOB SAFETY MEETING. PREP EQUIPMENT FOR FRAC OPERATIONS C ST FRAC STAGE #23 7,263' TO 7,466'. 54 HOLES. MAX RATE 82.7 BPM. AVG RATE 80.2 BPM. MAX PSI 6093 AVG PSI TOTAL SAND PUMPED # WHITE 40/ # WHITE 30/70 MAX CONC 4.1 PPG ISIP 2604 FG.82 PSI. TOTAL LOAD 5388 BBLS C PF PERF STAGE # HOLES TOTAL. RIH SET 7,213'. TEST TO 4000 PSI. TEST GOOD. PERFORATE CLUSTER 7,153', SPOTTED 3000 GALS 7.5% HCL ACID DURING PUMP DOWN. BREAK DOWN CLUSTER #1 PERFS. PUMPED 20 6 BPM 2922 PSI FORMATION BROKE. AFTER PERFORATING CLUSTER 7,063' & CLUSTER 6,963', PUMPED REMAINING PSI C ST FRAC STAGE #24 6,963' TO 7,156'. 54 HOLES. MAX RATE 81.6 BPM. AVG RATE 80.9 BPM. MAX PSI 5272 AVG PSI TOTAL SAND PUMPED # WHITE 40/ # WHITE 30/70 MAX CONC 4 PPG ISIP 2666 FG.83 PSI. TOTAL LOAD 5206 BBLS. WELL TREATMENT SUMMARY: TOTAL LOAD TO RECOVER: 141,484 BBLS TOTAL SAND PUMPED: 7,306,055 LBS 30/50 WHITE 979,408 LBS 1.00 C PF 30/70 WHITE: 1,842,114 LBS 40/70 WHITE: 4,484,533 LBS TOTAL 7.5% HCL PUMPED: 3561 BBLS EPA FUEL USAGE FOR COMPLETE FRAC OPERATIONS: 33,721 GALS. CLEAR DIESEL: 8,990 GALS RED DIESEL: 24,731 GALS SET COMPOSITE BRIDGE PLUG AT 6,450' TO CAP WELL. TESTED PLUG TO 3,050 PSI. PLUG TESTED GOOD. NO LEAK OFF. POOH WITH WIRELINE AND BLEED WELLBORE DOWN FOR NEGATIVE TEST. RD AND RELEASE E&P WIRELINE. SHUT WELL IN AND SECURE C OT RD HALLIBURTON FRAC EQUIPMENT C OT WELL SHUT IN AND SECURED. CURRENT ACTIVITY: MIRU PULLING UNIT. DRILL FRAC PLUGS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

54 Today's Date: 1/20/2011 DATE: 1/20/2011 DSS: 56 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,135, C OT WELL SHUT IN AND SECURED. HOLD PRE-JOB SAFETY MEETING. MIRU NABORS # C NU ND FRAC STACK. LOAD OUT FRAC STACK. NU BOP AND TEST. UNLOAD AND TALLEY 454 JOINTS NEW 2 7/8" P110 PH6 7.9# TUBING 4.00 C TR PU NEW 4 3/4" BIT, BIT SUB, FLOAT SUB, FLOAT SUB, 1 JOINT TUBING AND OTIS R NIPPLE. RAN & INSTALL 2ND "R" NIPPLE ON JT #200. TAG CAP PLUG ON JT #206. +/- 6450' C OT TIE BACK TO 6 LINES. NU STRIPPING HEAD, PU 3.5 BOWEN SWIVEL, LOAD TUBING AND BREAK CIRCULATION. HELD SAFETY MEETING ON SHUTING WELL ON FLOW RETURNS C DP DRILL CAP 6450', RIH & TAG SAND FILL AT 7210' WASH SAND TO 7490' ON TOP OF 1st FRAC CIRCULATING 10 MIN ON CONNECTIONS, 7513'. ANNULUS PRESSURE INCREASED TO 650 PSIG AFTER DRILLING CAP PLUG BPM. AV W/ PUMP 328 FPM + FLOW BACK FLUID. REC 1400 BLW/ 5 HRS. TLTR 1411,484 BLW LR 1400 BLW LTR 140,084 BLW 1% OF LOAD RECOVERED NO SHOW OIL OR GAS Copyright by Canrig Drilling Technology Ltd. All rights reserved.

55 Today's Date: 1/21/2011 DATE: 1/21/2011 DSS: 57 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,171, C DP CO SAND F/ 7490 TO FIRST FRAC PLUG (2nd 7513' DRILL FRAC PLUG No. 1 THRU FRAC PLUG 11,714'. 2-1/2 HRS TO WASH & DRILL FRAC PLUG No. 16. CURRENTLY CHANGING SAVER SUB ON SWIVEL. SETTING 8K ON BIT STALLS 3300 FT LBS. PUMPED GEL SWEEP ON PLUG 10, 14, AND 16. REDUCED TORQUE F/ +/- 15 MIN AND TORQUE RETURNED TO PREVIOUS LIMIT. RUNNING LIGHTER WT. ON BIT 4K TO 5K. CLEAN CIRCULATED TANKS FROM SAND FILL CLEANED FROM FRAC PLUG No. 1. RECOVED 4024 BLW PAST 24 HRS. TLTR 141,484 BLW LR 5424 BLW LTR 136,060 BLW 4% OF LOAD RECOVERED NO SHOW OF OIL OR GAS Copyright by Canrig Drilling Technology Ltd. All rights reserved.

56 Today's Date: 1/24/2011 DATE: 1/22/2011 DSS: 58 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,237, C DR DRILL PLUG No. 16 (FRAC PLUG No. 11,714' TO PLUG No. 13,820'. CLEAN OUT TO TOP OF PLUG 14,063' C CA PUMP 100 BBLS GELLED WATER CICULATED HOLE CLEAN W/ 500 BLW. DISPLACE HOLE WITH 320 BBLS BRINE WATER. SITP 140 PSIG. SICP 160 PSIG. BRINE WATER OUT 9.6 PPG. TANK BRINE WATER 10 PPG. CICULATE AND ADDITIONAL 100 BBLS 10 PPG BRINE DOWN TUBING W/ 175 PSIG ON ANNULUS. SICP 150 PSIG AND CLIMBED TO 215 PSIG. DID NOT KILL WELL WITH BRINE WATER C OT SET BACK SWIVEL AND PREP TO POOH LAYING DOWN DRILL STRING C TR POOH LAYING DOWN WORK STRING TO 7425' (+/-6700' TVD) AND SHUT WELL IN 30 MIN SICP 390 PSIG W/ 8.7 PPG WATER. CALCULATED BHP 3421 PSIG. (10 PPG BRINE 6700' = TO 3484). CONTINUE TO POOH LAY DOWN WORK STRING ALLOWING WELL TO FLOW DOWN THRU ANNULUS. RECOVERED 4250 BLW/ 24 HRS. TLTR 141,484 BLW DAILY RECOVERY 4,250 BLW TLR 9,674 BLW LTR 131,810 BLW HAVE REC. 8% OF LOAD NO SHOW OIL OR GAS. DATE: 1/23/2011 DSS: 59 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,334, C TR POOH WITH TUBING. WELL 100 TO 125 PSI WIDE OPEN C FT FLOW WELL TO TANKS. 5400'. FTP 125 PSI. RATE 200 BPH WATER 1.00 C TR TRIP BACK IN HOLE TO 6700' TVD(234 JOINTS). FLOWING WELL ALL THE TIME WHILE RUNNING IN C FT FLOW WELL. 06:00 HRS 60 PSI TLTR 141,484 BLW DAILY RECOVERY 5,599 BLW TLR 15,273 BLW LTR 126,211 BLW HAVE REC. 11% OF LOAD NO SHOW OIL OR GAS. DATE: 1/24/2011 DSS: 60 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,377, Page 1 of 2 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

57 Today's Date: 1/24/2011 DATE: 1/24/2011 DSS: 60 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,377, C FT FCP 50 PSI C WK FCP 50 PSI. RU AND PUMP 190 BBLS 10# BRINE. MONITOR WELL. WELL DEAD C TR POOH/LD TUBING AND BHA. (PROBLEMS WITH CLUTCHES ON RIG) 2.50 C WY RU E&P WIRELINE. RIH WITH HES 5 1/2" WIRLEINE SET PLT PACKER AND ON/OFF TOOL WITH PUMP OUT PLUG IN PLACE. SET 6100'. RD E&P WIRLEINE UNIT C OT RIG REPAIRS. ND HYRIL BOP. ND FLOW CROSS. ND PLUG AND TRASH CATCHER AND MANIFOLD.REPAIRS 17:00 HRS C TR RIH WITH HES ON/OFF TOOL OVERSHOT AND LUFKIN GLV. HES OVERSHOT, 1 JOINT TUBING, GLV #1@ '(850 PSI), 14 JOINTS TUBING, 5599'(895 PSI), 15 JOINTS TUBING, GLV 5109'(910 PSI), 15 JOINTS TUBING, GLV 4613'(925 PSI), 16 JOINTS TUBING, GLV 4087'(940 PSI), 26 JOINTS TUBING, GLV 3236'(955 PSI), 39 JOINT TUBING, GLV 1960'(970 PSI) AND 59 JOINTS TUBING TO SURFACE. SPACE OUT AND INSTALL HANGAR. TUBING SET IN 10,000# COMPRESSION C NU ND BOP. NU CAMERON 2 9/16" 5K TREE UPPER AND 7 1/16" 10K BOTTOM. SHUT WELL IN AND SEURE WELL C OT WELL SHUT IN AND SECURED. TLTR 141,484 BLW DAILY RECOVERY 291BLW TLR 15,564 BLW LTR 125,920 BLW HAVE REC. 11% OF LOAD CURRENT ACTIVITY: RD PULLING UNIT. LAY SUPPLY GAS LINE AND RU FLOW LINES. START COMPRESSOR AND BEGIN GAS LIFT OPERATIONS. DIESEL USAGE FOR WORKOVER(RIG, REVERSE UNIT, LIGHT TOWERS & GENERATOR: 1569 GALS Page 2 of 2 Copyright by Canrig Drilling Technology Ltd. All rights reserved.

58 Today's Date: 1/25/2011 DATE: 1/25/2011 DSS: 61 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,392, C OT WELL SHUT IN AND SECURED. RD PULLING UNIT. RU SUPPLY GAS LINES AND FLOW LINES. PURGE GAS LINE. START COMPRESSOR. CLEAN TANKS C FT START GAS 16:30 HOURS. 06: PSI INJECTION RATE 352 MCFD INJECTION PSI CASING 950 PSI TLTR 141,484 BLW DAILY RECOVERY 1,491BLW 0 BO TLR 17,055 BLW LTR 124,429 BLW GAS SALES.66 MCFD 12% OF LOAD TO DATE CURRENT ACTIVITY: FLOW TEST. GAS LIFT OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

59 Today's Date: 1/26/2011 DATE: 1/26/2011 DSS: 62 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,402, C FT 06: PSI INJECTION RATE 408 MCFD INJECTION PSI CASING 1000 PSI TLTR 141,484 BLW DAILY RECOVERY 1,981BLW 544 BO TLR 18,971 BLW LTR 122,513 BLW GAS SALES 194 MCFD 13% OF LOAD TO DATE CURRENT ACTIVITY: FLOW TEST. GAS LIFT OPERATIONS. Copyright by Canrig Drilling Technology Ltd. All rights reserved.

60 Today's Date: 1/27/2011 WELL NAME: UNIVERSITY 43 #1001H DATE: 1/27/2011 DSS: 63 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,412, C FT 24 HR FLOW TESTING (GAS LIFT) FTP 300 PSIG INJECTION RATE 414 MCFPD INJECTION CASING PRESS PSIG TLTR BLW DAILY RECOVERY 1764 BLW 548 BNO GAS SALES 268 MCFPD 15% OF LOAD RECOVERED Copyright by Canrig Drilling Technology Ltd. All rights reserved.

61 Today's Date: 1/28/2011 WELL NAME: UNIVERSITY 43 #1001H DATE: 1/28/2011 DSS: 64 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,421, C FT FLOW WELL TO SALES PAST 24 HRS FTP 300 PSIG INJECTION RATE 495 MCFPD TLTR 141,484 BLW DAILY RECOVERY 1,420 BLW BNO TLR 22,155 BLW LTR 119,329 BLW GAS SALES 228 MCF 16% OF LOAD RECOVERED Copyright by Canrig Drilling Technology Ltd. All rights reserved.

62 Today's Date: 1/31/2011 WELL NAME: UNIVERSITY 43 #1001H DATE: 1/29/2011 DSS: 65 DEPTH: 14,155 MUD WT: CUM COST TO DATE: 7,430, C OT FLOW WELL TO SALES PAST 24 HRS. FTP 300 PSIG INJECTION RATE 490 MCFPD INJECTION PRESS 950 PSIG TLTR BLW DAILY RECOVERY 1317 BLW BNO TLR BLW LTR BLW GAS SALES 259 MCF 17% OF LOAD RECOVERED FINAL REPORT FROM HAT CREEK TESTING Copyright by Canrig Drilling Technology Ltd. All rights reserved.

63

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 6 Brand Loadcraft Power: 550 HP Year: 2013 Double Drum: Drawworks and Sandline Drums : Self-propelled Land

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 4 Brand Taylor Power: 500 HP Year: 2004 Double Drum: Drawworks and Sandline Drums : Self-propelled Land Rig

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 2 Brand Wilson Power: 550 HP Year: 1982 (Repotenciado en el 2009) Double Drum: Drawworks and Sandline Drums

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

HYDRAULIC WORKOVER SERVICES

HYDRAULIC WORKOVER SERVICES HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500 SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information