Daily Drilling Report

Size: px
Start display at page:

Download "Daily Drilling Report"

Transcription

1 Page of UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB RAYMOND DUNLAP / JORGE VIZUET ROY ALAN DE NAPOLI DOL.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 70,860 04,557 DCC: DCC: DCC: 70,860 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/8/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 04,557 NEXT 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: RIG UP/ RUN WATER, AIR, ELECTRICAL LINES. 40% RIGGED UP, 00% MOVED 24 HR SUMMARY: WAIT ON DAYLIGHT & RIG UP TO APPROX. 40% ON NEW LOCATION 24 HR FORECAST: FINISH ASSEMBLING DERRICK & SET ON RIG FLOOR,STRING UP,RAISE DERRICK & FINISH RIGGING UP OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB WOD PP WAIT ON DAYLIGHT, RIG SHUT DOWN, 80% MOVED, 5% RIGGED UP BHA OF SERVICE 6:00 20: R-MOB-DEMOB MOB PP HOLD SAFETY MEETING WITH RIG MOVERS,RIG HANDS,& SAFETY MAN (WILLIAM LOCKE) PRIOR TO RESUMING RIG MOVE/FINISH SETTING BACKYARD COMPONENTS,SET & STACK SUBSTRUCTURE,LEVEL & CENTER OVER HOLE,BEGIN ASSEMBLING DERRICK & R/U TO APPROX.40% COMPLETE/ALL RIG COMPONENTS ON NEW 6:00 ON :00 0: R-MOB-DEMOB MOB PP RIG UP WITH CREWS = Total Hours Today 06:00 UP :00-06:00 RIG UP WITH CREWS, RIG UP WATER, AIR, & ELCTRICAL LINES, 40% RIGGED UP, 00% MOVED PERSONNEL DATA COMPANY QTY COMPANY QTY AIP SDS PETROLEUM CONSULTANTS EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 32 TOTAL HOURS ON BOARD: 468 DIESEL, MUD gal 500 RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/9/204 5:55:9AM

2 Page of 2 UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB RAYMOND DUNLAP / JORGE VIZUET ROY ALAN DE NAPOLI DOL 2.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 4,480 46,037 DCC: DCC: DCC: 4,480 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/9/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 46,037 NEXT 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: RIG ON DOWN TIME,RIG UP WITH CREWS TO RAISE DERRICK, 00% MOVED, 70 % RIGGED UP, TROUBLESHOOT AIR SUPPLY TO RIG 24 HR SUMMARY: RIG UP WITH LIGHTNING TRUCKING 24 HR FORECAST: RIG UP WITH CREWS, RAISE DERRICK, MAKE UP TOP DRIVE TRACK OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB MOB PP RIG UP WITH CREWS, RIG UP WATER, AIR, & ELCTRICAL LINES 6:00 6: R-MOB-DEMOB MOB PP RIG UP WITH LIGHTNING TRUCKING, 00% MOVED, 65% RIGGED UP, DERRICK ON FLOOR AT 400, TRUCKS RELEASE AT 600 6:00 0: R-MOB-DEMOB MOB PP RIG UP WITH CREWS, STRING UP BLOCKS, REPLACE LIGHTS IN DERRICK, HOOK UP AIR AND ELECTRICAL TO EDS/DRAWWORKS, CHECK BRUSHES IN MOTORS, CHANGE OUT 6" VALVE ON PITS = Total Hours Today 06:00 UP :00-06:00 RIG ON DOWN TIME: RIG UP WITH CREWS, RUN HOIST & PASON LINES IN DERRICK, CHANGE OUT FITTINGS ON WICHITA BRAKE (00:00-04:30) COULD NOT PUT DRILL LINE ON DRUM DUE TO WATER LINES ON WICHITA BRAKE NEEDING REPLACED 00:00-04:30 (04:30-06:00) TROUBLESHOOT AIR TO DRAWWORKS PERSONNEL DATA BHA OF SERVICE COMPANY QTY COMPANY QTY SDS PETROLEUM CONSULTANTS AIP EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING DIESEL, RIG FUEL gal 9346 MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 3 TOTAL HOURS ON BOARD: 444 Printed: 9/0/204 5:43:49AM

3 Page 2 of 2 UNIVERSITY 4 TAYLOR DRAW 30HU SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/0/204 5:43:49AM

4 Page of 2 UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB RAYMOND DUNLAP / JORGE VIZUET ROY ALAN DE NAPOLI DOL 3.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 49, ,504 DCC: DCC: DCC: 49,467 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9//204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 295,504 NEXT 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: RIG ON DOWN TIME, INSTALLING CONDUCTOR, R/U SERVICE LOOPS 24 HR SUMMARY: DOWN FOR NIGHT,REPLACED AIR COMPRESSORS,RAISED DERRICK,FINISH RUNNING MISC. ELECTRICAL LINES,FINISH RIGGING UP PUMPS & PITS 24 HR FORECAST: PICK UP TRACK & TOP DRIVE,INSTALL SHAKER TROUGH,FINISH RIGGING UP MISC.RIG COMPONENTS OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 4: R-MOB-DEMOB RU_RD PP RIG UP WITH CREWS, RUN HOIST & PASON LINES IN DERRICK,RUN MISC. ELECTRICAL LINES,AND R/U PUMPS & PITS ATTEMPTED TO SLIP LINE ONTO DRUM BUT HAD TO POSTPONE DUE TO WATER LINES ON WICHITA BRAKE NEEDING REPLACED 4:30 6:00.50 R-MOB-DEMOB RU_RD PP RIG UP RENTAL AIR COMPRESSOR AND TROUBLESHOOT AIR PROBLEMS TO DRAWWORKS DUE TO COMPRESSORS BEING DOWN 6:00 0: R-MOB-DEMOB RU_RD PP FINISH R/U MISC. RIG COMPONENTS = Total Hours Today :00-06:00 FINISH R/U MISC. RIG COMPONENTS 06:00 UP PERSONNEL DATA BHA OF SERVICE COMPANY QTY COMPANY QTY SDS PETROLEUM CONSULTANTS AIP EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 3 TOTAL HOURS ON BOARD: 444 Printed: 9//204 6:58:45AM

5 Page 2 of 2 UNIVERSITY 4 TAYLOR DRAW 30HU SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9//204 6:58:45AM

6 Page of 2 UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB RAYMOND DUNLAP / JORGE VIZUET ROY ALAN DE NAPOLI DOL 4.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 07, ,600 DCC: DCC: DCC: 07,096 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9//204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 402,600 NEXT 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: N/U FLOWLINE & INSTALL TURNBUCKLES ON CONDUCTOR 24 HR SUMMARY: R/U SERVICE LOOPS, TONGS, ST-80'S, REMOVE SHAKER SLIDES,& INSTALL TROUGH, BACK HOISTS, TDS, BACK YARD, REPLACE SEATS ON #2 PUMP, C/O SAVER SUB, UPPER & LOWER IBOP 24 HR FORECAST: SPUD IN WELL, TD SURFACE, CIRC., P.O.O.H, RUN CSG & CMT OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB RU_RD PP R/U SERVICE LOOPS, TONGS, REMOVE SLIDES ON SHAKERS & INSTALL TROUGH 6:00 8: R-MOB-DEMOB RU_RD PP R/U BACK HOIST & TOP DRIVE ( FUNCTION TEST ), REPLACE HOSE ON TDS, REPLACE SEATS ON #2 PUMP, FIX AIR LEAK ON GRASSHOPPER, REPLACE SAVER SUB, UPPER & LOWER IBOP BHA OF SERVICE 8:00 0: R-MOB-DEMOB RU_RD PP FINISH C/O SAVER SUB, UPPER & LOWER IBOP, PUT TOGETHER ROTARY CHAIN GAURD, INSTALL BALES & ELEVATORS, R/U STANDPIPE, INSTALL MOUSE HOLE = Total Hours Today 06:00 UP : REMOVE LINER ON #2 PUMP #2 POD TO REMOVE BROKE BOLTS ON WEAR PLATE ( USE WELDER TO WELD NUTS ON BROKEN BOLTS TO REMOVE ) PERSONNEL DATA COMPANY QTY COMPANY QTY SDS PETROLEUM CONSULTANTS AIP GREENES CONSULTING 0.00 EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 32 TOTAL HOURS ON BOARD: 444 Printed: 9/2/204 5:43:0AM

7 Page 2 of 2 UNIVERSITY 4 TAYLOR DRAW 30HU SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/2/204 5:43:0AM

8 Page of 3 UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 0.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 RAYMOND DUNLAP / JASON GAMEL ROY ALAN DE NAPOLI DOL 5.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 39, ,575 DCC: DCC: DCC: 39,975 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/2/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 442,575 NEXT 0.0 INC 0.00 AZM ft ft CURRENT OPERATIONS: CHANGING OUT SAVER SUB & DIES ON TOP DRIVE 24 HR SUMMARY: REMOVE LINER ON #2 PUMP #2 POD TO ATTEMPT TO REMOVE BROKEN BOLTS FROM WEAR PLATE ( USING WELDER TO ASSIST ), MIX SPUD MUD, N/U FLOWLINE & TURNBUCKLES, STRAP & CALIPER BHA, P/U BHA, 08', 9:00, DRLG AHEAD 24 HR FORECAST: TD SURFACE, CIRC. & COND. HOLE, P.O.O.H, RUN CSG & CMT OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY BHA OF SERVICE 0:00 6: R-MOB-DEMOB RU_RD PP REMOVE LINER ON #2 PUMP #2 POD TO ATTEMPT TO REMOVE BROKE BOLTS ON WEAR PLATE ( USE WELDER TO WELD NUTS ON BROKEN BOLTS TO REMOVE ) UNSUCCESSFUL & REINSTALL SAME 6:00 9: R-MOB-DEMOB RU_RD PP WORK ON CRI / PRE SPUD INSPECTION, SPOOL UP DRILL LINE, INSTALL GROUND RODS, R/U V-DOOR RED ZONE NET, CONTAINMENT AROUND HYDR. & USED OIL DRUMS 9:00 2: R-MOB-DEMOB RU_RD PP FIX SERVICE LOOP SOCK, INSTALL C.O.M, INSTALL LAD-SAFE, R/U TRASH PUMP TO PITS,LOAD CSG ONTO RACK. 2:00 3:30.50 R-MOB-DEMOB MOB PN SWV REPLACE SWIVEL PACKING 3:30 4: R-MOB-DEMOB MOB PN SWV TEST STANDPIPE 4:00 9: R-MOB-DEMOB MOB PP MIX SPUD MUD, N/U FLOW LINE & TURNBUCKLES, STRAP & CALIPER BHA, P/U BHA & 08' 9:00 9: S-DRL M_SPUD PP SPUD 08' 9:00 20:00.00 S-DRL DRLG PP DRLG F/ 08' T/ 42' ( WASH & REAM EVERY CONN. ) 20:00 22: S-DRL DRLG PN SWV C/O ORINGS ON SWIVEL PACKING 22:30 0:00.50 S-DRL DRLG PP DRLG F/ 42' T/ 80' ( WASH & REAM EVERY CONN. ) = Total Hours Today :00-0:30 DRLG F/ 80' T/ 20' ( WASH & REAM EVERY CONN. ) 0:30-06:00 C/O SAVER SUB & DIES ON TDS BIT SIZE (in) 06:00 UP BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R / Hughes x / Printed: 9/3/204 6:3:25AM

9 Page 2 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG / /50.0 / MOTOR OUTPUT RPV: ROTARY CURRENT: 20 TOTAL RPM: 20 VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: 0.0 % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Fresh Water Cl Ca H2S KCL CUM ROP /2 2/2 / / / Density (ppg ) 8.40 PP DAILY COST 0 CUM COST 0 %OIL 0.00 % H2O BHA JAR S/N BHA / HOLE CONDITIONS JAR BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH LGS (kip) 85.0 (kip) 75.0 (kip) 80.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 7.5 IBS Drill Collar 8" DC Shock Sub SHOCK SUB Bit Sub BIT SUB PDC Bit 7.5 HUGHES /8" Reg # # 2 MUD PUMPS/HYDRAULICS STROKE LINER SPP: AV(DP): AV(DC): HP: (hp/in²) SPR PPSR PERSONNEL DATA COMPANY QTY COMPANY QTY GREENES CONSULTING 0.00 SDS PETROLEUM CONSULTANTS AIP EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 32 TOTAL HOURS ON BOARD: 444 WATER,GROUND-FRESH bbl 920 DIESEL, RIG FUEL gal DIESEL, MUD gal 500 BRINE bbl 600 BASE OIL bbl 2400 Printed: 9/3/204 6:3:25AM

10 Page 3 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/3/204 6:3:25AM

11 Page of 3 UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 RAYMOND DUNLAP / JASON GAMEL ROY ALAN DE NAPOLI DOL 6.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 4,08 483,656 DCC: DCC: DCC: 4,08 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/3/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 483,656 NEXT INC.30 AZM ft ft CURRENT OPERATIONS: PULLING OUT OF HOLE TO RUN SURFACE 24 HR SUMMARY: DRLG SURFACE, P.O.O.H TO RETRIEVE SURVEY TOOL, T.I.H, CONT. DRLG SURFACE, RIG ON DOWN TIME TO C/O BREAKER ON MP #2 IN SCR 24 HR FORECAST: TD 04:00, CIRC. & COND. HOLE, P.O.O.H, RUN CSG & CMT, CUT CONDUCTOR & INSTALL SOW OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :30.50 S-DRL DRLG PP DRLG F/ 80' T/ 20' ( WOB 25-30, SPP 260, GPM , TORQ 0-5, RPM 20 ) :30 7: S-DRL RU_RD PN TD C/O SAVER SUB & DIES ON TDS 7:00 9: S-DRL DRLG PP DRLG F/ 227' T/ 274' ( WOB 25-30, SPP 260, GPM , TORQ 0-5, RPM 20 ) 9:00 0:00.00 S-DRL DRLG PP REHEAD WIRELINE ( DUE TO CRIMPED WIRELINE ) 0:00 2: S-DRL POOH PN WL WIRE LINE PARTED, P.O.O.H TO RETRIEVE WIRELINE TOOL 2:30 3: S-DRL DRLG PP P/U TELEDRIFT 3:00 4:00.00 S-DRL TRIP PN WL T.I.H BHA OF SERVICE 4:00 9: S-DRL DRLG PP DRLG F/ 274' T/ 5' ( WOB 25-30, SPP 550, GPM , TORQ 0-5, RPM 20 ) (STARTED LOSING PARTIAL ABOUT 400' STARTED PUMPING 40 BBL LCM SWEEPS TO KEEP FULL RETURNS 9:00 9: S-DRL RIGSER PP RIG SERVICE 9:30 22: S-DRL DRLG PP DRLG F/ 5' T/ 63' ( WOB 25-30, SPP 750, GPM , TORQ 0-5, RPM 20 (LOST FULL 600' PUMPED 80 BBL LCM PILL W/POLY SWELL AND GAINED 00 % RETURNS) 22:30 0:00.50 S-DRL CIRC PN MP CIRC. WHILE C/O SWAB, C/O BREAKER IN SCR = Total Hours Today :00-02:00 RIG ON DOWN TIME ( C/O BREAKER ON #2 PUMP IN SCR ) 02:00-04:00 DRLG F/ 63' T/ 790' ( LAST 762' DEV. 0.5 ) 04:00-05:00 PUMP 2-40 BBL SWEEPS, CIRC. HOLE CLEAN 05:00-06:00 P.O.O.H BIT SIZE (in) 06:00 UP BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R / Hughes x / Printed: 9/4/204 7:05:03AM

12 Page 2 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG / /30.0 / MOTOR OUTPUT RPV: ROTARY CURRENT: 20 TOTAL RPM: 20 VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Fresh Water Cl Ca H2S KCL CUM ROP /2 2/2 9.00/ / Density (ppg ) 8.50 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA JAR S/N BHA / HOLE CONDITIONS JAR BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH LGS (kip) 20.0 (kip) 0.0 (kip) 5.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 7.5 IBS Drill Collar 8" DC Survey Tools TELEDRIFT Shock Sub SHOCK SUB Bit Sub BIT SUB PDC Bit 7.5 HUGHES /8" Reg APACHE SURVEY # # 2 TYPE DEG ( ) AZI ( ) TVD NORMAL NORMAL NORMAL STROKE MUD PUMPS/HYDRAULICS LINER SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA COMPANY QTY COMPANY QTY AIP GREENES CONSULTING 0.00 SDS PETROLEUM CONSULTANTS EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING DIESEL, RIG FUEL gal N/-S MATERIALS/CONSUMPTION +E/-W SPR V.SECT D.L ( /00ft) PPSR TOTAL PERSONNEL ON BOARD: 32 TOTAL HOURS ON BOARD: 444 Printed: 9/4/204 7:05:03AM

13 Page 3 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/4/204 7:05:03AM

14 Page of 3 UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 2.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 RAYMOND DUNLAP / JASON GAMEL ROY ALAN DE NAPOLI DOL 7.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 63, ,489 DCC: DCC: DCC: 63,832 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/4/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 547,489 NEXT INC.30 AZM ft ft CURRENT OPERATIONS: TESTING BOPS & ASSOCIATED EQUIP. 24 HR SUMMARY: TD 04:00, CIRC. & COND. HOLE, P.O.O.H, R/U CSG TOOLS & L/D TRUCK, RUN SURFACE CSG, CMT CSG, REMOVE CONDUCTOR, INSTALL WELL HEAD, N/U BOP 24 HR FORECAST: TEST BOPS, P/U BHA, TEST CSG, DRILL AHEAD OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 2: S-DRL CIRC PN MP CIRC. WHILE RIG ON DOWN TIME ( C/O BREAKER ON #2 PUMP IN SCR ) 2:00 4: S-DRL DRLG PP DRLG F/ 63' T/ 790' ( LAST 762' DEV. 0.5 ) (WOB 25-30, SPP 260, GPM , TORQ 0-5, RPM 20) 4:00 5:00.00 S-DRL CIRCT PP PUMP 2-40 BBL SWEEPS, CIRC. HOLE CLEAN 4:00 4: S-DRL M_TDSrf PP TD 790' 5:00 0: S-DRL TRIP PP P.O.O.H ( STRAP OUT ) 0:00 2: S-DRL TRIP PP BREAK BIT, L/D IBS & SHOCK SUB, RETRIEVE STAND OF 8" DC FROM BACK OF DERRICK 2:30 3: S-CSG CSG PP R/U CSG TOOLS & L/D TRUCK 3:00 4:30.50 S-CSG R_PCSG PP RUN 20 JTS. OF 3 3/8" 48# H40 STC T/ 790' TAG BTM 4:30 5: S-CSG CIRC PP R/U CIRC. SWEDGE & 200 GPM ( R/D CSG TOOLS ) BHA OF SERVICE 5:00 7: S-CMT CMTPRI PP HOLD SFTY MTG, R/U CREST CEMENTERS CMT HEAD, 3500 PSI, PUMP 50 BBLS H2O SPACER, 77 BBLS (600 SX) 3.7 CLASS C LEAD CMT, SHUT DOWN, DISP. W/ 8 BBLS 8.5 PPG MUD, FINISHED 7:00 ON 9/4/4 ( CMT 0 BBLS,CIRCULATED 7 BBLS BACK TO SURFACE, FCP 460 PSI ) 7:00 8:00.00 S-NUP BOPS PP FLUSH CONDUCTOR & FLOWLINE, N/D SAME 8:00 2: S-NUP BOPS PP CUT COND. & CSG, DRESS CSG & WELD ON "A" SECTION WELL HEAD, PRESSURE TEST SAME TO 500 PSI FOR 5 MIN, GOOD TEST ( JET PITS & FILL W/ BRINE WATER ) 2:00 0: S-NUP BOPS PP R/U WINCHES, INSTALL SPACER SPOOL = Total Hours Today :00-0:30 P/U BOP W/ POLE TRUCK ASSISTANCE, & TORQ SAME 0:30-06:00 N/U BOP BIT SIZE (in) 06:00 UP BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R / Hughes x / NO-A---NO-TD Printed: 9/5/204 7:34:46AM

15 Page 2 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU BIT OPERATIONS WOB RPM PRESS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG CUM ROP / /0.0 / MOTOR OUTPUT RPV: ROTARY CURRENT: 0 TOTAL RPM: 0 MUD PROPERTIES LCM: MUD TYPE: VIS (s/qt ) PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / OIL/WAT % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) Cl Ca H2S KCL LGS PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA JAR S/N BHA / HOLE CONDITIONS JAR BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH (kip) 0.0 (kip) 0.0 (kip) 0.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 7.5 IBS Drill Collar 8" DC Survey Tools TELEDRIFT Shock Sub SHOCK SUB Bit Sub BIT SUB PDC Bit 7.5 HUGHES /8" Reg MUD PUMPS/HYDRAULICS SPP: 0 SPR STROKE LINER AV(DP): AV(DC): PPSR HP: (hp/in²) PERSONNEL DATA COMPANY QTY COMPANY QTY GREENES CONSULTING 0.00 AIP SDS PETROLEUM CONSULTANTS EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 32 TOTAL HOURS ON BOARD: 444 DIESEL, RIG FUEL gal Printed: 9/5/204 7:34:46AM

16 Page 3 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/5/204 7:34:46AM

17 Page of 2 UNIVERSITY 4 TAYLOR DRAW 30HU RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 3.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 RAYMOND DUNLAP / JASON GAMEL ROY ALAN DE NAPOLI DOL 8.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 68,62 65,65 DCC: DCC: DCC: 68,62 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/5/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 65,65 NEXT INC.30 AZM ft ft CURRENT OPERATIONS: P/U BHA, TEST MTR, T.I.H 24 HR SUMMARY: P/U STACK & TORQ SAME, CONT. N/U, TEST BOP, CMT CELLAR TO BASE PLATE, R/D TESTERS, CSG BALES & ELEVATORS & WINCHES, STRAP & CALIPER BHA, INSTALL BELL NIPPLE & TURNBUCKLES, P/U NEW BHA & T.I.H 24 HR FORECAST: T.I.H TO TAG CMT, TEST CSG T/ 500PSI, DRILL OUT CMT & FLOAT EQUIP., DRILL AHAED IN INTERMEDIATE OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :30.50 S-NUP BOPS PP P/U BOP W/ POLE TRUCK ASSISTANCE, STACK & TORQ SAME :30 3: S-NUP BOPS PP CONTINUE N/U BOP 3:30 4: S-NUP BOPS PP R/U TESTING EQUIP. 4:00 7: S-NUP BOPS PP TEST BOPS, CHOKE MANIFOLD & ALL RELATED VALVES T/ 250L 3000H 7:00 8:00.00 S-NUP BOPS PP FILL CELLAR W/ CMT T/ WELL HEAD BASE PLATE, R/D WINCHES 8:00 0: S-NUP BOPS PP REINSTALL BELL NIPPLE, STRAP & CALIPER BHA = Total Hours Today 06:00 UP BHA OF SERVICE :00-0:30 INSTALL TURN BUCKLES & CENTER STACK 0:30-02:00 N/U FLOWLINE 02:00-04:00 R/U FILL UP LINES & TRIP TANK LINES, INSTALL MOUSEHOLE 04:00-06:00 P/U BHA, TEST MTR & T.I.H STROKE MUD PUMPS/HYDRAULICS LINER SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA SPR PPSR COMPANY QTY COMPANY QTY GREENES CONSULTING 0.00 AIP SDS PETROLEUM CONSULTANTS EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING DIESEL, RIG FUEL gal 339 3,80 MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 32 TOTAL HOURS ON BOARD: 444 Printed: 9/6/204 7:27:57AM

18 Page 2 of 2 UNIVERSITY 4 TAYLOR DRAW 30HU SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/6/204 7:27:57AM

19 Page of 3 UNIVERSITY 4 TAYLOR DRAW 30HU ,400.0, RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 4.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 RAYMOND DUNLAP / JASON GAMEL ROY ALAN DE NAPOLI DOL 9.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 60,87 702,2 DCC: DCC: DCC: 60,87 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/6/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 702,2 NEXT,62.0 INC 0.40 AZM ft ,520.0 ft CURRENT OPERATIONS: 742' 24 HR SUMMARY: FINISH N/U, R/U PANIC LINES & GAS BUSTER, INSTALL TRIP NIPPLE, P/U BHA, TEST MTR, T.I.H, DRLG OUT CMT, TEST 500 PSI, DRILL AHEAD IN INTERMEDIATE 24 HR FORECAST: DRILL AHEAD IN INTERMEDIATE OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :30.50 S-NUP BOPS PP INSTALL TURN BUCKLES & CENTER STACK :30 2: S-NUP BOPS PP N/U FLOWLINE 2:00 6: S-NUP BOPS PP CONTINUE N/U BOP, R/U FILL UP & TRIP TANK LINES, INSTALL MOUSE HOLE 6:00 8: S-NUP BOPS PP INSTALL TRIP NIPPLE, FINISH R/U ON PANIC LINES & GAS BUSTER 8:00 : S-DRL TRIP PP P/U BHA, TEST MTR, T.I.H ( TAG 774" :30 2:30.00 S-DRL LKOFF PP TEST 500 PSI F/30 MINS. 2:30 3:30.00 S-DRL DOCMT PP DRLG OUT CMT & FLOAT EQUIP WHILE DISP. HOLE W/ BRINE WATER 3:30 8: INT-DRL DRLG PP DRLG F/ 790' T/ 267' ( WOB 25, TORQ 0-2, SPP 250, ROT 30, DIFF , GPM 550 ) 3:30 3: INT-DRL M_SINT PP DRL AHEAD IN INTERMEDIATE 8:00 9:30.50 INT-DRL DRLG PN RO RIG ON DOWN TIME TO REPLACE BOLT ON STRONG BACK 9:30 20: INT-DRL DRLG PP DRLG F/ 267' T/ 362' ( WOB 25, TORQ 0-2, SPP 300, ROT 30, DIFF , GPM 550 ) 20:00 2:00.00 INT-DRL RIGSER PP RIG SERVICE 2:00 22:00.00 INT-DRL DRLG PN RO RIG ON DOWN TIME TO ADJUST STRONG BACK TO CENTER TRACK 22:00 22: INT-DRL DRLG PP DRLG F/ 362' T/ 400' ( WOB 25, TORQ 0-2, SPP 450, ROT 30, DIFF , GPM 550 ) 22:30 0:00.50 INT-DRL DRLG PN RO RIG ON DOWN TIME TO REPLACE BOLTS ON STRONG BACK = Total Hours Today :00-02:30 REPLACE BOLTS IN STRONG BACK FOR TDS TRACK 02:30-06:00 DRLG F/ 400' T/ 742' BIT SIZE (in) 06:00 UP BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN BHA OF SERVICE I-O-D-L-B-G-O-R 2 / Hughes 506X x / Printed: 9/7/204 7:34:49AM

20 Page 2 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU ,400.0, WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG 2/ /30.0 / MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 30 TOTAL RPM: 20 VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Brine Cl Ca H2S KCL CUM ROP /2 2/3 9.50/ / , Density (ppg ) 9.80 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH LGS (kip) 40.0 (kip) 30.0 (kip) 35.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Survey Tools TELEDRIFT Adjustable Housing BICO PDM PDC Bit 2.25 HUGHES 506X APACHE SURVEY # # 2 TYPE DEG ( ) AZI ( ) TVD NORMAL, , NORMAL, , STROKE MUD PUMPS/HYDRAULICS LINER SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA COMPANY QTY COMPANY QTY AIP SDS PETROLEUM CONSULTANTS GREENES CONSULTING 0.00 EDS PATTERSON-UTI DRILLING LIGHTNING TRUCKING DIESEL, RIG FUEL gal 79 2,46 +N/-S MATERIALS/CONSUMPTION +E/-W SPR V.SECT D.L ( /00ft) PPSR TOTAL PERSONNEL ON BOARD: 32 TOTAL HOURS ON BOARD: 444 Printed: 9/7/204 7:34:49AM

21 Page 3 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU ,400.0, SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/7/204 7:34:49AM

22 Page of 3 UNIVERSITY 4 TAYLOR DRAW 30HU , ,384.9 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 5.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 ERIC TAYLOR / JASON GAMEL ROY ALAN DE NAPOLI DOL 0.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 38,03 740,52 DCC: DCC: DCC: 38,03 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/7/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 740,52 NEXT 2,25.0 INC 0.00 AZM ft ,520.0 ft CURRENT OPERATIONS: DRLG 2575' 24 HR SUMMARY: C/O BOLTS ON STRONG BACK, DRILL IN INTERMEDIATE 24 HR FORECAST: DRILL AHEAD IN INTERMEDIATE OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 2: S-DRL CIRC PN TD REPLACE 2 BOLTS ON STRONG BACK 2:30 6: S-DRL DRLG PP DRILL F/400 - T/683 (WOB-20, RPM-50, TQ-5/8, GPM-600) 6:00 9: S-DRL CIRC PN TD REPLACE 2 BOLTS ON STRONG BACK 9:00 2: S-DRL DRLG PP DRILL F/683 - T/932 (WOB-20, RPM-50, TQ-5/8, GPM-600) 2:30 3: S-DRL CIRC PN MP CIRC & C/O VALVE ON # PUMP 3:00 4:00.00 S-DRL DRLG PP DRILL F/932 - T/2023 (WOB-20, RPM-50, TQ-5/8, GPM-600) 4:00 5:30.50 S-DRL CIRC PN MP CIRC & C/O SWAB ON #2 PUMP 5:30 7:00.50 S-DRL DRLG PP DRILL F/ T/252 (WOB-20, RPM-60, TQ-8/0, GPM-600) 7:00 9: S-DRL CIRC PN TD REPLACE BOLT ON STRONG BACK (TDS TECH IN ROUTE) 9:30 20:30.00 S-DRL DRLG PP DRILL F/252 - T/225(WOB-20, RPM-60, TQ-8/0, GPM :30 2: S-DRL RIGSER PP RIG SERVICE 2:00 0: S-DRL DRLG PP DRILL F/225 - T/2385(WOB-20, RPM-60, TQ-8/0, GPM = Total Hours Today :00-0:30 DRILL F/ 2385 T/ :30-04:30 REPLACE BOLTS ON STRONG BACK 04:30-06:00 DRILL F/ T/2575 (WOB-5, RPM-65, GPM-600, TQ-8/0) LAST 224' = 0.0 BIT SIZE (in) 06:00 UP BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN BHA OF SERVICE I-O-D-L-B-G-O-R 2 / Hughes 506X x / Printed: 9/8/204 7:34:6AM

23 Page 2 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU , ,384.9 WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG 2/ /25.0 / , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 65 TOTAL RPM: 76 VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Brine Cl Ca H2S KCL CUM ROP 3/4 0.00/ / , Density (ppg ) 0.0 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH LGS (kip) 55.0 (kip) 45.0 (kip) 50.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Survey Tools TELEDRIFT Adjustable Housing BICO PDM PDC Bit 2.25 HUGHES 506X APACHE SURVEY TYPE DEG ( ) AZI ( ) TVD NORMAL 2, , NORMAL, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H STROKE MUD PUMPS/HYDRAULICS LINER SPP: AV(DP): AV(DC): HP: (hp/in²) SPR PPSR PERSONNEL DATA COMPANY QTY COMPANY QTY HORIZON MUD GREENES CONSULTING EPI CONSULTING EDS PATTERSON-UTI DRILLING TOTAL PERSONNEL ON BOARD: 8 TOTAL HOURS ON BOARD: 252 Printed: 9/8/204 7:34:6AM

24 Page 3 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU , ,384.9 DIESEL, RIG FUEL gal 958,503 MATERIALS/CONSUMPTION SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/8/204 7:34:6AM

25 Page of 3 UNIVERSITY 4 TAYLOR DRAW 30HU , , RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 6.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 ERIC TAYLOR / JASON GAMEL ROY ALAN DE NAPOLI DOL.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 6,005 80,57 DCC: DCC: DCC: 6,005 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/8/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 80,57 NEXT 3,257.0 INC 0.40 AZM ft ,520.0 ft CURRENT OPERATIONS: JET & CLEAN PITS, TRANSFER SPRAYBERRY TO PITS 24 HR SUMMARY: DRILL AHEAD IN INTERMEDIATE, C/O DOGS/BOLTS ON TDS STRONG BACK, DRILL AHEAD IN INTERMEDIATE 24 HR FORECAST: DRILL TO 3637', CIRC. BTM UP, SHUT DOWN, JET & CLEAN PITS, TRANSFER SPRABERRY MUD TO PITS, DISPLACE BRINE WATER FROM HOLE, DRILL AHEAD IN INTERMEDIATE OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :30.50 INT-DRL DRLG PP DRILL F/ T/2470 ( 56'/HR, WOB-20, RPM-60, TQ-8/0, GPM-600) :30 4: INT-DRL CIRC PN TD REPLACE BOLTS ON TDS STRONG BACK 4:30 2: INT-DRL DRLG PP DRILL F/ T/ '/HR, WOB-20, RPM-60, TQ-8/0, GPM-600) 2:00 2: INT-DRL RIGSER PP RIG SERVICE 2:30 9: INT-DRL CIRC PN TD C/O DOGS & BOLTS ON TDS STRONG BACK 9:30 0: INT-DRL DRLG PP DRILL F/ T/ '/HR, WOB-20, RPM-60, TQ-8/0, GPM-600) = Total Hours Today 06:00 UP :00-05:00 F/ 3260' T/ '/HR, WOB-20, RPM-60, TQ-8/0, GPM-600) 05:00-06:00 CIRC. BTM UP, JET & CLEAN PITS BHA OF SERVICE LAST 3257'=.4 BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R 2 / Hughes 506X x / WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG 2/ /30.0 / , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 65 TOTAL RPM: 76 CUM ROP Printed: 9/9/204 4:43:29AM

26 Page 2 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU , , VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: 0.0 % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Brine Cl Ca H2S /2 2/3 / / / , Density (ppg ) 0.0 PP DAILY COST 0 CUM COST 0 %OIL 0.00 % H2O BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH KCL LGS (kip) 65.0 (kip) 40.0 (kip) 60.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Survey Tools TELEDRIFT Adjustable Housing BICO PDM PDC Bit 2.25 HUGHES 506X APACHE SURVEY TYPE DEG ( ) AZI ( ) TVD NORMAL 3, , NORMAL 2, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H STROKE MUD PUMPS/HYDRAULICS LINER SPP: AV(DP): AV(DC): HP: (hp/in²) SPR PPSR PERSONNEL DATA COMPANY QTY COMPANY QTY HORIZON MUD GREENES CONSULTING EPI CONSULTING EDS PATTERSON-UTI DRILLING DIESEL, RIG FUEL gal 443 7,254 MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 6 TOTAL HOURS ON BOARD: 228 Printed: 9/9/204 4:43:29AM

27 Page 3 of 3 UNIVERSITY 4 TAYLOR DRAW 30HU , , SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/9/204 4:43:29AM

28 Page of 2 UNIVERSITY 4 TAYLOR DRAW 30HU , , , RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 7.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 ERIC TAYLOR / JASON GAMEL ROY ALAN DE NAPOLI DOL 2.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 47, ,042 DCC: DCC: DCC: 47,885 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/9/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 849,042 NEXT 4,677.0 INC 0.30 AZM ft ,520.0 ft CURRENT OPERATIONS: DRILL 4850' 24 HR SUMMARY: DRLG IN INTERMEDIATE, JET & CLEAN PITS, TRANS. SPRABERRY TO PITS, DISP. HOLE, DRLG IN INTERMEDIATE 24 HR FORECAST: DRLG IN INTERMEDIATE OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 5: INT-DRL DRLG PP DRILL F/ 3260' T/ 3637' 68'/HR, WOB-20, RPM-60, TQ-8/0, GPM-600 ) 5:00 6:00.00 INT-DRL CIRC PP PUMP SWEEP & CIRC HOLE CLEAN 6:00 2: INT-DRL DPLACE PP JET PITS, CLEAN, FILL WITH SPRAYBERRY & DISP HOLE W/8.8 PPG/65 VISC SPRAYBERRY WBM 2:30 8: INT-DRL DRLG PP DRILL F/ T/40 78'/HR, WOB-25, RPM-60, TQ-8/0, GPM-600 8:30 9:30.00 INT-DRL RIGSER PP RIG SERVICE 9:30 0: INT-DRL DRLG PP DRILL F/40 - T/ '/HR, WOB-25, RPM-60, TQ-8/0, GPM = Total Hours Today 06:00 UP :00-06:00 DRILL F/ 4350' T/ 4850' 83'/HR, WOB-25, RPM-60, TQ-8/0, GPM-600) LAST 4677' =.3 DEG BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN BHA OF SERVICE I-O-D-L-B-G-O-R 2 / Hughes 506X x / WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG 2/ /30.0 / , , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 55 TOTAL RPM: 55 VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: 0.0 % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel Cl Ca H2S KCL CUM ROP /20 9/35 / / /0.30 0, Density (ppg ) 8.80 PP DAILY COST 0 CUM COST 0 %OIL 0.00 % H2O LGS Printed: 9/20/204 4:47:3AM

29 Page 2 of 2 UNIVERSITY 4 TAYLOR DRAW 30HU , , , BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH (kip) 80.0 (kip) 70.0 (kip) 75.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Survey Tools TELEDRIFT Adjustable Housing BICO PDM PDC Bit 2.25 HUGHES 506X APACHE SURVEY TYPE DEG ( ) AZI ( ) TVD NORMAL 4, , NORMAL 4, , NORMAL 3, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H STROKE MUD PUMPS/HYDRAULICS LINER SPP: AV(DP): AV(DC): HP: (hp/in²) SPR PPSR PERSONNEL DATA COMPANY QTY COMPANY QTY HORIZON MUD GREENES CONSULTING EPI CONSULTING EDS PATTERSON-UTI DRILLING DIESEL, RIG FUEL gal 437 5,87 MATERIALS/CONSUMPTION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 6 TOTAL HOURS ON BOARD: 228 RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/20/204 4:47:3AM

30 Page of 2 UNIVERSITY 4 TAYLOR DRAW 30HU , ,70.0 6, RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 8.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 ERIC TAYLOR / JASON GAMEL ROY ALAN DE NAPOLI DOL 3.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 40, ,377 DCC: DCC: DCC: 40,335 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/20/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 889,377 NEXT 6,287.0 INC 0.60 AZM ft ,520.0 ft CURRENT OPERATIONS: DRILL 6602' 24 HR SUMMARY: DRLG IN INTERMEDIATE 24 HR FORECAST: DRLG IN INTERMEDIATE OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 9: INT-DRL DRLG PP DRILL F/ T/552 89'/HR, WOB-25/30, RPM-55, TQ-0/2, GPM-550) 9:00 9: INT-DRL CIRC PP 40 & CLEAN OUT SHAKER TROUGH 9:30 5: INT-DRL DRLG PP DRILL F/552 - T/ '/HR, WOB-25/30, RPM-55, TQ-0/2, GPM-550) 5:30 6: INT-DRL CIRC PN MP CIRC & C/O SWAB ON #2 MUD PUMP 6:00 7:00.00 INT-DRL DRLG PP DRILL F/ T/572 64'/HR, WOB-25/30, RPM-55, TQ-0/2, GPM-550) 7:00 7: INT-DRL DRLG PP RIG SERVICE 7:30 0: INT-DRL DRLG PP DRILL F/572 - T/670 69'/HR, WOB-25/30, RPM-55, TQ-0/2, GPM-550) = Total Hours Today 06:00 UP :00-06:00 DRILL F/670 - T6602' 72'/HR, WOB-25/30, RPM-55, TQ-0/2, GPM-550 LAST 6287=.6 BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN BHA OF SERVICE I-O-D-L-B-G-O-R 2 / Hughes 506X x / WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG 2/ /30.0 / , , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 55 TOTAL RPM: 52 VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel Cl Ca H2S KCL CUM ROP /0 5/ / /0.30 2,500.7 Density (ppg ) 8.90 PP DAILY COST 0 CUM COST 0 %OIL % H2O LGS Printed: 9/2/204 4:40:3AM

31 Page 2 of 2 UNIVERSITY 4 TAYLOR DRAW 30HU , ,70.0 6, BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH (kip) (kip) (kip) (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub X-OVER /2 IF Drill Collar 6" DC /2 XH Crossover Sub X-OVER /2 XH Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Drill Collar 8" DC Integral Blade Stabilizer 2.25 IBS Survey Tools TELEDRIFT Adjustable Housing BICO PDM PDC Bit 2.25 HUGHES 506X APACHE SURVEY TYPE DEG ( ) AZI ( ) TVD NORMAL 6, , NORMAL 5, , NORMAL 5, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H STROKE MUD PUMPS/HYDRAULICS LINER SPP: AV(DP): AV(DC): HP: (hp/in²) SPR PPSR PERSONNEL DATA COMPANY QTY COMPANY QTY HORIZON MUD GREENES CONSULTING EPI CONSULTING EDS PATTERSON-UTI DRILLING DIESEL, RIG FUEL gal 678 4,39 MATERIALS/CONSUMPTION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 6 TOTAL HOURS ON BOARD: 228 RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 9/2/204 4:40:3AM

32 Page of 2 UNIVERSITY 4 TAYLOR DRAW 30HU , , , RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3, PLANNED DOW 8.00 (days) DFS 9.20 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :00 ERIC TAYLOR / JASON GAMEL ROY ALAN DE NAPOLI DOL 4.66 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SE DISTRICT - TX CZ TEXAS UPTON AFE # DH DESCRIPTION: D&C A HZ UPPER WC WELL TO 3,650' DEFAULT DATUM / ELEVATION RKB/RT / 2,736.6 LAST SURVEY AFE COSTS DAILY COSTS 40,30 929,678 DCC: DCC: DCC: 40,30 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 9/2/204 UPPER WOLFCAMP LAST CSG SHOE TEST (EMW) LAST CUMULATIVE COSTS 929,678 NEXT 7,53.0 INC 0.70 AZM ft ,520.0 ft CURRENT OPERATIONS: L/D DRILL COLLARS 24 HR SUMMARY: DRILL IN INTERMEDIATE, 9:00,CIRC & DROP GYRO, P.O.O.H 24 HR FORECAST: L/D DRILL COLLARS, RUN 9 5/8 CSG, CMT OPERATION SUMMARY From To Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 9: INT-DRL DRLG PP DRILL F/670 - T/7530 7'/HR, WOB-25/30, RPM-55, TQ-0/2, GPM-550) 9:00 9: INT-DRL M_TDINT PP 9:00 9:00 22: INT-DRL CIRC PP PUMP 2-40 BBL SWEEPS & CIRC HOLE CLEAN, DROP GYRO. 22:30 0:00.50 INT-DRL TRIP PP PUMP SLUG & P.O.O.H F/ 7530' T/ = Total Hours Today :00-02:00 P.O.O.H F/ 6675' T/ 3645' ( NO DRAG ) 02:00-03:00 CIRC. BTMS UP 03:00-05:00 P.O.O.H F/ 3645' T/ DC'S 05:00-06:00 R/U L/D MACHINE & L/D DRILL COLLARS'S 06:00 UP BHA OF SERVICE LAST 753' =.7 BIT SIZE (in) BIT DATA MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R 2 / Hughes 506X x / WOB RPM PRESS BIT OPERATIONS P BIT 24 Hr PROG 24 HR ROP CUM CUM PROG 2/ /30.0 / , , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 55 TOTAL RPM: 52 VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: 0.0 % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel Cl Ca H2S KCL CUM ROP /4 7/27 / / /0.40 7, Density (ppg ) 8.90 PP DAILY COST 0 CUM COST 0 %OIL 0.00 % H2O LGS Printed: 9/22/204 4:30:07AM

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE HM150 150MT DRILLING RIG HUISMAN PRODUCT BROCHURE M150 ENERAL INTRODUCTION 02 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves,

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

Rig 90. Rig 97. Future Technology From NOV

Rig 90. Rig 97. Future Technology From NOV Rig 90 Rig 97 Future Technology From NOV 1 - The Masts - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 2 - The Substructures - - - - - - - - - - - - - - - - - - - - - - - - - 2 3 - The

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 4 Brand Taylor Power: 500 HP Year: 2004 Double Drum: Drawworks and Sandline Drums : Self-propelled Land Rig

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Megaton Impact Tools optimize your drilling operations. Megaton Impact Tools Ulti-Torq high-torque, double shoulder connections Involute spline design High-strength steel developed

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

OilRigsNow.com Houston,TX USA (713)

OilRigsNow.com Houston,TX USA (713) Current DRAWWORKS: WILSON Mogul Single Drum Drawworks S/N 5131, Lebus Grooved f/ 1-1/8 Line, WILSON Torcair Brake, FOSTER/AMERICAN Catheads, Air Drillers Control Console, Crown-O-Matic. COMPOUND: EMSCO

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

Oil Rigs Now Houston, Texas

Oil Rigs Now Houston, Texas Oil Rigs Now Houston, Texas 713-570-6450 sales@oilrigsnow.com DRAWWORKS: DRILLMASTER 1200M New (2009) Single Drum Drawworks, 1,200 Hp Lebus grooved for 1-1/4 Drilling Line, Hydraulic operated Makeup &

More information

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D.

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D. LOADCRAFT INDUSTRIES, LTD. WE BUILD RIGS. L O A D C R A F T I N D U S T R I E S, LT D. RIGS drawworks WORKOVER mud systems PARTS/SERVICE (80 0 ) 8 0 3-018 3 3811 N. BRIDGE B R A D Y, T E X A S 7 6 8 2

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Oil Rigs Now Houston, Texas

Oil Rigs Now Houston, Texas Oil Rigs Now Houston, Texas 713-570-6450 DRAWWORKS: SUPERIOR 1000M New (2006) Single Drum Drawworks, 1,000 Hp Lebus grooved for 1-1/4 Drilling Line, Air operated Makeup & Breakout Catheads, Over-Running

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information