DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

Size: px
Start display at page:

Download "DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:"

Transcription

1 OXY INC Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: 0 ft Rig: 0 ft Progress: Rot Today: Avg ROP Today: H&P ft hr 0.0 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Lithology: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: $6,636 $6,636 $2,000,000 RIGGING DOWN MISC. EQUIPMENT, PREPARING TO MOVE RIG PICK UP RIG AT 18:00, CONTINUE RIGGING DOWN EQUIPMENT AND PREP DERRICK FOR SCOPE DOWN, SCOPE DOWN DERRICK CONTINUE RIGGING DOWN EQUIPMENT AND MOVE RIG TO VAQUERO UL 3221 CASINGWELL CONTROL PERSONNEL CARLTON COOLEY CODY SIRMONS JANICE CHIU Geologist: Oxy Personnel: 2 Contractor Personnel: 11 Total on Site: 13 HOOKLOAD & TORQUE Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: MD Incl Azi HYDRAULICS Pump Rate: 0.0 Pump Press: 0 TVD SURVEY DATA (LAST 6) N-S E-W MUD GAS Avg Max Conn: Trip: Backgr: VS DLS Build BIT RECORD Size Manufacturer Model Serial No IADC Nozzles MD In MD Out I-O-D-L B-G-O-R Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI Engineer: Sample From: Mud : Time MD: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: VG Meter: Comments: MUD DATA - MBT: ph: Pm Pom: Pf Mf: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss: Fluid Disch: Daily Mud Cost: Cum Mud Cost: 0.0 $0 $0 LAST OR CURRENT BHA Component OD ID Jts Length MUD PRODUCTS Product Number of Units Qty Used Units :58:46AM Page 1 of 2

2 OXY INC Report No: 1 From To OPERATIONS eration Details 18:00 22: MIRU LOCMOV RD P CONTINUE RIGGING DOWN AND STAGING EQUIPMENT FOR LOAD OUT. DRESS OUT AND PREPARE TO LOWER DERRICK 22:00 23: MIRU LOCMOV RD P CONDUCT PJSM WITH H&P SUPERINTENDENT AND OXY DSM WITH CREW ON LOWERING DERRICK AT NIGHT. LOWER DERRICK AND CATCH ON TRUCK. 23:00 0: MIRU LOCMOV RD P CONTINUE DRESSING OUT DERRICK WHILE LOWERED AND ON CATCH TRUCK FOR SEPERATION TOMORROW Total Time 6.00 OPERATIONS - NEXT DAY From To eration Details Total Time Safety Incident? N Environ Incident? N Days since Last RI: Days since Last LTA: Incident Comments: NO INCIDENTS, ACCIDENTS, OR POLLUTION IN LAST 24 HOURS. Other Remarks: Weather Comments: Directions to Vaquero UL #3221 From Fort Stocton, Texas, (Interstate 10 & FM1053), go East on Interstate 10 for 12.4 miles (Exit #272), the go south on University Rd (2.2 miles), the road will jog left for.5 miles then turn back South and travel (3.4 miles), Turn right and go West (2.6 Miles), Turn right and follow the road north to location (400 ft) LIFE FLIGHT COORDINATES: LAT LONG NAD 27 FLIGHT FOR LIFE AIR FLIGHT OXY DSM TRAILER: UNSAFE ACTS: 1 SAFE ACTS: 0 UNSAFE EQUIPMENT: 1 SWA'S:0 NEAR MISSES: 0 JSA'S: 3 SAFETY MEETINGS: 3 LOTO'S: 0 PERMITS TO WORK : 0 POWER LINE CHECKLIST: PRE SPUDRIG INSPECTION: HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED EMPLOYEE NOT USING THREE POINT CONTACT WALKING UP STAIRS. STOPPED AND EXPLAINED HAZARDS NOT USING THREE POINT CONTACT. HE UNDERSTOOD AND JOB CONTINUED WITHOUT INCIDENT :58:46AM Page 2 of 2

3 OXY INC Report No: 4 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: Engineer: 0 ft Rig: 0 ft Progress: 0 ft Rot Today: Avg ROP Today: RUSTLER@97.0 H&P ft hr 0.0 fthr DRILLING AHEAD SURFACE 385' W NO RETURNS. CONTINUE RIGGING UP. STRAP AND DRIFT BHA. MU 13.5" SURFACE BHA #1. RR(33015) ROL(040115) SPUDDRILL SURFACE INTERVAL. RUN 10-34" CASING. CASINGWELL CONTROL PERSONNEL CARLTON COOLEY SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 2 Contractor Personnel 16 Total on Site: 18 HOOKLOAD & TORQUE Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: MD Incl Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: $30,723 $259,422 $2,000,000 Lithology: SAND GYPSUM DOLOMITE Azi HYDRAULICS Pump Rate: 0.0 Pump Press: 0 TVD SURVEY DATA (LAST 6) N-S E-W MUD GAS Avg Max Conn: Trip: Backgr: VS DLS Build BIT RECORD Size Manufacturer Model Serial No IADC Nozzles MD In MD Out I-O-D-L B-G-O-R Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI MUD DATA - NOV Engineer: ROSS MEYER MBT: Sample From: SUCT ph: Mud : Time MD: Spud Mud 20:00.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter: 0@3 0@6 0@100 1@200 3@300 6@600 Comments: <div>-while RIGGING UP BUILD THICK PMIX W LCM & BUILD PIT SYSTEM FOR VIS & PH ADDING LIME & SODA 0.0 lbmbbl , ppm $1,543 $2,343 LAST OR CURRENT BHA Component OD ID Jts Length MUD PRODUCTS Product Number of Units Qty Used Units Fiber Seal 1.00 each Lime 1.00 each 8.00 Mica Fine 1.00 each 1 NOV Carb Fine 1.00 each 1 NOV Gel 1.00 each 5 Soda Ash 1.00 each StarDrill AP 1.00 each 1.00 Transportation 1.00 each :50:27AM Page 1 of 3

4 OXY INC Report No: 4 OPERATIONS From To eration Details 0:00 6: MIRU LOCMOV RU P FILL MUD PITS. TEST STAND PIPE TO 1500 PSI. OK. UN-PIN ODS BOOM POLE. PERFORM OXY PRE SPUD WALK AROUND. SPOT RISERROTATING HEAD FOR WELDER. NOTE: NOTIFIED ISABEL WITH TRRC OF UP COMING SPUD, CASING RUN & 10:00 HRS, , JOB # :00 10: MIRU LOCMOV RU P RIG UP PVC LINES TO SHAKER TROUGH. BUILD SPUD MUD IN PITS. CHANGE OUT TOP DRIVE DIES. INSTALL 4.5" SAVER SUB, STABBING GUIDE. 10:30 18: MIRU LOCMOV RU P FABRICATE FLANGE & CONDUCTOR. JSA. NIPPLE UP CONDUCTOR AND WELD ON SAME. INSTALL FLOW LINE. FABRICATE FILL UP LINE AND INSTALL. RIG UP LINES TO SUPER CHOKE. 18:00 21: MIRU LOCMOV RU P INSTALL FLARE LINE. INSTALL MWD TRANSDUCER SENSOR ON STAND PIPE. CENTER CONDUCTOR WITH TURN BUCKLES. INSTALL CELLAR PUMP HOSES AND RUN HOSES TO RESERVE PIT. INSTALL MOUSEHOLE. SPOT BHA ON OFF DRILLER SIDE OF WRANGLER. STRAP SURFACE BHA #1. OXY ACCEPTED RIG FOR DAYWORK: :00 HRS. 21:30 22: MIRU SAFE PJSM P JSA. DISCUSS PICKING UP BHA WITH DIRECTIONAL, MWD, OXY DSM, H&P CREW. 22:00 0: MIRU TRIP BHA P MAKE UP 13.5" SURFACE BHA AS FOLLOWS: SMITH SDSi616 BIT 8" " UG 1.15 BEND (RPG: 0.166) 8.4' BIT TO BEND 8" SHOCK SUB IBS EXTREME MWD HANGER SUB 8" NMDC CROSSOVER (6-58" REG X 6 58" NC56) CROSSOVER ( NC56 X 4-12" XH) (6 JTS) 6.5" DRILL COLLARS (12 JTS) HWDP Total Time OPERATIONS - NEXT DAY From To eration Details 0:00 0: MIRU LOCMOV RU P SURFACE TEST MWD WITH GPMS: 450, PUMP PRESSURE: 450 PSI. OK MAKE UP 13-12" BIT. TRIP IN HOLE AND 115'. 0:30 1: SUDR DRILL MTRVER P SPUD SURFACE HOLE AT 00:30 HRS DRILL 13 12" SURF HOLE F 115' T 175'. = 60' (AVE ROP: 120 FPH) GPM: 400, ON BTM PSI: 800, OFF BTM PSI: 450, ON BTM TORQ: 4-8 K, OFF BTM TORQ: 3 K., SRPM: 50, WOB: 4-6K. NOTICED FLOW STEADILY DECREASING. NO RETURNS AT 175'. 1:00 1: SUDR CIRC CNDHOL P PUMPED (2) 25 PPB SWEEPS AROUND WITH NO SUCCESS. LCF BLEND, LCF FINE, MICA, CAL CARB. 1:30 6: SUDR DRILL MTRVER P DRILL 13 12" SURF HOLE F 175' T 385' = 210'' (AVE ROP: 40 FPH) GPM: 450, ON BTM PSI: 800, OFF BTM PSI: 450, ON BTM TORQ: 4-10 K, OFF BTM TORQ: 3 K., SRPM: 70, MMRPM: 74 WOB: 15-18K. DRILLING AHEAD WITH NO RETURNS. OCCASSIONALY HAVING TO STOP TO BUILD VOLUME IN PITS. (12) TRUCKS IN ROUTE HAULING FRESH WATER. Total Time 6.00 Safety Incident? N Environ Incident? N Incident Comments: INCIDENT - ROLLED ANKLE. Days since Last RI: Days since Last LTA Weather Comments: :50:27AM Page 2 of 3

5 OXY INC Report No: 4 Other Remarks: VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT LONG NAD 27 FLIGHT FOR LIFE OXY DSM TRAILER: NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT 10:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 20 SAFETY MEETINGS: 22 LOTO'S: 0 PERMITS TO WORK : 11 POWER LINE CHECKLIST: PRE SPUDRIG INSPECTION: HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED CREW MEMBER WITHOUT RESPIRATOR ON WHILE MIXING CHEMICALS. STOPPED EMPLOYEE AND HAD HIM PUT ON HIS RESPIRATOR. TASK COMPLETED WITHOUT INCIDENT :50:27AM Page 3 of 3

6 OXY INC Report No: 10 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 4615 ft Progress: 3813 ft Rot Today: Avg ROP Today: BRUSHY CANYON@4,570.0 CASINGWELL CONTROL Last Casing: 842ft Next Casing: 7,500ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft hr 53.5 fthr DRILL 9 78" INTERVAL T 5,000'. TRIP BHA #2 DUE TO POOR ROP. CO BHA & TIH. DRILL F 3,813' T 4,615' (AVE ROP: 53 FPH) RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT LINSAY EARLE Geologist: MICHELLE WRY Oxy Personnel: 2 Contractor Personnel 15 Total on Site: 17 Size Manufacturer HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 5.97 $71,826 $939,085 $2,000,000 Lithology: 80% SAND, 10% SHALE, 10% LIMESTONE. 2,500.0 ft-lbf 6,000.0 ft-lbf HYDRAULICS Pump Rate: Pump Press: 2765 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 4, , , , , , , , , , , , Serial No BIT RECORD IADC NATIONAL OILWELL N DSH716D-81 A M324 7x Nozzles MD In MD Out I-O-D-L B-G-O-R BAKER DP607X M323 5x15, 2x RO-S X-1-CT-PR BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV Engineer: George Daily MBT: Sample From: SUCT ph: Mud : Time MD: Cut Brine 19:00 4,185.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 11@300 15@600 Comments: <div>4283 ft at time of report and drlg ahead. Made bit trip this morning without any problems. Added 4 more drill collars to drillstring MUD PRODUCTS 0.0 lbmbbl ,000 2, $1,703 $16,030 Product Number of Units Qty Used Units Barite 1.00 each 8 Caustic Soda 1.00 each 8.00 NOV Gel 1.00 each 4.00 Soap Stick 1.00 each 7 Soda Ash 1.00 each 9.00 StarDrill NP each 1.00 LAST OR CURRENT BHA BHA No: 3 : 3 MD In: 3854 ft Purpose: DRILL 9 78" VERTICAL HOLE MD Out: Component OD ID Jts Length HWDP DRILL COLLAR CROSSOVER NON-MAG SPIRAL DRILL COLLAR STRING STABILIZER NON-MAG SPIRAL DRILL COLLAR MULESHOE SUB FLOAT SUB STRING STABILIZER RSS (PUSH BIT) CROSSOVER FILTER SUB STRING STABILIZER Total Length: 1, ft Wt below Jars: 0.0 kip :17:35AM Page 1 of 3

7 OXY INC Report No: 10 OPERATIONS From To eration Details 0:00 3: INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 3,813' T 3,854'= 41' (AVE ROP: 14 FPH) GPM: , OFFON BTM PSI: 2, , DIFF: 280, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 30-45K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-7K. PU 154K, SO: 140K, RTWT: 143K ROP SLOWING DESPITE VARYING DRILLING PARAMETERS. CALLED FS & ENGINEER. AGREED TO PULL BHA #2 DUE TO POOR ROP IN THE LOWER CAPITAN FORMATION (3,820' 75% DOLOMITE, 25% LIMESTONE). CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 3:00 3: INDR CIRC CNDHOL PT CIRCULATE 20 BBL HI VIS SWEEP WHILE BUILDING SLUG. FLOW CHECK WELL. DSM VERIFIED WELL STATIC PUMP SLUG 3:30 6: INDR TRIP DRILL PT JSA. TOH F 3,854' '. CHECKED FOR TOP OF HWDP. WELL STATIC. CONTINUED TRIP OUT OF HOLE F 1300' T 130'. MONITOR DISPLACEMENT ON TRIP TANKS - WELL TAKING CORRECT FLUID FOR P[IPE DISPLACEMENT NO OVERPULL NOTED DURING TRIP OUT OF HOLE. 6:00 9: INDR TRIP BHA PT HANDLE BHA - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #2 - CHECK POWER V TOOL - MAKE UP BIT # 3 - BREAK & LAY OUT MTR # 2 & MU MTR # 3 BIT #2 GRADED AS FOLLOWS: 4-8-RO-S-X-1-CT-PR MAKE UP 9 78" INTERMEDIATE BHA #3 AS FOLLOWS: NOV DSH716D-81 W 7 x 14'S FOR JETS TFA: SN: A (BIT #3, RUN #1) 2. POWER DRIVE 675 X6 CA 9 78" SLICK " STABILIZER (18" UNDER GAUGE) 4. FILTER SUB 5. CROSSOVER 6. SLB 6.75" G MUD MOTOR (REVGAL: 0.28) 7. NM STABILIZER (18" UNDER GAUGE) 8. FLOAT SUB 9. MULE SHOE 10. NMDC 11. NM STABILIZER (14" UNDER GAUGE) " NMDC 13. CROSS OVER 14. (15) 6 12" DC 15. (24) 4.5" HWDP ***NOTE*** SURFACE TEST 10 34" SHOE - GOOD TEST 9:30 11: INDR TRIP DRILL PT TIH F SURFACE TO 3203' (***NOTE*** SURFACE TEST 10 34" SHOE - GOOD TEST) MONITOR WELL ON TRIP TANKS - GAIN PROPER MUD FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK 11:00 11: INDR SRFEQ RIGUP PT PULL TRIP NIPPLE & INSTALL ROTATING HEAD INSERT 11:30 12: INDR TRIP DRILL PT FINISH TRIP IN F 3203' TO 3854' - HAD CORRECT GAIN FOR PIPE DISPLACEMENT - HOLE CONDITION - SLICK ***NOTE***FILL 5800' & WR F 5800' TO 5854' AS PRECAUTION - NO FILL NOTICED ON BOTTOM 12:00 18: INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 3,854' T 4,140'= 286' (AVE ROP: 48 FPH) GPM: 530, OFFON BTM PSI: 2, , DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 18 TO 21 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-7K. PU 162K, SO: 153K, RTWT: 157 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: :17:35AM Page 2 of 3

8 OXY INC Report No: 10 From To eration Details 18:00 0: INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 4,140'' T 4,615'= 475' (AVE ROP: 79 FPH) GPM: 530, OFFON BTM PSI: 2, , DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 18 TO 21 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-7K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 Total Time SURVEY DEPTH 4,534', INC: 0.09 DEG, AZM: , TVD: ' OPERATIONS - NEXT DAY From To eration Details 0:00 6: INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 4,615'' T 5,000'= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 2, , DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 20 TO 25 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-9K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA - SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: TVD: 4,815' Weather Comments: VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT LONG NAD 27 FLIGHT FOR LIFE OXY DSM TRAILER: NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 19 SAFETY MEETINGS: 21 LOTO'S: 0 PERMITS TO WORK : 9 POWER LINE CHECKLIST: PRE SPUDRIG INSPECTION: HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED THIRD PARTY INSIDE BUFFER ZONE WHILE PICKING UP DIRECTIONAL EQUIPMENT. STOPPED TUGGER OPERATIONS AND HAD THIRD PARTY CLEAR AREA AND DISCUSSED HAZARDS WITH EMPLOYEE LATER. PICKING UP BHA COMPLETED WITHOUT INCIDENT :17:35AM Page 3 of 3

9 OXY INC Report No: 11 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 5104 ft Progress: 4615 ft Rot Today: Avg ROP Today: BRUSHY CANYON@4,570.0 CASINGWELL CONTROL Last Casing: 842ft Next Casing: 7,500ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft 8.50 hr 57.5 fthr DRILLING 9 78" 5,341'. DRILL 9 78" INTERVAL T 5,000'. TRIP FOR MOTOR. TIH & DRILL F 5,000' - 5,104'. RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT LINSAY EARLE Geologist: MICHELLE WRY Oxy Personnel: 3 Contractor Personnel 15 Total on Site: 18 Size Manufacturer HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 6.97 $58,026 $1,021,075 $2,000,000 Lithology: 70% SAND, 25% SHALE, 15% 5,060'. 2,500.0 ft-lbf 7,500.0 ft-lbf HYDRAULICS Pump Rate: Pump Press: 2245 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 4, , , , , , , , , , , , Serial No BIT RECORD IADC SMITH MSI713HUPX JJ9852 M323 2x13, 8x Nozzles MD In MD Out NATIONAL OILWELL N DSH716D-81 A M324 7x JD-A I-O-D-L B-G-O-R X-1-CT-DTF BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV Engineer: George Daily MBT: Sample From: PIT ph: Mud : Time MD: Cut Brine 19:33 5,032.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 9@300 13@600 Comments: <div>5032 ft and TIH at time of report. Made trip today to change out locked up mud motor. Tripped back in with a Smith Bit. No MUD PRODUCTS 0.0 lbmbbl ,000 2, $1,004 $17,035 Product Number of Units Qty Used Units Lime 1.00 each NOV Salt Gel 1.00 each 5 Soap Stick 1.00 each 2 StarDrill AP 1.00 each 5.00 LAST OR CURRENT BHA BHA No: 4 : 4 MD In: 5032 ft Purpose: DRILL 9 78" VERTICAL HOLE MD Out: Component OD ID Jts Length HWDP DRILL COLLAR CROSSOVER NON-MAG SPIRAL DRILL COLLAR STRING STABILIZER NON-MAG SPIRAL DRILL COLLAR MULESHOE SUB FLOAT SUB STRING STABILIZER STEERABLE MOTOR PDC BIT Total Length: 1, ft Wt below Jars: 0.0 kip :57:45AM Page 1 of 4

10 OXY INC Report No: 11 OPERATIONS From To eration Details 0:00 6: INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 4,615' T 5,000'= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 2, , DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 20 TO 25 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-9K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 - SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: TVD: 4,815' 6:00 7: INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 5,000' T 5,032'= 32' (AVE ROP: 21 FPH) GPM: 530, OFFON BTM PSI: 2, , DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 20 TO 25 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-9K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 12, VIS: 30 - SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: TVD: 4,815' ***NOTE*** MOTOR STARTED 5020' - AFTER SEVERAL SPIKES - MTR STALLED - HAD TO SLOW PUMP RATE TO 270 GPM WITH 3500 PSI OFF BOTTOM PRESSURE 7:30 8: INDR CIRC CNDHOL PT ATTEMPT SEVERAL TIMES TO TAG BOTTOM W REDUCED PUMP RATE TO FREE MOTOR W NO SUCCESS CONTINUE CIRC WHILE CALLS MADE TO DE & FDS - DECESION MADE TO TRIP OUT 8:30 10: INDR TRIP DRILL PT TRIP OUT OF HOLE FROM 5032' TO 1318' DUE TO MTR FAILURE MONITOR DISPLACEMENT ON TRIP TANKS - WELL TAKING CORRECT FLUID FOR PIPE DISPLACEMENT NO OVERPULL NOTED DURING TRIP OUT OF HOLE. 10:30 11: INDR SRFEQ RIGUP PT PULL ROTATING HEAD INSERT & INSTALL TRIP NIPPLE 11:00 12: INDR TRIP DRILL PT TRIP OUT FROM 1318' TO DIRECTIONAL 134' MONITOR DISPLACEMENT ON TRIP TANKS - WELL TAKING CORRECT FLUID FOR PIPE DISPLACEMENT NO OVERPULL NOTED DURING TRIP OUT OF HOLE. 12:30 14: INDR TRIP BHA PT HANDLE BHA - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #3,POWER V TOOL, MUD MTR & MWD PROBE BIT #3 GRADED AS FOLLOWS: 4-4-JD-A-X-1-CT-DTF ***NOTE***AFTER GETTING OUT, NOTICED POWER V-TOOL WAS DAMAGED AND MOTOR WAS LOCKED UP - TOOK 8 K FTLBS TO TURN MTR & DRAIN SAME, ALSO BIT HAD SIGNS OF JUNK DAMAGE 14:00 14: INDR RIGMT SRVRIG PT SERVICE RIG & RELATED EQUIPMENT 14:30 15: INDR WAIT OTH PT CALLS MADE TO DE, FDS AND DISCUSSED OPTIONS - DECESION MADE TO LAY OUT POWER V & TRIP IN W STERRABLE ASSEMBLY TO FINISH DRILLIN 9 78" INTERMEDIATE HOLE STRAP TOOLS & MAKE UP NEW MWD TOOL 15:30 16: INDR SAFE PJSM PT HOLD PJSM WITH RIG CREW, PATHFINDER DIRMWD HANDS, & DSM ON PICKING UP BHA # :57:45AM Page 2 of 4

11 OXY INC Report No: 11 From To eration Details 16:00 19: INDR TRIP BHA PT MAKE UP 9 78" INTERMEDIATE BHA #4 AS FOLLOWS: SMITH MS713HUPX W 8 x 12'S & 2 x 13'S FOR JETS TFA: SN: JJ9852 (BIT #4, RUN #1) 2. SLB 6.75" G MUD MOTOR (REVGAL: 0.28) " STABILIZER (18" UNDER GAUGE) 4. FILTER SUB 5. CROSSOVER 6. SLB 6.75" G MUD MOTOR (REVGAL: 0.28) 7. NM STABILIZER (18" UNDER GAUGE) 8. FLOAT SUB 9. MULE SHOE 10. NMDC 11. NM STABILIZER (14" UNDER GAUGE) " NMDC 13. CROSS OVER 14. (15) 6 12" DC 15. (24) 4.5" HWDP ***NOTE*** SURFACE TEST MWDMTR - GOOD TEST 19:30 21: INDR TRIP DRILL PT PJSM. TIH F SURFACE TO 3,650' (***NOTE*** TEST 10 34" SHOE - GOOD TEST) 21:00 21: INDR SRFEQ RIGUP PT INSTALL ROTATING HEAD. 21:30 22: INDR TRIP DRILL PT PJSM. TIH F 3,650' TO 4,999' MONITOR WELL ON TRIP TANKS - GAIN PROPER MUD FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK MONITOR WELL ON TRIP TANKS - GAIN PROPER MUD FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK 22:00 23: INDR CIRC CNDHOL PT WASH TO BOTTOM F 4,999' - 5,032'. TAG BOTTOM AND PICK UP AND CIRCULATE W 550 GPM, SURFACE RPM: 50. SCHLUMBERGER MWD REPROGRAMMED MWD TOOL. 23:00 0: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 5,032' T 5,104'= 72' (AVE ROP: 72 FPH) GPM: , OFFON BTM PSI:1,885 2,400, DIFF: 415, SRPM: MRPM: 154 = BRPM 204, WOB: 10 TO 25 K, OFF BTM TORQ: 3K, ON BTM TORQ: 6-9K. NOTE: SLB MWD RECORDING HIGH TO SEVERE DOWNHOLE VIBRATIONS. SLB OFFSET FIELD DATA SHOWS HIGH VIBRATIONS IN AREA. CALLED OXY ENGINEERING. ADJUSTED WOB (10-20K), SRPM (45-60), FLOW RATE ( ). FOUND LOWEST DOWNHOLE VIBRATIONS WITH WOB: 16K, SRPM: 50, FLOW RATE: 530 GPM'S. PU 177K, SO: 168K, RTWT: 166 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 11, VIS: 30 Total Time SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: TVD: 4,815' :57:45AM Page 3 of 4

12 OXY INC Report No: 11 OPERATIONS - NEXT DAY From To eration Details 0:00 2: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 5,104' T 5,249'= 145' (AVE ROP: 58 FPH) GPM: 530, OFFON BTM PSI:1695 2,245, DIFF: 4-550, SRPM: 50 + MRPM: 148 = BRPM 198, WOB: 18 K, OFF BTM TORQ: 3K, ON BTM TORQ: 6-9K. ATTEMPT TO TAKE SURVEY. ABLE TO OBTAIN PU 178K, SO: 168K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 11, VIS: 30 2:30 4: INDR DRILL MTRVER PT NPT MWD - UNABLE TO OBTAIN RAW SURVEY DATA AS PER OXY REQUIREMENTS. MWD TOOL BECAME PROGRAMMED INTO AUTO CALCULATE MODE VS OXY RAW SURVEY MODE. MWD TROUBLESHOOTING WITH SCHLUMBERGER CONTROL CENTER AND UNABLE TO RE PROGRAM TOOL FROM SURFACE. CALLED OXY ENGINEERING AND DECIDED TO DRILL AHEAD WHILE SCHLUMBERGER CONTINUES TO TRY TO TROUBLESHOOT THE ISSUE. 4:00 6: INDR DRILL MTRVER PT DRILL 9 78" INTERMEDIATE HOLE F 5,249' T 5,341'= 92' (AVE ROP: 46 FPH) GPM: 530, OFFON BTM PSI:1695 2,245, DIFF: 4-550, SRPM: 50 + MRPM: 148 = BRPM 198, WOB: 18 K, OFF BTM TORQ: 3K, ON BTM TORQ: 6-9K. PU 178K, SO: 168K, RTWT: 167 K Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 11, VIS: Weather Comments: VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT LONG NAD 27 FLIGHT FOR LIFE OXY DSM TRAILER: NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 19 SAFETY MEETINGS: 21 LOTO'S: 1 PERMITS TO WORK : 6 POWER LINE CHECKLIST: PRE SPUDRIG INSPECTION: HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED TUGGER OPERATOR PREPARING TO OPERATE TUGGER AND PIPE WRANGLER. STOPPED HIM AND MADE HIM AWARE OF SIMOPS WITH THESE TWO PIECES OF EQUIPMENT. HE AGREED. 2ND EMPLOYEE HELPED RUNNING THE HOIST. THE BHA WAS PICKED UP WITHOUTH INCIDENT :57:45AM Page 4 of 4

13 OXY INC Report No: 13 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 6637 ft Progress: 5924 ft Rot Today: Avg ROP Today: LEONARD@6,370.0 CASINGWELL CONTROL Last Casing: 842ft Next Casing: 7,500ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft hr 30.3 fthr LD BHA #4 (BIT & MOTOR). DRILL 9 78" INTERVAL F 5,924' T 6,637'. RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 3 Contractor Personnel 17 Total on Site: 20 Size Manufacturer HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 8.97 $43,663 $1,114,213 $2,000,000 Lithology: MIDDLE LEONARD: 80% SHALE, 20% SAND. 3,700.0 ft-lbf 7,800.0 ft-lbf HYDRAULICS Pump Rate: Pump Press: 2355 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 6, , , , , , , , , , , , Serial No BIT RECORD IADC SMITH MSI713HUPX JJ9852 M323 2x13, 8x Nozzles MD In MD Out I-O-D-L B-G-O-R BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV Engineer: George Daily MBT: Sample From: SUCT ph: Mud : Time MD: Cut Brine 19:24 6,115.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 11@300 15@600 Comments: <div>6464 ft at time of report and drlg ahead. The last 24 hrs we have beed been drlg with WOB of 18k to 21k. We have up'ed the MUD PRODUCTS 0.0 lbmbbl ,000 2,000 Product Number of Units Qty Used Units Lime 1.00 each 7.00 NOV Salt Gel 1.00 each Soap Stick 1.00 each 1 Soda Ash 1.00 each 2.00 StarDrill NP each 5.00 LAST OR CURRENT BHA BHA No: 4 : 4 MD In: 5032 ft Purpose: DRILL 9 78" VERTICAL HOLE MD Out: Component OD ID Jts Length HWDP DRILL COLLAR CROSSOVER NON-MAG SPIRAL DRILL COLLAR STRING STABILIZER NON-MAG SPIRAL DRILL COLLAR MULESHOE SUB FLOAT SUB STRING STABILIZER STEERABLE MOTOR PDC BIT $999 $19,404 Total Length: 1, ft Wt below Jars: 0.0 kip :51:48AM Page 1 of 3

14 OXY INC Report No: 13 OPERATIONS From To eration Details 0:00 6: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 5,924' T0 6,099'= 175' (AVE ROP: 31 FPH) GPM: 530, OFFON BTM PSI: 1,790 2,250, DIFF: 460, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 21 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 193K, SO: 183K, RTWT: 189 K SLIDE: 6,005' - 6,030' TOOLFACE: 25 MAG (2.5 HRS) SLIDE FTG = 10 FPH = 14% FTG & 42% TIME CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 - SURVEY DEPTH: 5,947', INC: 3.52 DEG, AZM: TVD: 5,947.42', VS: 33' 6:00 12: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,099' T 6,234'= 135' (AVE ROP: 23 FPH) GPM: 530, OFFON BTM PSI: 1,790 2,250, DIFF: 460, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 21 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 193K, SO: 183K, RTWT: 189 K SLIDE: 6,099' - 6,119' TOOLFACE: 25 MAG (1.5 hrs); 6,193' TO 6,218' (2 HRS) SLIDE FTG = 13 FPH = 33% FTG & 58% TIME CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 - SURVEY DEPTH: 6,136', INC: 1.76 DEG, AZM: TVD: 6,135.42', VS: 33' 12:00 17: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,234' T 6,382'= 148' (AVE ROP: 27 FPH) GPM: 530, OFFON BTM PSI: 1,850 2,250, DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 198K, SO: 188K, RTWT: 194 K 17:30 18: INDR RIGMT SRVRIG P RIG SERVICE CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' 18:00 0: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,382' T 6637'= 255'' (AVE ROP: 42 FPH) GPM: 530, OFFON BTM PSI: 1,810 2,350, DIFF: 4-540, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 197K, SO: 188K, RTWT: 194 K INSTRUCTED TO INCREASE WOB F 21K TO 30-40K TO INCREASE ROP. Total Time CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' :51:48AM Page 2 of 3

15 OXY INC Report No: 13 OPERATIONS - NEXT DAY From To eration Details 0:00 1: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,637' T 6,661'= 24'' (AVE ROP: 24 FPH) GPM: 530, OFFON BTM PSI: 1,810 2,350, DIFF: 4-540, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7-9.8K. PU 197K, SO: 188K, RTWT: 194 K DRILLING AHEAD IN THE MIDDLE LEONARD WITH GOOD DIFFERENTIAL AND VARYING WOB F 30-40K TO OPTIMIZE ROP. ROP SLOWLY BEGAN TO TAPER OFF TO 0 6,661'. ATTEMPTED TO PICK UP AND RESTART BIT BUT UNABLE TO GET BACK TO BOTTOM (1' OFF BOTTOM) BEFORE THE BIT WOULD START TAKING WEIGHT. MAX DIFFERENTIAL ABLE TO OBTAIN WAS PSI. CALLED ENGINEER & FS. DECISION MADE TO TRIP BHA. CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' 1:00 2: INDR CIRC CNDHOL P CIRCULATE 20 BBL HI VIS SWEEP AROUND. BUILD SLUG WHILE CIRCULATING. JSA WITH RIG CREW AND REVIEWED TRIPPING OPERATIONS, WORKING AT HEIGHTS AND LOOK UP TO LIVE. PERFORMED FLOW CHECK. NO FLOW. 2:00 4: INDR TRIP DRILL P TRIP OUT OF THE HOLE WITH BHA #4 F 6,661' - 1,300'. MONITOR RETURNS ON TRIP TANKS. FLOW HWDP (1,373'). NO FLOW. CONTINUE TOH F 1,374' T 130'. 4:00 6: INDR P HANDLE BHA #4 - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #4,, MUD MTR & MWD PROBE Weather Comments: VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT LONG NAD 27 FLIGHT FOR LIFE OXY DSM TRAILER: NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 16 SAFETY MEETINGS: 17 LOTO'S: 0 PERMITS TO WORK : 5 POWER LINE CHECKLIST: PRE SPUDRIG INSPECTION: HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: REMOVED TRIP TANK LID TO OBSERVE FLOW FOR FLOW CHECK. COMPLETED FLOW CHECK AND DERRICKHAND WALKED OFF. STOPPED HIM AND HAD HIM COVER THE TRIP TANK TO MITIGATE THE HAZARD. CONTINUED TASK WITHOUT INCIDENT :51:48AM Page 3 of 3

16 OXY INC Report No: 14 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 7136 ft Progress: 6637 ft Rot Today: Avg ROP Today: 3RD BONE SPRING@6,957.0 CASINGWELL CONTROL Last Casing: 842ft Next Casing: 7,500ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft 1 hr 49.9 fthr DRILL 9 78" INTERMEDIATE INTERVAL TO TD. (7,521') DRILL T 6,661'. TOH TO CHANGE OUT BHA #4. MU 9 78" BHA #5. TIH & DRILL T 7,136'. RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 3 Contractor Personnel 17 Total on Site: 20 Size Manufacturer HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 9.97 $72,116 $1,188,293 $2,000,000 Lithology: 45% SHALE, 55% LIMESTONE 3,700.0 ft-lbf 7,800.0 ft-lbf HYDRAULICS Pump Rate: Pump Press: 2445 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 6, , , , , , , , , , , , Serial No BIT RECORD IADC ULTERRA DRILLING T U716M M323 4x15, 3x Nozzles MD In MD Out I-O-D-L B-G-O-R SMITH MSI713HUPX JJ9852 M323 2x13, 8x CR-N X-1-WT-PR BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV FluidControl Engineer: George Daily MBT: Sample From: PIT ph: Mud : Time MD: Cut Brine 19:41 6,660.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 5.00 VG Meter:?@6 11@300 16@600 Comments: MUD PRODUCTS Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: <div>6946 ft at time of report and drlg ahead ft this morning made trip for new bit. Changed out bit and mud motor. No problem 0.0 lbmbbl ,000 2,000 Product Number of Units Qty Used Units Barite 1.00 each 0.55 NOV Salt Gel 1.00 each 5 Soap Stick 1.00 each 1 StarDrill NP each 1.00 LAST OR CURRENT BHA BHA No: 5 : 1 MD In: 6661 ft Purpose: DRILL 9 78" VERTICAL INTERVAL MD Out: Component OD ID Jts Length HWDP DRILL COLLAR CROSSOVER NON-MAG SPIRAL DRILL COLLAR STRING STABILIZER NON-MAG SPIRAL DRILL COLLAR MULESHOE SUB FLOAT SUB STRING STABILIZER STEERABLE MOTOR PDC BIT $731 $20,357 Total Length: 1, ft Wt below Jars: 0.0 kip :27:32AM Page 1 of 3

17 OXY INC Report No: 14 OPERATIONS From To eration Details 0:00 1: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,637' T 6,661'= 24' (AVE ROP: 24 FPH) GPM: 530, OFFON BTM PSI: 1,810 2,350, DIFF: 4-540, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7-9.8K. PU 197K, SO: 188K, RTWT: 194 K DRILLING AHEAD IN THE MIDDLE LEONARD WITH GOOD DIFFERENTIAL AND VARYING WOB F 30-40K TO OPTIMIZE ROP. ROP SLOWLY BEGAN TO TAPER OFF TO 0 6,661'. ATTEMPTED TO PICK UP AND RESTART BIT BUT UNABLE TO GET BACK TO BOTTOM (1' OFF BOTTOM) BEFORE THE BIT WOULD START TAKING WEIGHT. MAX DIFFERENTIAL ABLE TO OBTAIN WAS PSI. CALLED ENGINEER & FS. DECISION MADE TO TRIP BHA. CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' 1:00 2: INDR CIRC CNDHOL PT CIRCULATE 20 BBL HI VIS SWEEP AROUND. BUILD SLUG WHILE CIRCULATING. JSA WITH RIG CREW AND REVIEWED TRIPPING OPERATIONS, WORKING AT HEIGHTS AND LOOK UP TO LIVE. PERFORMED FLOW CHECK. NO FLOW. 2:00 4: INDR TRIP DRILL PT TRIP OUT OF THE HOLE WITH BHA #4 F 6,661' - 1,300'. MONITOR RETURNS ON TRIP TANKS. FLOW HWDP (1,373'). NO FLOW. CONTINUE TOH F 1,374' T 130'. 4:00 6: INDR TRIP BHA PT HANDLE BHA #4 - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #4, MUD MTR & MWD PROBE BIT # 4 GRADED AS FOLLOWS: 8-2-CR-N-X-116-WT-PR 6:00 6: INDR SAFE PJSM PT PJSM WITH RIG CREW, PATHFINDER HANDS & DSM ON HANDLING DIRECTIONAL TOOLS 6:30 7: INDR TRIP BHA PT FINISH HANDLE BHA-LAY DOWN MUD MTR # 4 - CHANGE OUT BATTERY ON MWD RIG CREW CLEAN RIG FLOOR & PREP TO TRIP IN PJSM WITH RIG CREW, DIRECTIONAL, & DSM ON PICK UP BHABIT # 5 7:30 10: INDR TRIP BHA PT MAKE UP 9 78" INTERMEDIATE BHA #5 AS FOLLOWS: ULTERA U716M W 3 x 14'S & 4 x 15'S FOR JETS TFA: SN: (BIT #5, RUN #1) 2. SLB 6.75" G MUD MOTOR (REVGAL: 0.28) ORIENT & SCRIBE MTR W MWD - WITNESSED BY DSM " STABILIZER (14" UNDER GAUGE) 4. FLOAT SUB 5. MULESHOE 6. NMDC W MWD " NM STABILIZER (14" UNDER GAUGE) " NMDC 13. CROSS OVER 14. (15) 6 12" DC 15. (24) 4.5" HWDP ***NOTE*** SURFACE TEST MWDMTR W NO BIT- GOOD TEST 10:00 13: INDR TRIP DRILL PT TRIP IN FROM DIRECTIONAL TOOLS TO 6006' MONITOR WELL ON TRIP TANK - HAD CORRECT MUD GAIN FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK TOOK CHECK SHOTS WITH 842', 2014', 4024', & 6002' - ALL CHECK GOOD 13:00 13: INDR SRFEQ RIGUP PT REVIEW JSA'S - REMOVE TRIP NIPPLE & INSTALL ROTATING HEAD 13:30 14: INDR TRIP DRILL PT FINISH TRIP IN F 6006' TO 6571' HAD CORRECT MUD GAIN & HOLE SLICK 14:00 14: INDR REAM PRRM PT FILL PIPE & TAKE LAST CHECK SHOT W MWD WASHREAM FROM 6571' TO 6660' AS PRECATION DRILL CONE LEFT FROM CORED BIT W 1 TO 2 K ON BIT :27:32AM Page 2 of 3

18 OXY INC Report No: 14 From To eration Details 14:30 17: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,661' T 6,790'= 129' (AVE ROP: 43 FPH) GPM: 530, OFFON BTM PSI: 1,860 2,350, DIFF: 490, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.0K. PU 207K, SO: 195K, RTWT: 204 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 17:30 18: INDR RIGMT SRVRIG P RIG SERVICE. - SURVEY DEPTH: 6,701', INC: 1.49 DEG, AZM: TVD: 6700' 18:00 0: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,790' T 7,136'= 346' (AVE ROP: 58 FPH) GPM: 530, OFFON BTM PSI: 1,910 2,445, DIFF: 535, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 26 K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.9K. PU 209K, SO: 200K, RTWT: 203 K PERFORM DRILL OFF TEST IN NEW FORMATION "LOWER LEONARD". FOUND WOB: 26K, SRPM: 45 TO PRODUCE LOWEST CONSISTENT MSE RESULTS. CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 Total Time SURVEY DEPTH: 6,984', INC: 2.81 DEG, AZM: TVD: 6,983' OPERATIONS - NEXT DAY From To eration Details 0:00 6: INDR DRILL P DRILL 9 78" INTERMEDIATE HOLE F 7,136' T 7,521' TD= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 1,910 2,445, DIFF: 535, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 26 K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.9K. PU 209K, SO: 200K, RTWT: 203 K Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10.5, VIS: Weather Comments: VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT LONG NAD 27 FLIGHT FOR LIFE OXY DSM TRAILER: NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 20 SAFETY MEETINGS: 22 LOTO'S: 1 PERMITS TO WORK : 9 POWER LINE CHECKLIST: PRE SPUDRIG INSPECTION: HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: CREW MEMBER WAS IN HAMMER SWING PLANE WHILE MAKING UP A HOSE. STOPPED JOB AND MADE CREW MEMBER AWARE AND TO MOVE. JOB FINISHED WITHOUT INCIDENT :27:32AM Page 3 of 3

19 OXY INC Report No: 15 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 7521 ft Progress: 7136 ft Rot Today: Avg ROP Today: 3RD BONE SPRING@6,957.0 CASINGWELL CONTROL Last Casing: 842ft Next Casing: 7,500ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft 6.00 hr 64.2 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: $97,666 $1,277,110 $2,000,000 Lithology: 30% SHALE & 70% 7,521'. RIH W 7 58" CASING T 2,400'. DRILL 9 78" INTERMEDIATE TO TD (7,521'). TOH LAYING DOWN DP, DC'S, BHA. PULL WEAR BUSHING. RR(040115) ROL(040315) RU CASING CREW. RIH W 7" & 7 58" CASING. CEMENT SAME. PSI TEST CSG. MU BHA #6. PERSONNEL EDDIE BOND SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 2 Contractor Personnel 17 Total on Site: 19 Size Manufacturer HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model 3,500.0 ft-lbf 9,900.0 ft-lbf HYDRAULICS Pump Rate: Pump Press: 2450 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 7, , , , , , , , , , , , Serial No BIT RECORD IADC ULTERRA DRILLING T U716M M323 4x15, 3x CT-S X-I-NO-TD Nozzles MD In MD Out I-O-D-L B-G-O-R SMITH MSI713HUPX JJ9852 M323 2x13, 8x CR-N X-1-WT-PR BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV Engineer: George Daily MBT: Sample From: PIT ph: Mud : Time MD: Cut Brine 18:54 7,521.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 9@300 13@600 Comments: <div>td the intermediate 7521 ft. At TD we ran 2 high vis sweeps and circ bottoms up to ensure clean hole. TOOH laying MUD PRODUCTS 0.0 lbmbbl ,000 2, $587 $20,943 Product Number of Units Qty Used Units Lime 1.00 each 2.00 NOV Salt Gel 1.00 each 5 Soda Ash 1.00 each 3.00 StarDrill NP each 1.00 LAST OR CURRENT BHA BHA No: 5 : 5 MD In: 6661 ft Purpose: DRILL 9 78" VERTICAL INTERVAL MD Out: 7521 ft Component OD ID Jts Length HWDP DRILL COLLAR CROSSOVER NON-MAG SPIRAL DRILL COLLAR STRING STABILIZER NON-MAG SPIRAL DRILL COLLAR MULESHOE SUB FLOAT SUB STRING STABILIZER STEERABLE MOTOR PDC BIT Total Length: 1, ft Wt below Jars: 0.0 kip :57:06AM Page 1 of 4

20 OXY INC Report No: 15 OPERATIONS From To eration Details 0:00 6: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 7,136' T 7,521' TD= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 1,910 2,445, DIFF: 535, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 26 K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.9K. PU 209K, SO: 200K, RTWT: 203 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10.5, VIS: 30 CLOSE IN SYSTEM TO MUD 05:30 HRS 6:00 7: INDR CIRC CNDHOL P CIRCCOND WELL FOR RUNNING INTERMEDIATE CSG - CIRC HI VIS SWEEP W NUT 7:00 7: INDR WLCNTL CHKFLOW P CHECK FOR FLOW - WELL STATIC PLUG FOR HOLE CALIPER SURFACE TO SURFACE CALCULATED = 7231 STKS SHAKERS = 9550 STKS WASH OUT 32 % 7:30 8: INDR CIRC CNDHOL P CIRCCOND WELL FOR RUNNING INTERMEDIATE CSG - 2ND BTMS UP PUMP SLUG 8:00 8: INDR TRIP DRILL P TRIP OUT FROM 7521' TO 6571' RACKING BACK PIPE IN DERRICK WELL TAKING PROPER FILL FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK 8:30 14: INDR TRIP PULD P CONTINUE TRIPPING OUT FROM 6571' TO 2355' LAYING DOWN 4 12" DRILL PIPE WELL TAKING PROPER FILL HOLE CONDITION: SLICK NOTE: CSG CREW ARRIVED ON LOCATION *NOTIFIED TRRC OF CASING & CEMENTING OF INTERMEDIATE CASING. SPOKE WITH 08:30 HRS. 14:00 14: INDR SRFEQ RIGUP P REVIEW JSA'S - REMOVE ROTATING HEAD & INSTALL TRIP NIPPLE 14:30 15: INDR TRIP PULD P CONTINUE TRIPPING OUT FROM 2355' TO 1292 LAYING DOWN 4 12" DRILL PIPE WELL TAKING PROPER FILL & HOLE SLICK 15:30 16: INDR TRIP DRILL P TRIP IN HOLE FROM 1292' TO 2235' WITH STANDS FROM DERRICK HAD PROPER MUD GAIN FOR PIPE DISPLACEMENT AND CAPACITY 16:00 21: INDR TRIP PULD P CONTINUE TRIPPING OUT FROM 2235' TO 108' LAYING DOWN 4 12" DRILL PIPE, 4 12" HWDP, & 6 12" DCS. NOTE: PIPE TIGHT. HAD TO WARM BOXES UP WITH HAMMER. WELL TAKING PROPER FILL HOLE CONDITION: SLICK 21:00 23: INDR TRIP DRILL P HANDLE BHA #5 - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #5, MUD MTR & MWD PROBE. NO SQUAT IN MOTOR. BIT # 5 GRADED AS FOLLOWS: 1-1-CT-S-X-I-NO-TD 23:00 23: INDR TRIP BHA P CLEAN RIG FLOOR. LAY DOWN ALL 4.5" HANDLING TOOLS OFF FLOOR. 23:30 0: INDR SRFEQ RIGUP P PULL WEAR BUSHING. Total Time :57:06AM Page 2 of 4

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures IADC Southern Arabian Peninsula Chapter February 15 th, 2018 Top Drive Automation Overcoming Inefficiencies

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A 4.2 Formation Multi-Test (FMT) Analysis Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A summary 6. DRILL STEM TESTING A dual

More information

Successful New Technology Introduction and Applications of Rotary Steerable System.

Successful New Technology Introduction and Applications of Rotary Steerable System. Successful New Technology Introduction and Applications of Rotary Steerable System. Mohammed Ibrahim Schlumberger Copyright 2003, MPC 2004 This paper was prepared for the 8th MEDITERRANEAN PETROLEUM CONFERENCE

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

SPE Distinguished Lecturer Program

SPE Distinguished Lecturer Program SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully acknowledges the companies that support this

More information

Motor Handbook. 4th Edition Ver. 1.0a ALL RIGHTS RESERVED. Issue Date; December 23, 2013 Wenzel Downhole Tools

Motor Handbook. 4th Edition Ver. 1.0a ALL RIGHTS RESERVED.  Issue Date; December 23, 2013 Wenzel Downhole Tools MOTOR HANDBOOK Motor Handbook 4th Edition Ver. 1.0a Issue Date; December 23, 2013 Wenzel Downhole Tools ALL RIGHTS RESERVED The information contained in this manual is provided for informational and illustration

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information

Section 1 - General Data. Mud. Hole Size (in) Interval (mmd BRT) Mud Type Mud Weight (SG) 9 7/ Seawater w/ hi-vis 1.

Section 1 - General Data. Mud. Hole Size (in) Interval (mmd BRT) Mud Type Mud Weight (SG) 9 7/ Seawater w/ hi-vis 1. Section - General Data l3-9s T2 Mud Hole Size (in) Interval (mmd BRT) Mud Type Mud Weight (SG) 9 78 9-050 Seawater w hi-vis 3 sweeps 36 (HO) 9-65 Seawater w hi-vis 3 sweeps 7 V 2 65-050 Seawater w hi-vis

More information

Ashmin HammR Drill Motor

Ashmin HammR Drill Motor Ashmin HammR Drill Motor By: Dr. Gunther (Doc) Tuesday, September 12 th, 2017 Research. Innovate. Test. Deploy. Agenda Drilling Challenges Alternative Designs Drilling Hammer Trends Ashmin HammR Drill

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

Gyrodata Incorporated

Gyrodata Incorporated Gyrodata is an independent supplier and service provider delivering precision wellbore placement and evaluation solutions for drilling, completions and production challenges. Since 1980, we have been partnering

More information

Gyrodata Incorporated

Gyrodata Incorporated Gyrodata is an independent supplier and service provider delivering precision wellbore placement and evaluation solutions for drilling, completions and production challenges. Since 1980, we have been partnering

More information

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved

More information

Daily Drilling Report

Daily Drilling Report Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Latest Advancements in DrillString Mechanics

Latest Advancements in DrillString Mechanics Services, Trainings, Softwares Latest Advancements in DrillString Mechanics SPE Gulf Coast Section 03/09/2016 Stephane Menand, Ph.D. stephane.menand@drillscan.com 1 DrillScan Intro Directional Drilling

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET. RKB-MSL: 18m RIG: WEST ALPHAk FORMATION PRESSURE SO<PSIA) SOXPSIA) HP(PSIA) NORMAL TEST ,1 5776,3

SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET. RKB-MSL: 18m RIG: WEST ALPHAk FORMATION PRESSURE SO<PSIA) SOXPSIA) HP(PSIA) NORMAL TEST ,1 5776,3 Well 7-9 Formation Pressures (RFT) r i WELL NO: 7-9 PRESSURE UNITS: PSIA SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET RKB-MSL: 8m RIG: WEST ALPHAk PAGE OF: WITNESSED BY: BAa & TOR DATE: -9 RUN* A TEST* DEPTH

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation 2/5/2013 Roger L. Schultz TTS Drilling Solutions Presentation Overview Frictional Forces, Vibratory

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009NTCE-04-01 DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS

More information

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements AADE-03-NTCE-49 Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements Copyright 2003 AADE Technical Conference

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Megaton Impact Tools optimize your drilling operations. Megaton Impact Tools Ulti-Torq high-torque, double shoulder connections Involute spline design High-strength steel developed

More information

POWR Series. Performance and Steerable Drilling Motors

POWR Series. Performance and Steerable Drilling Motors POWR Series Performance and Steerable Drilling Motors Drilling Reliable. Innovative. Premium. We are proud of our products and their contribution to the downhole drilling and thru-tubing industries. Research

More information

Mitigating Bit-Related Stick-Slip With A Torsional Impact Hammer

Mitigating Bit-Related Stick-Slip With A Torsional Impact Hammer AADE-11-NTCE-10 Mitigating Bit-Related Stick-Slip With A Torsional Impact Hammer Ryan Wedel, Shaun Mathison, and Greg Hightower, Ulterra Drilling Technologies, Craig Staley, Chesapeake Energy Copyright

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #: MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:

More information

AxeBlade. Ridged diamond element bit

AxeBlade. Ridged diamond element bit AxeBlade Ridged diamond element bit Instantaneous ROP Improvement. Better Steerability. The AxeBlade* ridged diamond element bit positions Axe* elements along the bit face to achieve increased ROP and

More information

CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS

CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS Authors: Erik Andreas Løken (UiS) & Suranga C.H. Geekiyanage (UiS) Co-Authors: Dan Sui (UiS) & Robert

More information