Callon Petroleum Company Drilling Report

Size: px
Start display at page:

Download "Callon Petroleum Company Drilling Report"

Transcription

1 LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: Drilling Report CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS. HES Risks Next 4 hrs: ELECTRICAL HAZARDS Lay Derrick Over and Rig Down Cactus CASING OD WT GRD RIG: 56 CURRENT ACTIVITY: Waiiting on daylight DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G HYDRAULICS DATA PUMP MAKE MODEL LINER STK DP CAP SPM PSI GPM GPS ANN CAP EFF% AVDP KOP AVDC HSI ECD CONSISTS OF: LENGTH ROT. WT. SURVEY DATA ANGLE WT. AIR P.U. WT. AZIMUTH WT. MUD S.O. WT. N/S COORDINATES HRS. ON JARS TORQUE E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS ACTIVITY 6:00 0: Rigup /Tear Dwn 0:00 6: Other DIESEL FUEL (GALS) ACCIDENTS: Rig down, start moving misc. rig, R/D Floor remove top houses. Attempt to lay derrick over unable to get derrick shoe pins out, use porta- power and apply pis. w/o success. Install rig walker cylinder in attempt to level rig, still unable to remove pin. Will install two on ODS in attempt to knock pin out at daylight. Shut down for night TOTAL MAN HRS: 907 None Crane arrived at 5:30 TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 76,300 Daily Intangible: $ 76,300 Cum Intangible: $ 76,300 Daily Tangible: $ Cum Tangible: $ Daily Mud: $ Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 76,300 07/5/04

2 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 7/5/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 4 Cactus Rig Manager 4 4 Cactus Rig Crews Butch's Rig Move Pro Tech Pipe Inspection 3 Omron Operating System Tech FP USA Rental Equipment 6 6 Express Location Liner Misc. Sales Butch's Rathole Set Consuctor 3 Penn Construction Location Building Lobos Haul Brine Lobos Haul OBM Mustang Rst. Lay Water line FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

3 LEASE: PARISH /STATE: SPUD 7/6/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 46 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: Drilling Report CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE Continue moving out and Rigging up. Cactus CASING OD WT GRD RIG: 56 CURRENT ACTIVITY: Shut Down for Night DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G HYDRAULICS DATA PUMP MAKE MODEL LINER STK DP CAP SPM PSI GPM GPS ANN CAP EFF% AVDP KOP AVDC HSI ECD CONSISTS OF: LENGTH ROT. WT. SURVEY DATA ANGLE WT. AIR P.U. WT. AZIMUTH WT. MUD S.O. WT. N/S COORDINATES HRS. ON JARS TORQUE E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS 6:00 : ACTIVITY Rigup /Tear Dwn DIESEL FUEL (GALS) TOTAL MAN HRS: ACCIDENTS: Rig Down and Load out. Wash crew set up cleaning outbound loads off location. Removed ODS derrick 0;830 by leveling rig. 8 loads left on Pembrook Location,594 None TOTAL HRS 5.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 30,800 Daily Intangible: $ 30,800 Cum Intangible: $ 07,00 Daily Tangible: $ Cum Tangible: $ Daily Mud: $ Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 07,00 07/6/04

4 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 7/6/04 TOTAL HRS 5.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 48 Cactus Rig Manager 4 48 Cactus Rig Crews 68 3 Butch's Rig Move Pro Tech Pipe Inspection 3 7 Omron Operating System Tech FP USA Rental Equipment 7 Express Location Liner 35 Misc. Sales 6 Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line 3 FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

5 LEASE: PARISH /STATE: SPUD 7/7/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 47 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 3 Drilling Report CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE Raise Derrick, Continue to Rig Up Cactus CASING OD WT GRD RIG: 56 CURRENT ACTIVITY: Shut Down for Night DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G HYDRAULICS DATA PUMP MAKE MODEL LINER STK DP CAP SPM PSI GPM GPS ANN CAP EFF% AVDP KOP AVDC HSI ECD CONSISTS OF: LENGTH ROT. WT. SURVEY DATA ANGLE WT. AIR P.U. WT. AZIMUTH WT. MUD S.O. WT. N/S COORDINATES HRS. ON JARS TORQUE E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS 6:00 8:00.0 ACTIVITY Rigup /Tear Dwn DIESEL FUEL (GALS) TOTAL MAN HRS: ACCIDENTS: Move Camps and set in, Load out remaining rig equipment, clean location, set subs and center over hole, Set in center steel, set drawworks and drill line spool, pin derrick, Replace hoist lines, prep derrick to raise, pin service tray arms to rig. Hook up electric lines to VFD. Hook up gen package.,06 None 8:00 6:00.0 Rigup /Tear Dwn Shut Down for Night TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 30,800 Daily Intangible: $ 30,800 Cum Intangible: $ 37,900 Daily Tangible: $ WELL: University 7-34 #LH Cum Tangible: $ Daily Mud: $ Cum Mud: $ WellEz Information Management, LLC Ver bg REPORT 37,900 07/7/04

6 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 7/7/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 7 Cactus Rig Manager 4 7 Cactus Rig Crews Butch's Rig Move Pro Tech Pipe Inspection 3 08 Omron Operating System Tech FP USA Rental Equipment 7 Express Location Liner 35 Misc. Sales 6 Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line 3 FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

7 LEASE: PARISH /STATE: SPUD 7/8/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 48 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 4 Drilling Report CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE Continue to R/U, Spud and Drill to +/- 650 ft. Cactus CASING OD WT GRD RIG: 56 CURRENT ACTIVITY: Shut down for night DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G HYDRAULICS DATA PUMP MAKE MODEL LINER STK DP CAP SPM PSI GPM GPS ANN CAP EFF% AVDP KOP AVDC HSI ECD CONSISTS OF: LENGTH ROT. WT. SURVEY DATA ANGLE WT. AIR P.U. WT. AZIMUTH WT. MUD S.O. WT. N/S COORDINATES HRS. ON JARS TORQUE E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS 6:00 9: ACTIVITY Rigup /Tear Dwn DIESEL FUEL (GALS) 3,700 TOTAL MAN HRS:,434 Rig Up, 00% Set In, 75% R/U Butch's Trucks and Cranes 9:00 hrs. ACCIDENTS: None 9:00 6:00.0 Rigup /Tear Dwn Shut Down for Night TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 76,48 Daily Intangible: $ 76,48 Cum Intangible: $ 34,38 Daily Tangible: $ WELL: University 7-34 #LH Cum Tangible: $ Daily Mud: $ Cum Mud: $ WellEz Information Management, LLC Ver bg REPORT 34,38 07/8/04

8 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 7/8/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 96 Cactus Rig Manager 4 96 Cactus Rig Crews Butch's Rig Move Pro Tech Pipe Inspection 08 Omron Operating System Tech 8 0 FP USA Rental Equipment 7 Express Location Liner 35 Misc. Sales 6 Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line 3 FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

9 LEASE: PARISH /STATE: SPUD 7/9/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 49 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 5 Drilling Report CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE Work with Omon, installing programs and re-witing, Make up Bit, Spud Cactus CASING OD WT GRD RIG: 56 CURRENT ACTIVITY: Working With OMRON DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G HYDRAULICS DATA PUMP MAKE MODEL LINER STK DP CAP SPM PSI GPM GPS ANN CAP EFF% AVDP KOP AVDC HSI ECD CONSISTS OF: LENGTH ROT. WT. SURVEY DATA ANGLE WT. AIR P.U. WT. AZIMUTH WT. MUD S.O. WT. N/S COORDINATES HRS. ON JARS TORQUE E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS 6:00 8:00.0 ACTIVITY Rigup /Tear Dwn DIESEL FUEL (GALS) -400 TOTAL MAN HRS: ACCIDENTS: R/U top drive service loop and Kelly hose. R/U hydraulic hoist on floor, R/U hydraulic cat head, Hook up electrical for pipe cat, Install Pipe cat, Finish R/U floor, add oil T.D. Replace Fuel Filters all engines, Install Shaker trough, Hook up shaker manifold and trip tank/ Work with Omron to download programs for Drawworks line speed and link tilt After downloading programs drawworks brake would not release, Got drawworks back 6:00 hrs. Top Drive grabber wouldn't work, rewrite program, still not working,78 Spool up drum, weld on conductor riser and stabilize, R/u derrick climber and slow decent line None 8:00 6:00.0 Rigup /Tear Dwn Install flow line and Extensions, R/U transfer pumps to circulate reserve pit, Hook up Pason lines, R/U bales and elevators, Calibrate Omron, R/U pipe cat and function test. Set pipe racks, continue to work with OMRON, Check line speed after last down load, Hoist now 35'/minute, Link Tilt safety feature still 65', Work on up grade program, Mud pumps not functioning due to faults, trouble shoot. While trouble shooting, black out rig, Got rig running, now nothing works again TOTAL HRS 4.0 Notified TRRC District 7 with Intent to spud and cement. Spoke with Amanda, Job # issued 670 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 3,5 Daily Intangible: $ 3,5 Cum Intangible: $ 345,553 Daily Tangible: $ WELL: University 7-34 #LH Cum Tangible: $ Daily Mud: $ Cum Mud: $ WellEz Information Management, LLC Ver bg REPORT 345,553 07/9/04

10 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 7/9/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 0 Cactus Rig Manager 4 0 Cactus Rig Crews Butch's Rig Move Pro Tech Pipe Inspection 08 Omron Operating System Tech 4 44 FP USA Rental Equipment 7 Express Location Liner 35 Misc. Sales Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

11 LEASE: PARISH /STATE: SPUD 7/30/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 50 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 6 Drilling Report CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE Install Program, Spud and drill to +/- 650 ft. Cactus CASING OD WT GRD RIG: 6 CURRENT ACTIVITY: Awaiting program change from Omron, Preparing to Spud, DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G HYDRAULICS DATA PUMP MAKE MODEL LINER STK DP CAP SPM PSI GPM GPS ANN CAP EFF% AVDP KOP AVDC HSI ECD CONSISTS OF: LENGTH ROT. WT. SURVEY DATA ANGLE WT. AIR P.U. WT. AZIMUTH WT. MUD S.O. WT. N/S COORDINATES HRS. ON JARS TORQUE E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS 6:00 6: ACTIVITY Repair Rig DIESEL FUEL (GALS) -300 TOTAL MAN HRS: ACCIDENTS: Continue working with Omron to troubleshoot programming issues. Wait on Tech. to fly in from Utah to help rewire chair. while working with Omron rack and strap R/U bulk tanks and repair blower. Pre-Spud inspection and preparations, rebuild " stand pipe valve. Drillers chair was rewired by Tech. awaiting program change from Omron. Go thru both mud pumps and change liners, swabs, valves. 3,40 None TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 30,800 Daily Intangible: $ 30,800 Cum Intangible: $ 376,353 Daily Tangible: $ WELL: University 7-34 #LH Cum Tangible: $ Daily Mud: $ Cum Mud: $ WellEz Information Management, LLC Ver bg REPORT 376,353 07/30/04

12 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 7/30/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 44 Cactus Rig Manager 4 44 Cactus Rig Crews Butch's Rig Move Pro Tech Pipe Inspection 08 Omron Operating System Tech 80 FP USA Rental Equipment 7 Express Location Liner 35 Misc. Sales 3 3 Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

13 LEASE: PARISH /STATE: SPUD 7/3/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 5 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 7 Drilling Report CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE, ROTARY SAFETY WHILE P/U PIPE AND Re time I Bop to where it will fully open and close, Cactus CASING OD WT GRD RIG: 6 CURRENT ACTIVITY: Breaking bit to get protector pieces out of jets, DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G HYDRAULICS DATA PUMP MAKE MODEL LINER STK DP CAP SPM PSI GPM GPS ANN CAP EFF% AVDP KOP AVDC HSI ECD CONSISTS OF: LENGTH ROT. WT. SURVEY DATA ANGLE WT. AIR P.U. WT. AZIMUTH WT. MUD S.O. WT. N/S COORDINATES HRS. ON JARS TORQUE E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS 6:00 0: ACTIVITY Repair Rig DIESEL FUEL (GALS) -400 TOTAL MAN HRS: Continue working with Omron trouble shooting operating system changes and download software, Fixed link tilt heights error. new usable height 80', changed out pressure sensor line. 3,373 ACCIDENTS: from MP # & to rig, pressure test back to manual I BOP valve, reprogramed torque wrench switch acceptable. None 0:00 :30.5 WOW Weight on Weather due to severe lightning :30 :30.0 P/U tools,, Bit, Motor, SS, 0' attempt. to break circulation :30 6: TOOH, found drill pipe protector off saver sub in crows foot on top of baffle plate, pull out checking motor, bit, jets for more pieces of protector. TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 65,800 Daily Intangible: $ 65,800 Cum Intangible: $ 3,53 Daily Tangible: $ WELL: University 7-34 #LH Cum Tangible: $ Daily Mud: $ Cum Mud: $ WellEz Information Management, LLC Ver bg REPORT 3,53 07/3/04

14 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 7/3/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 68 Cactus Rig Manager 4 68 Cactus Rig Crews 44 5 Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 6 FP USA Rental Equipment 7 Express Location Liner 35 Misc. Sales Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

15 LEASE: PARISH /STATE: SPUD 8//04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 5 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE, ROTARY SAFETY WHILE P/U PIPE AND TIH to 470' wash and ream thru tight spot, TOOH R/U and run casing. Cactus CASING OD WT 640 Drilling Report GRD RIG: 6 CURRENT ACTIVITY: TIH DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES 7.50 NOV TFFX59S E9487 4X4, X6 TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G DP CAP ANN CAP KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS F , F , CONSISTS OF: Bit, XO, Motor, Double Pin X-O, Shock Sub, -8: Dc, StB, 5 8" DC, XO, -6" DC,XO LENGTH WT. AIR WT. MUD ROT. WT. P.U. WT. S.O. WT. SURVEY DATA ANGLE AZIMUTH N/S EFF% AVDP AVDC HSI HRS. ON JARS TORQUE COORDINATES E/W V. SECTION DLS ECD MISCELLANEOUS DATA FROM TO HRS 6:00 6: ACTIVITY Other DIESEL FUEL (GALS) -,000 TOTAL MAN HRS: 3,670 Break Bit and clean out jets, pieces of thread protector from IBOP ACCIDENTS: None 6:30 8:30.0 Repair Rig RE-Time IBOP 8:30 9: Drilling Drlg. F/0' to 53' 9:00 9: Deviation Survey Circulate and W/L 5' =.75 Deg. 9:30 :30.0 Drilling Drlg. F/53' to 46' :30 : Deviation Survey Circulate and 46' =.50 Deg. :00 4:00.0 Drilling Drlg. F/46' to 460' 4:00 4: Deviation Survey Circulate & 45'=0.75 Deg. 4:30 6:00.5 Drilling Drlg. F/460' to 640' (Casing Point) 6:00 7:00.0 Cond Mud & Circ Circulate Hole Clean TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 30,800 Daily Intangible: $ 30,800 Cum Intangible: $ 34,953 Daily Tangible: $ WELL: University 7-34 #LH Cum Tangible: $ Daily Mud: $ Cum Mud: $ WellEz Information Management, LLC Ver bg REPORT 34,953 08/0/04

16 WELL: University 7-34 #LH FROM TO HRS ACTIVITY 7:00 9:30.5 Drilling Report Pg. Trip out to run 3 3/8 Casing. Lay Down Bit, Motor, Shock Sub 8//04 9:30 0:30.0 Run Csg & Cement Rig Down Bails, Elevators, Rig Up Casing Crew 0:30 3:00.5 Run Csg & Cement Make up Float Shoe and Collar, Run Casing to 470' hit ledge 3:00 :30.5 Washing / ReamingRig up Circulating Iron & Swedge, Circulate and attempt to wash thru tight spot without success. :30 4:00.5 UnPlanned Lay Casing Down 4:00 5:00.0 UnPlanned Rig Down Casing Crew, Change out bales and elevators. 5:00 6:00.0 UnPlanned P/U Bit, Bit Sub, Stb. and TIH to ream tight spot. TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 9 Cactus Rig Manager 4 9 Cactus Rig Crews Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 5 FP USA Rental Equipment 7 Express Location Liner Misc. Sales 5 5 Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

17 LEASE: PARISH /STATE: 8//04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 8 RR: TX REPORT #: API #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 9 CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE, ROTARY SAFETY WHILE P/U PIPE AND Nippled Up, Test Bop, P/U drilling assembly, TIH, test csg. Drill out shoe track, Drill Ahead Cactus CASING OD WT 640 Drilling Report GRD RIG: 6 CURRENT ACTIVITY: Nippling up BOP DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES 7.50 NOV TFFX59S E9487 4X4, X6 TFA IN OUT FEET HRS WOB RPM AV ROP BIT NO. T B G DP CAP ANN CAP KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS F , F , CONSISTS OF: Bit, XO, Motor, Double Pin X-O, Shock Sub, -8: Dc, StB, 5 8" DC, XO, -6" DC,XO LENGTH WT. AIR WT. MUD ROT. WT. P.U. WT. S.O. WT. SURVEY DATA ANGLE AZIMUTH N/S EFF% AVDP AVDC HSI HRS. ON JARS TORQUE COORDINATES E/W V. SECTION DLS ECD MISCELLANEOUS DATA FROM TO HRS 6:00 7:00.0 ACTIVITY DIESEL FUEL (GALS) TIH to wash out ledge TOTAL MAN HRS: 4,00 ACCIDENTS: None 7:00 9:00.0 Washing / Reaming Tag up at 470' set 35K, Ream 470' to 47, not able to wash down after. Ream and Back Ream thru 470' 5 times. Attempt to wash without rotating no success. Work past ledge by setting wt. down and slow rotating with 5 RPM. Wash thru spot 5 times without rotating, Ream 450' to 50'. Ream and wash to bottom. Did not see any tight hole 9:00 9: Cond Mud & Circ Pump sweep and circulate hole clean. 9:30 0: Lubricate Rig Service Rig and Repair oil leak 0:00 :00.0 Trip out of Hole and lay down tools. Slack off every stand while TOOH to make sure get back down without rotating :00 3:00.0 Run Csg & Cement Safety Meeting with Express, Change out bales, and R/U to run casing. 3:00 5:00.0 Run Csg & Cement Run 5 jts. 3 5/8 54.5#, J-55 casing to bottom. (Received 3 jts from Rig 56 to replace 3 bad jt. Done visual inspection, and lay out 3 jts. from laid down string, Received 5:00 8: Run Csg & Cement Rig 650' Down Express while circulating, Safety meeting with Allied, Cement as per program. Bumped plug at 460 psi. carry to 780 psi. and monitor, no leakage, 8:00 8: Wait on Cement Returned WOC and 37 Pump bbls. thru (6 conductor SK and flow line to wash out cement. TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 05,908 Daily Intangible: $ 80,708 Cum Intangible: $ 448,86 Daily Tangible: $ 5,00 Cum Tangible: $ Daily Mud: $ Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 43,66 5,00 08/0/04

18 WELL: University 7-34 #LH FROM TO HRS ACTIVITY 8:30 : Wait on Cement Drilling Report Pg. Wait on Cement, Prep rotating head assembly, DSA, Well Head, Riser Spools, 8//04 :00 3:00.0 Other Cut off Conductor Riser, Make rough and final cut on casing. 3:00 3: Other Install 3 5/8 casing head 56" below ground level and test to,000 psi. for 5 minutes. 3:30 6:00.5 Nipple Up B.O.P. Nipple up BOP TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 6 Cactus Rig Manager 4 6 Cactus Rig Crews Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 88 FP USA Rental Equipment 7 Express Location Liner Misc. Sales Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

19 LEASE: PARISH /STATE: 8/3/04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 9 3 RR: TX REPORT #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 0 API #: CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, WORKING WITH 3RD PARTY'S, FORKLIFT SAFETY, FOLLOWING PROCEDURE AND POLICYS, HES Risks Next 4 hrs: ELECTRICAL HAZARDS, USING TAG LINE, ROTARY SAFETY WHILE P/U PIPE AND Drill ahead Cactus CASING OD WT 956 Drilling Report GRD RIG: 6 CURRENT ACTIVITY: 956' DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP.5 U;terra U76F 50 6X NOV TFFX59S E9487 4X4, X BIT NO. T B G DP CAP ANN CAP KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS F , F , CONSISTS OF: Bit, Motor, flow drift, -8: Dc, R/R, - 8" DC, R/R, 4-8" DC,-6" DC,XO, 9-HWDP LENGTH WT. AIR WT. MUD ROT. WT. P.U. WT. S.O. WT. SURVEY DATA ANGLE AZIMUTH N/S EFF% AVDP AVDC HSI ECD HRS. ON JARS TORQUE COORDINATES E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS ACTIVITY 6:00 0: Nipple Up B.O.P. 0:30 6: Repair Rig 6:00 : Test B.O.P. DIESEL FUEL (GALS) -700 TOTAL MAN HRS: ACCIDENTS: Nipple up BOP, Flow line, choke line, Change out Bails & Elevators, lay out casing equipment, hook up mud bucket hose from rig floor to tanks, Nipple Down BOP due to not testing found rocks in break at DSA from lower rams to ' 3 5/8 0M drilling spool. Break and clean bottom break on spool. Test BOPE 50 low,,500 high, Rig down Hydrostatic testers and load out 4,90 None :30 3:30.0 Make up bit, motor, flow drift, 8" DC, R/R, 8" DC, R/R 3:30 :00.5 TIH with to 580', Tag Up, Circulate 0 minutes :00 : Other Test Csg. to 500 psi., for 30 minutes, (Good Test) :30 :30.0 Other Drill Float Collar and Cement to 60' :30 3: Lubricate Rig Service Rig and Repair oil leak on top drive 3:00 3: Other Drill Cement F/60' to 630' Circulate, Re-test casing to 500 psi. good test 3:30 4: Other Drill 60' to 64 ' TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: 58,05 Daily Intangible: $ 44,704 Cum Intangible: $ 507,066 Daily Tangible: $ 3,50 Cum Tangible: $ Daily Mud: $ Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 468,5 38,70 08/03/04

20 Drilling Report Pg. WELL: University 7-34 #LH FROM TO HRS ACTIVITY 4:00 6:00.0 Drilling Drlg. F/ 64' to 956' 8/3/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 40 Cactus Rig Manager 4 40 Cactus Rig Crews Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 88 FP USA Rental Equipment 7 Express Location Liner 07 Misc. Sales 6 Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement Hydrostatic Testers Test BOP 3 FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

21 LEASE: API #: Surface 3-5/8 55 J PARISH /STATE: 8/4/04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 0 4 RR: TX REPORT #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 3,65 CONTRACTOR: LAT: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, FORKLIFT SAFETY, ROTARY TABLE SAFETY HES Risks Next 4 hrs: Drill to 6,000', TOOH for MWD-Gamma tools Cactus CASING OD WT 4, Drilling Report GRD LONG: RIG: 6 CURRENT ACTIVITY: 4, DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP.5 Ulterra U76F 50 6X , 3, NOV TFFX59S E9487 4X4, X BIT NO. T B G DP CAP ANN CAP KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS F , F , CONSISTS OF: Bit, Motor, flow drift, -8: Dc, R/R, - 8" DC, R/R, 4-8" DC,-6" DC,XO, 9-HWDP LENGTH WT. AIR WT. MUD ROT. WT. P.U. WT. S.O. WT. SURVEY DATA ANGLE AZIMUTH N/S, , ,58.0 3,995 MISCELLANEOUS DATA FROM TO HRS 6:00 6: DIESEL FUEL (GALS) ACTIVITY Drilling Drlg. F/956' to,584' EFF% AVDP AVDC HSI ECD HRS. ON JARS TORQUE COORDINATES E/W V. SECTION DLS -5 TOTAL MAN HRS: 4,483 ACCIDENTS: None 6:00 6: Lubricate Rig Service Rig, Top Drive, Blocks, ST-80, 6:30 9:00.5 Drilling Drlg. F/,584' to,900' 9:00 9: Other Work on Callon reserve pit transfer pump 9:30 6: Drilling Drlg. F/,900' to 4,' TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: ,790 Daily Intangible: $ 40,790 Cum Intangible: $ 547,856 Daily Tangible: $ Cum Tangible: $ Daily Mud: $ Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 509,55 38,70 08/04/04

22 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 8/4/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 64 Cactus Rig Manager 4 64 Cactus Rig Crews Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 88 FP USA Rental Equipment 7 Express Location Liner 07 Misc. Sales 7 Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement 5 Hydrostatic Testers Test BOP FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

23 LEASE: API #: Surface 3-5/8 55 J PARISH /STATE: 8/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 5 RR: TX REPORT #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST:,879 CONTRACTOR: LAT: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, FORKLIFT SAFETY, ROTARY TABLE SAFETY HES Risks Next 4 hrs: Make up Tools in, TIH Drlg. to core pt. Cactus CASING OD WT 6,000 Drilling Report GRD LONG: RIG: 6 CURRENT ACTIVITY: TOOH for Gamma and MWD DRILLING FLUID TIME MW FV WL Shoe Test (ppg): ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W ES PRESSURE PARAMETERS BG: GAS: CONN: TRIP: SHOW DEPTHS MAX: Cl: LITHOLOGY: ROP REDUCED PUMP RATES PORE PRESSURE: PUMP SPM PRESS # # GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A DEPTH HEAVIES BIT DATA NO. SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP.5 Ulterra U76F 50 6X ,000 5, NOV TFFX59S E9487 4X4, X DIESEL FUEL (GALS) ACTIVITY Drilling Drlg. F/4,' to 4,748' BIT NO. T B G DP CAP ANN CAP KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% AVDP AVDC HSI ECD F , F , CONSISTS OF: Bit, Motor, flow drift, -8: Dc, R/R, - 8" DC, R/R, 4-8" DC,-6" DC,XO, 9-HWDP LENGTH WT. AIR WT. MUD HRS. ON JARS ROT. WT. 09,000 P.U. WT. 5,000 S.O. WT. 00,000 TORQUE SURVEY DATA ANGLE AZIMUTH N/S COORDINATES E/W V. SECTION DLS 4, , , ,688 MISCELLANEOUS DATA FROM TO HRS 6:00 : ,944 TOTAL MAN HRS: 4,706 ACCIDENTS: None :30 : Lubricate Rig Service Rig, Top Drive, Blocks, Draw works, ST-80 :00 3:00.0 Drilling Drlg. F/4,748' to 4,84' 3:00 4:00.0 Cond Mud & Circ Displace to Water Base Mud (3,700 Strokes,,50 BBLS) 4:00 :30.5 Drilling Drlg. F/4,84' to 6,000' :30 4:00.5 Cond Mud & Circ Circulate Hole Clean 4:00 6:00.0 Drop Gyro, Pump Slug, TOOH TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: ,549 Daily Intangible: $ 79,549 Cum Intangible: $ 67,405 Daily Tangible: $ Cum Tangible: $ Daily Mud: $ Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 588,704 38,70 08/05/04

24 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 8/5/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 88 Cactus Rig Manager 4 88 Cactus Rig Crews Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 88 FP USA Rental Equipment 7 Express Location Liner 07 Misc. Sales Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement 5 Hydrostatic Testers Test BOP Scientific Directional FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

25 LEASE: API #: Surface 3-5/8 55 J PARISH /STATE: 8/6/04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 6 RR: TX REPORT #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 3 6,3 5 8//04 CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: MOVING EQUIPMENT, FORKLIFT SAFETY, ROTARY TABLE SAFETY, Picking up tools, PINCH POINTS ON TRIPS AND WORKING HES Risks Next 4 hrs: ON LAST DAY OF HITCH POOH, REPROGRAM MWD, TIH, DRILL DIRECTIONALLY TO STRAIGHTEN HOLE TO CORE POINT. POOH Cactus CASING OD WT 6,5 Drilling Report GRD RIG: 6 CURRENT ACTIVITY: POOH TO REPROGRAM MWD DRILLING FLUID Shoe Test (ppg): TIME MW FV WL ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W : , PRESSURE PARAMETERS REDUCED PUMP RATES BG: MAX: PORE PRESSURE: PUMP SPM PRESS DEPTH GAS: CONN: Cl: # TRIP: LITHOLOGY: # SHOW DEPTHS ROP GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A HEAVIES ES BIT DATA NO. 3 SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP.5 Ulterra U76S 5 6X ,000 6,5 5.5 Ulterra U76F 50 6X ,000 5, BIT NO. T B G IN DP CAP ANN CAP KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% AVDP AVDC HSI ECD F , F , CONSISTS OF: BIT, MTR,NC,PSUB,NC,XO,8"DC,XO,7"DC'S,XO,HWDP LENGTH WT. AIR WT. MUD HRS. ON JARS ROT. WT. 09,000 P.U. WT. 5,000 S.O. WT. 00,000 TORQUE SURVEY DATA ANGLE AZIMUTH N/S COORDINATES E/W V. SECTION DLS 5, , MISCELLANEOUS DATA FROM TO HRS 6:00 9: ACTIVITY DIESEL FUEL (GALS) -,04 TOTAL MAN HRS: 5,035 Finish TOOH to P/U MWD and Gamma ACCIDENTS: None 9:00 9: Dir Work Retrieve Gyro 9:30 :30.0 Change out Bits and P/U MWD and Gyro :30 6: TIH 6:00 7:30.5 Drilling Drlg. F/6,000' to 6,5'. 5,980= Azm. 6,074= 3.34 Deg AZM 7:30 8:30.0 Cond Mud & Circ Circulate for TOOH to p/u directional tools 8:30 3: Pump Slug, TOOH for directional tools 3:30 :00.5 P/U tools,, new motor :00 4: TIH to 65 and found MWD not programmed correctly 4:00 6:00.0 Pooh to reprogram MWD TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: ,095 Daily Intangible: $ 84,095 Cum Intangible: $ 78,08 Daily Tangible: $ Cum Tangible: $ Daily Mud: $,60 Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 689,380 38,70 6,788 08/06/04

26 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 8/6/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 3 CALLON GEO, INTERINS Cactus Rig Manager 4 3 Cactus Rig Crews Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 88 FP USA Rental Equipment 7 Express Location Liner 07 Misc. Sales Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement 5 Hydrostatic Testers Test BOP Scientific Directional Diversified Mud Loggers 8 8 Haliburton Core Hands, FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

27 LEASE: API #: Surface 3-5/8 55 J PARISH /STATE: 8/7/04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 3 7 RR: TX REPORT #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 8//04 LAT: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: FIRST DAY BACK, PINCH POINTS ON TRIPS, HANDLING AND WORKING WITH CORE BBL HES Risks Next 4 hrs: DRILL TO CORE 740+/-, POOH, P/U CORE BBL, TIH AND CORE 4 7, CONTRACTOR: Cactus CASING OD WT 7,049 Drilling Report GRD LONG: RIG: 6 CURRENT ACTIVITY: DRILLING AT 7049 DRILLING FLUID Shoe Test (ppg): TIME MW FV WL ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W : , PRESSURE PARAMETERS REDUCED PUMP RATES BG: 50 MAX: 387 PORE PRESSURE: PUMP SPM PRESS DEPTH GAS: CONN: 300 Cl: # TRIP: LITHOLOGY: # SHOW DEPTHS ROP GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A HEAVIES ES BIT DATA NO. 3 SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP.5 Ulterra U76S 5 6X ,000, Ulterra U76F 50 6X ,000 5, BIT NO. T B G IN DP CAP.0776 ANN CAP 850 KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% F , F , CONSISTS OF: BIT, MTR,NC,PSUB,NC,XO,8"DC,XO,7"DC'S,XO,HWDP LENGTH WT. AIR WT. MUD ROT. WT. 9,000 P.U. WT. 35,000 SURVEY DATA ANGLE AZIMUTH 6, , , DIESEL FUEL (GALS) ACTIVITY FINISH POOH S.O. WT. N/S AVDP AVDC HSI ECD HRS. ON JARS TORQUE 6, , MISCELLANEOUS DATA FROM TO HRS 6:00 9: ,000 COORDINATES E/W V. SECTION DLS 6, , , ,44 TOTAL MAN HRS: 5,40 ACCIDENTS: 9:30 0:30.0 Dir Work REPROGRAM MWD TOOL 0:30 :00.5 TIH TO 303 :00 : Lubricate Rig RIG SERVICE :30 4:30.0 FINISH TIH TO 65 4:30 6: Drilling DRILL F/65 TO 7049, SLIDE TO DROP ANGLE WHEN NECCESSARY. TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: ,3 Daily Intangible: $ 9,3 Cum Intangible: $ 80,94 Daily Tangible: $ Cum Tangible: $ Daily Mud: $ 3,588 Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 78,493 38,70 0,376 08/07/04

28 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 8/7/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 3 CALLON GEO, INTERINS Cactus Rig Manager 4 3 Cactus Rig Crews 0 0 Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 88 FP USA Rental Equipment 7 Express Location Liner 07 Misc. Sales Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement 5 Hydrostatic Testers Test BOP Scientific Directional 4 88 Diversified Mud Loggers Haliburton Core Hands, 3 66 AES MUD ENGINEER FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

29 LEASE: API #: Surface 3-5/8 55 J PARISH /STATE: 8/8/04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 4 8 RR: TX REPORT #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 5 7,69 8//04 CONTRACTOR: LAT: LONG: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: HANDLING CORE BBL, WORKING WITH CORE LAB AND CORE HANDS, PINCH POINTS ON TRIPS AND STAYING HYDRATED HES Risks Next 4 hrs: CORE TO 790, POOH, L/D CORE, TIH AND REAM CORE HOLE AND DRILL Cactus CASING OD WT 7,7 Drilling Report GRD RIG: 6 CURRENT ACTIVITY: CORING AT 77 DRILLING FLUID Shoe Test (ppg): TIME MW FV WL ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W : , PRESSURE PARAMETERS REDUCED PUMP RATES BG: MAX: PORE PRESSURE: PUMP SPM PRESS DEPTH GAS: CONN: Cl: # TRIP: LITHOLOGY: # SHOW DEPTHS ROP GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A HEAVIES ES BIT DATA NO. 4 3 SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP 8.50 HAL FC , Ulterra U76S 5 6X ,000 7,30, BIT NO. T B G DP CAP.0776 ANN CAP 850 KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% AVDP AVDC HSI ECD F F CONSISTS OF: COREBBL, XO, 8"DC,RR,8"DC,XO,7"DC,XO LENGTH WT. AIR WT. MUD HRS. ON JARS ROT. WT. 07,000 P.U. WT. 0,000 S.O. WT. 05,000 TORQUE SURVEY DATA ANGLE AZIMUTH N/S COORDINATES E/W V. SECTION DLS 7, , , , MISCELLANEOUS DATA FROM TO HRS 6:00 9: ACTIVITY Drilling DIESEL FUEL (GALS) DRILL F/7049 TO 730 -,043 TOTAL MAN HRS: 5,77 ACCIDENTS: 9:00 0:00.0 Cond Mud & Circ CIRCULATE BTMS UP 0:00 4: POOH TO L/D DIRECTIONAL TOOLS AND P/U CORE BARRELL 4:30 6:30.0 Dir Work DRAIN MTR AND L/D ALL DIRECTIONAL TOOLS 6:30 0: Coring HELD 30 MIN SAFETY WITH HALIBURTON CORING, AND P/U 60' CORE BARRELL ASSEMBLY 0:30 : Lubricate Rig RIG SERVICE :00 : TIH, AS PER HALIBURTON INSTRUCTION AND CIRCULATE THROUGH BARREL EVERY 0 STANDS. :00 3:00.0 Coring TAG CIRCULATE TO INSURE CORE BBL IS CLEAN, DROP BALL, RECORD INITIAL WT AND PSI 3:00 6: Coring CORE F/730 TO 77 TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: ,84 Daily Intangible: $ 77,84 Cum Intangible: $ 897,377 Daily Tangible: $ Cum Tangible: $ Daily Mud: $ 3,759 Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 858,676 38,70 4,34 08/08/04

30 Drilling Report Pg. WELL: FROM University 7-34 #LH TO HRS ACTIVITY 8/8/04 TOTAL HRS 4.0 PERSONNEL INFO: COMPANY JOB FUNCTION NUMBER HOURS CUM HOURS Global Drilling Consultants & Services Location Supervisin 4 0 CALLON GEO, INTERINS Cactus Rig Manager 4 0 Cactus Rig Crews Butch's Rig Move 50 Pro Tech Pipe Inspection 08 Omron Operating System Tech 88 FP USA Rental Equipment 7 Express Location Liner 07 Misc. Sales Butch's Rathole Set Consuctor Penn Construction Location Building 9 Lobos Haul Brine 96 Lobos Haul OBM 96 Mustang Rst. Lay Water line/trash trailer 3 Alied Cement 5 Hydrostatic Testers Test BOP Scientific Directional Diversified Mud Loggers 88 Haliburton Core Hands, 3 0 AES MUD ENGINEER 4 FULL CREW (Y/N): POSITIONS SHORT: WellEz Information Management, LLC Ver bg

31 LEASE: API #: Surface 3-5/8 55 J PARISH /STATE: 8/9/04 WELL: University 7-34 #LH 4005AFE #: FIELD: SPUD 7/3/04 DOL: LOC BLD DAYS: DFS: 5 9 RR: TX REPORT #: DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP TEST: 8//04 LAT: LGL SUR LOC: 400 FNL 355 FEL Section BOTTOM HOLE LOC: NONE HES Incidents Last 4 hrs: HANDLING CORE BBL, PINCH POINTS ON TRIPS, FORKLIFT SAFETY, AND WORKING IN HEAT HES Risks Next 4 hrs: DRILL TO 7530',CIRC, POOH, P/U CORE BBL, TIH, AND CORE 6 7,37 03 CONTRACTOR: Cactus CASING OD WT 7,374 Drilling Report GRD LONG: RIG: 6 CURRENT ACTIVITY: DRILLING AT 7374 DRILLING FLUID Shoe Test (ppg): TIME MW FV WL ph CAKE GELS OIL PV YP LGS Cl Pf Mf Ca HTHP O/W : , PRESSURE PARAMETERS REDUCED PUMP RATES BG: 5 MAX: 45 PORE PRESSURE: PUMP SPM PRESS DEPTH GAS: CONN: 45 Cl: # TRIP: 4 LITHOLOGY: # SHOW DEPTHS ROP GAS: B / D / A MUD WT: B / D / A CHLORIDES: B / D / A HEAVIES ES BIT DATA NO. 3 4 SIZE MAKE TYPE SER NO. NOZZLES TFA IN OUT FEET HRS WOB RPM AV ROP.5 ULT U76S 5 6 X ,8, HAL FC ,30 7, BIT NO. T B G DP CAP.0776 ANN CAP 900 KOP HYDRAULICS DATA PUMP MAKE MODEL LINER STK SPM PSI GPM GPS EFF% AVDP AVDC HSI ECD F , F , CONSISTS OF: COREBBL, XO, 8"DC,RR,8"DC,XO,7"DC,XO LENGTH 6.53 WT. AIR WT. MUD HRS. ON JARS ROT. WT. 07,000 P.U. WT. 0,000 S.O. WT. 05,000 TORQUE SURVEY DATA ANGLE AZIMUTH N/S COORDINATES E/W V. SECTION DLS MISCELLANEOUS DATA FROM TO HRS 6:00 7:00.0 ACTIVITY Coring DIESEL FUEL (GALS) -,047 TOTAL MAN HRS: 6,07 CORING F/77 TO 78, BBL JAMMED AFTER 5' OF CORING ACCIDENTS: 7:00 5: POOH WITH CORE BBL AS PER CORELABS TRIP SCHEDULE 5:00 5: Coring WAIT 30 MINUTES FOR GAS EXPANSION 5:30 8:00.5 FINISH POOH WITH CORE BARRELL 8:00 0:30.5 L/D CORE AND CORE BARRELS, RETRIEVE 00% OF CORE 0:30 : Lubricate Rig RIG SERVICE :00 :30.5 M/U BIT, NEAR BIT AND INSTALL ROLLER REAMERS AT 30' AND 60' AND TIH WITH :30 3:30.0 Cut off Drill Line SLIP AND CUT 50' OF DRILL LINE 3:30 : TIH TO 730 :30 4:00.5 Washing / Reaming REAM 8.5" CORE HOLE TO.5" F/730 TO 78 TOTAL HRS 4.0 COMMENTS COSTS DATA AFE DHC: $,947,0 Daily Drlg Cost: $ AFE TWC: $ 7,940,373 Cum Drlg Cost: $ RIG PHONE: DRILLING SUPERVISOR: ,87 Daily Intangible: $ 58,87 Cum Intangible: $ 956,48 Daily Tangible: $ Cum Tangible: $ Daily Mud: $,496 Cum Mud: $ WELL: University 7-34 #LH REPORT WellEz Information Management, LLC Ver bg 97,547 38,70 5,630 08/09/04

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS BASK1 BASK2 BASK3 BASK6 SLING1 SLING2 BASKETS/SLINGS CARRYING TOOL BASKET 4' X 4' GALVANIZED CERT. RATED SWL 6,800 LBS TOOL BASKET 4' X 6' GALVANIZED CERT. RATED SWL 8,950 LBS TOOL BASKET 4' X 8' GALVANIZED

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves,

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS BASK1 BASK2 BASK3 BASK6 SLING1 SLING2 TOOL BASKET 4' X 4' GALVANIZED CERT. RATED SWL 6,800 LBS TOOL BASKET 4' X 6' GALVANIZED CERT. RATED SWL 8,950 LBS TOOL BASKET 4' X 8' GALVANIZED CERT. RATED SWL 11,200

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500 SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE HM150 150MT DRILLING RIG HUISMAN PRODUCT BROCHURE M150 ENERAL INTRODUCTION 02 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 6 Brand Loadcraft Power: 550 HP Year: 2013 Double Drum: Drawworks and Sandline Drums : Self-propelled Land

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 4 Brand Taylor Power: 500 HP Year: 2004 Double Drum: Drawworks and Sandline Drums : Self-propelled Land Rig

More information

Drillmec HH-300 spec.

Drillmec HH-300 spec. Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 2 Brand Wilson Power: 550 HP Year: 1982 (Repotenciado en el 2009) Double Drum: Drawworks and Sandline Drums

More information