1 Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well 8:15 AM & drilled from 77' to 478' Executive 54 ft/hr). Ran deviation 443' =.75, TD 478'. Continued drilling from 478' to ft/hr). Tour change & Summary: continued drilling from 658' to 1,705' ft/hr). TD 17-1/2" Surface 7:05 AM 12/22/16 at a depth of 1,705. Drilling 1,699', ROP = 62.5 ft/hr, WOB = 18.3 klbs. 1,705'. : 8:00 AM Finish PU BHA, test motor, fill conductor. 3:30 PM Drill from 77' to 478' 54 ft/hr). 4:00 PM Deviation 443' = 0.75, TD 478'. 7:00 PM Drill from 478' to 658' 60 ft/hr). Drill from 658' to 1,705' ft/hr ). TD 17-1/2" 7:05 AM 12/22/16. Rig Up/Down TRC Depth Angle Bit Size Mfg. Type Serial # Jets 8x20 Ulterra 1705' 77' RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr No. 1 Spudded well 8:15 AM 12/21/16. TD 17-1/2 hole 1,705 : 12/22/16, 7:05 AM rotating 75 ft/hr. Diesel (gal) Start Received End

2 Date: 12/23/2016 Rig: Norton Rig #2 Daily Cost: $104,634 Report #: 4 Current Depth: 1705' Progress Last 24 Hrs: 0 Cum Cost: $372,882 Circulate clean up 1,705', TOOH to BHA 50K drag at 1,520' & 1,055', TIH to btm & CBU spot high vis pill. TOOH tight 1,615', 1,603', 1,598', 1,247', RU laydown machine & LD BHA, RU csg tools & run 39 jts , 68#/ft, J-55 csg to 1,705', Executive CBU & pump cmt, 1,106 sx 12.5 ppg (415 bbls) 379 sx 14.8 ppg (90 bbls) displace w/ 242 bbls, bump plug w/ 900 Summary: 2:40 AM 12/23/16, check floats, floats holding, full returns. 510 sx (192 bbls ) cmt to surface. Test csg to 1,500 psi. WOC. : 8:30 AM 10:00 AM 11:30 AM 2:30 PM 3:30 PM 7:00 PM 10:00PM 11:30PM 12:00PM 3:00AM 3:30AM 7:00AM WOC. Pump sweeps & circulate bottoms up 2X. TOOH to DCs for wiper run. Jts (3nd & 7th stand) pulled tight off bottom. TBIH to bottom. Pump sweeps & circulate bottoms up 2X, spot high vis pill. TOOH, tight 1,615', 1,603', 1,598', 1,247'& 716'. Pulled up to 166 klbs over. RU LD machine & LD BHA. RU Casing Crew, HSM. Start RIH w/ 13-3/8", 68#, J-55, BTC csg. Finish running , 68 #/ft J-55 csg to 1,705', wash down last 2 jts. 430 GPM. PJSM w/ Baker, & RU to cmt. Test lines & pump cmt, 415 bbls lead 12.5ppg, 90 bbls 14.8 ppg, had full returns on job. 192 bbls cmt back to surface. Bump plug at calculated displacement 242 bbls. Test csg to 1,500 psi, Charted for 30 minutes. WOC, clean active pits. Suction Depth Angle Bit Size Mfg. Type Serial # Jets 443' ' 1705' 17-1/4 Ulterra U616S PDC x20 2 RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Casing Detail: 39 jts 13-3/8, 68 #, J-55, BTC new API Csg Float 1, KB Float 1, KB Cement Detail: Lead: 1,106 sx; 35/65 POZ "Premium Plus C" pps Static Free + 5% Salt + 1/4 pps celloflakes + 4% Bentonite + 2% Sodium Matasilicate + 5% MPA gps FP-6L, 12.5 ppg, 2.14 cuft/sx, gals/sx, 2, cuft Tail: 379 sx; Premium Plus C pps Static Free + 1% CaCl pps FP-6L, 14.8 ppg, 1.34 cuft/sx, 6.34 gals/sx, cuft. Bumped plug w/ 900 2:40 AM 12/23/16. Floats held, circulated 510 sx (192 bbls) cement to surface. Tested 13-3/8 csg to 1,500 psi for 30 mins, received good chart.

3 Date: 12/24/2016 Rig: Norton Rig #2 Daily Cost: $65,370 Report #: 5 Current Depth: 1853' Progress Last 24 Hrs: 148 Cum Cost: $438,252 Install 13-5/8" 3M x 13-3/8" SOW csg head, test to 900 psi. NU & test BOP, run Gyro Survey. PU & test BHA, TIH & tag Executive 1,604', displace well w/ 10.0 ppg brine, drill cmt & float equip. 1,614', 1,705'. Drill new formation from 1,705' to Summary: 1,853'. : 8:30 AM 11:00 AM 5:30 PM 7:00 PM 11:00PM 1:00AM 2:00AM 3:30AM 7:00AM Drilling 12.25" hole 1,853'. Cut & drain conductor, cut 13 3/8 csg. Dress 13-3/8" csg & install 13-5/8" 3M x 13-3/8" SOW csg head, test to 900 psi. Stack BOP & NU, run Gyro while NU. Function test BOP, test BOP to 250 psi/1,500 psi Low/High test. SLM BHA, M/U & surface test BHA & MWD. TIH, tag 1,605'. Displace hole w/ 10.0 ppg brine, re-route discharge lines to outside reserve. Drill cmt & float equip, 1,614', 1,705'. Drill new formation from 1,705' to 1,853' ft/hr). Suction Depth Angle Bit Size Mfg. Type Serial # Jets ' 1705' 17-1/4 Ulterra U616S PDC x ' 12-1/5 U7195 PDC x18 + 3x RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr

4 Date: 12/25/2016 Rig: Norton Rig #2 Daily Cost: $30,359 Report #: 6 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $468,610 Executive Drill from 1,853' to 2,223' 85.5 ft/hr). MWD tool failure, trouble shoot MWD. TOOH, replace MWD & surface test, TIH. Summary: Drill from 2,223' to 3,105' ft/hr). Had 10.5 hrs NPT (MWD). : 12:30 PM 1:00 PM 4:00 PM 7:00 PM 8:00 PM 11:00PM 7:00AM Drilling 12.25" hole 3,105'. Drill from 1,853' to 2,223' 67.3 ft/hr). Lost communications w/ MWD tool, trouble shoot tool. TOOH to MWD tool. MWD tool on surface, change out faulty parts & reprogram. Finish changing out MWD & surface test. TIH. Drill from 2,223' to 3,105' ft/hr ) TRC 11.8 Depth Angle Bit Size Mfg. Type Serial # Jets / ' U616S PDC x /5 1400' 1705' U7195 PDC x18 + 3x22 15/25K RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr ' Ulterra

5 Date: 12/26/2016 Rig: Norton Rig #2 Daily Cost: $26,839 Report #: 7 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $495,449 Executive Drilling 12.25" hole section from 3,105' to 3,544'. Service rig & Topdrive, continue drilling from 3,544' to 4,640' Summary: ft/hr ). Drilling 12.25" hole 4,640'. : 1:30 PM Drill from 3,105' to 3,544' ft/hr). 2:00 PM Service rig & Topdrive. 7:00 PM Drill from 3,544' to 3,826' ft/hr). 7:00AM Drill from 3,826' to 4,640' ft/hr) TRC 11.8 Depth Angle Bit Size Mfg. Type Serial # Jets / ' U616S PDC x / ' U7195 PDC x18 + 3x22 15/25K RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr ' Ulterra

6 Date: 12/27/2016 Rig: Norton Rig #2 Daily Cost: $28,860 Report #: 8 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $524,310 Continued drilling & sliding from 4,640' to 6,363'. Total footage = 76.4 ft/hr. Slide from 4,671' to 4,691', 4773' to 4788' & from 5,517 to 5,532. Pump #1 5,273' (4:20 PM) - change out liners, ROPs down to ft/hr. Pump #1 back on 5,510' (8:20 PM), ROPs increased to ± 105 ft/hr. Executive Drilling 6,314', ROP = 92 ft/hr, WOB = 30 klbs, Rot = 69 rpm, Tor = kft-lb, Pump Rate = 733 gpm, Diff Press = Summary: psi, SPP = 3,594 psi. Connection & 6,362.8', after connection kicked pumps on & had no returns. LD makeup jt to TOOH 5 stands. Latched onto DP in the hole & found pipe was 6,358'. Worked to free pipe pulling 100 K. Regained full returns, pipe still 6,357', continued working to free pipe. : 12:30 PM 1:00 PM 7:00 PM 5:00 AM 5:30 AM 6:00 AM 6:30 AM Working stuck pipe w/ 6,359' (2 ft off bottom). Drill/ Slide from 4,640' to 4,954' 57 ft/hr, Slide from 4,671' to 4,691' & from 4,773' to 4,788'). Rig Service. Drill from 4,954' to 5,423' 78.2 ft/hr). Pump #1 5,273' (4:20 PM) - change out liners, ROPs down to ft/hr. 5,510' (8:20 PM). ROPs increased to ± 105 ft/hr. Drilling 6,314', ROP = 92 ft/hr, WOB = 30 klbs, Rot = 69 rpm, Tor = kft-lb, Pump Rate = 733 gpm, Diff Press = psi, SPP = 3,594 psi. Connection & 6,362.8', after connection kicked pumps on & had no returns. LD makeup jt to TOOH 5 stands. Latched onto DP in the hole & found pipe was 6,358'. Worked to free pipe pulling 100 K. Regained full returns, pipe still 6,357' TRC 11.8 Depth Angle Bit Size Mfg. Type Serial # Jets / ' U616S PDC x / ' U7195 PDC x18 + 3x22 15/25K RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr ' Ulterra Morning tour reported losing 3" of fluid in working pits while drilling from 5,430' to 6,170'. Increase fiber LCM in suction pits. Drilling 6,314', ROP = 92 ft/hr, WOB = 30 klbs, Rot = 69 rpm, Tor = kft-lb, Pump Rate = 733 gpm, Diff Press = psi, SPP = 3,594 psi. Connection & 6,362.8', after connection kicked pumps on & had no returns. LD makeup jt to TOOH 5 stands. Latched onto DP in the hole & found pipe was 6,358'. Worked to free pipe pulling 100 K. Regained full returns, pipe still 6,357', continued working to free pipe

7 Date: Rig: Norton Rig #2 Daily Cost: $44,150 Report #: 9 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $568,460 Continued working stuck pipe w/ 6,263' by pulling up to 283 klbs, applying torque & increasing pump rate. Spotted 80 bbls FW across BHA to lighten fluid in BHA. Worked to free pipe. Gained ± 6'. Make call for diesel delivery. Spotted 40 bbls of diesel across bottom of DS, stand-by for diesel to slick-up/ lighten bottom of BHA. Continued working pipe while pumping additional diesel 15 bbls at a time, letting fluid rest for 15 mins between pulling & applying torque. Gained ± 4'. Decision was made to call for N2. 90 bbls total diesel pumped. Kicked pumps on to displace diesel out of hole & lost returns. Pumped 38 bbls fluid before regaining returns. Returns carried blocks of sand/lcm out of hole. Executive Continued working pipe while standing by for Pro Petro N2. Pro Petro on location w/ 680,000 SCF of nitrogen, RU N2 pump, Summary: flowline from choke manifold to pit & "muffler" at end of flowline to restrict flow when N2 comes around. HSM. Pumped Nitrogen laden mud as follows: 40 bbls BW ramping N2 up to 300 SCF/bbl + 80 bbl 45 Vis mud ramping N2 up to 500 SCF/bbl + 30 bbls BW ramping N2 down to 300 SCF/bbl. WO N2 mud to clear, latched onto DP & worked to free pipe. Unable to gain any footage, pulling up to 280 klbs. Pumped 2nd stage of Nitrogen laden mud as follows: 50 bbls BW ramping N2 up to 500 SCF/bbl + 80 bbl 45 Vis mud ramping N2 up to 80,000 SCF/bbl + 90 bbls BW ramping N2 down to 500 SCF/bbl. Stand-by for N2 Mud to clear WB. Latched onto DP & found pipe was free. POOH standing DP back. : TOH to check tools/ reloading hole w/ BW. 8:00 AM 2:30 PM 3:00 PM 9:00 PM 11:00 PM 1:30 AM 2:00 AM 3:00 AM 3:30 AM 4:30 AM Pipe stuck w/ 6,263', continued working to free pipe, pulling up to 283 klbs, applying torque & increasing pump rate. Spotted 80 bbls FW across BHA to lighten fluid in BHA. Worked to free pipe. Gained ± 6'. Make call for diesel delivery. Spotted 40 bbls of diesel across bottom of DS, stand-by for diesel to slick-up/ lighten bottom of BHA. Continued working pipe while pumping additional diesel 15 bbls at a time, letting fluid rest for 15 mins between pulling & applying torque. Gained ± 4'. Decision was made to call for N2. Kicked pumps on to displace diesel out of hole & lost returns. Pumped 38 bbls fluid before regaining returns. Returns carried blocks of sand/lcm out of hole. Continued working pipe while standing by for Pro Petro N2. Pro Petro on location w/ 680,000 SCF of nitrogen, RU N2 pump, flowline from choke manifold to pit & "muffler" at end of flowline to restrict flow when N2 comes around. HSM. Pumped Nitrogen laden mud as follows: 40 bbls BW ramping N2 up to 300 SCF/bbl + 80 bbl 45 Vis mud ramping N2 up to 500 SCF/bbl + 30 bbls BW ramping N2 down to 300 SCF/bbl. WO N2 mud to clear, latched onto DP & worked to free pipe. Unable to gain any footage, pulling up to 280 klbs. Pumped 2nd stage of Nitrogen laden mud as follows: 50 bbls BW ramping N2 up to 500 SCF/bbl + 80 bbl 45 Vis mud ramping N2 up to 80,000 SCF/bbl + 90 bbls BW ramping N2 down to 500 SCF/bbl. Stand-by for N2 Mud to clear WB. Latched onto DP & found pipe was free. POOH standing DP back. Rig Up/Down Drilling Reaming Coring Plug Back Plug Back TRC.1/.35 0/87.2 Depth Angle Bit Size Mfg. Type Serial # Jets 77' Ulterra 1705' Diesel (gal) RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr 1 Start PZ11 No Received 23 hrs down time to free pipe. Does not include TOOH & TIN to check tools. NA End 10 Used 4185 Rate ($/gal) Total Cost ($)

8 Date: 12/29/2016 Rig: Norton Rig #2 Daily Cost: $49,663 Report #: 10 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $618,123 Continued TOOH standing back, keeping DP & annulus full. Began pump & break 382 gpm, getting full returns. LD bit #2, found bit w/ 11 teeth chipped or missing, motor shock sub & MWD tool all visually appear to be in good condition. PU directional BHA #2, surface test motor & MWD. TIH w/ BHA #2 + DCs + DP to 1,700'. Slip & cut drlg line, 80', service rig. Executive Condition mud in working pits & TIH to 3,000'. Crew mixed LCM pill in slug tank in case of lost circulation. Circulated bottoms Summary: 3,000' w/ BW. Nova Mud Engineer on location. Continued TIH to 5,300'. Installed rotating head w/ new rubber. Break circulation after pumping 50 bbls BW & continued circulating getting full returns. Mix & condition mud to ± 34 vis & 7 water loss. (Note: Crew is shorthanded.) Began washing down from 5,300' to 150 ft/hr, pump 410 gpm. Good returns w/ minimal fluid loss. : 8:00 AM 10:30AM 1:00PM 3:00PM 6:00 PM 8:00 PM 9:00 PM 10:30 PM 3:00 AM Washing down w/ BHA #2 to 6,000'. Fill pipe & backside, break circulation & 382 gpm, full returns. POOH & LD bit #2. LD directional BHA #1 & PU directional BHA #2, surface test motor & MWD. TIH w/ DC + DP to 1,700'. Slip & cut drlg line, 80'. Condition mud in working pits. TIH to 3,000', mix LCM pill in slug tank. Circulate bottoms 3,000' w/ BW. Nova Mud Engineer on location. TIH to 5,300'. Install rotating head w/ new rubber. Break circulation after pumping 50 bbls BW circulate. Mix & condition mud to ± 34 vis & 7 water loss. (Note: Crew is short handed.) Wash down from 5,300' to 150 ft/hr, pump 410 gpm. Good returns w/ minimal fluid loss. Rig Up/Down Drilling Reaming Coring Plug Back Plug Back Depth Angle Bit Size Mfg. Type Serial # Jets 1705' Ulterra Ulterra Diesel (gal) RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr 1 Start PZ11 No Received NA End 10 Used 4185 Rate ($/gal) Total Cost ($)

9 Date: 12/30/2016 Rig: Norton Rig #2 Daily Cost: $35,955 Report #: 11 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $654,078 Washed & reamed from 5,800' to 6,019'. Circulated bottoms up & had no fluid loss, mud check 33 Vis, 7 water loss, 10.1 Executive ppg. Continued washing & reaming from 6,019' to 6,361' (point at which pipe was stuck). Circulated bottoms up & reconditioned mud 38 Vis, 8 water loss, 10.0 ppg- did not lose any fluid. Drilled 12.25" hole section from 6,361' to Summary: 7,113', slid from 6,738' to 6,757', & 7,020 to 7,046'. TD 12-1/4 4:30 AM, 12/30/16. : 8:00 AM 9:00 AM 12:00 PM 12:30 PM 5:00 PM 5:30 PM 6:30 PM 7:00 PM 8:30 PM 3:30 AM 4:30 AM TD'd 12-1/4" hole, circulating bottoms up 2 times. Wash & ream from 5,800' to 6,019'. Circulate, no mud loss. Wash & ream from 6,019' to 6,361'. Circulate & condition mud, no mud loss. Drill 12.25" hole section from 6,361' to 6,644' ft/hr). Service Rig & TDS. Drill 12.25" hole section from 6,644' to 6,707' 63 ft/hr). SPM, unplug dump lines on shale shakers. Drill from 6,707' to 6,738' 20.7 ft/hr). Slide from 6,738' to 6,757' (19'). Drill from 6,757' to 7,020' 39 ft/hr). Slide from 7,020' to 7,046' (26'). Drill from 7,046' to 7,113' 67 ft/hr). Circulate bottoms up times 2. Rig Up/Down Drilling Reaming Coring Plug Back Plug Back /.4 0/87.9 Depth Angle Bit Size Mfg. Type Serial # Jets 1705' Ulterra Ulterra Diesel (gal) RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr 150 Start PZ11 No Received TD 12-1/4" 4:30 AM, 12/30/16. End 951 Used 4185 Rate ($/gal) Total Cost ($)

10 Date: 12/31/2016 Rig: Norton Rig #2 Daily Cost: $201,239 Report #: 12 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $855,317 Finished circulating bottoms up times 2- returns are clear. TOOH for wiper run from 7,113' to 5,250', max 6,300', 20K over. TBIH to 7,113'- had minimal fill. Circulated 1st high Vis sweep, circulated 2nd calculated bottoms up strokes & lost full returns. TOOH from 7,113' to BHA- no drag. Filled backside w/ 140 bbls fresh water- hole stayed full. RU laydown Executive machine & LD BHA. Changed out rig bails & elevators, prepare floor to run csg. Weatherford DV Tool Operator on location. Summary: RU csg tools & HSM. RIH w/ 9-5/8", 40# Csg as follows (bottom to top): FS + SJ + FC + 69 jts HCL-80 + DV Tool + 89 jts J-55. 7,109.85', 7,065.82', DV 3,956.58'. Had no problems getting to bottom. RD csg crew & PU/LD machine. Circulated csg w/ rig pumps- getting full returns. : 7:30 AM 8:30AM 9:30AM 12:30PM 6:00PM 6:30 PM 8:00PM 9:00PM 10:00 PM 5:30 AM RU Baker Hughes Cementers. Finish circulate bottoms up times 2- hole clean. TOOH from 7,113' to 5,250', max 6,300', 20K over. TIH to 7,113'. Circulate 1st sweep, circulate 2nd calculated btm. Up stks lost full returns. TOOH from 7,113' to BHA'- no drag. Fill backside w/ 140 bbls fresh water- hole staying full. RU laydown machine. LD BHA. Change rig bails & elevators. RU csg tools. HSM. RIH w/ 9-5/8", 40# Csg as follows (bottom to top): FS + SJ + FC + 69 jts HCL-80 + DV Tool + 89 jts J-55. 7,109.85', 7,065.82', DV 3,956.58'. No problems getting to bottom. RD csg crew & PU/LD machine. Circulate csg- getting full returns. Rig Up/Down Drilling Reaming Coring Cond mud/circ Trips Plug Back Sqz Cmt Fishing Plug Back Sqz Cmt Fishing / Depth Angle Bit Size Mfg. Type Serial # Jets Diesel (gal) Ulterra 1800 No. 1 PZ Start Ulterra 1800 No. 2 PZ11 Received RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr End Used Casing Detail: 7, Top of 7, jts 9-5/8, 40#, HCL-80, LTC Csg. Top of DV 3, jts 9-5/8, 40#, J-55, LTC Csg to surface Rate ($/gal) Total Cost ($)

11 Date: 1/1/2017 Rig: Norton Rig #2 Daily Cost: $89,846 Report #: 13 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $945,163 Circulated csg w/ rig pump- full returns. Well flowed 20 min then Static. Continued circulating w/ full returns. RU pump trucks & held PJSM. Stand-by for booster pump from Baker Hughes. Test lines, mixed & pumped Stage 1 cmt as follows: Lead 917 sx 50/50 POZ Premium Plus C + additives, Tail 254 sx 50/50 POZ Premium Plus C + additives. Dropped bottom 1:51 PM, start displacement w/ 30 bbl FW lead followed by BW Mud. With 220 bbls displacement gone lost full returns, regained partial returns from 300 to 410 bbls gone, then lost full returns until plug down w/ 1,100 3:15 PM. Float Executive holding, dropped DV Tool opening cone. Pressured up on opening cone w/ 670 psi & opened DV Tool. Pumped 20 bbls & Summary: regained full returns. Changed lines to rig pump & circulated w/ rig pump getting full returns. Did not circulate any cement off top of DV Tool. WOC for 4 hours while circulating w/ rig pump. HSM, mixed & pumped Stage 2 cement as follows: Lead 552 sx 50/50 POZ C + additives, Tail 145 sx 50/50 POZ + additives. Bumped plug w/ 1,950 10:21 PM. Held pressure for 30 mins (csg test). Bleed pressure back to pump, DV Tool closed. No cement to surface. RD Baker Hughes Cementers. ND & hung back BOP stack. Set slips w/ 200K setting down on them. ND spacer spools, cut csg, NU & tested B Section WH to 1,500 psi. Began NU BOP. NU BOP, jetting pits. : 8:00 AM Circulate w/ rig pump- full returns. Well flowed 20 min then Static. 11:30 AM Circulate w/ full returns. RU pump trucks & held PJSM. WO Baker equipment. 4:00PM 8:00PM 10:30 PM 11:00 AM 11:30 PM 12:30 AM 5:00 AM Test lines to 3m PSI, pump cmt. 1 stage as per Baker cement proposal. Drop 220 bbls displacement gone lost full returns, regain partial returns from 300 to 410 bbls gone & lost full returns until bumping plug. Float holding, drop bomb (25 min) & pressure up & open DV 625 psi. Pump 20 bbls & regain full returns. Change lines to rig pump. Circulate w/ rig pump- full returns. HSM. Mixed & pumped Stage 2 cement: Lead 552 sx 50/50 POZ C, Tail 145 sx 50/50 POZ. Bumped plug w/ 1,950 10:21 PM. Held pressure for 30 mins (csg test). Bleed pressure back to pump, DV Tool closed. RD Baker Hughes Cementers. ND & hang back BOP Stack. Set slips w/ 200K setting down on them. ND spacer spools, cut csg, NU & tested B Section WH to 1,500 psi. NU BOP. Rig Up/Down Plug Back Drilling Sqz Cmt Reaming Fishing Coring Plug Back Cond mud/circ Sqz Cmt Trips Fishing TRC 0/ Depth Angle Bit Size Mfg. Type Serial # Jets Diesel (gal) Ulterra 1800 No. 1 PZ Start Ulterra 1800 No. 2 PZ11 Received RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr End Used Cement Details: Stage 1: Lead: 917 sx 50/50 POZ Premium Plus C + 3 pps LCM % Bentonite +.2% Sodium Metasilicate +.5% FL-52D gps FP-6L + 5% Salt pps Static Free +.5% R ppg, 2.46 cuft/sx, cuft. Tail: 254 sx 50/50 POZ Premium Plus C +.4% CD % Bentonite +.35% Sodium Metasilicate +.1% FL- 52D gps FP-6L pps Static Free + 5% Salt +.2% R ppg, 1.30 cuft/sx, cuft. Displaced w/ 40 bbls FW followed by 496 bbls BW Mud. Stage 2: Lead: 552 sx 50/50 POZ Premium Plus C +.5% FL-52D gps FP-6L pps Static Free + 5% Salt + 3 pps LCM % Bentonite +.2% Sodium Metasilicate ppg, 2.46 cuft/sx, cuft. Tail: 145 sx 50/50 POZ Premium Plus C +.4% CD % Bentonite +.35% Sodium Metasilicate +.1% FL- 52D gps FP-6L pps Static Free + 5% Salt ppg, 1.30 cuft/sx, cuft. Displaced w/ 20 bbls FW followed by 284 bbls BW Mud Rate ($/gal) Total Cost ($)

12 Date: 1/2/2017 Rig: Norton Rig #2 Daily Cost: $53,457 Report #: 14 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $998,620 Finished NU BOP. Jet & clean active mud pits. RD dump lines & clean back yard. Spot Q max solids control equipment w/ rig forklift & began RU. Function tested BOP, pressure test BOP to 250 psi/1,500 psi Low/High test. Finished RU panic line to Executive reserve pit. PU & MU directional BHA as follows: 8-3/4" U613M PDC Bit + 6-3/4, 7/ w/ 8-1/2 NBS Motor + Summary: NM Nortrack Stab w/ 8-1/2" Blades + NM X/O + NMDC w/ MWD + NM X/O + Nortrack Stab w/ 8-1/2" Blades + (18) 6-1/2 DCs. Surface test MWN Tools. TIH to 3,101' & RU transfer pump to drill out DV Tool w/ BW. TIH & tagged & drilled out DV 3,997'. TIH to 6,914', closed rams on BOP & tested csg to 1,500 psi for 30 mins. Changed out swivel wash pipe. : 8:00 AM 9:00AM 1:30PM 4:00PM 6:00PM 7:00 PM 9:30 PM 12:00 AM 1:00 AM 2:00 AM 3:15 AM 4:45 AM 6:00 AM Continue RU solids control, changing out swivel wash pipe. Finish NU BOP. Finish cleaning active mud pits, RD dump lines & clean back yard. Spot Q max solids control equipment w/ rig forklift. Function test BOP, pressure test BOP to 250 psi/1,500 psi Low/High test. Finish RU panic line to reserve pit. PU & MU directional BHA. PU directional tools/scribe & test. TIH to 3,101'. RU transfer pump to drill out DV Tool w/ BW. TIH & tag DV 3,997'. Drill out DV Tool. TIH to 6,914'. Test csg to 1,500 psi for 30 mins. Change out swivel wash pipe. Rig Up/Down Drilling Reaming Coring Plug Back Plug Back TRC.1/.2 0/87.2 Depth Angle Bit Size Mfg. Type Serial # Jets Ulterra Ulterra Diesel (gal) RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr 150 Start PZ11 No Received Tagged & drilled out DV 3997'. Test csg from 6,914 to surface to 1,500 psi. Held pressure for 30 mins, received good chart. End 951 Used 4185 Rate ($/gal) Total Cost ($)

13 Date: 1/3/2017 Rig: Norton Rig #2 Daily Cost: $32,360 Report #: 15 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $1,030,980 Crew worked to prepare to transfer OBM to active pits, pumping out rain water & checking valves. Nova Mud Engineer on Executive location. Held PJSM, transferred & rolled 10.5ppg OBM to active pits. Displaced hole w/ 10.5 ppg OBM. Drilled 7,065' Summary: & drilled out cement to 7,110'. Continued drilling/sliding new hole from 7,110 to 7,867 = ft/hr. Slid for a total of 2.5 hrs & made 53. : 11:30 AM 12:30 PM 1:30 PM 5:30 PM 6:00 PM 7:00 PM 7:30 PM 11:00 PM 11:30 PM 1:30 AM 2:00 AM 3:00 AM 3:30 AM 4:00 AM 6:00 AM 6:30 AM Drilling 7,853 ', ROP = 80 ft/hr, WOB = 25 klbs, Rot = 51 rpms, Pump rate = 460 gpm, Diff Pres = 216 psi ppg, Vis = 55. Pump out rain water from active pits, PJSM & transfer 10.5 ppg OBM to active pits. Displace hole w/ 10.5 ppg OBM. Drill 7,065', drill cmt, 7,110'. Drill 8.75 hole section from 7,110' to 7,289' ft/hr). Service rig & TDS. Drill 8.75 hole section from 7,289' to 7,321' 32ft/hr). Slide from 7384' to 7394' (10 20 ft/hr). Drill from 7394' to 7571' ( ft/hr). Slide from 7571' to 7586' 30 ft/hr). Drill from 7586' to 7681' 47.5 ft/hr). Slide from 7681' to ft/hr). Drill from 7691' to 7759' 68 ft/hr). Rig Repair - Change out Grabber Dies. Slide from 7759' to 7767' 16 ft/hr). Drill from 7767' to 7850' 41.5 ft/hr). Slide from 7850' to 7860' 20 ft/hr). Drill from 7860' to 7867' 14' ft/hr). Drill from 7860' to 7867' 14' ft/hr) / Depth Angle Bit Size Mfg. Type Serial # Jets x 22 Ulterra 15/35K 80TD/126DH x18 + 3x22 Ulterra 15/25K 80TD/126DH RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr No. 1 PZ11 Diesel (gal) 85 Start 0 Received

14 Date: 1/4/2017 Rig: Norton Rig #2 Daily Cost: Report #: 16 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: Drilled 8-3/4" hole section from 7,854' to 8,100' 35 ft/hr). Lost returns, and POH from 8,100' to 7,724'. Mixed and condition LCM 20 #/bbl. Pumped LCM pill, plugged bit at calculated strokes to bit. POH to csg shoe and attempt to Executive unplug bit with no success. TOH pulling wet string for pugged off bit/pipe. LD bit, found bit jets clear. Shoulders on bit worn. Summary: Worked to remove MWD out on Monel. LD mud motor, found motor plugged off w/ LCM. PU on new 6-3/4, 7/ w/8-1/2 NBS Motor + new MWD & RIH. Test motor & MWD tool. PU new 8-3/4" U613M PDC Bit & TIH w/ new BHA : 2:00 PM 3:00 PM 4:00 PM 5:00 PM 7:00 PM 12:30 AM 3:00 AM 4:30 AM 5:30 AM TIH w/ new bit + new motor + new MWD Drill 8.75" hole section from 7,854' to 8,100' ( 35 ft/hr ) Lost returns, and POH from 8,100' to 7,724' Mix and condition LCM 20 #/bbl Pump LCM pill, plugged bit at calculated strokes to bit. POH to csg shoe and attempt to unplug bit with no success. POH with wet string. TOH pulling wet string for pugged off bit/pipe LD bit, found bit jets clear. Worked to remove MWD out on Monel. LD mud motor, found motor plugged off w/ LCM PU on new 6-3/4, 7/ w/8-1/2 NBS Motor + new MWD & RIH Test motor & MWD tool. PU new 8-3/4" U613M PDC Bit & TIH w/ new BHA Rig Up/Down Drilling Reaming Coring Cond mud/circ Trips Lube Rig Plug Back Sqz Cmt Fishing Dir. Work Sqz Cmt Fishing Dir. Work 66/ Depth Angle Bit Size Mfg. Type Serial # Jets 122 Start Ulterra No. 1 PZ Received Ulterra No. 2 PZ11 0 End RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr 63 Used Rate ($/gal) Number Total Cost ($)

15 Date: 01/07/2017 Rig: Norton Rig #2 Daily Cost: $56,447 Report #: 19 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $1,190,710 Drilled 8.75" hole section from 9,446' to 9,771' 28.3 ft/hr). Mud Motor stalling, ROPs down to 18 ft/hr, WOB = 35 klbs, Rot = 63 rpms, Torque = 9.1 kft-lbs, Pump Rate = 454 gpm, Diff Pres = psi, SPP = 2973 psi. 9.8 ppg, Vis = Executive 50. Circulate & spot heavy pill on bottom. TOH to check mud motor & bit. ± 4400' (inside csg), air lines are beginning to Summary: freeze on rig. Blocks will not raise or lower. Work to thaw & inspect rig. Found drum valve behind console frozen. Continued TOH for motor/ bit. : 4:00 PM 4:30 PM 7:00 PM 8:00 PM 11:00 PM 3:00 AM TOH to check motor & bit Drill 8.75" hole section from 9,422' to 9,735' ( ft/hr ) Service rig and TDS Drill 8.75" hole section from 9,735' to 9,773' ( ft/hr ) = 2973 psi. 9.8 ppg, Vis = 50. Circulate & spot heavy pill on bottom. Mud Motor stalling, TOH to Check mud motor & bit. Found drum valve behind console frozen. Continue TOH for motor/ bit / Depth Angle Bit Size Mfg. Type Serial # Jets 6 x 22 Ulterra 15/35K 80TD/126DH x 22 Ulterra 15/35K 80TD/126DH RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr No. 1 PZ11 Diesel (gal) 16 Start 129 Received

16 Date: 01/08/2017 Rig: Norton Rig #2 Daily Cost: $55,383 Report #: 20 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $1,285,061 Laid down 8-3/4 bit #3. Found bit to be in gauge & 3 teeth damaged. Attempted to drain mud motor- motor did not drain. Executive Changed out & shallow tested directional tools. MWD tool failed- repair, replaced & retested tool. TIH w/ BHA & 1 stand Summary: DP, slipped & cut 115' drlg line. TIH to 7,100' filling pipe every 20 stds. Circulate & condition mud to 9.7 ppg In/out. TIH & washed down to bottom. Drilled from 9,771' to 10, ft/hr). Drilling 10,123 ', ROP = 31.7 ft/hr, WOB = 30.2 klbs, Rot = 49 rpms, Torque = 9.9 kft-lbs, Pump Rate = 425 gpm, : Diff Pres = 238 psi, SPP = 2,598 psi. 9.8 ppg, Vis = 50. 8:30 AM 10:00 AM 11:30 AM 1:00 PM 4:00 PM 5:00 PM 7:30 PM Break bit & drain mud motor- motor did not drain. Change directional tools & shallow test MWD- tool failed. LD MWD & work on same, shallow test- OK. TIH w/ BHA & 1 std DP. Slip & cut 115' drlg line. TIH to 7,100', fill pipe every 20 stds. Circulate & condition mud, 9.7+ ppg in/out. TIH, wash down to bottom. Drill from 9,771' to 10,123' 30.6 ft/hr) / Depth Angle Bit Size Mfg. Type Serial # Jets 6 x 22 Ulterra 15/35K 80TD/126DH x 22 Ulterra 15/35K 80TD/126DH 9771 RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr No. 1 PZ11 Diesel (gal) 12 Start 71 Received

17 Date: 01/09/2017 Rig: Norton Rig #2 Daily Cost: $88,224 Report #: 21 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $1,378,523 Drill from 10,123' to 10,460' ft/hr). Pump Hi-Vis LCM sweep & circulate hole clean. POOH to 9,540'- no excessive drag. TIH w/ full returns. Circulate bottoms up, mud 9.8 ppg in/out. TOOH, remove RCH at 9,280' & continue to TOOH. RU LD Truck, HSM & LD 6" DCs & directional tools. PU new directional tools & RIH as follows: 6-3/4, Executive 7/ Slick Motor + NM Pony DC + NM X/O + NMDC w/ MWD + NM X/O + NM Flex Collar. Shallow test Summary: directional tools. PU on 8-3/4" Hybrid Bit & continue to TIH w/ 16 Stands 4-1/2" DP. Check pump-in pressure = SPM. PU on X/O + NOV Agitator + X/O + 1 stand 4-1/2 DP & check pump-in pressure = SPM. Continue TIH w/ BHA on 4-1/2 DP. : TIH w/ Build assembly BHA to drill curve. 1:30 PM 3:00 PM 4:00 PM 5:00 PM 7:00 PM 10:00 PM 10:30 PM 1:00 AM 3:30 AM Daily ( - ) Drill from 10,123' to 10,460' ft/hr). Pump Hi-Vis LCM sweep & circulate hole clean. POOH to 9,540'- no excessive drag. TIH w/ full returns. CBU, MU 9.8ppg in/out. POOH, remove RCH at 9,280'. POOH. TOOH. RU LD Truck, HSM. LD 6" DCs & Directional Tools. PU new directional tools & shallow test. PU on 8-3/4" Hybrid Bit. TIH w/ BHA on 16 stands 4-1/2" DP. Check pump-in pressure = SPM. PU Agitator, check pump-in pressure = 480 Nova / Depth Angle Bit Size Mfg. Type Serial # Jets Depth Angle /4 Baker HughesKM624 Hybri x /4 Ulterra U613M PDC x 22 RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Bit #6 Report: 1,1,CT,G,-,IN,NO,TD.

18 Date: 01/10/2017 Rig: Norton Rig #2 Daily Cost: $42,912 Report #: 22 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $1,421,435 TIH w/ curve BHA to 7,100', filled hole every 20 stds w/ full returns. Circulated bottoms up w/ 9.8 ppg mud in/out. TIH Executive picking up 4.5" DP from 9,995' to 10,460'. Slide & drill building curve hole section from 10,460' to 11,225 MD. Summary: Landed 11,225, w/ last 11,903 Inc = 71.2, Azm = Predicted 11,153 MD, Inc = 80.00, 342, 10, Total time to drill curve = 16.5 hours. : Circulating bottoms up, prep for short trip to 10,460'. 8:00 AM 8:30 AM 10:30 AM 11:00 AM 12:30 PM 6:00 PM 6:15 PM 6:40 PM 6:55 PM 8:35 PM 8:55 PM 10:45 PM 11:05 PM 11:45 PM 12:00 AM 1:15 AM 1:40 AM 3:50 AM Daily ( - ) TIH w/ curve BHA to 7,100' fill hole every 20 stds w/ full returns. CBU 9.8 ppg in/out. TIH to 9,995'- full returns. Service rig & TDS., change dies on TD grabber. Pick up 4.5" DP from 9,995' to Btm 10,460'. Slide drill building curve hole section from 10,460' to 10,715' ft/hr). Drilled from 10,715' to 10,755' 165 ft/hr) - WOB = 30 klbs; GPM = 340; RPMs = 55. Slide from 10,755' to 10,773' ft/hr) - WOB = 20 klbs; GPM = 486; 90L. Survey & 10,713', Inc = 28.17, Azm = Slide from 10,773' to 10,868' ft/hr) - WOB = 20 klbs; GPM = 486; TFO = 90L. Survey & 10,808', Inc = 33.27, Azm = Slide from 10,868' to 10,963' ft/hr) - WOB = 20 klbs; GPM = 486; TFO = 30L. Survey & 10,903', Inc = 47.31, Azm = Slide from 10,963' to 10,973' ft/hr) - WOB = 20 klbs; GPM = 447, TFO = 30L. Drill from 10,973' to 10,983' 40 ft/hr) - WOB = 30 klbs; GPM = 340; RPM = 55. Survey & 10,903', Inc = 47.31, Azm = Slide from 10,963' to 10,973' ft/hr) - WOB = 20 klbs; GPM = 447, TFO = 30L. Drill from 10,973' to 10,983' 40 ft/hr) - WOB = 30 klbs; GPM = 340; RPM = 55. Nova /8 Depth Angle Bit Size Mfg. Type Serial # Jets 4 x /4 30/30 6 x /4 Deviation RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Depth Angle KM624 Hybrid

19 Date: 01/11/2017 Rig: Norton Rig #2 Daily Cost: $204,952 Report #: 23 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $1,626,387 Pumped sweep & circulated hole clean. Oscillate drill string 60', 450 gpm, 3,075# spp, 30 rpm. Short trip to 10,400'- no excessive drag, no fill on bottom. Pumped sweep & circulated hole clean, oscillate drill string 60', 450 gpm, 3,075# spp, 30 Executive rpm. Spotted 10.3 ppg pill from 11,225' to 10,400' (through curve). POOH to 10,000'. Circulate & mix slug. Change Summary: hydraulic hose on ST-80. PJSM & RU laydown machine. Pumped slug & began LD 4-1/2" drill string + agitator + XOs. TIH w/ 4-1/2" DP out of derrick & LD. LD directional tools, pulled wear bussing, changed out elevators & bails. RU csg crew, HSM & began RIH w/ 7.0", 26#, P-110, LTC csg. : RIH w/ 7" csg. 9:00 AM 10:00 AM 12:00 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 7:00 PM 8:45 PM 9:15 PM 10:45 PM 12:15 AM 1:00 AM 2:00 AM Daily ( - ) Pump sweep & circulate hole clean, oscillate drill string 60', 450 gpm, 3,075# spp, 30 rpm. Short Pump trip sweep to 10,400'- & circulate no excessive hole clean, drag, oscillate no fill drill on string btm. 60', 450 gpm, 3,075# spp, 30 rpm. Spot 10.3 ppg pill from 11,225' to 10,400'. POOH to 10,000'. Circulate, mix slug. Service rig & TDS, change hydraulic hose on ST-80. PJSM & RU laydown machine. Pump slug & LD 4-1/2" drill string. LD 4-1/2" DP + agitator + XOs. TIH w/ 4-1/2" DP out of derrick. LD 4-1/2" DP. LD directional tools. Pull wear bussing. Change out elevators & bails. RU csg crew. HSM. RIH w/ 7.0", 26#, P-110, LTC csg. Pull wear bussing. Change out elevators & bails. RU csg crew. HSM. RIH w/ 7.0", 26#, P-110, LTC csg /8 4/6 -/ Depth Angle Bit Size Mfg. Type Serial # Jets KM624 Hybrid No. 1 4 x 18 U613M PDC No. 2 6 x 22 30/ RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Baker Hughe Diesel (gal)

20 Date: 01/12/2017 Rig: Norton Rig #2 Daily Cost: $157,522 Report #: 24 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $1,783,909 RIH w/ 7.0", 26#/ft, P-110, LTC csg to 7,081'. Attempt to break 315 gpm, partial returns. WO 275 gpm. RU Rugged Energy Services pump truck & break 1.5 gpm, stage pump to 2 bpm & started losing mud. 1.5 bpm w/ full returns. Finish RIH w/ 7.0", 26#/ft, P-110, LTC csg to 11,225'. Circulate w/ pump 1.0 bpm stage up to 3.0 bpm. RD csg crew. RU cementers ground. HSM, RU cementer s floor. Mixed & pumped Stage 1 cement: Lead: 309 sx 50/50 POZ C + additives, 11.8 ppg, 2.45 cuft/sx; Tail: 150 sx 50/50 POZ C + additives, 14.2 ppg, 2.46 cuft/sx. Had full returns Executive throughout cement job. 300 bbls into displacement started losing returns. Bumped 12:05 AM w/ 1,450 psi, check Summary: floats- good. Drop DV Tool opening plug. Pressured up on plug to 720 psi & opened tool. Turned operations over to rig & began circulating 5.5 BPM. Started losing returns (100 bbls). RU pump truck & circulated WB w/ PT BPM- getting full returns. WOC. Safety meeting. Mixed & pumped Stage 2 Cement: Lead: 220 sx 50/50 POZ C + additives, 11.8 ppg, 2.46 cuft/sx; Tail: 61 sx 50/50 POZ C + additives, 14.2 ppg, 1.3 cuft/sx. Pumped job w/ full returns, closed stage tool w/ 1,980 8:10 AM. No cement to surface. Pressure test csg to 1,500 psi from DV 6,900 to surface- good test. : Testing 7" csg from DV 6,900' to 1,500 psi. 8:30 AM 9:30 AM 9:30 AM 5:00 PM 8:00 PM 12:00 AM 1:00 AM 6:00 AM RIH w/ 7.0", 26#/ft, P-110, LTC csg to 7,081'. Attempt to break 315 gpm, partial returns, WO 275 gpm TEE pump truck (Rugged). RU pump truck & break 1.5 gpm, stage pump to 2 bpm & started losing mud. 1.5 bpm w/ full returns. Finish RIH w/ 7.0", 26#/ft, P-110, LTC csg to 11,225'. Circulate w/ pump 1.0 bpm stage up to 3.0 bpm. RD csg crew. RU cementers ground. Hold safety meeting, RU cementers. Mixed & pumped Stage 1 cement: Lead: 309 sx 50/50 POZ C + additives, 11.8 ppg, 2.45 Drop DV Tool opening plug. Pressured up on plug to 720 psi & opened tool. Turned operations over to rig & began circulating 5.5 BPM. Started losing returns (100 bbls). RU pump truck & circulat Safety meeting. Mixed & pumped Stage 2 Cement: Lead: 220 sx 50/50 POZ C + additives, 11.8 ppg, 2.46 cuft/sx; Tail: 61 sx 5 -/ / Depth Angle Bit Size Mfg. Type Serial # Jets Baker Hughe No. 1 Diesel (gal) Ulterra No. 2 Start RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Received PZ End Casing Detail: 247 jts + SJ - 7.0, 26#, P-110, LTC. 11,224, 11,176, DV 6,900. Marker 9, & 6, (from surface). Cement Detail: Stage 1: Lead 309 sx 50/50 POZ C + additives, 11.8 ppg, 2.46 cuft/sx. Tail 150 sx 50/50 POZ H + additives, 14.2 ppg, 1.26 cuft/sx. Bumped Plug w/ 1,450 psi, Floats held. 12:00 AM; 1/12/17. Opened Staging Tool w/ 720 psi. Stage 2: Lead 220 sx 50/50 POZ C + additives, 11.8 ppg, 2.46 cuft/sx. Tail 61 sx 50/50 POZ C + additives, 14.2 ppg, 1.26 cuft/sx. Used Rate ($/gal) Total Cost ($)

21 Tail 61 sx 50/50 POZ C + additives, 14.2 ppg, 1.26 cuft/sx. Closed Staging Tool w/ 1,980 psi. 8:10 AM; 1/12/17. No cement to surface.

22 Date: 01/13/2017 Rig: Norton Rig #2 Daily Cost: Report #: 25 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: Finished pumping stage 2 Cement: Lead sx 50/50 POZ C + additives, 11.8 ppg, 2.46 cuft/sx, Tail - 61 sx 50/50 POZ C + additives, 14.2 ppg, 1.3 cuft/sx. Pumped job w/ full returns, closed stage tool w/ :10 1/12/2017., Check floats, holding, bleed back 2 bbls. Pressured up to 1500 psi & recorded for 30 minutes. Good test. PJSM and rig down cementing Executive equipment. N/D pollution pan and BOP, pick up stack and set 7" C-22 casing slips. PJSM. Cut and dress 7" casing. Changed Summary: out liners on both MP's to 4.5" & changed out E-Brake on draw works. Nipple up BOP, changed out DP ram blocks to 4.0. Change out bail, elevators & PU 4" handling tools. Test BOP/ blinds, 4" manual valve & test choke, 250 low high. Cut & slip 90' of drill line. Rack & strap 4" drill pipe. Enter tally into Pason : Strapping BHA 9:30 AM 10:00 AM 10:00 AM 7:00 PM 10:30 PM 12:30 AM 2:45 AM 3:45 AM additives, 14.2 ppg, 1.3 cuft/sx. Pumped job w/ full returns, closed stage tool w/ :10 1/12/2017., Check floats, PJSM and rig down cementing equipment. MP's to 4.5", Change E-Brake on Dwks. Nipple up BOP, Change DP ram blocks to 4.0". Change out 4-1/2" pipe rams to 4" rams Change out bail, elevators & PU 4" handling tools Test BOP/ blinds, 4" manual valve & test choke, 250 low high Cut & slip 90' of drill line Rack & strap 4" drill pipe. Enter tally into Pason -/ / Depth Angle Bit Size Mfg. Type Serial # Jets Baker Hughe No. 1 Diesel (gal) Ulterra No. 2 Start RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Received PZ End Changing out Equipment & tools to drill lateral w/ 4" Used Rate ($/gal) Total Cost ($)

23

24 Date: 01/14/2017 Rig: Norton Rig #2 Daily Cost: Report #: 26 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: Pick up and make up lateral BHA as follows: Ulterra 6.125: U613M PDC bit w/ 6 x 18 jets , 7/8, 3.8 Mud Motor + Double pin NM sub + NMDC w/mwd + NMDC + XO + 48 jts 4.0" 14#/ft S-135 DP + Agitator & safety sub. Surface test mud motor and MWD. PJSM with laydown crew, R/U laydown machine. (533 jnts 4.0" DP + 30 jts 4 HW DP on Executive location). Strap & Tally 4" 14#/ft S-135 DP with XT39 connection. P/U & RIH w/ DP drifting to 2.437" to 6,898'. Re-count DP Summary: on location, review and confirm tally & depth, TOH standing back 12 stands 4" DP. Load & strap HW 4" DP, PU & RIH w/ 30 jts 4" HW DP w/ XT-39 connections + 2 stds 4" DP out of derrick. Condition mud & circulate, check pumps. Tag & drill out DV 6889'. TIH 9 stds 4" DP out of derrick. PU & continue RIH w/ 4", 14#, S-135 DP w/ XT-39 connections. Tag 11,158' (reported Float 11,183'). RD PU/LD machine, install rotating head w/ new rubber & circulate bottoms up. Float Collar : 9:00 AM 9:30 AM 9:30 AM 8:00 PM 8:30 PM 9:00 PM 10:00 PM 11:00 PM 11:30 PM 12:00 AM 4:30 AM 5:00 AM Pick up and make up lateral BHA. Surface test mud mtr and MWD. PJSM with laydown crew, R/U laydown machine. ( 533 jnts 4.0" DP on Loc. ) SLM 4" 14#/ft S-135 DP with XT39 connection. P/U & drift (2.437") DP to 6,898' Count DP on location, review and confirm tally & depth TOH 12 stands 4" DP Load & strap HW 4" DP PU & RIH w/ 30 jts 4" HW DP w/ XT-39 connections + 2 stds 4", 14#, S-135 DP w/ XT-39 conn. Condition mud & circulate, check pumps Tag DV 6889', drill out DV Tool TIH 9 stds 4" out of derrick PU & continue RIH w/ 4", 14#, S-135 DP w/ XT-39 connections to 11,153' (Float 11,1') RD PU/LD machine 11/8 10 -/ // Depth Angle Bit Size Mfg. Type Serial # Jets 24.5k No No RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Ulterra PZ11 14 Diesel (gal) Start Received End

25 Date: 01/15/2017 Rig: Norton Rig #2 Daily Cost: Report #: 27 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: Test Csg from 11173' to surface, to 1,500 psi for 30 mins. Received good chart. Drilled out FC + SJ + DS, fell out of 11,225. Drilled/ slide from 11,225' to 11,599' 41.6 ft/hr) Drilling WOB = 30 klbs, 60 RPMs, GPM. Sliding WOB = 20 klbs, GPM. Began losing pressure & differential pressure, TOH w/ 6 stands to 11,225'. Pressure test rig lines for leaks/ check pumps for wash-out, found all OK. TOH standing back to check down hole tools. Found hole in 4" Executive DP: Middle Jt of stand #21, Jt # 256, 9,649' below surface w/ 11,505. LD bad jt, PU new jt & TBIH w/ 4" DP out of Summary: derrick. Drilled/ Slide from 11,599' to 11,758' ft/hr). Drilling WOB = 20 klbs, 60 RPMs, 200 GPM. Sliding WOB = klbs, 200 GPM. 5 Hrs Sliding, 12.5 hrs Drilling Drilling 11,758' MD, ROP = 55 ft/hr, WOB = 20 klbs, ROT = 65 rpm, TOR = 8.1 kft-lbs, Diff Pres = 424 psi, Pump rate : = SPM, SPP = 2458 psi. 7:30 AM 9:30 AM 9:30 AM 5:00 PM 7:00 PM 7:30 PM 9:00 PM 10:15 PM 10:45 PM 12:30 AM Test Csg to 1500 psi for 30 mins, from 11173' to surface. Received good chart Drill out FC + SJ + DS, fell out of GPM. Rig Service GPM. Losing pressure & differential pressure, TOH w/ 6 stands to 11,225' Pressure test rig lines for leaks/ check pumps for wash-out, found all OK TOH standing back to check down hole tools. Found hole in 4" DP: Middle Jt of stand 21, Jt # 256, 9,649' below surface w/ 10(LD bad jt, PU new jt. TBIH w/ 4" DP out of derrick Drilled/ Slide from 11,599' to 11,758' ft/hr). Drilling WOB = 20 klbs, 60 RPMs, 200 GPM. Sliding WOB = k 15/ / / Depth Angle Bit Size Mfg. Type Serial # Jets k No No RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Ulterra PZ11 14 Diesel (gal) 85 Start 90 Received 342 End

26 Date: 01/16/2017 Rig: Norton Rig #2 Daily Cost: $47,528 Report #: 28 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $2,024,701 Drill & slide from 11,758' to 12, ft/hr). Average parameters while drilling: WOB = 20 klbs, 60 RPMs, 200 GPM. Average parameters while sliding: WOB = klbs, 200 GPM. 3.5 hours sliding, 20 hours drilling. Recent Survey: MD = 12,595, INC = AZI = , TVD = 10,917.33, VS = '. Executive Footage in Zone: -30 RSD. Summary: Observed 2.5 formation up dip. Dip angle calculations sustaining 2.5. Note: Top of Zone = +38 RSD/ Base of Zone = -62 RSD. : Drilling 12,670' MD, ROP = 84.8 ft/hr, WOB = 20 klbs, ROT = 72 rpm, TOR = kft-lbs, Diff Pres = 395 psi, Pump Rate = 226 gpm, SPP = 2,834 psi. 3:00 PM 3:30 PM 3:30 PM 8:00 PM 8:30 PM 12:30 AM 2:00 AM 4:00 AM 4:30 AM Drill/ Slide from 11,758' to 12, ft/hr). Drilling WOB = 20 klbs, 60 RPMs, 200 GPM. Sliding WOB = klbs, 200 GPM. Service rig & TDS. Drill/ Slide from 12,071 to 12,228' 44.8 ft/hr). Drilling WOB = 20 klbs, 60 RPMs, 200 GPM. Sliding WOB = klbs, 200 GPM. Drill from 12,228' to 12,269' 41 ft/hr). WOB = 20 klbs, Pump Rate = 200 gpm, Rot = 65 rpms. Slide from 12,269' to 12,279' 20 ft/hr). WOB = 20 klbs, Pump Rate = 200 gpm, 180. Drill from 12,279' to 12,458' ft/hr). WOB = 20 klbs, Pump Rate = 200 gpm, Rot = 65 rpms. Slide from 12,458' to 12,478' 13.3 ft/hr). WOB = 20 klbs, Pump Rate = 200 gpm, 180. Drill from 12,478' to 12,552' 37 ft/hr). WOB = 20 klbs, Pump Rate = 200 gpm, Rot = 65 rpms. Slide from 12,552' to 12,562' 20 ft/hr). WOB = 20 klbs, Pump Rate = 200 gpm, 180. Drill from 12,562' to 12,670' 43.2 ft/hr). WOB = 20 klbs, Pump Rate = 225 gpm, Rot = 72 rpms. 3.5 Hrs Sliding, 20 hrs Drilling. 13/ / / Depth Angle Bit Size Mfg. Type Serial # Jets k No No RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Ulterra PZ Diesel (gal) 170 Start 382 Received 0 End

27 Date: 01/17/2017 Rig: Norton Rig #2 Daily Cost: $50,456 Report #: 29 Current Depth: Progress Last 24 Hrs: 0 Cum Cost: $2,075,157 Drill & slid lateral from 12,670 to 13,768 MD, ft/hr). 14 hours drilling, 7 hours sliding, 3 hours surveying & connections. Average parameters while drilling: WOB = 20 klbs, ROT = 65 rpms, Pump Rate = 208 gpm. Average Executive parameters while sliding: WOB = 20 klbs, Pump Rate = 200 gpm. Summary: Most Recent Survey: MD = 13,727, INC = 94.65, AZI = , TVD = 10,871.90, VS = 2, RSD (at top of or just above miss lm) footage in zone. Observed 1.55 (up) formation dip. : Drilling 13,768' MD, ROP = 78.7 ft/hr, WOB = 16.6 klbs, Rot = 68 rpm, TOR = kft-lbs, Diff Pres = psi, Pump Rate = 211 gpm, SPP = 3,037 psi. 3:00 PM 4:00 PM 4:00 PM 7:30 PM 9:00 PM 10:00 PM 11:00 PM 12:30 AM 1:15 AM 3:30 AM 4:30 AM 6:00 AM Drill/ Slide from 12,670' to 13, ft/hr). Drilling WOB = 20 klbs, 60 RPMs, 220 GPM. Sliding WOB = klbs, 220 GPM. Service Drill/ Slide rig & from TDS. 13,108' to 13,306' 66 ft/hr). Drilling WOB = 20 klbs, 60 RPMs, 220 GPM. Sliding WOB = klbs, 220 GPM. Slide from 13,306' to 13,321'. WOB = 20 klbs, Pump Rate = 200 gpm, 150L. Drill from 13,321' to 13,401' 53 ft/hr). WOB = 20 klbs, Rot = 65 rpms, Pump Rate = 225 gpm. Slide from 13,401 to 13,431'. WOB = 20 klbs, Pump Rate = 225 gpm, 75 R. Drill from 13,431' to 13,495' 64 ft/hr). WOB = 20 klbs, Rot = 65 rpms, Pump Rate = 225 gpm. Slide from 13,495' to 13,535'. WOB = 20 klbs, Pump Rate = 208 gpm, 30 R. Drill from 13,535' to 13,579' 59 ft/hr). WOB = 20 klbs, Rot = 65 rpms, Pump Rate = 208 gpm. Slide from 13,579' to 13,609'. WOB = 20 klbs, Pump Rate = 200 gpm, 80 R. Drill from 13,609' to 13,673' 64 ft/hr). WOB = 20 klbs, Rot = 65 rpms, Pump Rate = 208 gpm. Slide from 13,673' to 13,697'. WOB = 20 klbs, Pump Rate = 200 gpm, 150 R. 12/ / / Depth Angle Bit Size Mfg. Type Serial # Jets k No No RPM WOB Pump Press. SPM GPM Ftg Hrs Ft/Hr Ulterra PZ11 Diesel (gal) 132 Start 528 Received 0 End

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Latest Advancements in DrillString Mechanics

Latest Advancements in DrillString Mechanics Services, Trainings, Softwares Latest Advancements in DrillString Mechanics SPE Gulf Coast Section 03/09/2016 Stephane Menand, Ph.D. stephane.menand@drillscan.com 1 DrillScan Intro Directional Drilling

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8 -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8 12UNF Each 6 Vendor Item UOM Qty Uniexcel Sumitomo Sumitomo 7" OD Pup Joint 35 PPF P110-5 ft Long PTB007 Pin X Box Ea 9 7" Integral Cross Over 24" OAL 35ppf VAM TOP Pin x NSCC Box materal AISI Ea 1 USED ITEM 7" Integral

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures IADC Southern Arabian Peninsula Chapter February 15 th, 2018 Top Drive Automation Overcoming Inefficiencies

More information

Health, Safety and Environment: Product Performance: Proven Quality: Presence: Client Focus: Tried and Tested:

Health, Safety and Environment: Product Performance: Proven Quality: Presence: Client Focus: Tried and Tested: Wenzel Downhole Tools is the leading motor and drilling tool supplier, with worldwide operations supporting the oilfield and construction industries. Wenzel s capability to engineer, manufacture and service

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

Superintendent Rig Checklist

Superintendent Rig Checklist Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:

More information

Casing Cementation Equipment

Casing Cementation Equipment Casing Cementation Equipment Float Equipment Cementing Plugs Casing Centralizers Stage Tools Inflatable Casing Packers Extended Reach Casing Equipment Swellable Casing Packers Liner Equipment Quality Control/Assurance

More information