1 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@ CASINGWELL CONTROL Last Casing: 121ft Next Casing: 1,550ft Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: Engineer: H&P 639 hr 0.0 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 2.00 $105,931 $542,605 $2,000,000 Lithology: SANDGYPSUMDOLOMITE CHANGING OUT ORBIT VALVE CEMENT 10 34" CASING, INSTALL WELLHEAD, NIPPLE UP AND TEST BOP'S AND TEST CASING. (RR ROL 4115) RUN IN HOLE WITH BHA #2 AND DRILL AHEAD AS PER PROG. PERSONNEL JON JOHNSON MARCOS GARCIA KARINA YUSTIZ-DIAZ Geologist: SPENCER GUNDERSON Oxy Personnel: 3 Contractor Personnel 25 Total on Site: 28 Size Manufacturer HOOKLOAD & TORQUE Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model HYDRAULICS Pump Rate: 0.0 Pump Press: 0 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 1, , , , Serial No BIT RECORD IADC Nozzles MD In MD Out I-O-D-L B-G-O-R Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI MUD DATA - NOV FluidControl Engineer: Mike Haralson MBT: Sample From: In (Suction Pit) ph: Mud Type: Time MD: Spud Mud 0:01 1,576.0 Pm Pom: Pf Mf: Temp: 8.90 Rheology Temp: 80 Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 1.50 VG Meter: 0@0 4@300 6@600 Comments: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: 8.0 2, $400 $1,600 LAST OR CURRENT BHA Component OD ID Jts Length MUD PRODUCTS Product Number of Units Qty Used Units Transportation 1.00 each :56:00AM Page 1 of 3

2 Report No: 5 OPERATIONS From To Phase Sub Type eration Details 0:00 1: SURC CMT RIGUP P PJSM WITH HALLIBURTON AND RIG UP CEMENT EQUIPMENT 1:00 3: SURC CMT PRIM P PJSM ON CEMENTING. TEST LINES TO 3K, TEST GOOD. PUMP 20 BBLS DYE PPG 6 BBLSMIN. PUMP LEAD CEMENT 217 BBLS (660 PPG 6 BBLSMIN YIELD 1.843, HALLIBURTON LIGHT PREMIUM PLUS 3% SALT (ACCELERATOR) 5 LBM KOL-SEAL LBM POLY-E-FLAKE. PUMP TAIL CEMENT 138 BBLS (580 PPG 6 BBLSMIN YIELD 1.342, PREMIUM PLUS CEMENT 2% CALCIUM CHLORIDE PELLET. DISPLACE 148 BBLS PPG 6 BBLSMIN. SLOW DOWN LAST 20 BBLS TO 3 BBLSMIN. FINAL CIRCULATING PRESSURE 600 PSI, BUMP PLUG W 1100 PSI, HELD FOR 5 MINS, BLEED BACK 1 BBL, FLOAT HELD. HAD FULL RETURNS THROUGH WHOLE JOB, 200 BBLS (600 SKS) CEMENT BACK TO SURFACE. 3:30 4: SURC CMT RIGUP P REVIEWED EJSA AND FLUSH CONDUCTOR PIPE AND FLOW LINE AND RIG DOWN CEMENTING EQUIPMENT 4:30 6: SURC CMT RIGUP P NIPPLE DOWN FLOW LINE, 16'' CONDUCTOR PIPE AND RELATED EQUIPMENT, LIFT 16'' CONDUCTOR PIPE MAKE ROUGH CUT ON CONDUCTOR PIPE AND LAY DOWN SAME 6:00 10: SURC WLHD RWH P MAKING FINAL CUT ON CASING AND CONDUCTOR, INSTALL AND TEST WELLHEAD TO 1463 PSI. TEST GOOD. 10:30 12: SURC BOP RUBOP P PJSM WITH MONAHANS NIPPLE UP CREW AND RIG CREW, NIPPLE UP BOPS, CHOKE LINE AND HYDRAULIC HOSES AND FUNCTION TEST SAME. 12:00 16: SURC BOP TSTBOP P RU MONAHANS TESTING EQUIPMENT AND COMPLETED BOP TESTING, TEST TIW AND DART TO 250 LOW AND 10K HIGH FOR 5 MINS EACH, TEST STAND PIPE, MUD LINES AND TOP DRIVE VALVES TO 250 LOW AND 3500 HIGH FOR 5 MINS EACH, TEST A-SECTION OF WELLHEAD TO 250 LOW AND 5K HIGH FOR 5 MINS EACH, TEST B-SECTION OF WELLHEAD TO 250 LOW AND 10K HIGH FOR 5 MINS EACH. 16:00 16: SURC CSG PIPE P TEST CASING TO 2800 PSI FOR 30 MINUTES. TEST GOOD. 16:30 22: SURC BOP RUBOP P INSTALL ORBIT VALVE ON STACK, RU FLOWLINE TURNBUCKLES AND ALL HOSES TO ROTATING HEAD AND ORBIT VALVE, RU 2" KILL LINE TO STACK, RU TURNBUCKLES TO STACK, DRESS SHAKER AND RU DUMP LINE TO RESERVE PIT, RU HOSES TO CENTER RESERVE PIT, INSTALL MOUSE HOLE. 22:00 23: SURC BOP RPWB P INSTALL WEAR BUSHING. 23:00 0: SURC RIGMT SRVRIG P RIG SERVICE AND RIG DOWN CASING BAIL EXTENT IONS AND ELEVATORS, AND Total Time INSTALL RIG'S BAILS AND ELEVATORS OPERATIONS - NEXT DAY From To eration Details Phase Sub Type 0:00 2: SURC TRIP BHA P REVIEWED EJSA AND PICK UP AND MAKE UP BIT, AND DIRECTIONAL TOOLS, SCRIBE MUD MOTOR, INSTALL MWD TOOL AND (MAKE UP AND BREAK OUT & RE TORQUE EVERY DIRECTIONAL PIECE) SURFACE TEST MWD TOOL (TEST GOOD) PICK UP AND MAKE UP BHA #2 AS FOLLOWS: " PDC DP607, BAKER 2 - PD 675 X6 CA 9 78" Slick CC, SCHLUMBERGER 3-18" UG Stabilizer 4 - Downhole Filter Sub in G rpg, Pathfinder 6 - Float Sub DR 7-14" UG Stabilizer " Mule Shoe 9 - MWD - HDS " UG Stabilizer " NMDC " Crossover " DC (12 joints) " HWDP (30 joints) 2:30 3: SURC TRIP DRILL P PICK UP AND MAKE UP 6.5'' DC AND TRIP IN THE HOLE TO 504' 3:30 6: SURC BOP CHRAMS PT CHANG OUT ROTATING HEAD OBIT VALVE DUE TO NOT CLOSING 100% Total Time :56:00AM Page 2 of 3

3 Report No: 5 Safety Incident? Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N N Days since Last RI: Days since Last LTA Weather Comments: DRIVING DIRECTIONS TO BLACKHAWK UL 3112: FROM FT STOCKTON GO EAST ON INTERSTATE I MILES TO EXIT #272, THEN GO SOUTH ON UNIVERSITY ROAD 2.2 MILES, THE ROAD WILL TURN LEFT FOR 5 THENTHS OF A MILE THEN TURN BACK SOUTH FOR 3.4 MILES, TURN WEST 3 MILES THEN TURN RIGHT 3 TENTHS OF A MILE AND TURN NORTH TO LOCATION RIG PHONE: LAT: N LON: W NOTIFIED TRRC OF INTENT TO SPUD, RUN CSG & CEMENT: TALKED TO 11AM ON JOB # 3728 NOTIFIED TRRC OF INTENT TO RUN CSG & CEMENT: RIG ACCEPTED ON FULL RATE ON 11:00HRS 4.5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION- 0 5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION " DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 8" DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 UNSAFE ACTS: 14 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA: 14 NEAR MISSES: 0 JSA's: 16 SAFETY MEETINGS: 14 LOTO's: 0 PERMITS TO WORK: 21 POWER LINE CHECK LIST: PRE SPUD INSPECTION: HAZARD ID's: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED HAND ATTEMPTING TO CARRY HEAVY LOAD BY HIMSELF, HAND WAS STOPPED AND DANGERS WERE DISCUSSED AND WORK CONTINUED WITHOUT INCIDENT :56:00AM Page 3 of 3

4 Report No: 8 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 5585 ft Progress: 4846 ft Rot Today: Avg ROP Today: BRUSHY CANYON@4,620.0 CASINGWELL CONTROL Last Casing: 1,576ft Next Casing: 7,500ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft 7.50 hr 98.5 fthr DRILLING 9 78'' HOLE TRIP OUT TO REPLACE MOTOR AND BIT, TRIP IN TO BTM AND DRILL TO 5585'. (RR ROL 4115) DRILL INTERMEDIATE HOLE AS PER PROG. PERSONNEL ONAS ZAMORA MARCOS GARCIA BRIAN STOCKHOLM Geologist: SPENCER GUNDERSON Oxy Personnel: 3 Contractor Personnel 19 Total on Site: 22 Size Manufacturer HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 5.00 $76,432 $873,532 $2,000,000 Lithology: 65% SILTSTONE, 35% SAND 3.0 ft-lbf 10.0 ft-lbf HYDRAULICS Pump Rate: Pump Press: 3300 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 5, , , , , , , , , , , , Serial No BIT RECORD IADC HALLIBURTON MM65DM M423 6x Nozzles MD In MD Out BAKER DP607X M423 7x BT-A I-O-D-L B-G-O-R X-1-CT-BHA BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV FluidControl Engineer: MIKE HARALSON MBT: Sample From: In (Suction Pit) ph: Mud Type: Time MD: Brine-Based 0:01 5,035.0 Pm Pom: Pf Mf: Temp: 9.20 Rheology Temp: 80 Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 2.10 VG Meter: 0@0 3@300 5@600 Comments: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: LAST OR CURRENT BHA BHA No: 3 : 3 MD In: 5035 ft 9.0 Purpose: DRILL INTERMEDIATE MD Out: Component OD ID Jts Length 22,000 HWDP DRILL COLLAR CROSSOVER NON-MAG DRILL COLLAR FLOAT SUB UNDERGAUGE INTEGRAL BLADE STABILIZ MWD TOOL MULESHOE SUB UNDERGAUGE INTEGRAL BLADE STABILIZ ROTARY STEERABLE MOTOR PDC BIT $400 $2,400 Total Length: 1, ft Wt below Jars: MUD PRODUCTS Product Number of Units Qty Used Units Barite 10 lb NOV Salt Gel 5 lb Soda Ash 5 bbl 2 Transportation 1.00 each :26:07AM Page 1 of 3

5 Report No: 8 OPERATIONS From To Phase Sub Type eration Details 0:00 3: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 4,846' - TO 5,035' = 189 (AT 44 FPH AVG ROP) USING 525 GPM, 2825 PSI ON BTM, 2025 PSI OFF BTM, 60 SRPM, 147 MRPM = 207 BRPM, 30 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 178, SO 171, ROT :30 4: INDR CIRC CNDHOL PT CIRCULATE HOLE CLEAN TO TRIP OUT OF THE HOLE DUE TO EXCESS OF DIFF. PRESSURE AFTER ATTEMPTING TO DRILL WITH OUT SUCCESS DECISION WAS MADE TO TRIP OUT OF THE HOLE 4:30 6: INDR TRIP DRILL PT CHECK FOR FLOW (NO FLOW) PUMP A SLUG AND TRIP OF THE HOLE TO 2661' MONITORING WELL ON TRIP TANKS. WELL TAKING PROPER FILLS 6:00 6: INDR TRIP DRILL PT PJSM WITH CREW AND TOOH FROM 2661' TO 1550'. 6:30 7: INDR BOP CHRAMS PT PULL ROTATING HEAD AND INSTALL TRIP NIPPLE. 7:00 8: INDR TRIP DRILL PT TOOH FROM 1550' TO DIRECTIONAL TOOLS 8:00 8: INDR SAFE PJSM PT PJSM WITH CREW AND SCHLUMBERGER ON LAYING DIRECTIONAL TOOLS. 8:30 10: INDR TRIP PULD PT BREAK OUT BIT, PULL AND LAY DOWN MWD TOOL, STAB, MOTOR, STRAP AND PICK UP NEW MOTOR. IODL 1 2 BT A BGOR X 1 CT BHA 10:00 14: INDR TRIP DRILL PT STRAP CALIPER PICK UP AND MAKE UP NEW BIT AND DIRECTIONAL TOOLS, SCRIBE MUD MOTOR INSTALL MWD TOOL, AND TEST SAME 14:00 15: INDR TRIP DRILL PT REVIEWED EJSA AND TRIP IN THE HOLE TO 1,765' MONITORING WELL ON TRIP TANKS, WELL GIVING PROPER DISPLACEMENTS 15:30 16: INDR BOP CHRAMS PT REVIEWED EJSA AND PULL TRIP NIPPLE AND INSTALL ROTATING HEAD ELEMENT 16:00 18: INDR TRIP DRILL PT REVIEWED EJSA AND TRIP IN THE HOLE TO BOTTOM MONITORING WELL ON TRIP TANKS, WELL GIVING PROPER DISPLACEMENTS. 18:00 19: INDR CIRC CNDHOL PT DOWN LINK MWD TOOL AND WASH TO BOTTOM FROM 4989' TO 5035'.. 19:00 20: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 5035' - TO 5175' = 140 (AT 140 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2300 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 35 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 180, SO 176, ROT :00 21: INDR CIRC CNDHOL P LOST ALL RETURNS AT 5175' (450 BBLS). PUMPED 40 BBL LCM PILL AT 30 LBBBL AT 450 GPM, FOLLOWED BY 30 BBL 9.2 PPG MUD SURFACE TO SURFACE AND GOT RETURNS, PUMPED ANOTHER 40 BBL LCM PILL AT 30 LBBBL AT 450 GPM. RE-ESTABLISHED FULL CIRCULATION. 21:00 0: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 5175' - TO 5585' = 410 (AT 137 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 35 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 189, SO 182, ROT 183. Total Time OPERATIONS - NEXT DAY From To eration Details Phase Sub Type 0:00 4: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 5,585' - TO 6,053' = 468 (AT 177 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 45 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 189, SO 182, ROT :00 6: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 6,053' - TO 6,214' = 161 (AT 80.5 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 45 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 196, SO 191, ROT 195. Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. N Days since Last RI: Days since Last LTA Weather Comments: :26:07AM Page 2 of 3

6 Report No: 8 Other Remarks: DRIVING DIRECTIONS TO BLACKHAWK UL 3112: FROM FT STOCKTON GO EAST ON INTERSTATE I MILES TO EXIT #272, THEN GO SOUTH ON UNIVERSITY ROAD 2.2 MILES, THE ROAD WILL TURN LEFT FOR 5 THENTHS OF A MILE THEN TURN BACK SOUTH FOR 3.4 MILES, TURN WEST 3 MILES THEN TURN RIGHT 3 TENTHS OF A MILE AND TURN NORTH TO LOCATION RIG PHONE: LAT: N LON: W NOTIFIED TRRC OF INTENT TO SPUD, RUN CSG & CEMENT: TALKED TO 11AM ON JOB # 3728 NOTIFIED TRRC OF INTENT TO RUN CSG & CEMENT: RIG ACCEPTED ON FULL RATE ON 11:00HRS 4.5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION- 0 5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION " DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 8" DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 UNSAFE ACTS: 12 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA: 12 NEAR MISSES: 0 JSA's: 14 SAFETY MEETINGS: 11 LOTO's: 0 PERMITS TO WORK: 19 POWER LINE CHECK LIST: PRE SPUD INSPECTION: HAZARD ID's: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED HAND MIXING CHEMICALS WITHOUT RESPIRATOR, WORK WAS STOPPED AND DANGERS WERE DISCUSSED AND WORK CONTINUED WITHOUT INCIDENT :26:07AM Page 3 of 3

7 Report No: 9 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: CASINGWELL CONTROL PERSONNEL ONAS ZAMORA MARCOS GARCIA BRIAN STOCKHOLM Geologist: SPENCER GUNDERSON Oxy Personnel: 3 Contractor Personnel 19 Total on Site: 22 Rig: Progress: Rot Today: Avg ROP Today: HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: MD Incl Ref Datum: Ground Elev: AFE MDDays: AFE Number: Lithology: Azi HYDRAULICS 0.0 Pump Rate: Pump Press: 0 TVD SURVEY DATA (LAST 6) N-S days E-W DFS: Daily Cost: Cum Cost: AFE Cost: MUD GAS Avg Max Conn: Trip: Backgr: VS DLS Build BIT RECORD Size Manufacturer Model Serial No IADC Nozzles MD In MD Out I-O-D-L B-G-O-R Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI Engineer: Sample From: Mud Type: Time MD: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: VG Meter: Comments: MUD DATA - MBT: ph: Pm Pom: Pf Mf: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: $0 $3,200 LAST OR CURRENT BHA Component OD ID Jts Length MUD PRODUCTS Product Number of Units Qty Used Units Barite 10 lb Drilling Paper 4 lb 6.00 Fiber Plug 6 lb 6.00 Fiber Seal 4 lb NOV Carb Coarse 5 lb 1 NOV Carb Medium 5 lb NOV Salt Gel 5 lb Nut Plug Medium 5 lb Soda Ash 5 bbl :58:32AM Page 1 of 3

8 Report No: 9 OPERATIONS From To Phase Sub Type eration Details 0:00 4: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 5,585' - TO 6,053' = 468 (AT 177 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 45 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 189, SO 182, ROT :00 6: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 6,053' - TO 6,214' = 161 (AT 80.5 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 45 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 196, SO 191, ROT :00 10: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 6,214' - TO 6,402' = 188 (AT 47 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 45 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 196, SO 191, ROT :00 10: INDR RIGMT SRVRIG P RIG SERVICE 10:30 14: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 6,402' - TO 6,513' =110 (AT 27.5 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 45 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 196, SO 191, ROT :30 16: INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE FROM 6,513' - TO 6,548' =65 (AT 23.3 FPH AVG ROP) USING 525 GPM, 3300 PSI ON BTM, 2350 PSI OFF BTM, 50 SRPM, 147 MRPM = 197 BRPM, 45 WOB, 12K TRQ ON BTM, 3K OFF BTM, PU 196, SO , ROT :00 17: INDR CIRC CNDHOL PT CIRCULATE HOLE CLEAN TO TRIP OUT OF THE HOLE DUE TO LOSS OF ROP, AFTER ATTEMPTING TO DRILL WITH OUT SUCCESS DECISION WAS MADE TO TRIP OUT OF THE HOLE 17:30 18: INDR TRIP DRILL PT REVIEWED EJSA, CHECK FOR FLOW (NO FLOW) PUMP SLUG AND TRIP OUT OF THE HOLE MONITORING WELL ON TRIP TANKS, WELL TAKING PROPER FILLS TO 5,930' 18:00 23: INDR TRIP DRILL PT FINISH TRIPPING OUT OF THE HOLE TO BIT, MONITORING WELL ON TRIP TANKS, WELL TAKING PROPER FILLS 23:00 0: INDR TRIP BHA PT DRAIN MUD MOTOR BREAK OUT BIT AND PULL MWD TOOL Total Time OPERATIONS - NEXT DAY From To eration Details Phase Sub Type 0:00 1: INDR TRIP BHA PT DIAL DOWN MUD MOTOR FROM 1.5º TO 1.15º SCRIBE SAME, MAKE UP BIT, INSTALL AND SURFACE TEST MWD TOOL (TEST GOOD) 1:30 4: INDR TRIP DRILL PT REVIEWED EJSA AND TRIP IN THE HOLE TO 6,100' MONITORING WELL ON TRIP TANKS, WELL GIVING PROPER DISPLACEMENTS 4:00 4: INDR BOP CHRAMS PT PULL TRIP NIPPLE AND INSTALL ROTATING HEAD ELEMENT 4:30 5: INDR TRIP DRILL PT FINISH TRIPPING IN THE HOLE, WASH LAST STAND DOWN AT 525GPM AND 50 RPM 5:00 6: INDR DRILL SLDDIR P SLIDE DRILL 9 78" INTERMEDIATE HOLE FROM 6,548' - TO 6,565' =17 (AT 17 FPH AVG Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. N Days since Last RI: Days since Last LTA ROP) USING 525 GPM, 2500 PSI ON BTM, 2250 PSI OFF BTM, 0 SRPM, 147 MRPM = 147 BRPM, 15 WOB, 0K TRQ ON BTM, 0K OFF BTM, PU 197, SO 192, ROT Weather Comments: :58:32AM Page 2 of 3

9 Report No: 9 Other Remarks: DRIVING DIRECTIONS TO BLACKHAWK UL 3112: FROM FT STOCKTON GO EAST ON INTERSTATE I MILES TO EXIT #272, THEN GO SOUTH ON UNIVERSITY ROAD 2.2 MILES, THE ROAD WILL TURN LEFT FOR 5 THENTHS OF A MILE THEN TURN BACK SOUTH FOR 3.4 MILES, TURN WEST 3 MILES THEN TURN RIGHT 3 TENTHS OF A MILE AND TURN NORTH TO LOCATION RIG PHONE: LAT: N LON: W NOTIFIED TRRC OF INTENT TO SPUD, RUN CSG & CEMENT: TALKED TO 11AM ON JOB # 3728 NOTIFIED TRRC OF INTENT TO RUN CSG & CEMENT: RIG ACCEPTED ON FULL RATE ON 11:00HRS 4.5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION- 0 5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION " DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 8" DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 UNSAFE ACTS: 12 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA: 2 NEAR MISSES: 0 JSA's: 15 SAFETY MEETINGS: 12 LOTO's: 0 PERMITS TO WORK: 17 POWER LINE CHECK LIST: PRE SPUD INSPECTION: HAZARD ID's: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED HAND WORKING UNDER SUSPENDED LOAD WHILE PULLING ROTATING HEAD ELEMENT, WORK WAS STOPPED AND DANGERS WERE DISCUSSED AND WORK CONTINUED WITHOUT INCIDENT :58:32AM Page 3 of 3

10 Report No: 10 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 7409 ft Progress: 6548 ft Rot Today: Avg ROP Today: BRUSHY CANYON@4,620.0 CASINGWELL CONTROL Last Casing: 121ft Next Casing: 1,550ft Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: Engineer: PERSONNEL ONAS ZAMORA DANIEL COOK BRIAN STOCKHOLM Geologist: SPENCER GUNDERSON Oxy Personnel: 3 Contractor Personnel 19 Total on Site: 22 Size Manufacturer H&P ft 0.0 fthr HOOKLOAD & TORQUE Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Lithology: HYDRAULICS Pump Rate: 0.0 Pump Press: 0 Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 7.00 $66,015 $1,002,744 $2,200,000 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 1, , , , Serial No BIT RECORD IADC Nozzles MD In MD Out I-O-D-L B-G-O-R Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI MUD DATA - NOV FluidControl Engineer: SCOTT CALLAIS MBT: Sample From: In (Suction Pit) ph: Mud Type: Time MD: Brine-Based 0:01 7,280.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 3.00 VG Meter: Comments: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: 1@3 1@6 1@100 2@200 3@300 5@600 CHANGE BIT. TIH. DRILLING AT REPORT TIME , $675 $7,817 LAST OR CURRENT BHA Component OD ID Jts Length MUD PRODUCTS Product Number of Units Qty Used Units NOV Carb Coarse 5 lb 4.00 NOV Carb Medium 5 lb 4.00 NOV Salt Gel 5 lb Nut Plug Medium 5 lb Soda Ash 5 bbl :16:47AM Page 1 of 2

11 Report No: 10 OPERATIONS From To Phase Sub Type eration Details 0:00 1: INDR TRIP BHA PT DIAL DOWN MUD MOTOR FROM 1.5º TO 1.15º SCRIBE SAME, MAKE UP BIT, INSTALL AND SURFACE TEST MWD TOOL (TEST GOOD) 1:30 4: INDR TRIP DRILL PT REVIEWED EJSA AND TRIP IN THE HOLE TO 6,100' MONITORING WELL ON TRIP TANKS, WELL GIVING PROPER DISPLACEMENTS 4:00 4: INDR BOP CHRAMS PT PULL TRIP NIPPLE AND INSTALL ROTATING HEAD ELEMENT 4:30 5: INDR TRIP DRILL PT FINISH TRIPPING IN THE HOLE, WASH LAST STAND DOWN AT 525GPM AND 50 RPM 5:00 6: INDR DRILL SLDDIR P ROTATE & SLIDE DRILL 9 78" INTERMEDIATE HOLE FROM 6,548' - TO 6,565' =17 (AT 17 FPH AVG ROP) USING 525 GPM, 2500 PSI ON BTM, 2250 PSI OFF BTM, 0 SRPM, 147 MRPM = 147 BRPM, 15 WOB, 0K TRQ ON BTM, 0K OFF BTM, PU 197, SO 192, ROT :00 6: INDR DRILL MTRVER P ROTARY DRILL F6,565' T6610' (45'@ 90 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 45 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT :30 7: INDR DRILL MTRVER P SLIDE F 6610' ' (30'@ 30 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 0 SRPM, 148 MRPM, 15-20K WOB 7:30 11: INDR DRILL MTRVER P ROTARY DRILL F6,640' T6874' (234'@ 66.8 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 45 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT :00 12: INDR RIGMT SRVRIG P SERVICE RIG & TOP DRIVE, H&P MECHANIC SERVICED BRAKES ON DRAWORKS & GREASED COUPLINGS 12:00 13: INDR DRILL MTRVER P ROTARY DRILL F6874' T6980' (106'@ 70.6 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 40 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT :30 15: INDR DRILL MTRVER P SLIDE F 6980' (24'@ 16 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 0 SRPM, 148 MRPM, 15-20K WOB 15:00 16: INDR DRILL MTRVER P ROTARY DRILL F7004' ' (61'@ 61 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 40 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT ', 3.34 INC, AZI 16:00 18: INDR DRILL MTRVER P SLIDE F 7065' (61'@ 30.5 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 0 SRPM, 148 MRPM, 15-20K WOB 18:00 21: INDR DRILL MTRVER P ROTATE & SLIDE DRILL F7126' T7346' (220'@ FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 40 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT ', 3.08 INC, AZI 21:00 0: INDR DRILL MTRVER P SLIDE F 7346' (63'@ 21 FPH) USING 530 GPM, 2500 PSI ON BTM, 2250 PSI Total Time OFF BTM, 0 SRPM, 148 MRPM, 15-20K WOB OPERATIONS - NEXT DAY From To eration Details Phase Sub Type 21INDR DRILL P Total Time Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. N Days since Last RI: Days since Last LTA Weather Comments: Other Remarks: :16:47AM Page 2 of 2

12 Report No: 11 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 7518 ft Progress: 7409 ft Rot Today: Avg ROP Today: MIDDLE LEONARD@4,620.0 CASINGWELL CONTROL Last Casing: 121ft Next Casing: 1,550ft Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: Engineer: H&P ft 2.50 hr 43.6 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 8.00 $59,177 $1,113,417 $2,200,000 Lithology: 90% SHALE, 10% LIMESTONE PUMPING CEMENT DRILL 9 58" INT HOLE TO 7518FT, CIRC, TOOH, LD BHA, MU SHOE, RUN CSG TO 6500FT, LOST RETURNS, BUILD LCM PILL (RR ROL 4215) CEMENT INT CSG, SET & TEST PACK OFF, TEST CSG & BOP RAMS W 4" DP, PICK UP BHA PERSONNEL ONAS ZAMORA DANIEL COOK BRIAN STOCKHOLM Geologist: SPENCER GUNDERSON Oxy Personnel: 3 Contractor Personnel 19 Total on Site: 22 Size Manufacturer HOOKLOAD & TORQUE kip kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model HYDRAULICS Pump Rate: Pump Press: 2700 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 7, , , , , , , , , , , , Serial No BIT RECORD IADC Nozzles MD In MD Out HALLIBURTON MM65DM M423 7x BT-N I-O-D-L B-G-O-R X-1-CT-TD BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV FluidControl Engineer: SCOTT CALLAIS MBT: Sample From: ph: Mud Type: Time MD: Brine-Based 0:01 7,518.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 3.00 VG Meter: Comments: MUD PRODUCTS Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: 1@3 1@6 1@100 2@200 3@300 5@600 DRILL TO 7518'. CIRC HOLOE CLEAN. POOH. RUNNING CASING AT REPORT TIME. Product Number of Units Qty Used Units Barite 2,00 bbl 4.00 Lime 5 lb 7.00 NOV Salt Gel 5 lb 2 Nut Plug Medium 5 lb LAST OR CURRENT BHA BHA No: 4 : 4 MD In: 6548 ft 9.8 Purpose: DRILL INTER HOLE MD Out: 7518 ft Component OD ID Jts Length ,500 HWDP DRILL COLLAR CROSSOVER NON-MAG DRILL COLLAR FLOAT SUB UNDERGAUGE INTEGRAL BLADE STABILIZ MWD TOOL MULESHOE SUB UNDERGAUGE INTEGRAL BLADE STABILIZ ROTARY STEERABLE MOTOR PDC BIT $1,521 $12,377 Total Length: 1, ft Wt below Jars: :02:44AM Page 1 of 4

13 Report No: 11 OPERATIONS From To Phase Sub Type eration Details 0:00 1: INDR DRILL MTRVER P ROTATE & SLIDE DRILL F7409' T7470' (61'@ 61 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 40 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT 195. MUD WEIGHT INOUT :00 1: INDR DRILL MTRVER P TAKE CHECK 7470', 2.64, NOTIFIED DE, FORWARD PLAN TO ROTARY DRILL 20 MORE FT AND TAKE CHECK 7490'. 1:30 2: INDR DRILL MTRVER P ROTARY DRILL F7470' T7490' (20'@ 40 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 40 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT 195. MUD WEIGHT INOUT CHECK 7490', 2.46, NOTIFIED DE, FORWARD PLAN TO ROTARY DRILL TO TD. 2:00 2: INDR DRILL MTRVER P ROTARY DRILL TO SECTION TOTAL DEPTH F7490' T7518' (28'@ 56 FPH) USING 530 GPM, 2700 PSI ON BTM, 2250 PSI OFF BTM, 40 SRPM, 148 MRPM, TRPM 193, WOB, TRQ ONOFF BOTT= 9K 4K, PU 197, SO 192, ROT 195. MUD WEIGHT INOUT :30 3: INRC CIRC CNDHOL P PUMP HIGH VIS SWEEP WITH NUT 530 GPM, 40 RPM, RECIPROCATE PIPE, FLUID CALIPER CALCULATION <5% WASHOUT, SHAKERS CLEAN 3:30 4: INRC TRIP BHA P LINE UP TO TRIP TANKS, FLOW CHECK, NO FLOW, PREPARE TO TOOH 4:00 6: INRC TRIP BHA P TOOH FOR TD F 7518FT TO 3500FT, <15K DRAG, HOLE TAKING PROPER FILL 6:00 7: INRC TRIP DRILL P TRIP OUT OF HOLE F2538' T1400' 7:00 7: INRC TRIP DRILL P RETRIEVE ROTATING HEAD & INSTALL TRIP NIPPLE 7:30 12: INRC TRIP BHA P CONTINUE TRIPPING OUT LAYING DOWN HWTS, DC & DIRECTIONAL TOOLS 12:00 13: INRC TRIP BHA P PULL WEAR BUSHING & CLEAR RIG FLOOR 13:00 14: INRC CSG RIGUP P REVIEW EJSA & RIG UP CASING CREW EQUIPMENT 14:30 22: INRC CSG RUNCSG P MAKE UP SHOE TRACK AND PUMP THROUGH SAME, RIH TO 5900FT AS FOLLOWS: SET DEPTH 1- SHOE 7", BTC (7405') 1-7" CASING, L-80, 26#, BTC 1- FLOAT COLLAR 7" (7459') 8-7" CASING L-80, 26#, BTC (7166' ) 1- CROSSOVER 7" " (7166') 180- JTS 7 58" L-80, 29#, BTC (7163') 1- HANGER 1- LANDING JT FILLING PIPE EVERY 15 JOINTS, HOLE GIVING BACK PROPER DISPLACEMENT 22:30 23: INRC CSG RUNCSG P HOLE NOT GIVING BACK PROPER DISPLACEMENT, SLOWED DOWN TRIP SPEED, RIH TO 6200FT, ZERO DISPLACEMENT COMING BACK 23:00 23: INRC CIRC CNDHOL P PUMP ACROSS BACK SIDE, BACK SIDE FULL SWAGE UP, KICK ON 40 GPM AND STAGE UP TO 115 GPM, ATTEMPT TO SWAB IN RETURNS, REGAINED RETURNS MUD WEIGHT INOUT , DILUTE WITH FRESH WATER 23:30 0: INRC CIRC CNDHOL P BUILD LCM PILL, 20 PPB, 115 GPM AND RECIPROCATE PIPE, SOME SEEPAGE LOSSES OBSERVED Total Time CUT BACK MUD WEIGHT TO 9.2# IN ACTIVE WITH FRESH WATER :02:44AM Page 2 of 4

14 Report No: 11 OPERATIONS - NEXT DAY From To eration Details Phase Sub Type 0:00 1: INRC CIRC CNDHOL P CONTINUE TO CIRCULATE STAGE UP PUMPS TO 230 GPM, SEEPAGE LOSSES OBSERVED, BUILD LCM PILL AND DILUTE MUD IN ACTIVE TO 9.1# WITH FRESH WATER 1:00 2: INRC LCIRC LCM P SPOT 40 BBLS OF 20 PPB LCM OUT OF 230 GPM, SEEPAGE LOSSES OBSERVED, MAINTAIN MUD IN ACTIVE 9.1# 2:00 3: INRC CSG RUNCSG P CONTINUE TO RIH WITH CSG F 6500FT TO 7471FT, PICK UP MANDREL HANGER ASSEMBLY WITH CAMERON TECH, LAND MANDREL IN WELL HEAD NOTE: OBSERVED NO FILL 3:00 4: INRC CIRC CNDHOL P INSTALL CEMENT HEAD AND CIRCULATE 1X BOTTOMS 230 GPM SIMOPS: RIG DOWN CASING CREW, HALLIBURTON DOUBLE CHECKING ALL EQUIP, HOLD PJSM WITH FOR CEMENT JOB 4:30 6: INRC CMT PRIM P LOAD PLUG INTO CEMENT HEAD (DSM WITNESS) PRESSURE TEST LINES TO 6000 PSI, PERFORM INTERMEDIATE CEMENT JOB AS FOLLOWS: PUMP 50 BBLS TUNED 7 BPM FOLLOWED BY 1320 SKS (644 BBLS) OF PREMIUM PLUS C CEMENT, 10.8 PPG, CU FTSK, GALSK, 25% 7 BPM Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. N Days since Last RI: Days since Last LTA ******PUMPING 06:00 HRS******** Weather Comments: :02:44AM Page 3 of 4

15 Report No: 11 Other Remarks: DRIVING DIRECTIONS TO BLACKHAWK UL 3112: FROM FT STOCKTON GO EAST ON INTERSTATE I MILES TO EXIT #272, THEN GO SOUTH ON UNIVERSITY ROAD 2.2 MILES, THE ROAD WILL TURN LEFT FOR 5 THENTHS OF A MILE THEN TURN BACK SOUTH FOR 3.4 MILES, TURN WEST 3 MILES THEN TURN RIGHT 3 TENTHS OF A MILE AND TURN NORTH TO LOCATION RIG PHONE: LAT: N LON: W NOTIFIED TRRC OF INTENT TO SPUD, RUN CSG & CEMENT: TALKED TO 11AM ON JOB # 3728 NOTIFIED TRRC OF INTENT TO RUN CSG & CEMENT: SPOKE WITH HRS ON RIG ACCEPTED ON FULL RATE ON 11:00HRS 4.5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION- 0 5" DRILL PIPE HOURS SINCE LAST INSPECTION " HWDP HOURS SINCE LAST INSPECTION " DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 8" DRILL COLLAR HOURS SINCE LAST INSPECTION- 0 UNSAFE ACTS: 9 SAFE ACTS: 3 UNSAFE EQUIPMENT: 0 SWA: 2 NEAR MISSES: 0 JSA's: 15 SAFETY MEETINGS: 12 LOTO's: 0 PERMITS TO WORK: 8 POWER LINE CHECK LIST: PRE SPUD INSPECTION: HAZARD ID's: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED NO WHIP CHECK ON HOSE THAT WAS ABOUT TO BE USED, STOPPED THE JOB AND INSTALLED WHIP CHECK :02:44AM Page 4 of 4

16 Event: DEV DRILLING REDHAWK UL UNITED STATES Report No: 14 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 7520 ft Progress: 7520 ft Rot Today: Avg ROP Today: L LEONARD@6,928.0 CASINGWELL CONTROL Last Casing: 876ft Next Casing: 7,500ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft hr 0.0 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 3, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 9.16 $382,946 $1,667,513 $2,000,000 Lithology: 95% SH, 5% LS AT 7480' CEMENT 7" X 7 58" INTERMEDIATE CSG, SET AND TEST PACKOFF, INSTALL WEAR BUSHING, PU AND MU 6 18" BHA, T.I.H. RR ( ) ROL ( ) CONT T.I.H, TEST CSG, DRILL OUT SHOE TRACK, 10' NEW FORM, FIT, DRILL 6 18" PROD HOLE. PERSONNEL MARK BONNER RICHARD IBARRA NATHAN NEAL Geologist: MICHELLE WRY Oxy Personnel: 4 Contractor Personnel 23 Total on Site: 27 Size Manufacturer HOOKLOAD & TORQUE Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model HYDRAULICS Pump Rate: 0.0 Pump Press: 0 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: MD Incl Azi TVD N-S E-W VS DLS Build 7, , , , , , , , , , , , Serial No BIT RECORD IADC SMITH MSI613 JJ0638 M223 6x BAKER DP607X M233 7x Nozzles MD In MD Out I-O-D-L B-G-O-R Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI MUD DATA - NOV FluidControl Engineer: Troy Beckert MBT: Sample From: Pit ph: Mud Type: Time MD: Brine-Based 0:01 7,520.0 Pm Pom: Pf Mf: Temp: Rheology Temp: 0 Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: VG Meter: 0@300 0@600 Comments: report. MUD PRODUCTS Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: Pits were emptied and cleaned. No fluid in pits at time of Product Number of Units Qty Used Units LAST OR CURRENT BHA BHA No: 5 : 5 MD In: 7520 ft 0.0 Purpose: DRILL 6 18" PRODUCTION SECTION MD Out: Component OD ID Jts Length 0 HWDP CROSSOVER NON-MAG DRILL COLLAR UNDERGAUGE INTEGRAL BLADE STABILIZ MWD TOOL UBHO SUB UNDERGAUGE INTEGRAL BLADE STABILIZ POSITIVE DISPLACEMENT MOTOR FILTER SUB RSS (PUSH BIT) PDC BIT $0 $13,194 Total Length: 1, ft Wt below Jars: :06:10AM Page 1 of 3

17 Event: DEV DRILLING REDHAWK UL UNITED STATES Report No: 14 OPERATIONS From To Phase Sub Type eration Details 0:00 2: INRC CSG RUNCSG P LD TWO JNTS, PICK UP AND LAND HANGER AND VERIFY MEASUREMENTS. 2:00 2: INRC CSG RIGUP P RIG DOWN CASING CREW. 2:30 3: INRC CMT RIGUP P PJSM WITH CEMENTERS ON RIGGING UP CEMENT HEAD AND ASSOCIATED EQUIPMENTS. 3:00 4: INRC CIRC CNDHOL P CIRC AND CONDITION HOLE 2 BOTTOMS UP 4:00 6: INRC CMT PRIM P PUMPING CEMENT JOB 7" X 7 58" CSG AT PRESENT TIME 6:00 8: INRC CMT PRIM P CEMENT 7 58" x 7" CASING, TESTED LINES TO 2000 PSI, PUMPED 50 BBL 10 PPG TUNED SPACER SPACER WITH MARKER DYE AT 6 BPM, FOLLOWED BY 693 BBL (1420 SX), 10.8 PPG, 2.74 ft3 YIELD, galsx MIX WATER OF LEAD CEMENT AT 6 BPM. PUMPED 52 BBL (175 SX), 10.8 PPG, 2.74 ft3 YIELD, galsx MIX WATER TAIL CEMENT. WITNESSED DROPING THE PLUG. DISPLACED WITH 341 BBL 10 PPG BRINE AT 4 BPM AND SLOWED TO 3 BPM THE LAST 50 BBL. FINAL LIFT PRESSURE 800 PSI, BUMPED 1320 PSI, HELD 5 MIN, FLOATS HELD BLED BACK 1.5 BBLS, CEMENT TO SURFACE 211 BBL WITH FULL RETURNS THROUGOUT JOB. 8:30 10: INRC CMT RIGUP P RIG DOWN CEMENTERS, FLUSH STACK & SURFACE EQUIPMENT PUMPED SUGAR WATER FROM TRIP TANK THROUGH BOP STACK. 10:00 14: INRC SRFEQ RIGUP PT RAN PACKOFF INTO WELL HEAD AND CONDUCTED SEVERAL FAILED ATTEMPTS TO SET AND TEST PACKOFF TO 5000PSI. REMOVED RUN IN TOOL AND PACKOFF ASSEMBLY AND FLUSHED WELLHEAD WITH WATER. 14:00 15: INRC SRFEQ RIGUP P RE RAN PACKOFF INTO THE WELL HEAD AND SUCCESSFULLY SET AND TESTED PACKOFF TO 5000PSI. 15:00 16: INRC BOP RPWB P INSPECTED WEAR BUSHING AND CONFIRMED DRIFT TO PASS 6 18" BIT. RAN AND SET THE WEAR BUSHING. 16:00 18: INRC SRFEQ RIGUP P CHANGE OUT ROTARY TOOLS FOR 4" XT39 TO INCLUDE SAVER SUB, ELEVATORS, AND TDS DIE BLOCKS. 18:00 22: INRC TRIP BHA P PJSM W H&P, SLB AND OXY DSM ON HANDLING 6 18 BHA AS FOLLOW: 6 18" SMITH PDC BIT MSI613 NOZZLE(6X10) TFA 0.46 PD475 X6AA 6" STB 4.75" FILTER SUB 5 18" MUD MOTOR, 78, 3.8, STRAIGHT FIXED 5.875" STB 14 UG 4.75" UBHO 4.688" MWD MONEL 5.875" STB-14UG 4.75" NM COLLAR 4.75" XO 3 12" IF PIN TO XT39 BOX 4" (30 JNTS) 10 STD OF HWDP SHALLOW TEST MWD TO 900 PSI STAND PIPE PRESSURE TEST GOOD. SAFETY BREAK: HAND PLACEMENT WHILE MAKING CONNECTION. 22:00 0: INRC TRIP DRILL P TRIP IN HOLE W 6 18" VERTICAL RSS MOTOR ASSY. Total Time OPERATIONS - NEXT DAY From To eration Details Phase Sub Type 0:00 2: INRC TRIP DRILL P TRIP IN HOLE F 1,765' T 4,185' W 4", 14#, XT-39 DRILL PIPE, FILLING PIPE EVERY 20 STANDS. 2:30 4: INRC TRIP DRILL P LOAD PIPE RACKS W 4", 14#, XT-39 DRILL PIPE AND STRAP SAME. 4:00 6: INRC TRIP DRILL P TRIP IN HOLE F 4,185' T 6,200' W 4", 14#, XT-39 DRILL PIPE, FILLING PIPE AVERY 20 Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. N Days since Last RI: Days since Last LTA STANDS Weather Comments: :06:10AM Page 2 of 3

18 Event: DEV DRILLING REDHAWK UL UNITED STATES Report No: 14 Other Remarks: Directions From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (1.2 miles) turn right and follow road north to location (400 feet)! ODESSA FLIGHT FOR LIFE: LATITUDE: N LONGITUDE: W H&P 620 DSM OFFICE NUMBER: (713) H&P 620 RIG MANAGERS OFFICE: (918) H&P OXY PERMIAN SUPPORT PERSONNEL: ROBERT HOLCOMB - ( ) (DRILLING SUPERINTENDENT) ROGER ALLEN - ( ) (FIELD SUPERINTENDENT) DANNY HOWELL - ( ) (FIELD SUPERINTENDENT) NATHAN NEAL- ( ) (DRILLING ENGINEER) MICHELLE WRY- ( )(GEOLOGIST) DAVID (ED) SCHRIM- ( )(OPS GEOLOGIST) NOTIFIED TRRC OF INTENT TO RUN 10 34" CASING AND CEMENT SAME AT 21: , CONTACT (DOPHENE, OPERATOR #5) NOTIFIED TRRC OF INTENT TO RUN 7" AND 7 58" CASING AND CEMENT SAME AT 04: , CONTACT (AUDRY, OPERATOR #2) UNSAFE ACTS: 12 SAFE ACTS : 00 UNSAFE EQUIPMENT: 00 SWA s: 00 NEAR MISSES: 0 JSA s: 08 SAFETY MEETINGS: 11 LOTO'S: 0 PERMITS TO WORK: 09 FORKLIFT POWER LINE CHECK LIST: PRE SPUDRIG INSPECTION: HAZARD ID s: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED EMPLOYEE PLACING HAND BETWEEN STUMP AND ST-80, STOP THE JOB AND EXPLAIN PROPER HAND POSITION AND JOB CONTINUE WITHOUT ANY INCIDENTS :06:10AM Page 3 of 3

19 Report No: 13 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 0 ft Rig: 7637 ft Progress: 7518 ft Rot Today: Avg ROP Today: MIDDLE LEONARD@7,620.0 CASINGWELL CONTROL Last Casing: 121ft Next Casing: 1,576ft Last BOP Press Test: Form TestEMW: FIT ppg Supervisor 1: Supervisor 2: Engineer: H&P ft 4.50 hr 26.4 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original 2, ft 9, days #0102 DFS: Daily Cost: Cum Cost: AFE Cost: 1 $167,432 $1,688,493 $2,200,000 Lithology: 60% SHALE, 10% SILT, 30% LIMESTONE PU BHA #5, RIH PU 4" DP, TAG CMT, CONDITION MUD TO 11.0#, CHOKE DRILL, DRILL OUT, 12.8 FIT, DRILL TO 7637FT (RR ROL 4215) ROTARY DRILL 6 18" PRODUCTION HOLE PERSONNEL ONAS ZAMORA DANIEL COOK BRIAN STOCKHOLM Geologist: SPENCER GUNDERSON Oxy Personnel: 2 Contractor Personnel 15 Total on Site: 17 Size Manufacturer HOOKLOAD & TORQUE HYDRAULICS Str Wt UpDn: Pump Rate: Str Wt Rot: Torq Off Btm: 2,000.0 ft-lbf Pump Press: 1300 Torq On Btm: 5,500.0 ft-lbf Model SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: 5 17 MD Incl Azi TVD N-S E-W VS DLS Build 7, , , , , , , , , , , , Serial No BIT RECORD IADC SMITH MSi613 JJ6482 M223 6x Nozzles MD In MD Out I-O-D-L B-G-O-R BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI MUD DATA - NOV FluidControl Engineer: scott callais MBT: Sample From: In (Suction Pit) ph: Mud Type: Time MD: Calcium-Based 0:01 7,570.0 Pm Pom: Pf Mf: Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter: 8@3 9@6 14@100 16@200 19@300 26@600 Comments: PU BHA AND DRILL STRING. DRILL OUT CEMENT, AND 10' OF NEW FORMATION. PERFORM FIT. DRILLING AT REPORT TIME. MUD PRODUCTS Product Number of Units Qty Used Units Barite 2,00 bbl Defoam A lb 8.00 Lime 5 lb 5.00 NOV Pac LV 5 lb 5.00 NOV Salt Gel 5 lb XCD Polymer lb 1 LAST OR CURRENT BHA BHA No: 5 : 5 MD In: 7518 ft 10.0 Purpose: DRILL 6 18" PRODUCTION HOLE MD Out: Component OD ID Jts Length ,000 HWDP CROSSOVER FILTER SUB NON-MAG DRILL COLLAR INTEGRAL BLADE STABILIZER MWD TOOL UBHO SUB INTEGRAL BLADE STABILIZER DRILL COLLAR INTEGRAL BLADE STABILIZER PDC BIT $3,594 $23,895 Total Length: 1, ft Wt below Jars: :34:52AM Page 1 of 3

20 Report No: 13 OPERATIONS From To Phase Sub Type 0:00 2: INRC TRIP BHA P PICK UP BHA # 5 AS FOLLOWS: eration Details " PDC BIT (SMITH 6X11'S, SN:JJ6482) 1 - IBS (18" UG) " PONY COLLAR 1 - IBS (18" UG) 1 - UBHO 1 - HDS-1 NMDC 1 - IBS (18" UG) " NMDC 1 - FILTER SUB 1 - XO 30 - JTS OF HWDP STOPPED AT XO TO TEST MWD, TEST PASSED SIMOPS: LAY OUT 4" DRILL PIPE ON PIPE RACKS 2:30 4: INRC TRIP BHA P STRAP HWDP AND DRILL PIPE ON RACKS AND ENTER TALLY INTO TOTCO 4:00 5: INRC TRIP BHA P CONTINUE PICKING UP BHA #5 5:00 14: INRC TRIP PULD P RIH WITH BHA #5, TAG 7457FT 14:30 16: INRC CIRC CNDFLD P 360 GPM AND WEIGHT UP MUD TO 11.0 PPG. 16:00 16: INRC TRIP DRILL P HOLD PJSM, PERFORM CHOKE DRILL AS FOLLOWS: TRAP 300 PSI ON BACK SIDE, STAGE UP PUMPS TO 40 SPM WHILE MAINTAINING 300 PSI CASING PRESSURE, CLOSE CHOKE TO INCREASE PSI TO 400 PSI, OBSERVED APPROX 15 SECOND LAG TIME, STAGE DOWN PUMPS WHILE MAINTAINING 400 PSI 16:30 17: INRC DRLOUT DOCMT P DRILL OUT FLOAT COLLAR WITH 300 GPM, 40 RPM, 10K WOB, KELLY DOWN (7465FT) 17:00 17: INRC DRLOUT DOCMT P INSTALL ROT HEAD 17:30 18: INRC DRLOUT DOCMT P DRILL OUT REMAINING SHOE TRACK AND 10FT OF NEW FORMATION TO 7528FT, RPM, 10K WOB, 2-5K FT-LBS TORQUE, 300 GPM SIMOPS: PRODUCTION CASING DELIVERED TO LOCATION, CLEAN AND DRIFT CASING. 18:30 19: INRC CIRC CNDHOL P CIRCULATE HOLE CLEAN W 300 GPM WHILE CONDITIONING MUD WITH DEFOAMER, MUD WEIGHT INOUT 11.0 PPG 19:00 19: INRC DRLOUT FST P PERFORM FIT TO 12.8 PPG EMW, GOOD TEST. 19:30 22: PRDR DRILL ROTVER P ROTARY DRILL 6 18" PRODUCTION HOLE F 7528' , 25.6 FTHR 10-20K WOB, RPM, 3-7K FT-LBS TORQUE, 300 GPM, PRESSURE OFFON BOTTOM FT, 2.02 INC, 0.51 AZI MUD WEIGHT INOUT NOTE: EXCESSIVE SHOCK AND VIBRATION ON MWD TOOL, ATTEMPT TO REDUCE BY ADJUSTING PARAMETERS, DECISION MADE TO REDUCE FLOW RATE TO 250 GPM ON NEXT STAND 22:30 0: PRDR DRILL ROTVER P ROTARY DRILL 6 18" PRODUCTION HOLE F 7605' , 21.3 FTHR 10-20K WOB, RPM, 3-7K FT-LBS TORQUE, 250 GPM, PRESSURE OFFON BOTTOM MUD WEIGHT INOUT Total Time NOTE: REDUCED FLOW RATE REDUCED SHOCK AND VIBRATION :34:52AM Page 2 of 3

21 Report No: 13 OPERATIONS - NEXT DAY From To eration Details Phase Sub Type 0:00 6: PRDR DRILL ROTVER P ROTARY DRILL 6 18" PRODUCTION HOLE F 7637' - 7XXX, 21.3 FTHR 10-20K WOB, RPM, 3-7K FT-LBS TORQUE, 250 GPM, PRESSURE OFFON BOTTOM Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA MUD WEIGHT INOUT Weather Comments: DRIVING DIRECTIONS TO BLACKHAWK UL 3112: FROM FT STOCKTON GO EAST ON INTERSTATE I MILES TO EXIT #272, THEN GO SOUTH ON UNIVERSITY ROAD 2.2 MILES, THE ROAD WILL TURN LEFT FOR 5 THENTHS OF A MILE THEN TURN BACK SOUTH FOR 3.4 MILES, TURN WEST 3 MILES THEN TURN RIGHT 3 TENTHS OF A MILE AND TURN NORTH TO LOCATION RIG PHONE: LAT: N LON: W NOTIFIED TRRC OF INTENT TO SPUD, RUN CSG & CEMENT: TALKED TO 11AM ON JOB # 3728 NOTIFIED TRRC OF INTENT TO RUN CSG & CEMENT: SPOKE WITH HRS ON RIG ACCEPTED ON FULL RATE ON 11:00HRS 4" DRILL PIPE HOURS SINCE LAST INSPECTION UNSAFE ACTS: 9 SAFE ACTS: 3 UNSAFE EQUIPMENT: 0 SWA: 2 NEAR MISSES: 0 JSA's: 15 SAFETY MEETINGS: 5 LOTO's: 0 PERMITS TO WORK: 8 POWER LINE CHECK LIST: PRE SPUD INSPECTION: HAZARD ID's: 1 EP2 OBSERVATIONS: 2 BEST STOP CARD: OBSERVED 3RD PARTY HAND STANDING TOO CLOSE TO PIPE WRANGLER WHILE IN USE, STOPPED HIM AND REMINDED HIM TO ALWAYS STAY CLEAR OF THE BUFFER ZONE :34:52AM Page 3 of 3

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A 4.2 Formation Multi-Test (FMT) Analysis Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A summary 6. DRILL STEM TESTING A dual

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved

More information

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures IADC Southern Arabian Peninsula Chapter February 15 th, 2018 Top Drive Automation Overcoming Inefficiencies

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

Section 1 - General Data. Mud. Hole Size (in) Interval (mmd BRT) Mud Type Mud Weight (SG) 9 7/ Seawater w/ hi-vis 1.

Section 1 - General Data. Mud. Hole Size (in) Interval (mmd BRT) Mud Type Mud Weight (SG) 9 7/ Seawater w/ hi-vis 1. Section - General Data l3-9s T2 Mud Hole Size (in) Interval (mmd BRT) Mud Type Mud Weight (SG) 9 78 9-050 Seawater w hi-vis 3 sweeps 36 (HO) 9-65 Seawater w hi-vis 3 sweeps 7 V 2 65-050 Seawater w hi-vis

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements AADE-03-NTCE-49 Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements Copyright 2003 AADE Technical Conference

More information

Daily Drilling Report

Daily Drilling Report Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Megaton Impact Tools optimize your drilling operations. Megaton Impact Tools Ulti-Torq high-torque, double shoulder connections Involute spline design High-strength steel developed

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

ONYX 360. Rolling PDC cutter

ONYX 360. Rolling PDC cutter ONYX 360 Rolling PDC cutter ONYX 360 Rolling PDC Cutter Applications Drilling conditions that cause and accelerate PDC cutter wear Abrasive environments Benefits Extends bit durability Increases run footage

More information

Casing Scraper. Service Equipment. Features

Casing Scraper. Service Equipment. Features Casing Scraper The Casing Scraper is a spring type, mechanical casing scraper, featuring a large by-pass area between the blades to allow circulation of debris. The body is constructed of the highest quality

More information

Highlights of Achievements at Loc. TU

Highlights of Achievements at Loc. TU Highlights of Achievements at Loc. TU Planned-80 days / Actual-74 days. Different BHAs for drilling in rotary mode designed by in-house expertise. Sliding was limited to

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE 2009NTCE-04-01 DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS BASK1 BASK2 BASK3 BASK6 SLING1 SLING2 BASKETS/SLINGS CARRYING TOOL BASKET 4' X 4' GALVANIZED CERT. RATED SWL 6,800 LBS TOOL BASKET 4' X 6' GALVANIZED CERT. RATED SWL 8,950 LBS TOOL BASKET 4' X 8' GALVANIZED

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

Successful New Technology Introduction and Applications of Rotary Steerable System.

Successful New Technology Introduction and Applications of Rotary Steerable System. Successful New Technology Introduction and Applications of Rotary Steerable System. Mohammed Ibrahim Schlumberger Copyright 2003, MPC 2004 This paper was prepared for the 8th MEDITERRANEAN PETROLEUM CONFERENCE

More information

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation 2/5/2013 Roger L. Schultz TTS Drilling Solutions Presentation Overview Frictional Forces, Vibratory

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS BASK1 BASK2 BASK3 BASK6 SLING1 SLING2 TOOL BASKET 4' X 4' GALVANIZED CERT. RATED SWL 6,800 LBS TOOL BASKET 4' X 6' GALVANIZED CERT. RATED SWL 8,950 LBS TOOL BASKET 4' X 8' GALVANIZED CERT. RATED SWL 11,200

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information