1 MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From To Hrs Code Rpr Hrs for Day: Repair Hrs. for Job: BHA/Mtr Hours: 281 BHA Safety meeting, continued running 1/2" 2# P-11 LTC production casing Safety meeting, broke bolts on BOPE and lifted stack to set slips University E Phone #: TVD: 11,67 Field: Wildcat Last Casing: 1/2" Production set at 11,67' Rotating Hrs:. Drlg. Contractor: Oryan Shoe Test: N/A Footage 24 Hrs: Rig Name & #: #7 KB: 17.' Avg ROP 24 Hrs: #DIV/! Safety Topic: Nipple down and rig down. Crew: and Third Party: 13 Present Operations: Released rig at 7 AM on 7/23/21. Rigging down rig. Breakdown of Operations Safety meeting, circulated production casing to condition hole prior to cementing. Safety meeting, rigged up cementers and cemented production casing. Tested lines to 4 psi, pumped spacer 2 bbl fresh water, lead cement 128 sxs 11.9 ppg 2.4 yield 49 bbls, tail 2 sxs 14.4 ppg 1.2 yield 6 bbls, displaced with 244 bbls of fresh water, floats held, bled back 2 bbls and circulated 2 sxs 1 bbls of good cement to surface. Safety meeting, Sweco technician set slips with 1K Safety meeting, rough cut casing, set back BOPE, removed rotating head and BOPE components. Safety meeting, made final cut on casing, installed Sweeco tubing head 11" M X 7-1/16" 1M and tested to 22 psi. Tested Good Safety meeting, jetted out working pits, started rigging down rig and third party equipment. Total 24. Diesel Used: 8 Rig Diesel on Hand: 27 Qty OD ID Description Length Intangibles Daily Cummulative On Loc: In Out Total DP: DC: DC: 3 3 HWDP MW Vis PV YP Cake % % PH 1 sec 1 min cc. HTHP 32nd Solids Sand ES Pf Pm TR Shaker Screen Size: 4x8 Date Last BOP Drill: 7/1/1 Bit Record Bit Size Mfg Type Serial Jets Depth Depth Ftg Hrs FPH Wt. RPM Inner Outer Dull Loca- Brng. Gage Other Reason No. No. 32's In Out Mtr Row Row Char. Seal 1/16 Dull Pulled Varel PDC x1,4x WT S n/a 1 WT TD 6RR 7.88 Varel PDC x1,4x WT A n/a 1 WT Performance Pump Model Stroke Liner Gal. / Stk. SPM GPM No. 1 Emsco No. 2 Emsco Surveys Depth: Depth: BG Gas: Bottom Hole Assembly Drilling Cost AFE # D13 Well Site Supervision 3,4 12, Gate Guard Serv. 1,8 2,2 Location, 222,71 Disposals / Transp. Drilling Contractor 12, 382, Bits and Down Hole Tools / Serv. 21,399 Fuels 72,99 Drilling Fluids ,646 Misc.Serv/Cont.Labor,1 246,313 Casing Crew/Torque Turn/LDM 8,46 16,189 Transportation 7, 47,7 Cement Services 37,613 13,843 Well Evaluation / MudLogging 18, Surface Rentals All 12,99 88,617 Total Length. Solids Control / Screens ect. Wt of BHA: Supplies/PotableWater/Misc.Exp. Eff.Bit Wt: Tangibles/Csng/Float Equip/Wellhead 188, ,64 DP Size/WT/Gr./Conn. Taxes / Contingencies 4."/16.6/S-13/XH Total Costs $34,788 $2,3,78 Mud Properties Gels Wtr. Loss Pump Data Alk Ca Cl % OWR Lime Cont. Wtr Phase Liquids Date Last BOP Test: 7/1/1 Pressure Annular Velocity Kill Rate Length Size 9% Eff. DP DC's SPM Pres. 11,1 Inclination: 1.3 Azimuth: TVD: V.Sec: 1,977 Inclination: 1.4 Azimuth: TVD: V.Sec: DLS: Mud Logger 22 Conn. Gas 43 Trip Gas: 133 Lithology: 1% Shale. Mud Loggers have been released. DLS:

2 MLC Operating Fuel Inventory For Rig Use Rig Received With: Fuel Delivered: IADC Code Time Breakdown Report Description Daily Cummulative 1 Rig Up / Rig Down / Moving Drilling 28. Daily Fuel Used: 8 3 Reaming Total Fuel Delivered: 21 4 Coring Total Fuel Used: 1926 Circulating and Conditioning Mud Tripping Drill Pipe 11. Fuel Inventory For Air Use 7 Normal Rig Maintenance 7 Fuel Delivered: 8 Down Time 1. Daily Fuel Used: 9 Cut Drill Line 2. Total Del. For Air: 14 1 Deviation Survey 11 Total Fuel Used For Mud Wireline Logs 4. Air Diesel on Hand: 12 Casing and Cement Daily Disposal Haul Offs: 13 Wait on Cement 4 WBM Bbls: 14 Nipple Up / Nipple Down WBM Loads: 1 BOP Test / Fit / Casing Test / Drill Cmt 1. WBM Washouts: 16 Drill Stem Test 17 Plug Back Total Disposal Haul Offs: 18 Squeeze Cement WBM Bbls: 19 Fishing Operations WBM Loads: 2 Directional Work / Gyro / MWD Survey WBM Washouts: 21 Other Work Directed by Operator Force Mature: Weather/Ect: Daily Diposal Haul Offs: Totals: OBM Bbls: OBM Loads: OBM Washouts: Mud Inventory Total Disposal Haul Offs: Water Based Mud Oil Based Mud OBM Bbls: Total Delivered: Total Delivered: OBM Loads: Lost: OBM Washouts: Returned: On Hand: Well Notes and Comments Lost: 11. Returned: On Hand: Derrick raised at 12 hours on 6/26/21 Notififed TRRC of intent to cement surface casing at 9 hours on 6/28/21 spoke to Amy Job# 981 Circulated 86 bbls of cement to surface during second stage of cement job with CJ/Nabors on 6/3/21 Notififed TRRC of intent to cement intermediate casing at 8 hours on 7//21 spoke to Gina Job# 981 While hammer drilling with 7 7/8" hammer hole became deviated up to 4894'. Pulling hammer to pick up DBHA and straighten out. TD well at 11,67' on 7/17/21 at 23 hours 7/2/21 Ran Baker coring tool and collected 6 of 6 cores. Notififed TRRC of intent to cement production casing at 9 hours on 7/21/21 spoke to Ivey Job# 981 Completed production cement job. Circulated 2 sxs 1 bbls of good cement to surface. Released rig at 7 AM on 7/23/21

3 Costs Tangible Rentals And Miscellaneous Well Eval Special Service And Contract Drilling Fluids Fuels Bits And Down Hole Tools Drlg Contractor Location MLC Operating Cat Sprv Gate Disp. Trns Cmt Solids Misc Tax Code Intangibles Well Site Supervision - Consultant - Engineer Gate Guard Service Cost Breakdown Report AFE# D13 Daily Cummulative Prev Cummu Conductor, Start hole, Rat hole, Mouse hole, Rig Anchors Permits, Surveys, BLM, State, Fees 2 2 Construction-Location, Roads, Location Repair and Maintenance 12 7 Water Well Drilling Pit Liners and Fencing 2 2 Caliche and Water Royalty - Damages 4 4 Disposal Fees, Reserve Pit, Location Clean Up, Transportation of Disposals Rig Mob and De Mob (Include Rig Move Rate) 7 7 Drilling Day Rate or Footage Rate (After Spud In) Include OBM Pay Turnkey Operations, Ect: Crew Incentive, Bonus, Award - (Performance Pay) Bits, PDC, Core, Hammer, Diamond, (All Bits) Torkbuster, Agitator, Drlg Motor, Hammer, (Include Service Man and Insp) KSW, RT, RMR, IBS, Tri-Sq DC, Quad, Combo, Hole Opener, Under Ream Open or Cased Hole Whipstock - Tools and Service Hand, Down Hole Equip. Purchased DP,DC,HWDP,Kelly,Valves,Subs,Tubing,HandlingTools Drilling Jars, ShockSub, Prodrift-Teledrift Rig Diesel Air Jammers Diesel Fuel for Camp, Water well, Propane, WB Mud Products, Sack or Liquid, Service, Tax OB Mud Products, Sack or Liquid, Service, Tax Water Well Fresh Water, Transportation Trucked Kill Truck Corrosion Control Drlg Mud Oil, Lubricant, Beads, Bead Recovery, Service Air Compressor, N2 Unit, Mist Pump, Chemical, All Trucking, Service Contract Labor, Roustabout, Welding, Backhoe, Fabrication, Other Labor Directional Tools and Service, MWD, Gyro (Actual) Fishing -Tools, All Trkg, Hotshot, Service Coring - Tools, All Trkg, Hotshot, Service -(Related Lab Costs) Other Wire line, Well Survey and Insp, Pipe Recovery, Tool Setting, Slick line Tubular Inspection, Casing, DP, DC, Kelly, Tbg, Subs, (All) Csg Crew, LD Machine, Torque Turn, Fill Up Tool Clean and Drift, Nipple Up Crew, Stack Lift, BOPE Testing Transportation of FW, WBM, OBM - Trucking and Hotshot for All other Equipment 7 Cement Products and Service (All) -Not Float Equipment Open/Cased Hole Logging, Sidewall Cores, RFT, Geo Steering, CBL, Other Eval Drill stem Testing - Tools and Service, Well testing - Eqpt and Service Mud Logging Forklift, Man lift, Pressure Washer, Trash Trailer, Port-john, Backhoe Instrumentation,PVT System, Automatic Driller Separator, Igniter, Equipment, Service, Blooie line Frac and Test Tanks, Diesel-Mud-Water, Generator, Pumps, Equipment Miscellaneous (Ditch Magnets) BOPE, DSA, Choke Manifold, Spools, Valves, Wear Bushing Rotating Head, Rubbers Power Chokes and Service All Trailers, Septic, Generator, Satellite, Intercom, PC, House Clean Catwalk, Pipe Racks, Matting Boards, Light Plant, Light towers Water Well, Pump, Generator, Fasline, Equipment, Service H2S and Safety and Serv Hand Solids Control, Screens,MaxVac, Pump, Centrifuge, Mud Cleaner,Serv Misc. Expenses, Office Supplies, Potable Camp Water, Screens Drilling Expendables Protective Intermediate Casing Surface Wellhead Intermediate Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Ha Final Production Casing, Production Tie Back, ect Production Wellheads, Casing Spools, Valves, Tree, Hanger and Serv Hand Production Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Hand Well Insurance 1 1 Misc. Applicable Tax at a % requested by Client (Manual Entry) Daily Intangible $16,97. Total Intangable $1,62,176. Total Total Prev Da Daily Tangible $188,818. Total Tangible $433,64. Daily Cost: Cumm Cost: Cumm C Daily Taxes $. Total Taxes $. $34,788. $2,3,78. $1,68,

4 ulative Cost: ay 92.

5 MLC Opertating Daily Drilling Report Date: 7/21/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 2 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From To Hrs Code Rpr Hrs for Day: Repair Hrs. for Job: BHA/Mtr Hours: 281 BHA JSA reviewed, finished circulating to clean and condition hole. Checked for flow (no flow) University E Phone #: TVD: 11,67 Field: Wildcat Last Casing: 9 /8" Intermediate set at 462' Rotating Hrs:. Drlg. Contractor: Oryan Shoe Test: N/A Footage 24 Hrs: Rig Name & #: #7 KB: 17.' Avg ROP 24 Hrs: #DIV/! Safety Topic: Running casing. Crew: and Third Party: 14 Present Operations: Running 1/2" 2# P-11 LTC Production casing. Breakdown of Operations JSA reviewed, rigged up laydown machine. JSA reviewed, layed out drill pipe and collars. JSA reviewed, rigged up casing crew, made up shoe track and tested (tested good). Ran 1/2" 2# P-11 LTC casing. JSA reviewed, changed out clutch on #1 drawworks motor. JSA reviewed, continued running 1/2" 2# P-11 LTC casing. Total 24. Diesel Used: 72 Rig Diesel on Hand: 3 Qty OD ID Description Length Intangibles Daily Cummulative On Loc: In Out Total DP: DC: DC: 3 3 HWDP MW Vis PV YP Cake % % PH 1 sec 1 min cc. HTHP 32nd Solids Sand ES Pf Pm TR Shaker Screen Size: 4x8 Date Last BOP Drill: 7/1/1 Bit Record Bit Size Mfg Type Serial Jets Depth Depth Ftg Hrs FPH Wt. RPM Inner Outer Dull Loca- Brng. Gage Other Reason No. No. 32's In Out Mtr Row Row Char. Seal 1/16 Dull Pulled Varel PDC x1,4x WT S n/a 1 WT TD 6RR 7.88 Varel PDC x1,4x WT A n/a 1 WT Performance Pump Model Stroke Liner Gal. / Stk. SPM GPM No. 1 Emsco No. 2 Emsco Surveys Depth: Depth: BG Gas: Bottom Hole Assembly Drilling Cost AFE # D13 Varel RS716DR PDC 1. Well Site Supervision 2,8 89,6 Bit sub 26.2 Gate Guard Serv. 6 18,4 6" Drill Collars Location 172,71 Disposals / Transp. Drilling Contractor 12, 37, Bits and Down Hole Tools / Serv. 21,399 Fuels 72,99 Drilling Fluids ,44 Misc.Serv/Cont.Labor 241,163 Casing Crew/Torque Turn/LDM 7,783 Transportation 4,2 Cement Services 66,23 Well Evaluation / MudLogging 18, Surface Rentals All 2,867 7,78 Total Length Solids Control / Screens ect. Wt of BHA: 43 Supplies/PotableWater/Misc.Exp. Eff.Bit Wt: 36 Tangibles/Csng/Float Equip/Wellhead 244,786 DP Size/WT/Gr./Conn. Taxes / Contingencies 4."/16.6/S-13/XH Total Costs $19,29 $1,68,992 Mud Properties Gels Wtr. Loss Pump Data Alk Ca Cl % OWR Lime Cont. Wtr Phase Liquids Date Last BOP Test: 7/1/1 Pressure Annular Velocity Kill Rate Length Size 9% Eff. DP DC's SPM Pres. 11,1 Inclination: 1.3 Azimuth: TVD: V.Sec: 1,977 Inclination: 1.4 Azimuth: TVD: V.Sec: DLS: Mud Logger 22 Conn. Gas 43 Trip Gas: 133 Lithology: 1% Shale. Mud Loggers have been released. DLS:

6 MLC Operating Fuel Inventory For Rig Use Rig Received With: Fuel Delivered: IADC Code Time Breakdown Report Description Daily Cummulative 1 Rig Up / Rig Down / Moving 42 2 Drilling 28. Daily Fuel Used: 72 3 Reaming Total Fuel Delivered: 21 4 Coring Total Fuel Used: Circulating and Conditioning Mud Tripping Drill Pipe Fuel Inventory For Air Use 7 Normal Rig Maintenance 7 Fuel Delivered: 8 Down Time 1 1. Daily Fuel Used: 9 Cut Drill Line 2. Total Del. For Air: 14 1 Deviation Survey 11 Total Fuel Used For Mud Wireline Logs 4. Air Diesel on Hand: 12 Casing and Cement Daily Disposal Haul Offs: 13 Wait on Cement 4 WBM Bbls: 14 Nipple Up / Nipple Down 2. WBM Loads: 1 BOP Test / Fit / Casing Test / Drill Cmt 1. WBM Washouts: 16 Drill Stem Test 17 Plug Back Total Disposal Haul Offs: 18 Squeeze Cement WBM Bbls: 19 Fishing Operations WBM Loads: 2 Directional Work / Gyro / MWD Survey WBM Washouts: 21 Other Work Directed by Operator Force Mature: Weather/Ect: Daily Diposal Haul Offs: Totals: OBM Bbls: OBM Loads: OBM Washouts: Mud Inventory Total Disposal Haul Offs: Water Based Mud Oil Based Mud OBM Bbls: Total Delivered: Total Delivered: OBM Loads: Lost: OBM Washouts: Returned: On Hand: Well Notes and Comments Lost: 11. Returned: On Hand: Derrick raised at 12 hours on 6/26/21 Notififed TRRC of intent to cement surface casing at 9 hours on 6/28/21 spoke to Amy Job# 981 Circulated 86 bbls of cement to surface during second stage of cement job with CJ/Nabors on 6/3/21 Notififed TRRC of intent to cement intermediate casing at 8 hours on 7//21 spoke to Gina Job# 981 While hammer drilling with 7 7/8" hammer hole became deviated up to 4894'. Pulling hammer to pick up DBHA and straighten out. TD well at 11,67' on 7/17/21 at 23 hours 7/2/21 Ran Baker coring tool and collected 6 of 6 cores. Notififed TRRC of intent to cement production casing at 9 hours on 7/21/21 spoke to Ivey Job# 981

7 Costs Tangible Rentals And Miscellaneous Well Eval Special Service And Contract Drilling Fluids Fuels Bits And Down Hole Tools Drlg Contractor Location MLC Operating Cat Sprv Gate Disp. Trns Cmt Solids Misc Tax Code Intangibles Well Site Supervision - Consultant - Engineer Gate Guard Service Cost Breakdown Report AFE# D13 Daily Cummulative Prev Cummu Conductor, Start hole, Rat hole, Mouse hole, Rig Anchors Permits, Surveys, BLM, State, Fees 2 2 Construction-Location, Roads, Location Repair and Maintenance 7 7 Water Well Drilling Pit Liners and Fencing 2 2 Caliche and Water Royalty - Damages 4 4 Disposal Fees, Reserve Pit, Location Clean Up, Transportation of Disposals Rig Mob and De Mob (Include Rig Move Rate) 7 7 Drilling Day Rate or Footage Rate (After Spud In) Include OBM Pay Turnkey Operations, Ect: Crew Incentive, Bonus, Award - (Performance Pay) Bits, PDC, Core, Hammer, Diamond, (All Bits) Torkbuster, Agitator, Drlg Motor, Hammer, (Include Service Man and Insp) KSW, RT, RMR, IBS, Tri-Sq DC, Quad, Combo, Hole Opener, Under Ream Open or Cased Hole Whipstock - Tools and Service Hand, Down Hole Equip. Purchased DP,DC,HWDP,Kelly,Valves,Subs,Tubing,HandlingTools Drilling Jars, ShockSub, Prodrift-Teledrift Rig Diesel Air Jammers Diesel Fuel for Camp, Water well, Propane, WB Mud Products, Sack or Liquid, Service, Tax OB Mud Products, Sack or Liquid, Service, Tax Water Well Fresh Water, Transportation Trucked Kill Truck Corrosion Control Drlg Mud Oil, Lubricant, Beads, Bead Recovery, Service Air Compressor, N2 Unit, Mist Pump, Chemical, All Trucking, Service Contract Labor, Roustabout, Welding, Backhoe, Fabrication, Other Labor Directional Tools and Service, MWD, Gyro (Actual) Fishing -Tools, All Trkg, Hotshot, Service Coring - Tools, All Trkg, Hotshot, Service -(Related Lab Costs) Other Wire line, Well Survey and Insp, Pipe Recovery, Tool Setting, Slick line Tubular Inspection, Casing, DP, DC, Kelly, Tbg, Subs, (All) Csg Crew, LD Machine, Torque Turn, Fill Up Tool Clean and Drift, Nipple Up Crew, Stack Lift, BOPE Testing Transportation of FW, WBM, OBM - Trucking and Hotshot for All other Equipment Cement Products and Service (All) -Not Float Equipment Open/Cased Hole Logging, Sidewall Cores, RFT, Geo Steering, CBL, Other Eval Drill stem Testing - Tools and Service, Well testing - Eqpt and Service Mud Logging Forklift, Man lift, Pressure Washer, Trash Trailer, Port-john, Backhoe Instrumentation,PVT System, Automatic Driller Separator, Igniter, Equipment, Service, Blooie line Frac and Test Tanks, Diesel-Mud-Water, Generator, Pumps, Equipment Miscellaneous (Ditch Magnets) BOPE, DSA, Choke Manifold, Spools, Valves, Wear Bushing Rotating Head, Rubbers Power Chokes and Service 2 2 All Trailers, Septic, Generator, Satellite, Intercom, PC, House Clean Catwalk, Pipe Racks, Matting Boards, Light Plant, Light towers Water Well, Pump, Generator, Fasline, Equipment, Service H2S and Safety and Serv Hand Solids Control, Screens,MaxVac, Pump, Centrifuge, Mud Cleaner,Serv Misc. Expenses, Office Supplies, Potable Camp Water, Screens Drilling Expendables Protective Intermediate Casing Surface Wellhead Intermediate Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Ha Final Production Casing, Production Tie Back, ect. Production Wellheads, Casing Spools, Valves, Tree, Hanger and Serv Hand Production Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Hand Well Insurance 1 1 Misc. Applicable Tax at a % requested by Client (Manual Entry) Daily Intangible $19,29. Total Intangable $1,436,26. Total Total Prev Da Daily Tangible $. Total Tangible $244,786. Daily Cost: Cumm Cost: Cumm C Daily Taxes $. Total Taxes $. $19,29. $1,68,992. $1,661,

8 ulative Cost: ay 83.

9 MLC Opertating Daily Drilling Report Date: 7/2/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 24 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: University E Phone #: TVD: 11,67 Field: Wildcat Last Casing: 9 /8" Intermediate set at 462' Rotating Hrs:. Drlg. Contractor: Oryan Shoe Test: N/A Footage 24 Hrs: Rig Name & #: #7 KB: 17.' Avg ROP 24 Hrs: #DIV/! Safety Topic: Rigging up/down wireline. Crew: and Third Party: 14 Present Operations: Circulating to clean and condition hole for casing run. Breakdown of Operations From To Hrs Code Rpr Hrs for Day: Repair Hrs. for Job: BHA/Mtr Hours: 281 BHA JSA reviewed, finished collecting cores, laid down coring tool and ran imaging log. 6 of 6 cores were collected JSA reviewed, rigged down Baker wireline. JSA reviewed, tripped in hole filling pipe every 3 stands to 46' JSA reviewed, slip and cut 78" of drill line. JSA reviewed, tripped in hole filling pipe every 3 stands from 46' to bottom. Washed down last 2 joints for safety. JSA reviewed, began circulating 2 bottoms up to clean and condition hole. Total 24. Diesel Used: 36 Rig Diesel on Hand: 422 Qty OD ID Description Length Intangibles Daily Cummulative On Loc: In Out Total DP: DC: DC: 3 3 HWDP MW Vis PV YP Cake % % PH 1 sec 1 min cc. HTHP 32nd Solids Sand ES Pf Pm TR Shaker Screen Size: 4x8 Date Last BOP Drill: 7/1/1 Date Last BOP Test: 7/1/1 Bit Size Mfg Type Serial Jets Depth Depth Ftg Hrs FPH Wt. RPM Inner Outer Dull Loca- Brng. Gage Other Reason No. No. 32's In Out Mtr Row Row Char. Seal 1/16 Dull Pulled Varel PDC x1,4x WT S n/a 1 WT Still using to condition hole. 6RR 7.88 Varel PDC x1,4x WT A n/a 1 WT Performance Pump Model Stroke Liner Gal. / Stk. SPM GPM No. 1 Emsco No. 2 Emsco Surveys Depth: Depth: BG Gas: Bottom Hole Assembly Drilling Cost AFE # D13 Varel RS716DR PDC 1. Well Site Supervision 2,8 86,8 Bit sub 26.2 Gate Guard Serv. 6 17,8 6" Drill Collars Location 172,71 Disposals / Transp. Drilling Contractor 12, 38, Bits and Down Hole Tools / Serv. 11,44 21,399 Surface Rentals All 2,867 72,841 Total Length Solids Control / Screens ect. Wt of BHA: 43 Supplies/PotableWater/Misc.Exp. Eff.Bit Wt: 36 Tangibles/Csng/Float Equip/Wellhead 244,786 DP Size/WT/Gr./Conn. Taxes / Contingencies 4."/16.6/S-13/XH Total Costs $137,18 $1,661,783 Mud Properties Gels Wtr. Loss Bit Record Pump Data Length Size 9% Eff. DP DC's SPM Pres. 11,1 Inclination: 1.3 Azimuth: TVD: Fuels 72,99 Drilling Fluids 3,311 61,12 Misc.Serv/Cont.Labor 241,163 Casing Crew/Torque Turn/LDM 7,783 Transportation 4,2 Cement Services 66,23 Well Evaluation / MudLogging 18, Alk Ca Cl % OWR Lime Cont. Wtr Phase Liquids Pressure Annular Velocity Kill Rate V.Sec: 1,977 Inclination: 1.4 Azimuth: TVD: V.Sec: DLS: Mud Logger 22 Conn. Gas 43 Trip Gas: 133 Lithology: 1% Shale. Mud Loggers have been released. DLS:

10 MLC Operating Time Breakdown Report Fuel Inventory For Rig Use IADC Code Description Daily Cummulative Rig Received With: Fuel Delivered: Daily Fuel Used: 36 3 Reaming Total Fuel Delivered: 21 4 Coring Total Fuel Used: 1824 Circulating and Conditioning Mud Tripping Drill Pipe Fuel Inventory For Air Use 7 Normal Rig Maintenance 7 Fuel Delivered: 8 Down Time. Daily Fuel Used: 9 Cut Drill Line 1 2. Total Del. For Air: 14 1 Deviation Survey 11 Total Fuel Used For Mud Wireline Logs Air Diesel on Hand: 12 Casing and Cement 23 Daily Disposal Haul Offs: 13 Wait on Cement 4 WBM Bbls: 14 Nipple Up / Nipple Down 2. WBM Loads: 1 BOP Test / Fit / Casing Test / Drill Cmt 1. WBM Washouts: 16 Drill Stem Test 17 Plug Back Total Disposal Haul Offs: 18 Squeeze Cement WBM Bbls: 19 Fishing Operations WBM Loads: 2 Directional Work / Gyro / MWD Survey WBM Washouts: 21 Other Work Directed by Operator Force Mature: Weather/Ect: Daily Diposal Haul Offs: Totals: 24 7 OBM Bbls: OBM Loads: OBM Washouts: Mud Inventory Total Disposal Haul Offs: Water Based Mud Oil Based Mud OBM Bbls: Total Delivered: Total Delivered: OBM Loads: 1 Rig Up / Rig Down / Moving 42 2 Drilling 28. Lost: OBM Washouts: Returned: Returned: On Hand: On Hand: Well Notes and Comments Derrick raised at 12 hours on 6/26/21 Notififed TRRC of intent to cement surface casing at 9 hours on 6/28/21 spoke to Amy Job# 981 Circulated 86 bbls of cement to surface during second stage of cement job with CJ/Nabors on 6/3/21 Notififed TRRC of intent to cement intermediate casing at 8 hours on 7//21 spoke to Gina Job# 981 While hammer drilling with 7 7/8" hammer hole became deviated up to 4894'. Pulling hammer to pick up DBHA and straighten out. TD well at 11,67' on 7/17/21 at 23 hours 7/2/21 Ran Baker coring tool and collected 6 of 6 cores. Lost: 11.

11 Costs Tangible Rentals And Miscellaneous Well Eval Special Service And Contract Drilling Fluids Fuels Bits And Down Hole Tools Drlg Contractor Location MLC Operating Cat Sprv Gate Disp. Trns Cmt Solids Misc Tax Code Well Site Supervision - Consultant - Engineer Gate Guard Service Intangibles Rig Mob and De Mob (Include Rig Move Rate) 7 7 Drilling Day Rate or Footage Rate (After Spud In) Include OBM Pay Turnkey Operations, Ect: Crew Incentive, Bonus, Award - (Performance Pay) Bits, PDC, Core, Hammer, Diamond, (All Bits) Torkbuster, Agitator, Drlg Motor, Hammer, (Include Service Man and Insp) KSW, RT, RMR, IBS, Tri-Sq DC, Quad, Combo, Hole Opener, Under Ream Open or Cased Hole Whipstock - Tools and Service Hand, Down Hole Equip. Purchased DP,DC,HWDP,Kelly,Valves,Subs,Tubing,HandlingTools Drilling Jars, ShockSub, Prodrift-Teledrift Rig Diesel Air Jammers Diesel Fuel for Camp, Water well, Propane, WB Mud Products, Sack or Liquid, Service, Tax OB Mud Products, Sack or Liquid, Service, Tax Water Well Fresh Water, Transportation Trucked Kill Truck Corrosion Control Drlg Mud Oil, Lubricant, Beads, Bead Recovery, Service Cost Breakdown Report Conductor, Start hole, Rat hole, Mouse hole, Rig Anchors Permits, Surveys, BLM, State, Fees 2 2 Construction-Location, Roads, Location Repair and Maintenance 7 7 Water Well Drilling Pit Liners and Fencing 2 2 Caliche and Water Royalty - Damages 4 4 Disposal Fees, Reserve Pit, Location Clean Up, Transportation of Disposals Air Compressor, N2 Unit, Mist Pump, Chemical, All Trucking, Service 817. Contract Labor, Roustabout, Welding, Backhoe, Fabrication, Other Labor 161 Fishing -Tools, All Trkg, Hotshot, Service Coring - Tools, All Trkg, Hotshot, Service -(Related Lab Costs) Other Wire line, Well Survey and Insp, Pipe Recovery, Tool Setting, Slick line Tubular Inspection, Casing, DP, DC, Kelly, Tbg, Subs, (All) Csg Crew, LD Machine, Torque Turn, Fill Up Tool Clean and Drift, Nipple Up Crew, Stack Lift, BOPE Testing Transportation of FW, WBM, OBM - Trucking and Hotshot for All other Equipment 42 Cement Products and Service (All) -Not Float Equipment Open/Cased Hole Logging, Sidewall Cores, RFT, Geo Steering, CBL, Other Eval Drill stem Testing - Tools and Service, Well testing - Eqpt and Service Mud Logging Forklift, Man lift, Pressure Washer, Trash Trailer, Port-john, Backhoe Instrumentation,PVT System, Automatic Driller Separator, Igniter, Equipment, Service, Blooie line Frac and Test Tanks, Diesel-Mud-Water, Generator, Pumps, Equipment Miscellaneous (Ditch Magnets) BOPE, DSA, Choke Manifold, Spools, Valves, Wear Bushing Rotating Head, Rubbers Power Chokes and Service 2 47 All Trailers, Septic, Generator, Satellite, Intercom, PC, House Clean Catwalk, Pipe Racks, Matting Boards, Light Plant, Light towers Water Well, Pump, Generator, Fasline, Equipment, Service H2S and Safety and Serv Hand Solids Control, Screens,MaxVac, Pump, Centrifuge, Mud Cleaner,Serv Misc. Expenses, Office Supplies, Potable Camp Water, Screens Drilling Expendables Protective Intermediate Casing Surface Wellhead Intermediate Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Ha Final Production Casing, Production Tie Back, ect. Production Wellheads, Casing Spools, Valves, Tree, Hanger and Serv Hand Production Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Hand Well Insurance 1 1 Misc. Applicable Tax at a % requested by Client (Manual Entry) Daily Cummulative Prev Cummu Directional Tools and Service, MWD, Gyro (Actual) Daily Intangible $137,18. Total Intangable $1,416,997. Total Total Prev Da Daily Tangible $. Total Tangible $244,786. Daily Cost: Cumm Cost: Cumm C Daily Taxes $. Total Taxes $. $137,18. $1,661,783. $1,24,76 AFE# D13 42

12 ulative ay Cost: 6.

13 MLC Opertating Daily Drilling Report Date: 7/19/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 23 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: University E Phone #: TVD: 11,67 Field: Wildcat Last Casing: 9 /8" Intermediate set at 462' Rotating Hrs:. Drlg. Contractor: Oryan Shoe Test: N/A Footage 24 Hrs: Rig Name & #: #7 KB: 17.' Avg ROP 24 Hrs: #DIV/! Safety Topic: Presssure washer use. Crew: and Third Party: 14 Present Operations: Coring with Baker WLS. Breakdown of Operations From To Hrs Code Rpr Hrs for Day: Repair Hrs. for Job: BHA/Mtr Hours: 281 BHA JSA reviewed, ran quad combo with Baker, then ran in hole with coring tool (6 f 6) cores have been as of report time. Total 24. Diesel Used: Rig Diesel on Hand: 462 Qty OD ID Description Length Intangibles Daily Cummulative On Loc: In Out Total DP: DC: DC: 3 3 HWDP MW Vis PV YP Cake % % PH 1 sec 1 min cc. HTHP 32nd Solids Sand ES Pf Pm TR 9.4. Shaker Screen Size: 4x8 Date Last BOP Drill: 7/1/1 Bit Record Bit Size Mfg Type Serial Jets Depth Depth Ftg Hrs FPH Wt. RPM Inner Outer Dull Loca- Brng. Gage Other Reason No. No. 32's In Out Mtr Row Row Char. Seal 1/16 Dull Pulled Varel PDC x1,4x WT S n/a 1 WT Still using to condition hole. 6RR 7.88 Varel PDC x1,4x WT A n/a 1 WT Performance Pump No. 1 No. 2 Depth: Depth: BG Gas: Bottom Hole Assembly Drilling Cost AFE # D13 Varel RS716DR PDC 1. Well Site Supervision 2,8 84, Bit sub 26.2 Gate Guard Serv. 6 17,2 6" Drill Collars Location 172,71 Disposals / Transp. Drilling Contractor 12, 346, Bits and Down Hole Tools / Serv. 8,99 Model Stroke Liner Gal. / Stk. SPM GPM Fuels 72,99 Drilling Fluids 8,21 Misc.Serv/Cont.Labor 241,163 Casing Crew/Torque Turn/LDM 7,783 Transportation 4,2 Cement Services 66,23 Well Evaluation / MudLogging 18, Surface Rentals All 2,867 69,974 Total Length Solids Control / Screens ect. Wt of BHA: 43 Supplies/PotableWater/Misc.Exp. Eff.Bit Wt: 36 Tangibles/Csng/Float Equip/Wellhead 244,786 DP Size/WT/Gr./Conn. Taxes / Contingencies 4."/16.6/S-13/XH Total Costs $18,267 $1,24,76 Mud Properties Gels Wtr. Loss Pump Data Alk Ca Cl % OWR Lime Cont. Wtr Phase Liquids Date Last BOP Test: 7/1/1 Pressure Annular Velocity Kill Rate Length Size 9% Eff. DP DC's SPM Pres. Emsco Emsco Surveys 11,1 Inclination: 1.3 Azimuth: TVD: 3 V.Sec: 79 1,977 Inclination: 1.4 Azimuth: TVD: V.Sec: DLS: Mud Logger 22 Conn. Gas 43 Trip Gas: 133 Lithology: 1% Shale. Mud Loggers have been released. DLS:

14 MLC Operating Fuel Inventory For Rig Use Rig Received With: Fuel Delivered: IADC Code Time Breakdown Report Description Daily Cummulative 1 Rig Up / Rig Down / Moving 42 2 Drilling 28. Daily Fuel Used: 3 Reaming Total Fuel Delivered: 21 4 Coring Total Fuel Used: Circulating and Conditioning Mud Tripping Drill Pipe 91. Fuel Inventory For Air Use 7 Normal Rig Maintenance 7 Fuel Delivered: 8 Down Time. Daily Fuel Used: 9 Cut Drill Line 1. Total Del. For Air: 14 1 Deviation Survey 11 Total Fuel Used For Mud Wireline Logs Air Diesel on Hand: 12 Casing and Cement 23 Daily Disposal Haul Offs: 13 Wait on Cement 4 WBM Bbls: 14 Nipple Up / Nipple Down 2. WBM Loads: 1 BOP Test / Fit / Casing Test / Drill Cmt 1. WBM Washouts: 16 Drill Stem Test 17 Plug Back Total Disposal Haul Offs: 18 Squeeze Cement WBM Bbls: 19 Fishing Operations WBM Loads: 2 Directional Work / Gyro / MWD Survey WBM Washouts: 21 Other Work Directed by Operator Force Mature: Weather/Ect: Daily Diposal Haul Offs: Totals: OBM Bbls: OBM Loads: OBM Washouts: Mud Inventory Total Disposal Haul Offs: Water Based Mud Oil Based Mud OBM Bbls: Total Delivered: Total Delivered: OBM Loads: Lost: OBM Washouts: Returned: On Hand: Well Notes and Comments Lost: 11. Returned: On Hand: Derrick raised at 12 hours on 6/26/21 Notififed TRRC of intent to cement surface casing at 9 hours on 6/28/21 spoke to Amy Job# 981 Circulated 86 bbls of cement to surface during second stage of cement job with CJ/Nabors on 6/3/21 Notififed TRRC of intent to cement intermediate casing at 8 hours on 7//21 spoke to Gina Job# 981 While hammer drilling with 7 7/8" hammer hole became deviated up to 4894'. Pulling hammer to pick up DBHA and straighten out. TD well at 11,67' on 7/17/21 at 23 hours

15 Costs Tangible Rentals And Miscellaneous Well Eval Special Service And Contract Drilling Fluids Fuels Bits And Down Hole Tools Drlg Contractor Location MLC Operating Cat Sprv Gate Disp. Trns Cmt Solids Misc Tax Code Intangibles Well Site Supervision - Consultant - Engineer Gate Guard Service Cost Breakdown Report AFE# D13 Daily Cummulative Prev Cummu Conductor, Start hole, Rat hole, Mouse hole, Rig Anchors Permits, Surveys, BLM, State, Fees 2 2 Construction-Location, Roads, Location Repair and Maintenance 7 7 Water Well Drilling Pit Liners and Fencing 2 2 Caliche and Water Royalty - Damages 4 4 Disposal Fees, Reserve Pit, Location Clean Up, Transportation of Disposals Rig Mob and De Mob (Include Rig Move Rate) 7 7 Drilling Day Rate or Footage Rate (After Spud In) Include OBM Pay Turnkey Operations, Ect: Crew Incentive, Bonus, Award - (Performance Pay) Bits, PDC, Core, Hammer, Diamond, (All Bits) Torkbuster, Agitator, Drlg Motor, Hammer, (Include Service Man and Insp) KSW, RT, RMR, IBS, Tri-Sq DC, Quad, Combo, Hole Opener, Under Ream 1 1 Open or Cased Hole Whipstock - Tools and Service Hand, Down Hole Equip. Purchased DP,DC,HWDP,Kelly,Valves,Subs,Tubing,HandlingTools Drilling Jars, ShockSub, Prodrift-Teledrift Rig Diesel Air Jammers Diesel Fuel for Camp, Water well, Propane, WB Mud Products, Sack or Liquid, Service, Tax OB Mud Products, Sack or Liquid, Service, Tax Water Well Fresh Water, Transportation Trucked Kill Truck Corrosion Control Drlg Mud Oil, Lubricant, Beads, Bead Recovery, Service Air Compressor, N2 Unit, Mist Pump, Chemical, All Trucking, Service Contract Labor, Roustabout, Welding, Backhoe, Fabrication, Other Labor Directional Tools and Service, MWD, Gyro (Actual) Fishing -Tools, All Trkg, Hotshot, Service Coring - Tools, All Trkg, Hotshot, Service -(Related Lab Costs) Other Wire line, Well Survey and Insp, Pipe Recovery, Tool Setting, Slick line Tubular Inspection, Casing, DP, DC, Kelly, Tbg, Subs, (All) Csg Crew, LD Machine, Torque Turn, Fill Up Tool Clean and Drift, Nipple Up Crew, Stack Lift, BOPE Testing Transportation of FW, WBM, OBM - Trucking and Hotshot for All other Equipment Cement Products and Service (All) -Not Float Equipment Open/Cased Hole Logging, Sidewall Cores, RFT, Geo Steering, CBL, Other Eval Drill stem Testing - Tools and Service, Well testing - Eqpt and Service Mud Logging Forklift, Man lift, Pressure Washer, Trash Trailer, Port-john, Backhoe Instrumentation,PVT System, Automatic Driller Separator, Igniter, Equipment, Service, Blooie line Frac and Test Tanks, Diesel-Mud-Water, Generator, Pumps, Equipment Miscellaneous (Ditch Magnets) BOPE, DSA, Choke Manifold, Spools, Valves, Wear Bushing Rotating Head, Rubbers Power Chokes and Service All Trailers, Septic, Generator, Satellite, Intercom, PC, House Clean Catwalk, Pipe Racks, Matting Boards, Light Plant, Light towers Water Well, Pump, Generator, Fasline, Equipment, Service H2S and Safety and Serv Hand Solids Control, Screens,MaxVac, Pump, Centrifuge, Mud Cleaner,Serv Misc. Expenses, Office Supplies, Potable Camp Water, Screens Drilling Expendables Protective Intermediate Casing Surface Wellhead Intermediate Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Ha Final Production Casing, Production Tie Back, ect. Production Wellheads, Casing Spools, Valves, Tree, Hanger and Serv Hand Production Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Hand Well Insurance 1 1 Misc. Applicable Tax at a % requested by Client (Manual Entry) Daily Intangible $18,267. Total Intangable $1,279,979. Total Total Prev Da Daily Tangible $. Total Tangible $244,786. Daily Cost: Cumm Cost: Cumm C Daily Taxes $. Total Taxes $. $18,267. $1,24,76. $1,6,

16 ulative Cost: ay 98.

17 MLC Opertating Daily Drilling Report Date: 7/18/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 22 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: University E Phone #: TVD: 11,67 Field: Wildcat Last Casing: 9 /8" Intermediate set at 462' Rotating Hrs:. Drlg. Contractor: Oryan Shoe Test: N/A Footage 24 Hrs: Rig Name & #: #7 KB: 17.' Avg ROP 24 Hrs: #DIV/! Safety Topic: Tripping pipe. Crew: and Third Party: 12 Present Operations: Running in hole for first logging run with Baker WLS. Breakdown of Operations From To Hrs Code Rpr Hrs for Day: Repair Hrs. for Job: BHA/Mtr Hours: 281 BHA JSA reviewed, continued tripping out ouf hole to lay out DBHA JSA reviewed, laid down directional assembly. Picked up bit sub and 4 collars to trip back in hole for wiper trip. JSA reviewed, tripped in hole filling pipe every 3 stands. Washed down last 2 joints for safety. JSA reviewed, circulated 3 bottoms up to clean and condition hole. JSA reviewed, tripped out of hole to surface in preparation of rigging up loggers. JSA reviewed, rigged up loggers. Total 24. Diesel Used: 72 Rig Diesel on Hand: 112 Qty OD ID Description Length Intangibles Daily Cummulative On Loc: In Out Total DP: DC: DC: 3 3 HWDP MW Vis PV YP Cake % % PH 1 sec 1 min cc. HTHP 32nd Solids Sand ES Pf Pm TR Shaker Screen Size: 4x8 Date Last BOP Drill: 7/1/1 Date Last BOP Test: 7/1/1 Bit Size Mfg Type Serial Jets Depth Depth Ftg Hrs FPH Wt. RPM Inner Outer Dull Loca- Brng. Gage Other Reason No. No. 32's In Out Mtr Row Row Char. Seal 1/16 Dull Pulled Varel PDC x1,4x WT S n/a 1 WT Still using for Wiper 6RR 7.88 Varel PDC x1,4x WT A n/a 1 WT Performance Pump Model Stroke Liner Gal. / Stk. SPM GPM No. 1 Emsco No. 2 Emsco Surveys Depth: Depth: BG Gas: Bottom Hole Assembly Drilling Cost AFE # D13 Varel RS716DR PDC 1. Well Site Supervision 2,8 81,2 Bit sub 26.2 Gate Guard Serv. 6 16,6 6" Drill Collars Location 172,71 Disposals / Transp. Drilling Contractor 12, 334, Bits and Down Hole Tools / Serv. 8,99 Surface Rentals All 2,867 67,17 Total Length Solids Control / Screens ect. Wt of BHA: 43 Supplies/PotableWater/Misc.Exp. Eff.Bit Wt: 36 Tangibles/Csng/Float Equip/Wellhead 244,786 DP Size/WT/Gr./Conn. Taxes / Contingencies 4."/16.6/S-13/XH Total Costs $2,73 $1,6,498 Mud Properties Gels Wtr. Loss Bit Record Pump Data Length Size 9% Eff. DP DC's SPM Pres. 11,1 Inclination: 1.3 Azimuth: TVD: Fuels 72,99 Drilling Fluids 2,346 8,21 Misc.Serv/Cont.Labor 3,76 241,163 Casing Crew/Torque Turn/LDM 7,783 Transportation 4,2 Cement Services 66,23 Well Evaluation / MudLogging 1,2 18, Alk Ca Cl % OWR Lime Cont. Wtr Phase Liquids Pressure Annular Velocity Kill Rate V.Sec: 1,977 Inclination: 1.4 Azimuth: TVD: V.Sec: DLS: Mud Logger 22 Conn. Gas 43 Trip Gas: 133 Lithology: 1% Shale DLS:

18 MLC Operating Time Breakdown Report Fuel Inventory For Rig Use IADC Code Description Daily Cummulative Rig Received With: Fuel Delivered: Daily Fuel Used: 72 3 Reaming Total Fuel Delivered: 21 4 Coring Total Fuel Used: Circulating and Conditioning Mud Tripping Drill Pipe Fuel Inventory For Air Use 7 Normal Rig Maintenance 7 Fuel Delivered: 8 Down Time. Daily Fuel Used: 9 Cut Drill Line 1. Total Del. For Air: 14 1 Deviation Survey 11 Total Fuel Used For Mud Wireline Logs 2 2 Air Diesel on Hand: 12 Casing and Cement 23 Daily Disposal Haul Offs: 13 Wait on Cement 4 WBM Bbls: 14 Nipple Up / Nipple Down 2. WBM Loads: 1 BOP Test / Fit / Casing Test / Drill Cmt 1. WBM Washouts: 16 Drill Stem Test 17 Plug Back Total Disposal Haul Offs: 18 Squeeze Cement WBM Bbls: 19 Fishing Operations WBM Loads: 2 Directional Work / Gyro / MWD Survey WBM Washouts: 21 Other Work Directed by Operator Force Mature: Weather/Ect: Daily Diposal Haul Offs: Totals: OBM Bbls: OBM Loads: OBM Washouts: Mud Inventory Total Disposal Haul Offs: Water Based Mud Oil Based Mud OBM Bbls: Total Delivered: Total Delivered: OBM Loads: 1 Rig Up / Rig Down / Moving 42 2 Drilling 28. Lost: OBM Washouts: Returned: Returned: On Hand: On Hand: Well Notes and Comments Derrick raised at 12 hours on 6/26/21 Notififed TRRC of intent to cement surface casing at 9 hours on 6/28/21 spoke to Amy Job# 981 Circulated 86 bbls of cement to surface during second stage of cement job with CJ/Nabors on 6/3/21 Notififed TRRC of intent to cement intermediate casing at 8 hours on 7//21 spoke to Gina Job# 981 While hammer drilling with 7 7/8" hammer hole became deviated up to 4894'. Pulling hammer to pick up DBHA and straighten out. TD well at 11,67' on 7/17/21 at 23 hours Lost: 3 11.

19 Costs Tangible Rentals And Miscellaneous Well Eval Special Service And Contract Drilling Fluids Fuels Bits And Down Hole Tools Drlg Contractor Location MLC Operating Cat Sprv Gate Disp. Trns Cmt Solids Misc Tax Code Well Site Supervision - Consultant - Engineer Gate Guard Service Intangibles Rig Mob and De Mob (Include Rig Move Rate) 7 7 Drilling Day Rate or Footage Rate (After Spud In) Include OBM Pay Turnkey Operations, Ect: Crew Incentive, Bonus, Award - (Performance Pay) Bits, PDC, Core, Hammer, Diamond, (All Bits) Torkbuster, Agitator, Drlg Motor, Hammer, (Include Service Man and Insp) KSW, RT, RMR, IBS, Tri-Sq DC, Quad, Combo, Hole Opener, Under Ream 1 1 Open or Cased Hole Whipstock - Tools and Service Hand, Down Hole Equip. Purchased DP,DC,HWDP,Kelly,Valves,Subs,Tubing,HandlingTools Drilling Jars, ShockSub, Prodrift-Teledrift Rig Diesel Air Jammers Diesel Fuel for Camp, Water well, Propane, WB Mud Products, Sack or Liquid, Service, Tax OB Mud Products, Sack or Liquid, Service, Tax Water Well Fresh Water, Transportation Trucked Kill Truck Corrosion Control Drlg Mud Oil, Lubricant, Beads, Bead Recovery, Service Cost Breakdown Report Conductor, Start hole, Rat hole, Mouse hole, Rig Anchors Permits, Surveys, BLM, State, Fees 2 2 Construction-Location, Roads, Location Repair and Maintenance 7 7 Water Well Drilling Pit Liners and Fencing 2 2 Caliche and Water Royalty - Damages 4 4 Disposal Fees, Reserve Pit, Location Clean Up, Transportation of Disposals Air Compressor, N2 Unit, Mist Pump, Chemical, All Trucking, Service 817. Contract Labor, Roustabout, Welding, Backhoe, Fabrication, Other Labor 161 Fishing -Tools, All Trkg, Hotshot, Service Coring - Tools, All Trkg, Hotshot, Service -(Related Lab Costs) Other Wire line, Well Survey and Insp, Pipe Recovery, Tool Setting, Slick line Tubular Inspection, Casing, DP, DC, Kelly, Tbg, Subs, (All) Csg Crew, LD Machine, Torque Turn, Fill Up Tool Clean and Drift, Nipple Up Crew, Stack Lift, BOPE Testing Transportation of FW, WBM, OBM - Trucking and Hotshot for All other Equipment 42 Cement Products and Service (All) -Not Float Equipment Open/Cased Hole Logging, Sidewall Cores, RFT, Geo Steering, CBL, Other Eval Drill stem Testing - Tools and Service, Well testing - Eqpt and Service Mud Logging Forklift, Man lift, Pressure Washer, Trash Trailer, Port-john, Backhoe Instrumentation,PVT System, Automatic Driller Separator, Igniter, Equipment, Service, Blooie line Frac and Test Tanks, Diesel-Mud-Water, Generator, Pumps, Equipment Miscellaneous (Ditch Magnets) BOPE, DSA, Choke Manifold, Spools, Valves, Wear Bushing Rotating Head, Rubbers Power Chokes and Service All Trailers, Septic, Generator, Satellite, Intercom, PC, House Clean Catwalk, Pipe Racks, Matting Boards, Light Plant, Light towers Water Well, Pump, Generator, Fasline, Equipment, Service H2S and Safety and Serv Hand Solids Control, Screens,MaxVac, Pump, Centrifuge, Mud Cleaner,Serv Misc. Expenses, Office Supplies, Potable Camp Water, Screens Drilling Expendables Protective Intermediate Casing Surface Wellhead Intermediate Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Ha Final Production Casing, Production Tie Back, ect. Production Wellheads, Casing Spools, Valves, Tree, Hanger and Serv Hand Production Float Equipment, Centralizers, Jewelry, DV Tool, Liner Equipment, Serv Hand Well Insurance 1 1 Misc. Applicable Tax at a % requested by Client (Manual Entry) Daily Cummulative Prev Cummu Directional Tools and Service, MWD, Gyro (Actual) Daily Intangible $2,73. Total Intangable $1,261,712. Total Total Prev Da Daily Tangible $. Total Tangible $244,786. Daily Cost: Cumm Cost: Cumm C Daily Taxes $. Total Taxes $. $2,73. $1,6,498. $1,43,92 AFE# D13 42

20 ulative ay Cost: 2.

21 MLC Opertating Daily Drilling Report Date: 7/17/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 21 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From To Hrs Code Rpr Hrs for Day: Repair Hrs. for Job: BHA/Mtr Hours: BHA JSA reviewed, rotate drilled from 1687' to 1843', slide drilled from 1843' to 183', rotate drilled from 183' to 19', University E Phone #: TVD: 11,67 Field: Wildcat Last Casing: 9 /8" Intermediate set at 462' Rotating Hrs: 1. Drlg. Contractor: Oryan Shoe Test: N/A Footage 24 Hrs: 38 Rig Name & #: #7 KB: 17.' Avg ROP 24 Hrs: 2 Safety Topic: Tripping pipe. Crew: and Third Party: 12 Present Operations: Tripping out of hole to lay out DBHA and perform full wiper trip. Breakdown of Operations WOB 1-2k, GPM 43, Diff 2-3, Rotate ROP 3 fph, Slide ROP 1 fph JSA reviewed, serviced rig. JSA reviewed, rotate drilled from 19' to 1167', WOB 1-2k, GPM 43, Diff 2-3, Rotate ROP 3 fph JSA reviewed, began circulating 2 bottoms up in preparation of short trip. While circulating began having stand pipe pressure drop. Possible washed out drill pipe, spoke to Pete Ortez and decided to to make a full trip to surface to inspect pipe JSA reviewed, tripped out ouf hole to lay out DBHA and inspect pipe. Found 2 connections washed out (laid out 4 joints). Confirmed TD with Mike Mount 11,'. Drilled to 11,67' to fit casing. Total 24. Diesel Used: Rig Diesel on Hand: 864 Qty OD ID Description Length Intangibles Daily Cummulative On Loc: In Out Total DP: DC: DC: 3 3 HWDP MW Vis PV YP Cake % % PH 1 sec 1 min cc. HTHP 32nd Solids Sand ES Pf Pm TR Shaker Screen Size: 4x8 Date Last BOP Drill: 7/1/1 Bit Record Bit Size Mfg Type Serial Jets Depth Depth Ftg Hrs FPH Wt. RPM Inner Outer Dull Loca- Brng. Gage Other Reason No. No. 32's In Out Mtr Row Row Char. Seal 1/16 Dull Pulled Varel PDC x1,4x In hole 6RR 7.88 Varel PDC x1,4x WT A n/a 1 WT Performance Pump Model Stroke Liner Gal. / Stk. SPM GPM No. 1 Emsco No. 2 Emsco Surveys Depth: Depth: BG Gas: Bottom Hole Assembly Drilling Cost AFE # D13 Varel RS716DR PDC 1. Well Site Supervision 2,8 78,4 Mud motor 6/.stg 1.* 26.2 Gate Guard Serv. 6 16, Float sub 3.16 Location 172,71 UBHO 3.4 Disposals / Transp. NMDC 3.4 Drilling Contractor 12, 322, NMDC 29.8 Bits and Down Hole Tools / Serv. 8,99 6" Drill Collars Fuels 72,99 Drilling Fluids 13,16,8 Misc.Serv/Cont.Labor 8,76 21,43 Casing Crew/Torque Turn/LDM 7,783 Transportation 4,2 Cement Services 66,23 Well Evaluation / MudLogging 1,2 16,8 Surface Rentals All 3,717 64,24 Total Length 29.4 Solids Control / Screens ect. Wt of BHA: 43 Supplies/PotableWater/Misc.Exp. Eff.Bit Wt: 36 Tangibles/Csng/Float Equip/Wellhead 244,786 DP Size/WT/Gr./Conn. Taxes / Contingencies 4."/16.6/S-13/XH Total Costs $42,98 $1,43,92 Mud Properties Gels Wtr. Loss Pump Data Alk Ca Cl % OWR Lime Cont. Wtr Phase Liquids Date Last BOP Test: 7/1/1 Pressure Annular Velocity Kill Rate Length Size 9% Eff. DP DC's SPM Pres. 11,1 Inclination: 1.3 Azimuth: TVD: V.Sec: 1,977 Inclination: 1.4 Azimuth: TVD: V.Sec: DLS: Mud Logger 22 Conn. Gas 43 Trip Gas: n/a Lithology: 1% Shale DLS:

22 MLC Operating Fuel Inventory For Rig Use Rig Received With: Fuel Delivered: IADC Code Time Breakdown Report Description Daily Cummulative 1 Rig Up / Rig Down / Moving 42 2 Drilling Daily Fuel Used: 3 Reaming Total Fuel Delivered: 21 4 Coring Total Fuel Used: Circulating and Conditioning Mud Tripping Drill Pipe 7 7. Fuel Inventory For Air Use 7 Normal Rig Maintenance. 7 Fuel Delivered: 8 Down Time. Daily Fuel Used: 9 Cut Drill Line 1. Total Del. For Air: 14 1 Deviation Survey 11 Total Fuel Used For Mud Wireline Logs Air Diesel on Hand: 12 Casing and Cement 23 Daily Disposal Haul Offs: 13 Wait on Cement 4 WBM Bbls: 14 Nipple Up / Nipple Down 2. WBM Loads: 1 BOP Test / Fit / Casing Test / Drill Cmt 1. WBM Washouts: 16 Drill Stem Test 17 Plug Back Total Disposal Haul Offs: 18 Squeeze Cement WBM Bbls: 19 Fishing Operations WBM Loads: 2 Directional Work / Gyro / MWD Survey WBM Washouts: 21 Other Work Directed by Operator Force Mature: Weather/Ect: Daily Diposal Haul Offs: Totals: OBM Bbls: OBM Loads: OBM Washouts: Mud Inventory Total Disposal Haul Offs: Water Based Mud Oil Based Mud OBM Bbls: Total Delivered: Total Delivered: OBM Loads: Lost: OBM Washouts: Returned: On Hand: Well Notes and Comments Lost: 8. Returned: On Hand: Derrick raised at 12 hours on 6/26/21 Notififed TRRC of intent to cement surface casing at 9 hours on 6/28/21 spoke to Amy Job# 981 Circulated 86 bbls of cement to surface during second stage of cement job with CJ/Nabors on 6/3/21 Notififed TRRC of intent to cement intermediate casing at 8 hours on 7//21 spoke to Gina Job# 981 While hammer drilling with 7 7/8" hammer hole became deviated up to 4894'. Pulling hammer to pick up DBHA and straighten out. TD well at 11,67' on 7/17/21 at 23 hours

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Superintendent Rig Checklist

Superintendent Rig Checklist Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment. REV 1c

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment.  REV 1c : The cost effective solution for efficient deep water drilling in mild environment. REV 1c Concept The ED concept was born from the experiences of the Unocal 76 Deepwater Asia Team from 1997-2005. The

More information

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM 750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM PAGE 1 OF 7 DRAWWORKS: TSM 7000 Drawworks, 750hp, grooved f/1-1/8 Drill Line, p/b 540HP CAT C-15, w/allison CLT- 6061 Automatic Transmission, Right Angle Drive,

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

Understanding & Calculating the Impact of Oil-Related Traffic

Understanding & Calculating the Impact of Oil-Related Traffic Understanding & Calculating the Impact of Oil-Related Traffic Jack Olson, Asst. Director Planning/Asset Management Division ND Department of Transportation Bismarck, ND October 26, 2011 1. An overview

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

Drillmec HH-300 spec.

Drillmec HH-300 spec. Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable

More information

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS DRAWWORKS/POWER NATIONAL T 32 Single Drum Drawworks, S/N N/A, 400 HP, LEBUS Grooved f/1 1/8 Line, AMERICAN Makeup & Breakout Catheads, Rotary Table Drive, Quad Water Brake, Driller s Control Console w/air

More information

OilRigsNow.com Houston,TX USA (713)

OilRigsNow.com Houston,TX USA (713) Current DRAWWORKS: WILSON Mogul Single Drum Drawworks S/N 5131, Lebus Grooved f/ 1-1/8 Line, WILSON Torcair Brake, FOSTER/AMERICAN Catheads, Air Drillers Control Console, Crown-O-Matic. COMPOUND: EMSCO

More information