EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

Size: px
Start display at page:

Download "EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017"

Transcription

1 Report /25/27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original Spud Date Days Since Spud. Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor DENNIS MORGAN Measured Depth 2,375. Engineer YERMEK TYNYSHBAYEV TVD 2,373.8 Other Supervisor TREY HARGETT, YU LIU 24 Hr Progress 2,375. Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 3.25 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 2.in@46.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 5 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 5 Safety Comments: MAN HOURS HRS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 24 Hour Summary Operations Summary CONDUCT CEMENTING ON 97H WITH FULL RETURNS AND OBSERVED CEMENT BACK TO SURFACE, CIRCULATE 452 BBLS (357 SACKS) CEMENT BACK TO SURFACE, SECOND STAGE WAS CANCELLED, SPUD 98H, DRILL F/6' T/2375' Update Since Report Time DRILL F/2375' 24 Hour Forecast DRILL TD, POOH, R/U CASING CREW, RUN CASING, CEMENT /26/27 6:38:6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE

2 bore Report /25/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description 4: 2. SRF RUP TO SPUD, R/U CATWALK, PVC OVERFLOW LINES, CELLAR COVERS 6:. SRF CEM *NOTE- NOTIFIED TRRC OF WELL SPUD. SPOKE WITH AUDREY OPERATOR #2 CEMENT JOB OFFLINE FOR UNIVERSITY 9 UNIT 57H 6:45 TEST LINES TO 45 PSI PUMP 5 BBLS OF FRESH WATER AT 5 BPM, RETURNS WERE ESTABLISHED 7:4 LEAD SLURRY: PUMP 86BBLS OF 2.8PPG CEMENT AT 6 BPM PUMPED SLURRY CONSISTING OF 2585 SACKS (66.95 MIX WATER) (3% EXCESS) OF 35:65:4 POZ:PREMIUM CLASS C ADDITIVES(C65/35/POZ+4%BENTONITE+.75%R-2+.65%SMS+.5%SAL T+.GAL/SK FP-6L+.5 LB/SK STATIC FREE) 9:34 TAIL CEMENT: PUMP 8BBLS OF 4.8PPG CEMENT AT 4 BPM PUMPED SLURRY CONSISTING OF 5 SACKS (75.6 MIX WATER) (% EXCESS) OF PREMIUM CLASS C ADDITIVES (C+.25%R-2+.5%SMS+.GAL/SK FP-6L+.5LB/SK STATIC FREE) : DROPPED DPLUG :4 DISPLACEMENT FLUIDS: START DISPLACING WITH BBLS OF FRESH WATER+352BBLS BRINE WATER AT 6BPM BUMPED PLUG AT 2 PSI, HELD FOR 2 MIN &.25 BBLS BACK CEMENT RETURN WAS ESTABLISHED CIRCULATE 452 BBLS (357 SACKS) CEMENT BACK TO SURFACE, SECOND STAGE WAS CANCELLED 6:. SRF RUP 2:3 DOWN CEMENTERS R/U TO SPUD, CATWALK, TRANSFER TANK, FLOOR 7:.5 SRF RUP SERVICE 7:3 2. SRF TIH TIH W/ BHA# 9:3. SRF TIH TIGHTEN LEAKING CONDUCTOR :3 3: SRF DRL SRF DRL ROTATE DRILLING F/ 6 T/ 76 (ROP 28 FT/HR) WOB: 2 K - 25 K RPM: SURFACE 9 MOTOR 94 BIT 284 PRESSURE AND FLOW: SPP 39, GPM 882 TORQUE ON BOTTOM -6 OFF BOTTOM 2 STRING WEIGHT: UP 2K DOWN 5K ROTATING K MW: 9. PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A INSTALL ROTATING HEAD 4: 4. SRF DRL ROTATE DRILLING F/ 76 T/ 26 (ROP 4 FT/HR) WOB: 2 K - 25 K RPM: SURFACE 9 MOTOR 94 BIT 284 PRESSURE AND FLOW: SPP 39, GPM 882 TORQUE ON BOTTOM -6 OFF BOTTOM 2 STRING WEIGHT: UP 32K DOWN 2K ROTATING 25K /26/27 6:38:6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 2

3 bore Report /25/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description MW: 9. PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A 8: 6. SRF DRL ROTATE DRILLING F/ 26 T/ 2375 (ROP 93 FT/HR) WOB: 25 K - 4 K RPM: SURFACE 9 MOTOR 84 BIT 274 PRESSURE AND FLOW: SPP 39, GPM 836 TORQUE ON BOTTOM 7-6 OFF BOTTOM 3 STRING WEIGHT: UP 55K DOWN 45K ROTATING 5K MW: 9. PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A Total 2. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft), , PTW UNKNOWN_26, , PTW UNKNOWN_26, , PTW UNKNOWN_26 2, , PTW UNKNOWN_26 2, , PTW UNKNOWN_26 Bit Details Tool Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade 2.25 BAKER OIL TOOL T66FX x Bit Operations MD WOB Min/Max Current RPM (rpm) Flow rate (gpm) SPP (psi) P bit (psi) Bit HHP (hp) Hours ROP (ft/hr) Hours cum cum. ROP cum. (ft/hr) Item description HWDP # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 IF 4 /2 XH Pin x 4 /2IF Box /2 IF DRILL COLLAR 6 5/8 REG Pin x 4 /2 XH Box SCREEN SUB STABILIZER SLICK COLLAR NONMAG 8In. 6 5/8 REG. PIN X BOX 3.25In. ID STABILIZER 8 GAP SUB ASSY COMPLETE VELOCITY 8 CENTRALIZER COLLAR ASSY VELOCITY 8 LANDING SUB ASSY VELOCITY 65 CROSSOVER SUB VELOCITY /2 XH /2 XH NESXO /8 REG DR /8 REG DR /8 REG NESNM /8 REG DR /8 REG VG89P TS /8 FH VC /8 FH VL /8 REG VX824 /26/27 6:38:6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 3

4 bore Report /25/27 Item description PONY SLICK COLLAR NONMAG 8In. 6 5/8 REG PIN x BOX SN: STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /8 REG NESPC /8 REG DR9796 8" BAKER 5/6 6. Stg. SN: RPG.22 BIT # RUN # 2.25" BAKER T66FX SN: X /8 REG /8 REG Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose /25/27 7:,38.34 DRILL 2.25 DIESEL FUEL ON HAND 7994 GALLONS DIESEL FUEL USED 68 GALLONS DIEESEL FUEL DELIVERED GALLONS CNG USED 43.4 GALLONS Remarks /26/27 6:38:6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 4

5 Report 2 /26/27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location 2. Objective Drill - Wolfcamp B Shale Original Spud Date Days Since Spud 2. Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor DENNIS MORGAN Measured Depth 4,867. Engineer YERMEK TYNYSHBAYEV TVD 4,864.9 Other Supervisor TREY HARGETT, YU LIU 24 Hr Progress 2,492. Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 3.25 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 2.in@46.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 6 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 3 Safety Comments: MAN HOURS HRS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 7 24 Hour Summary DRILL F/2735' T/4867', POOH W/DP Update Since Report Time Operations Summary POOH W/DP T/67', REMOVE ROTATING HEAD, POOH W/COLLARS F/67 T/2', POOH 24 Hour Forecast R/U CASING CREW, RUN CSG, CEMENT /27/27 5:5: Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE

6 bore Report 2 /26/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description : 5.5 SRF DRL ROTATE DRILLING F/ 2375 T/ 376 (ROP 46 FT/HR) WOB: 25 K - 4 K RPM: SURFACE 9 MOTOR 84 BIT 274 PRESSURE AND FLOW: SPP 39, GPM 836 TORQUE ON BOTTOM 7-6 OFF BOTTOM 4 STRING WEIGHT: UP 6K DOWN 45K ROTATING 5K MW: 9.9 PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A 5:3.5 SRF DRL SLIDE DRILLING F/ 376 T/ 385 (ROP 8 FT/HR) WOB: 2 K - 25 K RPM: SURFACE MOTOR 8 BIT 8 PRESSURE AND FLOW: SPP 37, GPM 82 STRING WEIGHT: UP 68K DOWN 5K ROTATING 55K MW: 9.9 PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A 6:.5 SRF DRL SLIDE DRILLING F/ 385 T/ 326 (ROP 62 FT/HR) WOB: 2 K - 25 K RPM: SURFACE MOTOR 8 BIT 8 PRESSURE AND FLOW: SPP 37, GPM 82 STRING WEIGHT: UP 68K DOWN 5K ROTATING 55K MW: PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A 6:3. SRF DRL ROTATE DRILLING F/ 326 T/ 3354 (ROP 38 FT/HR) WOB: 25 K - 32 K RPM: SURFACE 9 MOTOR 76 BIT 266 PRESSURE AND FLOW: SPP 4, GPM 8 TORQUE ON BOTTOM 8-2 OFF BOTTOM 4.5 STRING WEIGHT: UP 68K DOWN 5K ROTATING 55K MW: PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A 7:3. SRF DRL TROUBLESHOOT MWD 8:3 7:3 22: SRF DRL SRF DRL SRF CBU ROTATE DRILLING F/ 3354 T/ 449 (ROP 26 FT/HR) WOB: 25 K - 38 K RPM: SURFACE 9 MOTOR 76 BIT 266 PRESSURE AND FLOW: SPP 42, GPM 8 TORQUE ON BOTTOM 8-2 OFF BOTTOM 4.5 STRING WEIGHT: UP 95K DOWN 8K ROTATING 86K MW: PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A ROTATE DRILLING F/ 449' T/ 4867' (ROP 84 FT/HR) WOB: 25 K - 3 K RPM: SURFACE 9 MOTOR 74 BIT 264 PRESSURE AND FLOW: SPP 38, GPM 789 TORQUE ON BOTTOM 8-2 OFF BOTTOM 4.5 STRING WEIGHT: UP 2K DOWN 9K ROTATING 95K MW: PPG MOTOR REVS/GAL.22 GAS: BG N/A CG N/A CONDITION MUD & CIRCULATE 23:. SRF TOH FLOW CHECK, PUMP SLUG, POOH W/DP T/23' Total 24. /27/27 5:5: Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 2

7 bore Report 2 /26/27 NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status /26/27 7:3 PHOENIX TECHNOLOGY SERVICES USA INC Directional (MWD Measurem ent While Drilling/gyr o) DRL N.. Description: Title: TROUBLE SHOOT MWD Total.. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade 2.25 BAKER OIL TOOL T66FX x Tool MD 3,76. 3,85. 3,26. 3,354. 4,49. 4,867. WOB Min/Max Current RPM (rpm) Flow rate (gpm) SPP (psi) P bit (psi) Bit Operations Bit HHP (hp) Hours ROP (ft/hr) Hours cum cum. 25./ , , / , , / , , / , , / , , , / , , ROP cum. (ft/hr) Item description HWDP # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 IF 4 /2 XH Pin x 4 /2IF Box /2 IF DRILL COLLAR 6 5/8 REG Pin x 4 /2 XH Box SCREEN SUB STABILIZER SLICK COLLAR NONMAG 8In. 6 5/8 REG. PIN X BOX 3.25In. ID STABILIZER 8 GAP SUB ASSY COMPLETE VELOCITY 8 CENTRALIZER COLLAR ASSY VELOCITY 8 LANDING SUB ASSY VELOCITY /2 XH /2 XH NESXO /8 REG DR /8 REG DR /8 REG NESNM /8 REG DR /8 REG VG89P TS /8 FH VC /8 FH VL86 /27/27 5:5: Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 3

8 bore Report 2 /26/27 Item description 65 CROSSOVER SUB VELOCITY PONY SLICK COLLAR NONMAG 8In. 6 5/8 REG PIN x BOX SN: STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /8 REG VX /8 REG NESPC /8 REG DR9796 8" BAKER 5/6 6. Stg. SN: DM RPG.22 BIT # RUN # 2.25" BAKER T66FX SN: X /8 REG DM /8 REG Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose /25/27 7:,38.6 DRILL 2.25 MD 3,76. 3,85. 3,26. 3,354. 4,49. 4,867. SW Up SW Down SW Rotn Drag Tq On Btm Tq Off Btm (ft-lbf) (ft-lbf) ,. 4, ,. 4, ,. 4,5., ,. 4, DIESEL FUEL ON HAND 2574 GALLONS DIESEL FUEL USED 458 GALLONS DIEESEL FUEL DELIVERED 75 GALLONS CNG USED GALLONS Remarks /27/27 5:5: Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 4

9 Report 3 /27/27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location 3. Objective Drill - Wolfcamp B Shale Original Spud Date Days Since Spud 2.56 Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor DENNIS MORGAN Measured Depth 4,867. Engineer YERMEK TYNYSHBAYEV TVD 4,864.9 Other Supervisor TREY HARGETT, YU LIU 24 Hr Progress Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 3.25 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 2.in@46.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 7 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 7 Safety Comments: MAN HOURS HRS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary POOH, RUN 9.625'' CSG, CONDUCT CEMENTING WITH FULL RETURNS AND OBSERVED CEMENT RETURN TO SURFACE, TEST CASING T/5 FOR 3 MINS AND PASS, INSTALL WELLHEAD Update Since Report Time INSTALL WELL HEAD ON CASING AND WELD ON HEAD, WALK, N/U 24 Hour Forecast CONDUCT BOP TESTING, ACCUMULATOR DRAWDOWN TEST, TIH W/DP, DRILL OUT SHOE TRACK /28/27 5:43:49 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE

10 bore Report 3 /27/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description :. SRF TOH POOH W/DP T/672' :.5 SRF TOH PULL ROTATING HEAD & REMOVE FROM PIPE :3.5 SRF TOH POOH W/BHA 2: 4: 2..5 SRF TOH SRF RIC POOH W/DIRECTIONALS, L/D DIRECTIONALS BIT GRADE: --WT-A-X--NO-CP T66FX, BAKER R/U CASING CREW & BAIL EXTENTION 4:3.5 SRF RIC HOLD PJSM & RUN 9.625'' CSG T/93' 6: 5.5 SRF CLR RUN 9.625'' CSG F/93' T/4825', FILLING PIPE WITH PUMPS :3 2. SRF CLR FILLED CASING, VERFIED FLUID WENT THROUGH FLOATS 3:3.5 SRF RCC SURFACE CASING RAN 8 JOINTS, 9-5/8" " 4 LB/FT J-55 LTC CASING LANDED AT 4867 FLOAT COLLAR SHOE DV TOOL JOINTS OUT *NOTE- NOTIFIED TRRC OF SURFACE CASING RUN AND CEMENT JOB. SPOKE WITH AUDREY OPERATOR #2. PJSM & R/U CEMENT CREW 4: 4. SRF CEM CEMENTING CASING CEMENT 3:58 LOAD/TEST LINES TO 45PSI PUMP 5 BBLS OF FRESH WATER AT 6 BPM, RETURNS WERE ESTABLISHED 4:9 LEAD SLURRY: PUMP 86 BBLS OF 2.8PPG CEMENT AT 6BPM PUMPED SLURRY CONSISTING OF 2585 SACKS (65.32BBLS OF MIX WATER) (3%) OF 35:65:4 POZ: PREMIUM CLASS C ADDITIVES (C65/35POZ + 4%BENTONITE +.75% R %SMS + 5%SALT +.GAL/SK FP-6L +.5 LB/SK STATIC FREE) 6:29 TAIL SLURRY: PUMPED 8 BBLS OF 4.8PPG CEMENT AT 5BPM PUMPED SLURRY CONSISTING OF 5 SACKS (75.6BBLS OF MIX WATER) (%) PREMIUM CLASS C ADDITIVES (C +.25% R-2 +.5% SMS +. FP-6L +.5 LB/SK STATIC FREE) 6:54 SHUTDOWN AND DROPPED PLUG 7: DISPLACEMENT FLUID: START DISPLACING AT 6.5BPM WITH 2 BBLS FRESH WATER + 32BBLS BRINE + 23 BBLS FRESH WATER 8:2 BUMPED PLUG AT 65PSI, HOLD 2 MIN FOR.5BBLS BACK 8:2 PRESSURE TEST CASING TO 5 PSI FOR 3 MINS BLED OFF PRESSURE, BLED.5 BBLS BACK CIRCULATED 55 BBLS OF 2.8 PPG (654 SACKS) BACK TO SURFACE, SECOND STAGE WAS CANCELLED /28/27 5:43:49 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 2

11 bore Report 3 /27/27 Time Summary Start Hours PH OPN Detail Drilled NPT Description Depth level 8:.5 SRF CEM 9:3 R/D SAFETY MEETING TEST CASING AT 5 PSI, PASS 8:3.5 SRF RDC R/D CEMENT HEAD LINES 9:.5 SRF RDC FLUSH THROUGH CONDUCTOR & FLOWLINE WITH SUGAR WATER 9:3 23: SRF WHD SRF WHD BREAK BOLTS ON CONDUCTOR, REMOVE FLOWLINE, REMOVE TURNBUCKLES, CLEAN OUT CELLAR FOR WELDER, MAKE ROUGH CUT ON CASING & CONDUCTOR, REMOVE CASING ELEVATORS & BAIL EXTENSION, L/D MOUSEHOLE, L/D CASING TOOLS WELL HEAD EQUIPMENT, CUT CONDUCTOR OFF, CUT 9-5/8" CASING AND PERFORM FINAL CUT, INSTALL WELLHEAD ON CASING & WELD ON HEAD. TEST WELD TO 3 PSI FOR MIN. TEST WAS SATISFACTORY. Total 24. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade 2.25 BAKER OIL TOOL T66FX x Tool Bit Operations MD WOB Min/Max Current RPM (rpm) Flow rate (gpm) SPP (psi) P bit (psi) Bit HHP (hp) Hours ROP (ft/hr) Hours cum cum. ROP cum. (ft/hr) Item description HWDP # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 IF 4 /2 XH Pin x 4 /2IF Box /2 IF DRILL COLLAR /2 XH 6 5/8 REG Pin x 4 /2 XH Box /2 XH NESXO8 7 /28/27 5:43:49 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 3

12 bore Report 3 /27/27 Item description SCREEN SUB STABILIZER SLICK COLLAR NONMAG 8In. 6 5/8 REG. PIN X BOX 3.25In. ID STABILIZER 8 GAP SUB ASSY COMPLETE VELOCITY 8 CENTRALIZER COLLAR ASSY VELOCITY 8 LANDING SUB ASSY VELOCITY 65 CROSSOVER SUB VELOCITY PONY SLICK COLLAR NONMAG 8In. 6 5/8 REG PIN x BOX SN: STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /8 REG DR /8 REG DR /8 REG NESNM /8 REG DR /8 REG VG89P TS /8 FH VC /8 FH VL /8 REG VX /8 REG NESPC /8 REG DR9796 8" BAKER 5/6 6. Stg. SN: DM RPG.22 BIT # RUN # 2.25" BAKER T66FX SN: X /8 REG DM /8 REG Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose /25/27 7:,38.6 DRILL 2.25 DIESEL FUEL ON HAND 965 GALLONS DIESEL FUEL USED 69 GALLONS DIEESEL FUEL DELIVERED GALLONS CNG USED 7.23 GALLONS Remarks /28/27 5:43:49 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 4

13 /29/27 6:4:25 Report Version: 4..6R8 Generated from data in EDM/Opens/PROFILE Report 4 /28/27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location 4. Objective Drill - Wolfcamp B Shale Original Spud Date Days Since Spud 3.56 Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor DENNIS MORGAN Measured Depth 4,867. Engineer YERMEK TYNYSHBAYEV TVD 4,864.9 Other Supervisor TREY HARGETT, YU LIU 24 Hr Progress Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 3.25 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 289,745/3,44, ,66 Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 2.in@46.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 8 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 5 Safety Comments: MAN HOURS - 393HOURS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary INSTALL WELLHEADS ON 58H/57H/56H, TEST WELLHEADS, WALK TO STACK ON, SET STACK, TOQUE SPEEDY SPOOL, TEST,PSI FOR MIN, INSTALL CHOKE LINE, N/U BOP, INSTALL KILL LINE, CONDUCT ACCUMULATOR TEST AND PASS, TEST BOPS, INSTALL FLOWLINE Update Since Report Time INSTALL FLOWLINE, INSTALL WENCH GUARDS, L/D 6 COLLARS, P/U 24 Hour Forecast TIH, DRILL OUT SHOE TRACK

14 /29/27 6:4:25 Report Version: 4..6R8 Generated from data in EDM/Opens/PROFILE 2 bore Report 4 /28/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description :.5 SRF WHD 4,867. WELLHEAD EQUIPMENT, CLEAN UP CUT ON CSG, INSTALL WELL HEAD ON CASING & WELD ON HEAD :3.5 SRF WHD 4,867. TEST WELL HEAD W/3 PSI :. SRF WHD 4,867. INSTALL WELLHEADS ON WELL 56 & 57H 2:. SRF WHD 4,867. INSTALL FLOWLINE SWEDGE ON OBRIT VALVE 3:. SRF WHD 4,867. WALK OVER 4'' TO GET STACK ON 4: 5: 6: 2: 2:3 8: 9: 2: 2: 22:3 23:3. SRF WHD 4,867. WELLHEAD EQUIPMENT, SET STACK ON WELLHEAD, TORQUE SPEEDY SPOOL AND TEST SAME T/, PSI FOR MIN. SRF WHD 4,867. INSTALL TURNBUCKLES, REMOVE STACK GRABER, INSTALL CHOKE LINE 6. INT RUP 4,867. N/U BOP, INSTALL KILL LINE MANIFOLD, CHOKE HOSE, ONCE INSTALLED AND BEGAN TIGHTENNING BOLTS STUD ON CHOKE HOSE FAILED, REMOVED HOSE AND REPLACED STUD, INSTALLED ACCUMULATOR HOSES, FUNCTIONED RAMS, INSTALLED KILL LINE.5 INT RUP 4,867. CONDUCTED ACCUMULATOR DRAWDOWN TEST FOLLOWING SHELL STANDARD, TEST WAS SATISFACTORY 5.5 INT BOP 4,867. R/U TESTERS, INSTALL CAMERON TEST PLUG, TEST BOPS 25PSI LOW/K PSI HIGH, ANNULAR 25PSI LOW/35 PSI HIGH, TEST MUD LINES 25 PSI LOW/75 PSI HIGH. INT BOP 4,867. REPLACE PADDLE & RUBBER IN 4'' VALVE ON STAND PIPE. INT BOP 4,867. CONT TESTING MUDLINES & BLINDS, R/D TEST CREW. INT PUP 4,867. PULL TEST PLUG & INSTALL WEAR BUSHING.5 INT PUP 4,867. INSTALL FLOW LINE & PULL GUARDS ON WINCHES. INT CUT 4,867. SLIP & CUT DRILL LINE 6 FEET.5 INT SVC 4,867. SERVICE TOPDRIVE & BLOCK Total 24. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Tool

15 /29/27 6:4:25 Report Version: 4..6R8 Generated from data in EDM/Opens/PROFILE 3 bore Report 4 /28/27 DIESEL FUEL ON HAND 759 GALLONS DIESEL FUEL USED 26 GALLONS DIEESEL FUEL DELIVERED GALLONS CNG USED GALLONS Remarks

16 Report 5 /29/27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location 5. Objective Drill - Wolfcamp B Shale Original Spud Date Days Since Spud 4.56 Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor DENNIS MORGAN Measured Depth 5,84. Engineer YERMEK TYNYSHBAYEV TVD 5,83.4 Other Supervisor TREY HARGETT, YU LIU 24 Hr Progress 974. Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 8.75 THF Datum Daily NPT(hr/%) 3.5/4.58 Days Ahd(-) Bhnd(+)(5/5) Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 9.625in@4,867.ft 7.in@ Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 9 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 3 Safety Comments: MAN HOURS HRS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test /28/27 /28/27 2/8/27 JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary TIH, DRILL OUT DV TOOLS/SHOE TRACK, POOH T/3747' TO TROUBLESHOOT LOSS OF DP PRESSURE, DRILL T/584' Update Since Report Time DRILL F/584' 24 Hour Forecast DRILL TOWARD KOP /3/27 7:53:28 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE

17 bore Report 5 /29/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description : 2.5 INT PUP 4,867. FILL GAS BUSTER W/BRINE, CHANGE OUT SHAKER SCREENS, PREP FLOOR FOR BHA, HOOK UP FILL UP LINE ON STACK, HOOK UP ORBIT VALVE LINES, HOOK UP ROTATING HEAD, TORQUE BOLTS O ORBIT VALVE 2:3. INT PUP 4,867. L/D COLLARS 3:3 5:3 6: 6:3 7: 8:3 9: :3 5: 5:3 6: 2. INT BHA 4,867. M/U BHA #2, TIH.5 INT TIH 4,867. TIH W/BHA.5 INT TIH 4,867. TIH W/DP T/ 27'.5 INT DCM 4,867. DRILL OUT DV WOB: 5-2 RPM: SURFACE 5 MOTOR 84 BIT 99 PRESSURE AND FLOW: SPP 34, GPM 349 STRING WEIGHT: UP 3K DOWN 2K ROTATING 25K MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A.5 INT TIH 4,867. TIH W/DP F/27' T/468'.5 INT TIH 4,867. INSTALL ROTATING HEAD.5 INT DCM 4,867. FILL PIPE, WASH DOWN TO FLOAT, TAGGED DRILL SHOE TRACK, TAGGED WOB: 5-3 RPM: SURFACE 2 MOTOR 77 BIT 97 PRESSURE AND FLOW: SPP 968, GPM 32 STRING WEIGHT: UP 82K DOWN 65K ROTATING 72K MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A 4.5 INT DRL 5,39. ROTATE DRILLING F/ 486 T/ 539 (ROP 4FT/HR) WOB: 5 K - 32 K RPM: SURFACE 2 MOTOR 77 BIT 97 PRESSURE AND FLOW: SPP 265, GPM 32 TORQUE ON BOTTOM 5-2 OFF BOTTOM 3.5 STRING WEIGHT: UP 96 DOWN 75 ROTATING 8 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A.5 INT DRL 5,85. SLIDE DRILLING F/ 539 T/ 585 (ROP 92 FT/HR) WOB: 5 K - 25 K RPM: SURFACE MOTOR 8 BIT 8 PRESSURE AND FLOW: SPP 265, GPM 33 STRING WEIGHT: UP 68K DOWN 5K ROTATING 55K MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A.5 INT DRL 5,32. ROTATE DRILLING F/ 585 T/ 532 (ROP 94FT/HR) WOB: 4 K - 42 K RPM: SURFACE 8 MOTOR 6 BIT 24 PRESSURE AND FLOW: SPP 3939, GPM 66 TORQUE ON BOTTOM 2-5 OFF BOTTOM 3.5 STRING WEIGHT: UP 9K DOWN 8K ROTATING 85K MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A.5 INT DRL 5,32. CHANGE OUT BLACK GOLD ROTATING HEAD/LOCKED UP BEARING /3/27 7:53:28 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 2

18 bore Report 5 /29/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description ASSEMBLY 6:3. INT DRL 5,396. ROTATE DRILLING F/ 532 T/ 5396 (ROP WOB: 4 K - 45 K RPM: SURFACE 85 MOTOR 6 BIT 245 PRESSURE AND FLOW: SPP 32, GPM 66 TORQUE ON BOTTOM 4-6 OFF BOTTOM 4 STRING WEIGHT: UP 98 DOWN 85 ROTATING 9 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A 7:3.5 INT DRL 5,396. SERVICE TOP DRIVE 8: 8:3 9: 9:3 2:3 22: 23:.5 INT DRL 5,574. ROTATE DRILLING F/ 5396 T/ 5574 (ROP WOB: 35 K - 45 K RPM: SURFACE 85 MOTOR 6 BIT 245 PRESSURE AND FLOW: SPP 3, GPM 66 TORQUE ON BOTTOM 4-6 OFF BOTTOM 4 STRING WEIGHT: UP 98 DOWN 85 ROTATING 9 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A.5 INT DRL 5,69. SLIDE DRILLING F/ 5574 T/ 569 (ROP 7 FT/HR) WOB: K - 4 K RPM: SURFACE MOTOR 8 BIT 8 PRESSURE AND FLOW: SPP, GPM STRING WEIGHT: UP 98 DOWN 85 ROTATING 9 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A.5 INT DRL 5,668. ROTATE DRILLING F/ 569 T/ 5668 (ROP WOB: 35 K - 45 K RPM: SURFACE 85 MOTOR 6 BIT 245 PRESSURE AND FLOW: SPP 3, GPM 66 TORQUE ON BOTTOM 4-6 OFF BOTTOM 4 STRING WEIGHT: UP 2 DOWN 9 ROTATING 95 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A. INT DRL 5,668. TROUBLE SHOOT STANDPIPE PRESSURE LOSS.5 INT DRL 5,668. POOH W/DP FOR WASHOUT, WASH IN INT DRL 5,668. TIH W/DP T/5668'. INT DRL 5,84. ROTATE DRILLING F/ 5668 T/ 584 (ROP WOB: 35 K - 45 K RPM: SURFACE 85 MOTOR 6 BIT 245 PRESSURE AND FLOW: SPP 36, GPM 66 TORQUE ON BOTTOM 2-6 OFF BOTTOM 4 STRING WEIGHT: UP 22 DOWN 9 ROTATING 2 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A Total 24. /3/27 7:53:28 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 3

19 bore Report 5 /29/27 NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status /29/27 9:3 PRECISION DRILLING COMPANY LP Drillstring/B HA Bottom Hole Assembly 5,668. DRL EN Drill Pipe OPEN Description: DRILL PIPE BODY WASH OUT Title: PIPE BODY WASH OUT Total MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 5, , PTW UNKNOWN_26 5, , PTW UNKNOWN_26 5, , PTW UNKNOWN_26 5, , PTW UNKNOWN_26 5, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 A x 4, Tool Bit Operations MD WOB Min/Max Current RPM (rpm) Flow rate (gpm) SPP (psi) P bit (psi) Bit HHP (hp) Hours ROP (ft/hr) Hours cum cum. ROP cum. (ft/hr) Item description 4" DP HWDP # Jts Length Drillstring Components OD 4. Max OD ID Connection Name Weight (ppf) Grade Serial no /2 IF /2 IF 4.5" XO /2 IF 4.5" DC SCREEN SUB STABLIIZER NMDC STABILIZER GAP SUB ASSY SEALED VELOCITY /2 XH /2 XH DR /2 XH SD /2 XH NESNM /2 XH SD /2 XH VG653P TS /3/27 7:53:28 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 4

20 bore Report 5 /29/27 Item description 65 CENTRALIZER COLLAR ASSY VELOCITY 65 LANDING SUB ASSY VELOCITY 65 XO SUB PHX VELOCITY NMPC STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 XH VC /2 IF VL , /2 IF VX /2 XH PXGPC /2 XH DR28753 MUD MOTOR 725 ML PHX BIT #2 RUN # 8.75" NOV TK76 (7X's) SN: A /2 XH PHX PTS /2 XH A Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose /29/27 3: DRILL 8.75" INTERMEDIATE HOLE SECTION DIESEL FUEL ON HAND 6887 GALLONS DIESEL FUEL USED 95 GALLONS DIEESEL FUEL DELIVERED 6223 GALLONS CNG USED GALLONS Remarks /3/27 7:53:28 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 5

21 Report 7 /3/27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location 7. Objective Drill - Wolfcamp B Shale Original Spud Date /25/27 Days Since Spud 6.56 Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor ASHLEY HRIVNAK, JC PALMER Measured Depth,296. Engineer YERMEK TYNYSHBAYEV TVD, Other Supervisor YU LIU 24 Hr Progress 2,26. Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 8.75 THF Datum Daily NPT(hr/%).5/6.25 Days Ahd(-) Bhnd(+)(5/5) Last Casing MD 9.625in@4,867.ft Next Casing MD 7.in@,7.ft Current Fluid Density(ppg) 9.4 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: MAN HOURS - 33 HRS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test /28/27 /28/27 2/8/ JSA's/Toolbox Talks Days Since Last Drill Hour Summary DRILLED F/827' T/296' Update Since Report Time DRILLED F/296' 24 Hour Forecast Operations Summary DRILL TOWARD KOP, TOOH TO CHANGE CURVE BHA, TIH, AND DRILL AHEAD 2//27 7::6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE

22 bore Report 7 /3/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description :.5 INT DRL 8,29. SLIDE DRILLING F/ 827' T/ 829 FT/HR) WOB: 25 K - 35 K RPM: SURFACE MOTOR 6 BIT 6 PRESSURE AND FLOW: SPP 32, GPM 662 STRING WEIGHT: UP 262 DOWN 228 ROTATING 242 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG 565 CG 565 :3 5.5 INT DRL 8,69. ROTATE DRILLING F/ 829 T/ 869 FT/HR) WOB: 38 K - 4 K RPM: SURFACE 2 MOTOR 6 BIT 8 PRESSURE AND FLOW: SPP 35, GPM 663 TORQUE ON BOTTOM 2-5 OFF BOTTOM 7 STRING WEIGHT: UP 262 DOWN 228 ROTATING 242 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG 594 CG 97 6:.5 INT DRL 9,76. ROTATE DRILLING F/ 869 T/ FT/HR) WOB: 38 K - 4 K RPM: SURFACE 2/6 MOTOR BIT PRESSURE AND FLOW: SPP 38, GPM 663 TORQUE ON BOTTOM 2-5 OFF BOTTOM STRING WEIGHT: UP 262 DOWN 228 ROTATING 242 MW: 9.4 PPG MOTOR REVS/GAL.242 GAS: BG N/A CG N/A 6:3.5 INT SVC 9,76. SERVICE TOP DRIVE 7: 8: 2: 2:3. INT DRL 9,76. NPT-CIRCULATE WHILE WORKING ON MUD PUMP # 3. INT DRL,3. ROTATE DRILLING F/ 976 T/ 3 9FT/HR) WOB: 38 K - 4 K RPM: SURFACE 6 MOTOR 65 BIT 225 PRESSURE AND FLOW: SPP 38, GPM 68 TORQUE ON BOTTOM 2-5 OFF BOTTOM 7 STRING WEIGHT: UP 262 DOWN 228 ROTATING 242 MW: 9.5 PPG MOTOR REVS/GAL.242 GAS: BG 5 CG 9.5 INT DRL,3. NPT-CHANGE CLIPPER SEAL ON MUD PUMP # 2.5 INT DRL,296. ROTATE DRILLING F/ 3 T/ FT/HR) WOB: 38 K - 4 K RPM: SURFACE 6 MOTOR 65 BIT 225 PRESSURE AND FLOW: SPP 355, GPM 68 TORQUE ON BOTTOM 5-2 OFF BOTTOM 7 STRING WEIGHT: UP 35 DOWN 22 ROTATING 275 MW: 9.6 PPG MOTOR REVS/GAL.242 GAS: BG 85 CG 925 Total 24. 2//27 7::6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 2

23 bore Report 7 /3/27 NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status /3/27 7: PRECISION Rig/Work DRILLING Unit Misc COMPANY LP 9,76. DRL EN Mud Pump.. OPEN Description: CIRCULATE WHILE WORKING ON MUD PUMP # Title: CIRCULATE WHILE WORKING ON MUD PUMP # /3/27 2: PRECISION Rig/Work DRILLING Unit Misc COMPANY LP,3. DRL EN Mud Pump.5.5 OPEN Description: CHANGE CLIPPER SEAL ON MUD PUMP # Title: CHANGE CLIPPER SEAL ON MUD PUMP # Total.5.5 MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26, , PTW UNKNOWN_26, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%)./92.5 ph/pm (cc) 7./. MD 9,46. TS/HGS/LGS (%) 5.5// Pf/Mf (cc)./.2 Mud Density (ppg) 9.4 Sand (%).5 Ca+ (ppm) Vis (s/qt) 28. Cl- (ppm) 38, PV/YP (cp/lbf/ft²)./2. MBT (lbm/bbl) Gels s/m (lbf/ft²)./. LCM (lbm/bbl) API/HTHP WL (cc/3min)./ ECD (ppg) 9.62 R6/3 FC/HTHP FC (32nd") 2./ H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 A x 4, Tool MD 8,29. 8,69. 9,76.,3.,296. WOB Min/Max Current RPM (rpm) Flow rate (gpm) SPP (psi) P bit (psi) Bit Operations Bit HHP (hp) Hours ROP (ft/hr) Hours cum cum. 25./ , , / , , / , , , / , , / , , ROP cum. (ft/hr) Item description 4" DP HWDP # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 3 9, /2 IF /2 IF 4.5" XO /2 IF 4.5" DC /2 XH 2//27 7::6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 3

24 bore Report 7 /3/27 Item description SCREEN SUB STABLIIZER NMDC STABILIZER GAP SUB ASSY SEALED VELOCITY 65 CENTRALIZER COLLAR ASSY VELOCITY 65 LANDING SUB ASSY VELOCITY 65 XO SUB PHX VELOCITY NMPC STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 XH DR /2 XH SD /2 XH NESNM /2 XH SD /2 XH VG653P TS /2 XH VC /2 IF VL , /2 IF VX /2 XH PXGPC /2 XH DR28753 MUD MOTOR 725 ML PHX BIT #2 RUN # 8.75" NOV TK76 (7X's) SN: A /2 XH PHX PTS /2 XH A Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose /29/27 3: DRILL 8.75" INTERMEDIATE HOLE SECTION MD 8,29. SW Up 262. SW Down 228. SW Rotn. Drag 262. Tq On Btm (ft-lbf). Tq Off Btm (ft-lbf). 2. 8,69. 9,76.,3., ,. 7, ,. 7,., ,. 7, ,. 7, DIESEL FUEL ON HAND 759 GALLONS DIESEL FUEL USED 2946 GALLONS DIEESEL FUEL DELIVERED GALLONS CNG USED 4.78 GALLONS Remarks 2//27 7::6 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 4

25 Report 8 2//27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location 8. Objective Drill - Wolfcamp B Shale Original Spud Date /25/27 Days Since Spud 7.56 Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor ASHLEY HRIVNAK, JC PALMER Measured Depth,98. Engineer YERMEK TYNYSHBAYEV TVD, Other Supervisor YU LIU 24 Hr Progress 684. Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 8.75 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Last Casing MD 9.625in@4,867.ft Next Casing MD 7.in@,7.ft Current Fluid Density(ppg) 9.7 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 2 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) 3 Safety Comments: MAN HOURS HRS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test /28/27 /28/27 2/8/ JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary DRILL F/296' T/98', POOH T/', PUMP TOTAL 3 BBLS OF KWM TO BACKSIDE (ORBIT VALVE WOULD NOT CLOSE THE ENTIRE WAY, USED THE ANNULAR INSTEAD), POOH, CHANGE TO CURVE BHA, TIH T/4524' Update Since Report Time TIH 24 Hour Forecast TIH, DRILL AHEAD, POOH, RUN 7'' CSG 2/2/27 7:8:27 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE

26 bore Report 8 2//27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description : 4. INT DRL,563. ROTATE DRILLING F/ 296 T/ 563 FT/HR) WOB: 38 K - 4 K RPM: SURFACE 6 MOTOR 64 BIT 224 PRESSURE AND FLOW: SPP 355, GPM 68 TORQUE ON BOTTOM 2 OFF BOTTOM 7 STRING WEIGHT: UP 282 DOWN 25 ROTATING 27 MW: 9.6 PPG MOTOR REVS/GAL.242 GAS: BG 2 CG 2 4:.5 INT SVC,563. SERVICE 4:3 6: : 2: 3: 5:3 6: 7: 8: 8:3 9:3 2:3.5 INT DRL,652. ROTATE DRILLING F/ 563 T/ 652 FT/HR) WOB: 38 K - 4 K RPM: SURFACE 6 MOTOR 64 BIT 224 PRESSURE AND FLOW: SPP 355, GPM 68 TORQUE ON BOTTOM 2 OFF BOTTOM 8 STRING WEIGHT: UP 35 DOWN 22 ROTATING 28 MW: 9.6 PPG MOTOR REVS/GAL.242 GAS: BG 75 CG INT DRL,98. ROTATE DRILLING F/ 652 T/ 98 FT/HR) WOB: 38 K - 4 K RPM: SURFACE 6 MOTOR 6 BIT 22 PRESSURE AND FLOW: SPP 355, GPM 66 TORQUE ON BOTTOM 23 OFF BOTTOM 4.8 STRING WEIGHT: UP 33 DOWN 27 ROTATING 3 MW: 9.6 PPG MOTOR REVS/GAL.242 GAS: BG 2 CG INT TOH,98. POOH F/98' T/', MONITOR WELL VIA TRIP TANK. HOLE NOT TAKING PROPER FILL. INT CDM,98. MONITOR WELL. WELL FLOWING. ATTEMPTED TO FORCE FILL, ORBIT VALVE NOT CLOSE WHOLE WAY, USE THE ANNULAR. PUMPED A TOTAL 3 BBLS OF KWM 2.5 INT TOH,98. POOH F/' T/47', PUMP CALCULATED DISPLACEMENT.5 INT TOH,98. BOP DRILL W/CREW, WELL SECURE MIN 2 SEC. INT TOH,98. POOH F/47' T/85', REMOVE ROTATING RUBBER. INT SVC,98. SERVICE TOP DRIVE, REPLACE HYDRAULIC LINE ON RLA.5 INT SVC,98. SERVICE, ADD 2 GAL OIL TO TOP DRIVE. INT TOH,98. POOH W/HWDP, FILL HOLE W/CALCULATED VOLUME 2. INT BHA,98. CHANGE OUT BHA 2.5 INT TIH,98. TIH T/4525', FILL PIPE EVERY 3 STD. NO RETURNS, Total 24. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft), , PTW UNKNOWN_26, , PTW MWD+HDGM_26, , PTW UNKNOWN_26, , PTW MWD+HDGM_26, , PTW UNKNOWN_26 Tool 2/2/27 7:8:27 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 2

27 bore Report 8 2//27 Fluid Details Mud type NaCl Brine Oil/Water (%)./9.5 ph/pm (cc) 8./. MD 9,46. TS/HGS/LGS (%) 6.3// Pf/Mf (cc)./.2 Mud Density (ppg) 9.7 Sand (%). Ca+ (ppm) Vis (s/qt) 28. Cl- (ppm) 6,5 PV/YP (cp/lbf/ft²)./2. MBT (lbm/bbl) Gels s/m (lbf/ft²)./. LCM (lbm/bbl) API/HTHP WL (cc/3min)./ ECD (ppg) 9.7 R6/3 FC/HTHP FC (32nd") 2./ H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC Serial Size MD in MD out IADC Dull Grade code no. (32nd") HALLIBURTON MMD64C x2, Bit Operations MD WOB Min/Max Current RPM (rpm) Flow rate (gpm) SPP (psi) P bit (psi) Bit HHP (hp) Hours ROP (ft/hr) Hours cum cum. ROP cum. (ft/hr) Item description 5" DRILL PIPE HWDP 5" DRILL PIPE 4.5" XO SCREEN SUB FLOAT SUB NMDC GAP SUB ASSY SEALED VELOCITY 65 CENTRALIZER COLLAR ASSY VELOCITY 65 LANDING SUB ASSY VELOCITY 65 XO SUB PHX VELOCITY # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no , /2 IF /2 IF 24, /2 IF /2 IF /2 XH DR /2 XH FS /2 XH FL /2 XH VG653P TS /2 XH VC /2 IF VL , /2 IF VX6534 NMPC MUD MOTOR 4/5 LOBE, STAGE 7, FBH, 2.38 SN: BIT #3 RUN # 8.75" SECURITY MMD64C (6X2) SN: /2 XH PXGPC /2 XH 24X PTS /2 REG Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2//27 2: DRILL 8.75" INTERMEDIATE SECTION Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 A x 4,867., WT-S-X--LT-BHA 2/2/27 7:8:27 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 3

28 bore Report 8 2//27 MD,563.,652.,98. WOB Min/Max Current RPM (rpm) Flow rate (gpm) SPP (psi) P bit (psi) Bit Operations Bit HHP (hp) Hours ROP (ft/hr) Hours cum cum. 38./ , , / , , / , , ROP cum. (ft/hr) Item description 4" DP HWDP # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 3, /2 IF /2 IF 4.5" XO /2 IF 4.5" DC SCREEN SUB STABLIIZER NMDC STABILIZER GAP SUB ASSY SEALED VELOCITY 65 CENTRALIZER COLLAR ASSY VELOCITY 65 LANDING SUB ASSY VELOCITY 65 XO SUB PHX VELOCITY NMPC STABILIZER /2 XH /2 XH DR /2 XH SD /2 XH NESNM /2 XH SD /2 XH VG653P TS /2 XH VC /2 IF VL , /2 IF VX /2 XH PXGPC /2 XH DR28753 MUD MOTOR 725 ML PHX BIT #2 RUN # 8.75" NOV TK76 (7X's) SN: A /2 XH PHX PTS /2 XH A Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose /29/27 3:3 2//27 2:3 2,3.37 DRILL 8.75" INTERMEDIATE HOLE SECTION MD,563. SW Up 282. SW Down 25. SW Rotn 27. Drag 2. Tq On Btm (ft-lbf) 2,. Tq Off Btm (ft-lbf) 7,. 267.,652., ,. 8, ,. 4, DIESEL FUEL ON HAND 35 GALLONS DIESEL FUEL USED 454 GALLONS DIEESEL FUEL DELIVERED GALLONS CNG USED 2.85 GALLONS Remarks 2/2/27 7:8:27 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 4

29 Report 9 2/2/27 Company Type bore WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location 9. Objective Drill - Wolfcamp B Shale Original Spud Date /25/27 Days Since Spud 8.56 Est. Days 25. Contractor PRECISION Work Unit PRECISION 559 Days To Release Rig Phone/FAX No. Status Supervisor ASHLEY HRIVNAK, JC PALMER Measured Depth,693. Engineer YERMEK TYNYSHBAYEV TVD, Other Supervisor D. H. JOHNSON 24 Hr Progress 73. Depth Ref/Grd Elev/Water Depth DFE: 2,769.6 / 2,743.6 Hole size 8.75 THF Datum Daily NPT(hr/%) 2.5/.42 Days Ahd(-) Bhnd(+)(5/5) Last Casing MD 9.625in@4,867.ft Next Casing MD 7.in@,7.ft Current Fluid Density(ppg) 9.7 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /2/26 3 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: NO ACCIDENTS NO INCIDENTS HELD PRETOUR SAFETY MEETING WITH CREWS MAN HOURS 36 HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test /28/27 /28/27 2/8/ JSA's/Toolbox Talks Days Since Last Drill 8 24 Hour Summary Operations Summary CHANGE SWIVEL PACKING, TIH FROM 4524' TO 65. INDUCE FLOW. WAH FROM 65' TO 98'. ROTATE AND SLIDE FROM 98' TO 337'. WORK STUCK PIPE FREE AT 337'. ROTATE AND SLIDE FROM 337' TO 693' Update Since Report Time TD INTERMEDIATE SECTION AT 792'. CIRCULATE SWEEPS AROUND. KILL WELL, POOH TO TOP OF CURVE. PUMP SLUG AND POOH 24 Hour Forecast POOH AND UP AND RUN 7 INCH CASING 2/3/27 9:29:45 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE

30 bore Report 9 2/2/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description :. INT TIH,98. NPT: CHANGE OUT SWIVEL PACKING ON TOP DRIVE : 5: 7: 8: 3: 3:3 4:3 6: 7: 8: 9: 2: 22:3 23:3 4. INT TIH,98. TIH FROM 4524' TO 65' WITH NO RETURNS. 2. INT CDM,98. INDUCE FLOW PUMP 25 BBLS OF 8.3 WATER DOWN ANNLUS. PUMP 75 BBLS OF 9.6 MUD DOWN DRILL STRING. OPEN WELL REGAIN CIRCULATION. INT DRL,98. WASH FROM 65' TO 98' SPP 65 PSI. 4 GPM BIT RPM 23. S/O 28K. MUD WT 9.6 PPG. FLARE NONE. GAS 6 UNITS 5. INT DRL,248. DRILL SLIDE FROM 98' TO 248' ( 268' AT 53.6 FT/HR ) WOB 2K. GPM 5. SPP 25 PSI. BIT RPM 248. P/U 35K. S/O 23K. MUD WT 9.6 PPG. NO FLARE. GAS 2 UNITS. PUMP 2 BBL HI VIS SWEEPS EVERY 2'..5 INT DRL,293. DRILL ROTATE FROM 248' TO 293' ( 9FT/HR ). WOB 3 K. SPP 33 PSI.. GPM 575. SURFACE RPM 2. MOTORE RPM 285. BIT RPM 35. P/U 355 K. S/O 23 K. ROT WT 268 K. TORQUE OFF BTM 9 K TORQUE ON BTM 9 K MUD WT 9.6 PPG FLARE 3-5 FT. GAS 9 UNITS.. INT DRL,337. DRILL SLIDE FROM 293' TO 337' ( 39FT/HR ) WOB 6 K. SPP 28 PSI. GPM 575. MOTOR RPM 285 P/U 42 K. S/O 23 K. MUD WT 9.7 PPG. FLARE 3 TO 5 FT. GAS 58 UNITS..5 INT DRL,337. NPT: PIPE STUCK AT 337' WORK PIPE FREE.. INT DRL,38. DRILL ROTATE FROM 337' TO 38' ( 43FT/HR ). WOB 2 K. SPP 285 PSI.. GPM 575. SURFACE RPM 2. MOTORE RPM 285. BIT RPM 35. P/U 35 K. S/O 225K. ROT WT 268 K. TORQUE OFF BTM 6.5 K TORQUE ON BTM 24 K MUD WT 9.7 PPG FLARE 3-5 FT. GAS 675 UNITS.. INT DRL,42. DRILL SLIDE FROM 38' TO 42' (4 4FT/HR ) WOB 5 K. SPP 3 PSI. GPM 575. MOTOR RPM 285 P/U 355 K. S/O 2 K. MUD WT 9.7 PPG. FLARE 3 TO 5 FT. GAS 682 UNITS.. INT DRL,47. DRILL ROTATE FROM 42' TO 47' ( 5FT/HR ). WOB 3 K. SPP 65 PSI.. GPM 462 SURFACE RPM 2. MOTORE RPM 229. BIT RPM 249. P/U 375 K. S/O 225K. ROT WT 286 K. TORQUE OFF BTM K TORQUE ON BTM 23 K MUD WT 9.7 PPG FLARE 3-5 FT. GAS 75 UNITS.( USING ONE MUD PUMP, WAITING ON BLOWER MOTOR FOR PUMP) 2. INT DRL,553. DRILL SLIDE FROM 47' TO 553' (83 4.5FT/HR ) WOB 3 K. SPP 65PSI. GPM 462. MOTOR RPM 229 P/U 4 K. S/O 225 K. MUD WT 9.7 PPG. FLARE 3 TO 5 FT. GAS 75 UNITS..5 INT DRL,64. DRILL ROTATE FROM 553' TO 64' ( 34 FT/HR ). WOB 2 K. SPP 285 PSI.. GPM 462. SURFACE RPM 2. MOTORE RPM 229. BIT RPM 249 P/U 375 K. S/O 225K. ROT WT 286 K. TORQUE OFF BTM 8 K TORQUE ON BTM 23 K MUD WT 9.7 PPG FLARE 3-5 FT. GAS 75 UNITS.. INT DRL,67. DRILL SLIDE FROM 64' TO 67' (66 66 FT/HR ) WOB 3 K. SPP 65PSI. GPM 462. MOTOR RPM 229 P/U 395 K. S/O 225 K. MUD WT 9.7 PPG. FLARE 3 TO 5 FT. GAS 75 UNITS..5 INT DRL,693. DRILL ROTATE FROM 67' TO 693' ( 46 FT/HR ). WOB 2 K. SPP 65 PSI.. GPM 462. SURFACE RPM 2. MOTORE RPM 229. BIT RPM 249 P/U 385 K. S/O 225K. ROT WT 265 K. TORQUE OFF BTM 4 K TORQUE ON BTM 23 K MUD WT 9.7 PPG FLARE 3-5 FT. GAS 85 UNITS. Total 24. NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status 2/2/27 : PRECISION Rig/Work DRILLING Unit Misc COMPANY LP,98. TIH EN Top Drive/Power Swivel. OPEN Description: CHANGE OUT SWIVEL PACKING ON TOP DRIVE Title: CHANGE OUT SWIVEL PACKING ON TOP DRIVE 2/2/27 4:3 SHELL BH Stuck Pipe,337. DRL N.5 OPEN Description: PIPE STUCK AT 337' WORK PIPE FREE Title: PIPE STUCK AT 337' WORK PIPE FREE Total 2.5 2/3/27 9:29:45 Report Version: 4..6R4 Generated from data in EDM/Opens/PROFILE 2

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC How is a Dual Gradient Achieved

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM 750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM PAGE 1 OF 7 DRAWWORKS: TSM 7000 Drawworks, 750hp, grooved f/1-1/8 Drill Line, p/b 540HP CAT C-15, w/allison CLT- 6061 Automatic Transmission, Right Angle Drive,

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013 Abandonment BAS-3 Frisia Zout B.V. 4 December 213 Contents BAS-3 status Definitieve afsluiting van caverne BAS-3 verdere plannen Algemene aandachtspunten 2 BAS-3 Start Item Description Well diagram version

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Daily Drilling Report

Daily Drilling Report Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

Pi PK Information Document

Pi PK Information Document Pi PK - 500 Information Document CONTENTS RIG TECHNICAL SPECIFICATION...1 RIG STORAGE CAPACITIES... 1 DIESEL FUEL...1 POWER PLANT... 1 MAIN POWER GENERATOR SYSTEM...1 ELECTRICAL LIGHTING SYSTEM...2 EMERGENCY

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

Rig 90. Rig 97. Future Technology From NOV

Rig 90. Rig 97. Future Technology From NOV Rig 90 Rig 97 Future Technology From NOV 1 - The Masts - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 2 - The Substructures - - - - - - - - - - - - - - - - - - - - - - - - - 2 3 - The

More information