1 Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE Operation Desc: RIGGING DOWN. RIG IN TRANSPORT. AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: AFE DHC: $3,180,125 Days from Spud: -4 Rig Supervisor 1: CODY CHAMBERS Daily Costs: $25,427 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT This AFE DHC to Date: $25,427 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER This AFE CWC to Date: $25,427 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: FINISH CLEANING PITS. RIG DOWN ALL 3RD PARTY EQUIPMENT. START RIGGING DOWN RIG EQUIPMENT. TRANSPORT ALL DRILL PIPE & MISC. EQUIPMENT TO NEW LOCATION. PREP RIG FOR TRANSPORT TO NEW LOCATION. RIGGED DOWN- 80% TRANSPORTED- 20% RIGGED UP- 0% Next Day Operations: FINSH RIGGING DOWN ON OLD LOCATION. TRANSPORT ALL TO NEW LOCATION. TRANSPORT ALL HOUSING. START RIG UP ON NEW WELL. RIG RELEASED FROM UNIVERSITY :00 HRS. ON SPUD: XX:XX HRS. TOTAL RIG MOVE HRS.: 24 / DAYS: X.XX TOTAL HRS. FROM SPUD: TOTAL DAYS TO TD: TOTAL DAYS TO RELEASE: DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY #1R, ON 6/4/2015. CSI. SAFETY MTG.: SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. DAYS SINCE LAST LTA: 342 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG XXX' 13 3/8" SURFACE CSG X,XXX' 9 5/8'' INT. CSG X,XXX' 7" INT. CSG XX,XXX' 4.5'' PRO. CASING XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: 0 Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: FINISH CLEANING RIG. RIG DOWN ALL 3RD PARTY EQUIPMENT. START HAULING ALL DRILL PIPE & MISC. EQUIPMENT. HANG OFF BLOCKS, SEPARATE FROM TOP DRIVE, PREP TO LOWER SUBS. RIG DOWN MUD PITS, CHOKE SKID, GAS BUSTER. PREP ALL BACK YARD FOR TRANSPORT. LOWER SUB STUCTURE. LOAD OUT CATWALK, CUMMY, TRIP TANK, BULK TANKS, AND WATER TANKS. Total: NIH 6/5/ Rig Up & Tear Down $25,427 $25,427 $6,116,398 Page 1 of 2 Powered by Production Access

2 Report No: 1 Report Date: 6/5/2015 Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER New Prospect Company CO MAN Precision Drilling Rig Crews Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/4/2015 ISION / ENERGEN / RED S ALL SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $22,500 IDC - DRILL - EQUIPMEN PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $191 IDC - DRILL - SURFACE K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $2,736 IDC - DRILL - SURFACE RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $2,736 IDC - DRILL - SURFACE TAN MAR HOUSING PACKAGE $650 $2,736 IDC - DRILL - SURFACE PRIME TIME R/U WATER TANKS $1,250 $2,736 IDC - DRILL - SURFACE LEOS TRUCKING 2 X FRAC TANKS $60 $2,736 IDC - DRILL - SURFACE PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $2,736 Total IDC: $25,427 $25,427 Total Cumulative Well Costs: $25,427 $25,427 Lost Time First Aid Med Visit 6/5/ Rig Up & Tear Down $25,427 $25,427 $6,116,398 Page 2 of 2 Powered by Production Access

3 Report No: 2 Report Date: 6/6/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 2 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE Operation Desc: RIG MOVE. LOAD OUT SUB AND DERRICK AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: AFE DHC: $3,180,125 Days from Spud: -3 Rig Supervisor 1: CODY CHAMBERS Daily Costs: $24,177 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT This AFE DHC to Date: $49,604 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER This AFE CWC to Date: $49,604 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: CONTINUE RIGGING DOWN ELECTRICAL LINES. LOAD OUT BACK YARD AND GEN HOUSES. LOWER DERRICK, REMOVE BOARD, PREP DERRICK FOR TRANSPORT. SPLIT DERRICK. SPLIT SUB STRUCTURE, REMOVE DRAWWORKS, BOP CART, AND SUB STRUCTURE. SET IN PITS, MUD PUMPS, WATER TANK, AND GEN HOUSES. RIGGED DOWN- 100% TRANSPORTED- 85% RIGGED UP- 20% Next Day Operations: TRANSPORT DERRICK AND SUB TO NEW LOCATION. START RIG UP ON NEW WELL. RIG RELEASED FROM UNIVERSITY :00 HRS. ON SPUD: XX:XX HRS. TOTAL RIG MOVE HRS.: 48 / DAYS: 2 TOTAL HRS. FROM SPUD: TOTAL DAYS TO TD: TOTAL DAYS TO RELEASE: DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY #1R, ON 6/4/2015. CSI. SAFETY MTG.: SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. DAYS SINCE LAST LTA: 344 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG XXX' 13 3/8" SURFACE CSG X,XXX' 9 5/8'' INT. CSG X,XXX' 7" INT. CSG XX,XXX' 4.5'' PRO. CASING XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: CONTINUE RIGGING DOWN ELECTRICAL LINES. LOAD OUT BACK YARD AND GEN HOUSES. LOWER DERRICK, REMOVE BOARD, PREP DERRICK FOR TRANSPORT. SPLIT DERRICK. SPLIT SUB STRUCTURE, REMOVE DRAWWORKS, BOP CART, AND SUB STRUCTURE. SET IN PITS, MUD PUMPS, WATER TANK, AND GEN HOUSES. Total: Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE 0 0 NIH 6/6/ Rig Up & Tear Down $24,177 $49,604 $6,116,398 Page 1 of 2 Powered by Production Access

4 Report No: 2 Report Date: 6/6/2015 Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER New Prospect Company CO MAN Precision Drilling Rig Crews Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/6/2015 / ENERGEN / RED STONE ALL RIG PERSONEL SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $45,000 IDC - DRILL - EQUIPMEN PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $382 IDC - DRILL - SURFACE K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $4,222 IDC - DRILL - SURFACE LEOS TRUCKING 2 X FRAC TANKS $60 $4,222 IDC - DRILL - SURFACE PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $4,222 IDC - DRILL - SURFACE RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $4,222 IDC - DRILL - SURFACE TAN MAR HOUSING PACKAGE $650 $4,222 Total IDC: $24,177 $49,604 Total Cumulative Well Costs: $24,177 $49,604 Lost Time First Aid Med Visit 6/6/ Rig Up & Tear Down $24,177 $49,604 $6,116,398 Page 2 of 2 Powered by Production Access

5 Report No: 3 Report Date: 6/7/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 3 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE Operation Desc: RIGGING UP DERRICK AND GROUND AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: AFE DHC: $3,180,125 Days from Spud: -2 Rig Supervisor 1: CODY CHAMBERS Daily Costs: $28,377 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT This AFE DHC to Date: $77,981 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER This AFE CWC to Date: $77,981 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: LOAD OUT SUB STRUCTURE, RIG MATS, AND DERRICK. SET IN RIG MATS. SET IN SUB AND CENTER OVER HOLE. INSTALL CENTER STEEL AND DRAWORKS. REMOVE TDS AND REPLACE ROLLERS. PIN DERRICK TO SUB AND SET ON HEADACHE RACK. SET IN BOP WRANGLER AND CATWALK. INSTALL BOARD. ATTACH HYDRAULIC CYLINDERS TO DERRICK. RIG UP ELECTRICAL LINES AND PITS. RIG UP DIESEL LINES TO GEN HOUSES. RIGGED DOWN- 100% TRANSPORTED- 100% RIGGED UP- 40% Next Day Operations: CONTINUE RIGGING UP GROUND. RAISE DERRICK AND SUB STRUCTURE. RIG UP FLOOR AND PREP FOR SPUD IN. RIG RELEASED FROM UNIVERSITY :00 HRS. ON SPUD: XX:XX HRS. TOTAL RIG MOVE HRS.: 72 / DAYS: 3 TOTAL HRS. FROM SPUD: TOTAL DAYS TO TD: TOTAL DAYS TO RELEASE: DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY #1R, ON 6/4/2015. CSI. SAFETY MTG.: SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. DAYS SINCE LAST LTA: 344 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG XXX' 13 3/8" SURFACE CSG X,XXX' 9 5/8'' INT. CSG X,XXX' 7" INT. CSG XX,XXX' 4.5'' PRO. CASING XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: LOAD OUT SUB STRUCTURE, RIG MATS, AND DERRICK. SET IN RIG MATS. SET IN SUB AND CENTER OVER HOLE. INSTALL CENTER STEAL AND DRAWORKS. REMOVE TDS AND REPLACE ROLLERS. PIN DERRICK TO SUB AND SET ON HEADACHE RACK. SET IN BOP WRANGLER AND CATWALK. INSTALL BOARD. ATTACH HYDRAULIC CYLINDERS TO DERRICK. RIG UP ELECTRICAL LINES AND PITS. RIG UP DIESEL LINES TO GEN HOUSES. Total: NIH 6/7/ Rig Up & Tear Down $28,377 $77,981 $6,116,398 Page 1 of 2 Powered by Production Access

6 Report No: 3 Report Date: 6/7/2015 Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER New Prospect Company CO MAN Precision Drilling Rig Crews Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/7/2015 / ENERGEN / RED RIVER T ALL RIG PERSONEL SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $67,500 IDC - DRILL - EQUIPMEN PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $573 IDC - DRILL - SURFACE TAN MAR HOUSING PACKAGE $650 $9,908 IDC - DRILL - SURFACE PRIME TIME WATER S RIG UP WATER TANKS FOR $4,200 $9,908 IDC - DRILL - SURFACE K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $9,908 IDC - DRILL - SURFACE LEOS TRUCKING 2 X FRAC TANKS $60 $9,908 IDC - DRILL - SURFACE PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $9,908 IDC - DRILL - SURFACE RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $9,908 Total IDC: $28,377 $77,981 Total Cumulative Well Costs: $28,377 $77,981 Lost Time First Aid Med Visit 6/7/ Rig Up & Tear Down $28,377 $77,981 $6,116,398 Page 2 of 2 Powered by Production Access

7 Report No: 4 Report Date: 6/8/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 4 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE Operation Desc: RIGGING UP GROUND AND FLOOR AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: AFE DHC: $3,180,125 Days from Spud: -1 Rig Supervisor 1: CODY CHAMBERS Daily Costs: $38,765 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT This AFE DHC to Date: $116,746 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER This AFE CWC to Date: $116,746 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: RE-POSITION TOP DRIVE TRACK. PREP DERRICK TO BE RAISED. PERFORM HYDRAULIC CYLINDER BLEED OFF PROCEDURE. RAISE DERRICK AND PIN. UN-PIN HYDRAULIC CYLINDERS FROM DERRICK AND RE- POSITION TO SUB STRUCTURE. RIG UP WIRE TREY AND RUN ELECTRICAL LINES TO RIG FLOOR. RIG UP STAND PIPE. RIG UP SUB AND PREP TO RAISE SUB STRUCTURE. PERFORM BLEED OFF PROCEDURE TO SUBS HYDRAULIC CYLINDERS. RAISE AND PIN SUB STRUCTURE. INSTALL FLOWLINE AND RIG UP CATWALK AND V-DOOR. RIG UP PIPE WRANGLER. RIG UP MISC. ON GROUND AND PITS. UN-HANG BLOCKS AND PIN TO TOP DRIVE. RIG UP MISC. ON RIG FLOOR. HANG TONGS, RIG UP ST-80,... ETC. TRANSPORTED- 100% RIGGED UP- 80% Next Day Operations: CONTINUE RIGGING UP GROUND AND FLOOR. INSTALL CONDUCTOR. PREP BHA AND MAKE UP BHA #1. SPUD IN WELL RIG RELEASED FROM UNIVERSITY :00 HRS. ON SPUD: XX:XX HRS. TOTAL RIG MOVE HRS.: 96 / DAYS: 4 TOTAL HRS. FROM SPUD: TOTAL DAYS TO TD: TOTAL DAYS TO RELEASE: DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY #1R, ON 6/4/2015. CSI. SAFETY MTG.:SAFETY MEETING ON RAISING DERRICK AND SUB. JSA ON HEAVY LIFTING AND OVERHEAD LOADS. DAYS SINCE LAST LTA: 345 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG XXX' 13 3/8" SURFACE CSG X,XXX' 9 5/8'' INT. CSG X,XXX' 7" INT. CSG XX,XXX' 4.5'' PRO. CASING XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/ J Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 Last BOP Test: Last BOP Drill Date: Casing BOP Test and Inspection Dates Days Since BOP Tested: BOP Test Due: Last Inspection: 6/8/ Rig Up & Tear Down $38,765 $116,746 $6,116,398 Page 1 of 2 Powered by Production Access

8 Report No: 4 Report Date: 6/8/2015 Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: RE-POSITION TOP DRIVE TRACK. PREP DERRICK TO BE RAISED. PERFORM HYDRAULIC CYLINDER BLEED OFF PROCEDURE. RAISE DERRICK AND PIN. UN-PIN HYDRAULIC CYLINDERS FROM DERRICK AND RE-POSITION TO SUB STRUCTURE. RIG UP WIRE TREY AND RUN ELECTRICAL LINES TO RIG FLOOR. RIG UP STAND PIPE. RIG UP SUB AND PREP TO RAISE SUB STRUCTURE. PERFORM BLEED OFF PROCEDURE TO SUBS HYDRAULIC CYLINDERS. RAISE AND PIN SUB STRUCTURE. INSTALL FLOWLINE AND RIG UP CATWALK AND V-DOOR. RIG UP PIPE WRANGLER. RIG UP MISC. ON GROUND AND PITS. UN-HANG BLOCKS AND PIN TO TOP DRIVE. RIG UP MISC. ON RIG FLOOR. HANG TONGS, RIG UP ST-80,... ETC. Total: Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 1 1 6/8/ /2 Ulterra U616S Date Out 6/9/2015 Jets 14 / 14 / 14 / 14 / 14 / 14 / 14 / 14 TFA 1.20 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / A / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM IMPACT 6/ ADJ.13 RPG Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter ULTERRA U616S S/N: x14's TFA: Motor - steerable BEND // 17" STAB. // MAX DIFF // GPM: 600 / 1 Stab - Undergauge " NM IBS S/N: 5016 Sub - Orienting HANG OFF SUB S/N: Monel NMDC S/N: AWS Sub - Shock " SHOCK SUB S/N: SD Sub - XO X-O SUB 6 5/8 REG x 4 1/2 XH S/N: 1305 Drill collar " DRILL COLLARS Sub - XO X-O SUB 4 1/2 XH x 4 1/2 IF S/N: 5120 HWDP " HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER New Prospect Company CO MAN Precision Drilling Rig Crews Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/7/2015 PRECISION/ENERGEN/RED STONE TRANSPORT ALL RIG PERSONEL SAFETY MEETING ON RAISING DERRICK AND SUB. JSA ON HEAVY LIFTING AND OVERHEAD LOADS. Drilling 6/8/2015 ENERGEN NOTIFY TRRC OF INTENT TO SPUD AND SET SURFACE 15:00 HRS JOB # Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $90,000 IDC - DRILL - EQUIPMEN PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $764 IDC - DRILL - FUEL Blue Streak Transportati DELIVER 7000 GAL OFF ROA $14,588 $14,588 IDC - DRILL - SURFACE LEOS TRUCKING 2 X FRAC TANKS $60 $11,394 IDC - DRILL - SURFACE K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $11,394 IDC - DRILL - SURFACE TAN MAR HOUSING PACKAGE $650 $11,394 IDC - DRILL - SURFACE RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $11,394 IDC - DRILL - SURFACE PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $11,394 Total IDC: $38,765 $116,746 Total Cumulative Well Costs: $38,765 $116, Lost Time First Aid NIH Med Visit 6/8/ Rig Up & Tear Down $38,765 $116,746 $6,116,398 Page 2 of 2 Powered by Production Access

9 Report No: 5 Report Date: 6/9/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 5 Rpt T. Activity: 02 - Drilling AFE #: PBE Operation Desc: DRILLING AHEAD IN 17 1/2" SURFACE 513' AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: AFE DHC: $3,180,125 Days from Spud: 1 Rig Supervisor 1: MICHAEL MCCART Daily Costs: $357,373 Field Name: Wellcore Rig Supervisor 2: CODY CHAMBERS This AFE DHC to Date: $474,119 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER This AFE CWC to Date: $474,119 Start Depth(ft): 130 Formation: Surface Total Project Costs: $3,400,564 Ending Depth(ft): 513 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 513 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $9,927 Rig Company: Precision Drilling 24 Hr. Footage: 383 Develop To: 0 Cum Mud Costs: $9,927 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: CONTINUE RIGGING UP GROUND AND FLOOR. PICK UP AND MAKE UP BHA #1 AND BIT #1. SPUD IN 00:00 ON DRILL AHEAD IN 17 1/2" SURFACE SECTION F/ 130' T/ 513' 24 HOUR FOOTAGE: 383 AVG ROP: 64 FPH Next Day Operations: DRILL AHEAD IN 17 1/2" SURFACE HOLE TO TD. POOH AND LAY DOWN BHA #1. RUN 13 3/8" CASING. CEMENT 13 3/8" CASING RIG RELEASED FROM UNIVERSITY :00 HRS. ON SPUD: 00:00 HRS. TOTAL RIG MOVE HRS.: 106 / DAYS: 4.42 TOTAL HRS. FROM SPUD: 6 TOTAL DAYS TO TD: TOTAL DAYS TO RELEASE: DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY #1R, ON 6/4/2015. CSI. SAFETY MTG: RIGGING UP TOP DRIVE SYSTEM. LOCK OUT / TAG OUT. JSA'S ON PICKING UP COLLARS, PROPER LIFTING TECHINQUE DAYS SINCE LAST LTA: 346 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** BHA #1 17 ½" ULTERRA U616S BIT // 9 5/8" 6/7 5.0 STAGE ADJUSTABLE BEND 1.5 W/ 17" STABILIZER // 17" STEEL IBS // 8" NMDC // 8" HANG-OFF SUB // 8" NMDC // 8" SHOCK SUB // X-O SUB 6 5/8 REG x 4 ½ XH // 12 x 6 ½" DRILL COLLARS // X-O SUB 4 ½ XH x 4 ½ IF // 9 x HWDP ( DRILLING HOURS: 6 // CIRC HOURS: O ) 20'' CONDUCTOR CSG XXX' 13 3/8" SURFACE CSG X,XXX' 9 5/8'' INT. CSG X,XXX' 7" INT. CSG XX,XXX' 4.5'' PRO. CASING XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: NOTIFY TRRC OF INTENT TO 15:00 HRS Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 1 6/9/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/ J Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 6/9/ Drilling 8.4 $357,373 $474,119 $6,116,398 Page 1 of 3 Powered by Production Access

10 Report No: 5 Report Date: 6/9/2015 BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /5/ % 96.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: RIG UP MISC GROUND RUN PVC FROM STEEL PITS TO RESERVE. HOOK UP 0 0 NIH REMAINIG ELECTRICAL LINES. HOOK UP VIBRATING HOSES TO PUMPS AND TANKS. RIG UP SHAKER SCREENS AND SHAKER SLIDE. RIG UP MISC FLOOR HOOK UP SERVICE LOOP TO TDS RUN DIAGNOSTICS ON TDS ELECTRICAL SYSTEM. INSTALL BELLS AND ELEVATORS. PICK UP 5" HANDLEING TOOLS. INSTALL 4 1/2" IF SAVER SUB AND 5" DIE BLOCKS. HOOK UP LINK TILTS TO BELLS. INSTALL MOUSEHOLE. LOAD RACKS AND STAGE BHA. 16: INSTALL 20" CONDUCTOR AND NIPPLE UP SAME. INSTALL FLOWLINE AND FILL UP 0 0 NIH LINE. HOOK UP TURNBUCKLES AND CENTER 20" CONDUCTOR 20: PICK UP AND MAKE UP BHA #1. SCRIBE MOTOR AND TEST MWD : SPUD IN WELL. DRILL F/ 130' T/ 513' ( 64 FPH ) WOB: 20K RPM: 65 GPM: 650 MM RPM: 84 TOTAL RPM: 149 MUD WT: 8.4 VIS: 39. Total: Drilling Data Hook Load: Pick Up: Slack Off: Over Pull: 2000 ROP: Pres on Bot: 1250 Press Off Bot: 1500 Kickoff Depth: 0 WOB: 20 Rotary RPM: 65 Motor RPM: 84 Torque: 8000 BHA Hours: 6.00 Crew Status: ON Remarks: NONE Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 1 1 6/8/ /2 Ulterra U616S Date Out 6/9/2015 Jets 14 / 14 / 14 / 14 / 14 / 14 / 14 / 14 TFA 1.20 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / A / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM IMPACT 6/ ADJ.13 RPG Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter ULTERRA U616S S/N: x14's TFA: Motor - steerable IMPACT /8" 7/ // 5.0 STAGE // ADJ BEND // 17" STAB. // MAX DIFF // GPM: 600 / 1200 // MA Stab - Undergauge " NM IBS S/N: 5016 Sub - Orienting HANG OFF SUB S/N: Monel NMDC S/N: AWS Sub - Shock " SHOCK SUB S/N: SD Sub - XO X-O SUB 6 5/8 REG x 4 1/2 XH S/N: 1305 Drill collar " DRILL COLLARS Sub - XO X-O SUB 4 1/2 XH x 4 1/2 IF S/N: 5120 HWDP " HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER New Prospect Company CO MAN Precision Drilling Rig Crews Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/8/2015 PRECISION / ENERGEN ALL RIG PERSONEL RIGGING UP TOP DRIVE SYSTEM. LOCK OUT / TAG OUT. JSA'S ON PICKING UP COLLARS, PROPER LIFTING TECHINQUE Lost Time First Aid 1 Med Visit 6/9/ Drilling 8.4 $357,373 $474,119 $6,116,398 Page 2 of 3 Powered by Production Access

11 Report No: 5 Report Date: 6/9/2015 Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - ROAD & SITE CON Unknown ROADS AND LOCATION / PIT $175,000 $175,000 IDC - INSURANCE & BO Various INS AND BOND CONTINGEN $10,000 $10,000 IDC - PERMITS SURVEY Various PERMITS AND SURVEYS CO $45,000 $45,000 IDC - DRILL - CONTRAC PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $112,500 IDC - DRILL - EQUIPMEN PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $955 IDC - DRILL - FUEL $14,588 IDC - DRILL - EQUIPMEN TOM-E-LEE TRUCKING DELIVER DIRECTIONAL TOO $1,126 $2,014 IDC - DRILL - EQUIPMEN RAM ROD TRUCKING, I DELIVER MWD TOOLS TO LO $444 $2,014 IDC - DRILL - EQUIPMEN RAM ROD TRUCKING, I DELIVER MWD TRAILER TO L $444 $2,014 IDC - DRILL - DIRECTIO PREMIER DIRECTIONA DAILY DIRECTIONAL COSTS $16,255 $16,255 IDC - DRILL - MOBDEMO RED STONE OPERATI RIG MOVE TO UNIVERSITY 4 $75,000 $75,000 IDC - DRILL - SURFACE K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $12,880 IDC - DRILL - SURFACE LEOS TRUCKING 2 X FRAC TANKS $60 $12,880 IDC - DRILL - SURFACE PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $12,880 IDC - DRILL - SURFACE TAN MAR HOUSING PACKAGE $650 $12,880 IDC - DRILL - SURFACE RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $12,880 Total IDC: $347,446 $474,119 Total Cumulative Well Costs: $347,446 $474,119 6/9/ Drilling 8.4 $357,373 $474,119 $6,116,398 Page 3 of 3 Powered by Production Access

12 Report No: 6 Report Date: 6/10/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 6 Rpt T. Activity: 12 - Run Casing & Cement AFE #: PBE Operation Desc: WAIT ON CEMENT AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: AFE DHC: $3,180,125 Days from Spud: 2 Rig Supervisor 1: MICHAEL MCCART Daily Costs: $96,361 Field Name: Wellcore Rig Supervisor 2: CODY CHAMBERS This AFE DHC to Date: $570,480 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER This AFE CWC to Date: $570,480 Start Depth(ft): 513 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 1440 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $9,927 Rig Company: Precision Drilling 24 Hr. Footage: 927 Develop To: 0 Cum Mud Costs: $19,854 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: DRILL AHEAD IN 17 1/2" HOLE SECTION F/ 513' T/ 1440'. CIRCULATE HOLE CLEAN AND POOH FOR 13 3/8" CASING RUN. RIG UP CASING CREW AND RUN 35 JOINTS OF 13 3/8" CASING. RIG UP CEMENTERS AND CEMENT 13 3/8" CASING. RIG DOWN CEMENTERS. TOTAL 24 HOUR FOOTAGE: 927 AVG ROP: 116 Next Day Operations: INSTALL WELLHEAD. NIPPLE UP BOP'S / TEST BOP'S. MAKE UP BHA #2 AND DRILL AHEAD IN 12 1/4" HOLE SECTION. RIG RELEASED FROM UNIVERSITY :00 HRS. ON SPUD: 00:00 HRS. TOTAL RIG MOVE HRS.: 106 / DAYS: 4.42 TOTAL HRS. FROM SPUD: 30 TOTAL DAYS TO TD: TOTAL DAYS TO RELEASE: DOWNTIME HRS.: 1 TODAY / 1 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 1% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY #1R, ON 6/4/2015. CSI. SAFETY MTG:JSA'S & SAFETY MEETINGS OVER, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS. DAYS SINCE LAST LTA: 347 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: 0 FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** BHA #1 17 ½" ULTERRA U616S BIT // 9 5/8" 6/7 5.0 STAGE ADJUSTABLE BEND 1.5 W/ 17" STABILIZER // 17" STEEL IBS // 8" NMDC // 8" HANG-OFF SUB // 8" NMDC // 8" SHOCK SUB // X-O SUB 6 5/8 REG x 4 ½ XH // 12 x 6 ½" DRILL COLLARS // X-O SUB 4 ½ XH x 4 ½ IF // 9 x HWDP ( DRILLING HOURS: 14 // CIRC HOURS: 3 TOTAL HOURS: 17 ) REASON PULLED: SURFACE CASING POINT BIT GRADE: 1/1 20'' CONDUCTOR CSG 130' 13 3/8" SURFACE CSG 1,440' WEATHERFORD FLOAT 1,440.18' 1 JOINT 13 3/8" 54.5# J-55 BTC CASING WEATHERFORD FLOAT 1,397.43' 34 JOINTS 13 3/8" 54.5# J-55 BTC CASING TOTAL CENTRALIZERS: 12 1 CENTRALIZER ON FIRST 1,415' 1 CENTRALIZER EVERY 3RD JOINT TO 77' 9 5/8'' INT. CSG X,XXX' 7" INT. CSG XX,XXX' 4.5'' PRO. CASING XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: DEPTH: 1,375' INC:.73 AZM: TRRC: NOTIFY TRRC OF INTENT TO SPUD AND SURFACE 15:00 HRS /10/ Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 1 of 4 Powered by Production Access

13 Report No: 6 Report Date: 6/10/2015 Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 2 6/10/ /10/ /10/ Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/ J Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /5/ % 96.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: ROT & SLIDE DRILL 17 ½ SURFACE HOLE F/ 513' T/ 1,440' ( 116 FPH) // WOB: 10-20K // GPM: 630 // SPM: 150 // SPP: 1,725 // RPM: 60 // MOTOR RPM: 91 // TOTAL RPM: 151 // DIFF. PSI: **** CONTROL 300 FPH**** 14: ROT & 100 FPM PUMPING 650 GPM, 90 RPM, PUMP FIRST HIGH VIS SWEEP (90 VIS) 80 BBLS, SWEEP BACK TO SURFACE WITH 100% COVERAGE, MIX & PUMP SECOND HIGH VIS SWEEP (90 VIS) 60 BBLS, AND CIRCULATE OUT WITH 10-15% COVERAGE HOLE CLEAN. CALC. 6% EXCESS WASH OUT, **TUBULAR COUNT CORRECT IN HOLE VS. OUT** 15: TOOH TO RUN 13 3/8 CASING F/ 1,440' - T/ 95', (SLM) MONITORING DISPLACEMENT T/F TRIP TANK HOLE TAKING CORRECT DISP **NO OVERPULL OR TIGHT SPOT SEEN** 17: L/D MONELS, UBHO, STAB, MTR. & BIT, BIT GRADE 2/1, CLEAR RIG FLOOR FOR CASING RUNNING. 19: TROUBLESHOOT AND REPAIR PIPE WRANGLER NIH 20: LAY DOWN 9 5/8" MOTOR NIH 20: HOLD PJSM AND RIG UP BUTCH'S CASING CREW NIH 21: MAKE UP SHOE TRACK AND RUN 35 TOTAL JOINTS OF 13 3/8' 54.5# J-55 BTC CASING NIH // 13 3/8" SURFACE CSG 1,440' WEATHERFORD FLOAT 1,440.18' 1 JOINT 13 3/8" 54.5# J-55 BTC CASING WEATHERFORD FLOAT 1,397.43' 34 JOINTS 13 3/8" 54.5# J-55 BTC CASING TOTAL CENTRALIZERS: 12 1 CENTRALIZER ON FIRST 1,415' 1 CENTRALIZER EVERY 3RD JOINT TO 77' 2: CIRCULATE CASING 2X CAPACITY NIH 3: HOLD PJSM AND RIG UP O-TEX CEMENTERS NIH 3: SWITCH OVER TO O-TEX, CEMENT SURFACE CASING AS FOLLOWS: PRESSURE TEST NIH LINES TO 2000 PSI. TEST GOOD. PUMP 20 BBL FRESH WATER SPACER. THEN PUMP LEAD SLURRY SACKS OF 12.8 PPG 35:65 CLASS C + 6% GEL + 3% SALT + ¼#/SK CELLOFLAKE + CASING. INSTALL CAP. KICK OUT PLUG WITH 10 BBLS FRESHWATER, PUMPED 216 BBLS DISPLACE WITH FRESH WATER DISPLACEMENT. SLOWED 10 BBLS BEFORE END OF DISPLACEMENT AND BUMPED 600 PSI OVER PSI TO HOLD PRESSURE 2 MINUTES. BLED OFF. BLED BACK 1 BBLS. FLOAT HOLDING FULL CIRCULATION THROUGHOUT CEMENT JOB, CIRCULATED 488 SX (156 BBLS) GOOD CEMENT BACK TO SURFACE. 5: RIG DOWN CEMENTERS / WAIT ON CEMENT NIH Total: /10/ Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 2 of 4 Powered by Production Access

14 Report No: 6 Report Date: 6/10/2015 Drilling Data Hook Load: Pick Up: Slack Off: Over Pull: 2000 ROP: Pres on Bot: 1250 Press Off Bot: 1500 Kickoff Depth: 0 WOB: 20 Rotary RPM: 65 Motor RPM: 84 Torque: 8000 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 1 1 6/8/ /2 Ulterra U616S Date Out 6/9/2015 Jets 14 / 14 / 14 / 14 / 14 / 14 / 14 / 14 TFA 1.20 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / A / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM IMPACT 6/ ADJ.13 RPG BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 2 2 6/10/ /4 Ulterra U616M Date Out 6/13/2015 Jets 18 / 18 / 18 / 16 / 16 / 16 / 0 / 0 TFA 1.35 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / N / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM NOV 6/ ADJ.15 RPG Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter /4" ULTERRA PDC BIT. Motor - steerable / ADJ.15 RPG MOTOR. Stab - Undergauge /8" IBS Monel NMDC Sub - Orienting UBHO Monel NMDC Sub - Shock SD SHOCK SUB. Sub - XO XO Drill collar " D.C'S Sub - XO XO HWDP " HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER New Prospect Company CO MAN Precision Drilling Rig Crews Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/9/2015 PRECISION, PREMIER, ENERGEN, ANCHOR ALL PERSONAL ONSITE. JSA'S & SAFETY MEETINGS OVER, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS. Lost Time First Aid Med Visit 6/10/ Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 3 of 4 Powered by Production Access

15 Report No: 6 Report Date: 6/10/2015 Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - ROAD & SITE CON $175,000 IDC - INSURANCE & BO $10,000 IDC - PERMITS SURVEY $45,000 IDC - DRILL - CONTRAC PRECISION DRILLING RIG & CREWS $23,500 $136,000 IDC - DRILL - EQUIPMEN PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $1,146 IDC - DRILL - FUEL $14,588 IDC - DRILL - EQUIPMEN $2,014 IDC - DRILL - DIRECTIO PREMIER DIRECTIONA DAILY DIRECTIONAL COSTS $7,725 $23,980 IDC - DRILL - MOBDEMO $75,000 IDC - DRILL - SURFACE LEOS TRUCKING 2 X FRAC TANKS $60 $15,566 IDC - DRILL - SURFACE PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $15,566 IDC - DRILL - SURFACE TAN MAR HOUSING PACKAGE $650 $15,566 IDC - DRILL - SURFACE K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $15,566 IDC - DRILL - SURFACE RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $15,566 IDC - DRILL - SURFACE PRIMETIME WATER SU 6000 GAL. FRESHWATER FO $1,200 $15,566 IDC - DRILL - SPECIAL S Butch's Rathole CASING CREW TO RUN 13 3/ $3,062 $3,062 Total IDC: $37,164 $521,210 TDC Code Vendor Remarks Daily Exp Cum Exp TDC - DE - SURFACE CA Weatherford 13 3/8" FLOAT EQUIPMENT $1,585 $49,270 TDC - DE - SURFACE CA Sooner Pipe, L.L.P. 13 3/8" ESTIMATED CASING $47,685 $49,270 Total TDC: $49,270 $49,270 Total Cumulative Well Costs: $86,434 $570,480 6/10/ Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 4 of 4 Powered by Production Access

16 Report No: 7 Report Date: 6/11/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 7 Rpt T. Activity: 21 - Other AFE #: PBE Operation Desc: INSTALLING WEAR BUSHING AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: AFE DHC: $3,180,125 Days from Spud: 3 Rig Supervisor 1: MICHAEL MCCART Daily Costs: $129,390 Field Name: Wellcore Rig Supervisor 2: CODY CHAMBERS This AFE DHC to Date: $699,870 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER This AFE CWC to Date: $699,870 Start Depth(ft): 1440 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 1440 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $861 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $20,715 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: WAIT ON CEMENT AND INSTALL WELLHEAD. NIPPLE UP BOP'S. TEST BOP'S. INSTALL WEAR BUSHING. Next Day Operations: MAKE UP BHA #2. TEST CASING. DRILL OUT CEMENT AND FLOAT EQUIPMENT. DRILL AHEAD IN 12 1/4" HOLE SECTION. RIG RELEASED FROM UNIVERSITY :00 HRS. ON SPUD: 00:00 HRS. TOTAL RIG MOVE HRS.: 106 / DAYS: 4.42 TOTAL HRS. FROM SPUD: 54 TOTAL DAYS TO TD: TOTAL DAYS TO RELEASE: DOWNTIME HRS.: 0 TODAY / 1 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 1% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY #1R, ON 6/4/2015. CSI. SAFETY MTG:JSA'S & SAFETY MEETINGS OVER, NIPPLING UP B.O.P, TESTING B.O.P, OVERHEAD LOADS, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS DAYS SINCE LAST LTA: 348 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: 0 FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** BHA #1 17 ½" ULTERRA U616S BIT // 9 5/8" 6/7 5.0 STAGE ADJUSTABLE BEND 1.5 W/ 17" STABILIZER // 17" STEEL IBS // 8" NMDC // 8" HANG-OFF SUB // 8" NMDC // 8" SHOCK SUB // X-O SUB 6 5/8 REG x 4 ½ XH // 12 x 6 ½" DRILL COLLARS // X-O SUB 4 ½ XH x 4 ½ IF // 9 x HWDP ( DRILLING HOURS: 14 // CIRC HOURS: 3 TOTAL HOURS: 17 ) REASON PULLED: SURFACE CASING POINT BIT GRADE: 1/1 BHA #2: ULTERRA 12 1/4" U616M JETS: 3x18 / 3x16 TFA: 1.35 // 8" GYRODATA 7/8 4.0 ADJ. 1.5 BEND W/ 11 ¾" STABILIZER // 12 1/8" STABILIZER // 8" NMDC // 8" UBHO SUB // 1 X 8" NMDC S // 8" SHOCK SUB // X-O SUB // 12-6 ½" DRILL COLLARS // X-O SUB // 9 - HWDP ( DRLG HRS:, CIRC. HRS:, TOTAL HRS: ) 20'' CONDUCTOR CSG 130' 13 3/8" SURFACE CSG 1,440' 9 5/8'' INT. CSG X,XXX' 7" INT. CSG XX,XXX' 4.5'' PRO. CASING XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: DEPTH: 1,375' INC:.73 AZM: TRRC: NOTIFY TRRC OF INTENT TO SPUD AND SURFACE 15:00 HRS JOB # 8028 Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 2 6/10/ /10/ /10/ /11/ Other 9.4 $129,390 $699,870 $6,116,398 Page 1 of 3 Powered by Production Access

17 Report No: 7 Report Date: 6/11/2015 Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/ J Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 BOP Test and Inspection Dates Last BOP Test: 6/11/2015 Days Since BOP Tested: 0 Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand : /5/ % 96.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost Water Lost LCM ECD FL Temp Remarks Hours Summary ( Daily / Cumulative ) Drilling Rotating Trips Circulating Down Other Operations Start Hrs Code Remarks Start Depth End Depth Run 6: WOC, FLUSH OUT DIVERTER & CONDUCTER, RIGGING DOWN CEMENTERS, CONDUCTER, & DIVERTER 10: MAKE FINAL CUT ON CONDUCTOR & CASING, DRESS CASING & INSTALL WELL HEAD. WELD ON 13 3/8" SOW X 11" 10M WELL HEAD AND TEST TO 1500 PSI (OK) AS PER FMC INSTALLATION PROCEDURES, INSTALL WITNESSED BY WEIR REP. 15: NIPPLE UP B.O.P'S, INSTALL DSA, SPOOLS, MUD CROSS. INSTALL NEW HCR VALVE AND 2" CHECK VALVE. HOOK UP KILL LINE. CHANGE OUT 4" PIPE RAMS FOR 5" PIPE RAMS. HOOK UP CUMMY LINES. FUNCTION TEST ALL LINES. INSTALL TURNBUCKLES AND CENTER BOP. 0: TESTING BOP'S. TEST BLIND RAMS, PIPE RAMS, CHOKE LINE, 4" MANUAL, CHOKE LINE HCR, KILL LINE, KILL LINE MANUAL, KILL LINE HCR, KILL LINE CHECK VALVE, CHOKE MANIFOLD, ALL MANUAL VALVES ON MANIFOLD, HYDRAULIC CHOKES TO 250 PSI LOW, 5,000 PSI HIGH. 5 MINUTE LOW TEST & 5 MINUTE HIGH TESTS. TEST ANNULAR TO 3500 PSI. TEST FLOOR VALVES TO 5,000 PSI. TEST MUD LINES FROM TOP DRIVE TIW VALVE BACK TO PUMP TO 4000 PSI., FULL KOOMEY DRAW DOWN TEST, R/D TESTER **TOP OF 10' BELOW WELLHEAD** 5: SERVICE RIG AND TOP DRIVE NIH 5: PICK UP AND INSTALL WEAR BUSHING NIH Total: Drilling Data Hook Load: Pick Up: Slack Off: Over Pull: 2000 ROP: 0.00 Pres on Bot: 1250 Press Off Bot: 1500 Kickoff Depth: 0 WOB: 20 Rotary RPM: 65 Motor RPM: 84 Torque: 8000 BHA Hours: 0.00 Crew Status: ON Remarks: NONE NIH NIH NIH NIH 6/11/ Other 9.4 $129,390 $699,870 $6,116,398 Page 2 of 3 Powered by Production Access

18 Report No: 7 Report Date: 6/11/2015 Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 2 2 6/10/ /4 Ulterra U616M Date Out 6/13/2015 Jets 18 / 18 / 18 / 16 / 16 / 16 / 0 / 0 TFA 1.35 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / N / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM NOV 6/ ADJ.15 RPG Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter /4" ULTERRA PDC BIT. Motor - steerable / ADJ.15 RPG MOTOR. Stab - Undergauge /8" IBS Monel NMDC Sub - Orienting UBHO Monel NMDC Sub - Shock SD SHOCK SUB. Sub - XO XO Drill collar " D.C'S Sub - XO XO HWDP " HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD /0 0/0 0/0 2 FD /0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER New Prospect Company CO MAN Precision Drilling Rig Crews Totals Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/10/2015 PRECISION, PREMIER, ENERGEN, ANCHOR ALL PERSONAL ONSITE. JSA'S & SAFETY MEETINGS OVER, NIPPLING UP B.O.P, TESTING B.O.P, OVERHEAD LOADS, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - ROAD & SITE CON $175,000 IDC - INSURANCE & BO $10,000 IDC - PERMITS SURVEY $45,000 IDC - DRILL - CEMENT & Weatherford 13 3/8" FLOAT EQUIPMENT & $1,713 $37,063 IDC - DRILL - CEMENT & OTEX PUMPING LLC CEMENT 13 3/8" CASING. $35,349 $37,063 IDC - DRILL - CONTRAC PRECISION DRILLING RIG & CREWS $23,500 $159,500 IDC - DRILL - EQUIPMEN PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $1,337 IDC - DRILL - FUEL $14,588 IDC - DRILL - EQUIPMEN $2,014 IDC - DRILL - DIRECTIO PREMIER DIRECTIONA DAILY DIRECTIONAL COSTS $7,725 $31,705 IDC - DRILL - MOBDEMO $75,000 IDC - DRILL - SURFACE LEOS TRUCKING 2 X FRAC TANKS $60 $18,822 IDC - DRILL - SURFACE PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $18,822 IDC - DRILL - SURFACE RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $18,822 IDC - DRILL - SURFACE TAN MAR HOUSING PACKAGE $650 $18,822 IDC - DRILL - SURFACE IRON HORSE TOOLS, L INSTALL AND RIG UP FLARE $1,770 $18,822 IDC - DRILL - SURFACE K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $18,822 IDC - DRILL - SPECIAL S WEIR OIL & GAS FIELD TECH TO SUPERVISE $960 $13,590 IDC - DRILL - SPECIAL S Monahans Nipple-Up NIPPLE UP BOPS $4,165 $13,590 IDC - DRILL - SPECIAL S Monahans Nipple-Up TEST BOPS $2,340 $13,590 IDC - DRILL - SPECIAL S BUTCH'S CASING DIVI RUN 13 3/8" CASING. $3,063 $13,590 Total IDC: $82,262 $604,333 TDC Code Vendor Remarks Daily Exp Cum Exp TDC - DE - SURFACE CA SOONER PIPE 1,440' OF 13 3/8" SURFACE C $46,267 $95,537 Total TDC: $46,267 $95,537 Total Cumulative Well Costs: $128,529 $699,870 Lost Time First Aid Med Visit 6/11/ Other 9.4 $129,390 $699,870 $6,116,398 Page 3 of 3 Powered by Production Access

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves,

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Superintendent Rig Checklist

Superintendent Rig Checklist Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500 SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

Daily Drilling Report

Daily Drilling Report Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 6 Brand Loadcraft Power: 550 HP Year: 2013 Double Drum: Drawworks and Sandline Drums : Self-propelled Land

More information

THE OFFSHORE Drilling Solution

THE OFFSHORE Drilling Solution THE OFFSHORE Drilling Solution ATLANTIC 7 RIG brings energy to the world as a global provider of offshore drilling services to the petroleum industry. www.rigatlantic7.com Technical Information General

More information

Rig 90. Rig 97. Future Technology From NOV

Rig 90. Rig 97. Future Technology From NOV Rig 90 Rig 97 Future Technology From NOV 1 - The Masts - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 2 - The Substructures - - - - - - - - - - - - - - - - - - - - - - - - - 2 3 - The

More information

Ashmin HammR Drill Motor

Ashmin HammR Drill Motor Ashmin HammR Drill Motor By: Dr. Gunther (Doc) Tuesday, September 12 th, 2017 Research. Innovate. Test. Deploy. Agenda Drilling Challenges Alternative Designs Drilling Hammer Trends Ashmin HammR Drill

More information

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM 750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM PAGE 1 OF 7 DRAWWORKS: TSM 7000 Drawworks, 750hp, grooved f/1-1/8 Drill Line, p/b 540HP CAT C-15, w/allison CLT- 6061 Automatic Transmission, Right Angle Drive,

More information

HYDRAULIC WORKOVER SERVICES

HYDRAULIC WORKOVER SERVICES HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well

More information

4.7 Formation Temperature

4.7 Formation Temperature 4.7 Formation Temperature The maximum recorded temperatures (BHT) obtained during logging have been converted to static formation temperatures (T f ) using a Homer plot technique. The recorded BHTs and

More information