1 Page of RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM / LOREN ALFORD TIM ORSAK DOL 0.00 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 5,929 5,929 2,569,800 TOTAL: 2,569,800 TOTAL: 5,929 TOTAL: 5,929 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: RIGGING DOWN 95% RIGGED DOWN 24 HR SUMMARY: RIG DOWN PREPARE RIG TO MOVE 24 HR FORECAST: MOVE RIG TO UNIVERSITY HU OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 6:00 0: R-MOB-DEMOB RU_RD PP CLEAN MUD TANKS, RIG DOWN SERVICE LOOPS, RIG DOWN TOP DRIVE, BRIDAL UP AND LAY OVER DERRICK, RIG DOWN BACK YARD, CLEANING RIG FOOR AND SUBS 8.00 = Total Hours Today 06:00 UP :00-06:00 CONTINUE TO CLEAN RIG, RIG DOWN PREPARE RIG TO MOVE Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD Tie On PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD PATTERSON-UTI DRILLING SDS ENVIORMENTAL DRILLING SOLUTIONS DDC PATTERSON-UTI DRILLING N/-S MATERIALS/CONSUMPTION +E/-W V.SECT D.L ( /00ft) TOTAL PERSONNEL ON BOARD: 26 TOTAL HOURS ON BOARD: 32 DIESEL, RIG FUEL gal 44 DIESEL, MUD gal 527 Printed: //204 5:45:59AM
2 Page 2 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours Printed: //204 5:45:59AM
3 Page of RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM / LOREN ALFORD TIM ORSAK DOL 0.00 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 98,42 250,070 2,569,800 TOTAL: 2,569,800 TOTAL: 98,42 TOTAL: 250,070 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: HOOKING UP ELECTRICAL LINES 24 HR SUMMARY: CLEAN MUD TANKS, PREPARE RIG TO MOVE, MOVE RIG, RIG 50% SPOTTED, RIG UP BACK YARD, PULL AND HOOK UP ELECTRICAL LINES 24 HR FORECAST: CONTINUE TO MOVE AND RIG UP RIG, PREPARE RIG TO SPUD OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB RU_RD PP CONTINUE TO CLEAN RIG, RIG DOWN PREPARE RIG TO MOVE 6:00 8: R-MOB-DEMOB RU_RD PP PJSM, UN DRESS RIG FLOOR, UN BRIDLE, REMOVE DRAW WORKS, REMOVE DERRICK, REMOVE TOP SUB, MOVE MUD TANKS, MUD PUMPS, MOTORS, SCR, DIESEL TANK, MUD DIESEL TANK TO UNIVERSITY HU, SPOT BACK YARD, PUMPS AND MOTORS, SCR AND DIESEL TANK, RIG 45% ON NEW LOCATION, 5% RIGGED UP, RECEIVED NEW PRE MIX 8:00 0: R-MOB-DEMOB RU_RD PP RIG UP BACK YARD, PULL ELECTRICAL LINES = Total Hours Today 06:00 UP :00-06:00 CONTINUE TO RIG UP BACK YARD AND HOOK UP ELECTRICAL LINES, START COLD START, REPLACE CABLE ON EQUALIZER LINE IN SETTLING TANK PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS PATTERSON-UTI DRILLING HORIZON MUD SDS ENVIORMENTAL DRILLING SOLUTIONS DDC PATTERSON-UTI DRILLING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 26 TOTAL HOURS ON BOARD: 32 DIESEL, RIG FUEL gal 0 44 DIESEL, MUD gal Printed: /2/204 4:55:47AM
4 Page 2 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: /2/204 4:55:47AM
5 Page of RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 29,566 27,476 5,968 5,968 TOTAL: 2,569,800 TOTAL: 45,534 TOTAL: 287,444 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: RIGGING UP FESTOON 24 HR SUMMARY: RIG UP BACK YARD, MOVE REST OF RIG TO NEW LOCATION, SPOT AND RIG UP, PREPARE RIG TO SPUD, 80% RIG MOVED / 40% RIGGED UP 24 HR FORECAST: CONTINUE TO RIG UP AND PERPARE RIG TO SPUD OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB RU_RD PP CONTINUE TO RIG UP BACK YARD AND HOOK UP ELECTRICAL LINES, START COLD START, REPLACE CABLE ON EQUALIZER LINE IN SETTLING TANK 6:00 0: R-MOB-DEMOB MOB PP PJSM, MOVE SUBS, CAT WALK, TOP DRIVE, KOMMEY UNIT, DERRICK BOARD, DRAW WORKS AND MISC EQUIPMENT, SET RIG MATTS, SET AND CENTER SUBS OVER WELL, RIG UP DRAW WORKS, SPOT CHOKE MANIFOLD, GAS BUSTER, SHAKERS, CAT WALK AND V DOOR, PIN DERRICK TO FLOOR, SET DOG HOUSE, SET IN BULK HOPPERS AND PRE MIX, START MOTOR AND POWER LIGHTS, PRE SPUD MEETING, RIG 80% SPOTTED, 40% RIGGED UP = Total Hours Today 06:00 UP :00-06:00 DRESS DERRICK, PULL ELECTRICAL LINES, RIG UP PREPARE RIG TO SPUD, RIG 80% SPOTTED, 45% RIGGED UP PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS PATTERSON-UTI DRILLING HORIZON MUD SDS ENVIORMENTAL DRILLING SOLUTIONS DDC PATTERSON-UTI DRILLING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 26 TOTAL HOURS ON BOARD: 32 DIESEL, RIG FUEL gal DIESEL, MUD gal Printed: /3/204 5:3:3AM
6 Page 2 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. DAY HAND WALK AROUND;Noticed that new frac tanks for OBM did not have plugs in all openings, ask hands to install them. Printed: /3/204 5:3:3AM
7 Page of RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 2.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 55,72 334,9 5,968 TOTAL: 2,569,800 TOTAL: 55,72 TOTAL: 350,879 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: HANGING TOPDRIVE, 00% SPOTTED, 90% RIGGED UP 24 HR SUMMARY: CONTINUE TO RIG UP, SPOT EQUIPMENT, SPOOL UP AND RAISE DERRICK, PREPARE RIG TO SPUD 24 HR FORECAST: CONTINUE TO RIG UP, PREPARE RIG TO SPUD, DRILL SURFACE HOLE OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB RU_RD PP DRESS DERRICK, PULL ELECTRICAL LINES, RIG UP PREPARE RIG TO SPUD, RIG 80% SPOTTED, 45% RIGGED UP 6:00 0: R-MOB-DEMOB RU_RD PP RIG UP ELECTRICAL LINES, SPOOL UP, RIG TARPS ON DERRICK, MOVE MUD, RIG UP HI PRESSURE LINES, ST 80, SPOT KOMMEY, KSA VAC, RAISE DERRICK, INSTALL WIND WALLS, RECEIVE SPUD LOAD OF MUD, TRANSFERD 400 BBLS OIL BASE MUD UNTIL DARK AND SHUT DOWN UNTIL DAYLIGHT, RIG 00% SPOTTED, 90% RIGGED UP = Total Hours Today 06:00 UP :00-06:00 CONTINUE TO HANG WHEN WALLS, HANG TOP DRIVE TRACK AND TOPDRIVE, 00% SPOTTED, 90% RIGGED UP PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD PATTERSON-UTI DRILLING SDS ENVIORMENTAL DRILLING SOLUTIONS DDC PATTERSON-UTI DRILLING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 26 TOTAL HOURS ON BOARD: 32 DIESEL, RIG FUEL gal DIESEL, MUD gal Printed: /4/204 5:2:2AM
8 Page 2 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours Day walk around: checking out plugs in frac tanks to prvent spills tonight, take care of yourself Night walk around: weather Printed: /4/204 5:2:2AM
9 Page of RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 0.00 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 3.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 53, ,309 TOTAL: 2,569,800 TOTAL: 53,429 TOTAL: 404,309 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 0.0 INC 0.00 AZM ft CURRENT OPERATIONS: PICKING UP TOOLS TO DRILL SURFACE 24 HR SUMMARY: CONTINUE TO RIG UP, PREPARE RIG TO SPUD, PRE SPUD INSPECTION ANS EXCEPT RIG, NIPPLE UP CONDUCTOR, TURN BUCKLES AND FLOW LINE 24 HR FORECAST: CONTINUE TO RIG UP FLOW LINE, PICK UP 7 /2" SURFACE TOOLS AND SPUD WELL OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: R-MOB-DEMOB RU_RD PP CONTINUE TO HANG WIND WALLS, HANG TOP DRIVE TRACK AND TOPDRIVE, 00% SPOTTED, 90% RIGGED UP 6:00 8: R-MOB-DEMOB RU_RD PP CONTINUE TO RIG UP, RIG UP SERVICE LOOPS AND FUCTION TEST TOPDRIVE, RIG UP KELLY HOSE, FILL MUD TANKS, FRAC AND PRE MIX WITH FRESH WATER, LAY OUT AND STRAP 7 /2" SURFACE BHA, RIG UP RIG FLOOR, PREPARE TO PICK UP BHA 8:00 9:00.00 R-MOB-DEMOB RU_RD PP PRE SPUD INSPECTION, EXCEPT PATTERSON 30 9:00 0: C-NUP RU_RD PP RIG UP CONDUCTOR, TURN BUCKLES AND FLOW LINE = Total Hours Today 06:00 UP :00-0:30 CONTINUE TO RIG UP FLOW LINE, INSTALL MOUSE HOLE, MOUSE HOLE WON'T FIT, HOLE DRILLED AT WRONG ANGLE, CALL WELDER TO CUT MOUSE HOLE 0:30-06:00 PICK UP SURFACE TOOLS PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS PATTERSON-UTI DRILLING HORIZON MUD SDS ENVIORMENTAL DRILLING SOLUTIONS DDC PATTERSON-UTI DRILLING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 26 TOTAL HOURS ON BOARD: 32 DIESEL, RIG FUEL gal 654 6,096 DIESEL, MUD gal Printed: /5/204 5::20AM
10 Page 2 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: /5/204 5::20AM
11 Page of RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 0.52 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB :30 JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 4.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 52, ,27 TOTAL: 2,569,800 TOTAL: 52,908 TOTAL: 457,27 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE /6/204 LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD INC 0.90 AZM ft ,530.0 ft CURRENT OPERATIONS: TRIPPING OUT OF HOLE AT 365' 24 HR SUMMARY: NIPPLE UP, PICK UP 7 /2" SURFACE ASSEMBLY, NIPPLE UP CHOKE MANIFOLD, REPAIR STANDPIPE VALVE, SPUD WELL, DRILL 7 /2" SURFACE FROM 2' TO 335' 24 HR FORECAST: CONTINUE TO DRILL 7 /2" SURFACE, CIRCULATE, TOOH, RIG UP AND TIH 3 3/8", CEMENT, NIPPLE UP AND TEST OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :30.50 C-NUP WLHEAD PP CONTINUE TO RIG UP FLOW LINE, INSTALL MOUSE HOLE, MOUSE HOLE WON'T FIT, HOLE DRILLED AT WRONG ANGLE, :30 8: S-DRL TRIPDIR PP PICK UP SURFACE TOOLS USING CHAIN TONGS AND RIG TONGS DUE TO ST-80 NOT WORKING ALSO NOT ABLE TO USE MOUSEHOLE DUE TO SHUCK NOT GOING IN HOLE FAR ENOUGH (CALLED WELDER TO CUT SEVERAL FEET OFF IT BUT KEPT PICKING UP TOOLS) ATTEMPTED TO TEST LINES BEFORE SPUDDING IN AND 4" STAND PIPE VALVE WAS LEAKING FROM STEM ( WOULD HAVE TESTED LINES BEFORE ACCEPTING RIG BUT DID NOT WANT TO FILL MUD LINES WITH WATER AND POSSIBLY FREEZING) 8:30 0: S-DRL RU_RD PP NIPPLE UP CHOKE MANIFOLD 0:30 7: S-DRL RIGSER PN MP ATTEMPTED TO REBUILD 4" STANDPIPE VALVE BUT HAD TO GET WELDER OUT TO REPLACE IT COMPLETELY 7:30 7: S-DRL M_SPUD PP SPUD UNIVERSITY HU 7:30 0: S-DRL DRLG PP DRILL 7 /2" SURFACE FROM 2' TO 335', 223' AT 34' HR WITH 60 GPM, 850 PSI, 00 RPM, 9.0 TQ, 25 WOB LAST SURVEY 227' 0.9 INC 55.9 AZM = Total Hours Today 06:00 UP :00-05:00 DRILL 7 /2" SURFACE FROM 335' TO 559', 223' AT 34' HR WITH 60 GPM, 850 PSI, 00 RPM, 9.0 TQ, 25 WOB LAST SURVEY 506' 2.2 INC 69.8 AZM 05:00-05:30 CIRCULATE TO SWEEPS OUT OF HOLE AND CLEAN HOLE 05:30-06:00 TRIP OUT OF HOLE FROM 559' TO 365' BIT DATA BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Hughes H0605S JETS OR TFA 9x6 DEPTH IN / IN / I-O-D-L-B-G-O-R Printed: /6/204 5:9:35AM
12 Page 2 of BIT OPERATIONS WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /25.0 / MOTOR OUTPUT RPV: ROTARY CURRENT: 00 TOTAL RPM: 00 Company: VIS (s/qt ) Horizon PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Fresh Water Density (ppg ) 8.40 ECD (ppg ) 8.40 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (kip) 75.0 (kip) 75.0 (kip) 75.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub 4.5" XO PIN X 4.5" IF BOX /2 IF Drill Collar 6 /2" DRILL COLLAR /2 XH Crossover Sub REG. PIN X 4.5 XO BOX /2 XH Drill Collar 8" DRILL COLLAR Non-Mag Drill Collar 8" MONEL Non-Mag Drill Collar 8" MONEL UBHO Sub UBHO Integral Blade Stabilizer 7.5 STAB Shock Sub 8" SHOCK SUB Bit Sub REG. BOX X REG. BOX PDC Bit 7.5 PDC BIT /8" Reg Company: APACHE SURVEY # # 2 TYPE MD DEG ( ) AZI ( ) TVD NORMAL NORMAL STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD PATTERSON-UTI DRILLING DDC SDS ENVIORMENTAL DRILLING SOLUTIONS PATTERSON-UTI DRILLING N/-S MATERIALS/CONSUMPTION +E/-W SPR SPM V.SECT D.L ( /00ft) PPSR TOTAL PERSONNEL ON BOARD: 24 TOTAL HOURS ON BOARD: 336 DIESEL, RIG FUEL gal 936 5,60 DIESEL, MUD gal Printed: /6/204 5:9:35AM
13 Page 3 of SAFETY DRILLS RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. DAY HAND WALK AROUND; Talked to rig crews about freezing issues. NIGHT HAND WALK AROUND;Noticed flowline union leaking and ask hands to tighten it up. Printed: /6/204 5:9:35AM
14 Page of RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS.52 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 5.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 82,28 539,434 TOTAL: 2,569,800 TOTAL: 82,28 TOTAL: 539,434 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE /6/204 LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD INC 2.20 AZM ft ,530.0 ft CURRENT OPERATIONS: NIPPLING UP BOP'S 24 HR SUMMARY: DRILL SURFACE FROM 335' TO 559', CIRCULATE, TOOH, RIG UP CREW, TIH 3 3/8", RIG DOWN, RIG UP CEMENTERS, CEMENT 3 3/8", RIG DOWN, WAIT ON CEMENT, CUT CONDUCTOR AND AND LAY DOWN, MAKE FINAL CUT, INSTALL WELD HEAD AND TEST 24 HR FORECAST: CONTINUE TO NIPPLE UP BOP'S, TEST BOP'S, LAY OUT AND STRAP 2 /4" INTERMEDIATE ASSEMBLY, PICK UP AND TIH, DRILL 2 /4" INTERMEDIATE HOLE OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 5: S-DRL DRLG PP DRILL 7 /2" SURFACE FROM 335' TO 559', 223' AT 34' HR WITH 60 GPM, 850 PSI, 00 RPM, 9.0 TQ, 25 WOB LAST SURVEY 506' 2.2 INC 69.8 AZM 5:00 5: S-DRL M_TDSrf PP MILESTONE; T.D. SURFACE 5:00 5: S-DRL CIRCT PP CIRCULATE TWO 40 BBL, SWEEPS OUT 5:30 9: S-DRL TRIP PP PULL OUT OF HOLE / PULL MWD, LAY DOWN IBS, SHOCK TOOL AND BIT 9:30 :00.50 S-DRL SFTY PP REMOVE BAILS AND ELEVATORS FROM TOP DRIVE, CLEAN FLOOR / HELD SAFETY MEETING WITH BUTCH'S CREW / RIG UP TOOLS :00 3: S-CSG R_PCSG PP MAKE UP AND TEST FLOAT EQUIPMENT - TX PATTERN SHOE=.55, /8 #48 H40 STC CSG JT,= FLOAT COLLAR=.5, /8 #48 H40 STC CSG JT,= #48 H40 STC CSG CUT JT,=5.4 TOTAL PIPE RAN= SET AT 559 WITH 3.8 STICK UP. CONTACTED TRC WITH SPUD AND TIME AND WITH SURFACE CEMENT 08:30 ON -6-4 AND TALKED TO MONICA 3:00 4:00.00 S-CSG CIRC PP CIRCULATE WHILE RIGGING DOWN TOOLS AND GETTING CEMENT HEAD ON FLOOR. 4:00 4: S-CMT SFTY PP SAFETY MEETING W/ CREST 4:30 6:00.50 S-CMT CMTPRI PP RU CREST CMT HD.TEST LINES TO 2000 PSI PUMP 20 BBL FW SPACER. PUMP TAIL CEMENT W/ 400 SKS (95 BBLS) CLASS C PREMIUM AT 4.8 WT,.33 YD, DISPLACE W/ 40 BBLS FW AT 6 BPM FCP AT 3 BPM WAS 220 PSI BUMP PLUG AT 5:44 HS /6/4 W/ 630 PSI. GOOD CIRCULATION AND FLOATS HELD, GOT 0 BBLS, 42 SX CEMENT TO RESERVE PIT 6:00 7:30.50 S-CMT WOC PP WINTERIZE RIG / RIG DOWN WALK AROUND, FLOWLINE AND TURNBUCKLES FROM CONDUCTOR / READY STACK FOR NIPPLE UP WHILE WAITING ON CEMENT Printed: /7/204 0:7:08AM
15 Page 2 of OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 7:30 2: S-NUP WLHEAD PP CUT AND LAY DOWN CONDUCTOR AND, DRESS, WELD ON STARTER HEAD AND TEST WITH NO PROBLEMS 2:30 22:30.00 S-NUP BOPS PP WAIT ON WELL HEAD TO COOL, CLEAN STUDS AND NUTS ON DSA AND SPACER SPOOL, HOOK UP BOP WINCHES 22:30 0:00.50 S-NUP BOPS PP NIPPLE UP DSA, SPACER SPOOL, BOP STACK = Total Hours Today 06:00 UP :00-06:00 CONTINUE TO NIPPLE UP 3 5/8" BOP'S, BELL NIPPLE, FLOW LINE, HCR, KILL LINE, TURN BUCKLES AND FILL UP HOSE, FUCTION TEST BOP'S BIT DATA BIT SIZE (in) MANUFACTURER TYPE SERIAL NO JETS OR TFA DEPTH IN / IN I-O-D-L-B-G-O-R Hughes H0605S x / NO-A-X--NO-TD BIT OPERATIONS WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /35.0 / MOTOR OUTPUT RPV: ROTARY CURRENT: 0 TOTAL RPM: 0 Company: VIS (s/qt ) Horizon PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Brine / Density (ppg ) 9.50 ECD (ppg ) 9.20 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (kip) 80.0 (kip) 80.0 (kip) 80.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub 4.5" XO PIN X 4.5" IF BOX /2 IF Drill Collar 6 /2" DRILL COLLAR /2 XH Crossover Sub REG. PIN X 4.5 XO BOX /2 XH Drill Collar 8" DRILL COLLAR Non-Mag Drill Collar 8" MONEL Non-Mag Drill Collar 8" MONEL UBHO Sub UBHO Integral Blade Stabilizer 7.5 STAB Shock Sub 8" SHOCK SUB Bit Sub REG. BOX X REG. BOX PDC Bit 7.5 PDC BIT /8" Reg Printed: /7/204 0:7:08AM
16 Page 3 of Company: TYPE APACHE MD DEG ( ) AZI ( ) SURVEY TVD +N/-S +E/-W V.SECT NORMAL NORMAL NORMAL D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD PATTERSON-UTI DRILLING DDC SDS BUTCH'S DIVISON ENVIORMENTAL DRILLING SOLUTIONS CREST PUMPING PATTERSON-UTI DRILLING DIESEL, RIG FUEL gal 20 5,040 MATERIALS/CONSUMPTION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 3 TOTAL HOURS ON BOARD: 398 DIESEL, MUD gal RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. DAY HAND WALK AROUND;Noticed that rig floor had several trip hazards laying around before rigging up casing tools, ask hands to clean it. Night walk around: Cold weather and several trip hazards entering the cellar area Printed: /7/204 0:7:08AM
17 Page of ,078.0, RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 2.52 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 6.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 59,70 696,709 TOTAL: 2,569,800 TOTAL: 59,70 TOTAL: 696,709 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE /7/204 LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD,023.0 INC.40 AZM ft ,62.0 ft CURRENT OPERATIONS: DRILLING 2 /4" INTERMEDIATE HOLE AT 866' 24 HR SUMMARY: NIPPLE UP BOP'S, RIG DOWN BAILS AND ELEVATORS, DEICE RIG, TEST BOP'S, PICK UP 2 /4" INTERMEDIATE ASSEMBLY, TIH, TEST 3 /8", DRILL OUT FLOAT EQUIPMENT, DRILL 2 /4" INTERMEDIATE HOLE FROM 559' TO 078' 24 HR FORECAST: DRILL 2 /4" INTERMEDIATE HOLE OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: S-NUP BOPS PP CONTINUE TO NIPPLE UP 3 5/8" BOP'S, BELL NIPPLE, FLOW LINE, HCR, KILL LINE, TURN BUCKLES AND FILL UP HOSE, FUCTION TEST BOP'S 6:00 8: S-NUP BOPS PP RIG DOWN BAILS AND ELEVATORS AND INSTALL RIGS,/ FUNCTION TEST KOOMIE. 8:00 9:30.50 S-NUP RIGSER PN CMB DE-ICE KILL LINE / PUMP 0 PPG BRINE THOUGH CHOKE MANIFOLD, GAS BUSTER AND LINES TO PREVENT FREEZING. 9:30 2: S-NUP BOPS PP SAFETY MEETING / RIG UP B.O.P. TESTER, TEST BLEND RAMS 250 LOW AND 5000 PSI HIGH 2, TEST PIPE RAMS 250 LOW AND 5000 PSI HIGH 3, TEST CHOKE MANIFOLD 250 LOW AND 5000 PSI HIGH 4, TEST ANNULAR 250 LOW 500 PSI HIGH 5, GOOD TEST 2:30 3: S-NUP RU_RD PP RIG DOWN TESTER 3:00 5: S-DRL TRIPDIR PP PICK UP AND SCRIBE TOOLS / PICK UP TWO 2 /8" IBS. 5:00 6:30.50 S-DRL TRIPDIR PP TRIP IN HOLE T/ 505' 6:30 7: S-CSG TEST PP TEST SURFACE T/ 500 PSI FOR 30 MINUTES WITH NO PROBLEMS, RECORDED ON PASON 7:00 8:30.50 S-DRL DOCMT PP DRILL OUT FLOAT COLLAR AND SHOE TRACK 8:30 8: INT-DRL M_SINT PP START DRILLING 2 /4" INTERMEDIATE HOLE 8:30 0: INT-DRL DRLG PP DRILL 2 /4" INTERMEDIATE FROM 559' TO 078', 59' AVG 94' FPH, WOB 25, RPM 50, 5 TQ, 32 STKS, 547 GPM, DIFF 350/550, OBP 660 LAST 023'.4 INC, 90.7 AZI = Total Hours Today 06:00 UP :00-06:00 DRILL 2 /4" INTERMEDIATE FROM 078' TO 866', 788' AVG 3' FPH, WOB 25, RPM 70, 5 TQ, 40 STKS, 580 GPM, DIFF 350/550, OBP 750 LAST 680'.3 INC, 89.5 AZM Printed: /8/204 5:8:33AM
18 Page 2 of ,078.0, BIT DATA BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Reed SKHI76M A JETS OR TFA 7x3 DEPTH IN / IN / I-O-D-L-B-G-O-R BIT OPERATIONS WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /30.0 / MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 65 TOTAL RPM: 53 Company: VIS (s/qt ) Horizon PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Brine Density (ppg ) 9.50 PP DAILY COST 0 CUM COST 0 %OIL % H2O 9.50 BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (kip) 25.0 (kip) 25.0 (kip) 25.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub 4.5" XO PIN X 4.5" IF BOX /2 IF Drill Collar 6 /2" DRILL COLLAR /2 XH Crossover Sub REG. PIN X 4.5 XO BOX /2 XH Drill Collar 8" DRILL COLLAR Non-Mag Drill Collar 8" MONEL Non-Mag Drill Collar 8" MONEL Integral Blade Stabilizer 2 /8" IBS UBHO Sub UBHO Integral Blade Stabilizer 2 /8" IBS Bent Housing 9 5/8" X 8" BICO 7/8 LOBE, 4STG,.83*, 0.66 RPG PDC Bit 2.25 PDC BIT /8" Reg Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL, , NORMAL NORMAL NORMAL NORMAL N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H Printed: /8/204 5:8:33AM
19 Page 3 of ,078.0, # # 2 STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA SPR SPM COMPANY QTY HRS COMPANY QTY HRS PATTERSON-UTI DRILLING HORIZON MUD DDC SDS ENVIORMENTAL DRILLING SOLUTIONS PATTERSON-UTI DRILLING DIESEL, RIG FUEL gal 266 2,424 MATERIALS/CONSUMPTION SAFETY DRILLS PPSR TOTAL PERSONNEL ON BOARD: 24 TOTAL HOURS ON BOARD: 336 DIESEL, MUD gal RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. DAY HAND WALK AROUND; Noticed that we had trapped pressure between pump and b.o.p found a 2" valve had an ice block in it, had crew thaw it out. Night walk around: Trash laying around location. Asked crews to please pick up and make a better looking work place Printed: /8/204 5:8:33AM
20 Page of , ,8.0 2, RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 3.52 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 7.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 65, ,057 TOTAL: 2,569,800 TOTAL: 65,348 TOTAL: 762,057 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 2,79.0 INC.00 AZM ft ,62.0 ft CURRENT OPERATIONS: DRILLING 2 /4" INTERMEDIATE HOLE AT 387' 24 HR SUMMARY: DRILL 2 /4" HOLE FROM 078' TO 240', RIG SERVICE, DRILL 2 /4" HOLE FROM 240' TO 28' 24 HR FORECAST: CONTINUE TO DRILL 2 /4" HOLE, DISPLACE TO GEL MUD, CONTINUE TO DRILL 2 /4" HOLE OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: INT-DRL DRLG PP DRILL 2 /4" 078'-866', 788' AVG 3 FPH, WOB 25, RPM 70, 5 TQ, 40 STKS, 580 GPM, DIFF 350/550, OBP 750 LAST 680'.3 INC, 89.5 AZM 6:00 6: INT-DRL DRLG PP DRILL 2 /4" 866'-240', 535' AVG 53.5 FPH, WOB 25, RPM 45, 5 TQ, 40 STKS, 580 GPM, DIFF 350/550, OBP 750 LAST 234'. INC, AZM 6:00 6: INT-DRL RIGSER PP RIG SERVICE, TOP DRIVE AND BLOCKS 6:30 0: INT-DRL DRLG PP DRILL 2 /4" 240'-28', 40' AVG 55 FPH, WOB 25, RPM 45, 5 TQ, 30 STKS, 540 GPM, DIFF 350/550, OBP 750 LAST 2779'.0 INC, AZM = Total Hours Today 06:00 UP :00-06:00 DRILL 2 /4" 28'-387', 376' AVG 62 FPH, WOB 35, RPM 45, 7 TQ, 30 STKS, 540 GPM, DIFF 350/550, OBP 850 LAST 3095', INC, 340 AZM 2.5' NORTH AND 22' EAST BIT DATA BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Reed SKHI76M A JETS OR TFA 7x3 DEPTH IN / IN / I-O-D-L-B-G-O-R BIT OPERATIONS WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /30.0 / , , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 45 TOTAL RPM: 35 Printed: /9/204 5:24:9AM
21 Page 2 of , ,8.0 2, Company: VIS (s/qt ) Horizon PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Brine Cl Ca H2S / / / , Density (ppg ) 0.20 ECD (ppg ) 0.4 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH KCL LGS (kip) 50.0 (kip) 45.0 (kip) 45.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub 4.5" XO PIN X 4.5" IF BOX /2 IF Drill Collar 6 /2" DRILL COLLAR /2 XH Crossover Sub REG. PIN X 4.5 XO BOX /2 XH Drill Collar 8" DRILL COLLAR Non-Mag Drill Collar 8" MONEL Non-Mag Drill Collar 8" MONEL Integral Blade Stabilizer 2 /8" IBS UBHO Sub UBHO Integral Blade Stabilizer 2 /8" IBS Bent Housing 9 5/8" X 8" BICO 7/8 LOBE, 4STG,.83*, 0.66 RPG PDC Bit 2.25 PDC BIT /8" Reg Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL 2, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , NORMAL, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H Printed: /9/204 5:24:9AM
22 Page 3 of , ,8.0 2, # # 2 STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) PERSONNEL DATA SPR SPM COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD DDC SDS ENVIORMENTAL DRILLING SOLUTIONS PATTERSON-UTI DRILLING DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION SAFETY DRILLS PPSR TOTAL PERSONNEL ON BOARD: 8 TOTAL HOURS ON BOARD: 276 DIESEL, MUD gal RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. DAY HAND WALK AROUND'Noticed that cellar on next well was not covered, ask crew to get cellar covers on it. Printed: /9/204 5:24:9AM
23 Page of ,0.0 3,92.0 3, RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 4.52 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 8.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 48, ,26 TOTAL: 2,569,800 TOTAL: 48,203 TOTAL: 805,26 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE /9/204 LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 3,472.0 INC 0.80 AZM ft ,62.0 ft CURRENT OPERATIONS: DRILLING 2 /4" INTERMEDIATE HOLE AT 400' 24 HR SUMMARY: DRILL 2 /4" 28'-3428', DISPLACE WELL TO FRESH WATER MUD, DRILL 2 /4" 3428'-3532', LAY DOWN 2 JOINTS DRILLPIPE DAMAGED, RIG SERVICE, CHANGE OUT SWIVEL PACKING, DRILL 2 /4" 3532'-392' 24 HR FORECAST: CONTINUE TO DRILL 2 /4" HOLE OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: INT-DRL DRLG PP DRILL 2 /4" 28'-387', 376' AVG 62 FPH, WOB 35, RPM 45, 7 TQ, 30 STKS, 540 GPM, DIFF 350/550, OBP 850 LAST 3095', INC, 340 AZM 2.5' NORTH AND 22' EAST 6:00 : INT-DRL DRLG PP DRILL 2 /4" 387'-3428',24', 43.8 FPH, 35 WOB, 45 RPM'S, 22 TQ, 580 GPM'S, DIFF, OBP 850 LAST 3378', 0.8 INC, AMZ :30 2:30.00 INT-DRL CIRC PP DISPLACE HOLE WITH FW MUD / CLEAN PITS 2:30 3:30.00 INT-DRL DRLG PP DRILL 2 /4" 3428'-3532', 94',94 FPH, 35 WOB, 45 RPM'S,22 TQ, 540 GPM'S,DIFF 450, OBP 500, LAST 3378', 0.8 INC, AMZ 3:30 4: INT-DRL CIRC PN DP HAD TO LAY DOWN TWO JOINTS OF DRILL PIPE BECAUSE THEY CROSS THREADED THEM DUE TO MOUSE HOLE BEING DRILLED AT WRONG ANGLE ( BEEN HAVING ISSUES ON THIS FROM SPUD BECAUSE CONDUCTOR WAS DRILLED OFF CENTER SO MOUSEHOLE HAD TO BE DRILLED FURTHER AWAY THAN NORMAL) 4:00 4: INT-DRL RIGSER PP SERVICE RIG AND TOP DRIVE 4:30 6: INT-DRL RIGSER PN SWV CHANGE OUT SWIVEL PACKING ON TOP DRIVE 6:30 0: INT-DRL DRLG PP DRILL 2 /4" 3532'-392', 389', 52 FPH, 35 WOB, 45 RPM'S, 7 TQ, 540 GPM'S, DIFF 250, OBP 500 LAST 3849', 0.8 INC, AMZ = Total Hours Today 06:00 UP :00-06:00 DRILL 2 /4" 392'-400', 79', 29.8 FPH, 35 WOB, 45 RPM'S, 7 TQ, 540 GPM'S, DIFF 250, OBP 500 LAST 4036',. INC, AMZ BIT DATA BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Reed SKHI76M A JETS OR TFA 7x3 DEPTH IN / IN / I-O-D-L-B-G-O-R Printed: /20/204 9:28:29AM
24 Page 2 of ,0.0 3,92.0 3, BIT OPERATIONS WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /30.0 / , , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 50 TOTAL RPM: 40 Company: VIS (s/qt ) Horizon PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel /35 20/ Density (ppg ) 8.70 ECD (ppg ) 8.96 PP DAILY COST 0 CUM COST 0 %OIL % H2O 97.0 BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 2 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (kip) 20.0 (kip) 50.0 (kip) 80.0 (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub 4.5" XO PIN X 4.5" IF BOX /2 IF Drill Collar 6 /2" DRILL COLLAR /2 XH Crossover Sub REG. PIN X 4.5 XO BOX /2 XH Drill Collar 8" DRILL COLLAR Non-Mag Drill Collar 8" MONEL Non-Mag Drill Collar 8" MONEL Integral Blade Stabilizer 2 /8" IBS UBHO Sub UBHO Integral Blade Stabilizer 2 /8" IBS Bent Housing 9 5/8" X 8" BICO 7/8 LOBE, 4STG,.83*, 0.66 RPG PDC Bit 2.25 PDC BIT /8" Reg Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 3, , NORMAL 2, , NORMAL 2, , N/-S +E/-W V.SECT D.L ( /00ft) Printed: /20/204 9:28:29AM
25 Page 3 of ,0.0 3,92.0 3, S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD ENVIORMENTAL DRILLING SOLUTIONS SDS DDC PATTERSON-UTI DRILLING DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 8 TOTAL HOURS ON BOARD: 276 DIESEL, MUD gal RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours DAY HAND WALK AROUND; Noticed that 3rd, party hand was not clean shaven, I informed him of Apache's policy and he complied,also noticed that hand was on floor with derrick belt on while rotary was turning, I ask him to get off floor. Night walk around: lots of water on ground from pressure washing and running water tank, its muddy and causing slips hazards, ask crew to pay more attention while filling up water tanks Printed: /20/204 9:28:29AM
26 Page of , , RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 7.52 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 44, ,778 TOTAL: 2,569,800 TOTAL: 44,548 TOTAL: 970,778 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE /22/204 LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 7,479.0 INC 0.60 AZM ft ,530.0 ft CURRENT OPERATIONS: RUNNING 9 5/8" INTERMEDIATE 06:00 SHOE DEPTH = HR SUMMARY: DRILLED 2 /4" HOLE 727' ' / CIRCULATE / STRAP OUT OF HOLE / RIG UP TOOLS / RUN T/ 92' TOTAL ROTATING HRS. IN SURFACE = HR FORECAST: FINISH RUNNING 9 5/8" / CIRCULATE / CEMENT OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 7: INT-DRL DRLG PP DRILL 2 /4" 727'- 7539',42, 59 FPH, 35 WOB, 65 RPM'S, 8 TQ, 530 GPM'S,500 DIFF, OBP 700 LAST 7479',0.6 INC, 86.3 AMZ, 40' NORTH AND 3.5 WEST 08.5 TOTAL ROTATING HRS IN SURFACE 7:00 0: INT-DRL CIRCT PP CIRCULATE TWO BOTTOMS UP 24,000 STROKES / SPOTTED 9 PPG LCM PILL AT 6000' 0:00 0: INT-DRL CIRC PP PREFORM FLOW CHECK "WELL STATIC" / PUMP SLUG 0:30 20: INT-DRL TRIP PP STRAP OUT OF HOLE TO RUN 9 5/8", LAY DOWN ALL X-0'S,MOTOR,STABS AND UBHO 20:00 20: INT-DRL RU_RD PP REMOVE ELEVATORS FROM TOP DRIVE / CLEAN FLOOR 20:30 2: INT-CSG SFTY PP SAFETY MEETING WITH CREW 2:00 2: INT-CSG RU_RD PP RIG UP TOOLS 2:30 0: INT-CSG R_PCSG PP MAKE UP AND TEST FLOAT EQUIPMENT AND RUN 9 5/8" T/92' = Total Hours Today 06:00 UP :00-06:00 CONTINUE TO TIH 9 5/8" 92' -585' ( TOP FILLED T/3200' THEN DISPLACED 280 BBL, MUD INTO RESERVE PIT TO GET RID OF CONTAMINATED MUD) BIT DATA BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Reed SKHI76M A JETS OR TFA 7x3 DEPTH IN / IN / I-O-D-L-B-G-O-R 2-2-CT-G-X-I-CT-TD Printed: /23/204 6:04:3AM
27 Page 2 of , , BIT OPERATIONS WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /35.0 / , MOTOR OUTPUT RPV: 0.7rev/gal ROTARY CURRENT: 65 TOTAL RPM: 55 Company: VIS (s/qt ) Horizon PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / MUD PROPERTIES OIL/WAT LCM: % SAND/MBT /(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: Freshwater Gel / 8/4 3.0/ / /0.20 9, Density (ppg ) 9.00 ECD (ppg ) 9.08 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 2 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (kip) (kip) (kip) (kip) (ft-lbf) COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Crossover Sub 4.5" XO PIN X 4.5" IF BOX /2 IF Drill Collar 6 /2" DRILL COLLAR /2 XH Crossover Sub REG. PIN X 4.5 XO BOX /2 XH Drill Collar 8" DRILL COLLAR Non-Mag Drill Collar 8" MONEL Non-Mag Drill Collar 8" MONEL Integral Blade Stabilizer 2 /8" IBS UBHO Sub UBHO Integral Blade Stabilizer 2 /8" IBS Bent Housing 9 5/8" X 8" BICO 7/8 LOBE, 4STG,.83*, 0.66 RPG PDC Bit 2.25 PDC BIT /8" Reg Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 7, , NORMAL 7, , NORMAL 7, , NORMAL 7, , NORMAL 7, , N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: (hp/in²) SPR SPM PPSR Printed: /23/204 6:04:3AM
28 Page 3 of , , PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS WEATHERFORD 7.00 HORIZON MUD SDS DDC ENVIORMENTAL DRILLING SOLUTIONS BUTCH'S DIVISON PATTERSON-UTI DRILLING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 24 TOTAL HOURS ON BOARD: 33 DIESEL, RIG FUEL gal 090 0,244 SAFETY DRILLS DIESEL, MUD gal RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. DAY HAND WALK AROUND; Noticed that crew had left mud/bar sacks on ground around hopper, ask them to clean area and put sacks in trash trailer. Printed: /23/204 6:04:3AM
29 Page of , , RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5, PLANNED DOW 2.40 (days) DFS 8.52 (days) WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB : :30 JAMES LANHAM / LOREN ALFORD TIM ORSAK DOL 2.58 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: D&C A HZ MIDDLE WOLFCAMP WELL DEFAULT DATUM / ELEVATION RKB/RT / 22.0 AFE COSTS DAILY COSTS CUMULATIVE COSTS 2,569,800 45,29,385,998 TOTAL: 2,569,800 TOTAL: 45,29 TOTAL:,385,998 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION BHA HRS OF SERVICE /23/204 LAST SURVEY LAST CSG SHOE TEST (EMW) LAST NEXT MD 7,479.0 INC 0.60 AZM ft ,530.0 ft CURRENT OPERATIONS: MAKING UP 8 /2" DRILL OUT ASSEMBLY TO DRILL D.V. TOOL 24 HR SUMMARY: FINISH RUNNING 9 5/8" / CIRCULATE WITH ON BOTTOM / CEMENT ST STAGE / CIRCULATE / CEMENT 2ND STAGE, RIG DOWN CREST AND WASH THROUGH BOP'S, NIPPLE DOWN BOP'S 24 HR FORECAST: CONTINUE TO NIPPLE DOWN BOP'S, LIFT BOP'S AND SET SLIPS, CUT AND LAY DOWN, NIPPLE UP BOP'S, TIH DRILL OUT ASSEMBLY AND DRILL OUT DVT, TOOH, NIPPLE DOWN AND WALK RIG OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 9: INT-CSG R_PCSG PP MAKE UP AND TEST FLOAT EQUIPMENT - FLOAT SHOE=.3, /8 # 40 J-55 LTC CSG, JT = FLOAT COLLAR = /8 # 40 J-55 STC CSG JTS = D.V. TOOL = /8 # 40 J-55 STC CSG JTS = TOTAL PIPE RAN = WITH 5 STICK UP RAN 50 CENTRALIZERS, 25 ABOVE D.V. TOOL AND 35 BELOW/ NOTIFIED T.R.C. WITH INTERMEDIATE CEMENT 05:00 ON AND TALKED TO KAY 9:30 : INT-CSG CIRC PP CIRCULATE.5 CAP, WHILE RIGGING DOWN TOOLS :30 2: INT-CMT SFTY PP SAFETY MEETING WITH CREST 2:00 22: INT-CMT CMTPRI PP ST, STAGE RU CREST CMT HD.TEST LINES TO 3000 PSI PUMP 20 BBL FW SPACER PUMP FIRST STAGE LEAD W/ 605 SKS ( BBLS) 50/50 CLASS H AT.9 WT, 2.40 YD, TAIL W/ 80 SKS (5.2 BBLS) CLASS H PLUS AT 3.2 WT,.63 YD DISPLACE W/ BBLS FRESH WATER MUD AT 7 BPM.(LOST RETURNS 530 BBL INTO DISPLACEMENT SLOWED TO BBL MINUTE FOR 0 BBL, THEN WENT BACK TO 4 BBL, BUT NEVER REGAINED FLOW) FCP AT 3 BPM WAS 670 PSI DID NOT BUMP PLUG PUMPED 3 BBL, OVER AND STOPPED FLOATS HELD. OPEN DVT W/ 720 PSI, CIRCULATE 20 BBL WITH CREST TRUCK THEN TURNED OVER TO RIG CIRCULATE DID NOT GET AND ANY CEMENT OFF D.V. TOOL CONTINUED CIRCULATING FOR TOTAL OF 5 HRS BETWEEN STAGES, 2ND, STAGE PUMP 20 BBL FW SPACER, CMT SECOND STAGE LEAD W/ 850 SKS ( 365 BBLS) 50/50 POZ C AT.9 WT, 2.4 YD TAIL W/ 20 SX, (50 BBLS,) CLASS C AT 4.8 WT,.33 YD DISPLACE W/ 330 BBLS FW. AT 5 BPM. FCP WAS 350 PSI AT 4 BPM BUMP PLUG W/ 250 PSI, PLUG DN AT 22:00 HR GOOD CIRCULATION UNTIL SHUT DOWN TO DROP PLUG, NO CIRCULATION TO END OF JOB, FLOATS HELD Printed: /24/204 7:37:09AM
30 Page 2 of , , OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY :30 23: INT-CMT RURDCU PP RIG DOWN CREST, WASH THROUGH BOP'S, FLOW LINE AND OVER BOARD LINE 23:00 0:00.00 INT-NUP BOPS PP NIPPLE DOWN BOP'S, PREPARE TO LIFT BOP'S AND SET SLIPS = Total Hours Today 06:00 UP :00-0:30 CONTINUE TO NIPPLE DOWN BOP'S, PREPARE TO LIFT BOP'S TO SET SLIPS 0:30-02:30 SET SLIPS 330,000, CUT AT 0", LAY DOWN CUT JOINT 02:30-05:00 NIPPLE UP BOP'S 05:00-06:00 MAKE UP 8 /2" ASSEMBLY TO DRILL D.V. TOOL S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H INTERMEDIATE J-55 7,539.0 PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD WEATHERFORD 6.00 SDS DDC ENVIORMENTAL DRILLING SOLUTIONS BUTCH'S DIVISON CREST PUMPING PATTERSON-UTI DRILLING MATERIALS/CONSUMPTION TOTAL PERSONNEL ON BOARD: 30 TOTAL HOURS ON BOARD: 42 DIESEL, RIG FUEL gal SAFETY DRILLS DIESEL, MUD gal RAMS ANNULARS FUNCTION PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. DAY HAND WALK AROUND; Noticed during safety meeting that several crest hands and one Patterson hand needed to shave,i ask them to shave and as soon as meeting was over they complied. Night walk around: Everyone working safe and cement job done Printed: /24/204 7:37:09AM
Daily Drilling Report
Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES
More informationAPACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00
More informationPage of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB
More informationDaily Drilling Report
Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG
More informationDaily Drilling Report
Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28
MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move
More informationPartner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig
: 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28
MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int
More informationAPACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report
More informationDaily Drilling Summary Report
Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well
More information19,683 8,
General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg
More informationDAILY DRILLING REPORT DATE : 08/01/2012
DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:
More informationGulftex Energy III LP DAILY COMPLETION REPORT
07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM
More information02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00
DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University
More informationEndeavor Energy Resources, LP. DAILY DRILLING REPORT
Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment
More informationDATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS
DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud
More informationCallon Petroleum Company Drilling Report
LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP
More information8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250
DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz
More informationDAILY DRILLING REPORT
UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED
More informationGeneral Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN
UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate
More informationDrilling & Completion Summary
API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing
More informationDaily Activity Report
605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT
More informationWell Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:
Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.
More informationOPERATIONS SUMMARY REPORT
Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:
More information5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.
MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b
More informationEP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017
Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original
More information3/25/15 University DC 1H Devonian Completion
3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University
More informationReport No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE
Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI
More informationDrilling & Completion Summary - Ascending
UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014
More informationMcKissick 200mt. Stabbing board
MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #
More informationSpud meeting with Periscope Connect electric lines, r/u v-door install shak
Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect
More informationDAILY OPERATIONS REPORT Date:
OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor
More informationMLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations
MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From
More informationEND OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:
UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of
More informationDATE: 01/03/ DAILY COMPLETION REPORT
DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@
More informationEP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017
1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original
More informationRig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading
Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:
More informationCompletion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00
Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217
More informationIdeco - H25 Information Document
Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig
More informationDAILY DRILLING REPORT DATE : 04/20/2011
DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539
More informationElevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:
FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar
More informationExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #
6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main
More informationH. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas
H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)
More informationEP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017
6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion
More informationFOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)
FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH
More informationRIG 32. Rig 32. Page 1 of 13
Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with
More information1042 FNL, 1935 FEL - ECTOR, TX
Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i
More informationRotary Snubbing Technology Option for Long Reach
Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results
More informationVDD 370 Super Single Rig - Automatic Pipehandling System
Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.
More informationAbout Cobra Downhole Motors
February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationAbout Cobra Downhole Motors
October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling
More informationVDD 200 Super Single Rig - Automated Pipehandling System
Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles
More informationView Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013
Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,
More informationCNL, CCL, GR, CBL. RDMO
Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.
More informationLAGO Energy Presents,
LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.
More informationDRILLING BARGE SS AMEQ CASPIAN SEA
DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL
More informationCUSTOMER WELL NAME COUNTY, STATE
DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed
More informationSCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.
SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL
More informationSCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL
SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL
More informationSCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)
SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.
More informationCasing Drilling Technology Implementation In Petrom
Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga
More informationRig 1 Sky top 4 Axle Carrier 6500 Drilling Depth
Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping
More informationMast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)
General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads
More informationSCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth
SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95
More informationPROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..
DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks
More informationCasing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas
Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing
More informationMOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES
MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October
More informationLOC 400 Drilling Rig
TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP
More informationSPECIFICATION OF ZJ40/2250LDB DRILLING RIG
SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION
More informationPATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL
PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL
More informationDrillmec HH-300 spec.
Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable
More informationGENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500
SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.
More informationVDD 400 Offshore Super Single - Automated Pipehandling System
Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating
More informationHYDRAULIC WORKOVER SERVICES
HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well
More informationElevation Resources LLC
FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20
More informationBASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS
BASK1 BASK2 BASK3 BASK6 SLING1 SLING2 TOOL BASKET 4' X 4' GALVANIZED CERT. RATED SWL 6,800 LBS TOOL BASKET 4' X 6' GALVANIZED CERT. RATED SWL 8,950 LBS TOOL BASKET 4' X 8' GALVANIZED CERT. RATED SWL 11,200
More informationROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT
DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves,
More informationRIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D.
LOADCRAFT INDUSTRIES, LTD. WE BUILD RIGS. L O A D C R A F T I N D U S T R I E S, LT D. RIGS drawworks WORKOVER mud systems PARTS/SERVICE (80 0 ) 8 0 3-018 3 3811 N. BRIDGE B R A D Y, T E X A S 7 6 8 2
More informationAthlon Energy Operating LLC
Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB
More informationBASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS
BASK1 BASK2 BASK3 BASK6 SLING1 SLING2 BASKETS/SLINGS CARRYING TOOL BASKET 4' X 4' GALVANIZED CERT. RATED SWL 6,800 LBS TOOL BASKET 4' X 6' GALVANIZED CERT. RATED SWL 8,950 LBS TOOL BASKET 4' X 8' GALVANIZED
More informationSchede tecniche Corsair 300 PDB
Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015
More informationGLOBAL DRILLING SOLUTIONS, INC STOCK LIST
GLOBAL DRILLING SOLUTIONS, INC STOCK LIST Item Description Qty in Stock Lighting Equipment LED Flood Light. IECEX Certificed. Explosion proof / Zone & ; Ex d IIB T Gb; IP. / Rated voltage: 00 00VAC, 0/0Hz.
More informationbbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P
Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels
More informationDaily Drilling Report
Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS
More informationHighlights of Achievements at Loc. TU
Highlights of Achievements at Loc. TU Planned-80 days / Actual-74 days. Different BHAs for drilling in rotary mode designed by in-house expertise. Sliding was limited to
More information