1 SR 3/SR 304 Bremerton Interchange Improvements Feasibility Study MP to MP Dec October 21, 2015 Olympic Region Planning P. O. Box Olympia, WA Phone:

2 Title VI Notice to Public It is the Washington State Department of Transportation's (WSDOT) policy to ensure no person shall, on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with WSDOT's Office of Equal Opportunity (OEO). For Title VI complaint forms and advice, please contact OEO's Title VI Coordinator at r Americans with Disabilities Act (ADA) Information Materials can be made available in an alternate format by ing the WSDOT Diversity/ADA Affairs Team at wsdotada@wsdot.wa.gov or by calling toll free, Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711. Intro ii SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

3 SR 3/SR 304 Bremerton Interchange Improvements Feasibility Study Table of Contents Executive Summary... Page ES-3 Chapter 1: Study Overview... Page 1-1 Study Description... Page 1-5 Existing Roadway Configuration... Page 1-6 Existing Traffic Operations... Page 1-9 Collision History... Page1-10 Travel Demand Management... Page 1-11 Chapter 2: Reasonable Alternatives... Page 2-1 Alternative 1: Southbound SR 3 Hard Shoulder Running... Page 2-3 Alternative 2: Restripe Southbound SR 3 to 2 Lanes... Page 2-4 Alternative 3: Construct Southbound SR 3 to 2 Lanes... Page 2-5 Alternative 4: Southbound SR 3 Add a Third Lane from SR 304 to Gorst... Page 2-6 Alternative 5: Travel Demand Management (TDM)... Page 2-7 Chapter #3: Operational and Collision Analysis... Page 3-1 Summary... Page 3-3 Study Limits... Page 3-5 Existing Year (2013) No Build... Page 3-8 Opening Year (2020) No Build... Page 3-11 Opening Year (2020) Build Alternatives... Page 3-12 Design Year (2040) No Build Operations... Page 3-18 Design Year (2040) Build Operations... Page 3-20 Collision Forecast Methodology... Page 3-23 Matrices... Page 3-27 Screening Results & Conclusion... Page 3-32 Intro iii SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

4 SR 3/SR 304 Bremerton Interchange Improvements Feasibility Study Table of Contents Chapter 4: Access Connections and Design... Page 4-1 Proposed Intersection Modification... Page 4-3 Conceptual Interchange Drawings... Page 4-5 Chapter 5: Land Use and Transportation Plans... Page 5-1 Is the proposed access point revision compatible with all land use and transportation plans for the area?... Page 5-3 Kitsap County land use map graphic... Page HSP Solutions... Page 5-5 Chapter 6: Future Interchanges... Page 6-1 Is the proposed access point revision compatible with a comprehensive network plan?... Page 6-3 Chapter 7: Coordination... Page 7-1 Are all coordinating projects and actions programmed and funded?... Page 7-3 Chapter 8: Environmental Processes... Page 8-1 Environmental Issues... Page 8-3 Appendices Appendix A Methods and Assumptions Document Page A1 30 Appendix B SR 3/SR 304 Additional Traffic Information Page B1 52 Appendix C Collision Data Analysis for SR 3 Freeway Alternatives Safety Analysis Documentation Page C1 25 Appendix D SR 3/SR 304 Bremerton Interchange Improvements Page D1 31

5 Acronyms EB FHWA GP HCM HOV HQ HSP IJR LEAP LOS M/A MOE NB OR PSNS SB SR TDM WSF WB Eastbound Federal Highway Administration General Purpose Highway Capacity Manual High Occupancy Vehicle WSDOT s Headquarters Office Highway System Plan Intersection Justification Report Legislative Evaluation and Accountability Program Level of Service Methods and Assumptions Document Measures of Effectiveness Northbound Olympic Region Puget Sound Naval Shipyard Southbound State Route Transportation Demand Management Washington State Ferries Westbound Intro v SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

6 This page was intentionally left blank. Intro vi SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

7 Executive Summary ES-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

8 This page was intentionally left blank. ES-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

9 Executive Summary The purpose of the feasibility study is to assess the impacts associated with the modification at the SR 3/SR 304 interchange in accordance with FHWA regulations. The modifications proposed as part of the SB SR 3 Restripe to 2 Lanes alternative include: providing two continuous lanes on SB SR 3 from the Loxie Eagans interchange to Gorst; and the reconfiguration of the SR 304 on-ramp to SB SR 3 as a parallel ramp connection that ends approximately 900 feet south of the existing merge. This study identified problems at the SR 3/SR 304 interchange and analyzed solutions that improve the traffic operations and safety for SR 3 and SR 304 and supports the adopted local and regional land use plans, encourages regional economic vitality, and enhances overall mobility of all users in the study area. With the current corridor geometric configurations, the following locations cause congestion during the PM commute period: SB SR 3 at the merge from two lanes to one lane WB SR 304 at the merge from two lanes to one lane With the anticipated growth in traffic volumes in the opening year (2020) and future year (2040), congestion levels are anticipated to increase, and travel time in the corridor would worsen. A short-term preferred solution to the congestion and queuing is a Restripe alternative. However after Year 2020, there also will be a need to consider a longer term solution for both the PM congestion on SB SR 3 at the parallel SR 304 on-ramp merge; and the AM congestion on NB SR 3 from Gorst to Bremerton The ultimate solution for this location is the Add Lane alternative which would add a third lane SB between Gorst and Bremerton for the PM peak congestion. For the AM peak congestion (6:15 to 7:15 AM) an added third lane NB between Gorst and Bremerton should also be considered to alleviate congestion after Year Though this alternative provides better mobility, it does have a number of environmental mitigation and cost benefit issues that need to be addressed. Therefore, the study members selected the Restripe alternative in order to address the immediate situation. The purpose of the SR 3/SR 304 Bremerton Interchange Improvements study is to improve mobility by eliminating the bottleneck along SB SR 3 in the vicinity of the SR 3/SR 304 interchange where two lanes merge into one. The 2012 Supplemental Transportation Budget identified a proviso as part of Legislative Evaluation & Accountability Program (LEAP) to begin environmental documentation and preliminary design to expedite project delivery Five alternatives were identified to improve the traffic flow along SB SR 3 at the SR 3/ SR 304 interchange. 1. Hard Shoulder Running. 2. Restripe to 2 Lanes 3. Construct to 2 Lanes 4. Add 3rd Lane from the SR 304 on-ramp to Gorst 5. Transportation Demand Management (TDM) The TDM alternative was dropped as a standalone alternative. Since transit expressed the difficulty and the prohibitive cost of implementing an additional 5-10% vehicle reduction over the current 30 percent of vehicles carrying two or more people. The main motivation to this high figure is the result of a combination of the rideshare programs being sponsored by Kitsap Transit and Mason Transit Authority and the restrictive parking at the region s defense facilities (Puget Sound Naval Shipyard, Navy Supply Center, Naval Base Kitsap at Bangor and Kitsap Keyport Naval Base). Instead, the preferred alternatives are assumed to include TDM strategies. ES-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

10 Executive Summary continued Both SB SR 3 and WB SR 304 are currently and will continue to be fully directional (except for SB SR 3 to EB SR 304), connected to public roads, and designed to full WSDOT design standards. With the planning level design completed, one deviation was identified. The SB SR 3 inside left shoulder could be reduced from 6 feet to 2 feet for approximately 0.38 mile from MP to MP Instead of reducing the inside left shoulder, the outside right shoulder or even the through lanes may be modified using practical design in the restripe alternative. It also appears that the SR 3/SR 304 interchange was built in a manner largely consistent with the intent of having two SB traffic lanes under the existing bridge. As a result, the implementation of the restripe alternative is expected to primarily be on existing pavement (except in the existing gore where WB SR 304 merges onto SB SR 3. Before the gore is restriped into a new parallel on ramp, it will need additional surfacing depth. However, the original (1989) design did not use a parallel on connection, so some minor widening may be necessary. Improvements in the vicinity of the SR 3/SR 304 interchange are consistent with the current WSDOT s Highway System Plan and are consistent with and would support the land use and the development plans for the area. The following environmental information was based on the 1996 Bremerton Ferry Terminal to Vicinity of Gorst Final EIS. Two fish passages were identified and are in need of replacement. Site ID and Site ID fish passages are located near Wright Creek and within the SR 3/SR 304 interchange respectively. Based on the Environmental Scan of the study area, no significant constraints were identified that would prohibit or affect the implementation of the preferred alternative. Both the National Environmental Policy Act (NEPA) and State Environmental Policy Act (SEPA) documentation will be prepared during the preliminary and design phase of the project. For the NEPA documentation, it is assumed that the Restripe 2 Lanes improvement along southbound SR 3 will be classified as a Documented Categorical Exclusion (DCE). For SEPA documentation, it is anticipated that the Restripe 2 Lanes improvement along southbound SR 3 will receive a Mitigated Determination of Non-Significance. The NEPA Environmental Classification Summary and the SEPA Checklist will be supported by the following discipline reports: Wetlands and Streams Biological Assessment Cultural and Historic Resources Air Quality Noise Hazardous Materials Stormwater Geotechnic Nine wetlands were identified in the study area. One cultural resource site was identified and is located along southbound SR 3 between Sherman Heights Road & Gorst. One endangered species was identified in the study area. There is a Purple martin bird habitat near Wright Creek. ES-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

11 Chapter 1 Study Overview Chapter 1-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

12 This page was intentionally left blank. Chapter 1-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

13 Chapter #1 Study Overview Project Purpose The purpose of this study is to improve mobility by eliminating the bottleneck along SB SR 3 in the vicinity of the SR 3/SR 304 interchange where two lanes merge into one. The 2012 Supplemental Transportation Budget identified a proviso for the SR 3/SR 304 Bremerton Interchange Improvements project as part of Legislative Evaluation & Accountability Program (LEAP) to begin environmental documentation and preliminary design to expedite project delivery. The WSDOT HSP (Appendix J, Page J-75, Key 162 and Page J-77, Key 344) identifies the SR 3/SR 304 interchange as a bottleneck where congested conditions currently occur in the PM peak hours along SB SR 3 in the vicinity of the SR 3/SR 304 interchange where the two lanes merge into one. The SR 3/SR 304 interchange was also identified as a 2013 unfunded system investment by WSDOT. The mobility LOS is also below the adopted service objective in the PM peak period at this location. The resulting congestion increases delay and travel time affecting safety and imposes inconvenience for motorized travelers, and creates challenges for non-motorized travelers using the state highway Stakeholders Project leads, proponents, and other team members The working group committee is comprised of technical level representatives from the following communities and WSDOT: Communities Bremerton Kitsap County Kitsap Transit Naval Base Kitsap Port Orchard WSDOT HQ Design HQ Highway Access HQ Traffic OR Project Development OR Planning OR Traffic The internal technical team consisted of members from WSDOT s HQ and OR Traffic Operations, and OR Planning with VISSIM traffic analysis consultant support from Parametrix. The study team also coordinated with the Suquamish Tribe and the West Sound Cycling Club. As sponsors of the project, the following individual groups set the goals and requirements for the project and its deliverables. WSDOT s Olympic Region Planning office is the study lead. The study s structure consisted of a working group and an internal technical team. Chapter 1-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

14 Chapter #1 Study Overview Study Area and Project Limits The study area includes; SR 3 in Kitsap County and SR 304 in Bremerton. SR 3 southbound between Werner Road/Loxie Eagans interchange to the north, and the W. Sam Christopherson Avenue intersection to the south; the SR 3/SR 16 interchange; and SR 304 between Farragut Avenue and SR 3. A map of the study area is shown in Figure 1: SR 3/SR 304 Bremerton Interchange Improvements Study Area graphic below. MAP LEGEND Numbered Key Locations 1. Werner Road/Loxie Eagans Blvd. & Auto Center Way/Oyster Bay Ave. 2. Loxie Eagans Blvd. & SR 3 SB Ramps 3. Loxie Eagans Blvd. & SR 3 NB Ramps 4. Farragut Ave/ Cambrian Ave. & SR Charleston Beach Road & SR W. Sam Christoperson Ave. & SR 3 Figure 1: SR 3/SR 304 Bremerton Interchange Improvements Study Area Loxie Eagans Blvd. Chapter 1-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

15 Chapter 1: Study Overview Project Description The SR 3/SR 304 interchange is located in Bremerton; and provides an important freeway to freeway connection between two major highways. This interchange moves people and goods via commuter, freight, and other multimodal traffic through the City of Bremerton, Kitsap County, and the communities and regions beyond. SR 3 is a north-south highway approximately sixty miles in length that runs between the City of Shelton in Mason County and SR 104 in the vicinity of the Hood Canal in Kitsap County. SR 3 provides a critically important link in the regional transportation system serving as a primary regional transportation principle arterial, a key freight route and a commuter highway. SR 304 is an east-west highway three miles in length, located within the City of Bremerton, connecting SR 3 with downtown Bremerton and the Washington State Ferries (WSF) Bremerton ferry terminal. SR 304 also provides access to the Puget Sound Naval Shipyard (PSNS). The naval shipyard with its intermediate maintenance facility is the Pacific Northwest s largest naval shore facility, and one of Washington State s largest industrial installations. Besides the WSF terminal, the major traffic generator along this route is the PSNS. While serving as a major regional freight corridor, SR 3 is also a vital link for the urban communities of Silverdale, Chico and Gorst along the corridor as well as the primary commuter route for the three naval bases on the Kitsap Peninsula (PSNS, Bangor and Keyport). The current corridor geometric configurations contribute to the PM peak congestion that is being experienced along these corridors. Both SR 3 SB prior to the interchange and SR 304 WB merge from two lanes to one lane. SR 3 continues as a 2-lane facility, after the SR 3/SR 304 merge. With the anticipated growth in traffic volumes in 2020 and 2040, congestion levels are anticipated to increase, and travel time in the corridor will worsen. Horizontal Stopping Sight Distance The August 2011, Scoping Estimate Package for the SR 3/SR 304 Interchange Improvements project highlights the concern of a sub-standard sight distance. When continuing a second lane on southbound SR 3 at the SR 304 ramp structure will result in a sub-standard sight distance (June 2011 WSDOT Scoping Estimate Package SR 3/SR 304 I/C Interchange Improvements). The horizontal stopping sight distance currently meets the 50 MPH design speed for the -3% (446 feet) and -6% (474 feet) downgrade. The actual sight distance was measured by the Port Orchard Project Engineer s Office. The methodology used was to set a series of traffic cones 20 feet apart and 4 feet outside the edge line, at the downstream end of the section. This location was just beyond the abutment of the overcrossing ramp. The crew went back up the shoulder to the point where the farthest cone disappeared from view. Crews could see by the angle that this would be the minimum sight distance. Crews measured the distance, with a measuring wheel, along a line approximately 4 feet outside of the edge line. The distance was 611 feet. According to Chapter 1260 Sight Distance of the WSDOT s Design Manual dated July 2013, the design speed with stopping sight distance and downgrades are listed below: Design Speed Stopping Distance Downgrade: -3% -6% 50 MPH 446 ft. 474 ft. 60 MPH 598 ft. 638 ft. The current speed limit in this area is 50 MPH with a 611 foot measured sight distance. With the removal of the two lane merge into one conflict, there is a possibility that the speed limit may increase in this area. There is also a possibility that queuing on the SR 3 SB off ramp into the Loxie Eagans stop-controlled intersection may reduce speeds on the downgrade after Year Chapter 1-5 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

16 Chapter #1 Study Overview center median. In the WB direction, the inside lane is a high occupancy vehicle (HOV) lane. The HOV lane designation ends east of the SR 3/SR 304 interchange, and the right lane drops at the on-ramp to SR 3 NB. The two remaining WB lanes merge to one lane prior to the SR 304 WB undercrossing. Baseline Transportation Networks Existing Roadway Configuration SR 3 is a four-lane (two lanes each direction) divided highway in the vicinity of the Loxie Eagans Boulevard interchange. However, within the SR3/SR 304 interchange, the highway reduces down to 3 lanes with the two SB lanes merging into one. In the vicinity of the SR 3/SR 304 interchange, SR 3 in the NB direction features two lanes with a double dedicated off ramp exit to EB SR 304. SR 304 WB provides access via single lane onramps to both NB and SB SR 3. However from SB SR 3 no access to WB SR 304 is provided. Note: The WB SR 304 on-ramp connects to SB SR 3 as an add-lane and SB SR 3 maintains two lanes between SR 304 and SR 16. North of Farragut Avenue, SR 304 is four-lane arterial with a landscaped center median. South of Farragut Avenue to Charleston Boulevard, SR 304 is a six-lane arterial with a landscaped The infrastructure within Kitsap County supports an economy based on public sector Department of Defense jobs, as well as over 10,000 uniform service personnel. The balance of the economic activity in the county includes a thriving gaming industry with a large casino located on tribal properties, a major medical center and a regional retail hub attracting shoppers from Kitsap County as well as the surrounding rural counties; Clallam, Jefferson and Mason. In Kitsap County, job numbers are starting to rebound, but have yet to make up for losses occurring from 2007 to Specifically, there were 84,800 non-farm jobs in the county, in June This figure reflects a net loss of approximately 3,200 jobs since June The chart in Figure 2: 2010 Census Population Projections table below depicts the 2010 Census population projections. This chart also includes consideration of the current recession s effect on migration and fertility behavior, which impacts many counties projections. The preliminary projections (low, middle and high series) are highlighted. The economic and demographic forecast estimates are for total employment, including uniformed military personnel in Kitsap County Figure 2: 2010 Census Population Projections YEAR POPULATION LOW POPULATION MEDIUM POPULATION HIGH , , , , , , , , , , , ,873 Chapter 1-6 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

17 Chapter #1 Study Overview Funded Transportation Improvement Projects Currently, there are no programmed or funded local, regional, or state transportation improvement projects within the study area. However, Naval Base Kitsap is trying to secure construction funding for a truck only entrance to the base, which may significantly reduce morning congestion in the vicinity of the shipyard near the Charleston intersection. Currently, delivery trucks are queuing onto EB SR 304 while waiting for access to the shipyard in the AM peak. The Navy s proposed truck only entrance would provide a space for the delivery trucks to queue inside the shipyard s parking lot instead of the highway. This project includes pavement widening for a new deceleration lane leading directly into the Navy s shipyard, and also proposes an adjacent 4-foot paved shoulder for a section of roadway along SR 304. Traffic Model Analysis Years Existing year traffic volumes for the 5-hour PM peak period (2-7 PM) were developed for all roadways and intersections in the study area using information from turn movement and tube counts collected between 2010 and Volumes were also developed for the 1:30 2:00 PM time period. This 30 minute period is included in the model to allow vehicles time to populate the network. The existing year for this study was assumed to be 2013, and collected traffic volumes were factored to match traffic volumes for Opening Year (2020) and future year (2040) traffic volumes were developed by assuming a 1.5% annual growth rate in traffic volumes between 2013 and the respective analysis year. The annual growth rate was based on a review of the following: Kitsap County s 2010 and 2025 Travel Demand Models Puget Sound Regional Council s 2006 and 2040 Travel Demand Models Bremerton s Economic Development Study (WSDOT, 2012) City of Bremerton s Comprehensive Plan Note: Adjustments to the traffic data counts were considered due to the following impacts: The Bremerton Shipyard expects to increase personnel by 20% over the next year or so. No aircraft carriers were in port, during the traffic data collection. A typical aircraft carrier brings 3,000 sailors and up to 10,000 private contractors to perform maintenance on the carriers. However, after discussions with the Technical Team and the consultant, WSDOT decided that additional traffic wouldn t change the No Build throughput results, since the PM volumes were already at or near capacity. Origin & Destination (O&D) Study Results An O&D study was conducted to determine how much traffic originating from the Naval Base Kitsap s Bangor site passes through the SR 3/SR 304 interchange and where the Naval Base Kitsap s shipyard traffic travels on SR 3. During the traffic data collection, crews installed 4 cameras: 1. At the Naval Base Kitsap s Bangor gate; 2. At the SR 310 interchange; 3. Outside the Bremerton Shipyard at the Farragut Ave entrance; 4. At the SR 3/SR 304 merge to capture origin and destination data as depicted in Figure 3: SR 3/SR 304 Origin & Destination Results graphic on Page 1-8. Of all the SB SR 3 traffic originating north of SR 310 (Kitsap Way), 58-68% traveled through the SR 3/SR 304 merge. At the Bangor Gate, 1,867 vehicles were recorded: 25% of the drivers travel through the SR 310 (Kitsap Way) interchange. 25% exited at Loxie Eagans Blvd % traveled though the SR 3/ SR 304 merge. Chapter 1-7 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

18 Chapter 1 Study Overview Origin & Destination (O&D) Study Results continued Along SR 304, 5,891 vehicles were recorded during this period: 90% of those vehicles were traveling south on Farragut Ave. traveled thru the SR 3/SR 304 merge. Figure 3: SR 3/SR 304 Origin & Destination Results Chapter 1-8 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

19 Chapter #1 Study Overview Existing Traffic Operations Findings from the analysis demonstrate that there are two locations in the study area where vehicle volumes exceed available roadway capacity during the PM commute period as follows: Where SR 3 SB merges from two lanes to one lane south of the Loxie Eagans interchange; this location is congested for approximately 2 hours 45 minutes, and queuing extends through the Loxie Eagans interchange. Where SR 304 WB merges from two lanes to one lane east of the SR 3/SR 304 interchange: This location is congested for approximately 1 hour 45 minutes. Queuing in the GP lane extends back to the Charleston Beach Road intersection. The HOV lane allows transit, vanpools and carpools to bypass the congested GP lane, but HOV vehicles experience congestion once the HOV lane terminates. There is no substantial congestion on SR 3 NB or SR 304 EB in the PM peak. All intersections operate at a LOS D or better with the following two exceptions: 2. SR 3 and W. Sam Christopherson Ave. (MP 34.23) This signalized intersection operates at LOS E during the PM peak hour. Note: In some cases, congestion extends beyond the limits of the model, and vehicles are effectively queuing outside of the model. Intersection Level of Service (LOS) Figure 4: Intersection Level of Service graphic below depicts the LOS for the existing, opening and future years for the No Build option. The Opening Year intersection LOS is anticipated to remain the same as compared to the existing conditions at all six study intersections with the exception of the Loxie Eagans Boulevard and SR 3 SB ramps intersection. The stop-controlled SR 3 SB off ramp worsens from LOS E to F, and is over capacity during the peak hour. The resulting queue is anticipated to extend to the SR 3 mainline auxiliary lane. In the Future Year, the intersection LOS is anticipated to worsen compared to existing conditions and Opening Year conditions at all study intersections, except for the Loxie Eagans Boulevard and SR 3 SB ramps intersection which is already operating at LOS F in the Opening Year. The resulting queue spills back to the SR 3 mainline auxiliary lane. 1. Loxie Eagans Boulevard and SR 3 SB ramps the SB approach to this stopcontrolled intersection operates at LOS E during the PM peak hour. Figure 4: Intersection Level of Service Chapter 1-9 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

20 Chapter #1 Study Overview Collision History Under 23 U.S. Code, 409, safety data, reports, surveys, schedules, lists compiled or collected for the purpose of identifying, evaluating, or planning the safety enhancement of potential crash sites, hazardous roadway conditions, or railway-highway crossings are not subject to discovery or admitted into evidence in a Federal or state court proceeding or considered for other purposes in any action for damages arising from any occurrence at a location mentioned or addressed in such reports, surveys, schedules, lists, or data. This section provides a summary and a planning level analysis of collision data for the SR 3 and SR 304 study area. A 5-year collision analysis was conducted. No locations within the study area were identified as an area of concern. However, an Intersection Analysis Location (IAL) was noted at MP 37.31, the ramp terminal at Werner Road. The pie chart below depicts the five year ( ) crash history results along SR 3 in the study area. The 273 recorded collisions were broken down into the follow collision type categories: 212 Property Damage Only 37 Possible Injury 17 Evident Injury 3 Serious Injury 4 Fatalities SR 3 Fatality Details: Feb. 24, 2012: Vicinity of Sherman Heights Rd., in the NB direction Rear End Collision. Sept. 16, 2011: Vicinity of Auto Center Way, in the SB direction Sideswiped with vehicle stopped. June 23, 2010: Vicinity of Gorst, in both directions Head-on Crash from opposite directions. April 10, 2010: Vicinity of Gorst, in the SB direction Hit concrete jersey barrier (driver inattention). The pie chart above depicts the five year ( ) crash history results along SR 304 in the study area. The 125 recorded collisions were broken down into the follow collision type categories: 95 Property Damage Only 24 Possible Injury 4 Evident Injury 2 Serious Injury 0 Fatalities Note: A detailed review of the collision data is provided under Chapter 3 Chapter 1-10 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

21 Chapter #1 Study Overview Travel Demand Management For two decades, commute trip reduction has proven an effective tool for easing congestion and operating our transportation system efficiently. Kitsap Transit was ahead of their time when they created the Worker/Driver bus program. This unique program was developed during WWII out of a need to transport thousands of Puget Sound Naval Shipyard employees to and from work. The Worker/Driver bus program currently operates thirty buses; twenty-eight buses travel to PSNS and Naval Station Bremerton and two routes travel to Sub Base Bangor. Mason Transit also operates four buses traveling to PSNS. The worker/driver buses are driven by full time employees of the military facilities who are also part time employees of Kitsap Transit or Mason Transit. Buses operate much like a large carpool. The driver boards their bus near their home in the morning and travels to work, picking up coworkers along the way. After work, they hop back in their bus and reverse the process. Thanks in part to the Worker/Driver bus program SR 3 and SR 304 currently experiences up to 30 percent of vehicles carrying two or more people. This results in a 51 percent of total person-trips during peak traffic periods. The main incentive for this high figure is the result of a combination of the rideshare programs being sponsored by Kitsap and Mason Transits and the restrictive parking at the region s defense facilities (Puget Sound Naval Shipyard, Navy Supply Center, Naval Base Kitsap at Bangor and the Kitsap Keyport Naval Base). The focus of the traffic analysis was not on the specific strategies used, but on the effect of removing trips from the transportation network. The opening year analysis assumed a 5% reduction in traffic volumes, and the future year analysis assumed a 10 percent reduction in traffic volumes. The TDM alternative was modified from a 2% reduction of vehicles to a proposed 5% reduction in 2020 and a 10 % reduction in The preliminary 2% reduction of vehicles matched the growth rate of 1.5%. TDM was dropped as a stand-along alternative due to the difficulty and the prohibitive cost of implementing an additional 5-10% vehicle reduction. Instead, all proposed alternatives were assumed to include TDM strategies. Facilities that will be affected by the project The SR 3 and SR 304 interchange and the Loxie Eagans Boulevard SB on-ramp will be directly affected by this project. Chapter 1-11 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

22 This page was intentionally left blank. Chapter 1-12 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

23 Chapter 2 Reasonable Alternatives Chapter 2-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

24 This page was intentionally left blank. Chapter 2-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

25 Chapter #2 Reasonable Alternatives Describe the reasonable alternatives that have been evaluated. The following five alternatives were identified to improve the traffic flow at the SR 3/SR 304 interchange. Alternative 1: Southbound SR 3: Hard Shoulder Running This alternative investigates opening the SB SR 3 shoulder to traffic on weekdays from 3-6 PM. Those hours often see the heaviest traffic volumes. The shoulder along SR 3 SB would be open to traffic during those hours in the vicinity of the SR 3/SR 304 interchange where the two SB lanes merge into one. This alternative would also add an HOV lane to the SR 304 on-ramp ending 100 feet after the bridge. The Planning cost estimate for this alternative is $3,4 million. The Hard Shoulder Running alternative was removed from further consideration because it doesn t provide a 24- hour solution; it moves the merge points further downstream; and bike capacity is lost through the SR 3/SR 304 interchange curve. Chapter 2-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

26 Chapter #2 Reasonable Alternatives Describe the reasonable alternatives that have been evaluated continued Alternative 2: Restripe to 2 Lanes This alternative restripes the existing roadway to create two lanes on SR 3 SB in the area where two lanes currently merge into one. This alternative would also add an HOV lane to the SR 304 on-ramp ending 100 feet after the bridge. The current SR 304 WB add lane onramp merge to SR 3 SB would be reconfigured into a parallel on-ramp merge. The second SR 3 SB lane would be a permanent fix that is available around the clock. This alternative was identified as the low cost and short term solution with a planning level cost of $3.8 million. Chapter 2-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

27 Chapter #2 Reasonable Alternatives Describe the reasonable alternatives that have been evaluated continued Alternative 3: Construct to 2 Lanes This alternative demolishes and rebuilds the SR 304 on-ramp over SR 3 to accommodate two lanes on SR 3 SB in the area where two lanes merge into one. It will also add an HOV lane on the SR 304 on-ramp ending 100 feet after the bridge. One fish passage culvert will be replaced at the SR 3/SR 304 interchange, one wetland at the interchange may be affected by construction and construction may require a temporary railroad detour. This alternative has a planning level cost estimate of $60.8 million. However, Alternative 2 is more cost effective for the same benefit. Note: Once it was identified that there was enough room under the SR 304 ramp to accommodate two lanes, this alternative was dropped in favor of the least cost alternative. Chapter 2-5 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

28 Chapter #2 Reasonable Alternatives Describe the reasonable alternatives that have been evaluated continued Alternative 4: Southbound SR 3: Add Third Lane from SR 304 to Gorst This alternative would add a 3 rd Lane from the SR 304 on-ramp to Gorst. SB SR 3 from the SR 304 on-ramp to Gorst would be widened to create three at-grade lanes. At Gorst the 3 rd lane would tie into the existing three lane section leading to SR 16. Crews would also restripe SR 3 SB to two lanes in the area where two lanes merge into one. This alternative is the ultimate solution, however it s expensive. The planning level cost estimate is $158 million. Chapter 2-6 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

29 Chapter #2 Reasonable Alternatives Describe the reasonable alternatives that have been evaluated. continued Alternative 5: Transportation Demand Management (TDM) This alternative assumed a reduction in future traffic volumes through the implementation of TDM strategies. The focus of the traffic analysis was not on the specific strategies used, but on the effect of removing trips from the transportation network. The opening year (2020) analysis assumed a five percent reduction in traffic volumes, and the future year (2040) analysis assumed a 10 percent reduction in traffic volumes. The TDM alternative was modified from a 2% reduction of vehicle to a proposed 5% reduction in 2020 and a 10% proposed reduction in The graphic below depicts the number of vehicles that would need to be removed from the network. The preliminary 2% reduction of vehicle matched the growth rate of 1.5%. Also noted was that the SR 3 SB and SR 304 WB may experience up to a 30 percent of vehicles carrying two or more people resulting in 51% of total person-trips during peak traffic periods. The main reason for this high figure may be the result of a combination of the rideshare programs being sponsored by Kitsap Transit and the restrictive parking at the region s defense facilities. Note: TDM was dropped as a stand-alone alternative due to the difficulty and the prohibitive cost of implementing an additional 5-10% vehicle reduction. Instead, the proposed alternatives are assumed to include TDM strategies. Chapter 2-7 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

30 This page was intentionally left blank. Chapter 2-8 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

31 Chapter 3 Operational and Collision Analysis Chapter 3-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

32 This page was intentionally left blank. Chapter 3-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

33 Chapter #3 Operational and Collision Analysis How will the proposal affect safety and traffic operations at year of opening and design year? Summary The preferred Restripe Alternative, Year 2020 (opening year) and Year 2040 (design year) includes the SB SR 3 mainline becoming 2 lanes and the WB SR 304 High Occupancy Vehicle (HOV) merge being relocated to 100 ft. west of Bridge 304/001W-S. Future mainline predicted collisions/crashes would be close or similar to a No Build condition. The possible ultimate solution Add Lane Alternative, Year 2020 and 2040 includes the SB SR 3 mainline becoming 3 lanes between Gorst and Bremerton and WB SR 304 High Occupancy Vehicle (HOV) merge being relocated to the beginning of the SB add lane merge. Predicted collisions/crashes would be less than the Restripe Alternative (Approximately seven vehicles per year difference). There would also be a need for an added lane NB (or reversible lane) on SR 3 between SR 16 and SR 304 to address AM peak congestion. This analysis also evaluates other proposals and their effects on the operation and safety of the surface streets and freeway systems. A 10% TDM reduction was determined to be an unrealistic alternative after discussions with local transit agencies and WSDOT s Public Transportation. Constructing the Restripe alternative, would address short-term needs. The purpose of this study is to improve mobility by eliminating the bottleneck along SB SR 3 in the vicinity of the SR 3/SR 304 interchange where two lanes merge into one. The proposed statement of purpose and statement of deficiencies/needs are: This project will advance initial development of interchange improvements by beginning environmental documentation and preliminary design to expedite project delivery. The purpose of this project is to improve mobility by reducing delay and providing consistent travel time through the SR 3/SR 304 Interchange for travelers using State Route 3 at this location, while maintaining or improving the safe operation of both State Route 3 and State Route 304 in the process. Mobility level of service is below the adopted service objective during the PM peak commute periods along State Route 3 in the SB direction where the travel lanes narrow down from two to one lane under the SR 304 WB Ramp (Bridge Undercrossing Number 304/1W-S). The resulting congestion increases delay and travel time affecting safety and imposing inconvenience for motorized travelers, and creates challenges for non-motorized travelers using the state highway. Analysis Methods and Assumptions for Traffic Volume Development The methodology for developing traffic forecasts included comparing various growth rates. Tube counts are used for current year analysis and were performed in April of 2013 during the weekday (Wednesday, April 17). Intersection turning movement counts were also done in The Loxie Eagans Boulevard turning movements and tube counts were conducted in May Other counts between February 2010 and May 2014 were also used and factored to Year 2013 volumes. Traffic Count Adjustments When WSDOT performed the traffic data collection in April 2013, no aircraft carriers were in port at the Bremerton Shipyard. WSDOT in consultation with the consultant and Technical Team members decided that no adjustments to the traffic count data were needed to capture the additional traffic demand out of the Bremerton Shipyard when one or two aircraft carriers are in port. Excerpts from the Navy s 2012 Vehicle and Pedestrian Safety Study indicates that one aircraft carrier in port may produce between additional vehicles leaving the Charleston Boulevard gate turning onto WB SR 304. Chapter 3-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

34 Chapter #3 Operational and Collision Analysis Analysis Methods and Assumptions for Traffic Volume Development Traffic Count Adjustments continued Because the existing year (2013) PM peak volumes on SR 304 WB toward SR 3 SB is already approaching or at capacity for the SR 3/SR 304 interchange, the additional traffic from one or more aircraft carriers will not significantly change the No Build throughput results. For example, the GP lane queuing on WB SR 304 blocks the signalized SR 304/ Charleston intersection from about 4-4:14 PM in the 2013 simulation. When this signalized intersection is blocked by the WB SR 304 queue, no additional GP left turn traffic can proceed out of Charleston Gate intersection. Short Duration Counts (Historical AADT) Puget Sound Regional Council (PSRC) Land Use Model 2006 to 2040 Bremerton Economic Development Study (BEDS) 2008 to 2030 City of Bremerton Comprehensive Plan 2001 to 2030 PM WSDOT Highway Analysis Program Trend Line Growth Rates Even though the data indicates one additional carrier will generate about 200 additional left turn vehicles out of the Charleston Gate towards WB SR 304, not much more GP traffic can get through in a one hour PM peak under the No Build scenario(s). However, an exception would be an extended SR 304 WB HOV lane on-ramp into an add lane build scenario. A WB SR 304 HOV lane may attract additional HOV traffic, but up to 30% measured HOV volumes on WB SR 304 already appears to be a high percentage. Travel Demand Forecasting Forecasts of travel demand for the various mainline alternatives used April 2013 traffic counts with network modifications to create opening and design year build alternatives (2020 and 2040). There were no aircraft carriers in the Puget Sound Naval Shipyard (PSNS) during the 2013 counts. The existing year mainline counts were based upon April 17, 2013, Wednesday. A straight line annual growth rate of 1.5% was decided upon for the forecast by the technical team after considering the following information: Kitsap County Land Use Model 2010 to 2025 PM Chapter 3-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

35 Chapter #3 Operational & Collision Analysis Study Limits Discussion The decision to expand the study area was made by the Technical Team on September 17, 2013 in a meeting held from 1:00 to 2:30 PM. During this meeting, the proposed study limits were expanded to include one interchange and their ramps prior to and after the SR 3/SR 304 interchange. Figure 5 below depicts the study area which includes SR 3 in Kitsap County and SR 304 in Bremerton, SR 3 between Werner Road/Loxie Eagans interchange to the north, and the Sam Christopherson Avenue intersection to the south, the SR 3/SR 16 interchange, and SR 304 between Farragut Avenue and SR 3. Numbered Locations 1. Werner Road/Loxie Eagans Blvd & Auto Center Way/Oyster Bay Ave. 2. Loxie Eagans Blvd & SR 3 SB Ramps 3. Loxie Eagans Blvd & SR 3 NB Ramps 4. Farragut Ave/Cambrian Ave & SR Charleston Beach Road & SR Sam Christopherson Ave & SR 3 Figure 4: SR 3/SR 304 Bremerton Interchange Improvements Study Area Chapter 3-5 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

36 Chapter #3 Operational and Collision Analysis Operational and Safety Analysis The traffic operational methodology is the same as used for the No Build analysis, as documented in Chapter 1. Freeway and ramp configurations were modified as appropriate to account for the preferred Restripe Alternative. The implementation of this alternative would provide for a short term build configuration. SB SR 3 would be restriped from a one lane configuration into two through lanes at the SR 3/ SR 304 Interchange, the WB SR 304 add lane on ramp merge would be restriped into an approximate 1500-ft parallel on ramp merge, and the High Occupancy Vehicle (HOV) lane restriped to end about 100 feet beyond the beginning of the SR 304 Bridge. The preferred SB SR 3 rebuild/restripe proposal is not forecasted to have significant queuing impacts on SB SR 3 until after WB SR 304 is forecasted to have queuing impacts at both intersections (Charleston and Farragut) with or without the Restripe project in The following traffic models were used to analyze traffic operations: 1. Synchro (version 8.0) is a deterministic model used to calculate peak hour vehicle delay and LOS at intersections, similar to the methodologies outlined in the HCM. 2. VISSIM (version and/or ) is a stochastic model (microsimulation) that accounts for variability in driver behavior and is used to calculate travel times, speeds, and congestion levels for multiple modes of travel over long periods of time. VISSIM was used for the PM peak period. 3. Highway Capacity Manual Software (HCM 2010) was used for the AM peak on SR 3 and SR 304 for mainline basic, merge and diverge ramp influence areas, and weaving in the study area. A VISSIM model was used to analyze the mainline sections of SR 3 from just north of Werner Road/Loxie Eagans Blvd. interchange to the SR 16 ramp in Gorst to account for mainline queuing and SR 304 from the interchange with SR 3 to Farragut Avenue in the PM peak. A Synchro model was used to evaluate intersection operations at Sam Christopherson (SR 3), Charleston Blvd (SR 304), Farragut Avenue (SR 304), Loxie Eagans/Auto Center (SR 3), Loxie Eagans (SR 3) SB ramp terminal, and Loxie Eagans (SR 3) NB ramp terminal in AM and PM. Traffic Operations The operational analysis results are reported for average weekday AM and PM peak hour condition. Traffic data collection was performed along SR 3 and SR 304 during the week of April 15-18, 2013 (Traffic data was also collected for 5.5 hours from 1:30 to 7:00 PM). Twenty roadway tube counters were placed measuring rolling slow-downs, license plate reader cameras were placed at 4 locations to measure travel time, and manual turning movement counts were recorded along SR 304 at Charleston and Farragut Avenue gates. Traffic conditions were analyzed for the 2013 No Build volumes, 2020 Opening Year volumes, and 2040 Design Year volumes. They represent the completion and full operation of the various alternatives. The freeway basic, merge, diverge, and weaving mainline segments were analyzed for the No Build conditions and the short-term preferred Restripe SB SR 3 and WB SR 304 alternative in the AM peak hour using Highway Capacity Manual (HCM 2010) software. During the AM peak hour the No Build SR 3 freeway segments operate at LOS D or better in 2040, except for NB SR 3 between SR 16 and SR 304 and at the existing SB SR 3 bottleneck where two lanes merge into one. During the AM peak hour, the SR 304 arterial segments will operate at LOS D or better in 2040, except where SR 304 merges from two lanes (HOV inside lane) into one at the WB on ramp. Chapter 3-6 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

37 Chapter #3 Operational and Collision Analysis Traffic Operations continued The alternatives analyzed in this study are not assumed to change existing traffic patterns on a regional scale or how people travel. Traffic volume forecasts were developed separately for the AM opening year (2020) and AM design year (2040) analysis and reflect a one hour weekday peak and level of service. The PM peak period was analyzed using VISSIM modeling over a 5.5 hour period from 1:30 to 7:00 PM. This allowed for a conservative comparison describing how well each alternative performed with a given set of volumes in the PM weekday period. The PM analysis includes the following No Build and Build Alternatives: No Build Hard Shoulder Running Construct or Restripe Add Lane TDM The following pages show Existing Year (2013) No Build for the AM and PM peak period freeway and arterial mainline results. Chapter 3-7 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

38 Chapter #3 Operational and Collision Analysis Existing 2013 AM Peak Hour (SR 3 SB & NB, SR 304 WB & EB) Gorst to Bremerton SR 3: SB Multilane Arterial Diverge - Off Basic Merge - On Basic (Analyzed Using Directional Two-Way Facility Software) Merge - On Basic Diverge - Off Weaving Segment Merge - On Basic SB Volume LOS 1988 B 62 B 2050 C 697 B 1353 E 255 B 1098 B B B 11:00 AM Too short for a mainline 11:00 AM to SR 3 SB mainline Sherman Heights SR 3 SB mainline SR 304 WB On SR 3 SB mainline Loxie Eagans On SR 3 SB mainline Loxie Eagans Off (Rolling 1740 feet weave) SR 310 On SR 3 SB mainline to Noon 45.0 (Posted 40 mph) Noon Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed 43.7 (Posted 40 mph) (Posted 50 mph) Speed Speed 43.7 (Posted 40 mph) (Posted 50 mph) Speed 6:15 AM :15 AM to SR 16 mainline SR 3 NB On SR 3 NB mainline SR 304 Off SR 3 NB mainline SR 304 NB On Too short for a mainline Loxie Eagans Off SR 3 NB mainline Loxie Eagans On Too short for a mainline SR 310 Off SR 3 NB mainline to 7:15 AM 7% Grade (1900 feet weave) 7:15 AM Volume LOS 3010 E 825 E 3835 E 1694 D 2141 C C B 190 B 1801 C 145 B 1656 B NB Multilane Arterial Merge - On Basic Diverge - Off Basic Merge - On Weaving Segment Diverge - Off Basic Merge - On Basic Diverge - Off Basic NB Speeds > 42.5 mph Level of Service D 85% to 70% of Posted Speed = 42.5 to 35 mph Level of Service E 70% of Posted Speed or < 35 mph Level of Service F Preliminary 2013 Existing State Route 3 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning SR 3 to Farragut: WB One lane SR 3 NB On Ramp Multilane Signal Multilane Signal Multilane WB Volume LOS 6:15 AM 405 D 70 N/A 475 A B 540 A B 538 A 6:15 AM to SR 304 WB SR 304 WB mainline Charleston SR 304 WB Farragut SR 304 WB mainline to 7:15 AM (45 mph posted) 16.2 seconds 45.0 (30 mph posted) 17.4 seconds 45.0 (30 mph posted) 7:15 AM Speed (45 mph posted) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed Speed 40.7 (40.0 design speed) Transition 50.0 (45 mph posted) average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) Speed Speed 50.0 (45 mph posted speed) 16.2 seconds 45.0 (30 mph posted) 17.4 seconds 45.0 (30 mph posted) Speed Speed 50.0 (45 mph posted speed) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed 6:15 AM average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) 6:15 AM to SR 304 EB Charleston SR 304 EB Farragut SR 3 NB mainline to 7:15 AM 7:15 AM Volume LOS EB 1694 C Multilane B Signal 1583 B Multilane B Signal 1155 A Multilane EB Speeds > 38.2 mph based upon 45 mph Level of Service D 85% to 70% of Posted Speed = 38.2 to 31.5 mph Level of Service E 70% of Posted Speed or < 31.5 mph Level of Service F Preliminary 2013 Existing State Route 304 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning Chapter 3-8 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

39 Chapter #3 Operational and Collision Analysis 2013 Existing No Build PM Peak Period for SB & NB SR 3 LEGEND NOTE: THE POSTED SPEED LIMIT FOR SR 3 IS 50 MPH FROM GORST TO SR 304. Chapter 3-9 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

40 Chapter #3 Operational and Collision Analysis 2013 Existing No Build PM Peak Period for WB & EB SR 304 LEGEND NOTE: THE POSTED SPEED LIMIT FOR SR 304 IS 45 MPH FROM SR 3 TO CHARLESTON BEACH AND 30 MPH FROM CHARLESTON BEACH TO FARRAGUT AVE. Chapter 3-10 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

41 Chapter #3 Operational and Collision Analysis Opening Year (2020) No Build Alternative Traffic Operations Vehicle congestion is anticipated where SB SR 3 merges from two lanes to one, and where WB SR 304 merges from two lanes to one. The increased traffic volume modeled for the opening year (2020) results in more congestion compared to 2013 existing conditions in the PM peak. PM queuing also results in the Loxie Eagans onramp to SB SR 3 being blocked. Queuing along the on-ramp would extend back onto Loxie Eagans Boulevard. On SB SR 3 the PM duration of congestion is anticipated to increase from 2 hours 45 minutes with existing conditions to 4 hours 15 minutes with the No Build Alternative. Congestion would also extend beyond the limits of the study area, leaving approximately 460 unserved vehicles This Year 2020 No Build AM (SR 3 SB & NB, SR 304 WB & EB) Gorst to Bremerton SR 3: SB Multilane Arterial Diverge - Off Basic Merge - On Basic (Analyzed Using Directional Two-Way Facility Software) Merge - On Basic Diverge - Off Weaving Segment Merge - On Basic SB Volume LOS C C C B E B B B B Too short for a mainline 11:00 AM 11:00 AM to SR 3 SB mainline Sherman Heights SR 3 SB mainline SR 304 WB On SR 3 SB mainline Loxie Eagans On SR 3 SB mainline Loxie Eagans Off (Rolling 1740 feet weave) SR 310 On SR 3 SB mainline to Noon 45.0 (Posted 40 mph) Noon Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed 42.5 (Posted 40 mph) (Posted 50 mph) Speed Speed 42.5 (Posted 40 mph) (Posted 50 mph) Speed :15 AM 6:15 AM to to SR 3 NB On SR 3 NB mainline SR 304 Off SR 3 NB mainline SR 304 NB On Too short for a mainline Loxie Eagans Off SR 3 NB mainline Loxie Eagans On Too short for a mainline SR 310 Off SR 3 NB mainline SR 16 mainline 7% Grade (1900 feet weave) 7:15 AM 7:15 AM Volume LOS E F F F C C C C C C C NB Multilane Arterial Merge - On Basic Diverge - Off Basic Merge - On Weaving Segment Diverge - Off Basic Merge - On Basic Diverge - Off Basic NB Speeds > 42.5 mph Level of Service D 1.5% Straight Line Growth Rate 85% to 70% of Posted Speed = 42.5 to 35 mph Level of Service E 70% of Posted Speed or < 35 mph Level of Service F Preliminary 2020 Existing State Route 3 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning SR 3 to Farragut: WB One lane SR 3 NB On Ramp Multilane Signal Multilane Signal Multilane WB Volume LOS 6:15 AM 448 D 77 N/A 525 A B 597 A B 594 A 6:15 AM to SR 304 WB SR 304 WB mainline Charleston SR 304 WB Farragut SR 304 WB mainline to 7:15 AM (45 mph posted) 17.4 seconds 45.0 (30 mph posted) 20.0 seconds 45.0 (30 mph posted) 7:15 AM Speed (45 mph posted) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed Speed 40.4 (40.0 design speed) Transition 50.0 (45 mph posted) average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) Speed Speed seconds 45.0 (30 mph posted) 20.0 seconds 45.0 (30 mph posted) Speed Speed 50.0 of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed 6:15 AM average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) 6:15 AM to SR 304 EB Charleston SR 304 EB Farragut SR 3 NB mainline to 7:15 AM 7:15 AM Volume LOS EB 1872 C Multilane B Signal 1749 B Multilane B Signal 1276 B Multilane EB Speeds > 38.2 mph based upon 45 mph Level of Service D 85% to 70% of Posted Speed = 38.2 to 31.5 mph Level of Service E 70% of Posted Speed or < 31.5 mph Level of Service F Preliminary 2020 Existing State Route 304 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning Chapter 3-11 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

42 Chapter #3 Operational and Collision Analysis Opening Year (2020) Build Traffic Operations At the Loxie Eagans Boulevard and the SB SR 3 ramps intersection, the stop-controlled SB approach would be over capacity due to left turn delay, and the resulting queue is anticipated to extend back to the auxiliary lane on SB SR 3. The duration of congestion on WB SR 304 would increase from 1 hour 45 minutes with existing conditions to 2 hours 30 minutes with the No Build Alternative, and congestion would extend beyond the limits of the study area, leaving approximately 175 unserved vehicles. Congestion on NB SR 3 and EB SR 304 in the PM peak would not change with the No Build Alternative compared to existing conditions. NB SR 3 between SR 16 and SR 304 would change from LOS E to LOS F in the AM peak (6:15 to 7:15 AM). SB SR 3 would be eliminated, and congestion on SB SR 3 would be reduced. The Construct or Restripe Two Lanes alternatives with no ramp meter is anticipated to result in some congestion at the SR 304 on-ramp merge area due to the high volume of vehicles on the ramp. Average travel times on SB SR 3 with the Construct or Restripe, and Add Third Lane alternatives are modeled at over two minutes, compared to almost 10 minutes with the No Build alternative. With all build alternatives, the queue from the SB offramp to Loxie Eagans Boulevard is anticipated to extend into the auxiliary lane on the SB SR 3 mainline, similar to the No Build Alternative. Since the roadway configuration for the build alternatives on NB SR 3 and EB SR 304 do not change compared to the No Build Alternative, the traffic operations focus on the PM peak alternatives that reduce the bottleneck along SB SR 3 where two lanes currently merge into one lane. Note: The following alternatives are anticipated to experience congestion similar to the No Build alternative. This is due to the alternatives maintaining the merge condition from two lanes to one that is the source of PM peak congestion on SB SR 3. SB SR 3: Hard Shoulder Running: The merge location would be moved south, reducing the number of unserved vehicles compared to the No Build Alternative. Transportation Demand Management (TDM): the number of unserved vehicles would be reduced, because the traffic volumes will be 5% lower compared to the No Build Alternative. Travel times on SB SR 3 with the Hard Shoulder Running and TDM alternatives are similar to the No Build alternative. For the Construct or Restripe and the Add Third Lane preferred alternatives, the merge condition on Chapter 3-12 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

43 Chapter #3 Operational and Collision Analysis Opening Year 2020 AM Build (SR 3 SB & NB, SR 304 WB & EB) Gorst to Bremerton SR 3: SB Multilane Arterial Diverge - Off Basic Merge - On Basic Merge - On Basic Diverge - Off Weaving Segment Merge - On Basic SB Volume LOS C C C B B B B B B Too short for a mainline 11:00 AM 11:00 AM to SR 3 SB mainline Sherman Heights SR 3 SB mainline SR 304 WB On SR 3 SB mainline Loxie Eagans On SR 3 SB mainline Loxie Eagans Off (Rolling 1740 feet weave) SR 310 On SR 3 SB mainline to Noon 45.0 (Posted 40 mph) Noon Speed (Posted 40 mph) (Posted 50 mph) Speed Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed (Posted 40 mph) (Posted 50 mph) Speed Speed 42.5 (Posted 40 mph) (Posted 50 mph) Speed :15 AM 6:15 AM to to SR 3 NB On SR 3 NB mainline SR 304 Off SR 3 NB mainline SR 304 NB On Too short for a mainline Loxie Eagans Off SR 3 NB mainline Loxie Eagans On Too short for a mainline SR 310 Off SR 3 NB mainline SR 16 mainline 7% Grade (1900 feet weave) 7:15 AM 7:15 AM Volume LOS E F F F C C C C C C C NB Multilane Arterial Merge - On Basic Diverge - Off Basic Merge - On Weaving Segment Diverge - Off Basic Merge - On Basic Diverge - Off Basic NB Speeds > 42.5 mph Level of Service D 1.5% Straight Line Growth Rate 85% to 70% of Posted Speed = 42.5 to 35 mph Level of Service E 70% of Posted Speed or < 35 mph Level of Service F Preliminary 2020 Build Restripe Scenario State Route 3 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning SR 3 to Farragut: WB One lane Multilane SR 3 NB On Ramp Multilane Signal Multilane Signal Multilane WB Volume LOS D A N/A A B A B A 6:15 AM 6:15 AM to SR 304 WB SR 304 WB mainline Charleston SR 304 WB Farragut SR 304 WB mainline to 7:15 AM (45 mph posted) 17.4 seconds 45.0 (30 mph posted) 20.0 seconds 45.0 (30 mph posted) 7:15 AM Speed (45 mph posted) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed Speed 40.4 (40.0 design speed) Transition 50.0 (45 mph posted) average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) Speed Speed seconds 45.0 (30 mph posted) 20.0 seconds 45.0 (30 mph posted) Speed Speed 50.0 of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed 6:15 AM average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) 6:15 AM to SR 304 EB Charleston SR 304 EB Farragut SR 3 NB mainline to 7:15 AM 7:15 AM Volume LOS EB 1872 C Multilane B Signal 1749 B Multilane B Signal 1276 B Multilane EB Speeds > 38.2 mph based upon 45 mph Level of Service D 85% to 70% of Posted Speed = 38.2 to 31.5 mph Level of Service E 70% of Posted Speed or < 31.5 mph Level of Service F Preliminary 2020 Build Restripe SR 304 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning Chapter 3-13 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

44 Chapter #3 Operational and Collision Analysis Opening Year 2020 PM Build (SR 3 SB and SR 304 WB) Chapter 3-14 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

45 Chapter #3 Operational and Collision Analysis Opening Year (2020) Build Traffic Operations continued On WB SR 304, the Add Third Lane Alternative would maintain two travel lanes to an add lane connection with SB SR 3. This would relocate the HOV merge location, the main source of congestion in the No Build Alternative, and substantially reduce congestion compared to the No Build alternatives. The GP and HOV travel times would improve compared to the No Build alternative due to the reduced congestion levels and the relocated HOV merge occurring at the add lane merge. The Hard Shoulder Running and Construct or Restripe alternatives (no meter) would have similar congestion levels, congestion duration and unserved vehicles similar to the No Build Alternative with the WB SR 304 HOV merge relocated to 100 ft. west of the bridge. With the Construct or Restripe alternative (with ramp meter), the duration of congestion would increase to 5 hours, and the number of unserved vehicles would increase to over 1,300 as the ramp meter restricts the number of vehicles able to pass through to well below the vehicle demand. The on-ramp meter was modeled to be activated for 5.5 hours for a worst case scenario. Vehicle Hours of Delay and Throughput Vehicle Hours of Delay provides a simple comparison across alternatives by summing the delay experienced by each driver in the network. In the opening year (2020), the Construct, or Restripe without a ramp meter and the Add Third Lane alternatives perform the best. The remaining alternatives perform similar to the No Build alternative. Vehicle throughput just south of the SR 3/SR 304 interchange is over 90 percent for all alternatives. capacity during the PM peak hour. The resulting queue is anticipated to extend into the SR 3 mainline auxiliary lane. The Sam Christopherson intersection located at the end of the study area in Gorst is LOS E in Detailed Synchro (Version 8) Intersection LOS results for 2013, 2020, and 2040 in the AM and PM peak hour are included in Appendix B. LOS Criteria for Signalized Intersections: LOS A is less than or equal to 10 seconds LOS B is greater than 10 seconds and equal to or less than 20 seconds LOS C is greater than 20 seconds and equal to or less than 35 seconds. LOS D is greater than 35 seconds and equal to or less than 55 seconds. LOS E is greater than 55 seconds and equal to or less than 80 seconds. LOS F is greater than 80 seconds. LOS Criteria for Unsignalized Intersections: LOS A is less than or equal to 10 seconds LOS B is greater than 10 seconds and equal to or less than 15 seconds LOS C is greater than 15 seconds and equal to or less than 25 seconds. LOS D is greater than 25 seconds and equal to or less than 35 seconds. LOS E is greater than 35 seconds and equal to or less than 50 seconds. LOS F is greater than 50 seconds. Intersection Operations Opening year (2020), intersection LOS is anticipated to be better than a LOS D Urban threshold with the exceptions of the Loxie Eagans Boulevard/SB SR 3 off-ramp intersection. The stop-controlled SB SR 3 off-ramp worsens from LOS E to F, and is over Chapter 3-15 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

46 Chapter #3 Operational and Collision Analysis Opening Year (2020) Build Traffic Operations continued See the following page for a summary of AM and PM peak hour level of service (LOS) results. Signalized Intersections - LOS Summary AM Peak Hour SR 3/304 Bremerton Interchange Improvement Project Intersection WSDOT LOS Threshold Standard No Build Synchro 2013 AM LOS Intersection Report (Average Delay in Seconds) No Build Synchro 2020 AM LOS Intersection Report (Average Delay in Seconds) No Build Synchro2040 AM LOS Intersection Report (Average Delay in Seconds) SR 3/Sam Christopherson-SR 16 Spur D C (26.7) C (30.8) D (46.0) Comments 6:45 AM to 7:45 AM Peak (Closely matches 6:15 to 7:15 AM and a prior 2010 AM Count). In year 2040 NET queue exceeds 1355 feet. SR 304/Charleston D B (16.2) B (17.4) C (28.5) Averaged a WSDOT 6:15 AM to 7:15 AM count and PSNS 6:00 AM to 7:00 AM count which included carrier(s) in port SR 304/Farragut N/A B (17.4) B (20.0) C (31.2) 6:15 AM to 7:15 AM peak Loxie Eagans/Auto Center N/A C (21.3) B (19.5) C (24.1) 7:45 AM to 8:45 AM peak SR 3/Loxie Eagans NB off and on terminal D A (9.4) A (9.9) B (14.9) 7:45 AM to 8:45 AM peak Unsignalized Intersection - LOS Summary AM Peak Hour Intersection WSDOT LOS Threshold Standard No Build HCM 2010 Report for Year 2013 AM LOS (Average Delay in Seconds) No Build HCM 2010 Report for Year 2020 AM LOS (Average Delay in Seconds) No Build HCM 2010 Report for 2040 AM LOS (Average Delay in Seconds) SR 3/ Loxie Eagans SB off and on terminal D F (465) F (739) F (3043) Queue (in vehicles) 38 vehicles in Year 2013 for SBL, 49 vehicles in Year 2020 for SBL, 76 vehicles in Year 2040 for SBL Chapter 3-16 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

47 Chapter #3 Operational and Collision Analysis Opening Year (2020) Build Traffic Operations continued Intersection Operations continued PM peak hour Intersection Level of Service (LOS) Chapter 3-17 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

48 Chapter #3 Operational and Collision Analysis Design Year (2040) No Build Traffic Operations The No Build Alternative is anticipated to experience congestion and queuing beyond the study limits where SB SR 3 merges from two lanes to one, and where WB SR 304 merges from two lanes to one. The assumed increase in traffic volumes for the future year (2040) would result in increased congestion compared to existing conditions and the opening year (2020). On SB SR 3, the duration of congestion is anticipated to increase to 5 hours with the 2040 No Build alternative. Congestion would also extend beyond the study area, leaving over 4,500 unserved vehicles. It is likely that congestion would not reach such severe conditions, as people would divert or eliminate trips to avoid congestion. Note: This study assumed traffic volumes and traffic patterns to be the same across all alternatives. This allows for a conservative comparison that describes how well each of the alternatives performs with a given set of volumes. At the Loxie Eagans Boulevard and SB SR 3 ramps intersection, the stop-controlled SB left turn approach would be over capacity, and the resulting queue would extend back to the auxiliary lane on SB SR 3, and impact the through travel lanes as drivers slow to enter the queue in the auxiliary lane (and shoulder). The duration of congestion on WB SR 304 would also increase to 4 hours 45 minutes with the No Build alternative, and congestion would extend beyond the limits of the study area, leaving approximately 1,900 unserved vehicles. Congestion in the non-peak direction, on NB SR 3 and on EB SR 304, is not anticipated to change with the No Build Alternative compared to existing PM peak conditions. However, the level of service performance and congestion on NB SR 3 between SR 16 and SR 304 in the AM peak is anticipated to drop from LOS E in 2013 to LOS F in 2020 in the NB SR 3 on ramp merge influence, SR 3 basic freeway segment, and the EB SR 304 off ramp diverge influence area. There will be a need to address this congestion between 2020 and The following pages show Year 2040 No Build AM peak hour results. Chapter 3-18 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

49 Chapter #3 Operational and Collision Analysis Design Year (2040) Build Traffic Operations continued Gorst to Bremerton SR 3: Year 2040 No Build AM Peak (SB & NB SR 3 and WB & EB SR 304) Gorst to Bremerton SR 3: SB Multilane Arterial Diverge - Off Basic Merge - On Basic (Analyzed Using Directional Two-Way Facility Software) Merge - On Basic Diverge - Off Weaving Segment Merge - On Basic SB Volume LOS C C D C F B B B B Too short for a mainline 11:00 AM 11:00 AM to SR 3 SB mainline Sherman Heights SR 3 SB mainline SR 304 WB On SR 3 SB mainline Loxie Eagans On SR 3 SB mainline Loxie Eagans Off (Rolling 1740 feet weave) SR 310 On SR 3 SB mainline to Noon 45.0 (Posted 40 mph) Noon Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed < 40.0 (Posted 40 mph) (Posted 50 mph) Speed Speed < 40.0 (Posted 40 mph) (Posted 50 mph) Speed :15 AM 6:15 AM to to SR 3 NB On SR 3 NB mainline SR 304 Off SR 3 NB mainline SR 304 NB On Too short for a mainline Loxie Eagans Off SR 3 NB mainline Loxie Eagans On Too short for a mainline SR 310 Off SR 3 NB mainline SR 16 mainline 7% Grade (1900 feet weave) 7:15 AM 7:15 AM Volume LOS F F F F D D C C D C C NB Multilane Arterial Merge - On Basic Diverge - Off Basic Merge - On Weaving Segment Diverge - Off Basic Merge - On Basic Diverge - Off Basic NB Speeds > 42.5 mph Level of Service D 1.5% Straight Line Growth Rate 85% to 70% of Posted Speed = 42.5 to 35 mph Level of Service E 70% of Posted Speed or < 35 mph Level of Service F Preliminary 2040 Existing State Route 3 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning SR 3 to Farragut: Year 2040 No Build AM Peak (SB & NB SR 3 and WB & EB SR 304) SR 3 to Farragut: WB One lane SR 3 NB On Ramp Multilane Signal Multilane Signal Multilane WB Volume LOS 6:15 AM 569 E 98 N/A 667 A C 759 A C 756 A 6:15 AM to SR 304 WB SR 304 WB mainline Charleston SR 304 WB Farragut SR 304 WB mainline to 7:15 AM (45 mph posted) 28.5 seconds 45.0 (30 mph posted) 31.2 seconds 45.0 (30 mph posted) 7:15 AM Speed (45 mph posted) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed Speed 39.4 (40.0 design speed) Transition 50.0 (45 mph posted) average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) Speed Speed 50.0 (45 mph posted speed) 28.5 seconds 45.0 (30 mph posted) 31.2 seconds 45.0 (30 mph posted) Speed Speed 50.0 (45 mph posted speed) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed 6:15 AM average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) 6:15 AM to SR 304 EB Charleston SR 304 EB Farragut SR 3 NB mainline to 7:15 AM 7:15 AM Volume LOS EB 2380 D Multilane C Signal 2224 C Multilane C Signal 1623 B Multilane EB Speeds > 38.2 mph based upon 45 mph Level of Service D 85% to 70% of Posted Speed = 38.2 to 31.5 mph Level of Service E 70% of Posted Speed or < 31.5 mph Level of Service F Preliminary 2040 Existing State Route 304 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning Chapter 3-19 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

50 Chapter #3 Operational and Collision Analysis Design Year 2040 Build Alternatives With all build alternatives, the roadway configuration on NB SR 3 and EB SR 304 would not be modified compared to the No Build Alternative, and traffic operations in the PM peak would not change. The following two alternatives are anticipated to experience congestion similar to the No Build Alternative since each alternative maintains the source of congestion which is the merge condition from two lanes to one lane along SB SR 3. SB SR 3 Hard Shoulder Running moves the merge location south, reducing the number of unserved vehicles compared to the No Build alternative. TDM alternative reduces the number of unserved vehicles because traffic volumes are assumed to be 10% lower in 2040 (Verses 5% lower in 2020). The Construct or Restripe (with and without a ramp meter), and the Add Third Lane alternatives would eliminate the merge condition on SB SR 3, and reduce congestion on SB SR 3 compared to the No Build Alternative. The Construct or Restripe Two Lanes (both with and without a ramp meter) would result in congestion and queuing at the SR 304 onramp merge due to the high expected vehicle volume on the ramp. The average travel times on SB SR 3 SB with the Construct or Restripe, and Add Third Lane alternatives are anticipated to range from approximately 3 to 7 minutes, compared to over 14 minutes with the No Build alternative. With all build alternatives, the queue from the SB offramp to Loxie Eagans Boulevard is anticipated to extended into the auxiliary lane on the SB SR 3 mainline similar to the No Build alternative. Year 2040 AM Build Restripe SB & NB SR 3 and WB & EB SR 304 Gorst to Bremerton SR 3: SB Multilane Arterial Diverge - Off Basic Merge - On Basic Merge - On Basic Diverge - Off Weaving Segment Merge - On Basic SB Volume LOS 2793 C 87 C 2880 D 979 C 1901 C 358 B 1543 B B B 11:00 AM Too short for a mainline 11:00 AM to SR 3 SB mainline Sherman Heights SR 3 SB mainline SR 304 WB On SR 3 SB mainline Loxie Eagans On SR 3 SB mainline Loxie Eagans Off (Rolling 1740 feet weave) SR 310 On SR 3 SB mainline to Noon 45.0 (Posted 40 mph) Noon Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed 45.0 (Posted 40 mph) (Posted 50 mph) Speed Speed < 40.0 (Posted 40 mph) (Posted 50 mph) Speed Speed < 40.0 (Posted 40 mph) (Posted 50 mph) Speed 6:15 AM :15 AM to SR 16 mainline SR 3 NB On SR 3 NB mainline SR 304 Off SR 3 NB mainline SR 304 NB On Too short for a mainline Loxie Eagans Off SR 3 NB mainline Loxie Eagans On Too short for a mainline SR 310 Off SR 3 NB mainline to 7:15 AM 7% Grade (1900 feet weave) 7:15 AM Volume LOS 4229 F 1159 F 5388 F 2380 F 3008 D D C 267 C 2530 D 204 C 2326 C NB Multilane Arterial Merge - On Basic Diverge - Off Basic Merge - On Weaving Segment Diverge - Off Basic Merge - On Basic Diverge - Off Basic NB Speeds > 42.5 mph Level of Service D 1.5% Straight Line Growth Rate 85% to 70% of Posted Speed = 42.5 to 35 mph Level of Service E 70% of Posted Speed or < 35 mph Level of Service F Preliminary 2040 Build Restripe Scenario State Route 3 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning Chapter 3-20 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

51 Chapter #3 Operational and Collision Analysis Design Year 2040 Build Alternatives Year 2040 PM Build Restripe SB & NB SR 3 and WB & EB SR 304 SR 3 to Farragut: WB One lane Multilane SR 3 NB On Ramp Multilane Signal Multilane Signal Multilane WB Volume LOS E A N/A A C A C A 6:15 AM 6:15 AM to SR 304 WB SR 304 WB mainline Charleston SR 304 WB Farragut SR 304 WB mainline to 7:15 AM (45 mph posted) 28.5 seconds 45.0 (30 mph posted) 31.2 seconds 45.0 (30 mph posted) 7:15 AM Speed (45 mph posted) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed Speed 39.4 (40.0 design speed) Transition 50.0 (45 mph posted) average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) Speed Speed 50.0 (45 mph posted speed) 28.5 seconds 45.0 (30 mph posted) 31.2 seconds 45.0 (30 mph posted) Speed Speed 50.0 (45 mph posted speed) of 45.0 (30 mph posted) of 45.0 (30 mph posted) Speed 6:15 AM average delay 45.0 (30 mph posted) average delay 45.0 (30 mph posted) 6:15 AM to SR 304 EB Charleston SR 304 EB Farragut SR 3 NB mainline to 7:15 AM 7:15 AM Volume LOS EB 2380 D Multilane C Signal 2224 C Multilane C Signal 1623 B Multilane EB Speeds > 38.2 mph based upon 45 mph Level of Service D 85% to 70% of Posted Speed = 38.2 to 31.5 mph Level of Service E 70% of Posted Speed or < 31.5 mph Level of Service F Preliminary 2040 Build Restripe SR 304 Mainline AM Annual Weekday Peak Hour LOS Results SR 3 and SR 304 Corridor Study WSDOT Olympic Region Planning Chapter 3-21 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

52 Chapter #3 Operational and Collision Analysis Design Year 2040 Build Alternatives Chapter 3-22 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

53 Chapter #3 Operational and Collision Analysis Design Year 2040 Build Alternatives SR 304 Build Alternatives On SR 304, the Add Third Lane alternative would maintain two travel lanes to the connection with SB SR 3. This would relocate the HOV merge which is the main source of congestion in the No Build alternative. The Hard Shoulder Running and Construct or Restripe without a ramp meter have similar congestion levels, congestion duration, and unserved vehicles similar to the No Build alternative since the HOV merge location is extended to the beginning of the bridge. Since the ramp meter restricts throughput of GP lanes below the vehicle demand, the duration of congestion increases to 5 hours and the number of unserved vehicles increases to approximately 4,400. Intersection LOS is anticipated to worsen compared to existing and opening year conditions at all study intersections. Vehicle hours of delay increases substantially compared to the opening year (2020) for all alternatives except for the Add Third Lane. Vehicle throughput just south of the SR 3/SR 304 interchange drops below 90 percent with all alternatives except the Add Third Lane alternative. Collision Forecast Methodology Crash Data Disclaimer Under 23 U.S. Code 409, safety data, reports, surveys, schedules, lists compiled or collected for the purpose of identifying, evaluating, or planning the safety enhancement of potential crash sites, hazardous roadway conditions, or railway-highway crossings are not subject to discovery or admitted into evidence in a Federal or State court proceeding or considered for other purposes in any action for damages arising from any occurrence at a location mentioned or addressed in such reports, surveys, schedules, lists, or data. The above disclaimer applies to the following pages where collisions/crashes are identified. SR 3: Summary and Assumptions The alternatives likely to impact the safety performance of SR 3 from SR 16 to SR 310 are: Transportation Demand Management (TDM) All Day Hard Shoulder Running (Restripe early merge into late merge on SR 3 SB and SR 304 WB lane reductions) Restripe or Widen to create WB SR 304 parallel on ramp merge and 2 lanes SB under the WB SR 304 bridge Add lane on SB SR 3 between SR 16 and SR 304 SR 3 mainline was analyzed using the Highway Safety Manual (HSM) freeway model Interchange Safety Analysis Tool enhanced (ISATe) excel software and SR 304 was analyzed with the HSM Urban and Suburban arterial excel software. To analyze short-term build and no build effects, the traffic volumes were assumed to not change over a 5 year forecast period. Predicted crashes along SR 3 mainline were compared for the No Build and Build alternatives. Predicted and expected crashes along SR 304 were compared for the No Build and Build alternatives. The 5-year historical crash record was from January 1, 2009 to December 31, Federal highway safety laws require the state to create this crash database for use in obtaining federal safety improvement funds. Chapter 3-23 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

54 Chapter #3 Operational and Collision Analysis Collision Forecast Methodology continued SR 3 was analyzed using the Highway Safety Manual freeway model Interchange Safety Analysis Tool enhanced (ISATe) software. It was divided into the following eight segments totaling 3.46 miles: Segment 1: SR 3/SR 16 Interchange to Sherman Heights Road/Railroad Bridge Vicinity (0.30 mile) Segment 2: Sherman Heights Road/Railroad Bridge to Sinclair Inlet Vicinity (0.65 mile) Segment 3: Sinclair Inlet Vicinity to Wright Creek Vicinity/WB SR 304 merge (0.64 mile) Segment 5: SR 3/SR 304 Interchange Vicinity (0.29 mile) Segment 6: SR 3/SR 304 Interchange to Werner/Loxie Eagans Interchange (0.30 mile) Segment 7: Werner/Loxie Eagans Interchange Vicinity (0.58 mile) Segment 8: Werner/Loxie Eagans Interchange to SR 310 Interchange (0.36 mile) Segment 4: WB SR 304 Merge Vicinity (0.34 mile) Chapter 3-24 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

55 Chapter #3 Operational and Collision Analysis Collision Forecast Methodology continued Assumptions: Reducing existing 2013 volumes by 10% and 5% and assuming traffic volume will not change over a 5 year analysis period, will simulate a ranged effect of the TDM alternative(s). To analyze short-term build and no build effects, the build analyses was performed with a 10% and 5% reduction and no traffic growth over a 5-year period even though traffic may increase at a rate of 1.5% straight line. Subsequent discussions with public transportation mentioned obtaining a 10% TDM reduction is unrealistic. The 5-year historical crash record (January 1, 2009 to December 31, 2013) had a total of 273 crashes which would average out to 54.6 crashes per year. There was a total of 119 multiple rear-ends and 70 sideswipe crashes on the 3.46 mile mainline. The predicted crash results are summarized below in the table (more detailed report summaries are attached). The Predicted Widen or Restripe Crashes would be most similar to a Predicted No Build Scenario (4-lane verses existing 3-lane in Segment 5). The build alternatives ranked in relative order by total predicted crashes are: 1. 10% TDM Alternative. 2. Add Lane Alternative(s). 3. 5% TDM Alternative. 4. Widen or Restripe Alternative (and Hard Shoulder Alternative) 5-Year Total Estimated Crashes Estimated Average Crashes/Year Estimated Multiple rearends Estimated Multiple sideswipes Predicted and Observed Crashes for the TDM and Add Lane Alternatives Predicted Widen or Predicted 5% Restripe Crashes TDM Crashes (Close to No Build) Predicted 10% TDM Crashes Predicted Add Lane Crashes Chapter 3-25 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

56 Chapter #3 Operational and Collision Analysis Collision Forecast Methodology continued SR 304: Summary and Assumptions The build alternative likely to impact the safety performance of the SR 304 Urban Arterial from SR 3 to Farragut intersection is the Transportation Demand Management (TDM) alternative. SR 304 was analyzed as a 4-lane divided urban arterial with no commercial access breaks using Highway Safety Manual (HSM) Urban and Suburban arterial software. In addition to five lanes for GP, SR 304 has one inside High Occupancy Vehicle (HOV) lane WB. SR 304 is segmented into two parts with each having one signalized intersection. The first segment is from SR 3 to Charleston intersection with 45 mph posted speed (Milepost 0.00 to Milepost 0.75). The second segment is from Charleston to Farragut intersection with 30 mph posted speed (Milepost 0.75 to Milepost 1.25). To analyze short-term and no build effects, the build analysis was performed with a 10% and 5% reduction and assumed no traffic growth over a 5- year period even though traffic may increase at a rate of 1.5% straight line. The 5-year historical crash record (January 1, 2009 to December 31, 2013) averaged 25 crashes per year. The total average crashes per year results are summarized below in the table. Detailed report summaries are in Appendix C. The TDM Alternative(s) would reduce crashes, but since SR 304 is already experiencing more crashes than predicted for similar type facilities the crash reduction would be low. Because the prior 5-year crash history and expected crashes over the next 5 years with zero traffic growth are greater than the predicted crashes (other similar facilities), the TDM alternatives will likely experience more crashes than predicted. Below are charts showing time and number of collisions/crashes over a 5-year history, which are concentrated at Charleston Beach Rd (MP 0.73) and Farragut St (MP 1.15) in the PM peak. Predicted 10% TDM Crashes per Year Summary of total anticipated safety performance (average crashes per year) Predicted Predicted Expected Potential for Actual 5-Yr Averaged Crashes per Year History 5% TDM No Build No Build No Build Crashes Crashes Crashes Safety per Year per Year per Year Improvement Chapter 3-26 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

57 Chapter #3 Operational and Collision Analysis Collision Forecast Methodology SR 304: Summary and Assumptions continued Matrices The following matrices were used to demonstrate how each alternative would accomplish its stated objectives in the PM peak period. Vehicle Throughput Travel Time Vehicle Hours of Delay Duration of Congestion Unserved Vehicles Vehicle Throughput Southbound SR 3 south of the SR 304 On-Ramp Chapter 3-27 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

58 Chapter #3 Operational and Collision Analysis Matrices continued Travel Time SR 3 Southbound North of Loxie Eagans to south of SR 304 Chapter 3-28 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

59 Chapter #3 Operational and Collision Analysis Matrices continued Travel Time SR 304 Westbound North of Farragut to SR 3 south of SR 304 Chapter 3-29 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

60 Chapter #3 Operational and Collision Analysis Matrices continued Chapter 3-30 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

61 Chapter #3 Operational and Collision Analysis Matrices continued Chapter 3-31 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

62 Chapter #3 Operational and Collision Analysis Criteria Element Restripe 2 Lanes Add Lane to Gorst Construct 2 Lanes Ramp Meter Hard Shoulder Running Mobility Safety Environmental Constructability Maintenance/Operations Total Score Screening Results The table above represents the Stakeholder s Screening Results performed on August 6, 2014: Conclusions Constructing the preferred Restripe Alternative would meet the short-term (Year 2020) purpose and need to improve mobility by eliminating the bottleneck along SB SR 3 in the vicinity of the SR 3/SR 304 Interchange where two lanes merge into one. This Alternative is anticipated to be a least cost, practical design project with an estimated cost below $4 million ($3.77 million) Constructing the ultimate solution Add Lane Alternative would meet the short-term needs (Opening Year 2020) and begin to address the longterm needs (Design Year 2040) for SB SR 3. However this alternative comes with an estimated cost of over $158 Million and is Unfunded. It also comes with a number of environmental mitigation and cost benefit issues that need to be addressed including the replacement of at least two fish barrier culverts, and the existing railroad bridge with mitigation that would require high cost railroad detours among other issues identified during the study. Both the Restripe Alternative and the ultimate solution Add Lane Alternative would not meet LOS standards (LOS D Urban) for the AM peak hour on NB SR 3 between Gorst and Bremerton (SR 16 to SR 304). NB SR 3 is forecast to fail prior to Year 2020 in the SR 3 on ramp merge segment, SR 3 Basic Freeway segment, and EB SR 304 off ramp diverge segment. A subsequent study may consider the following additional alternatives for the long-term (Design Year 2040) AM and PM peak hour where WSDOT s LOS D urban threshold target is exceeded: Additional NB lane on SR 3 between SR 16 and SR 304 to create a six-lane facility. Convert the inside SB lane on SR 3 between SR 16 and SR 304 into a reversible lane for NB traffic in AM and SB traffic in PM (Assumes five-lane facility). Intersection control (signal or roundabout) at Loxie Eagans/SR 3 SB ramps. A single point urban interchange may also be considered depending upon additional analysis. Intersection control (signal or roundabout) at SR 3/Sam Christopherson Intersection. SR 3 SB flyover to SR 304 EB which would reduce queuing at Loxie Eagans/SR 3 SB ramps. This interchange alternative was identified in the prior City of Bremerton s Bremerton Ferry Terminal to the Vicinity of Gorst Final Environmental Impact Statement, dated May Sinclair Inlet Alternative. Chapter 3-32 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

63 Chapter 4 Access Connections and Design Chapter 4-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

64 This page was intentionally left blank. Chapter 4-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

65 Chapter #4 Access Connections & Design WILL THE PROPOSAL PROVIDE FULLY DIRECTIONAL INTERCHANGES CONNECTED TO PUBLIC STREETS OR ROADS, SPACED APPROPRAITELY, AND DESIGNED TO FULL DESIGN LEVEL GEOMETRIC CONTROL CRITERIA? Both SB SR 3 and WB SR 304 are currently and will continue to be fully directional, connected to public roads, and designed to full WSDOT design standards. The proposed interchange modification, changing the existing add lane merge to a parallel on-ramp merge, will not affect the existing interchange spacing. With the planning level design completed to date, one deviation was identified. The SB SR 3 inside left shoulder could be reduced from 6 feet to 2 feet for approximately 0.38 mile from MP to MP for the following justifications: This deviation would provide an effective 9 to 10 foot shoulder (11-ft) from the outside fog stripe to the face of the retaining wall supporting SR 304 WB ramp for bicycle use. This deviation should increase the horizontal stopping sight distance at or near the existing retaining wall. This deviation would provide an 8-foot outside shoulder for the SR 304 SW parallel on-ramp (Along the 900 foot parallel auxiliary lane and 600 foot 50:1 high speed taper). This inside 2-foot shoulder deviation from face of the jersey barrier to fog line is consistent or matches the downstream condition which already exists between Gorst and Bremerton. This deviation most closely matches the GIS shapefile map assumptions for the restripe alternative with an SR 304 parallel on ramp merge. Note: The preliminary cross-section assumptions were taken from Contract 7288, the 2007/2008 As-Built paving plans, and the last paver which occurred in this vicinity. These As- Built plans do not match the existing bridge plans for the roadway sections at or near the WB SR 304 retaining wing wall. Paving Plans for Contract 7288 show an existing 14 foot travel lane with a 16 foot shoulder rather than a 16 foot travel lane with a 16 foot shoulder like the bridge plans. Practical design options could include a narrower outside shoulder or travel lane widths instead of an inside SB SR 3 shoulder deviation. SB SR 3 Restripe to 2 Lanes Alternative Note: It appears that the SR 3/SR 304 interchange was built in a manner largely consistent with the intent of having two southbound traffic lanes. As a result, the implementation of the restripe alternative is expected to primarily be on existing pavement. However, the original (1989) design did not use a parallel on connection, so some minor widening may be necessary. The proposed SB SR 3 Restripe to 2 Lanes alternative will provide two continuous lanes on SB SR 3 from the Loxie Eagans interchange to Gorst and the ramp from SR 304 will be reconfigured as a parallel on ramp connection that ends approximately 900 south of the existing merge. Conceptual Interchange Drawings WSDOT staff measured the pavement width on SB SR 3 at MP to verify the amount of paved surface available. Thirty-nine feet of paved surface was measured from face of barrier to face of barrier which corresponded with the figures depicted in the Contract Five conceptual interchange drawings depict the roadway for the SB SR 3 Restripe to 2 Lanes alternative. For your reference, these drawings are shown on Pages PP4-5 - PP4-13. Section A-A and Section B-B roadway cross sections are displayed as inserts on Page PP4-9. A-A Roadway Cross Section, SR 3 MP Inside Shoulder: Travel Lane1: Travel Lane 2: Outside Shoulder: 6 foot 12 foot 12 foot 8 foot Chapter 4-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

66 Chapter #4 Access Connections & Design Conceptual Interchange Drawings SR 3: A-A Roadway Cross Section, MP continued In the A-A Roadway Cross Section, staff recommends reducing the inside shoulder width to 2 feet in order to maintain a consistent 10 outside shoulder width in this area. SR 304: B-B Roadway Cross Section, SR 304 MP 0.06 Inside Shoulder: Travel Lane1: Travel Lane 2: Outside Shoulder:. 3 foot 12 foot 12 foot 10 foot Chapter 4-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

67 Chapter 4-5 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

68 Chapter 4-6 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015 This page was intentionally left blank.

69 Chapter 4-7 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

70 Chapter 4-8 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015 This page was intentionally left blank.

71 Chapter 4-9 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21,

72 Chapter 4-10 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015 This page was intentionally left blank.

73 Chapter 4-11 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

74 Chapter 4-12 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015 This page was intentionally left blank.

75 Chapter 4-13 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

76 Chapter 4-14 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015 This page was intentionally left blank.

77 Chapter 5 Land Use and Transportation Plans Chapter 5-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

78 This page was intentionally left blank. Chapter 5-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

79 Chapter #5 Land Use & Transportation Plans IS THE PROPOSED ACCESS POINT REVISION COMPATIBLE WITH ALL LAND USE AND TRANSPORTATION PLANS FOR THE AREA? The proposed Restripe to 2 Lanes SB SR 3 Interchange Improvements project is consistent with the City of Bremerton and Kitsap County area land use plans. The traffic forecasts used to analyze these improvements as discussed in Chapter 3 were based on the adopted land use plans. Kitsap County and the City of Bremerton developed the land use data from these plans there were used to calibrate the regional travel model and to forecast future travel volumes. The Kitsap Peninsula is primarily served by state routes (SR) 3, 16, and 104. The Kitsap Peninsula, which encompasses all of Kitsap County except Bainbridge and Blake Islands, as well at the northeastern part of Mason County is surrounded by the waterbodies of the Puget Sound to the east and Hood Canal to the west. Much of the Kitsap Peninsula s terrain is flat. The Kitsap Peninsula is dependent upon ferry service from the Seattle region. The Kitsap Peninsula is also heavily dependent upon the Tacoma Narrows Bridge for access to the region. Kitsap County occupies a land area of square miles with a population density of per square mile, making it the third most densely populated county in Washington. The county is virtually an island, only a five-mile strip of land between the Hood Canal and Case Inlet keep it from being such. The relative isolation from the most densely populated areas on the eastern shore of Puget Sound has contributed to the perception of Kitsap as a predominately rural place. While this was true at one time, much of the county today is characterized by suburban and urban development. Much of the county s urban growth developed because of jobs created by Navy facilities such as the Puget Sound Naval Shipyard, Manchester Fuel Deport, Keyport and Bangor Naval Base. The siting of the Submarine Base at Bangor in the mid-1970s and then later the regional shopping center in early 1980s helped Silverdale become the county s center for commercial and business activity. A significant portion of the country s land mass has been designated rural, the county s comprehensive plan identified that approximately 34% of the unincorporated acreage is designated as either rural protection or rural residential. The next largest land use category in the county is forest which constitutes 22% of the land mass, much of which is located in the western portions of the county. City or urban land uses make up over 21.9% of the county. This urban designation includes incorporated cities and urban growth areas including urban reserve, industrial urban reserve, and urban restricted lands. Recent annexation of the South Kitsap Industrial area into the City of Bremerton has increased the amount of land designation as urban. Military lands account for approximately 3.4% of the county and is a major employer for county residents. Tribal lands constitute 1.7% of the county. Parks lands, public facilities, and open space make up 2.2% of the county land and mineral resource land, and mineral resource lands make up 1.2% of the county. Featured on the next page, is a graphic map depicting the different land uses within Kitsap County. Chapter 5-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

80 Chapter #5 Land Use & Transportation Plans Chapter 5-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

81 Chapter #5 Land Use & Transportation Plans The proposed Restripe to 2 Lanes SB SR 3 Interchange Improvements project is consistent with state, regional, county and local plans. A description of each plan follows: WSDOT s Highway System Plan (HSP) The Washington State Highway System Plan (HSP) is the state highway component of the Washington State Multimodal Transportation Plan (SMTP). The SMTP is the state s overall transportation plan that will include an analysis of facilities the state owns and those in which the state has an interest. WSDOT s HSP serves as the basis for the six-year highway program and the two-year biennial budget request to the State Legislature and is updated every two years.. The HSP is the element of the Washington Transportation Plan (WTP) that addresses current and forecasted state highway needs based on the investment options identified in the WTP. The WTP, identifies the SR 3/SR 304 intersection as both a bottleneck and chokepoint location. Bottlenecks are places where the physical attributes of a roadway change in a manner that impacts the flow of traffic. Typical bottlenecks are locations where the number of lanes decrease. Chokepoints are places where congestion occurs because of traffic interference and/or the roadway configuration (highway interchanges). WSDOT is dedicated to delivering a HSP that implements the Legislature s goals. This is accomplished through the coordination and integration of specific components from many statewide modal and program plans. The HSP is also aligned to the WTP which outlines the policies adopted by the Washington State Transportation Commission. WSDOT s goal is to create a long-range plan that provides decision-makers with the most cost-effective strategies. The spreadsheet below depicts the HSP solutions identified for the SR 3/SR 304 interchange Highway System Plan Solutions Title Description Strategy Need ID Key/ Page Year SR 3/SR 304 interchange Widen SB SR 3 under bridge; Widening and ramp meter WB SRamp meter WB SR 304 onto Add Capacity 304 onto SR 3 and extend onramp to SB SR 3. SB SR SR 3; and extend on-ramp to Strategically 3. The SB lanes narrow from two to one lane under a bridge structure. This lane reduction causes large back-ups. Key162/ J SR 3/SR 304 interchange Reconstruct interchange Reconstruct the SR 3/SR 304 interchange. Add Capacity Strategically Exceeds maximum throughput in 2005 Key 344/ J SR 3/SR 16 to SR 304 HOV Lanes Widen from 4 to 6-lanes divid facility between the SR 3/SR interchange and SR 3/SR 304 interchange. Add Capacity Strategically Exceeds maximum throughput in 2011 Key 343/ J SR 3/SR 16 Spur to SR 304 ITS Intelligent Transportation Systems Master Plan Improvements Operate Efficiently Mobility Deficiency; Key 54/ Bottleneck and Chokepoint; High traffic K-16 volume causes congestion 2030 Chapter 5-5 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

82 Chapter #5 Land Use & Transportation Plans 1996 SR 3/SR 304 Bremerton Ferry Terminal to Vicinity Gorst FEIS The City of Bremerton, in cooperation with WSDOT, FHWA, U.S. Navy, Kitsap County, Kitsap Transit, and the Transportation Improvement Board (TIB) are working to implement roadway improvements to SR 3, SR 304, and some Bremerton city streets. The project termini is on SR 3 just north of the SR 3/ SR 16 interchange near the railroad crossing in the vicinity of Gorst and the Bremerton Ferry terminal. The improvements proposed include road widening, highoccupancy vehicle (HOV) lanes, interchange improvements, access control measures, frontage road improvements, new intersections, signalization and signage improvements, roadway surface improvements, and a one-way couplet system. The proposed road widening includes expanding SR 3, currently four lanes, to eight lanes and expanding a portion of SR 304 from five lanes to six lanes. The proposed improvements would provide a higher level of service along this route, alleviate congestion, improve safety, and improve access between the regional highway system and downtown Bremerton. In conjunction with the road improvement project, Kitsap Transit is scheduling expansion of its base facility that is located on the project route. The proposed street improvements are coordinated with the street modifications necessary for the base facility s expansion. Based on review of the DEIS, public hearing and comments received, the Federal Transit Administration has issued a National Environmental Policy Act (NEPA) categorical exclusion (CE). All alternatives require implementation of Transportation Demand Management and Transportation Systems Management techniques. Note: This project was shelved in December 1999 due to the passage of Initiative 695 that provided tax relief to citizens by removing the vehicle licensing excise tax. Forty-seven percent of the license-tab money had gone to state transportation projects Value Engineering (VE) Study for SR 3 Gorst Railroad Bridge to SR 3/304 Interchange The purpose of this rural mobility project is to reduce congestion and increase safety on SR 3 between Gorst and Bremerton. The project will increase the capacity of SR 3 by adding HOV lanes from the railroad bridge tin Gorst to the SR 3/SR 304 interchange. Within the corridor, SR 3 parallels Sinclair Inlet and railroad tracks to one side and high rock bluffs to the other. Currently, the two northbound and two southbound lanes of SR 3 share a common alignment separated by 1.2 m shoulders and median barrier. The project will widen from the current 4 lanes to 6 lanes of an ultimate 8 lane facility. All additional lanes are to be HOV lanes with 2 HOV lanes and 2 general purpose lanes in each direction. The widening will be provided by building a new SB roadway paralleling the northbound roadway. The SB roadway will typically be at a higher elevation excavated into the rock bluffs. The existing roadway will be restriped to include only NB traffic, with a HOV lane. A Value Engineering team was assembled to develop and evaluate alternatives for the alignment and land configuration of the SB elements at the SR 3/SR 304 interchange to address the HOV connections. The Value Engineering Team developed the following recommendations recommendation: To provide for 2 general purpose lanes for SB SR 3 below the existing SR 304 bridge. There will be no provision for HOV traffic approaching the SR 304 bridge from the north. The SB HOV lane will begin from WB SR 304 and continue south on SR 3 in its own dedicated lane. The existing SR 304 bridge will carry one GP lane on the inside and one HOV traffic in the outside lane. The GP lane on SR 304 will merge with the right hand GP lane for SB SR 3, which will still allow for one uninterrupted SB SR 3 lane. Note: At some future date, another HOV lane will be added both northbound and southbound on SR 3. Chapter 5-6 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

83 Chapter #5 Land Use & Transportation Plans 2004 City of Bremerton Comprehensive Plan s Transportation Element Bremerton has a rich history of unique transportation options and patterns from the small mosquito ferries to a strong grid road system. The City of Bremerton s Comprehensive Plan Transportation Element emphasizes the need to consider pedestrians and bicycles in transportation planning, especially in the creation and linking of walkable centers with appealing streetscapes. While setting standards on heavily used arterials to enable traffic mobility, the Element also works to protect and integrate the adjacent neighborhood character and safety. A well-coordinated transportation system will enhance the quality of life in Bremerton, while reducing urban sprawl and other undesirable development patterns. A fundamental tool in these efforts, the Level of Service (LOS) standards established in this Element, provide the means to evaluate and measure the impact of future development in the community. Bremerton s Transportation Element identifies a series of improvements to SR 304 from SR 3 to the Bremerton Transportation Center in downtown Bremerton. SR 3 is the sole north-south freeway in Central Kitsap County. The four-lane limited access facility accommodates both regional and more localized travel between surrounding communities in Kitsap County. SR 304 is a three to four-lane principal arterial that is partially divided. The SR 304 alignment extends northeast from the SR 3/SR 304 interchange continuing on as the Navy Yard Highway to Charleston Boulevard, along Callow Avenue to Burwell Street and east on Burwell Street to downtown Bremerton Kitsap County Final Comprehensive Plan Kitsap County has reached a key point in its growth and development where many residents, business people and government officials see an opportunity to provide direction and a vision for the future growth of Kitsap County. Despite rapid growth in the past two decades, Kitsap County remains an attractive place to live and work. Kitsap County absorbed an 87% increase in population between 1970 and 1990, more than twice the state s growth rate of 42.6%. Between 1990 and 2000, Kitsap County increased in size by 22%. And the population continues to grow. Kitsap County represents the third most densely populated county in Washington due to its small geographic size and proximity to the state s largest employment centers. The vision for transportation in the future is an efficient, flexible, and coordinated multi-modal transportation system including roads, bridges and highways, ferries, transit, and non-motorized travel--- that provides interconnectivity and mobility for county residents and supports out urban and rural land use pattern. The comprehensive plan s Transportation chapter provides the policy framework to guide short-range and long-range development and maintenance of the multi-modal transportation system that includes roadways, bikeways, pedestrian facilities, ferries, buses, rail, air travel, freight movement and demand strategies. The Kitsap County s level of service (LOS) standards were coordinated with other jurisdictions and the two regional planning agencies. LOS standards on state facilities are consistent with those set by WSDOT. In addition to coordinating its LOS with PSRC, Kitsap County coordinates with PSRC in the identification of centers where additional transportation investments should be targeted. Chapter 5-7 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

84 Chapter #5 Land Use & Transportation Plans 2012 Bremerton Economic Development Study The Bremerton Economic Development Study (BEDS) is a planning study focused within the South Kitsap/North Mason County area. The study corridors are comprised of the following three principal highways and has a total length of approximately 47.1 miles: US 101 SR 3 SR 16 These highways provide regional access for Mason and Kitsap Counties and are the primary commercial, freight, military and recreational travel routes within and through these counties. The highways are part of the federal National Highway System and classified as part of of the Washington State s Highways of Statewide Significance (HSS) system. The Gorst Area Improvements: Heavy peak period travel through the Gorst area from SR 304, SR 3 and SR 16 has created a traffic congestion issue that cannot be easily improved with a single project. Stakeholders identified the following Gorst area Improvements as their top priorities: To meet existing demand, provide intersection improvements at SR 3/Sam Christopherson Road including grade separation. To meet 2020 demand, provide expanded Intersection improvements at SR 3/ Sam Christopherson Road. Widen SR 3 to eliminate lane drop on SR 16 to northbound SR 3 by extending the lane north of the railroad bridge, rebuild the bridge, and extend the northbound SR 3 lane. Widen SR 3 to 6 lanes from Gorst to SR 304 to add HOV & rebuild SR 3/SR 304 interchange Scoping Estimate SR 3/SR 304 I/C Improvements The scope of the proposal was to eliminate the existing lane reduction on SB SR 3 between Loxie Eagans interchange and the SR 304 interchange. The ramp from SR 304 to sb SR 3 would be configured to a parallel on-ramp connection. The 1989 plans for construction of this interchange show two continuous lanes on SB SR 3 with a standard ramp merge from SR 304. So, it appears the interchange was built in a manner largely consistent with the intent of this scoping proposal. As a result, the configuration in this scoping proposal is expected to primarily be on existing pavement. However, the original design didn t use a parallel on connection, so some minor widening may be necessary to provide that. Proposed revisions to the SR 3/SR 304 interchange include: The elimination of the lane reduction on SB SR 3 between Loxie Eagans and SR 304. This reconfiguration will provide two continuous lanes on SB SR 3 from Loxie Eagans interchange to Gorst and have the ramp from SR 304 reconfigured as a parallel on ramp connection that ends approximately 900 south of the existing merge. This alternative features 12 lanes on SR 3 and a 15 lane for the SR 304 ramp. (On SR lanes may be allowed if needed for ROW). Continuing the second SB lane on SR 3 was originally thought to result in a sub-standard sight distance beneath the bridge carrying the SR 304 ramp. Traffic modeling is recommended. Chapter 5-8 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

85 Chapter #5 Land Use & Transportation Plans Kitsap Transit s Transit Development Plan Kitsap Transit provides fixed route service, ADA-accessible doorto-door service, Worker/Driver service, vanpool service, general public dial-aride service, and foot ferry service for parts of Kitsap County. The headways for routes that operated all day were usually one hour. During commute hours, many of these allday routes were also scheduled to meet Washington State Ferries (WSF) at the Bainbridge Island, Bremerton and Southworth terminals. Weekday service hours were from 4:00 AM to 8:30 PM. On Saturdays, 19 routes were operated on one-hour headways between 10 AM and 5:30 PM. Employees of the Department of Defense who commute to work by bus, ferry (walk-ons or passengers in an eligible vanpool on either KTFF or WSF), or vanpool are eligible to register in the Transportation Incentive Program. Under this program, registered employees can receive a financial incentive, up to $130 per month for their actual commuting costs. Kitsap Transit also provides Worker/Driver Buses. Most worker driver bus fares ($2 one-way) are paid by the Navy via TIP. Kitsap Transit facilitates the following commute trip reduction services: All but two of the W/D buses and many vanpool vans served Puget Sound Naval Shipyard/Naval Base Kitsap. Other vanpools serve Naval Base Bangor along with two W/D buses. Kitsap Transit operated Routed and/or W/D service to 24 park & ride lots throughout Kitsap County in Worker/Driver buses from Gorst to PSNS 1 Worker/Driver bus from Gorst to Bangor 15 Vanpools to the Bangor Submarine Base 3 Vanpools to Keyport 5 Vanpools to PSNS 2013 Gorst Subarea Plan The Gorst Subarea Plan is a comprehensive 20- year plan that establishes the general patterns for future land use, transportation and other infrastructure needs in Gorst. The purpose of this plan is to provide greater detail, guidance and predictability to future development within the Gorst UGA, while also protecting the environment. The Subarea Plan is intended only to address the future vision and development regulations for the Gorst UGA which is approximately 335 acres in size. The Gorst community is located on Sinclair Inlet between Bremerton and Port Orchard. Two highways converge in Gorst, SR 3 and SR 16. A railroad also traverses the area and connects the Puget Sound Naval Shipyard with the Bangor submarine facility and the Port of Shelton. Through Gorst, county residents, commuters, and military personnel travel to major job centers in the County including Downtown Bremerton and the Puget Sound Naval Shipyard, Bremerton National Airport and associated South Kitsap Industrial Area, and others. From the north at Navy Yard City, SR 3 carries 44,000 Annual Average Daily Traffic (AADT), increasing to 73,000 AADT north of Gorst, and continuing on SR 16 to Port Orchard with 43,000 AADT (WSDOT 2012). In addition to being strategically located between major population and job centers in Kitsap County, the Gorst area contains regionally significant environmental resources. The approximately 6,570-acre Gorst Creek Watershed is diverse with thousands of acres of intact forest land, miles of streams and acres of wetlands. Much of the forested area that comprises the north and central portion of the Gorst Creek Watershed is publically owned, and lies within a contiguous area that also contains Green Mountain and Tahuya State Forest. Taken together, this area comprises the largest open-space block in the Puget Trough Ecoregion of the Puget Sound Basin. Chapter 5-9 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

86 Chapter #5 Land Use & Transportation Plans Peninsula Regional Transportation Planning Organization The proposed Restripe to 2 Lanes southbound SR 3 Interchange Improvements project is consistent with the Peninsula Regional Transportation Planning Organization s (PRTPO) Regional Transportation Plan (RTP) 2030 which was being finalized at the time of this study. The Regional Transportation Plan depicts national, state and county issues and challenges that will shape the PRTPO s thinking and planning in the years to come. The legislative environment at the state and national level does not offer a clear direction for regional planning at present. Selectively maintaining facilities, rather than undertaking new construction, is not popular with the governing bodies. Puget Sound Regional Council (PSRC): PSRC s Transportation 2040 is an action plan for transportation in the central Puget Sound region for the next three decades. Every four years, the region updates the plan to reflect changing conditions and to meet state and federal requirements. The proposed Restripe to 2 Lanes SB SR 3 Interchange Improvements project is included in Attachment A 2015 Transportation 2040 Minor Amendment Proposed Project Revisions Doc ID 1389 dated June 18, Chapter 5-10 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

87 Chapter 6 Future Interchanges Chapter 6-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

88 This page was intentionally left blank. Chapter 6-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

89 Chapter #6 Future Interchanges IS THE PROPOSED ACCESS POINT REVISION COMPATIBLE WITH A COMPREHENSIVE NETWORK PLAN? There is no comprehensive network plan for this section of SR 3 and there are no new interchanges proposed within five miles of the proposed interchange improvements at the SR 3/SR 304 interchange in Bremerton. The SR 3/SR 304 interchange improvements are consistent with other proposed noninterstate improvements as identified in WSDOT s Highway System Plan. Another study in the area that is just getting underway is the SR 3/SR 16 Gorst (Bremerton) Feasibility Study. Kitsap County received a Surface Transportation Program grant in the amount of $346,000. The STP funds were matched with $54,000 in local funds from WSDOT, Kitsap County, City of Bremerton, Port of Bremerton, Kitsap Transit and the City of Port Orchard. It is anticipated that this study will use the same travel demand model for traffic forecasting as the SR 3/SR 304 study analyses. WSDOT will study the feasibility of alternatives for the corridor between Gorst and Bremerton. Alternatives may include the following: The replacement of the Navy railroad bridge; Roadway alignment alternatives including six lanes, eight lanes, reversible lane and roadway changes to Sherman Heights Road, Environmental considerations such as shoreline mitigation, rising water from climate change, and salmon streams; Right of way acquisitions; TDM/TSM considerations; Non-motorized issues; and Transit considerations such as HOV lanes, worker-driver buses, transit stops, and park & ride lots. WSDOT has identified various interstate improvements near the SR 3/SR 304 interchange in Bremerton in their current Highway System Plan , completed in December The Highway System Plan (HSP) organizes projects into three tiers and also identifies solutions that require further analysis. These levels are as follows: Tier I Features low cost solutions; High return on investment; Short delivery schedules; System-wide implementation; Typical Minimum Fix. Tier II Features moderate to Higher cost solutions; Potential network benefits; Typical Moderate Fix. Tier III Features Higher cost solutions; Corridor-wide benefits; Typical Maximum Fix Study area projects featured in the HSP: TIER I: STUDY Add Intelligent Transportation System Master Plan Improvements from SR 3/ SR 16 Spur to SR 304. TIER II No Tier II solutions were identified. TIER III BOTTLENECKS & CHOKEPOINTS SR 3 and SR 16 SR 3 and SR 304 Widen SB SR 3 under the bridge; Ramp meter WB SR 304 onto SR 3; and extend on-ramp to SB SR 3. Reconstruct the SR 3/SR 304 interchange. Add HOV lanes by widening the roadway from 4 to 6-lanes divided facility between the SR 3/SR 16 interchange and the SR 3/SR 304 interchange. The revision of the access point of the SR 3/ SR 304 interchange is compatible with the comprehensive transportation network in the region. Chapter 6-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

90 This page was intentionally left blank. Chapter 6-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

91 Chapter 7 Coordination Chapter 7-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

92 This page was intentionally left blank. Chapter 7-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

93 Chapter #7 Coordination ARE ALL COORDINATING PROJECTS AND ACTIONS PROGRAMMED AND FUNDED? The proposed SR 3/SR 304 interchange improvements are being considered in conjunction with other programmed local projects to improve traffic flow throughout the project area. The analysis completed for this study was consistent with planned land use proposed by the City of Bremerton and Kitsap County and documented in the City of Bremerton s and Kitsap County s Comprehensive Plans and the Puget Sound Regional Council s Transportation Initially no assumptions regarding coordination were considered beyond the funds appropriated by the legislature for initial development of the project, however, current transportation revenue legislation proposed the following additional funds for this project. Funding for the SR 3 Restriping is recorded in the 2015 Supplemental Transportation Budget as identified as part of the LEAP Transportation Document 2015 NL-1 dated June 28, A total allocation of $4.2 million ($1.3 million in the biennium and $2.9 million in the biennium.) was allocated. As depicted in the graphic on the right, the SR 3 Restripe alternative restripes the existing roadway to create two lanes on SR 3 SB in the area where two lanes currently merge into one. This alternative also adds an HOV lane to the SR 304 onramp ending 100 feet after the bridge. The current SR 304 WB add lane on-ramp merge to SR 3 SB would be reconfigured into a parallel on-ramp merge. The second SR 3 SB lane would be a permanent fix that is available around the clock. This alternative was identified as the low cost and short term solution. The legislature also passed a new law budget that includes a SR 16/Corridor congestion Study between SR 3 and the Tacoma Narrows Bridge for $3 million in the biennium. Chapter 7-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

94 This page was intentionally left blank. Chapter 7-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

95 Chapter 8 Environmental Processes Chapter 8-1 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

96 This page was intentionally left blank. Chapter 8-2 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

97 Chapter #8 Environmental Processes WHAT IS THE STATUS OF THE PROPOSAL S ENVIRONMENTAL PROCESSES? This chapter highlights the required environmental process for the improvements described by this study. The feasibility study is intended to result in a finding of engineering and operational acceptability. A formal environmental process will occur following the study during the preliminary engineering process. A preliminary screening of potential environmental impacts of improvements at the SR 3/SR 304 interchange was completed as part of the SR 3/SR 304 Bremerton Interchange Improvements study. ENVIRONMENTAL ISSUES NOTE: The following environmental information was based on the 1996 Bremerton Ferry Terminal to the Vicinity of Gorst Final EIS. Wetlands In December 1992, Parametrix surveyed and flagged wetlands in the project area as part of the SR 3 Gorst Railroad Bridge to SR 304 project. The study area encompasses 9 jurisdictional wetland areas, including the shoreline of Sinclair Inlet (reference the Fish Passages & Wetland graphic on the next page). Four of these wetlands (1, 4, 7 and 8) are estuarine intertidal wetlands associated with Sinclair Inlet. The remaining wetlands are palustrine wetlands. Note: Palustrine systems are defined as all non-tidal wetlands dominated by trees, shrubs, persistent emergent, emergent mosses or lichens, and all such wetlands that occur in tidal areas where salinity due to oceanderived salts is below 5%. Wright Creek, the only perennial creek in the project area that drains into Sinclair Inlet, has its headwaters in a wetland. From this wetland the creek flows through a clear-cut forest, a heavily wooded area, and a steep raving. The upper segment of the creek is within the City of Bremerton s water supply watershed. There are a few homes located near the mouth of the creek where it becomes a small tidal estuary and flows into Sinclair Inlet and is associated with Wetland 7. The Ecology rating system uses specific criteria to classify individual wetlands in four categories, ranging from highest value Category I wetlands to lowest value Category IV wetlands. The rating is based on wetland functions and values, sensitivity to disturbance, rarity, and the ability to replace a particular wetland type. This rating system also recommends creating or preserving buffer zones to protect wetlands from adjacent development, and providing replacement rations for compensatory mitigation. Project Area Wetland Ratings Category I The entire shoreline of Sinclair Inlet Category II 3 wetlands (1, 7, 8) Category III 5 wetlands (2, 3, 4, 5, 6) Category IV 0 wetlands Cultural Resource Site One cultural resource site was identified between Sherman Heights Road and Gorst (Reference the Fish Passages & Wetlands graphic on the next page). A shell midden is a heap of clam, oyster, whelk, or mussel shells created by and large for a single purpose such as dinner. Mitigated Unstable Slopes Along SB SR 3 just south of Sherman Heights road are two mitigated unstable slopes. This type of basalt rock is featured throughout the study area. As part of the mitigation process, WSDOT removed the loose basalt rocks from the cliffs, secured the remaining rocks to the bank with dowels and installed a protective wire mesh to prevent rocks from falling onto SR 3. Chapter 8-3 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

98 This page was intentionally left blank. Chapter 8-4 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

99 Fish Passages & Wetlands A Cultural Resource site was identified between Sherman Heights Rd. and Gorst Chapter 8-5 SR 3/SR 304 Bremerton Interchange Improvements Project Revised October 21, 2015

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Final Interchange Justification Report

Final Interchange Justification Report I- / TROSPER ROAD Final Interchange Justification Report Prepared for: Prepared by: I-/Trosper Road Final Interchange Justification Report Prepared for City of Tumwater Israel Rd SW, Olympia, WA 0

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12 Mobility Investment Priorities Project Houston IH 45 IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) Current Conditions From IH 10 to IH 610 south, IH 45 is a 6- to 9-lane facility with three

More information

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Mobility Investment Priorities Project Houston US 59 US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Current Conditions From IH 610 West to SH 288, US 59 operates with four or five lanes

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Evaluation of Renton Ramp Meters on I-405

Evaluation of Renton Ramp Meters on I-405 Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK Gene

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Metropolitan Freeway System 2007 Congestion Report

Metropolitan Freeway System 2007 Congestion Report Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

Appendix B CTA Transit Data Supporting Documentation

Appendix B CTA Transit Data Supporting Documentation RED ED-PURPLE BYPASS PROJECT ENVIRONMENTAL ASSESSMENT AND SECTION 4(F) EVALUATION Appendix B CTA Transit Data Supporting Documentation 4( Memorandum Date: May 14, 2015 Subject: Chicago Transit Authority

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Interchange Justification Report

Interchange Justification Report Interchange Justification Report Interstate 29 at 85 th Street- Exit 74 Sioux Falls, SD SEH No. 132589 October 1, 2018 Prepared by: Short Elliott Hendrickson Inc. Executive Summary The Interchange Justification

More information

Transportation Technical Report

Transportation Technical Report Transportation Technical Report Puyallup Station Access Improvements Transportation Technical Report 4 South Jackson Street Seattle, WA 984 2826 February 26 This Page Intentionally Left Blank Puyallup

More information

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Southern Windsor County 2016 Traffic Count Program Summary April 2017 Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

GTA West Corridor Planning and EA Study Stage 1

GTA West Corridor Planning and EA Study Stage 1 GTA West Corridor Planning and EA Study Stage 1 Draft Development Strategy Presentation to Peel Goods Movement Task Force April 8 2011 Study Areas 2 Unique Approach Unprecedented two-stage EA process:

More information

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT May 8, 2018 Page i TABLE OF CONTENTS Table of Contents... i 1. Introduction... 1 1.1 Summary... 1 2.

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements Existing Conditions Belmont Circle Bourne, MA Speakers Pam Haznar, MassDOT Ed Hollingshead, Fay Spofford & Thorndike Heather Ostertog, Fay, Spofford & Thorndike Goals for Group Local Knowledge Work through

More information

Proposed Commercial Service at Paine Field Traffic Impact Analysis

Proposed Commercial Service at Paine Field Traffic Impact Analysis Gibson Traffic Consultants 80 Wetmore Avenue Suite 0 Everett, WA 980.9.86 Prepared for: Federal Aviation Administration July 0 GTC #09-07 TABLE OF CONTENTS. EXECUTIVE SUMMARY.... PROJECT IDENTIFICATION....

More information

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC Interstate 85 Widening Phase III Interchange Modification Report Exit 16 E. Cherokee Street Cherokee County, SC Prepared for: South Carolina Department of Transportation Prepared by: Stantec Consulting

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment 2.1.5 Traffic and Circulation This section addresses the potential impacts to traffic and circulation associated with construction and long-term operation of the proposed project. The traffic and circulation

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

Chapter 7. Transportation Capital Improvement Projects. Chapter 7

Chapter 7. Transportation Capital Improvement Projects. Chapter 7 Chapter 7 Transportation Capital Improvement Projects Chapter 7 81 Chapter 7 Transportation Capital Improvement Projects Local Transportation Sales Tax Programs For over three decades, Santa Clara County

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY Final Report Washington Metropolitan Area Transit Authority Office of Real Estate and Station Planning April 2016 [This page intentionally left blank]

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

FINAL DESIGN TRAFFIC OPERATIONS REPORT

FINAL DESIGN TRAFFIC OPERATIONS REPORT IndyGo Red Line Rapid Transit Project Phase 1 FINAL DESIGN TRAFFIC OPERATIONS REPORT IndyGo April, 2016 Table of Contents Section 1 Introduction... 1-1 1.1 Project Description... 1-1 1.2 Existing Conditions...

More information

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Annie Nam Southern California Association of Governments September 24, 2012 The Goods Movement

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Transportation Discipline Report

Transportation Discipline Report MUKILTEO MULTIMODAL PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT Transportation Discipline Report Prepared for: June 2013 Transportation Discipline Report Mukilteo Multimodal Project Final Environmental

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information