1 Mixed-Use Development Transport Impact Evidence Park Road Donvale

2 Mixed-Use Development Park Road, Donvale Transport Impact Evidence Client: CPG Australia Pty Ltd Reference: JM14940 GTA Consultants Office: Melbourne GTA Consultants (GTA Consultants (VIC) Pty Ltd) 2011 The information contained in this document is confidential and intended solely for the use of the client for the purpose for which it has been prepared and no representation is made or is to be implied as being made to any third party. Use or copying of this document in whole or in part without the written permission of GTA Consultants constitutes an infringement of copyright. The intellectual property contained in this document remains the property of GTA Consultants.

3 Required Statement of Witness Required Statement of Witness Name, Position and Address John Kiriakidis Director, GTA Consultants 87 High Street South Kew Vic 3101 Qualifications and Experience Qualifications B.E. (Hons) Civil and Computing, Monash University Professional Memberships Graduate Member of The Institution of Engineers, Australia Member of Australian Institute of Traffic Planning and Management Member of the Victorian Planning and Environmental Law Association Experience Traffic & Transport Planning 2 years Grogan Richards Pty Ltd 13 years GTA Consultants. Particular Area of Expertise Traffic and Transport Planning (refer to Curriculum Vitae in Appendix E). Scope of Report Refer to Section 1.2 of this evidence. Facts and Assumptions As detailed in submission. Reference Documents Refer to Section 1.3 of this evidence. Experiments Traffic and car parking surveys as detailed within this evidence. Supporting Staff The following staff assisted with the preparation of the evidence: Mr Jason Sellars (Associate Director) Mr Alex Connell (Traffic and Transport Planner) Summary of Opinion Refer to Section 8 of this evidence. Provisional Opinions Not applicable. Report Completeness Final. Transport Impact Evidence

4 Table of Contents Table of Contents 1. Introduction Background Purpose of this Evidence Referenced Documents 1 2. Existing Conditions Subject Site Road Network Accident Statistics Sight Distances Car Parking Sustainable Transport Infrastructure 9 3. Development Proposal Land Uses Revised Site Layout Plans Car Parking Vehicle Access Internal Road Layout Bicycle Facilities Pedestrian Facilities Loading Areas Car Parking Statutory Car Parking Requirements Decision Guidelines Adequacy of Parking Supply Car Parking Layout Sustainable Transport Infrastructure Bicycle End of Trip Facilities Loading Facilities Statutory Requirements Proposed Loading Arrangements Waste Collection Traffic Impact Assessment Traffic Generation Distribution and Assignment Traffic Impact Summary Conclusions 25 Transport Impact Evidence

5 Table of Contents Appendices A: SIDRA Intersection Results Existing B: SIDRA Intersection Results Post Development C: Proposed Park Road/Site Access Intersection GTA Consultants Drawing Number JM P1 D: Revised Site Layout Plans E: Curriculum Vitae Mr John Kiriakidis Figures Figure 2.1: Aerial Map of Subject Site and its Environs 2 Figure 2.2: Melways Map of Subject Site and its Environs 3 Figure 2.3: Land Zoning Map 3 Figure 2.4: Park Road looking northeast 4 Figure 2.5: Park Road looking southwest 4 Figure 2.6: Heads Road looking east 5 Figure 2.7: Existing AM Peak Hour Traffic Volumes 5 Figure 2.8: Existing PM Peak Hour Traffic Volumes 6 Figure 2.9: Saturday Peak Hour Traffic Volumes 6 Figure 2.10: Area of Car Parking Inventory 8 Figure 2.11: Public Transport Map 9 Figure 7.1: Park Road/Heads Road PM Peak Hour Flows Post Development (Sports Facility Use) 21 Figure 7.2: Park Road/Heads Road Saturday Peak Hour Flows Post Development (Sports Facility Use) 21 Figure 7.3: Park Road/Proposed Site Access PM Peak Hour Flows Post Development (Sports Facility Use) 22 Figure 7.4: Park Road/Proposed Site Access Saturday Peak Hour Flows Post Development (Sports Facility Use) 22 Tables Table 2.1: Average Weekday Daily Volume in vicinity of Subject Site 7 Table 2.2: Park Road/Heads Road Intersection Existing Operating Conditions 7 Table 2.3: Road Based Public Transport Provision 10 Table 3.1: Proposed Development Schedule 11 Table 4.1: Statutory Car Parking Requirements 13 Table 4.2: Car Parking Profiles (Active Weekday) 15 Table 4.3: Car Parking Profiles (Active Saturday) 16 Table 5.1: Standard Requirement for Bicycle Facilities 18 Table 7.1: Traffic Generation Weekday & Weekend Road Network Peak Hours 20 Transport Impact Evidence

6 Table of Contents Table 7.2: Park Road/Heads Road Intersection Post Development Operating Conditions 23 Table 7.3: Park Road/Proposed Site Access Intersection Post Development Operating Conditions 23 Table 7.4: Park Road/Proposed Site Access Intersection Post Development Operating Conditions 23 Table 7.5: Park Road/Proposed Site Access Intersection Post Development Operating Conditions (Yr 2021) 24 Transport Impact Evidence

7 Introduction 1. Introduction 1.1 Background A town planning permit is currently being sought for a proposed mixed-use development on land located at Park Road in Donvale. The proposed development incorporates the construction of a multi-purpose venue with associated basement and ground level car parking. The town planning application was lodged with Manningham City Council on 30 March An Application for Review at VCAT (P3135/2010) was lodged by the applicant on 9 November 2010 against Council s Refusal to Grant a Planning Permit. The basis for the refusal which pertains to traffic and transport matters include: 4. The proposal will contribute to increased traffic generation and parking issues which will impact on the unsignalised intersection of Park Road and Heads Road, Donvale and place additional traffic on local feeder roads. 5. The proposed service vehicle entry from Heads Road to the proposed building is unsatisfactory and will create hazardous access. GTA Consultants was commissioned by the Applicant in December 2010 to present expert traffic and transport evidence at VCAT. 1.2 Purpose of this Evidence This evidence sets out an assessment of the anticipated parking, traffic and transport implications of the proposed development, including consideration of the following: existing traffic and parking conditions surrounding the site parking demand likely to be generated by the proposed development suitability of the proposed parking in terms of supply (quantum) and layout traffic generation characteristics of the proposed development proposed access arrangements for the site transport impact of the development proposal on the surrounding road network. 1.3 Referenced Documents In preparing this report, reference has been made to a number of background documents, including: Manningham Planning Scheme Australian Standard/ New Zealand Standard, Parking Facilities, Part 1: Off-Street Car Parking AS/NZS :2004 Australian Standard, Parking Facilities, Part 2: Off-Street Commercial Vehicle Facilities AS :2002 plans for the proposed development prepared by Ammache Architects traffic and car parking surveys undertaken by GTA Consultants as referenced in the context of this report various technical data as referenced in this report an inspection of the site and its surrounds other documents as nominated. Transport Impact Evidence Page 1

8 Existing Conditions 2. Existing Conditions 2.1 Subject Site The subject site is located at Park Road in Donvale. The site has frontages of approximately 615m to Park Road and 300m to Heads Road. The site is located within a Low Density Residential Zone (LDRZ) and is currently occupied by the existing Coptic Orthodox Church Diocese of Melbourne. The surrounding properties are primarily residential. The notable exceptions include Whitefriars College located approximately 150m north of the subject site. The location of the subject site and the surrounding environs is shown in Figure 2.1 and Figure 2.2, and the land zoning is shown in Figure 2.3. Figure 2.1: Aerial Map of Subject Site and its Environs Subject Site (PhotoMap courtesy of NearMap Pty Ltd) Transport Impact Evidence Page 2

9 Existing Conditions Figure 2.2: Melways Map of Subject Site and its Environs Subject Site (Reproduced with Permission from Melway Publishing Pty Ltd) Figure 2.3: Land Zoning Map Subject Site (Reproduced from Land Channel web site) Transport Impact Evidence Page 3

10 Existing Conditions 2.2 Road Network Adjoining Roads Park Road Park Road functions as a major local road (under Manningham City Council control). It is a two way road aligned in a northeast-southwest direction and is configured with a two lane, 6.9 metre wide carriageway set within a 17 metre wide road reserve (approx). The posted speed limit on the road is 60km/h. Park Road carries approximately 5,620 vehicles per day 1. Heads Road Heads Road functions as a local road (under Manningham City Council control). It is a two way road aligned in an east-west direction and is configured with a two lane, 6.3 metre wide carriageway set within a 17 metre wide road reserve (approx). Heads Road carries approximately 2,060 vehicles per day 1. White Lodge Court White Lodge Court functions as a local road (under Manningham City Council control). It is a two way road aligned in an east-west direction to the west of Park Road, and is configured with a two lane, 6.0 metre wide carriageway road set within a 14 metre wide road reserve (approx). White Lodge Court carries approximately 560 vehicles per day 1. Park Road and Heads Road in the vicinity of the subject site are shown in Figure 2.4 to Figure 2.6. Figure 2.4: Park Road looking northeast Figure 2.5: Park Road looking southwest 1 Based on 24-hour pneumatic tube counts undertaken by GTA Consultants for a one week period from Thursday 9 December 2010 to Wednesday 15 December 2010 at locations identified in Section of this report. Transport Impact Evidence Page 4

11 Existing Conditions Figure 2.6: Heads Road looking east Surrounding Intersections The following intersections currently exist in the vicinity of the site: Park Road/Heads Road (unsignalised) Park Road/White Lodge Court (unsignalised) Park Road/Murndal Drive (unsignalised) Traffic Volumes GTA Consultants undertook traffic movement surveys at the Park Road/Heads Road intersection as follows: Thursday 9 December 2010 from 7:00am to 9:00am and 4.30pm to 7.30pm Saturday 11 December 2010 from 12:00noon to 2:00pm The weekday AM and PM peak hour and Saturday peak hour traffic volumes are shown in Figure 2.7 to Figure 2.9. Figure 2.7: Existing AM Peak Hour Traffic Volumes Transport Impact Evidence Page 5

12 Existing Conditions Figure 2.8: Existing PM Peak Hour Traffic Volumes Figure 2.9: Saturday Peak Hour Traffic Volumes In addition, 24-hour pneumatic tube counts were undertaken for a one week period from Thursday 9 December 2010 to Wednesday 15 December 2010 at the following locations: On Park Road adjacent to 113 Park Road On Heads Road immediately south of Park Road On White Lodge Court immediately north of Park Road On the existing site access road serving the subject site adjacent to Park Road. Transport Impact Evidence Page 6

13 Existing Conditions A summary of the average daily weekday and weekend day traffic volumes at these locations is presented in Table 2.1. Table 2.1: Average Weekday and Weekend Daily Volume in vicinity of Subject Site Location Average Weekday Daily Volume [1] Average Weekend Daily Volume [1] Park Road 5,620vpd 4,320vpd Heads Road 2,060vpd 1,870vpd White Lodge Court 560vpd 440vpd Existing Site Access 80vpd 200vpd [1] vpd denotes vehicles per day Intersection Operation The existing operation of the Park Road/Heads Road unsignalised intersection has been assessed using SIDRA INTERSECTION 2, a computer based modelling package which calculates intersection performance. The commonly used measure of intersection performance is referred to as the Degree of Saturation (DOS). The DOS represents the flow-to-capacity ratio for the most critical movement on each leg of the intersection. For unsignalised intersections, a DOS of around 0.90 has been typically considered the ideal limit, beyond which queues and delays increase disproportionately 3. Table 2.2 presents a summary of the existing operation of the intersection, with full results presented in Appendix A of this evidence. Table 2.2: Park Road/Heads Road Intersection Existing Operating Conditions Critical Turning Movements Approach Peak Hour DOS Average Delay 95 th Percentile Queue (m) AM sec 0 Park Road (south) PM 0.22# 2 sec 4m Sat Midday 0.12# 3 sec 3m AM 0.23# 11 sec 8m Heads Road (east) PM sec 3m Sat Midday sec 3m AM Park Road (north) PM sec 0 DOS Degree of saturation, # - Intersection DOS Sat Midday sec 0 On the basis of the above assessment, it is evident that the Park Road/Heads Road intersection currently operates satisfactory with acceptable queues and delays on all approaches. 2 Program used under license from Akcelik & Associates Pty Ltd. 3 SIDRA INTERSECTION adopts the following criteria for Level of Service assessment: Intersection Degree of Saturation (X) Unsignalised Intersection Signalised Intersection A Excellent <=0.50 <=0.60 B Very Good C Good D Acceptable E Poor F Very Poor >=1.0 >=1.0 Transport Impact Evidence Page 7

14 Existing Conditions 2.3 Accident Statistics A review of the reported accident casualty history for the roads and intersections adjoining the subject site has been sourced from VicRoads accident database. The CrashStats database includes all reported casualty accidents since A review of the abovementioned database indicates that one accident has been recorded during the last available five year period (1 June May 2010). This accident involved one vehicle veering right off the carriageway and colliding into an object/parked vehicle. On the basis of the available data, no accident trends exist in the vicinity of the subject site. 2.4 Sight Distances On-site field measurements suggest that sight distances are in excess of minimum requirements required by AustRoads design guidelines at key junctions including White Lodge Court and Heads Road. 2.5 Car Parking Supply GTA Consultants compiled an inventory of publicly available on-street car parking within approximately 250m of the subject site. The inventory area is presented in Figure Figure 2.10: Area of Car Parking Inventory Subject Site The inventory identified approximately 300 unrestricted on-street car spaces Demand On-site observations suggest that on-street parking demands are very low, particularly along Park Road. Transport Impact Evidence Page 8

15 Existing Conditions 2.6 Sustainable Transport Infrastructure Public Transport Figure 2.11 shows the subject site in relation to existing public transport routes within its vicinity whilst Table 2.3 summarises the road based routes and major destinations that can be reached using these services. Figure 2.11: Public Transport Map Bus Route 271 and 303 Subject Site Northbound Bus Stop along Park Road Southbound Bus Stop along Park Road (PhotoMap courtesy of NearMap Pty Ltd) Transport Impact Evidence Page 9

16 Existing Conditions Table 2.3: Road Based Public Transport Provision Service Route Nos Route Description Distance to Nearest Stop (m) Significant Destinations On Route Frequency On/Off peak Bus Box Hill Ringwood via Park Orchids City - North Ringwood via Springfield Road 30m 30m Ringwood Railway Station, Enfield Avenue/Park Road, Donvale Terminus/Mitcham Road, Tunstall Square Shopping Centre, Tasman Avenue/Junction Road, Springfield Road/Koonung Road, Box Hill Bus Station/Station Street. Oban Road/Warrandyte Road, Dalry Avenue/Park Road, Springvale Road/Springfield Road, Toogoods Rise/Middleborough Road, Johnston Street/Hoddle Street, Melbourne Central/Lonsdale Street, Little Collins Street/Queen Street. 30mins 20mins In addition to road based public transport, Nunawading rail station on the Lilydale and Belgrave lines is located approximately 3.5 kilometres south-west from the site Pedestrian and Bicycle Infrastructure No sealed pedestrian paths are provided in the vicinity of the subject site. In addition, there are no bicycle lanes or off-street paths in the vicinity of the subject site. Transport Impact Evidence Page 10

17 Development Proposal 3. Development Proposal 3.1 Land Uses The proposal includes the construction of a mixed-use building, as summarised in Table 3.1. Table 3.1: Proposed Development Schedule Use Gymnasium Squash Courts Swimming Pool Café Youth Lounge Function Centre Commercial Kitchen Office and Administration facilities Multi-purpose Sport Courts Store Room Size sqm 4 Courts (559.85sqm) 1 Swimming Pool (510.75sqm) 29 Seats sqm Maximum 1,000 people sqm 319sqm 3 Courts ( sqm) sqm Instruction from the applicant indicates that it is not intended to operate the function centre concurrently with any other development use within the proposal. 3.2 Revised Site Layout Plans Following a review of submissions received on the proposal, the applicant has chosen to adopt a series of changes which have been incorporated in an updated set of drawings attached in Appendix D of this report (Revision G). The changes to the plans are summarised as follows: A revised ground level to basement level ramp arrangement. The ramp has been increased in length to accommodate revised ramp grades to provide for truck access for deliveries and rubbish collection in the basement. Additional at grade and basement car parking spaces in response to the conditional approval determined by Council in their decision of 14 December A revised loading bay arrangement to facilitate the inclusion of additional car parking spaces within the basement. 3.3 Car Parking On-site car parking is proposed within a basement level car park and at ground level. A total of 123 car spaces area proposed in the basement car park (including four disabled spaces), with 178 car spaces proposed at ground level. A total of 301 marked car spaces are proposed in association with the proposal. 3.4 Vehicle Access A new vehicular access is proposed onto Park Road. The access is to be located approximately 150m north of the existing White Lodge Court/Park Road intersection. A concept layout of the proposed access is presented on GTA Consultants Drawing Number JM14940/SKo1 presented in Appendix C. This plan supersedes details shown on architectural drawings and is recommended for adoption. Transport Impact Evidence Page 11

18 Development Proposal On-site field measurements suggest that sight distances at the proposed site access location would be in excess of minimum requirements required by AustRoads Design Guidelines. A Safe Intersection Sight Distance (SISD) of 257m is achievable along Park Road in the south-westbound direction, with a sight distance of 280m achievable in the north-eastbound direction. The existing vehicle access is proposed to be allocated for pedestrian use only. 3.5 Internal Road Layout The proposed internal road layout is typically provided with a width of 6.0m, and this width will satisfactorily accommodate simultaneous two-way vehicle activity. It is noted that there are some sections of the road layout that have a width less than 5.5m. This matter is discussed further under Section 4.4 of this report. 3.6 Bicycle Facilities A total of 36 bicycle parking spaces are proposed in the basement car park. 3.7 Pedestrian Facilities Pedestrian access to the multi-purpose venue is proposed from a main entrance located at the northwest corner of the building. 3.8 Loading Areas An on-site loading area capable of accommodating up to and including a 6.4m long small rigid vehicle is proposed in the basement car park. Access for these vehicles will be provided access via Park Road rather than Heads Road as proposed under the original application. Transport Impact Evidence Page 12

19 Car Parking 4. Car Parking 4.1 Statutory Car Parking Requirements Statutory requirements for the provision of car parking are set out in Clause of the Manningham Planning Scheme, with parking rates specified in the Table to Clause An assessment of the statutory parking requirements for the development proposal is set out in Table 4.1. Table 4.1: Statutory Car Parking Requirements Description Use Size Statutory Parking Rate Statutory Parking Requirement Multi-Purpose Sports Courts Not Specified 3 Courts Not Specified 0 Gymnasium Not Specified sqm Not Specified 0 Squash Courts Indoor recreation facility 4 courts 3 car spaces to each court 12 Swimming Pool Indoor recreation facility sqm 5.6 car spaces to each 100sq.m of site 29 Function Centre Place of Assembly sqm 0.3 car spaces to each seat or to each sqm of net floor area, whichever is greater TOTAL spaces The above assessment anticipates the development proposal has statutory requirement of 429 car parking spaces for uses where a rate has been specified. In this instance, the statutory level of parking is not being met and a planning permit is being sought to reduce this requirement. 4.2 Decision Guidelines The Planning Scheme provides decision guidelines to reduce the statutory car parking requirement as follows. They are also useful for consideration when a statutory rate is not nominated in the scheme for the proposed use. Any relevant precinct plan. The availability of car parking in the locality. The availability of public transport in the locality. Any reduction in the car parking demand due to the sharing of car spaces by multiple uses, either because of variation of car parking demand over time or because of efficiencies gained from the consolidation of shared car parking spaces. Any car parking deficiency or surplus associated with the existing use of the land. Any credit which should be allowed for a car parking demand deemed to have been provided in association with a use which existed before the change of parking requirement. Local traffic management. Local amenity including pedestrian amenity. An empirical assessment of car parking demand. Any other relevant consideration. Each of the above guidelines relevant in this instance is discussed below. Transport Impact Evidence Page 13

20 Car Parking Empirical Assessment of Car Parking Demand Empirical car parking demand rates for the various uses proposed in the multi-purpose building have been sourced from the following: Road and Traffic Authority of New South Wales (RTA NSW) Guide to Traffic Generating Developments Car parking surveys undertaken at similar developments by GTA Consultants and other Melbourne traffic consultants. Gymnasium The nominated RTANSW Guide to Traffic Generating Developments represents the most comprehensive traffic and car parking generation data set compiled in Australia to date. The RTANSW document nominates a peak car parking rate of 4.5 spaces per 100sqm of ground floor area for a commercially operated facility. Application of this rate to the proposed gymnasium equates to a peak car parking demand of eight car spaces. Car parking surveys undertaken by GTA Consultants and other Melbourne traffic consultants suggests a peak car parking rate of 5.24 spaces per 100sqm of floor area. Application of this rate to the proposed gymnasium equates to a peak car parking demand of nine car spaces. Multi-Purpose Sports Courts Car parking surveys undertaken by GTA Consultants and other Melbourne traffic consultants suggests a peak car parking rate of 33 spaces per sports court 4. Application of this rate to the three proposed sports courts equates to a peak car parking demand of 99 spaces. Squash Courts The RTANSW document nominates a peak car parking rate of 3 spaces per court. Application of this rate to the proposed squash courts equates to a peak car parking demand of 12 car spaces. Swimming Pool Car parking surveys undertaken by GTA Consultants and other Melbourne traffic consultants suggests a peak car parking rate of 102 spaces per swimming pool facility 5. Application of this rate to the proposed swimming pool equates to a peak car parking demand of 102 car spaces. Function Centre The Manningham Planning Scheme nominates a peak car parking rate for a function centre of 0.3 car spaces per seat or to each sqm of floor area whichever is greater. The function centre is to operate with a maximum capacity of 1,000 people (including staff, caterers etc.). On this basis, I consider it appropriate to apply a car parking rate on a per person basis. Application of this rate to the proposed function centre equates to a peak car parking demand of 300 car spaces. It is noted that this rate was accepted by O Brien Traffic on behalf of Manningham City Council in their critique of the TTM traffic report prepared for the proposed development as part of the original planning application. Under Item 97 of the O Brien Traffic response the following is noted: 4 5 Based on surveys undertaken at nine (9) multi-purpose sporting facilities in Melbourne. Based on surveys undertaken at two (2) swimming pool facilities in Melbourne. Transport Impact Evidence Page 14

21 Car Parking TTM has indicated that surveys of function centres reveal parking generation rates of around 3 vehicles per person attending. It is assumed that the report is actually meant to suggest parking rates of 0.3 vehicles per person attending. This is a reasonable assumption and in line with typically accepted parking provision. Other Uses It is considered that the office and administration, cafe and commercial kitchen uses are ancillary to the sports facility and function centre uses and will not generate parking in their own right. It is further considered that the proposed youth lounge will be available for use by persons under the legal driving age and it is therefore unlikely to generate any direct parking demand Sharing of Car Spaces by Multiple Uses Consideration should be given to the extent to which the car parking associated with each use does, or does not, coincide throughout the day. When account is taken of the different pattern of activity between the uses, and the correspondingly different pattern of car parking, an assessment of the overall shared parking requirement for the development can be made. Adopting the empirical car parking rates discussed in Section of this evidence, Table 4.2 provides a summary of the likely car parking demand for each of the uses throughout a typical weekday while Table 4.3 provides a summary of the likely car parking demand for each of the uses throughout a typical Saturday. It is noted that the temporal peak parking demands for the combined sports facility and function centre (at peak patronage) have been considered independently of one other given aforementioned operational constraints. Table 4.2: Car Parking Profiles (Active Weekday) Land Use Gym [1] Squash Courts [2] Swimming Pool [3] Multi-Purpose Sports Courts [4] Combined Sports Facilities Car Parking Demand Function Centre [5] Function Centre Car Parking Demand Peak Demand (co-incidental peak) 9 spaces 12 spaces 102 spaces 99 spaces 222 spaces 300 spaces 300 spaces 8.00am 21% - 21% 21% am 28% - 28% 28% am 23% 27% 23% 23% am 18% 18% 18% 18% pm 19% 9% 19% 19% pm 19% 9% 19% 19% pm 15% 9% 15% 15% 33 9% pm 16% 9% 16% 16% 35 18% pm 25% 9% 25% 25% 54 18% pm 49% 9% 49% 49% 104 1% pm 76% 36% 76% 41% 129 2% pm 59% 100% 59% 100% % pm 31% 90% 31% 100% % pm 14% 9% 14% 81% % pm % 17 98% 294 [1] Based on surveys undertaken at Healthland Gymnasium in Richmond. [2] Based on surveys undertaken at Lower Plenty Sports Centre. [3] Conservatively utilising the parking profile adopted for the gymnasium use. [4] Conservatively utilising the parking profile adopted for the gymnasium use for morning and afternoon time periods [5] Typical Profile an average of surveys undertaken at three function centres. Transport Impact Evidence Page 15

22 Car Parking Table 4.3: Car Parking Profiles (Active Saturday) Land Use Gym [1] Squash Courts [2] Swimming Pool [3] Multi-Purpose Sport Courts [4] Combined Facilities Car Parking Demand Function Centre [5] Function Centre Car Parking Demand Peak Demand (co-incidental peak) 9 spaces 12 spaces 102 spaces 99 spaces 222 spaces 300 spaces 300 spaces 8.00am 12% 27% 12% 27% am 36% 34% 36% 34% am 29% 63% 29% 63% am 23% 70% 23% 70% pm 20% 55% 20% 55% pm 18% 67% 18% 67% pm 17% 74% 17% 74% pm 23% 82% 23% 82% pm 30% 62% 30% 62% pm 36% 22% 36% 22% pm 24% 24% 24% 24% 53 73% pm 12% 12% 12% 12% 27 90% pm 7% 7% 7% 7% 16 95% pm 7% 7% 7% 7% % pm % 291 [1] Based on surveys undertaken at Healthland Gymnasium in Richmond. [2] Based on surveys undertaken at Lower Plenty Sports Centre. [3] Conservatively utilising the parking profile adopted for the gymnasium use. [4] Conservatively utilising the parking profile adopted for the gymnasium use for morning and afternoon time periods [5] Typical Profile an average of surveys undertaken at three function centres. Tables 4.2 and 4.3 indicate that the peak car parking requirement for the sport facilities allowing for temporal activity associated with individual site uses is equal to 176 car parking spaces. The function centre at peak occupancy is estimated to generate a peak demand for 300 car spaces. 4.3 Adequacy of Parking Supply When consideration is given to the empirical car parking demand of the various uses, the level of coincidental car parking demand that will exist between these uses and applied operational constraints, it is considered that a car parking provision of 301 spaces will satisfactorily meet anticipated peak requirements. 4.4 Car Parking Layout The parking layout has been designed generally in accordance with the Manningham Planning Scheme and the Australian Standard/New Zealand Standard for Off Street Car parking (AS/NZS2890.1:2004) as follows: The proposed layout allows for all vehicles to enter and exit the site in a forward direction. A minimum 4.5m height clearance is maintained throughout the basement car park and on the ground level to the basement level car park. The ground level to basement level ramp has been designed to accommodate movements by up to and including a 6.4m long small rigid vehicle. The following ramp grades have been adopted: 1:20 (5%) x 16.0m 1:9 (11.11%) x 7.0m 1:6.5 (15.38%) x 48.0m 1:8 (12. 5%) x 7.0m 1:16 (6.25%) x 7.0m Transport Impact Evidence Page 16

23 Car Parking Car spaces are typically 5.4m long and 2.6m wide, accessed from a 6.4m wide aisle. Columns are located 250mm from the aisle and of car space and no more than 800mm into the car space. Disabled car spaces are 5.4m long and 3.2m wide, accessed from a 6.4m wide aisle. An area is provided at the end of blind car park aisles for a car to turn around. The loading bay in the basement car park is capable of accommodating up to and including a 6.4m long small rigid vehicle. The loading bay dimensions are 6.4m long and 4.0m wide, accessed from a 6.5m wide aisle. A minimum height clearance of 4.5m is also provided in the loading bay. It is recommended that internal road widths be provided with a minimum width of 5.5m, noting that any section of road providing direct access to 4.9m long 90 degree angled car spaces should be provided with a width of 6.4m. I believe that these recommendations can be delivered by way of an appropriately worded condition on any permit issued. Transport Impact Evidence Page 17

24 Sustainable Transport Infrastructure 5. Sustainable Transport Infrastructure 5.1 Bicycle End of Trip Facilities Clause of the Manningham Planning Scheme (Bicycle Facilities) seeks to encourage cycling as a mode of transport with the provision of secure, accessible and convenient bicycle parking spaces and associated shower and change facilities. Table 1 to Clause sets out the standard requirement for the provision of bicycle spaces for a range of uses. Tables 2 and 3 set out the requirements for showers and change rooms, respectively. Clause also requires signage to direct cyclists to the required facilities. Clause says a permit may be granted to vary, reduce or waive any requirement. The standard requirement for the provision of bicycle facilities for the subject use is set out in Table 5.1. Table 5.1: Standard Requirement for Bicycle Facilities Use Size Statutory Rate Statutory Requirement Employee Visitor Employee Visitor Multipurpose sports courts 3 courts (2949.7sqm) 1 per 4 employees [1] 1 to each 200sqm of net floor area 1 15 Gymnasium sqm Not Specified Not Specified 0 0 Squash Courts 4 courts (559.85sqm) 1 per 4 employees [2] 1 to each 200sqm of net floor area 1 3 Swimming Pool sqm 1 per 4 employees [3] 1 to each 200sqm of net floor area 2 3 Function Centre sqm 1 to each 1,500sqm of net floor area 2 plus 1 to each 1,500sqm of net floor area 1 3 Youth Lounge sqm 1 to each 1,500sqm of net floor area 2 plus 1 to each 1,500sqm of net floor area 0 2 Total 5 26 [1] Assuming three staff members [2] Assuming three staff members [3] Assuming eight staff members On the basis of the above, the proposed development has a statutory bicycle parking requirement of 31 spaces, comprising five employee spaces and 24 visitor spaces. The proposed provision of 36 bicycle spaces meets this requirement. In addition to the requirement for bicycle parking facilities, Clause of the Manningham Planning Scheme requires one shower for the first five employee bicycle parking spaces and one shower for each subsequent ten employee bicycle parking spaces if five or more employee bicycle parking spaces are required. Further, each shower must have access to a change room. Given that the development generates an employee bicycle parking rate of five spaces, there is a requirement for one change room and shower facility. A total of 12 showers and separate male and female change rooms are proposed for use by patrons to the sports facilities. It is considered that these facilities could be also used by staff. It is considered that the office and administration, cafe and commercial kitchen uses proposed will be ancillary and therefore unlikely to generate their own bicycle parking demand beyond that estimated for the function centre and sports facility uses. Transport Impact Evidence Page 18

25 Loading Facilities 6. Loading Facilities 6.1 Statutory Requirements Clause of the Manningham Planning Scheme (Loading and Unloading of Vehicles) is applicable where buildings or works are constructed for the manufacture, servicing, storage or sale of goods or materials. The Clause is reproduced below Loading and Unloading of Vehicles Purpose To set aside land for loading and unloading commercial vehicles to prevent loss of amenity and adverse effect on traffic flow and road safety. Requirements to be met No building or works may be constructed for the manufacture, servicing, storage or sale of goods or materials unless: Space is provided on the land for loading and unloading vehicles as specified in the table below. The driveway to the loading bay is at least 3.6 metres wide. If a driveway changes direction or intersects another driveway, the internal radius at the change of direction or intersection must be at least 6 metres. The road that provides access to the loading bay is at least 3.6 metres. A permit may be granted to reduce or waive these requirements if either: The land area is insufficient Adequate provision is made for loading and unloading vehicles to the satisfaction of the responsible authority. Floor Area Of Building Minimum Loading Bay Dimensions 2,600 sqm or less in single occupation Area 27.4 sqm Length Width Height Clearance 7.6 m 3.6 m 4.0 m For every additional 1,800 sqm or part Additional 18 sqm Clause requirements do not trigger a statutory requirement for an on-site loading area. 6.2 Proposed Loading Arrangements Irrespective of statutory requirements, a 6.4m long and 4.0m wide loading area, accessed from a 6.4m wide aisle, and with a height clearance of 4.5m is proposed in the basement level car park. Access to the loading area is proposed via the internal road connecting to Park Road. This arrangement addresses Council ground for refusal number 5 which is reproduced below: 5. The proposed service vehicle entry from Heads Road to the proposed building is unsatisfactory and will create hazardous access. 6.3 Waste Collection Waste is to be stored within the basement level car park. It is anticipated that waste collection will be undertaken from the basement car park by a private contractor and controlled by the implementation of an appropriate waste management plan as a permit condition. Transport Impact Evidence Page 19

26 Traffic Impact Assessment 7. Traffic Impact Assessment 7.1 Traffic Generation Design Rates Traffic generation estimates for the proposed development have been sourced from the RTANSW Guide to Traffic Generation Developments and from traffic surveys undertaken by GTA Consultants and other Melbourne traffic consultants. Estimates of peak hour and daily traffic volumes resulting from the proposal are set out in Table 7.1. Table 7.1: Traffic Generation Weekday & Weekend Road Network Peak Hours Use Size Source Peak Hour Traffic Generation Rate (Two-Way Movements) Weekday (PM) Saturday (MID) Road Network Peak Hour Vehicle Movements Weekday (PM) Saturday (MID) Gym 168.9sqm RTA 9 per 100sqm 9 per 100sqm Squash Courts 4 courts (559.85sqm) RTA 3 per court 3 per court Swimming Pool [1] 8 lane pool (510.75sqm) GTA 6.1 per Lane [1] 6.1 per lane Multi-purpose sports court [2] 3 courts (2949.7sqm) GTA 48 per court 48 per court Total Function Centre 1,000 patrons GTA 0.09 per patron [3] 0.23 per patron [4] [1] Surveys undertaken at State Swim Centre in Unley and Seaford (May 2010) [2] Surveys undertaken at Marden Basketball Centre (June 2010) [3] Data recorded in Footscray for a 700 seat facility indicated a rate of 0.09 vehicle movements per person. [4] Conservatively assuming that a 1000 person function finishes at the beginning of the Saturday midday peak hour (a typical event) and that 75% of patrons who have driven to the event are exiting the site. Table 7.1 indicates that the sport facilities and other ancillary uses will generate 220 vehicle movements during a typical weekday peak hour and the function centre will generate 225 vehicle movements during weekend peak hour under a 1000 person event which I expect to be the exception rather than the rule. Finally, Table 7.1 suggests that the sports facilities will generate higher levels of traffic during the typical weekday road network peak hours compared to the function centre. It is considered that the function centre will generate a similar level of traffic during the Saturday midday peak hour if an event start or finish were to coincide with midday. It is considered that any large function on a weekday is likely to take place in the later evening and outside the peak road network periods. 7.2 Distribution and Assignment The proposed development traffic has been distributed on the road network surrounding the subject site consistent with existing vehicle proportions. The scenario assuming the sports facility is operational has been assumed given the similarity in traffic levels between occupancy scenarios. In addition, a directional split of traffic (i.e. the ratio between the inbound and outbound traffic movements) for the sports facilities has been assumed to be 50% in/50% out in the weekday PM peak hour and Saturday peak hour, which have been identified as the busiest periods for the sports facilities. Transport Impact Evidence Page 20

27 Traffic Impact Assessment The post development flows for a typical weekday PM peak hour and Saturday peak hour at the Park Road/Heads Road intersection under a sports facility use operation are presented in Figure 7.1 and Figure 7.2. Figure 7.1: Park Road/Heads Road PM Peak Hour Flows Post Development (Sports Facility Use) Figure 7.2: Park Road/Heads Road Saturday Peak Hour Flows Post Development (Sports Facility Use) The post development flows for a typical weekday PM peak hour and Saturday peak hour at the Park Road/Proposed Site Access intersection are presented in Figure 7.3 and 7.4. Transport Impact Evidence Page 21

28 Traffic Impact Assessment Figure 7.3: Park Road/Proposed Site Access PM Peak Hour Flows Post Development (Sports Facility Use) Figure 7.4: Park Road/Proposed Site Access Saturday Peak Hour Flows Post Development (Sports Facility Use) Peak Hour Post Development Analysis The impact of development traffic upon the proposed site access onto Park Road and the Park Road/Heads Road intersection has been assessed using SIDRA Intersection. On the basis of the turning movement estimates presented above, Table 7.2 and Table 7.3 present a summary of the anticipated future operation of the nominated intersections following the full development of the site. Detailed results of this analysis are provided in Appendix B of this evidence Transport Impact Evidence Page 22

29 Traffic Impact Assessment Table 7.2: Park Road/Heads Road Intersection Post Development Operating Conditions Critical Turning Movements Approach Peak Hour DOS Average Delay 95 th Percentile Queue (m) Park Road (south) Heads Road (east) Park Road (north) PM 0.26# 2 sec 5m Sat Midday 0.15# 2 sec 3m PM sec 4m Sat Midday sec 3m PM sec 0 Sat Midday sec 0 DOS Degree of saturation, # - Intersection DOS Table 7.3: Park Road/Proposed Site Access Intersection Post Development Operating Conditions Critical Turning Movements Approach Peak Hour DOS Average Delay 95 th Percentile Queue (m) Park Road (south) Site Access (east) Park Road (north) PM sec 3m Sat Midday sec 2m PM 0.30# 20 sec 12m Sat Midday 0.20# 15 sec 7m PM sec 0 Sat Midday sec 0 DOS Degree of saturation, # - Intersection DOS As described earlier, a DOS of around 0.90 has traditionally been considered the ideal limit beyond which intersection performance is unsatisfactory, as beyond this value queues and delays increase disproportionately. On this criterion, the calculated DOS suggest that the nominated intersections can be expected to operate satisfactorily following full development of the site. For sensitivity purposes, an alternate assessment has also been undertaken for the Saturday midday peak period assuming that the function centre will contribute an additional 225 vehicle movements over and above the anticipated traffic demand generated by the sports facilities. The assessment has been prepared on the basis that the 225 vehicles are exiting the subject site. Table 7.4.presents a summary of the anticipated future operation of the site access intersection following the full development of the site. Detailed results of this analysis are provided in Appendix B of this evidence. Table 7.4: Park Road/Proposed Site Access Intersection Post Development Operating Conditions Critical Turning Movements Approach Peak Hour DOS Average Delay 95 th Percentile Queue (m) Park Road (south) Sat Midday sec 2m Site Access (east) Sat Midday 0.41# 17 sec 20m Park Road (north) Sat Midday sec 0 DOS Degree of saturation, # - Intersection DOS A further 10-year post development assessment of the proposed site access intersection has also been undertaken adopting a 3% growth rate per annum on Park Road. Table 7.5.presents a summary of the assessment results. Transport Impact Evidence Page 23

30 Traffic Impact Assessment Table 7.5: Park Road/Proposed Site Access Intersection Post Development Operating Conditions (Yr 2021) Critical Turning Movements Approach Peak Hour DOS Average Delay 95 th Percentile Queue (m) Park Road (south) Site Access (east) Park Road (north) PM sec 3m Sat sec 2m PM 0.45# 29 sec 18m Sat 0.25# 17 sec 9m PM sec 0 Sat sec 0 DOS Degree of saturation, # - Intersection DOS The assessment results summarised in Table 7.4 and Table 7.5 indicate that proposed site access intersection will operate satisfactorily under a 10 year planning horizon. 7.3 Traffic Impact Summary Against existing traffic volumes in the vicinity of the site and the traffic anticipated to be generated by the proposed development, it is considered that the additional traffic generated by the proposed development could not be expected to compromise the safety or function of the surrounding road network. Transport Impact Evidence Page 24

31 Conclusions 8. Conclusions Based on the analysis and discussions presented within this report, the following conclusions are made: The proposed development generates a statutory parking requirement of 429 spaces, for those uses with nominated rates. The proposed supply of 301 spaces is considered to be appropriate having consideration to the relevant decision guidelines and operational constraints between individual development uses. The proposed car parking layout is generally consistent with the dimensional requirements as set out in the Manningham Planning Scheme and Australian/New Zealand Standard for Off Street Car Parking (AS/NZS2890.1:2004). The proposed loading area layout is generally consistent with the dimensional requirements as set out in the Australian Standards for Off Street Commercial Vehicle Facilities (AS :2002). Vehicular access to the subject land is proposed from a new intersection onto Park Road. This intersection will provide access to the proposed development for cars and loading vehicles. The internal road layout be designed with road widths capable of accommodating the expected vehicle activity. As such, it is recommended that road widths be a minimum of 5.5m wide. Roads providing access to 4.9m long 90 degree angled car spaces should be 6.4m wide. It is considered that the provision of appropriate road widths can be delivered by way of an appropriately worded condition on any permit issued. The proposed development has a statutory requirement to provide 31 bicycle spaces. The provision of 36 bicycle spaces located within the basement car park exceeds this requirement. The proposed development its sporting facilities and other ancillary uses will generate 220 vehicle movements during a typical weekday peak hour and the function centre will generate 225 vehicle movements during a typical weekend peak hour. Against existing traffic volumes in the vicinity of the site and the traffic anticipated to be generated by the proposed development, it is considered that the additional traffic generated by the proposed development could not be expected to compromise the safety or function of the surrounding road network. Declaration I have made all the inquiries that I believe are desirable and appropriate and no matters of significance that I regard as relevant have, to my knowledge, been withheld from the tribunal. (Signature) John Kiriakidis Director (National) 24 January 2011 Transport Impact Evidence Page 25

32 Appendix A Appendix A Appendix A SIDRA Intersection Results Existing Transport Impact Evidence

33 Appendix A Transport Impact Evidence

34 Appendix A Transport Impact Evidence

35 Appendix B Appendix B SIDRA Intersection Results Post Development Appendix B Transport Impact Evidence

36 Appendix B Transport Impact Evidence

37 Appendix B Transport Impact Evidence

38 Appendix B Transport Impact Evidence

39 Appendix B Transport Impact Evidence

40 Appendix C Appendix C Proposed Park Road/Site Access Intersection GTA Consultants Drawing Number JM P1 Appendix C Transport Impact Evidence

41

42 Appendix D Appendix D Revised Site Layout Plans Appendix D Transport Impact Evidence

43 NOTE: VEHICLE ACCESS TO BE CLOSED TO ALL VEHICULAR TRAFFIC TURNI NG BAY TEMPORARY CAR PARK TO BE USED FOR MUTI-PURPOSE BUILDING FOOTPATH T UR NI NG B AY TEMPORARY CAR PARK TO BE USED FOR MUTI-PURPOSE BUILDING LOT 21 LP LEGEND: EXISTING TREES EXISTING TREES TO BE REMOVED FOR THE PROPOSE TEMPORARY CAR PARK SITE PLAN WARNING: THESE DRAWINGS HAVE BEEN PREPARED BY AMMACHE ARCHITECTS PTY. LTD. ON THE FOLLOWING BASIS: THAT NO BUILDING PERMIT IS TO BE ISSUED BY ANY BUILDING SURVEYOR OR ANY OTHER RELEVANT PERSON OR BODY SOLELY ON THE BASIS OF THESE DRAWINGS UNTIL AND UNLESS THE "WORKING OR CONSTRUCTION DRAWINGS" HAVE BEEN PROVIDED BY AMMACHE ARCHITECTS PTY. LTD. THESE DRAWINGS CAN NOT BE USED BY THE REGISTERED OWNER OF THE WITHIN SITE AND OR HIS SERVANTS AGENTS OR SUCCESSORS IN TITLE FOR ANY PURPOSE OTHER THAN FOR THE PURPOSE OF OBTAINING A PLANNING PERMIT WITHOUT THE PRIOR WRITTEN CONSENT OF AMMACHE ARCHITECTS PTY. LTD. THESE DRAWINGS CAN NOT BE USED BY THE REGISTERED OWNER OF THE WITHIN SITE AND OR HIS SERVANTS AGENTS OR SUCCESSORS IN TITLE OR ANY OTHER ARCHITECT, DESIGNER, DRAFTSPERSON OR ANY OTHER PERSON AS THE BASIS FOR THE PRODUCTION OF ANY WORKING DRAWINGS OR FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN CONSENT OF AMMACHE ARCHITECTS PTY. LTD. Rev No. Rev Date Description A 13/06/08 REVISED MASTER PLAN B 23/06/09 FURTHER INFORMATION DATED 29 APRIL 2009 C 15/03/10 MOVE MULTI PURPOSE BUILDING 25M WEST 10M NORTH D 01/04/10 MODIFY TEMPORARY CARPARKING E 03/12/10 FURTHER CHANGES F 15/10/10 INCREASE TEMPORARY CARPARKING G 17/01/11 MODIFY TEMPORARY CARPARKING AND RAMP PROJECT THE DOME PARK ROAD DONVALE CLIENT DRAWING SITE PLAN STAGE TOWNPLANNING Job No. Dwg. No. 88PARK.RD A02 Scale Date 1/500 Drawn N. AMMACHE Checked 17.JAN.2011 ANY BREACH OF THE ABOVE WILL RESULT IN LEGAL ACTION BEING INSTITUTED BY AMMACHE ARCHITECTS PTY. LTD. N. AMMACHE

44 33000 MULTI PURPOSE ROOM MECHANICAL ROOM RETAINING WALL LOADING BAY RAINWATER TANKS HOT WATER TANKS STORAGE ABOVE FFL: RETAINING WALL LOCKERS x 36 BICYCLE PARKING NED KELLY RETAINING WALL STUDIO ROOM YOUTH LOUNGE 100 PEOPLE MALE CAFE FEMALE PRE PARA TION MALE CHANGE FEMALE CHANGE UP POTENTIAL POOL POOL SPA LIFT STO RE STO RAGE 4750 STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE STO RAGE PUMP ROOM STORAGE PLANT ROOM UNDER GROUND NO PARKING FORKLIFT BAY STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE STO RAGE ABOVE BASEMENT FFL: PAVED AREA YOUTH CLUB 1355 M GAS ROOM ELEC ROOM RECYCLING AND WASTE BIN STORAGE MULTI PURPOSE BUILDING-STAGE 1 BASEMENT FLOOR PLAN WARNING: THESE DRAWINGS HAVE BEEN PREPARED BY AMMACHE ARCHITECTS PTY. LTD. ON THE FOLLOWING BASIS: THAT NO BUILDING PERMIT IS TO BE ISSUED BY ANY BUILDING SURVEYOR OR ANY OTHER RELEVANT PERSON OR BODY SOLELY ON THE BASIS OF THESE DRAWINGS UNTIL AND UNLESS THE "WORKING OR CONSTRUCTION DRAWINGS" HAVE BEEN PROVIDED BY AMMACHE ARCHITECTS PTY. LTD. THESE DRAWINGS CAN NOT BE USED BY THE REGISTERED OWNER OF THE WITHIN SITE AND OR HIS SERVANTS AGENTS OR SUCCESSORS IN TITLE FOR ANY PURPOSE OTHER THAN FOR THE PURPOSE OF OBTAINING A PLANNING PERMIT WITHOUT THE PRIOR WRITTEN CONSENT OF AMMACHE ARCHITECTS PTY. LTD. THESE DRAWINGS CAN NOT BE USED BY THE REGISTERED OWNER OF THE WITHIN SITE AND OR HIS SERVANTS AGENTS OR SUCCESSORS IN TITLE OR ANY OTHER ARCHITECT, DESIGNER, DRAFTSPERSON OR ANY OTHER PERSON AS THE BASIS FOR THE PRODUCTION OF ANY WORKING DRAWINGS OR FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN CONSENT OF AMMACHE ARCHITECTS PTY. LTD. ANY BREACH OF THE ABOVE WILL RESULT IN LEGAL ACTION BEING INSTITUTED BY AMMACHE ARCHITECTS PTY. LTD. Rev No. Rev Date Description A 13/06/08 REVISED MASTER PLAN B 23/06/09 FURTHER INFORMATION DATED 29 APRIL 2009 E 03/12/10 FURTHER CHANGES G 17/01/11 MODIFY TEMPORARY CARPARKING AND RAMP PROJECT THE DOME PARK ROAD DONVALE CLIENT DRAWING BASEMENT FLOOR PLAN STAGE TOWNPLANNING Job No. Dwg. No. 88PARK.RD A03 Scale Date 1/200 Drawn N. AMMACHE Checked N. AMMACHE 17.JAN.2011

45 Appendix E Appendix E Curriculum Vitae Mr John Kiriakidis Appendix E Transport Impact Evidence

46 John Kiriakidis Director (National) T E john.kiriakidis@gta.com.au Qualifications Bachelor of Engineering (Civil and Computing) from Monash University, with honours Memberships and Affiliations Institute of Engineers Australia (Civil College) Victorian Planning & Environmental Association Australian Institute of Traffic Planning & Management (AITPM) Industry Roles Moorabbin Airport Planning Committee John has over twelve years consulting experience in the field of traffic and transport planning for a broad crosssection of client across the Australasian private and public business sector. John has particular expertise in the field of land use planning and design with an emphasis on the preparation of Traffic and Transport Impact Evaluations, Integrated Transport Plans, Parking Assessments, Intersection and Car Park Design, Sub division Layout and Road Safety Reviews. John manages a large team of traffic and transport planners in GTA s Melbourne office and services a significant client base which delivers land use projects covering the full cross section of the commercial development sector. Professional Experience 1997 Present: GTA Consultants John is proficient in the application of sustainable transport planning principles and initiatives to land use planning projects. These principles encompass all motorised and nonmotorised transport modes and extend to include advice on infrastructure requirements necessary to support the full spectrum of travel modes. John is experienced in the delivery of all key design facets of traffic and transport planning elements including road networks, intersections, individual roadways, cross sections and road safety. He is also experienced in the delivery of projects using prominent micro simulation network analytical software including Q Paramics, Vissim and SIDRA. John is regularly involved in the delivery of parking policy guidelines on the management and delivery of car parking for both the public and private sector. This experience includes the use of parking guidance and paid parking infrastructure systems. John s project expertise is extensive and includes major regional shopping centre developments, large scale residential developments including high rise high density development and low density residential subdivisions Traffic Engineer, Grogan Richards As a Traffic Engineer for Grogan Richards, John assisted in the preparation of impact assessments for a range of land use developments throughout Melbourne and Victoria and was also involved in access and parking assessments and design and the preparation and implementation of traffic and parking surveys. Key Project Experience Meridian Business Park Broadmeadows Transit City Precinct Bendigo CBD Parking Strategy Moorabbin Airport Masterplan Westfield Southland Eureka Tower Freshwater Place Edgewater Maribyrnong Bunnings Store Locations Across Australia Merrifield at Kalkallo Traffic Impact Report Westfield Doncaster (Shoppingtown) Bus Interchange Beacon Cove and Princes Pier, Port Melbourne Residential High Rise Developments for Mirvac Tooronga Village Re development, Glen Iris, Stockland Epping North East Structure Plan (450ha) Honda Site, Camberwell, FKP Goodyear, Thomastown, Redevelopment, MAB

BARRABOOL HILLS SHOPPING CENTRE

BARRABOOL HILLS SHOPPING CENTRE BARRABOOL HILLS SHOPPING CENTRE PROVINCE BOULEVARD, HIGHTON Traffic Engineering Assessment Prepared for LASCORP DEVELOPMENT GROUP (AUST) PTY LTD MARCH 2012 OUR REFERENCE: 12073R7221FINAL BARRABOOL HILLS

More information

Proposed Supermarket Development Murradoc Road, Drysdale Expert Evidence

Proposed Supermarket Development Murradoc Road, Drysdale Expert Evidence Proposed Supermarket Development 24-32 Murradoc Road, Drysdale Expert Evidence Expert // Tim De Young Client // Coles Group Property Developments Limited Instructed by // Norton Rose Fulbright Reference

More information

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018 54 Parkway Drive, Rosedale Proposed Residential / Commercial Development Transportation Assessment Report 30 April 2018 Project: Report title: Document reference: 54 Parkway Drive, Rosedale Transportation

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

PROPOSED BROILER FARMS

PROPOSED BROILER FARMS PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment Prepared for PAVILION PARTNERS MARCH, 2014 OUR REFERENCE: 16853R9457 PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment

More information

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe,

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe, Our Ref: Contact: CG120569:VG Valentine Gnanakone Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC 3145 Attention: Joseph Nasr Dear Joe, 690 DERRIMUT ROAD PROPOSED RESIDENTIAL SUBDIVISION Further to our

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN 12 September 2017 Iain McManus Civitas Planning Consultants PO Box 47020 Ponsonby AUCKLAND 1144 Dear Iain, TRAFFIC ENGINEERING ASSESSMENT 43-45 45 MOUNT EDEN ROAD, MOUNT EDEN As requested, we have prepared

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group

More information

BETHLEHEM MISSIONS TRUST CAMPUS

BETHLEHEM MISSIONS TRUST CAMPUS BETHLEHEM MISSIONS TRUST CAMPUS Prepared For: Prepared By: Wasley Knell Consultants PO Box 5015, Mount Maunganui, 3150 BruceWRobinson@msn.com/(027) 4515685 Table of Contents Introduction... 3 Site Vicinity...

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA 20 March 2014 Report prepared by: Corli Havenga Transportation Engineers

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Proposed Readymix Regional Distribution Centre at Rooty Hill Traffic Impact Study

Proposed Readymix Regional Distribution Centre at Rooty Hill Traffic Impact Study Proposed Readymix Regional Distribution Centre at Rooty Hill Traffic Impact Study 23rd June 2005 Irwinconsult Pty Ltd Suite 602, Level 6 504 Pacific Hwy St Leonards NSW 2065, Australia ABN 12 050 883 657

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

REPORT ON TRAFFIC IMPACT FOR THE LEGITIMISATION OF EXISTING SHORT TERM & TENT SITES KIOLOA BEACH HOLIDAY PARK

REPORT ON TRAFFIC IMPACT FOR THE LEGITIMISATION OF EXISTING SHORT TERM & TENT SITES KIOLOA BEACH HOLIDAY PARK Engineering & Management Civil and Structural Engineering Environmental Engineering Quality Assurance Project Management Development Consultants 20 July, 2007 Ref. No. 06269 REPORT ON TRAFFIC IMPACT FOR

More information

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN as Trustee for C & B Unit Trust ABN 27 623 918 759 Our Ref: 20 July, 2017 TR/10419/jj Transport Planning Traffic Studies Parking Studies Frasers Property Australia PO Box 4148 SHELLHARBOUR NSW 2529 Attention:

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK Traffic Impact Assessment LOCATED ERF 1692 IN FRANSCHHOEK, WESTERN CAPE Project No. : STUR0202 NOVEMBER 2017 PREPARED BY: STURGEON

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

1 3 Gladstone Road, Dandenong

1 3 Gladstone Road, Dandenong 1 3 Gladstone Road, Dandenong Proposed Kaufland Supermarket Planning Panels Victoria Date of Hearing: Starting 23 rd November, 2018 Date of Statement: 19 th November, 2018 Date of Inspection: 22 nd October

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information

Resident Permit and Visitor Permit Guidelines

Resident Permit and Visitor Permit Guidelines OPERATING GUIDELINES Resident Permit and Visitor Permit Guidelines Approved by: GM, City Services May 2003 Subsequent Amendments: 9 September 2016 Associate Director (Vanessa Godden) Amended to reflect

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information

Draft Marrickville Car Share Policy 2014

Draft Marrickville Car Share Policy 2014 Draft Marrickville Car Share Policy 2014 1. Background 1.1. Marrickville Council has supported car sharing in the LGA since 2007 as part of a holistic approach to encouraging more sustainable modes of

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction The purpose of this study is to ensure that the Village, in cooperation and coordination with the Downtown Management Corporation (DMC), is using best practices as they plan

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Residential Development Bearna Engineering Services Report

Residential Development Bearna Engineering Services Report Residential Development Bearna Engineering Services Report APPENDIX D Job No: B861G TRAFFIC REPORT TRAFFIC IMPACT ASSESSMENT RESIDENTIAL DEVELOPMENT, BEARNA, CO. GALWAY Burkeway Homes Project No. B861

More information

BORAL CONCRETE GLENORIE

BORAL CONCRETE GLENORIE BORAL CONCRETE GLENORIE > Glenorie Progress Association meeting 14 March 2018 Glenorie RSL Club Glenorie A recap of our last discussion (Oct 2017)... Who are we? Boral Concrete (NSW/ACT) is part of the

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Attachment F: Transport assessment report on implications if Capell Avenue never formed

Attachment F: Transport assessment report on implications if Capell Avenue never formed Attachment F: Transport assessment report on implications if never formed CCL Ref: 14447-181118-williams.docx 18 November 2018 Tim Williams Williams and Co Limited By e-mail only: tim@williamsandco.nz

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

TRANSPORT IMPACT ASSESSMENT

TRANSPORT IMPACT ASSESSMENT TRANSPORT IMPACT ASSESSMENT 31 Maida Vale Maida Vale December 2018 Rev B HISTORY AND STATUS OF THE DOCUMENT Revision Date issued Reviewed by Approved by Date approved Revision type Rev A 20.09.2018 M Kleyweg

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Cornubia Retail and Business Park Development

Cornubia Retail and Business Park Development Development July 2013 Tongaat Hulett Development (Pty) Ltd Tel. No.: 031 560 1900 Contact Person: Karen Petersen 21 West Riding Row, Sherwood Tel: 031 240 7300 Andrew McKune Andrew.McKune@smec.com SMEC

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

November

November November 13 2008 4509.04 Mr. Rob Siddoo Siddoo Holdings 105 2277 West 2 nd Avenue Vancouver BC V6K 1H8 Dear Mr. Siddoo: Re: Transportation Assessment: 1030 Denman Street, Residential Conversion, Vancouver

More information

PARKING OCCUPANCY IN WINDSOR CENTER

PARKING OCCUPANCY IN WINDSOR CENTER PARKING OCCUPANCY IN WINDSOR CENTER TOWN OF WINDSOR, CONNECTICUT REPORT JUNE 2017 CONTENTS Background... 3 Other Relevant Data... 3 Parking Survey Design... 6 Parking Supply Inventory... 6 Parking Demand

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development Solmar Development Corp. 144&176 John St. and 2 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development TRANSPORTATION IMPACT STUDY 18145 November 217 LEA Consulting Ltd. Consulting

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Technical Note DESIGN OF ANGLED PARKING BAYS. Peter Damen and Anna Huband, ARRB Group

Technical Note DESIGN OF ANGLED PARKING BAYS. Peter Damen and Anna Huband, ARRB Group 84 DESIGN OF ANGLED PARKING BAYS Peter Damen and Anna Huband, ARRB Group Following the release of Australian and New Zealand Standard AS/NZS 2890.1-2004: Off-street parking, a review was undertaken to

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Gisborne District Traffic and Parking Bylaw DOCS_n144966

Gisborne District Traffic and Parking Bylaw DOCS_n144966 Gisborne District Traffic and Parking Bylaw 2011 DOCS_n144966 Contents 1. TITLE 1 2. COMMENCEMENT AND REPEALS 1 3. APPLICATION 1 4. INTERPRETATION 1 5. GENERAL 3 6. PARKING 7. PARKING OF HEAVY MOTOR VEHICLES

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010

KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010 PART 10 OF THE KAPITI COAST DISTRICT COUNCIL CONSOLIDATED BYLAWS KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010 1 Title, Commencement and Application... 2 2 Bylaw Validation... 2 3 Objective and Scope...

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

WATFORD LOCAL PLAN PART 2. Review of Car Parking Policy and Standards. Evidence Base. February 2012

WATFORD LOCAL PLAN PART 2. Review of Car Parking Policy and Standards. Evidence Base. February 2012 WATFORD LOCAL PLAN PART 2 Review of Car Parking Policy and Standards Evidence Base February 2012 1.0 Background 1.1 The Watford District Plan 2000 contains various policies relating to the provision of

More information

Updates of Land Use Parking and Traffic Generation Surveys

Updates of Land Use Parking and Traffic Generation Surveys Updates of Land Use and Traffic Generation Surveys John Hart RMS Network Optimisation Planning Sydney TDB Workshop 10 th September 2014 Brief History of Surveys In late 70s-80s Traffic Authority of NSW

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

1 Introduction Overview Strategic & Local Planning Context... 5

1 Introduction Overview Strategic & Local Planning Context... 5 CONTENTS 1 Introduction... 3 1.1 Overview... 3 2 Strategic & Local Planning Context... 5 2.1 Consideration of Parking and Traffic Impacts... 5 2.2 Strategic Context... 5 2.3 Parking Requirements under

More information

CHAPTER 2 ZONING AND DEVELOPMENT

CHAPTER 2 ZONING AND DEVELOPMENT 2.200 GENERAL DEVELOPMENT STANDARDS CHAPTER 2 ZONING AND DEVELOPMENT Section 2.201 GENERAL PROVISIONS... 2.2-1 Section 2.202 FENCES AND VISIONS CLEARANCE... 2.2-2 2.202.01 Fences... 2.2-2 2.202.02 Vision

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

NEW ELEMENTARY SCHOOL #1 Open BLPC Meeting January 9, 2013

NEW ELEMENTARY SCHOOL #1 Open BLPC Meeting January 9, 2013 NEW ELEMENTARY SCHOOL #1 Open BLPC Meeting January 9, 2013 It s for the Students! Maintain class size Hold fewer classes in relocatables Minimize travel distance to school Project Delay and it s impact

More information

APPENDIX VMT Evaluation

APPENDIX VMT Evaluation APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

CARPARK, RAMP AND DRIVEWAY CERTIFICATION OF RESIDENTIAL USE DEVELOPMENT. Prepared for: Harvey Property Investments Pty Ltd

CARPARK, RAMP AND DRIVEWAY CERTIFICATION OF RESIDENTIAL USE DEVELOPMENT. Prepared for: Harvey Property Investments Pty Ltd CARPARK, RAMP AND DRIVEWAY CERTIFICATION OF RESIDENTIAL USE DEVELOPMENT 8-9 Harvey Place in Toongabbie Prepared for: Harvey Property Investments Pty Ltd N1615708A (Version 1b) May 2016 Suite 195, 79 to

More information

Winstone Aggregates. Three Kings Quarry Filling, Mt Eden Road, Auckland TRANSPORTATION ASSESSMENT REPORT. June 2008

Winstone Aggregates. Three Kings Quarry Filling, Mt Eden Road, Auckland TRANSPORTATION ASSESSMENT REPORT. June 2008 Winstone Aggregates Three Kings Quarry Filling, Mt Eden Road, Auckland TRANSPORTATION ASSESSMENT REPORT PO Box 2592 Auckland Phone : +64 9 302 0901 New Zealand June 2008 www.tdg.co.nz Winstone Aggregates

More information