1 BARRABOOL HILLS SHOPPING CENTRE PROVINCE BOULEVARD, HIGHTON Traffic Engineering Assessment Prepared for LASCORP DEVELOPMENT GROUP (AUST) PTY LTD MARCH 2012 OUR REFERENCE: 12073R7221FINAL

2 BARRABOOL HILLS SHOPPING CENTRE PROVINCE BOULEVARD, HIGHTON Traffic Engineering Assessment Study Team: Henry Turnbull B.E. (Civil), M.I.E. Aust., M.I.T.E., F.V.P.E.L.A. Jodie Place B.E. (Civil) Hons Released By: HENRY H TURNBULL SIGNED 16 th March, 2012 DATE Document Status: Draft until signed as released. COPYRIGHT: The ideas and material contained in this document are the property of Traffix Group (Traffix Group Pty Ltd ABN , Traffix Survey Pty Ltd ABN , Traffix Design Pty Ltd ABN ). Use or copying of this document in whole or in part without the written permission of Traffix Group constitutes an infringement of copyright. LIMITATION: This report has been prepared on behalf of and for the exclusive use of Traffix Group s client, and is subject to and issued in connection with the provisions of the agreement between Traffix Group and its client. Traffix Group accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report by any third party.

3 TABLE OF CONTENTS 1 INTRODUCTION EXISTING CONDITIONS THE SITE LAND USE EXISTING ROAD NETWORK TRAFFIC VOLUMES EXISTING CAR PARKING CONDITIONS PUBLIC TRANSPORT PROPOSAL PROPOSED DEVELOPMENT CAR PARKING & ACCESS PROVISION CAR PARKING ASSESSMENT STATUTORY CAR PARKING RATES REVISED (DRAFT) CLAUSE RATES AVAILABILITY OF CAR PARKING IN THE LOCALITY EMPIRICAL RATES VARIATION IN DEMAND OVER TIME ADEQUACY OF CAR PARKING PROVISIONS CAR PARKING LAYOUT BICYCLE PARKING REQUIREMENTS TRAFFIC CONSIDERATIONS TRAFFIC GENERATION TRAFFIC DISTRIBUTION TRAFFIC IMPACT PROVISION FOR LOADING CONCLUSIONS R7221RevA Page 1

4 1 INTRODUCTION Traffix Group has been engaged by Lascorp Development Group (Aust) Pty Ltd to undertake a traffic impact assessment and to prepare a report for the proposed Barrabool Hills Shopping Centre located at Province Boulevard in Highton. This report provides a traffic engineering assessment of the proposal, with particular attention to car parking and traffic impacts. 2 EXISTING CONDITIONS 2.1 The Site The subject site is located on the north-east corner of the Province Boulevard/ Stoneleigh Crescent intersection in Highton as shown in the locality plan at Figure 1 below. Reproduced with permission from Melway Publishing Pty Ltd. Figure 1: Locality Plan The subject site has an area of approximately 5.8 hectares, with frontages to Province Boulevard and Stoneleigh Crescent. The majority of the site is currently vacant undeveloped land. There are two water tanks and some existing parking on part of the site, associated with the adjacent Barrabool Hills Baptist Church. There are no existing access points to the site R7221RevA Page 2

5 Figure 2: Subject Site Aerial View Source: (photo taken 28 th October, 2010 Figure 3: View of Subject Site from Southwest Figure 4: Subject Site Looking Northwest from Province Boulevard 12073R7221RevA Page 3

6 2.2 Land Use The subject site is zoned Residential 1 Zone (R1Z) as shown in Figure 5 below. Land to the south of the subject site has been recently developed for residential purposes, and land to the west is currently being developed as a residential subdivision. Barrabool Hills Baptist Church is located adjacent to the subject site to the east, and a Barwon Water reserve is located further to the east. Land to the north of the subject site is currently undeveloped. Figure 5: Land Use Zone Map Source: Planning Schemes Online: R7221RevA Page 4

7 2.3 Existing Road Network Province Boulevard Province Boulevard is a local access street which currently extends approximately 1.2km west from Scenic Road and terminates at a dead-end just west of Grantham Drive. Ultimately, Province Boulevard will extend a further 200 metres west and terminate at a T-intersection just east of the Geelong Ring Road. In the vicinity of the subject site, Province Boulevard is constructed with a 13.2 metre carriageway within a 24 metre road reservation, with footpaths on both sides. There is no existing line-marking, however the carriageway width is sufficient to accommodate a traffic lane and kerbside parallel parking lane in each direction. A 50km/h speed limit applies on Province Boulevard past the site. Figure 6: Province Boulevard Looking East Figure 7: Province Boulevard Looking West Stoneleigh Crescent Stoneleigh Crescent is currently under construction. It forms a T-intersection (roundabout-controlled) with Province Boulevard and extends north along the subject site s western boundary In the vicinity of the subject site, Stoneleigh Crescent is constructed with a 13.2 metre carriageway within a 24 metre road reservation, with footpaths on both sides. Figure 8: Stoneleigh Crescent Looking North Figure 9: Stoneleigh Crescent Looking South 12073R7221RevA Page 5

8 2.4 Traffic Volumes Traffix Survey Pty Ltd undertook a turning movement survey at the roundaboutcontrolled intersection of Scenic Road/Province Boulevard/The Ridge on Thursday 9 th December, 2010 from 4:00pm till 6:30pm. The peak hour was observed to occur between 5:15pm and 6:15pm. The surveyed peak hour turning movements are shown in Figure 10 below. Figure 10: Charles Street/McLennan Street AM (PM) Peak Hour Turning Movements Based on a peak-to-daily ratio of 10%, the following current two-way daily traffic volumes are estimated: Province Boulevard (west of Scenic Road): 1,210 vehicles per day Scenic Road (north of Province Boulevard): 5,540 vehicles per day Scenic Road (south of Province Boulevard): 5,190 vehicles per day The Ridge (east of Scenic Road): 900 vehicles per day 12073R7221RevA Page 6

9 2.5 Existing Car Parking Conditions Part of the carpark associated with the adjacent Barrabool Hills Baptist Church will be removed in order to accommodate the proposed development of the subject site. Accordingly, Traffix Group conducted surveys of the carpark to determine the parking demands. The Barrabool Hills Baptist Church holds a number of smaller group meetings throughout the week, however the peak parking demands occur during services. These are held on Sundays at 10am and at 6:30pm. The occupancy of the Barrabool Hills Baptist Church carpark was surveyed at the following days and times: Friday 26 th November, 2010 at 11:00am, and Sunday 5 th December, 2010 at 10:00am and at 10:30am. The survey areas are shown in Figure 11 below. Figure 11: Barrabool Hills Baptist Church Car Parking Survey Areas The survey results are set out in Table 1 below R7221RevA Page 7

10 Table 1: Car Parking Survey Results Demand Area Capacity 11:00am Fri 26/11/ am Sun 5/12/ :30am Sun 5/12/2010 A 84 spaces 0 spaces 9 spaces 20 spaces B 7 spaces 0 spaces 2 spaces 6 spaces C 4 spaces 0 spaces 1 space 1 space D 53 spaces 3 spaces 53 spaces 53 spaces E 63 spaces 0 spaces 62 spaces 62 spaces F 44 spaces 0 spaces 35 spaces 35 spaces G 31 spaces 0 spaces 20 spaces 28 spaces H 19 spaces 9 spaces 3 spaces 5 spaces Total 305 spaces 12 spaces 185 spaces 210 spaces No. of Vacant Spaces 293 spaces 120 spaces 95 spaces Percentage Occupancy 4% 61% 69% Table 1 indicates that of the three surveys, the peak parking demand occurred during the Sunday morning church service, at 10:30am, at which time there were 210 cars parked, corresponding to an occupancy rate of 69%. There were at least 95 vacant spaces within the church carpark at all survey times. Carpark Area A is proposed to be reduced from a capacity of 84 spaces to 26 spaces as a result of the proposed Barrabool Hills Shopping Centre development, i.e. a loss of 58 car spaces. During the car parking survey times, there were not more than 20 cars parked within Carpark Area A. The reduced carpark supply within Area A of 26 spaces exceeds the peak parking demand. Within the overall church carpark, there would still be a surplus of 37 car spaces based on a peak parking demand of 210 spaces and a reduced supply of 247 spaces R7221RevA Page 8

11 2.6 Public Transport The following public transport services operate near the site: Geelong Bus Route 16 operates along Scenic Road and provides a connection between Geelong City Centre and Deakin University via Highton. Geelong Bus Route 34 operates along Province Boulevard past the subject site and provides a connection between Geelong City Centre and Buckley Falls. Both bus services provide a connection to Geelong Railway Station. Figure 12 below shows the public transport services in proximity to the subject site. Figure 12: Public Transport Map 12073R7221RevA Page 9

12 3 PROPOSAL 3.1 Proposed Development The proposal is to develop the subject site for the purposes of a supermarket and specialty shops in accordance with the following schedule of uses: Table 2: Schedule of Uses Use Quantity Size Supermarket 1 tenancy 3,200 m 2 Specialty Shops 7 tenancies 670 m 2 Kiosks 1 tenancy 25 m 2 TOTAL 9 tenancies 3,895 m Car Parking & Access Provision A total of 195 car spaces are proposed to be provided on the subject site as follows: 181 customer car spaces (including 3 disabled spaces) within an at-grade carpark accessed via a new crossover to Province Boulevard, and 14 staff car spaces (tandem arrangement) within an at-grade carpark located to the rear of the development, accessed via Stoneleigh Crescent. Parking for bicycles is proposed at-grade. A pedestrian accessway is proposed to be provided between the existing adjacent Barrabool Hills Baptist Church site and the proposed shopping centre. A copy of the proposed plans is attached at Appendix A R7221RevA Page 10

13 4 CAR PARKING ASSESSMENT 4.1 Statutory Car Parking Rates The statutory car parking requirements are set out at Clause of the Greater Geelong Planning Scheme. Table 3 below sets out the statutory car parking requirements for the proposed development. Table 3: Statutory Car Parking Requirements Use Size Car Parking Rate Requirement Supermarket 3,200 m spaces Specialty Shops 670 m 2 54 spaces 8 car spaces per 100 m 2 Kiosks 25 m 2 2 spaces TOTAL 3,895 m spaces The proposed car parking provision of 195 spaces falls short of the statutory requirements. However, Clause of the Greater Geelong Planning Scheme allows a permit to be granted to vary the statutory car parking requirements having regard for the following decision guidelines: Any relevant parking precinct plan. The availability of car parking in the locality. The availability of public transport in the locality. Any reduction in car parking demand due to the sharing of car spaces by multiple uses, either because of variation of car parking demand over time or because of efficiencies gained from the consolidation of shared car parking spaces. Any car parking deficiency or surplus associated with the existing use of the land. Any credit which should be allowed for a car parking demand deemed to have been provided in association with a use which existed before the change of parking requirement. Local traffic management. Local amenity including pedestrian amenity. An empirical assessment of car parking demand. Any other relevant consideration. The relevant guidelines are discussed below R7221RevA Page 11

14 4.2 Revised (Draft) Clause Rates Many of the statutory car parking rates set out at Clause of the Victorian Planning Provisions are widely regarded as being outdated and a number of uses are not included at all, and accordingly the Minister for Planning appointed an Advisory Committee to review Clause The revised (draft) Clause is yet to be incorporated into the Planning Schemes. The revised (draft) Clause sets out different rates depending on whether or not the development is located within an activity centre. The following table sets out an assessment of the proposed development based on the standard (non activity centre) rates set out in the revised (draft) Clause Table 4: Revised (Draft) Clause Car Parking Assessment Use Size Car Parking Rate Requirement Supermarket 3,200 m 2 5 car spaces per 100 m spaces Specialty Shops 670 m 2 4 car spaces per 100 m 2 28 spaces Kiosks 25 m 2 TOTAL 3,895 m spaces Table 4 indicates that based on the revised (draft) Clause standard rates, the development may generate a peak parking demand for up to 188 car spaces. The proposed car parking provision of 195 spaces exceeds the revised (draft) Clause standard rates by 7 car spaces. This is summarised in Table 5 below. Table 5: Comparison of Proposed Car Parking spaces with requirements under Revised (Draft) Clause Car Parking Comparison Revised (Draft) Clause Proposed provision Surplus Parking 188 spaces 195 spaces 7 spaces 4.3 Availability of Car Parking in the Locality Both Province Boulevard and Stoneleigh Crescent have 13.2 metre wide carriageways, which is sufficient to accommodate two-way traffic flow on a bus route with kerbside parallel parking on both sides. In the order of 9 parallel car spaces can be accommodated on the north side of Province Boulevard along the site s frontage, and in the order of 20 parallel car spaces can be accommodated on the east side of Stoneleigh Crescent on the site s frontage. The proposed on-site car parking provision easily exceeds the anticipated peak car parking demands generated by the proposed development (based on the standard non 12073R7221RevA Page 12

15 activity centre revised draft Clause rates). The public on-street parking available along the site s frontages would provide even more opportunity for parking if required. 4.4 Empirical Rates Empirical surveyed peak parking rates at similar sized shopping centres which include a supermarket and a number of specialty shops are set out in Table 6 below. Table 6: Empirical Surveyed Parking Rates Location Size Surveyed Peak Parking Rate Year of Survey Patterson Lakes S.C. 7,588 m spaces per 100 m Newcombe S.C. (Greater Geelong) Thompson Parkway S.C. (Cranbourne) * Empirical Surveys Source: Ratio Consultants 6,993 m spaces per 100 m ,000 m spaces per 100 m The case study data presented in Table 6 shows a range between 3.1 and 4.2 car spaces per 100 m 2 for shopping centres similar to the proposed Barrabool Hills Shopping Centre. The proposed provision of 195 car spaces for the 3,895 m 2 development corresponds to a car parking provision ratio of 5 car spaces per 100 m 2, which exceeds the peak parking demands established at the three similar sites listed in Table Variation in Demand Over Time The proposed shopping centre use is likely to generate peak parking demands on Thursday and Friday evenings and also on Saturday mornings. This doesn t coincide with the existing adjacent Barrabool Hills Baptist Church, which generates peak parking demands generally on Sundays around 10:30am and again around 7pm. Accordingly, an informal sharing of parking resources can occur between the two uses. 4.6 Adequacy of Car Parking Provisions We are satisfied that the proposed on-site car parking provision of 195 car spaces together with the publicly available on-street parking on the subject site s frontages will be more than adequate to accommodate the peak parking demands generated by the proposed Barrabool Hills Shopping Centre development having regard to the revised (draft) Clause rates and empirical surveys of similar existing centres R7221RevA Page 13

16 4.7 Car Parking Layout The proposed car parking layout has been checked against the standards and requirements of Clause of the Greater Geelong Planning Scheme, Australian Standards for Off-Street Car Parking AS/NZS , Australian Standards for Off- Street Commercial Vehicle Facilities AS and Australian Standards for Off- Street Parking for People with Disabilities AS/NZS (where relevant). All of the proposed standard car spaces are 2.6 metres wide and 5.5 metres long, accessed via a 6.5 metre aisle. These dimensions exceed both the Planning Scheme and Australian Standard requirements. The proposed disabled car spaces are 2.4 metres wide with an adjacent 2.4 metre wide shared space (between two disabled car spaces). The shared space includes a bollard to prevent vehicles parking. The proposed disabled parking spaces are in accordance with the requirements of the disabled parking standard AS A maximum gradient of 1 in 40 is proposed within the at-grade carpark. Clause 2.3 of AS states that... each parking space for people with disabilities and related walking and wheelchair unloading areas shall comprise a firm plane surface with a fall not exceeding 1:40 in any direction (1:33 if the surface is a bituminous seal and the parking space is out of doors). The proposed gradient complies. The staff car parking area (tandem arrangement) shall be on a grade of 1:17. We note that Clause of AS/NZS requires that the maximum gradient within a parking module be 1:16. Accordingly the proposed gradient complies. The proposed ramp into the load dock area is to have a gradient of 1 in 17 for the first 19.8 metres from Stoneleigh Crescent, followed by a gradient of 1 in 8.5 for the next 9 metres and then a gradient of 1 in 16 for the remaining 10 metres. Clauses 3.3 and 3.4 of AS requires that the maximum grade on an access driveway in relation to commercial vehicle facilities be 1:20 from the property line to at least the longest wheelbase of any likely vehicle to use the driveway, the maximum ramp grade be 1:6.5 and the maximum rate of change of grade be 1:16 (6.25%) in 10 metres of travel. Whilst the proposed ramp does not meet the requirement in relation to the 1:20 grade from the property line, we are satisfied that it achieves the purpose of Clauses 3.3 and 3.4 and will work appropriately. The proposed main public access to the carpark (via Province Boulevard) includes separate 4.0 metre wide in and 4.0 metre wide out accessways, divided by a 1.5 metre wide median. The proposed dimensions exceed the Planning Scheme requirements of being 3.0 metres wide for one-way travel, and also satisfy Clause of AS which requires a 3.0 metre minimum roadway (for one-way travel) with an additional 0.3 metres clearance each side to kerbs higher than 0.15 metres, i.e. 3.6 metres total width between high kerbs. Adequate circulation is proposed within the car parking areas. No blind aisles are proposed within the public parking areas. We have checked access within the carpark (including the end bays within the staff carpark) using a static template representing the 85 th percentile design vehicle manoeuvring at low speeds on a 4 metre (minimum) radius. We are satisfied that each of the proposed car spaces is adequately accessible and importantly the carpark will operate well R7221RevA Page 14

17 5 BICYCLE PARKING REQUIREMENTS Statutory bicycle parking requirements are set out at Clause of the Greater Geelong Planning Scheme. For shops, the following bicycle parking requirements apply: 1 space to each 600 m 2 of leasable floor area if the leasable floor area exceeds 1,000m 2, for staff, and 1 space to each 500 m 2 of leasable floor area if the leasable floor area exceeds 1,000m 2, for customers. The overall floor area of the proposed shops is 3,895 m 2, which exceeds 1,000 m 2. Accordingly, the statutory bicycle parking requirement is 14 spaces, including 6 spaces for staff and 8 spaces for customers. Plans indicate that secure bicycle parking areas will be provided at ground level. Clause requires that bicycle parking spaces be at least 1.7 metres long and 1.2 metres high, with 0.7 metres width provided at the handlebars. The access aisle to the bicycle spaces should be 1.5 metres wide. We are satisfied that there is adequate space available on the site to easily satisfy the statutory bicycle parking requirements, and at any rate we note that bicycle parking provision can be addressed via pa permit condition if necessary, such as the following: Bicycle parking for at least 14 bicycles must be provided on-site to the satisfaction of the responsible authority R7221RevA Page 15

18 6 TRAFFIC CONSIDERATIONS 6.1 Traffic Generation The RTA Guide to Traffic Generating Developments (2002) (RTA Guide) sets out traffic generation rates based on survey data collected in New South Wales for a range of land uses. This guide is used by VicRoads and is generally regarded as the standard for metropolitan development characteristics. The RTA Guide sets out the following formulas for calculating traffic generation for shopping centres: Thursday: 15.5 (SM) (SS) Friday: 13.8 (SM) (SS) Saturday: 14.7 (SM) (SS) (where SM = supermarket floor area divided by 100 and SS = specialty shop floor area divided by 100) The following table sets out the peak hour traffic generation based on the formulas set out in the RTA Guide. Table 7: Peak Hour Traffic Generation Assessments RTA Guide Rates Day Supermarket Specialty Shop TOTAL Thursday 496 vph 32 vph 528 vph Friday 442 vph 39 vph 481 vph Saturday 470 vph 74 vph 545 vph We note that while Table 7 indicates that the shopping centre peak occurs on Saturday, the weekday PM peak hour is when the road network peak hour combines with high levels of shopping centre traffic and is considered to be the overall peak for traffic impact assessment purposes. The RTA Guide notes that the Thursday and Friday shopping centre peak hours typically occur between 4:30pm and 5:30pm, however for the purpose of providing a conservative analysis we have assumed that the weekday PM shopping centre peak (Thursday evening) coincides with the surveyed road network peak hour, i.e. 5:15pm till 6:15pm R7221RevA Page 16

19 6.2 Traffic Distribution By the time the shopping centre is operational, the surrounding street network (including Stoneleigh Crescent) is likely to be complete or near complete. Having regard to the site s locality and the layout of the surrounding road network, the following traffic distribution assumptions have been adopted: 50% of traffic will enter and 50% will exit during the peak hour, during the peak hour all traffic will enter and exit the site via the main entrance to Province Boulevard, 20% of traffic will be generated to/from the north (via Stoneleigh Crescent), 20% of traffic will be generated to/from the west (via Province Boulevard), the remaining 60% of traffic will be generated to/from the east (via Province Boulevard), and at the Province Boulevard/Scenic Road/The Ridge intersection, traffic will be split in the same proportions as the existing surveyed traffic movements. In order to account for future residential development to the west and northwest of the subject site, the surveyed traffic volumes entering and exiting Province Boulevard have been factored up by 3% per year for 10 years. Figures 13 and 14 below set out the anticipated PM peak hour turning movements at the site main entrance and at the Province Boulevard/Scenic Road/The Ridge intersection, based on the above assumptions. Figure 13: Future Peak Hour Turning Movements PM Peak Main Site Access/Province Boulevard Figure 14: Future Peak Hour Turning Movements PM Peak Province Boulevard/Scenic Road 12073R7221RevA Page 17

20 6.3 Traffic Impact The Province Boulevard/Site Access and Scenic Road/Province Boulevard/The Ridge intersections have been tested during the future weekday PM peak hour (assuming the shopping centre is fully developed and adding 10 years growth at 3% per year onto Province Boulevard to account for surrounding residential development) using the SIDRA intersection analysis program. The key outputs of SIDRA are Degree of Saturation (DOS), Average Delay and 95 th Percentile Queue. For unsignalised intersections, a DOS of up to 0.80 is considered to be good operating conditions, with values above 0.90 considered to be poor operating conditions. Beyond a DOS of 1.00, queues and delays increase disproportionately. Full detail of the output is attached at Appendix B and is summarised in Table 8 below. Table 8: SIDRA Output PM Peak Hour Approach DOS Average Delay 95% Queue Province Boulevard/Site Main Access Intersection (Give Way) Province Boulevard (E) seconds 9.1 metres Site Access (N) seconds 8.7 metres Province Boulevard (W) seconds Scenic Road/Province Boulevard/The Ridge Intersection (Roundabout) Scenic Road (S) seconds 12.9 metres The Ridge (E) seconds 2.2 metres Scenic Road (N) seconds 15.4 metres Province Boulevard (W) seconds 9.1 metres Table 8 indicates that both intersections will operate well within acceptable limits during the peak hour, with minimal queues and delays on all approaches. In order to provide a conservative analysis, we note that the above analysis assumes a single lane is provided on each approach with no provision for through traffic to overtake turning vehicles on Province Boulevard. However we note that Province Boulevard has a 13.2 metre wide carriageway which is sufficient for through traffic to overtake turning traffic provided there are no parked cars opposite the site entrance. Having regard to the results presented in Table 7, we note that there is no reason to ban parking opposite the site entrance, as the intersection will operate well within acceptable limits with minimal queues and delays on the assumption that through traffic cannot pass. We are satisfied that there will not be any adverse traffic impacts on the surrounding road network or intersections as a result of the proposed shopping centre development R7221RevA Page 18

21 7 PROVISION FOR LOADING Clause of the Greater Geelong Planning Scheme states that no buildings or works may be constructed for the manufacture, servicing, storage or sale of goods or materials unless space is provided on the land for loading and unloading vehicles as specified in the table below. Table 9: Statutory Loading Requirements Clause Floor Area of Building Minimum Loading Bay Dimensions 2,600 sq m or less in single occupation Area 27.4 sq m Length Width Height Clearance 7.6 m 3.6 m 4.0 m For every additional 1,800 sq m or part Additional 18 sq m A large loading zone is proposed to be located north of the building at the rear of the supermarket, accessed via the staff carpark. This loading bay exceeds the minimum dimensions required under Clause and we are satisfied that adequate provision is made for delivery of goods associated with the proposed use. Clause further requires that the road and the driveway providing access to the loading bay be at least 3.6 metres wide. This requirement has been met. We have checked semi-trailer access to the supermarket loading dock using AutoTURN and we are satisfied that the proposed loading bay is sufficient to accommodate these vehicles. Suitable service management plans will be in place to ensure that that there shall not be more than one semi-trailer serving the site at any one time. The diagram attached at Appendix C shows semi-trailer access to the supermarket loading bay (including travel paths through the Province Boulevard/Stoneleigh Crescent intersection). Notably, the 19-metre semi-trailer partly crosses onto the roundabout and spitter islands; however we note that these have been designed as fully mountable islands to facilitate movements by large vehicles while at the same time providing direction and control for normal traffic. Furthermore, we note that similar sized trucks (construction vehicles) were observed to already be operating in the area without any issues. In addition to the loading zone discussed above a delivery bay is proposed to be located south of the building within the customer car parking area. This loading bay is 2.6 metres wide by 5.5 metres in length. This is considered to be appropriate to accommodate the infrequent loading activities associated with the smaller retail units in conjunction with the larger loading zone R7221RevA Page 19

22 8 CONCLUSIONS Having visited the site, perused relevant documents and plans, undertaken spot parking surveys and undertaken an assessment of the traffic and car parking generation, we are of the opinion that: a) the proposed on-site car parking provision of 195 car spaces together with the publicly available on-street parking on the subject site s frontages will be more than adequate to accommodate the peak parking demands generated by the proposed Barrabool Hills Shopping Centre development having regard to the revised (draft) Clause rates and empirical surveys of similar existing centres, b) the proposed car parking layout generally complies with the standards and requirements set out under Clause of the Greater Geelong Planning Scheme, AS/NZS , AS and AS/NZS2890/ and importantly will work well, c) there is adequate space available on the site to easily satisfy the statutory bicycle parking requirements set out at Clause of the Greater Geelong Planning Scheme. Bicycle parking provision can be addressed via a permit condition if necessary, d) the proposed loading provisions exceed the requirements of Clause of the Greater Geelong Planning Scheme and the supermarket loading bay is adequately accessible for a semi-trailer. In conjunction with the larger loading zone the proposed additional loading bay within the customer car park is considered to be appropriate to accommodate the infrequent loading activities associated with the smaller retail units, e) traffic generated by the proposed development can easily be accommodated on the surrounding road network and intersections without any adverse impacts, and f) there are no traffic engineering reasons why a permit should not be granted for the proposed Barrabool Hills Shopping Centre development located at Province Boulevard in Highton R7221RevA Page 20

23 Development Plans

24

25 SIDRA Output

26 MOVEMENT SUMMARY Province Boulevard/Site Main Entrance Intersection PM Peak Hour Future Conditions (2020) Giveway / Yield (Two-Way) Site: Province/Site Access PM Future Movement Performance - Vehicles Mov ID Turn Demand Deg. Average Level of 95% Back of Queue Prop. Effective Average Flow HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed veh/h % v/c sec veh m per veh km/h East: Province Boulevard (E) 5 T LOS A R LOS B Approach NA North: Site Access (N) 7 L LOS A R LOS A Approach LOS A West: Province Boulevard (W) 10 L LOS A T LOS A Approach NA All Vehicles NA Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Minor Road Approach LOS values are based on average delay for all vehicle movements. NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements. SIDRA Standard Delay Model used. Processed: Friday, 20 January :50:48 AM Copyright Akcelik and Associates Pty Ltd SIDRA INTERSECTION Project: P:\Synergy\Projects\GRP1\GRP12073\Sidra\200112\12073 Sidra.sip , TRAFFIX GROUP PTY LTD, FLOATING

27 MOVEMENT SUMMARY Scenic Road/Province Boulevard/The Ridge PM Peak Hour Future Conditions ( with development traffic) Roundabout Site: Province/Scenic PM Future Movement Performance - Vehicles Mov ID Turn Demand Deg. Average Level of 95% Back of Queue Prop. Effective Average Flow HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed veh/h % v/c sec veh m per veh km/h South: Scenic Road (S) 1 L LOS A T LOS A R LOS B Approach LOS A East: The Ridge (E) 4 L LOS A T LOS A R LOS B Approach LOS B North: Scenic Road (N) 7 L LOS A T LOS A R LOS B Approach LOS A West: Province Boulevard (W) 10 L LOS A T LOS A R LOS B Approach LOS B All Vehicles LOS A Level of Service (LOS) Method: Delay (HCM 2000). Roundabout LOS Method: Same as Signalised Intersections. Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model used. Processed: Friday, 20 January :55:49 AM Copyright Akcelik and Associates Pty Ltd SIDRA INTERSECTION Project: P:\Synergy\Projects\GRP1\GRP12073\Sidra\200112\12073 Sidra.sip , TRAFFIX GROUP PTY LTD, FLOATING

28 Loading Bay Access

29

PROPOSED BROILER FARMS

PROPOSED BROILER FARMS PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment Prepared for PAVILION PARTNERS MARCH, 2014 OUR REFERENCE: 16853R9457 PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment

More information

Craigieburn Employment Precinct North and English Street

Craigieburn Employment Precinct North and English Street Craigieburn Employment Precinct North and English Street METROPOLITAN PLANNING AUTHORITY Intersection Analyses 7 February 2014 Intersection Analyses Craigieburn Employment Precinct North and English Street

More information

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN 12 September 2017 Iain McManus Civitas Planning Consultants PO Box 47020 Ponsonby AUCKLAND 1144 Dear Iain, TRAFFIC ENGINEERING ASSESSMENT 43-45 45 MOUNT EDEN ROAD, MOUNT EDEN As requested, we have prepared

More information

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018 54 Parkway Drive, Rosedale Proposed Residential / Commercial Development Transportation Assessment Report 30 April 2018 Project: Report title: Document reference: 54 Parkway Drive, Rosedale Transportation

More information

Proposed Supermarket Development Murradoc Road, Drysdale Expert Evidence

Proposed Supermarket Development Murradoc Road, Drysdale Expert Evidence Proposed Supermarket Development 24-32 Murradoc Road, Drysdale Expert Evidence Expert // Tim De Young Client // Coles Group Property Developments Limited Instructed by // Norton Rose Fulbright Reference

More information

Cornubia Retail and Business Park Development

Cornubia Retail and Business Park Development Development July 2013 Tongaat Hulett Development (Pty) Ltd Tel. No.: 031 560 1900 Contact Person: Karen Petersen 21 West Riding Row, Sherwood Tel: 031 240 7300 Andrew McKune Andrew.McKune@smec.com SMEC

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe,

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe, Our Ref: Contact: CG120569:VG Valentine Gnanakone Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC 3145 Attention: Joseph Nasr Dear Joe, 690 DERRIMUT ROAD PROPOSED RESIDENTIAL SUBDIVISION Further to our

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

1 3 Gladstone Road, Dandenong

1 3 Gladstone Road, Dandenong 1 3 Gladstone Road, Dandenong Proposed Kaufland Supermarket Planning Panels Victoria Date of Hearing: Starting 23 rd November, 2018 Date of Statement: 19 th November, 2018 Date of Inspection: 22 nd October

More information

Mixed-Use Development Transport Impact Evidence Park Road Donvale

Mixed-Use Development Transport Impact Evidence Park Road Donvale Mixed-Use Development Transport Impact Evidence 88-154 Park Road Donvale Mixed-Use Development 88-154 Park Road, Donvale Transport Impact Evidence Client: CPG Australia Pty Ltd Reference: JM14940 GTA Consultants

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA 20 March 2014 Report prepared by: Corli Havenga Transportation Engineers

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

CARPARK, RAMP AND DRIVEWAY CERTIFICATION OF RESIDENTIAL USE DEVELOPMENT. Prepared for: Harvey Property Investments Pty Ltd

CARPARK, RAMP AND DRIVEWAY CERTIFICATION OF RESIDENTIAL USE DEVELOPMENT. Prepared for: Harvey Property Investments Pty Ltd CARPARK, RAMP AND DRIVEWAY CERTIFICATION OF RESIDENTIAL USE DEVELOPMENT 8-9 Harvey Place in Toongabbie Prepared for: Harvey Property Investments Pty Ltd N1615708A (Version 1b) May 2016 Suite 195, 79 to

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK Traffic Impact Assessment LOCATED ERF 1692 IN FRANSCHHOEK, WESTERN CAPE Project No. : STUR0202 NOVEMBER 2017 PREPARED BY: STURGEON

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Locating Ground Mounted Equipment

Locating Ground Mounted Equipment Network Asset Technical Document Locating Ground Mounted Equipment Original issue: April 2008 Prepared by: Lee Chan & Robert Rogerson This revision: Original Issue Date for next review: April 2013 Copyright

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

\ ~ u~c 20\3 RM PROPOSED APARTMENT DEVELOPMENT, 2 MATATUA ROAD RAUMATI BEACH - FURTHER INFORMATION REQUEST

\ ~ u~c 20\3 RM PROPOSED APARTMENT DEVELOPMENT, 2 MATATUA ROAD RAUMATI BEACH - FURTHER INFORMATION REQUEST ttriss ref: raymond/21156 Cuttriss Consultants Limited Hutt Valley, Wellington, Kapiti Coast 33 Kapiti Road PO Box 386 Paraparaumu Tel: 04-9045420 Fax: 04-904 5423 Email: dean@cuttriss.co.nz 17 December

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

Proposed Readymix Regional Distribution Centre at Rooty Hill Traffic Impact Study

Proposed Readymix Regional Distribution Centre at Rooty Hill Traffic Impact Study Proposed Readymix Regional Distribution Centre at Rooty Hill Traffic Impact Study 23rd June 2005 Irwinconsult Pty Ltd Suite 602, Level 6 504 Pacific Hwy St Leonards NSW 2065, Australia ABN 12 050 883 657

More information

The Re:Queen and Sparks Traffic Brief - Addendum #2

The Re:Queen and Sparks Traffic Brief - Addendum #2 June 11, 2015 Ashcroft Homes 18 Antares Drive Ottawa, ON K2E 1A9 EMAIL: mpham@ashcrofthomes.com Attention: May Pham Development Planner Dear May, Re: The Re:Queen and Sparks Traffic Brief - Addendum #2

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TRANSPORT IMPACT ASSESSMENT

TRANSPORT IMPACT ASSESSMENT TRANSPORT IMPACT ASSESSMENT 31 Maida Vale Maida Vale December 2018 Rev B HISTORY AND STATUS OF THE DOCUMENT Revision Date issued Reviewed by Approved by Date approved Revision type Rev A 20.09.2018 M Kleyweg

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

NEW ELEMENTARY SCHOOL #1 Open BLPC Meeting January 9, 2013

NEW ELEMENTARY SCHOOL #1 Open BLPC Meeting January 9, 2013 NEW ELEMENTARY SCHOOL #1 Open BLPC Meeting January 9, 2013 It s for the Students! Maintain class size Hold fewer classes in relocatables Minimize travel distance to school Project Delay and it s impact

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017 Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A7 519-591-0426 November 8, 2017 Revised December 20, 2017 Laurie Wills, PEng Deputy Director of Public Works Town of Cobourg 740 Division

More information

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview 2 March 2015 OUR REF: TO3205TOB00 Conseil des écoles catholiques du Centre-Est (CECCE) 4000 rue Labelle Ottawa, Ontario K1J 1A1 Attention: Maguy Eustache Dear Maguy: Re: Sainte-Geneviève Elementary School

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief April 26 Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief Salvation Army Barrhaven Church 2 Bill Leathem Drive Transportation Brief prepared for: The Salvation Army 2 Overlea Blvd.

More information

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL Prepared For: 1602850 Ontario Ltd. 2800 Highway 7 Vaughan, Ontario L4K 1W8 Prepared By: URS Canada Inc.

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Strategic Transport Modelling Assessment (Ultimate Scenario)

Strategic Transport Modelling Assessment (Ultimate Scenario) Strategic Transport Modelling Assessment (Ultimate Scenario) McPherson, Croskell and Minta Farm Precincts CG447 Prepared for Metropolitan Planning Authority 3 August 25 Document Information Prepared for

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

RE: INNES / TRIM RETIREMENT RESIDENCE TRANSPORTATION OVERVIEW

RE: INNES / TRIM RETIREMENT RESIDENCE TRANSPORTATION OVERVIEW IBI GROUP 400 333 Preston Street Ottawa ON KS 5N4 Canada tel 63 225 3 fax 63 225 9868 ibigroup.com April 4, 207 Asad Yousfani, M.Eng., P.Eng. Project Manager, Infrastructure Approvals, Transportation City

More information

Traffic Impact Assessment

Traffic Impact Assessment Shepparton North East Growth Area Precinct Structure Plan Appendix F Traffic Impact Assessment C:\Documents and Settings\jensenbr\Local Settings\Temporary Internet Files\Content.MSO\DF1103FA.tmp Revision

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development Solmar Development Corp. 144&176 John St. and 2 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development TRANSPORTATION IMPACT STUDY 18145 November 217 LEA Consulting Ltd. Consulting

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN as Trustee for C & B Unit Trust ABN 27 623 918 759 Our Ref: 20 July, 2017 TR/10419/jj Transport Planning Traffic Studies Parking Studies Frasers Property Australia PO Box 4148 SHELLHARBOUR NSW 2529 Attention:

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise

More information

Trim Road, Commercial Development, City of Ottawa

Trim Road, Commercial Development, City of Ottawa HARDEN REALTIES July 2016 Trim Road, Commercial Development, City of Ottawa Transportation Impact Study Trim Road, Commercial Development, City of Ottawa Transportation Impact Study prepared for: Harden

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0 TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE October 2013 Revised: 2.0 Quality Management Issue/revision Issue 1 Issue 2 Remarks Draft Final Date 30

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Port of Durban Relocation of Administrative Building and Passenger Terminal at A & B Berth

Port of Durban Relocation of Administrative Building and Passenger Terminal at A & B Berth Transnet National Ports Authority Port of Durban Relocation of Administrative Building and Passenger Terminal at A & B Berth Transport Impact Assessment July 2012 J31151 Arcus GIBB (Pty) Ltd Reg. 1992/007139/07

More information

REPORT ON TRAFFIC IMPACT FOR THE LEGITIMISATION OF EXISTING SHORT TERM & TENT SITES KIOLOA BEACH HOLIDAY PARK

REPORT ON TRAFFIC IMPACT FOR THE LEGITIMISATION OF EXISTING SHORT TERM & TENT SITES KIOLOA BEACH HOLIDAY PARK Engineering & Management Civil and Structural Engineering Environmental Engineering Quality Assurance Project Management Development Consultants 20 July, 2007 Ref. No. 06269 REPORT ON TRAFFIC IMPACT FOR

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information