ASX RELEASE QUARTERLY ACTIVITIES REPORT. 31 October 2014 ASX : BGS SEPTEMBER The emerging West African Gold Exploration Company HIGHLIGHTS
|
|
- Pearl Lyons
- 6 years ago
- Views:
Transcription
1 31 Octber 2014 ASX RELEASE ASX : BGS The emerging West African Gld Explratin Cmpany HIGHLIGHTS QUARTERLY ACTIVITIES REPORT SEPTEMBER 2014 Targeting multi-millin unce gld depsits in Mali and Liberia. Expanding gld inventry at existing assets and via new prject generatin. Wintn Willesee Chairman Kevin Jyce Managing Directr Hugh Bresser Nn-Executive Directr Investr Relatins Rupert Dearden / Richard Glass MAGNUS Cmmunicatin T: Suite 9, 5 Centr Ave, Subiac WA 6008 PO Bx 457 West Perth WA 6872 P: F: E: inf@birimiangld.cm MASSIGUI GOLD PROJECT MALI Shallw high grade gld znes cnfirmed at Viper Prspect. Significant results include; 3.45 g/t Au frm 4m (incl g/t Au) 2.23 g/t Au frm 17m 2.54 g/t Au frm 14m 6.27 g/t Au frm 41m 1.60g/t Au frm 29m 1.16 g/t Au frm 4m Results cnfirm excellent ptential fr the delineatin f additinal gld resurces in the Ntila District. Multifaceted 4,500m drilling prgram underway, testing multiple high ptential advanced and early stage gld prspects in the Ntila District. Drilling results expected in mid-nvember. BASAWA GOLD PROJECT - LIBERIA Analysis f results has cnfirmed significant reginal-scale gld trend extending ver 15km f strike in the Bafawehn Regin and hsting multiple gld prspects. High pririty targets identified fr trenching, channel sampling and subsequent drill targeting at Befre Camp, Newtwn and Bafa Creek. CORPORATE Sund financial psitin with apprximately $1.7 millin cash available at end f the quarter. ABN
2 Birimian Gld Limited 31 Octber 2014 During the September 2014 quarter Birimian Gld Limited (ASX:BGS; Birimian Gld r the Cmpany ) remained fcussed n priritising targets and cmpleting preparatins fr the next rund f explratin drilling at the Massigui Gld Prject in suthern Mali and the Basawa Gld Prject in Liberia (Figure 1). Figure 1. Lcatin f Birimian Gld Limited s prjects in West Africa WEST AFRICAN GOLD PROJECTS Massigui Gld Prject, Mali While the Massigui Gld Prject lies adjacent t the Mrila Gld Mine Lease, surrunding it n 3 sides, imprtantly it als cvers strike extensins f the highly prspective gelgical sequence that hsts the 7Mz Mrila Gld Depsit (Figure 2). Wrk undertaken during the quarter included resampling, multielement analysis and gelgical re-lgging prgrams designed t prvide additinal infrmatin and understanding t assist in the planning f the next phase f drilling which cmmenced subsequent t the end f the reprting perid. Detailed sampling cnducted n aircre (AC) drill intervals at the Viper Prspect, situated apprximately 5km suth-west f the Ntila Depsit (Figure 3), significantly upgraded the previusly reprted drill results and prvided further cnfirmatin f the presence f high grade gld mineralisatin in the prspect area (ASX Release: 11 August 2014). Highlights frm the prgram included; 3.45 g/t Au frm 4m (incl g/t Au) 2.23 g/t Au frm 17m 2.54 g/t Au frm 14m 6.27 g/t Au frm 41m 1.60g/t Au frm 29m 1.00 g/t Au frm 19m 1.16 g/t Au frm 4m
3 Birimian Gld Limited 31 Octber 2014 As a result f the psitive utcmes frm the resampling wrk, the Cmpany mbilized an AC drill rig and a larger reverse circulatin (RC) drill rig t the Massigui Prject t cmmence drilling n the higher pririty targets in the Ntila District. Apprximately 4,500m f drilling is anticipated t be cmpleted in this initial drilling campaign. The drilling is designed t, Test depth extensins t the recently defined shallw high-grade gld znes at Viper Prspect. Infill and extend drill cverage alng strike and adjacent t re-grade drill intersectins at Viper Prspect, and Evaluate high ptential gld targets identified in previus AC and auger drilling at Kble, Kting, and Kura Prspects. Figure 2. Birimian Gld s Massigui Gld Prject, Mali. The Cmpany believes there is excellent scpe t delineate additinal shallw gld resurces at these prspects and mre bradly within the Massigui Gld Prject. The current phase f infill and extensinal drilling will frm the base fr subsequent resurce definitin drilling prgrams as the Cmpany wrks t build upn its current gld inventry thrugh nging explratin and discvery. Figure 3. Ntila Regin. Target areas are highlighted in white plygns.
4 Birimian Gld Limited 31 Octber 2014 Figure 4. Viper Prspect. Updated aircre drill hle intersectins (>0.5 g/t Au). Drillhle cllars are shwn as white pints (phase 1) and black pints (phase 2). Basawa Gld Prject, Liberia The Basawa Gld Prject cvers a large area (1,000km 2 ) f highly gld prspective terrain in sutheastern Liberia (Figure 5). The 4.2Mz Dugbe-Tuzn Gld Camp, which is wned and perated by AIM listed Hummingbird Resurces Plc, is situated n parallel gelgical structure apprximately 25km t the nrth f the Basawa Prject.. Figure 5. Birimian Gld s Basawa Gld Prject in Liberia.
5 Birimian Gld Limited 31 Octber 2014 Field prgrams cmpleted during the June 2014 quarter fcused n develping ptential drill targets ver advanced prspects at Befre Camp and Newtwn Prspects, and expanding recnnaissance sampling alng ptential strike extensins assciated with this mineralized trend. Results received during the September quarter frm this earlier wrk prgram have cnfirmed a significant reginal-scale gld trend, hsting multiple gld prspects and extending ver 15km f strike in the Bafawehn Regin (Figure 6 - ASX: 27 August 2014). The results als significantly upgraded the gld targets at Befre Camp and Newtwn, in additin t defining a third, new, high ptential target area at Bafa Creek (Figure 7). Results received during the quarter frm brad spaced (200m x 200m) sil sampling in the regin arund Bilap identified a zne f strngly elevated gld in sils (see Figure 6). The Bilap anmaly is situated adjacent t a large alluvial mining centre at the suthern edge f the current sampling grid and therefre represents a significant new target area fr further investigatin. The Cmpany is currently develping a prgram invlving trenching and channel sampling t assist in defining drill targets at Befre Camp, Newtwn and Bafa Creek Prspects. Planning is als underway fr a staged prgram f sil sampling and prspect develpment ver the brader Befre Camp Trend and at Bilap Prspect. The Cmpany is mnitring the develping situatin in Liberia in relatin t the Ebla Virus and while the Basawa Gld Prject is nt in a regin directly affected, the practicalities f perating in Liberia are challenging at the present time. At this stage the Cmpany des nt expect t re-cmmence field wrk befre the end f the year. Figure 6. Basawa Gld Prject. Bafawehn regin, viewed lking west. Sil gechemistry and prspect lcatins ver USGS gelgical interpretatin map.
6 Birimian Gld Limited 31 Octber 2014 Figure 7. Auger results at Befre Camp, Newtwn and Bafa Creek Prspects. Infill auger sampling areas utlined in blue. Dankassa Gld Prject, Mali The Dankassa Gld Prject cvers 510km 2 f gld prspective grund in suthern Mali (see Figure 1). N field activity ccurred during the quarter hwever desktp wrk cntinued t identify ptential drill targets and the Cmpany believes further recnnaissance drilling is warranted t test fr ecnmic mineralisatin n the Dankassa Gld Prject. The Cmpany will cntinue t evaluate and rank targets n all prperties within the Cmpany s prtfli t ensure resurces are directed t the highest pririty targets. At this time field wrk at the Dankassa Prject will remain n hld while the Cmpany fcuses its resurces n expanding the explratin and evaluatin drilling prgrams at the Massigui Prject. CORPORATE Cash available t the Cmpany at the end f the quarter is apprximately $1.7M. Fr further infrmatin please cntact : Mr Kevin Jyce Managing Directr (08) inf@birimiangld.cm Media: Rupert Dearden / Richard Glass MAGNUS Crprate and Financial Cmmunicatin
7 Birimian Gld Limited 31 Octber 2014 Schedule f Tenements held at 30 September 2014 Cuntry Prject Tenement Reference Mali 10/ /0590 Dankassa 13/ / / / / / /3125 Massigui 13/ / / /0389 Liberia Basawa MEL11100 Australia Waite Kauri Prject M37/1289 Cmpetent Persns Declaratin The infrmatin in this annuncement that relates t explratin results is based n infrmatin cmpiled by r under the supervisin f Kevin Anthny Jyce. Mr Jyce is Managing Directr f Birimian Gld Limited and a Member f the Australian Institute f Gescientists. Mr Jyce has sufficient experience which is relevant t the style f mineralisatin and type f depsit under cnsideratin and the activity he is undertaking t qualify as a Cmpetent Persn as defined in the 2012 Editin f the Australasian Cde fr Reprting f Explratin Results. Mr Jyce cnsents t the inclusin in the reprt f the matters based n his infrmatin in the frm and cntext in which it appears. Previus Reprted Results There is infrmatin in this annuncement relating t previus Explratin Results. The Cmpany cnfirms that it is nt aware f any new infrmatin r data that materially affects the infrmatin included in the riginal market annuncement(s), and that all material assumptins and technical parameters have nt materially changed. The Cmpany cnfirms that the frm and cntext in which the Cmpetent Persn s findings are presented have nt been materially mdified frm the riginal market annuncement.
10m at 18g/t Au from Dave Prospect
23rd April 2012 ASX Annuncement 10m at 18g/t Au frm Dave HIGHLIGHTS Level 2, 9 Clin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscvery.cm e inf@predictivediscvery.cm
More informationSIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION
Wednesday, 28 July 2010 SIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION Hillgrve Resurces Ltd (ASX:HGO) is pleased
More informationPositioned for Major Gold Discovery, West Africa
ASX: ERX Psitined fr Majr Gld Discvery, West Africa Cte d Ivire 121 Mining Investment, Hng Kng Octber 2018 Cmpetent Persns Statement & Disclaimer Cautinary Statement Previusly Reprted Explratin Results
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 14 April 2015 Further Update n the Develpment f the Old Pirate High Grade Gld Depsit ABM Resurces NL ( ABM r the Cmpany ) is pleased t annunce an update n the
More informationMining the Territory. 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gold Pour from Edna Beryl
13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gld Pur frm Edna Beryl 19 February 2018.Restructure f the JV with Evlutin (NT) 10 April 2018..High grade Cbalt, Cpper and Gld at Jasper
More informationFor personal use only
ASX Annuncement 16 March 2017 ASX Cde: ARM Aurra Minerals Grup f Cmpanies Diversified Minerals Explratin via direct and indirect interests Predictive Discvery Limited (ASX: PDI) 39.6% - Gld Explratin /
More informationFor personal use only
ASX Annuncement Predictive Discvery Limited is a gld explratin cmpany with strng technical capabilities fcused n a large gld explratin prtfli in West Africa. ASX: PDI Issued Capital: 163 millin shares
More informationFor personal use only
Suthern Crss Gldfields Ltd is an Australian explratin cmpany ffering investrs a cmpelling cmbinatin f near term cash flw and utstanding explratin ptential. The Cmpany has a dminant 4,000km 2 tenement and
More informationASX Announcement and Media Release KALAMAZOO PROCEEDS WITH PURCHASE OF THREE HIGHLY PROSPECTIVE GOLD PROJECTS IN WA S PILBARA
ASX Annuncement and Media Release 17 April 2018 KALAMAZOO PROCEEDS WITH PURCHASE OF THREE HIGHLY PROSPECTIVE GOLD PROJECTS IN WA S PILBARA HIGHLIGHTS: Kalamaz t prceed with the purchase f three highly
More informationEPITHERMAL GOLD IN NEVADA. Corporate Presentation January 2018
EPITHERMAL GOLD IN NEVADA Crprate Presentatin January 2018 Frward Lking Statements This presentatin by Discvery Harbur Resurces Inc. (the Cmpany ) cntains frwardlking statements, including, in particular,
More informationInvestor Presentation
13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gld Pur frm Edna Beryl 19 February 2018.Restructure f the JV with Evlutin (NT) 10 April 2018..High grade Cbalt, Cpper and Gld at Jasper
More informationPOSITIVE PRELIMINARY PIT OPTIMISATION AND METALLURGY RESULTS FOR MAKABINGUI GOLD PROJECT, SENEGAL. Highlights. 31 October 2013
Bassari Resurces Limited is an Australian listed cmpany fcused n discvering multimillin unce gld depsits in the Birimian Gld Belt, Senegal, West Africa. FAST FACTS ASX Cde BSR Issued Capital 771,319,369
More informationFor personal use only
STREET ADDRESS Unit 17, Level 2 100 Railway Rad Subiac, Western Australia 6008 POSTAL ADDRESS PO Bx 8129 Subiac East 6008 CONTACT DETAILS Tel: +61 (0)8 9380 9920 Fax: +61 (0)8 9381 5064 inf@indusenergy.cm.au
More informationStep-out drilling following up on previous intercepts on 800m spaced sections (refer to ASX release dated 19 June 2018) includes:
ASX ANNOUNCEMENT & MEDIA RELEASE 30 January 2019 QUARTERLY REPORT FOR THE PERIOD ENDING 31 December 2018 Alicant Minerals Ltd ( Alicant r the Cmpany ) (ASX: AQI) is pleased t prvide its quarterly activities
More informationTwin Bonanza Gold Camp Discovery Success:
QUARTERLY REPORT Fr the 3 Mnths Ended 31 March 2012 CORPORATE Strng Cash Psitin 31st March 2012 >$26 Millin. Share Placement and Optin Exercise fr net prceeds f $18.73 Millin. BUSINESS GOLD EXPLORATION
More informationContinental Gold Drills a New High-Grade Gold and Silver Discovery Over 1,200 Vertical Metres at Buriticá, Colombia
Cntinental Gld Drills a New High-Grade Gld and Silver Discvery Over 1,200 Vertical Metres at Buriticá, Clmbia Trnt, Ontari, September 13, 2012 -- Cntinental Gld Limited (TSX:CNL; OTCQX:CGOOF) ("Cntinental"
More informationExploration, Drilling and Enhanced Tenement Portfolio The Tasmanian Frontier
209+ ADDRESS PHONE EMAIL PO Bx 35 +61 (8) 9295 0388 inf@frntierresurces.cm.au Nrth Perth FAX WEBSITE WA 6906 Australia +61 (8) 9295 3480 www.frntierresurces.cm.au ABN 96 095 684 389 ASX : FNT ASX Limited
More informationFor personal use only GRUYERE GOLD PROJECT IN JOINT VENTURE WITH GOLD FIELDS LTD
GRUYERE GOLD PROJECT IN JOINT VENTURE WITH GOLD FIELDS LTD 1 Disclaimer Imprtant Ntices Nature f this dcument: The purpse f this presentatin is t prvide general infrmatin abut Gld Rad Resurces Limited
More informationNON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY
NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents
More informationHawthorn Resources Limited March 2011 Quarterly Report
Hawthrn Resurces Limited Quarterly Activities Reprt MARCH 2011 ASX Release 29 April 2011 ABN 44 009 157 439 Hawthrn Resurces Limited Level 2, 90 William Street Melburne VIC 3000 Australia Tel: +61 3 9605
More informationQuarterly Production Summary
30 Nvember 2018 Vast Resurces plc ( Vast r the Cmpany ) ly Prductin Summary Vast Resurces plc, the AIM listed mining cmpany with peratins in Rmania and Zimbabwe, presents its peratinal update and prductin
More informationMultiple +1% Copper Intersections from Latest Chanape Drilling
12 March 2014 Multiple +1% Cpper Intersectins frm Latest Chanape Drilling HIGHLIGHTS Assay results frm the latest drilling received with multiple znes f +1% Cu Intersectins include: 97m dwn-hle interval
More informationReport of the Service Director to the General Licensing Regulatory Board to be held on the 25 October 2017 ENFORCEMENT UPDATE. 1.
Reprt f the Service Directr t the General Licensing Regulatry Bard t be held n the 25 Octber 2017 ENFORCEMENT UPDATE 1. Purpse f Reprt The purpse f this reprt, is t prvide Members with an verview f the
More informationEast Alabama Region MPO & RPO Transportation Monthly Newsletter
East Alabama Regin MPO & RPO Transprtatin Mnthly Newsletter INSIDE THIS ISSUE December 2018 Issue MPO Updates Bike-Ped Plan Updates Public Participatin Plan Update Prject Changes RPO Updates FY19 Meetings
More informationGarden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights
7 December 2010 ABN 28 009 174 761 www.regisresources.com Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 Level 1, 1
More informationTransparency in the Mining Sector Taxes and Value Distribution
Transparency in the Mining Sectr Taxes and Value Distributin A presentatin by Edward Bickham 17 April 2014 Senir Adviser, Gld fr Develpment, Wrld Gld Cuncil UKSIF and Sustainalytics Seminar Edinburgh Transparency
More informationSOMSAS Student User Manual Overseas Short Term Programs
SOMSAS Student User Manual Overseas Shrt Term Prgrams Table f cntents WHAT IS SOMSAS? 2 CREATE A NEW APPLICATION 2 Shrt Term Prgram 3 ADD SUBJECTS TO YOUR APPLICATION 3 Hst Institutin Details 4 Partner
More informationThird Quarter 2014 Operating Results
1 22 May 2014 Third Quarter 2014 Operating Results Lndn, England & Baie Verte, Newfundland and Labradr, Canada Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ( Rambler r the Cmpany ), a cpper and
More informationPLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY
Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin
More informationThe GTB Glare and Visibility Study
Authr: G R Draper Infrmal dcument N. GRE-66-21 (66th GRE, 4-6 Octber 2011 agenda item 17(b)) GTB Dcument N. CE-4684 Date: 2011-09-16 The GTB Glare and Visibility Study GTB TASK FORCE COORDINATION f AUTOMOTIVE
More informationTHE YARAMOKO GOLD PROJECT ROBIN MILLS, Roxgold Non-Executive Director & Sr. Operating Partner of Appian Capital Advisory
THE YARAMOKO GOLD PROJECT ROBIN MILLS, Rxgld Nn-Executive Directr & Sr. Operating Partner f Appian Capital Advisry The Jburg Indaba 6 TH, Octber, 2016 CAUTIONARY STATEMENT This presentatin cntains frward-lking
More informationREQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES
REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins
More informationTexas Christian University Policy
Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines
More informationCity of San Luis Obispo Zoning Regulations December 2013
City f San Luis Obisp Zning Regulatins December 2013 parking areas, parking f vehicles fr purpses f vernight camping r sleeping is prhibited by and shall be subject t enfrcement in accrdance with Chapter
More information126m strike length vein averaging 42.37g/t gold
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 16 th July, 2012 Phase 3: Longitudinal Surface Vein Sampling Extends the Western Limb of Old Pirate Beyond Existing Resource with: 126m strike length vein averaging
More informationLLC Phone: (720)
DB Enterprise, 4771 S. Danube Circle Aurra, Clrad 80015 July 28, 2015 LLC Phne: (720) 231-1947 E-Mail: drubfe.jr@cmcast.net Mr. Ryan Rgers DCB Cnstructin Cmpany, Inc. 909 East 62 nd Avenue Denver, CO 80216
More informationMemorandum. Recommendations: 1.0 Background monitoring and recommendations
Memrandum T: Bassett Creek Watershed Management Cmmissin Recmmendatins: 1. Perfrm additinal mnitring f Schaper Pnd in 2018 including water quality mnitring lngitudinally thrugh the pnd, a bathymetric survey,
More informationCompliance Monitoring Procedure
Cmpliance Mnitring Prcedure fr Rules f Participatin 4CDc_002a_Cmpliance Mnitring Prcedure_v1.0_en Versin: Nvember 2014 Index 1. Intrductin... 2 2. Type f requirements, Mnitring and Sanctins... 3 3. Annex1
More informationENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100%
ENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100% June 28, 2010 Halifax, Nva Sctia and Gerge Twn, Grand Cayman, June 28, 2010 - Etruscan Resurces Inc. (
More informationNew Gold Achieves Strong Operational and Financial Performance in Second Quarter 2012 and Announces Commercial Production at New Afton
New Gld Achieves Strng Operatinal and Financial Perfrmance in Secnd Quarter 2012 and Annunces Cmmercial Prductin at New Aftn (All figures are in US dllars unless therwise indicated) August 1, 2012 New
More informationL2L DRIVING SCHOOL. Portfolio. Company Driver Assessments & Risk Management WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY
Cmpany Driver Assessments & Risk Management Prtfli WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY L2L DRIVING SCHOOL Learners T License Driving Schl Intrductin At Learners t License we pride urselves in assisting
More informationPacific Fishery Management Council
1 Frequency and Duratin f Meetings Full SSC meets during regularly scheduled meetings f the Pacific Cuncil March, April, June, September, and Nvember SSC typically meets fr tw days at the beginning f the
More informationCASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM
CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM PROGRAM OVERVIEW Ecnmic Vitality is a critical factr in ensuring Castle Rck s lng-term success and in achieving its Visin f being a Self-Sufficient
More informationTHIRD QUARTER 2017 SALES Growth of 1.9% at constant exchange rates
THIRD QUARTER 2017 SALES Grwth f 1.9% at cnstant Third-quarter sales f 21.9bn Up +1.9% n a reprted basis at cnstant and up 0.5% like-fr-like Grwth driven by Eurpe and Latin America Third-quarter perfrmance
More informationUnderground Storage Tank Management Practices
Prgram #: Envirnmental Management Prgram Revisin # 1.0 Implementatin Date 1/30/08 Page #: 1 f 13 Authr: Envirnmental Prgrams Apprval: W. Brewer Undergrund Strage Tank Management Practices 1.0 Purpse /
More informationFranchised Hauler Exemption for Recycling Application
Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler
More informationAnn Arbor Station Environmental Review
Ann Arbr Statin Envirnmental Review Leadership Advisry Grup May 13, 2015 Agenda Prject Update Review f Activities 2 ~ Last meeting September 15 (Site Tur) ~ Eliminatin f Nrth Main Street (Build Alternative
More informationStatement of Work (SOW) inemi Board Assembly TIG PCB Warpage Characterization and Minimization Project
Statement f Wrk (SOW) inemi Bard Assembly TIG PCB Warpage Characterizatin and Minimizatin Prject Versin # 3.1 Date: June 5, 2017 Prject Leader: Srinivasa Aravamudhan (Intel) inemi Staff: Haley Fu Backgrund/Prblem
More informationRequest for Proposal Annual NACRO Conference 2017 Submission Deadline: January 29th, September 30, 2015
Request fr Prpsal Annual NACRO Cnference 2017 Submissin Deadline: January 29th, 2016 September 30, 2015 CONNECT. BENCHMARK. IMPROVE. 1) Backgrund The Netwrk f Academic Crprate Relatins Officers (NACRO)
More informationDeaf Bay Area Poker Series Guidelines Season #8
Deaf Bay Area Pker Series Guidelines Seasn #8 Any changes t these guidelines will be determined and apprved by the majrity f the pker players that attended past series at the free rll (n qurum required)
More informationDesign Standard - Fume Hoods & Fume Hood Exhausts
1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an
More informationIB Regional Workshops: Guidelines for Host Schools in Latin America
IB Reginal Wrkshps: Guidelines fr Hst Schls in Latin America Page 1/11 Dear Head f Schl and IB crdinatr, Thank yu fr cnsidering hsting an IB Prfessinal Develpment event at yur schl. As a leader in prfessinal
More informationBus Transportation Program Handbook. Northside/Riverside School Year
Bus Transprtatin Prgram Handbk Nrthside/Riverside 2018-2019 Schl Year Bishp Jhn J. Snyder High Schl Bus Transprtatin Prgram Handbk Plicies and Prcedures fr the 2018-2019 Schl Year Admissins fr the Bus
More informationFOOD TRUCK VENDOR INSTRUCTIONS
FOOD TRUCK VENDOR INSTRUCTIONS City f Clumbia 208 S. Rapp Ave. Clumbia, IL 62236 618.281-7144 x 134 Please allw tw weeks fr prcessing. The fllwing dcuments must be submitted with this applicatin: - Cmpleted
More informationPARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS
ENFCEMENT ON PRIVATE PROPERTY BY AUTHIZED CITY BY-LAW ENFCEMENT OFFICERS T: Supervisr f Parking Services, City f Brantfrd: I, Of Name (print) Municipal Address (print) Brantfrd, ON Psitin (print) Type
More informationCS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date
CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By
More informationHANDLING AND STORAGE PRACTICE
PREFERRED RELIABILITY PRACTICES Practice N. PD-ED-1109 Page 1 f 5 Ni-H SPACECRAFT BATTERY HANDLING AND STORAGE PRACTICE Practice: Develp and implement handling and strage prcedures t ensure reliable peratin,
More informationDeaf Bay Area Poker Series Guidelines Season #9
Deaf Bay Area Pker Series Guidelines Seasn #9 Any changes t these guidelines will be determined and apprved by the majrity f the pker players that attended past series at the free rll (n qurum required)
More informationSafe Work Procedure Self-Loading Logging Truck
Safe Wrk Prcedure Self-Lading Lgging Truck PERSONAL PROTECTIVE EQUIPMENT: Adequate ftwear with gd tractin sles Hi-vis hardhat when ut f cab Hi-vis vest when ut f cab Hearing prtectin when driving PROCEDURES:
More informationMulti Unit Residential Building Charging Program: Application Guide
Multi Unit Residential Building Charging Prgram: Applicatin Guide Updated May 13, 2016 A prgram funded by the Prvince f British Clumbia. We are pleased t annunce the Multi Unit Residential Building Charging
More informationAustral Gold Announces Maiden Reserve Estimate for Amancaya Project and Updated Reserve and Resource Estimate at Guanaco Mine, Chile.
MEDIA RELEASE Austral Gld Limited 8 June 2017 Austral Gld Annunces Maiden Reserve Estimate fr Prject and Updated Reserve and Resurce Estimate at Guanac Mine, Chile. Austral Gld Limited ( Austral r the
More informationFor personal use only. Macquarie Western Australia Forum
Macquarie Western Australia Frum Andrew Bellamy, Chief Executive Officer 15 Octber 2015 Overview abut Austal Funded in 1988, publicly listed since 1998, and nw an ASX-200 cmpany, Austal is a leading defence
More informationREQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION
REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified
More informationGearbox Installation Manual
Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre
More informationCONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY
Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...
More informationC-BOA Tool Validation of Energy Savings Estimation Methods
C-BOA Tl Validatin f Energy Estimatin Methds February 21, 2012 1 f 7 Table f Cntents Summary... 3 Recmmendatin... 3 Evaluatin Apprach... 3 Technical Advisry Grup Oversight... 3 Prject Specificatins...
More informationDirector P. O. Box 1904 Service Engineering Operations Dearborn, Michigan Ford Customer Service Division
David J. Jhnsn Frd Mtr Cmpany Directr P. O. Bx 1904 Service Engineering Operatins Dearbrn, Michigan 48121 Frd Custmer Service Divisin TO: All U.S. Frd and Lincln Dealers SUBJECT: Certain 2005-2006 Frd
More informationWebinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs
Webinar: Ontari s 2012 Building Cde: Electric Vehicle Charging Presented by the Ministry f Municipal Affairs Ntice This presentatin is intended fr general infrmatin purpses related t electric vehicle charging
More informationDISD NATHAN ADAMS ELEMENTARY SCHOOL
TRAFFIC MANAGEMENT PLAN FOR DISD NATHAN ADAMS ELEMENTARY SCHOOL IN DALLAS, TEXAS DESHAZO PROJECT NO. 15235 Prepared fr: Masterplan 900 Jacksn Street, Suite 640 Dallas, Texas 75202 Prepared by: Texas Registered
More informationTEAM INTRODUCTIONS. GARVER Matthew Youngblood - Project Manager / Bridge Lead Jenny Sallee - Roadway Lead Kirsten McCullough - Environmental Lead
TEAM INTRODUCTIONS ODOT Paul Rachel - Divisin 3 Engineer Siv Sundaram - Envirnmental Prgrams Sctt Sundermeyer - Cultural Resurces Nick Grank & Diana Barlw - Right-f-Way & Utilities Frank Resler III - Public
More informationThis letter was written from the point of view of ASM to its employees. However the information is relevant to all incoming visitors to Phoenix, AZ.
This letter was written frm the pint f view f ASM t its emplyees. Hwever the infrmatin is relevant t all incming visitrs t Phenix, AZ. On 1/13/06 the City f Phenix had their grand pening festivities fr
More informationProposed Supplemental Agreement #1 FCC Recycle Processing Services Contract
Memrandum DATE February 20, 2019 CITY OF DALLAS TO Hnrable Members f the Quality f Life, Arts & Culture Cmmittee: Sandy Greysn (Chair), Mark Claytn (Vice Chair), Rickey D. Callahan, Jennifer S. Gates,
More information2016 OPP Year End Report. Georgian Bay Township. Presented by Inspector Andrew Ferguson
2016 OPP Year End Reprt Gergian Bay Twnship Presented by Inspectr Andrew Fergusn SOUTHERN GEORGIAN BAY DETACHMENT CORPORATE & EMERGENCY SERVICES REPORT Suthern Gergian Bay OPP 2016 Annual Reprt Gergian
More informationBus Transportation Program Handbook. Fleming Island Van School Year
Bus Transprtatin Prgram Handbk Fleming Island Van 2018-2019 Schl Year Bishp Jhn J. Snyder High Schl Bus Transprtatin Prgram Handbk Plicies and Prcedures fr the 2018-2019 Schl Year Admissins fr the Bus
More informationMARKET NEWSLETTER No 58 February 2012
THE WORLD MARKET IN OLIVE OIL AND OLIVE POMACE OIL U.S. IMPORT TRENDS Perfrmance in 2010/11 U.S. imprts f live il and live pmace il made a recrd figure f 292 048 t in the 2010/11 crp year (running frm
More informationGenesys Certification Study Guide
Genesys Certificatin Study Guide Genesys Certified Prfessinal 8 System Cnsultant, iwd Slutin (GCP8 - CiWD) Exam Cde Type f Exam Number f Items GCP8-CiWD (Prmetric cde: GE0_809) Written, multiple-chice
More informationRotary District 5360
Rtary District 5360 Rtary Friendship Exchange (RFE) ADMINISTRATIVE ROLES, POLICIES AND PROCEDURES July 27, 2018 (Rev 4) CONTENTS INTRODUCTION Administrative Rles Plicies and Prcedures 2 SECTION ONE General
More informationWORK DONE DURING THE PERIOD MAY 15TH - DEC. 3lST, 1987 BERALDTON LONBLAC QOLD INC
42EteNE8863 63.5159 CLTHAM 010 REPRT WRITTEN FR.M.A.P. N WRK DNE DURING THE PERID MAY 15TH - DEC. 3lST, 1987 N BERALDTN LNBLAC QLD INC REPRT WRITTEN FR.M.A.P. N WRK DNE DURING THE PERID MAY 15TH - DEC.
More informationCFO3 Connect East of England Case Officer
CFO3 Cnnect East f England Case Officer Jb Pack Sva is cmmitted t safeguarding and prmting the welfare f children, yung peple and vulnerable adults, and expects all staff and vlunteers t share this cmmitment.
More informationService Bulletin Product
Subject: External Stp Splitter (ESS) System Changes fr 9-, 13- and 18-Speeds Dcument Number: TMIB0252 EN-US Date: Octber 7, 2013 Issue Descriptin: Cntact between the splitter pistn and internal stps can
More informationGlobal Floating Solar Panels Market
Glbal Flating Slar Panels Market The glbal flating slar panels market was valued at $3.89 millin in 2014, and it is expected t grw with a CAGR f 116.1% during 2015-2020. The factrs driving the grwth f
More informationThe Beacon Council THE FUTURE OF TRANSPORTATION Alice N. Bravo, P.E. Director
The Beacn Cuncil THE FUTURE OF TRANSPORTATION Alice N. Brav, P.E. Directr ver 300 square miles 2.7millin residents 34 municipalities One Cunty Miami-Dade Cunty 8 th mst ppulus cunty in US 1 st mst ppulus
More informationASA Sponsored ACI Shotcrete Nozzleman Certification Policy for Hosts and Participants
1- Intrductin ASA Spnsred ACI Shtcrete Nzzleman Certificatin Plicy fr Hsts and Participants This dcument describes the respnsibilities f and relatinship between ASA, ACI, the Hst, the Educatin/certificatin
More informationAPPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD
APPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD Use the checklists belw t make sure that yur applicatin is cmplete befre yu return it. Have yu cnsidered applying fr yur driver card nline? It s quicker
More informationBHC-P-11.1 Temporary Works
Berkeley Hme Cunties Safety Prcedures Cntents 1.0 Purpse 2.0 Scpe 3.0 Definitins 4.0 Main requirements 5.0 Guidance dcuments and references 6.0 Appendices Revisin register BHC-P-11.1 Temprary Wrks Date
More informationTAFE Digital Application Form for Certificate III UEE30811 Electrotechnology Electrician
ELECTROTECHNOLOGY - CERT III ELECTRICIAN Natinal cde: UEE30811 Training package: UEE11 TAFE Digital Applicatin Frm fr Certificate III UEE30811 Electrtechnlgy Electrician OFFICE USE ONLY Date received:
More informationITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction
I n t e r n a t i n a l T e l e c m m u n i c a t i n U n i n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU FG Distractin Versin 1.0 (03/2013) ITU-T Fcus Grup n Driver Distractin Reprt n Vehicle-t-Applicatins
More informationTransport Research Laboratory Creating the future of transport
Transprt Research Labratry Creating the future f transprt CLIENT PROJECT REPORT CPR2188 Survey f vehicle radwrthiness f HCVs and driver cmpliance with EU rules n driving times, breaks and rest perids -
More informationJohn Murphy, Chair. Steffan Defeo. Patricia Delaney. Eric Ladensack. Amy Scharf. Anne Wilson
Jhn Murphy, Chair Steffan Defe Patricia Delaney Eric Ladensack Amy Scharf Anne Wilsn Adpted by the Selectbard and Twn Treasurer 2016 Twn f Duxbury ACCOUNTING, AUDITING AND FINANCIAL REPORTING Prcedures
More informationHaoma Mining NL. 7.10g/t, 84 to 86m 6.83g/t, 76 to 100m
Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: 411 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250
More informationCITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES
CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES Revised July 11, 2018 Prepared by: City f Elk Grve Public Wrks Department 1. INTRODUCTION BACKGROUND In 2002, the Public Wrks Department develped the
More informationSUBARU 5 YEAR/125,000 KILOMETRE SERVICE PLAN PROGRAM TERMS & CONDITIONS
SUBARU 5 YEAR/125,000 KILOMETRE SERVICE PLAN PROGRAM TERMS & CONDITIONS Under the Subaru 5 Year/125,000 Kilmetre Service Plan ( Service Plan ) wners f eligible Subaru vehicles are cvered fr scheduled servicing
More informationEuropean project: NeMo Hyper-Network for Electromobility
Eurpean prject: NeM Hyper-Netwrk fr Electrmbility > Backgrund and challenges Electric Vehicle charging statins belng t different netwrks and perate with different cnditins f access and payment. Charging
More informationWelcome to Our Open House for the Proposed Dublin Retail Project
Welcme t Our Open Huse fr the Prpsed Dublin Retail Prject PROPOSAL OVERVIEW Stre Structure Apprx. 378,000 sf 2-stry building (including flr-tceiling warehuse) Apprx. 1,300 parking spaces n-site fr IKEA
More informationProject #: Re: Steering Committee Meeting #1 Farmington Canal Heritage Trail Gap Closure Study and CTfastrak Connection Study
Place: Plainville Twn Library Auditrium 56 East Main Street Plainville, CT 06062 Date: Ntes Taken by: Andrea Drabicki Prject #: 42201.00 Re: Steering Cmmittee Meeting #1 Farmingtn Canal Heritage Trail
More informationBurlington Northern Santa Fe (BNSF) Railway Blocked Access to Crescent Beach
CORPORATE REPORT NO: R161 COUNCIL DATE: July 27, 2015 REGULAR COUNCIL TO: Mayr & Cuncil DATE: July 23, 2015 FROM: Fire Chief FILE: 8710-00 SUBJECT: Burlingtn Nrthern Santa Fe (BNSF) Railway Blcked Access
More informationBEST: Michigan Avenue Project September 9, 2015 Technical Committees Meeting Notes -- DRAFT
RTA f Sutheast Michigan 1001 Wdward Avenue, Suite 1400 Detrit, MI 48226 www.rtamichigan.rg BEST: Michigan Avenue Prject September 9, 2015 Technical Cmmittees Meeting Ntes -- DRAFT Subject BEST: Michigan
More informationLED Driver Feedback Signs
LED Driver Feedback Signs Installatin Instructins (029-04151-0000) Nvember 2012 Slar Kit 35AH / 55W 70AH / 55W 70AH / 85W M75-SOLAR-000S M75-SLR70-000S M75-SOLAR-000C E. 5676 Seltice Way Pst Falls, Idah
More informationICM Project Station Infrastructure and Equipment
( pages) ICM Prject Statin Infrastructure and Equipment Statins Switchgear Transfrmer Statins Segment Trnt Hydr Electric System Limited (THESL) I EXECUTIVE SUMMARY 0. Prject Descriptin Switchgear perating
More informationEthics and Campaign Filing. Shaun Adams, Esq. Associate Legislative Director ACCG Phone:
Ethics and Campaign Filing Shaun Adams, Esq. Assciate Legislative Directr ACCG Email: sadams@accg.rg Phne: 404-576-9119 Overview Part I Review f the Filing Prcess Understanding the Exemptin Affidavit Electin
More information