Third Quarter 2014 Operating Results

Size: px
Start display at page:

Download "Third Quarter 2014 Operating Results"

Transcription

1 1 22 May 2014 Third Quarter 2014 Operating Results Lndn, England & Baie Verte, Newfundland and Labradr, Canada Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ( Rambler r the Cmpany ), a cpper and gld prducer perating in Newfundland and Labradr, Canada, tday prvides an peratinal update fr its fiscal third quarter ending 30 April HIGHLIGHTS IN THE QUARTER: Prductin f 6,238 tnnes f cpper cncentrate representing a 36 per cent increase ver Q and a 9 per cent decrease ver Q Dry tnnes milled f 49,355 tnnes representing a 12 per cent increase ver Q and a 3 per cent decrease ver Q2 2014, resulting in the prductin f: 1,829 tnnes f cpper (8 per cent decrease ver the previus quarter) 1,608 unces f gld (4 per cent increase ver the previus quarter) 13,196 unces f silver (23 per cent increase ver the previus quarter) Head grades f cpper 3.84 per cent, gld 1.62 grammes per tnne and silver grammes per tnne with recveries t cncentrate fr cpper 96.4 per cent, gld 66.2 per cent and silver 79.2 per cent Cncentrate grade fr cpper per cent, gld 8.02 grammes per tnne and silver grammes per tnne Nrman Williams, CA, President and CEO, cmmented: I am pleased t reprt cpper recveries remained cnsistent with previus quarters with average cpper head grades matching year t date expectatins. Althugh we experienced extreme winter cnditins frm December t late Spring in Newfundland, the peratins team have demnstrated their ability t adapt and deliver steady prductins in such varying cnditins. I am cnfident that Rambler is n track t meet r exceed the tp end guidance fr cpper recvery, cncentrate prduced and metal prductin.

2 2 OPERATIONAL SUMMARY Since Q the Cmpany has milled 155,971 dry metric tnnes f re and prduced 19,648 tnnes f cpper cncentrate cntaining 5,764 tnnes f cpper metal, 4,814 unces f gld and 35,831 unces f silver. The average feed grade during this perid was 3.85 per cent cpper, 1.57 grammes per tnne gld and 9.90 grammes per tnne silver fllwed by a mill recvery f 96.3 per cent, 65.6 per cent and 79.0 per cent fr cpper, gld and silver respectively. The Cmpany first declared cmmercial prductin in Nvember 2012 and has since milled 293,368 dry metric tnnes and prduced 33,450 tnnes f cpper cncentrate cntaining 9,717 tnnes f cpper metal, 7,951 unces f gld and 59,789 unces f silver. Table 1 Ore and Cncentrate Prductin Summary fr Fiscal 2014 PRODUCTION Q (Aug, Sep, Oct) Q (Nv, Dec, Jan) YTD F2014 Guidance Dry Tnnes Milled 55,659 50,957 49, , , ,000 Cpper Recvery 95.9 % 96.8 % 96.4 % 96.3 % % Gld Recvery 61.7 % 69.1 % 66.2 % 65.6 % % Silver Recvery 76.1 % 81.9 % 79.2 % 79.0 % % Cpper Head Grade (%) Gld Head Grade (g/t) Silver Head Grade (g/t) CONCENTRATE (Prduced and Stred in Warehuse) Cpper (%) Gld (g/t) Silver (g/t) Dry Tnnes Prduced 6,591 6,818 6,238 19,648 20,000 24,000 Cpper Metal (tnnes) 1,956 1,978 1,829 5,764 5,700 6,840 Gld (unces) 1,655 1,551 1,608 4,814 4,500 5,500 Silver (unces) 11,870 10,764 13,196 35,831 32,000 39,000 See Nte 1 belw. FISCAL 2014 GUIDANCE The peratinal results fr the fiscal year cntinue t be in line with frecasts (see Table 1 abve). Frecasted cpper grades fr Q are anticipated t be n the lwer end f the prductin guidance. Hwever, the Cmpany remains n track t meet r exceed the tp end guidance fr cpper recvery, cncentrate prduced and metal prductin fr the fiscal year. Details f the Cmpany's financial perfrmance, including capital expenditure and perating csts, will be included in its financial results t be released n r befre Thursday 19 June 2014.

3 3 Table 2 belw indicates the cmparative results frm Q versus and Q versus. The cmparisns cntinue t demnstrate the peratinal imprvements accmplished ver the last twelve mnths as well as the stable prductin prfile ver the last six mnths. Table 2 Quarter ver Quarter Results Cmparisn PRODUCTION Q Q (Nv, Dec, Jan) Dry Tnnes Milled 43,907 49, % 50,957 49,355-3 % Cpper Recvery 91.0 % 96.4 % 6 % 96.8 % 96.4 % 0 % Gld Recvery 62.0 % 66.2 % 7 % 69.1 % 66.2 % -4 % Silver Recvery 71.0 % 79.2 % 11 % 81.9 % 79.2 % -3 % Cpper Head Grade (%) % % Gld Head Grade (g/t) % % Silver Head Grade (g/t) % % CONCENTRATE (Prduced and Stred in Warehuse) Cpper (%) % % Gld (g/t) % % Silver (g/t) % % Dry Tnnes Prduced 4,575 6, % 6,818 6,238-9 % Cpper Metal (tnnes) 1,278 1, % 1,978 1,829-8 % Gld (unces) 987 1, % 1,551 1,608 4 % Silver (unces) 7,557 13, % 10,764 13, % See Nte 1 belw. Quarter ver Quarter (Q vs and Q vs ) Prductin f 6,238 tnnes f cpper cncentrate representing a 36 per cent increase ver Q and a 9 per cent decrease ver Q Dry tnnes milled f 49,355 tnnes representing a 12 per cent increase ver Q and a 3 per cent decrease ver Q Prcess tnnes were similar t the previus quarter as we began t mve ut f the extreme cld cnditins. This resulted in the prductin f: 1,829 tnnes f Cpper (8 per cent decrease ver the previus quarter) 1,608 unces f Gld (4 per cent increase ver the previus quarter) 13,196 unces f Silver (23 per cent increase ver the previus quarter) Head grades f Cpper 3.84 per cent, Gld 1.62 grammes per tnne and Silver grammes per tnne with recveries t cncentrate fr Cpper 96.4 per cent, Gld 66.2 per cent and Silver 79.2 per cent. Each f these key perfrmance indicatrs shw a cnsistent trend cmpared t the previus quarter and a marked imprvement ver the same quarter in fiscal 2013 Cncentrate grade fr Cpper per cent, Gld 8.02 grammes per tnne and Silver grammes per tnne. Cncentrate prductin has been cmparatively cnsistent thrughut the fiscal year

4 4 ABOUT RAMBLER METALS AND MINING Rambler is a mining and develpment Cmpany that in Nvember 2012 brught its first mine int cmmercial prductin. The grup has a 100 per cent wnership in the Ming Cpper-Gld Mine, a fully peratinal base and precius metals prcessing facility and year rund bulk strage and shipping facility; all lcated n the Baie Verte peninsula, Newfundland and Labradr, Canada. The Cmpany s Visin is t be Atlantic Canada s leading mine peratr and resurce develper thrugh grwth and expansin f its existing assets; discvering new depsits; strategic partnerships; mergers and acquisitins. In additin t the Ming Mine, Rambler has strategic investments in the frmer prducing Hammerdwn gld mine Little Deer/ Whales Back cpper mines and the advanced Valentine Lake Gld Prject. Rambler is dual listed in Lndn under AIM:RMM and in Canada under TSX-V:RMM. Fr further infrmatin, please cntact: Nrman Williams, CA President and CEO Rambler Metals & Mining Plc Tel N: Fax N: Stewart Dicksn / Jeremy Stephensn Cantr Fitzgerald Eurpe Tel N: +44 (0) Peter Mercer Crprate Secretary Rambler Metals & Mining Plc Tel N: +44 (0) Fax N: +44 (0) Tim Blythe/ Camilla Hrsfall Blytheweigh Tel N: +44 (0) Website: Larry Pilgrim, P.Ge., is the Qualified Persn respnsible fr the technical cntent f this release and has reviewed and apprved it accrdingly. Mr. Pilgrim is an independent cnsultant cntracted by Rambler Metals and Mining Canada Limited. Tnnes referenced are dry metric tnnes unless therwise indicated. Nte 1: Results reprted are accurate and reflective as f the date f release. The Cmpany perfrms regular auditing and recnciliatin reviews n its mining and milling prcesses as well as stck inventry, fllwing which past results may be adjusted t reflect any changes. Neither TSX Venture Exchange nr its Regulatin Service Prvider (as that term is defined in the plicies f the TSX Venture Exchange) accepts respnsibility fr the adequacy r accuracy f this release. Cautin Regarding Frward Lking Statements: Certain infrmatin included in this press release, including infrmatin relating t future financial r perating perfrmance and ther statements that express the expectatins f management r estimates f future perfrmance cnstitute frward-lking statements. Such frward-lking statements include, withut limitatin, statements regarding cpper, gld and silver frecasts, the financial strength f the Cmpany, estimates regarding timing f future develpment and prductin and statements cncerning pssible expansin pprtunities fr the Cmpany. Where the Cmpany expresses r implies an expectatin r belief as t future events r results, such expectatin r belief are based n assumptins made in gd faith and believed t have a reasnable basis. Such assumptins include, withut limitatin, the price f and anticipated csts f recvery f, cpper cncentrate, gld and silver, the presence f and cntinuity f such minerals at mdeled grades and values, the capacities f varius machinery and equipment, the availability f persnnel, machinery and equipment at estimated prices, mineral recvery rates, and thers. Hwever, frward-lking statements are subject t risks, uncertainties and ther factrs, which culd cause actual results t differ materially frm future results expressed, prjected r implied by such frward-lking statements. Such risks include, but are nt limited t, interpretatin and implicatins f drilling and gephysical results; estimates regarding timing f future capital expenditures and csts twards prfitable cmmercial peratins. Other factrs that culd cause actual results, develpments r events t differ materially frm thse anticipated include, amng thers, increases/decreases in prductin; vlatility in metals prices and demand; currency fluctuatins; cash perating margins; cash perating cst per pund sld; csts per tn f re; variances in re grade r recvery rates frm thse assumed in mining plans; reserves and/r resurces; the ability t successfully integrate acquired assets; peratinal risks inherent in mining r develpment activities and legislative factrs relating t prices, taxes, ryalties, land use, title and permits, imprting and exprting f minerals and envirnmental prtectin. Accrdingly, undue

5 5 reliance shuld nt be placed n frward-lking statements and the frward-lking statements cntained in this press release are expressly qualified in their entirety by this cautinary statement. The frward-lking statements cntained herein are made as at the date heref and the Cmpany des nt undertake any bligatin t update publicly r revise any such frward-lking statements r any frward-lking statements cntained in any ther dcuments whether as a result f new infrmatin, future events r therwise, except as required under applicable security law.

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents

More information

Quarterly Production Summary

Quarterly Production Summary 30 Nvember 2018 Vast Resurces plc ( Vast r the Cmpany ) ly Prductin Summary Vast Resurces plc, the AIM listed mining cmpany with peratins in Rmania and Zimbabwe, presents its peratinal update and prductin

More information

MARKET NEWSLETTER No 58 February 2012

MARKET NEWSLETTER No 58 February 2012 THE WORLD MARKET IN OLIVE OIL AND OLIVE POMACE OIL U.S. IMPORT TRENDS Perfrmance in 2010/11 U.S. imprts f live il and live pmace il made a recrd figure f 292 048 t in the 2010/11 crp year (running frm

More information

New Gold Achieves Strong Operational and Financial Performance in Second Quarter 2012 and Announces Commercial Production at New Afton

New Gold Achieves Strong Operational and Financial Performance in Second Quarter 2012 and Announces Commercial Production at New Afton New Gld Achieves Strng Operatinal and Financial Perfrmance in Secnd Quarter 2012 and Annunces Cmmercial Prductin at New Aftn (All figures are in US dllars unless therwise indicated) August 1, 2012 New

More information

Hub/Remote Operations in version 3.0

Hub/Remote Operations in version 3.0 Hub/Remte Operatins in versin 3.0 In StckTrac Enterprise 3.0, the Hub and Remte perate quite a bit differently than they did in 2.0. In 2.0, the shps stred their business fr the day int daily files which

More information

C-BOA Tool Validation of Energy Savings Estimation Methods

C-BOA Tool Validation of Energy Savings Estimation Methods C-BOA Tl Validatin f Energy Estimatin Methds February 21, 2012 1 f 7 Table f Cntents Summary... 3 Recmmendatin... 3 Evaluatin Apprach... 3 Technical Advisry Grup Oversight... 3 Prject Specificatins...

More information

COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN. Financial Information for the Nine Months Ended September 30, 2010

COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN. Financial Information for the Nine Months Ended September 30, 2010 PRESS RELEASE Clermnt-Ferrand Octber 26, 2010 COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN Financial Infrmatin fr the Nine Mnths Ended September 30, 2010 2010 Nine-Mnth Net Sales Up 19.4% t 13 Billin

More information

Continental Gold Drills a New High-Grade Gold and Silver Discovery Over 1,200 Vertical Metres at Buriticá, Colombia

Continental Gold Drills a New High-Grade Gold and Silver Discovery Over 1,200 Vertical Metres at Buriticá, Colombia Cntinental Gld Drills a New High-Grade Gld and Silver Discvery Over 1,200 Vertical Metres at Buriticá, Clmbia Trnt, Ontari, September 13, 2012 -- Cntinental Gld Limited (TSX:CNL; OTCQX:CGOOF) ("Cntinental"

More information

THE YARAMOKO GOLD PROJECT ROBIN MILLS, Roxgold Non-Executive Director & Sr. Operating Partner of Appian Capital Advisory

THE YARAMOKO GOLD PROJECT ROBIN MILLS, Roxgold Non-Executive Director & Sr. Operating Partner of Appian Capital Advisory THE YARAMOKO GOLD PROJECT ROBIN MILLS, Rxgld Nn-Executive Directr & Sr. Operating Partner f Appian Capital Advisry The Jburg Indaba 6 TH, Octber, 2016 CAUTIONARY STATEMENT This presentatin cntains frward-lking

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 14 April 2015 Further Update n the Develpment f the Old Pirate High Grade Gld Depsit ABM Resurces NL ( ABM r the Cmpany ) is pleased t annunce an update n the

More information

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM PROGRAM OVERVIEW Ecnmic Vitality is a critical factr in ensuring Castle Rck s lng-term success and in achieving its Visin f being a Self-Sufficient

More information

CAPITAL MARKET DAY 2017 GTM STRATEGY UPDATE. Eric Duffaut CCO. March 14, Software AG. All rights reserved.

CAPITAL MARKET DAY 2017 GTM STRATEGY UPDATE. Eric Duffaut CCO. March 14, Software AG. All rights reserved. CAPITAL MARKET DAY 2017 GTM STRATEGY UPDATE Eric Duffaut CCO March 14, 2017 2017 Sftware AG. All rights reserved. SAFE-HARBOR-STATEMENT This presentatin includes frward-lking statements based n the beliefs

More information

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin

More information

Franchised Hauler Exemption for Recycling Application

Franchised Hauler Exemption for Recycling Application Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler

More information

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...

More information

Hydro One Electricity Bills. Summer 2010

Hydro One Electricity Bills. Summer 2010 Hydr One Electricity Bills Summer 2010 Agenda Explanatin f Bills Reasns fr High Bills Tax Exemptin Cntact Infrmatin 1. Explanatin f Bills Page 1 f the Bill Balance Infrmatin: Balance Frward Budget Billing

More information

Transparency in the Mining Sector Taxes and Value Distribution

Transparency in the Mining Sector Taxes and Value Distribution Transparency in the Mining Sectr Taxes and Value Distributin A presentatin by Edward Bickham 17 April 2014 Senir Adviser, Gld fr Develpment, Wrld Gld Cuncil UKSIF and Sustainalytics Seminar Edinburgh Transparency

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transprt Research Labratry Creating the future f transprt CLIENT PROJECT REPORT CPR2188 Survey f vehicle radwrthiness f HCVs and driver cmpliance with EU rules n driving times, breaks and rest perids -

More information

Lithium Battery Shipping Overview

Lithium Battery Shipping Overview Lithium batteries are used in many electrnic devices such as cameras, cell phnes, laptp cmputers, medical equipment and pwer tls. When shipping r imprting lithium batteries, including thse cntained in

More information

COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN. Financial Information for the Quarter Ending March 31, 2009

COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN. Financial Information for the Quarter Ending March 31, 2009 PRESS RELEASE Clermnt-Ferrand April 28, 2009 COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN Financial Infrmatin fr the Quarter Ending March 31, 2009 First-Quarter Net Sales Dwn 14.2% t 3.5 Billin Unit

More information

SIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION

SIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION Wednesday, 28 July 2010 SIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION Hillgrve Resurces Ltd (ASX:HGO) is pleased

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid March May 2018 Infrmatin Paper Reference: CRU/18/121 Date Published: 26/07/2018 Clsing

More information

Design Standard - Fume Hoods & Fume Hood Exhausts

Design Standard - Fume Hoods & Fume Hood Exhausts 1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an

More information

STAR CONFERENCE 2018

STAR CONFERENCE 2018 STAR CONFERENCE 2018 Milan March 27-28th, 2018 Laurent HEBENSTREIT - Chief Executive Officer Yann ALBRAND - Chief Financial Officer Stefan Canu - Investr Relatins Agenda 1 2 3 Full Year 2017 Results Technlgy

More information

ENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100%

ENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100% ENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100% June 28, 2010 Halifax, Nva Sctia and Gerge Twn, Grand Cayman, June 28, 2010 - Etruscan Resurces Inc. (

More information

LKQ CORPORATION (Exact name of registrant as specified in its charter)

LKQ CORPORATION (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 8-K Current Reprt Pursuant t Sectin 13 r 15(d) f The Securities Exchange Act f 1934 Date f Reprt (Date f earliest event reprted):

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid May July 2018 Infrmatin Paper Reference: CRU18223 Date Published: 1/10/2018 Clsing

More information

INVESTOR REPORT GREEN BONDS / VOLVOFINANS BANK AB

INVESTOR REPORT GREEN BONDS / VOLVOFINANS BANK AB INVESTOR REPORT GREEN BONDS / VOLVOFINANS BANK AB 2018 Investr reprt - Green Bnds In May 2017, Vlvfinans Bank issued its first, and t date, nly green bnd, being nly the secnd such green issue ever in Eurpe

More information

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins

More information

Estimating Economic Impacts of Energy Deployment National Association of State Energy Officials Regional Meeting David Keyser June 5, 2013

Estimating Economic Impacts of Energy Deployment National Association of State Energy Officials Regional Meeting David Keyser June 5, 2013 Estimating Ecnmic Impacts f Energy Deplyment Natinal Assciatin f State Energy Officials Reginal Meeting David Keyser June 5, 2013 NREL is a natinal labratry f the U.S. Department f Energy, Office f Energy

More information

Highfields Independent School and Day Nursery Mini Bus Policy

Highfields Independent School and Day Nursery Mini Bus Policy Highfields Independent Schl and Day Nursery Mini Bus Plicy Last Reviewed: Nv 2015 Apprved n: Cmmittee Respnsible: Pupil and Persnnel Next Review: Nv 2017 Apprved by: Full Gvs Highfields Schl is cmmitted

More information

Guidance for Selling Alternative Fuels to Airlines July 2018

Guidance for Selling Alternative Fuels to Airlines July 2018 Guidance fr Selling Alternative Fuels t Airlines July 2018 A Jint Publicatin f the Cmmercial Aviatin Alternative Fuels Initiative (CAAFI) Business Team and the Airlines fr America (A4A) Energy Cuncil Intrductin

More information

THIRD QUARTER 2017 SALES Growth of 1.9% at constant exchange rates

THIRD QUARTER 2017 SALES Growth of 1.9% at constant exchange rates THIRD QUARTER 2017 SALES Grwth f 1.9% at cnstant Third-quarter sales f 21.9bn Up +1.9% n a reprted basis at cnstant and up 0.5% like-fr-like Grwth driven by Eurpe and Latin America Third-quarter perfrmance

More information

ORCA GOLD PROVIDES GALAT SUFAR SOUTH UPDATE

ORCA GOLD PROVIDES GALAT SUFAR SOUTH UPDATE NEWS RELEASE Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 ORCA GOLD PROVIDES GALAT SUFAR SOUTH UPDATE May 16, 2013 Orca Gold Inc.

More information

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first

More information

WORLD COAL AUGUST VOLUME 20 NUMBER World Leader in Material Handling and Coal Preparation

WORLD COAL AUGUST VOLUME 20 NUMBER World Leader in Material Handling and Coal Preparation WORLD COAL AUGUST 2011 AUGUST 2011 - VOLUME 20 NUMBER 08 www.energyglbal.cm Wrld Leader in Material Handling and Cal Preparatin Smth peratins, n s r a L d i v Da., C n t r e t s e A.W. Chnes a simple US,

More information

Bus Transportation Program Handbook. Northside/Riverside School Year

Bus Transportation Program Handbook. Northside/Riverside School Year Bus Transprtatin Prgram Handbk Nrthside/Riverside 2018-2019 Schl Year Bishp Jhn J. Snyder High Schl Bus Transprtatin Prgram Handbk Plicies and Prcedures fr the 2018-2019 Schl Year Admissins fr the Bus

More information

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS 120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was

More information

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010)

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010) Summary f Regulatins fr Cmmercial Driver s Licenses frm the Federal Mtr Carrier Safety Administratin (Excerpts 2010) Classes f License: The Federal standard requires States t issue a CDL t drivers accrding

More information

LS travel retail has continued to expand its business activity during the first half of 2012.

LS travel retail has continued to expand its business activity during the first half of 2012. Press release Mnday, September 3 rd, 2012 LS travel retail has cntinued t expand its business activity during the first half f 2012. The internatinal grwth strategy undertaken by LS travel retail is prving

More information

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs Webinar: Ontari s 2012 Building Cde: Electric Vehicle Charging Presented by the Ministry f Municipal Affairs Ntice This presentatin is intended fr general infrmatin purpses related t electric vehicle charging

More information

Managing Seasonal Hydrology with PV and Battery Storage in an Asian Country Case Study. PM TUSON, J De la Bat. Mott MacDonald.

Managing Seasonal Hydrology with PV and Battery Storage in an Asian Country Case Study. PM TUSON, J De la Bat. Mott MacDonald. Managing Seasnal Hydrlgy with PV and Battery Strage in an Asian Cuntry Case Study PM TUSON, J De la Bat Mtt MacDnald Suth Africa Summary An Asian cuntry experiences hydr pwer spill in wet mnsn seasns and

More information

CMG GardenNotes #721 Sample Planting Guide for Raised-Bed Garden

CMG GardenNotes #721 Sample Planting Guide for Raised-Bed Garden CMG GardenNtes #721 Sample Guide fr Raised-Bed Garden The fllwing table is a guide fr a family vegetable garden in a blck-style layut. It is based n a raised bed system with bxes fur feet wide and rws

More information

John Murphy, Chair. Steffan Defeo. Patricia Delaney. Eric Ladensack. Amy Scharf. Anne Wilson

John Murphy, Chair. Steffan Defeo. Patricia Delaney. Eric Ladensack. Amy Scharf. Anne Wilson Jhn Murphy, Chair Steffan Defe Patricia Delaney Eric Ladensack Amy Scharf Anne Wilsn Adpted by the Selectbard and Twn Treasurer 2016 Twn f Duxbury ACCOUNTING, AUDITING AND FINANCIAL REPORTING Prcedures

More information

The GTB Glare and Visibility Study

The GTB Glare and Visibility Study Authr: G R Draper Infrmal dcument N. GRE-66-21 (66th GRE, 4-6 Octber 2011 agenda item 17(b)) GTB Dcument N. CE-4684 Date: 2011-09-16 The GTB Glare and Visibility Study GTB TASK FORCE COORDINATION f AUTOMOTIVE

More information

Applications. Sales. Billing. Production. Inventory. Finance

Applications. Sales. Billing. Production. Inventory. Finance A b u t U l t i m u s Ultimus Sftware Private Limited has prmted with the basic Objective f Develping User-Centered Prducts & Slutins useful fr small and medium scale enterprises. Alng with Prduct Building

More information

Burlington Northern Santa Fe (BNSF) Railway Blocked Access to Crescent Beach

Burlington Northern Santa Fe (BNSF) Railway Blocked Access to Crescent Beach CORPORATE REPORT NO: R161 COUNCIL DATE: July 27, 2015 REGULAR COUNCIL TO: Mayr & Cuncil DATE: July 23, 2015 FROM: Fire Chief FILE: 8710-00 SUBJECT: Burlingtn Nrthern Santa Fe (BNSF) Railway Blcked Access

More information

Comparison of Air Emission Standards

Comparison of Air Emission Standards Cmparisn f Air Emissin Standards CSSD Perfrmance Standards (Issued August 19, 2013) and Pennsylvania General Plan Apprval and/r General Operating Permit BAQ-GPA/GP-5 GP-5 (Issued February 1, 2013). 1/14/2014

More information

RICHARD L. OREAIR & CO. Safety Management System

RICHARD L. OREAIR & CO. Safety Management System SAFETY Dc N: Revisin Date: Revisin N. 2 Initial Versin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance with lcal regulatry

More information

PARKING POLICY JULY 2012

PARKING POLICY JULY 2012 1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:

More information

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY Dc N: DRIVING Issue Date JAN 1995 Revisin Versin Revisin N. 02 Next Revisin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance

More information

Gearbox Installation Manual

Gearbox Installation Manual Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre

More information

Rotary District 5360

Rotary District 5360 Rtary District 5360 Rtary Friendship Exchange (RFE) ADMINISTRATIVE ROLES, POLICIES AND PROCEDURES July 27, 2018 (Rev 4) CONTENTS INTRODUCTION Administrative Rles Plicies and Prcedures 2 SECTION ONE General

More information

CERTIFICATE OF APPROVAL No CF 119 DORMA UK LTD

CERTIFICATE OF APPROVAL No CF 119 DORMA UK LTD CERTIFICATE OF APPROVAL N CF 119 1 This is t certify that, in accrdance with TS00 General Requirements fr Certificatin f Fire Prtectin Prducts The undermentined prducts f Wilbury Way, Hitchin, Hertfrdshire

More information

Mining the Territory. 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gold Pour from Edna Beryl

Mining the Territory. 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gold Pour from Edna Beryl 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gld Pur frm Edna Beryl 19 February 2018.Restructure f the JV with Evlutin (NT) 10 April 2018..High grade Cbalt, Cpper and Gld at Jasper

More information

Minnesota Licensing and Registration System (MNLARS) Frequently Asked Questions

Minnesota Licensing and Registration System (MNLARS) Frequently Asked Questions Minnesta Licensing and Registratin System (MNLARS) Frequently Asked Questins The fllwing cntent was received frm the Minnesta Department f Public Safety in respnse t a request n Octber 12, 2017. Can I

More information

OPERATIONS. GSE Maintenance Manual

OPERATIONS. GSE Maintenance Manual OPERATIONS GSE Maintenance Manual Originally Published May 2010 PAGE: 2 (GMM) Master Table f Cntents 0. Intrductin 0.1 Master Table f Cntents 0.2 Recrd f Revisin 0.3 Revisin Plicy 0.3.1 Distributin f Revisins

More information

Memorandum. Recommendations: 1.0 Background monitoring and recommendations

Memorandum. Recommendations: 1.0 Background monitoring and recommendations Memrandum T: Bassett Creek Watershed Management Cmmissin Recmmendatins: 1. Perfrm additinal mnitring f Schaper Pnd in 2018 including water quality mnitring lngitudinally thrugh the pnd, a bathymetric survey,

More information

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings Prpsed Changes t Ontari s Building Cde Summer and Fall 2017 Cnsultatin: Electric Vehicle Charging in Multi-Unit Residential Buildings Purpse T prvide infrmatin n prpsed changes t the Building Cde regarding

More information

Motor Vehicle Working group 15 February 2017 Access to vehicle repair and maintenance information (RMI)

Motor Vehicle Working group 15 February 2017 Access to vehicle repair and maintenance information (RMI) Mtr Vehicle Wrking grup 15 February 2017 Access t vehicle repair and maintenance infrmatin (RMI) Internal market, Industry, Entrepreneurship and SMEs What is RMI? Vehicle repair and maintenance infrmatin

More information

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE 1. INTRODUCTION... 3 2. PRECAUTIONS... 3 3. INSPECTION UPON RECEIPT OF GOODS... 4 3.1 GENERAL... 4 3.2 VISIBLE DAMAGE... 4 3.3 CONCEALED DAMAGE...

More information

TECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS

TECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS TECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS Presented By: Frank(Fei) Xia, AVIAGE SYSTEMS Date: April 21, 2016 ABOUT AVIAGE

More information

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles Safe Handling f High Vltage Electrical cmpnents in Electrical End f Life Vehicles The fllwing infrmatin is extracted frm the dcument Safe Handling f High Vltage Electrical cmpnents in Electrical End f

More information

Printer/Copier Request for Proposals

Printer/Copier Request for Proposals The First Unitarian Church f Hamiltn Printer/Cpier RFP Cntents Printer/Cpier Request fr Prpsals Intrductin... 2 Type f Prpsal... 2 Managed Printing Cntract... 2 Equipment Lease, Maintenance Cntract Cmbinatin...

More information

EnergyBar 6. Setup Guide

EnergyBar 6. Setup Guide EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers

More information

Texas Christian University Policy

Texas Christian University Policy Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines

More information

HANDLING AND STORAGE PRACTICE

HANDLING AND STORAGE PRACTICE PREFERRED RELIABILITY PRACTICES Practice N. PD-ED-1109 Page 1 f 5 Ni-H SPACECRAFT BATTERY HANDLING AND STORAGE PRACTICE Practice: Develp and implement handling and strage prcedures t ensure reliable peratin,

More information

Proposed Supplemental Agreement #1 FCC Recycle Processing Services Contract

Proposed Supplemental Agreement #1 FCC Recycle Processing Services Contract Memrandum DATE February 20, 2019 CITY OF DALLAS TO Hnrable Members f the Quality f Life, Arts & Culture Cmmittee: Sandy Greysn (Chair), Mark Claytn (Vice Chair), Rickey D. Callahan, Jennifer S. Gates,

More information

Virginia s UST Compliance Program VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

Virginia s UST Compliance Program VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Virginia s UST Cmpliance Prgram BET TY LAMP OFFICE OF SPILL RESPONSE AND REMEDIATION VIRGINIA DEQ Revised Federal UST Regulatin Published in the July 15, 2015 Federal Register Effective Octber 13, 2015

More information

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better? Slvent Filter What is a Slvent Trap, Slvent Recycler r Slvent Filter? It is a device attached t the end f a threaded barrel that cllects all f the slvent and debris as it is cleaned frm the barrel and

More information

VLCT Model Town Meeting Articles and Guidance

VLCT Model Town Meeting Articles and Guidance VLCT Mdel Twn Meeting Articles and Guidance Intrductin The twn meeting warning must cntain the fllwing infrmatin, as described in 17 V.S.A 2641 et seq.: 1. The date, time, and lcatin f the meeting; 2.

More information

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction I n t e r n a t i n a l T e l e c m m u n i c a t i n U n i n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU FG Distractin Versin 1.0 (03/2013) ITU-T Fcus Grup n Driver Distractin Reprt n Vehicle-t-Applicatins

More information

DESIGNING FOR BENCHMARK Longwall mine of the Future

DESIGNING FOR BENCHMARK Longwall mine of the Future DESIGNING FOR BENCHMARK Lngwall mine f the Future ANGLO AMERICAN - A GLOBAL PLAYER Headquartered in Lndn with 10 crprate and representative ffices Key Headquarters Crprate & representative ffices Irn Ore

More information

BRITISH MICROLIGHT AIRCRAFT ASSOCIATION TECHNICAL INFORMATION LEAFLET NO: 117 ISSUE 1 JANUARY 2016

BRITISH MICROLIGHT AIRCRAFT ASSOCIATION TECHNICAL INFORMATION LEAFLET NO: 117 ISSUE 1 JANUARY 2016 Intrductin This leaflet cntains the required infrmatin t permit the straightfrward fitment f a Lithium Irn Phsphate (LifePO4) battery in place f standard lead acid battery in a BMAA aerplane. It permits

More information

Traffic Impact Statement and Vehicle Access Guideline

Traffic Impact Statement and Vehicle Access Guideline TABLE OF CONTENTS 1 TRAFFIC IMPACT STATEMENT AND VEHICLE ACCESS GUIDELINE... 2 1.1 TRAFFIC IMPACT STATEMENT... 2 1.2 VEHICLE ACCESS... 3 1.3 OCCASIONAL ACCESS... 3 1.4 REGULAR ACCESS MAJOR ROAD NETWORK...

More information

BHC-P-11.1 Temporary Works

BHC-P-11.1 Temporary Works Berkeley Hme Cunties Safety Prcedures Cntents 1.0 Purpse 2.0 Scpe 3.0 Definitins 4.0 Main requirements 5.0 Guidance dcuments and references 6.0 Appendices Revisin register BHC-P-11.1 Temprary Wrks Date

More information

- No object may be left inside the vehicle;

- No object may be left inside the vehicle; GENERAL CONDITIONS AND RULES OF USE OF THE CAR PARK ARTICLE 1 General prvisins and respnsibilities 1.1 - In the absence f a prir written agreement with PARKING, upn entering these premises the USER uncnditinally

More information

Building an ADDITION to an existing residence

Building an ADDITION to an existing residence Building an ADDITION t an existing residence Obtaining a permit fr yur cnstructin is a prcess that invlves review and apprval by multiple agencies. Brward Cunty Develpment and Envirnmental Regulatin Divisin,

More information

Guidelines on Occasional Outside Professional Activities by Health Sciences Compensation Plan Participants; November 23, 1999.

Guidelines on Occasional Outside Professional Activities by Health Sciences Compensation Plan Participants; November 23, 1999. SAN DIEGO: AUDIT & MANAGEMENT ADVISORY SERVICES 0919 June 13, 2011 RON ESPIRITU Assistant Vice Chancellr f Administratin UCSD Schl f Medicine 0602 Subject: Health Sciences Cmpensatin Plan Management Academic

More information

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375 GLOBAL LIFT CORP Owner s Manual Rtatinal Series R-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 ROTATIONAL SERIES POOL LIFTS R-375

More information

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

ADVISORY: General Motors Upfitter Integration  Bulletin #108d P a g e 1 May 18, 2016 Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:

More information

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved Hw t Sweat (Slder) Cpper Pipe By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t attach pieces f cpper pipe by sweating r sldering the metal tgether. This is a helpful skill

More information

PARKING AND VEHICULAR RULES

PARKING AND VEHICULAR RULES PARKING AND VEHICULAR RULES General Rules 1. All residents and guests must abide by all psted traffic signs, CC&Rs, Rules & Regulatins, Califrnia Vehicle Cdes, and San Clemente Municipal Cdes. All vilatins

More information

Operations & Maintenance High reliability & low maintenance long service life

Operations & Maintenance High reliability & low maintenance long service life Operatins & Maintenance High reliability & lw maintenance lng service life The abve graph utlines the CF perfrmance f the 4 Nrdic N1000 units relative t the 775 unit Swedish fleet f Turbines. The Nrdic

More information

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.

More information

MAXIMISING THE VALUE OF BUSES FOR GREATER MANCHESTER ELISABETH TASKER MANAGING DIRECTOR, STAGECOACH MANCHESTER

MAXIMISING THE VALUE OF BUSES FOR GREATER MANCHESTER ELISABETH TASKER MANAGING DIRECTOR, STAGECOACH MANCHESTER 1 MAXIMISING THE VALUE OF BUSES FOR GREATER MANCHESTER ELISABETH TASKER MANAGING DIRECTOR, STAGECOACH MANCHESTER STAGECOACH: CONNECTING MANCHESTER 2 Netwrk: 200+ lcal bus services cvering every district

More information

DRIVER S/OWNER OPERATOR APPLICATION FOR EMPLOYMENT

DRIVER S/OWNER OPERATOR APPLICATION FOR EMPLOYMENT Tll: 1-800-265-8789 Tel: 905-457-8789 Fax: 905-457-8372 careers@travelers.ca * www.travelers.ca * DRIVER S/OWNER OPERATOR APPLICATION FOR EMPLOYMENT Please read and sign page 6 befre cmpleting the fllwing

More information

Request for Proposal Annual NACRO Conference 2017 Submission Deadline: January 29th, September 30, 2015

Request for Proposal Annual NACRO Conference 2017 Submission Deadline: January 29th, September 30, 2015 Request fr Prpsal Annual NACRO Cnference 2017 Submissin Deadline: January 29th, 2016 September 30, 2015 CONNECT. BENCHMARK. IMPROVE. 1) Backgrund The Netwrk f Academic Crprate Relatins Officers (NACRO)

More information

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS Purpse The purpse f this Plicy is t ensure the safety f emplyees wh transprt students t schl authrized events and thse students being transprted.

More information

REACHING THE TARGETS. Figure 16 Guidebook Overview Map: Reaching targets and objectives. Coalition for Energy Savings

REACHING THE TARGETS. Figure 16 Guidebook Overview Map: Reaching targets and objectives. Coalition for Energy Savings II REACHING THE TARGETS Part II details the main elements f the EED, prviding a backgrund fr each f the subject areas, the requirements f the EED and recmmendatins fr effective implementatin and mnitring.

More information

SERVICE AREAS: PRIMARY RESEARCH US CARTRIDGE COLLECTION AND RECYCLING REPORT 2018

SERVICE AREAS: PRIMARY RESEARCH US CARTRIDGE COLLECTION AND RECYCLING REPORT 2018 SERVICE AREAS: PRIMARY RESEARCH US CARTRIDGE COLLECTION AND RECYCLING REPORT 2018 JANUARY 2018 cntents PRIMARY RESEARCH US Cartridge Cllectin and Recycling Reprt 2018 Dcument Executive Summary...2 Glssary...2

More information

Effective Date: 10-January Table of Contents

Effective Date: 10-January Table of Contents Versin: 3 Page: 1 f 7 Table f Cntents 1.0 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Definitins... 2 1.4 Training Requirements... 3 2.0 General Requirements... 3 3.0 Inspectin... 3 4.0 Testing...

More information

Forensic Science: Fundamentals & Investigations, 2e Chapter 17. All rights Reserved Cengage/NGL/South-Western 2016

Forensic Science: Fundamentals & Investigations, 2e Chapter 17. All rights Reserved Cengage/NGL/South-Western 2016 1 Frensic Science: Fundamentals & Investigatins, 2e Cengage/NGL/Suth-Western 2016 Tl Marks By the end f this chapter yu will be able t: 17.1 Describe hw frensic investigatrs analyze evidence frm tls and

More information

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified

More information

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance...

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance... n Intrductin... 3 Specificatins... 4 Structure & Perfrmance... 5 Assembly... 6 Flding... 7 Operatin... 8-12 Care & Maintenance... 13-15 2 P a g e Read and fllw all instructins, warnings, and ntes in this

More information

SOMSAS Student User Manual Overseas Short Term Programs

SOMSAS Student User Manual Overseas Short Term Programs SOMSAS Student User Manual Overseas Shrt Term Prgrams Table f cntents WHAT IS SOMSAS? 2 CREATE A NEW APPLICATION 2 Shrt Term Prgram 3 ADD SUBJECTS TO YOUR APPLICATION 3 Hst Institutin Details 4 Partner

More information

SPP TENDER MODEL. Electric buses. Joint Procurement of 19 urban electric buses in Piedmont. Contract: 19 electric buses (length 12m)

SPP TENDER MODEL. Electric buses. Joint Procurement of 19 urban electric buses in Piedmont. Contract: 19 electric buses (length 12m) SPP TENDER MODEL Electric buses Jint Prcurement f 19 urban electric buses in Piedmnt Purchasing bdy: GTT Grupp Trinese Trasprti S.p.A. Cntract: 19 electric buses (length 12m) Awarded: September 2016 Savings:

More information

STOP GIVING UP ENGINE PROTECTION TO GET FUEL ECONOMY.

STOP GIVING UP ENGINE PROTECTION TO GET FUEL ECONOMY. UP TO 4% FUEL SAVINGS STOP GIVING UP ENGINE PROTECTION TO GET FUEL ECONOMY. DURON TM -E delivers up t 2x* better wear prtectin and 4%** better fuel ecnmy. * Based n results frm the Daimler OM 646 LA industry

More information

Compliance Monitoring Procedure

Compliance Monitoring Procedure Cmpliance Mnitring Prcedure fr Rules f Participatin 4CDc_002a_Cmpliance Mnitring Prcedure_v1.0_en Versin: Nvember 2014 Index 1. Intrductin... 2 2. Type f requirements, Mnitring and Sanctins... 3 3. Annex1

More information

NIEVS PROJECT. First Registration Support Document Version 1.0

NIEVS PROJECT. First Registration Support Document Version 1.0 NIEVS PROJECT First Registratin Supprt Dcument Versin 1.0 CONTENTS CONTENTS... 2 INTRODUCTION... 3 SCOPE OF DOCUMENT... 3 FIRST REGISTRATION MIGRATION ACTIVITIES... 4 AFRL... 4 V55 MIGRATION... 4 SOM...

More information