1 OPERATIONS GSE Maintenance Manual Originally Published May 2010

2 PAGE: 2 (GMM) Master Table f Cntents 0. Intrductin 0.1 Master Table f Cntents 0.2 Recrd f Revisin 0.3 Revisin Plicy Distributin f Revisins Identificatin f Revisin Prpsed Revisins Recrding Revisins 0.4 Intrductin Authrity Respnsibility Manual Distributin 1. GSE Appearance 1.1 Paint 1.2 Lgs 1.3 Equipment Numbering 1.4 Decals 1.5 Placement f Lgs, Equipment Numbering and Decals 2. Equipment Inventry 2.1 Equipment Inventry 3. Maintenance Frms 3.1 Histry Files 3.2 Wrk Orders 3.3 Daily Vital Fluid and Safety Inspectin 3.4 Weekly Vital Fluid and Safety Inspectin 3.5 Mnthly Nn-Mtrized Equipment Check

3 PAGE: Equipment Discrepancy Sheet 4. Preventative Maintenance 4.1 Preventative Maintenance Inspectins 4.2 Preventative Maintenance Frms 5. Tls 5.1 Tl Inventries 6. Shp and Envirnmental Safety 6.1 Lck-ut / Tag-ut Shp Equipment 6.2 Lck-ut / Tag-ut GSE 6.3 Waste Oil Strage and Dispsal 6.4 Paint and Chemical Strage 6.5 Material Safety Data Sheets 6.6 Fire Extinguishers 6.7 First Aid Kit 6.8 Eyewash 6.9 Tire Cage 6.10 Specialized Equipment Safety Bench Grinder Oxy/Acetylene Trch Arc Welder Air Cmpressrs and Hses Electric tls, extensin crds and shp wiring Parts washer Drill Press 7. GSE Parts 7.1 Maintenance Budget 7.2 Parts Purchasing 7.3 Parts Strage, Stck Parts Inventry and Stck Parts Sheet

4 PAGE: Three Bid / Three Bid Waiver Frms 7.5 Capital Request 7.6 Transferring r Purchasing Equipment 8. Third Party Maintenance 8.1 Agreement

5 PAGE: Recrd f Revisin Revisin Number Date f Revisin Revisin Item Initials Original N/A MW Revisin 1 05/2010 Manual Restructure MW Revisin 2 10/ , 1.2, 1.4, 1.5, 8.1 MW Revisin 3 03/ MW Revisin 4 12/ , 1.2, 1.4, 1.5 MW

6 PAGE: Revisin Plicy and Prcedure ATS requires that all f its manuals be maintained current, reflecting applicable gvernmental regulatins and Cmpany plicies. T ensure that manuals are current, the revisin prcedures utlined herein have been established Distributin f Revisins The Manual Custdian is respnsible fr ensuring that the electrnic versin f the manual is revised. Each manual hlder will be cntacted via ASAP when a revisin is made, but nt later than ten (10) days after issuance Identificatin f Revisin One each revised page the new r changed infrmatin will be identified by a vertical line in the right margin. This line will appear ppsite the changed material Prpsed Revisins The prcedures that fllw are t be used fr the cntrl f the cntents f ATS manuals. 1. The Department Head is respnsible fr initiating changes fr manuals fr which they are respnsible. This is accmplished by cmpleting a Manual Change Order (frm #xxx), which is frwarded, alng with the cntents f the prpsed revisin, t the Manual Custdian. 2. Prpsed revisins will be issued by the Manual Custdian n yellw paper, marked DRAFT and circulated t affected parties, in accrdance with the distributin list n the Manual Change Order. Reviewing parties will be given ten (10) days t cmment. 3. Fllwing cmments frm affected parties, the prpsed revisin will be frwarded t the ATS Executive Cmmittee fr final apprval. 4. When the review and apprval prcess is cmplete, the Manual Custdian will make the apprved changes t the affected/new pages. The Manual Custdian is als respnsible fr ensuring that changes are made t electrnic versins f the affected manual Recrding Revisins The Manual Custdian will recrd the revisins n the Recrd f Revisins page. Example: Revisin #1 MAY 2010, Item revised was Sectin 2.3.1, revised by MW. Revisin Number Date f Revisin Revisin Item In itials Original N/A MW 1. Revisin 1 05/2010 Sectin MW

7 PAGE: Intrductin This GSE Maintenance Manual (GMM) will serve as a guideline fr Airprt Terminal Services (ATS) specific prcedures. In the event that cmpliance with ATS plicy r prcedure is nt pssible due t airline r airprt plicy r prcedure an Exceptin Request shall be submitted and apprved. Equipment shall be maintained in accrdance with instructins r guidance frm the manufacturer as well as established ATS prcedures. Emplyees f ATS shall be respnsible fr familiarizatin, understanding and cmpliance with all plicies and prcedures in this GMM, ATS training, and ther manuals Authrity The Vice President, Custmer Service and Operatins is respnsible fr ensuring that the cntent f this manual prvides persnnel with the plicies, prcedures and infrmatin t prperly cnduct themselves in a manner cnsistent with a safe and efficient peratin. The Vice President, Custmer Service and Operatins is als respnsible fr ensuring that the cntents f this manual are in cmpliance with all applicable reginal and natinal regulatins Respnsibility The fllwing plicies apply t thse persns t whm this manual is distributed: Statin Managers are respnsible fr the security f manuals at their lcatin. Statin Managers are t make the Manual available t emplyees fr their reference. Manuals are the prperty f ATS and remain such under all circumstances. They may nt be laned r given t any persn utside the Cmpany, nr may they be cpied r reprduced in any manner withut the apprval f an fficer Manual Distributin A cpy f the GSE Maintenance Manual is available nline. All references t the Manual shuld be accessed thrugh the ATS Cnnectin prtal. Printed and dwnladed cpies f the Manual shuld nt be kept. By accessing the Manual nline the mst up t date versin will be guaranteed.

8 PAGE: 8 1. GSE Appearance The appearance f the GSE equipment is very imprtant t the cmpany image as well as the custmers and airprts that are served. Because f this every effrt shuld be made t insure the GSE equipment lks gd at all times. All GSE equipment shuld be identified with cmpany lgs, equipment numbers and, where applicable, safety placards. 1.1 GSE Paint Washing the GSE equipment and keeping the scratches tuched up accmplish this. When the equipment is due an inspectin we shuld, if needed, repaint the entire unit at that time. In many areas it is nt permissible t spray paint withut the use f an apprved spray paint bth. Because f this ATS has the standard plicy that all paint shall be applied with a brush and rller in a well-ventilated area. All GSE is t be painted fleet white unless therwise instructed by the GSE Manager f Maintenance. The wheels/rims are t be painted glss black and black wing walk paint shuld be applied t all steps, flrs, and walking surfaces n the GSE equipment. All hitches and tngues are t painted safety yellw at least 12 inches dwn frm eyelet. Fuel caps shall be clr cded accrding t the fuel type used in the particular piece f equipment: Gasline shall be red. Diesel shall be green. The fill-prt n lavatry service equipment shall be painted blue. Types f paint used are as fllws: Rust--leum Glss White Paint Part # 7797 Rust--leum Glss Black Paint Part # 7779 Rust--leum Glss Yellw Paint Part # 7747 Rust--leum Metal Primer (Brwn) Part # 7769 All the abve paints can be purchased frm any Hme Dept r Grainger stres. Make sure t get an MSDS sheet, with French cpy in Canada, n all paints at the time f purchase and place it in yur MSDS manual in the GSE shp.

9 PAGE: Lgs There are fur sizes fr cmpany lgs. They are as fllws: Small Lg: Medium Lg: Large Lg: 6 high x 9 lng 10 high x 15 lng 24 high x 35 lng The specificatins fr the size and placement f lgs, numbers and placards are cvered in this sectin 1.5 f this manual. When applying the lgs it s recmmended t use a sap and water slutin alng with a brush t smth ut all wrinkles and air bubbles. All lgs shall be applied as neatly as pssible. Lgs may be rdered frm the Safety and Training Department at Crprate Office. 1.3 Numbering and Asset Tags All GSE equipment is assigned an asset number, which is als the equipment number. Each piece f GSE equipment shall have the equipment number stenciled n bth frnt and rear f the unit. An asset tag will be affixed t each piece f GSE equipment. This tag will have the cmpany name alng with a bar cde and a number f digits n the bttm f the tag. The asset tag details shuld crrespnd with equipment number painted n the unit. If the number n the equipment is different frm the tag, r vice versa, check the statin equipment inventry frm t see which number is crrect. All numbers and letters shall be 3 inches high and shuld be glss black unless therwise required by lcal airprt authrity. The best way t make the numbers is t use a 3-inch stencil set which the shp shuld already have. If ne is nt n hand ne can be purchased frm any Hme Dept, Grainger, r Office Dept. All numbering shall be applied as neatly as pssible.

10 PAGE: Decals Decals may be rdered frm the Safety and Training Department at Crprate Office. Keep Hands Clear Decal Shall be placed at any hitch and ther specified pinch pint hazards, fr example beside rtating beltlader belts. Lw Clearance Decal Shall be placed in driver view in all vehicles with a cab r have ther structure which requires vertical clearance. Make Turns Slwly Decal Shall be placed n all vehicles where there is significant hazard stability lss during turns. By-Pass Pin Installed Decal Shall be placed n all pushback tractrs. Stp Have Yu Discnnected Decal Shall be placed n all pieces f equipment that require a cnnectin t an aircraft, fr example lavatry and water servicing vehicles, grund pwer units and precnditined air, heat r airstart units. If the unit is drive-able this shall be in view f the driver while seated at the cntrls. If the unit is designed t be twed this shall be psitined at the tngue end f the equipment.

11 PAGE: 11

12 PAGE: REVISION: DATE: 12 Rev 4 12/2011

13 PAGE: Placement f Lgs, Equipment Numbering and Decals Placement f lgs, numbering and cautin placards is described fr specific equipment. If yur equipment is nt yet listed but is similar t ne dcumented, use a similar psitining methdlgy r cntact yur Reginal GSE Supervisr fr guidance. Tug Inc and TLD Beltladers Lg Medium ATS Lg Placed n bth sides f unit centered between the wheels Cautin Placards Cautin Placards Cautin Ht Exhaust placard at exhaust utlet Equipment Numbering Equipment number stenciled r placed at frnt and rear bttm right. See 1.3 fr number and letter requirements

14 PAGE: 14 Pinch placards, ne each n tp f belt at crners Battery Discnnect Switch identified Gear shift painted r therwise clr cded in yellw t aid with identificatin Pinch placards, ne each n tp f belt at crners Battery Discnnect Switch identified Wllard Beltlader Small ATS Lg placed n the bm n bth sides f the unit Cautin Ht Exhaust placard at exhaust utlet All ther items and requirements are the same as Tug beltladers detailed abve

15 PAGE: REVISION: DATE: 15 Rev 4 12/2011 Tug Inc Bag Tug Lg Small ATS Lg Placed n bth sides f hd Centered frm frnt t back Centered frm tp t bttm f panel Cautin Placards Lw Clearance placard in cvered cab tugs Equipment Numbering Cvered tugs als require ne rubber bumper n each crner f the cab Pinch placard at hitch Equipment number stenciled r placed at frnt and rear bttm right. See 1.3 fr number and letter requirements All hitches painted yellw

16 PAGE: 16 Tiger Bag Tug (with and withut cab) Lg Small ATS Lg Placed n bth sides f hd Centered frm frnt t back Centered frm tp t bttm f panel Cautin Placards Lw Clearance placard in cvered cab tugs Equipment Numbering Cvered tugs als require ne rubber bumper n each crner f the cab Pinch placard at hitch Equipment number stenciled r placed at frnt and rear bttm right. See 1.3 fr number and letter requirements All hitches painted yellw

17 PAGE: 17 Baggage Cart Lg Medium ATS Lg Placed n frnt and back f cart Centered frm left t right Psitined twelve inches dwn frm tp f cart Equipment Numbering Equipment number stenciled r placed at frnt and rear tp right. See 1.3 fr number and letter requirements Cautin Placards Tngue painted yellw at least 12 inches dwn frm eyelet Amber reflectrs n frnt f unit Red reflectrs n rear f unit (Unless lcal airprt requires different cnfiguratin) Pinch placard at hitch All hitches painted yellw

18 PAGE: 18 Grund Pwer Unit, Heat and Pre-Cnditined Air Carts Lg Medium ATS Lg Placed n each side f unit Centered frm left t right n mst practical panel Psitined twelve inches dwn frm tp f cart Cautin Placards Have Yu Discnnected sticker n frnt f unit Equipment Numbering 10lb BC Fire Extinguisher checked mnthly by statin and annual inspectin by qualified external cmpany. Inspectin tags must be present Equipment number stenciled r placed at frnt and rear bttm right. See 1.3 fr number and letter requirements Hitchlck r functinal GPU alarm required Make Turns Slwly sticker n frnt f unit Tngue painted yellw at least 12 inches dwn frm eyelet

19 PAGE: 19 Airstart Unit Tngue painted yellw at least 12 inches dwn frm eyelet Lg Large ATS Lg Placed n each side f unit Centered frm left t right Psitined twenty fur inches dwn frm tp f cart Cautin Placards 10lb BC Fire Extinguisher checked mnthly by statin and annual inspectin by qualified external cmpany. Inspectin tags must be present Hitchlck, painted red, required n all airstart units. Equipment Numbering Equipment number stenciled r placed at frnt and rear bttm right. See 1.3 fr number and letter requirements Have Yu Discnnected sticker n frnt f unit Make Turns Slwly sticker n frnt f unit

20 PAGE: 20 Pushback Tractr All types (With and Withut Cab) Lg Medium ATS Lg Placed n side f unit if n drs r n dr if unit is equipped with cab Centered frm left t right and twelve inches frm tp f side r dr Cautin Placards Lw Clearance placard in cvered cab pushbacks Cvered pushbacks als require ne rubber bumper n each crner f the cab Relevant pushback capability sticker in view f driver 10lb BC Fire Extinguisher checked mnthly by statin and annual inspectin by qualified external cmpany. Inspectin tags must be present Equipment Numbering Equipment number stenciled r placed at frnt and rear bttm right. See 1.3 fr number and letter requirements By-Pass Pin Installed sticker in view f driver while seated at cntrls Pinch placard at frnt and rear hitches All hitches painted yellw

21 PAGE: 21 Additinal Requirement fr Diesel Pwered Pushback Tractrs in Califrnia An EIN number fr vehicles registered as Off-Rad Diesel (ORD). The EIN needs t be white n a red backgrund, and lcated in clear view n the right side f the utside f the vehicle, apprx 5 feet abve grund. If the vehicle is nt 5 feet tall, the label may be placed lwer. Each character f the EIN needs t be at least 3 inches tall and 1.5 inches wide. The EIN must be maintained s that it is cnsistently legible. Carg Lader All types Cautin Markings Best Practice Cautin tape t highlight mvable rails clsest t aircraft Equipment Numbering Equipment number stenciled r placed at frnt and rear bttm right. Lg See 1.3 fr number and letter requirements Medium ATS Lg Placed n frnt f unit n engine access drs Centered frm left t right and twelve inches frm tp f dr

22 PAGE: 22 Ptable Water Cart All types Tngue painted yellw at least 12 inches dwn frm eyelet Equipment Numbering Equipment number stenciled r placed at frnt and rear tp right. See 1.3 fr number and letter requirements Cautin Placards Make Turns Slwly sticker n frnt f unit Have Yu Discnnected sticker n frnt f unit Lg Small ATS Lg Placed n sides f unit Side f unit marked n bth sides with Drinking Water, Ptable Water r equivalent designatin See 1.3 fr number and letter requirements (FDA requirement) Centered frm left t right belw the Ptable Water designatr

23 PAGE: 23 Lavatry Cart All types Tngue painted yellw at least 12 inches dwn frm eyelet Equipment Numbering Equipment number stenciled r placed at frnt and rear tp right. See 1.3 fr number and letter requirements Cautin Placards Make Turns Slwly sticker n frnt f unit Have Yu Discnnected sticker n frnt f unit Lg Small ATS Lg Placed n each side f unit Centered frm left t right and belw the lavatry service designatr Fill prt (nt shwn) painted blue Side f unit marked n bth sides with Lavatry Service designatin r equivalent See 1.3 fr number and letter requirements (FDA requirement)

24 PAGE: 24 Lavatry Truck All types Cautin Placards Have Yu Discnnected sticker in view f driver Lw Clearance placard in view f driver Make Turns Slwly sticker in view f driver Equipment Numbering Equipment number stenciled r placed at frnt and rear right f vehicle See 1.3 fr number and letter requirements Side f unit marked n bth sides with Lavatry Service designatin r equivalent See 1.3 fr number and letter requirements (FDA requirement) Fill prt (nt shwn) painted blue

25 PAGE: 25 Water Truck All types Cautin Placards Have Yu Discnnected sticker in view f driver Lw Clearance placard in view f driver Make Turns Slwly sticker in view f driver Equipment Numbering Equipment number stenciled r placed at frnt and rear right f vehicle See 1.3 fr number and letter requirements Side f unit marked n bth sides with Ptable Water Service designatin r equivalent See 1.3 fr number and letter requirements (FDA requirement) Medium ATS Lg Placed n each side dr f unit Centered frm left t right

26 PAGE: 26 Fuel Tanker All types Flammable, N Smking signs n frnt, rear and each side f truck Large ATS Lg Placed n each side f unit Centered frm left t right and tp t bttm Hazard Warning placards n frnt, rear and each side f truck Lw Clearance placard in view f driver Prduct identificatin labeling Fire Extinguisher lcatin labeling Unit requires at least 2 x 20lb Purple K fire extinguishers Emergency Shut- Off labeling

27 PAGE: Equipment Inventry 2.1 Equipment Inventry All statins are required t have an accurate inventry f the GSE at that lcatin. Once a year the crprate ffice will send ut a request fr an updated GSE inventry. This is the respnsibility f the lcal Statin Manager since he r she is respnsible fr all GSE at their lcatin. In the event f a manager change it is very imprtant that bth managers perfrm an accurate GSE inventry t assure all equipment is accunted fr. An accurate equipment inventry is used when making up the Preventative Maintenance Inspectin (PMI) schedule. 3. Maintenance Frms 3.1 Histry Files Histry files are used t keep an accurate recrd f what repairs have been perfrmed n all GSE equipment. All wrk perfrmed n a piece f equipment shall be entered in the Histry File accurately and in a timely manner. The file shall be maintained fr the lifetime f the equipment and transferred accrdingly if the equipment is mved t anther statin. The infrmatin that is entered in the n the Histry Card is invaluable t the mechanic fr trubleshting as well as trending any prblems with the equipment. In additin, the equipment cst is als tracked. This infrmatin is als very imprtant when trying t justify the replacement f a piece f GSE equipment. In the event f an accident r an injury invlving GSE equipment, the histry file will mst likely be sent t the crprate ffice t aide in the investigatin. 3.2 Wrk Orders The ATS wrk rder is used t recrd the repairs that are perfrmed n the GSE equipment. The frm has sectins t recrd equipment number, type f equipment, date wrk began, date wrk cmpleted, descriptin f wrk perfrmed, persn perfrming repairs, parts used, ttal labr hurs, and the cst f parts. The infrmatin n the wrk rder is then entered n the histry card in the frnt f the file (brief descriptin f wrk, labr hurs, parts cst) in the apprpriate clumns. The wrk rder shall then be placed behind the histry card in the equipment file. It is very imprtant that the wrk rders are filled ut prperly t assure that the infrmatin entered n the card is crrect.

28 PAGE: Daily Vital Fluid and Safety Inspectin The Daily Vital Fluid and Safety Inspectin checklist is used fr checking the vital fluids and basic safety features n the all mtrized GSE equipment. These checks are t be perfrmed and dcumented daily by the ramp. The fllwing fluid related items are checked: engine il antifreeze In additin t vital fluids the fllwing safety related items shall be inspected: ft brake, emergency brake lights hrn tires hitches hitch-lck r GPU alarm Frms may have the equipment numbers pre-filled but n ther sectin f the frm shall be cmpleted prir t cmmencement f daily checks. The agent r agents cmpleting each check shall sign in the Cmplete By clumn adjacent t each piece f equipment that they persnally inspected. The frm shall be dated and signed by a Supervisr as a verificatin f cmpletin and then turned int the Statin Manager. The cmpleted checklist shall be kept n file in the statin fr at least thirty (30) days. 3.4 Weekly Vital Fluid and Safety Inspectin Weekly Vital Fluid and Safety Inspectins shall be perfrmed and dcumented nce each week by a mechanic. The checks are similar t thse cnducted n a daily basis by the ramp but include sme additinal item s. The fllwing fluid related items are checked: engine il antifreeze transmissin fluid hydraulic fluid brake fluid In additin t vital fluids the fllwing safety related items shall be inspected: ft brake, emergency brake lights hrn

29 PAGE: 29 tires hitches hitch-lck r GPU alarm Frms may have the equipment numbers pre-filled but n ther sectin f the frm shall be cmpleted prir t cmmencement f daily checks. The agent r agents cmpleting each check shall sign in the Cmplete By clumn adjacent t each piece f equipment that they persnally inspected. The frm shall be dated and signed by a Supervisr as a verificatin f cmpletin and turned int the Statin Manager. The cmpleted checklist shall be kept n file in the statin fr at least thirty (30) days. 3.5 Mnthly Nn-Mtrized Equipment Check This check is designed t insure that all safety items are wrking prperly n all nnmtrized equip ment, fr example bag carts and dllies. The check sha ll be perfrmed at least nce each mnth. The fllwing items are checked fr crrect functin: brake tires hitches curtains crner bumpers tngues A cpy f the frm shall be kept n file in the statin fr twelve (12) mnths. In additin a cpy f the frm shall be frwarded t the relevant Reginal Safety Manager alng with the statin safety cmmittee meeting minutes at the end f each mnth. 3.6 Equipment Discrepancy Sheet The discrepancy sheet is used t reprt prblems with GSE equipment. The frm shuld be placed in an area that is accessible t all emplyees wh perate GSE. Mechanics shall check the discrepancy sheet n a daily basis and make all needed repairs. Once cmpleted, the mechanic shall indicate that the equipment is returned t service by signing and dating the discrepancy sheet adjacent t the relevant entry.

30 PAGE: Preventative Maintenance 4.1 Preventative Maintenance Inspectin Preventative maintenance inspectins (PMI) are designed t avid equipment breakdwn by inspecting and finding faults befre they break and interrupt usage. The PMI prgram is effective in that it saves mney by better cntrlling maintenance csts and makes fr safer, mre reliable equipment. ATS has a preventive maintenance inspectin prgram in place and it wrks very well when everyne des there part. Each lcatin has a schedule in place that includes the mnth, equipment number, type f equipment, and type f inspectin due. ATS perfrms tw types f inspectin: A Inspectins are perfrmed twice per year. B Inspectins are perfrmed nce each year. Each piece f equipment has a specific frm fr each type f inspectin. The inspectin is cmpleted using the relevant inspectin frm. As mechanics cmplete each item n the inspectin they shall cmplete the relevant area f the paperwrk. When all repairs have been made, the inspectin frm and wrk rder are stapled tgether and entered int the histry file the same as the wrk rders discussed earlier. Statins shall remain n schedule with the preventative maintenance inspectins as this is an area that will have a majr impact n the peratin, n safety, and n the bttm line Preventative Maintenance Frms Relevant PMI Frms are available n the ATS Cnnectin website. At the end f each mnth the statin manager is required t reprt the status f their PMIs t the Senir Manager, GSE Maintenance using the Mnthly PMI Reprting Frm. 5. Tls 1. 1 Tl Inventries All ATS statins that have their wn mechanics n staff are required t submit a tl inventry fr each mechanic t the Senir Manager, GSE Maintenance. This is fr insurance reasns and prtects bth the cmpany and the mechanic. If the statin has any cmpany wned tls they shall als be inventried. A cpy f the cmpany tl inventry shall be kept n file in the manager s ffice. Bth inventries shall be updated whenever there is a change t equipment n statin. Once a year the crprate ffice will send ut a request fr an updated inventry fr all mechanics.

31 PAGE: Shp and Envirnmental Safety 6.1 Lck-ut / Tag-ut Shp Equipment Many types f machines are used in a GSE shp. Because f this certain safety prcedures need t be fllwed when using them. Each hard wired machine is required t have a written Lck-ut / Tag-ut prcedure. Mst machines have nly ne surce f energy but thers have mre than ne. Fr example an air cmpressr has electricity as a pwer surce and air pressure as a stred energy. A cmprehensive written prcedure details each f the ptential surces and hw t islate them s that the equipment is safe t wrk n. The written prcedure defines the fllwing items: make and mdel type f machinery energy surces crrect prcedure fr Lck-ut / Tag-ut. 6.2 Lck-ut / Tag-ut GSE If a piece f equipment is cnsidered unserviceable because f a safety item r is brken dwn, it shall be tagged ut f service. The Out Of Service tag is used t identify any piece f GSE equipment that is ut f service. The tag shuld be filled ut and attached t the steering wheel f the vehicle. In additin the negative battery cable is t be discnnected and a yellw can placed n the end f the cable. Insert a zip tie thrugh the eyelet prvided n the can. This applies t vehicles ut f service in the GSE shp and t thse that are still lcated n the ramp. 6.3 Waste Oil Strage and Dispsal Waste ils and ther hazardus liquids shall be stred and dispsed f in the prper manner. Federal gvernments, prvinces and states all have guidelines that must be fllwed. Waste il shall be stred in a cntainer that has been prperly marked with cntents (example: Waste Oil Only). Cntainers shall be placed n a spill cntainment pallet that will hld ne and ne half (1½) times the barrel capacity. If the cntainer is f metal cnstructin it shall be grunded t earth. Waste il dispsal shall be cnducted by a reputable waste hauler that is licensed by bth the state and the federal EPA. Each time a pickup is made, a waste generatr frm shall be btained frm the haulage cmpany and filed in the statin indefinitely. Fr sme cmpanies the frm and the invice are ne and the same.

32 PAGE: 32 Items shall never be mixed in ne barrel. An example f this wuld be mixing anti freeze with mtr il. This culd require the hauler t perfrm an expensive chemical analysis f the material. If the test results shw ther chemicals are present the hauler may refuse the barrel. It may then be cnsidered hazardus waste and dispsal becmes mre cmplicated and expensive. 6.4 Paint and Chemical Strage All chemicals, fr example paints, slvents, thinners, r any ther flammable prduct shall be stred in an apprved flammable cabinet. Cans cntaining gasline shuld nt be stred in the cabinet with ther chemicals. The cabinet shall remain clsed at all times except when remving r replacing an item Material Safety Data Sheets All paint and chemicals that are purchased fr use in the GSE maintenance shp are required t have a Material Safety Data Sheet (MSDS) n file. An MSDS sheet shuld be btained at the time f purchase. The MSDS sheet cntains infrmatin abut the prduct that wuld be used t treat smene that had accidentally ingested r splashed it int their eyes. MSDS sheets are t be kept in a manual. The frnt page in the manual shuld be a prduct index t include item number and type f prduct. All prducts are t be with the numbered with the crrespnding MSDS manual sheet number. In Canada MSDS sheets shall als be available in French unless the manufacturer des nt prduce ne in that language. In this event a letter stating this fact shuld be placed n file. In additin, all MSDS sheets must have an effective date within the last three years. All mechanics are required t cmplete annual Right t Knw / WHMIS training which includes details f MSDS manual lcatin. 6.6 Fire Extinguishers All fire extinguishers in the shp shall be easily accessible in case f a fire. A three (3) ft clear zne shall be established arund each extinguisher t facilitate the clear zne. Extinguisher units shall be subject t an annual inspectin perfrmed by an apprved fire service cmpany. In additin the each unit shall be inspected mnthly fr prper pressurizatin and signs f bvius usage r damage. The inspectin shall be recrded n a mnthly inspectin tag attached t the unit. 6.7 First Aid Kit Ea ch GSE shp shall have a first aid kit stred in an accessible lcatin. A n inventry f each first aid kit shall be cmpleted n a regular basis t insure supplies are sufficient and replenished when required.

33 PAGE: Eyewash Statin All GSE shps are required t have an eyewash statin in place. There are tw types f eyewash statins: hard plumbed t water supply plastic tank fitted t the wall The requirement is that the eyewash has a minimum 15 minute flw time. Units shall be checked mnthly fr prper water level as well as fr prper peratin. The unit shuld have an inspectin tag t recrd inspectins. 6.9 Tire Cage In the lcatins where tire repairs are perfrmed a tire cntainment cage shall be utilized when inflating tire and rim assemblies. If wrking with tw-piece rims the lck shall be inspected fr prper seating prir t inflating the tire Specialized Equipment Safety Certain sa fety precautins must be taken t avid injury when perating equipment in the GSE shp. The fllwing is a list f safety guidelines that must be fllwed when using certain types f shp equipment Bench Grinder The grinder wheel must be in gd cnditin. There shall be n cracks r excessive cntaminatin and the surface must have even wear. The tl rest must have n mre than 1/8 f an inch clearance between it and the grinder wheel. If equipped with a tp guard, the guard shuld have n mre than ¼ inch clearance between it and the grinder wheel. Bth guards need t be painted safety yellw. A face shield shall be utilized when using any frm f grinder. These shuld be wrn at all times when perating the machine. Placards are available that read Eye Prtectin Must Be Wrn At all Times When Operating This Machine. These shuld be placed at eye level n wall behind the grinder if pssible Oxy/Acetylene Trch This tl is used fr cutting and gas welding items when making repairs n the GSE equipment. Like the grinder there are safety prcedures that must be fllwed. The unit must be equipped with flash back valves at bth the trch base and at the regulatrs. The valve prevents the flame frm traveling back thrugh the hse and int the tanks. When using the trch fr cutting are welding the peratr is required t wear welding gggles alng with glves and an aprn t prevent burns.

34 PAGE: 34 After use the tank valves need t be clsed cmpletely and bth hses shuld be purged. When string spare bttles always stre xygen and acetylene separately. They need t have the caps installed and shuld be chained t prevent them frm falling ver Arc Welder This tl is used fr welding repairs n the GSE equipment. This tl has safety prcedures that must be fllwed as well. The cables and clamps shuld be checked t be sure they are in gd cnditin. They shuld be checked fr bare spts where the wire may be shwing thrugh. At n time shuld the cable be taped up t repair it. If the wires have tears are rips they must be replaced cmpletely. When using this tl the peratr must wear a welding hd, welding glves, and a welding aprn t prevent burns. They shuld als have a fire extinguisher n hand in case f a fire. After use the cables shuld be wrapped up neatly and stred prperly. Make sure t remve welding rd frm electrde when nt in use Air Cmpressrs and Hses All air hses shuld be in gd cnditin and free f tears, burns, and repairs. At n time shuld an air hse be cut ff and clamped back nt the fitting. Hses shall nt be repaired. If this is required purchase a replacement. All air cmpressrs shall be secured t the grund r be equipped with ther means t avid inadvertent mvement Electric tls, extensin crds and shp wiring If electrical crd insulatin has a tear r if the plug is damaged the unit shuld be discarded and a new ne purchased. Field repairs are nt permitted n any electrical crd. This includes all crds used n the vacuum cleaners, drp lights, r any ther electrical device used by any emplyee. Electrical utlets shall be kept in gd repair with all faceplates in place. Receptacle bxes shall nt have hles expsing internal wiring. Electrical panels in the shp shall be easily accessible in case f a fire. A three (3) ft clear zne shall be established arund each panel t facilitate the clear zne Parts washer Eye prtectin shall be wrn while using the parts washer. When nt is use the eye prtectin shall be stred in a prtective puch. Lids/ cvers shall be clsed n parts washer when nt in use Drill Press Eye prtectin shall be wrn while using the drill press.

35 PAGE: 35 When nt is use the eye prtectin shall be stred in a prtective puch. All drill presses shall be secured t the grund. 7. GSE Parts 7.1 Maintenance Budget All statins are given a maintenance budget t wrk frm. Included in the budget amunt are the mechanics wages and GSE parts. The GSE Maintenance Manager will give the breakdwn fr the budgets t the managers. In the lcatins that ut-surce their maintenance, the manager shuld pay clse attentin t invice timeliness and cntent. It s much easier t cntrl maintenance cst when the manager cmmunicates with the mechanic, r the ut-surce cmpany n a daily basis. 7.2 Parts Purchasing The majrity f the GSE parts shuld be purchased thrugh lcal accunts, fr example NAPA. Fr specialty items we have natinal accunts that supply all f statins. When rdering thrugh the natinal supplier, please advise them yur statin and make ensure the invice is sent t the statin. This will aid in effective accunt management and n-time payment. When rdering parts fr equipment a Purchase Order number is required. The equipment number is used as the Purchase Order number and shuld be nted n the invice. This allws fr easier tracking f parts purchasing. 7.3 Parts Strage, Stck Parts Inventry and Stck Parts Sheet All GSE shps shall keep a current inventry f parts n hand. This applies t parts that are cnsidered stck parts and will include items such as filters, tune up parts, starters, alternatrs, blts, nuts, clamps, bulbs, etc. These are parts that are used n a daily basis and will save time by having them n hand. Sme suppliers like NAPA will prvide strage cabinets fr the prducts they sell. The cabinets have a hasp s yu can secure with a lck if needed. It is recmmended that all parts be stred in a secured area t prevent theft. When rdering stck parts, be careful nt t stck mre than is needed. As stck parts rders arrive at the GSE shp the parts shall be added t the Stck Parts Inventry. The sheet shuld have part #, descriptin, price, and number n hand. On items such as blts, nuts, washers, wire cnnectrs, etc, it is nt necessary t cunt every ne. These items are pennies and shuld be nted n the wrk rders and stck parts sheet when used. The Stck Parts Sheet is used t track parts that are used frm inventry.

36 PAGE: 36 Only parts that are purchased fr stck, nt parts purchased fr a specific repair shuld be recrded n these frms. The Stck Parts Sheet has sectins t recrd the equipment number, date, part descriptin, and part cst. A new frm shuld be filled ut mnthly and kept n file. 7.4 Three Bid / Three Bid Waiver Frms Anytime a part r a repair cst is $ r mre, three bids shall be btained. The frm is very simple t fill ut, and the fllwing infrmatin is needed: item being purchased, cmpany names, cntact, phne number, warranty, freight cst, and price. If fr sme reasn three bids cannt be btained, a three bid waiver frm is required. This frm is als simple t fill ut, and the fllwing infrmatin is needed: item being purchased, cst, reasn three bids culd nt be btained, cmpany, cntact, and phne number. Bth frms require a Reginal Vice President signature. 7.5 Capital Request Frm This frm is required fr purchases f $2,500 r mre. The three bids and three-bid waiver frm shuld be attached t the capital request when submitting fr apprval. The infrmatin needed n the capital request is as fllws: department, lcatin, date, and type f repair, descriptin f prject, justificatin, and the estimated cst. After cmpleting the frm, it will require the signature f the Reginal Vice President. After that it is sent t the Sr. Manager, GSE Maintenance, and accunting befre final apprval. The Sr. Manager, GSE maintenance will issue a Purchase Order number fr the prject. 7.6 Transferring r Purchasing Equipment When purchasing r transferring any equipment t a statin fr use in the peratin an evaluatin shall be made t ensure that the equipment meets the functinal specificatin fr the tasks t be perfrmed. Guidance n equipment functinal specificatins may be fund in the IATA Airprt Handling Manual. When purchasing new GSE which interfaces with aircraft cabin access drs, ne f the cnsideratins in the purchase decisin shuld be that it has platfrms f sufficient width t allw the aircraft dr t pen and clse when the equipment is in psitin at the aircraft. 8. Third Party Maintenance 8.1 Agreement At statins where GSE maintenance is cntracted t a third party, ATS will execute an agreement with that third party which establishes minimum expectatins fr service delivery and permits fr ATS t inspect the wrk premises as part f a standard statin audit.

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles Safe Handling f High Vltage Electrical cmpnents in Electrical End f Life Vehicles The fllwing infrmatin is extracted frm the dcument Safe Handling f High Vltage Electrical cmpnents in Electrical End f

More information

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.

More information

Hub/Remote Operations in version 3.0

Hub/Remote Operations in version 3.0 Hub/Remte Operatins in versin 3.0 In StckTrac Enterprise 3.0, the Hub and Remte perate quite a bit differently than they did in 2.0. In 2.0, the shps stred their business fr the day int daily files which

More information

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS 120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was

More information

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves)

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves) Truble Shting Guide fr AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves) AFVK-SP, AFVK-SP-H/L, AFVK-SP-MH/L AFVK-SP Series Valve Kit Truble Shting Guide (AF-4000 Series) TABLE OF CONTENTS General Infrmatin

More information

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents

More information

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 Guidelines fr Maintenance and Inspectin Prgrams fr Natural Gas and Prpane Appliances and their Fuel Features In Schls The Ontari Gas Utilizatin Cde states

More information

Lithium Battery Shipping Overview

Lithium Battery Shipping Overview Lithium batteries are used in many electrnic devices such as cameras, cell phnes, laptp cmputers, medical equipment and pwer tls. When shipping r imprting lithium batteries, including thse cntained in

More information

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE 1. INTRODUCTION... 3 2. PRECAUTIONS... 3 3. INSPECTION UPON RECEIPT OF GOODS... 4 3.1 GENERAL... 4 3.2 VISIBLE DAMAGE... 4 3.3 CONCEALED DAMAGE...

More information

PSS INSTALLATION INSTRUCTIONS

PSS INSTALLATION INSTRUCTIONS PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd

More information

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first

More information

Franchised Hauler Exemption for Recycling Application

Franchised Hauler Exemption for Recycling Application Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler

More information

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.

More information

EnergyBar 6. Setup Guide

EnergyBar 6. Setup Guide EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers

More information

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-30 TRACK TORCH/BURNER MACHINE. by BLUEROCK Tools

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-30 TRACK TORCH/BURNER MACHINE. by BLUEROCK Tools Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-30 TRACK TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.

More information

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY Dc N: DRIVING Issue Date JAN 1995 Revisin Versin Revisin N. 02 Next Revisin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance

More information

ABTQ-103 rev 01 Last review:

ABTQ-103 rev 01 Last review: INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH PCS Cntrl Statin Purpse f Instructins Wrking in hazardus areas, the safety f persnnel and plant depends n cmplying with all relevant safety

More information

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By

More information

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved Hw t Sweat (Slder) Cpper Pipe By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t attach pieces f cpper pipe by sweating r sldering the metal tgether. This is a helpful skill

More information

DriveCam Unit Installation Instructions

DriveCam Unit Installation Instructions DriveCam Unit Installatin Instructins Installatin f the DriveCam Unit is nt cmplicated, thugh care must be taken t avid specific prblems. Sme vehicles require additinal cnsideratin t determine the ptimum

More information

Texas Christian University Policy

Texas Christian University Policy Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines

More information

Tools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar)

Tools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar) Tls Required Phillips Screw Driver (crner lamps) Flat Head Screw Driver (ptinal fr headlight cver) Pliers (handy t have) Electrical Tape Sturdy Cpper Wire (t use as a wire fish) 10mm Scket r Wrench (grund

More information

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...

More information

Frequently Asked Fleet Card Questions HuskyPRO Universal Fuel Card

Frequently Asked Fleet Card Questions HuskyPRO Universal Fuel Card Frequently Asked Fleet Card Questins HuskyPRO Universal Fuel Card General Fleet Card Accunt Questins Hw can the HuskyPRO Universal Fuel Card Prgram help me manage my business fleet fuel expenses? HuskyPRO

More information

Pre-Planning Delivery Guide

Pre-Planning Delivery Guide Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur

More information

RICHARD L. OREAIR & CO. Safety Management System

RICHARD L. OREAIR & CO. Safety Management System SAFETY Dc N: Revisin Date: Revisin N. 2 Initial Versin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance with lcal regulatry

More information

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance...

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance... n Intrductin... 3 Specificatins... 4 Structure & Perfrmance... 5 Assembly... 6 Flding... 7 Operatin... 8-12 Care & Maintenance... 13-15 2 P a g e Read and fllw all instructins, warnings, and ntes in this

More information

Highfields Independent School and Day Nursery Mini Bus Policy

Highfields Independent School and Day Nursery Mini Bus Policy Highfields Independent Schl and Day Nursery Mini Bus Plicy Last Reviewed: Nv 2015 Apprved n: Cmmittee Respnsible: Pupil and Persnnel Next Review: Nv 2017 Apprved by: Full Gvs Highfields Schl is cmmitted

More information

Rejuvenation Instructions

Rejuvenation Instructions Rejuvenatin Instructins #521 200A Elbws UPR This NRI cvers the fllwing: Hw t prepare 200amp pre-mlded elbws fr injectin. Hw t install and re-infrce an injectin elbw. Hw t size an injectin elbw t match

More information

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events STE 120 HE ALTH CARE AGENCY/PUBLIC HE ALTH ENVIRONMENTAL HEALTH Prepackaged Fd Bths with Open Sampling r Beverage Dispensing at Cmmunity Events WHY THIS INFORMATION IS IMPORTANT A temprary fd bth, r hw

More information

Safety Rules. Danger Failure to obey the instructions and safety rules in this manual will result in death or serious injury. Do Not Operate Unless:

Safety Rules. Danger Failure to obey the instructions and safety rules in this manual will result in death or serious injury. Do Not Operate Unless: Third Editin First Printing Operatr's Manual Safety Rules Danger Failure t bey the instructins and safety rules in this manual will result in death r serius injury. D Nt Operate Unless: Yu learn and practice

More information

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm Website: www.vestil.cm 0317 DCR-205-DC, MANUAL DCR-205-XX-DC Pwered Drum Rtatrs

More information

Mini H1 Twin Kit - Installation Instructions

Mini H1 Twin Kit - Installation Instructions Intrductin: Thanks fr purchasing the Mini H twin kit! Yu are very clse t imprve yur lightning nw :) Please read this manual carefully. Feel free t cntact us r visit ur Facebk cmmunity; Eurpean Headlight

More information

John Murphy, Chair. Steffan Defeo. Patricia Delaney. Eric Ladensack. Amy Scharf. Anne Wilson

John Murphy, Chair. Steffan Defeo. Patricia Delaney. Eric Ladensack. Amy Scharf. Anne Wilson Jhn Murphy, Chair Steffan Defe Patricia Delaney Eric Ladensack Amy Scharf Anne Wilsn Adpted by the Selectbard and Twn Treasurer 2016 Twn f Duxbury ACCOUNTING, AUDITING AND FINANCIAL REPORTING Prcedures

More information

Gearbox Installation Manual

Gearbox Installation Manual Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre

More information

Machine Safeguarding

Machine Safeguarding Machine Safeguarding General This dcument will prvide yu a high-level verview n sme best practices pertaining t machine guarding and sample types f guards fund in manufacturing settings. The Main Causes

More information

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

ADVISORY: General Motors Upfitter Integration  Bulletin #108d P a g e 1 May 18, 2016 Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:

More information

PRE-PLANNING & DELIVERY GUIDE

PRE-PLANNING & DELIVERY GUIDE TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time

More information

Temporary Use and Vendor Stand Online Permit Submittal

Temporary Use and Vendor Stand Online Permit Submittal Temprary Use and Vendr Stand Online Permit Submittal A Temprary Use Permit is an pen-air small business that is there fr a limited time fr the uses listed belw. Temprary Use Duratin Extensin Agricultural

More information

Safe Work Procedure Self-Loading Logging Truck

Safe Work Procedure Self-Loading Logging Truck Safe Wrk Prcedure Self-Lading Lgging Truck PERSONAL PROTECTIVE EQUIPMENT: Adequate ftwear with gd tractin sles Hi-vis hardhat when ut f cab Hi-vis vest when ut f cab Hearing prtectin when driving PROCEDURES:

More information

Car Refrigerator PFN-C-WEA-25/35/45/55

Car Refrigerator PFN-C-WEA-25/35/45/55 Car Refrigeratr PFN-C-WEA-25/35/45/55 Accessries available separately:- Prtective Transit Bag AC0V -240Vt DC 2 V Pwer Adaptr Please read this manual carefully befre using yur unit. Sectin Page Key Prduct

More information

Effective Date: 10-January Table of Contents

Effective Date: 10-January Table of Contents Versin: 3 Page: 1 f 7 Table f Cntents 1.0 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Definitins... 2 1.4 Training Requirements... 3 2.0 General Requirements... 3 3.0 Inspectin... 3 4.0 Testing...

More information

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375 GLOBAL LIFT CORP Owner s Manual Rtatinal Series R-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 ROTATIONAL SERIES POOL LIFTS R-375

More information

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm) Hw t Install the Batteries Hw t Hld the Lamp: The InteliEnergy Lamp selectin switches utilize the same technlgy as cell phnes: Capacitive Tuch. This assures the ultimate in lngevity because there are n

More information

Design Standard - Fume Hoods & Fume Hood Exhausts

Design Standard - Fume Hoods & Fume Hood Exhausts 1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an

More information

FOOD TRUCK VENDOR INSTRUCTIONS

FOOD TRUCK VENDOR INSTRUCTIONS FOOD TRUCK VENDOR INSTRUCTIONS City f Clumbia 208 S. Rapp Ave. Clumbia, IL 62236 618.281-7144 x 134 Please allw tw weeks fr prcessing. The fllwing dcuments must be submitted with this applicatin: - Cmpleted

More information

BioWave Hydro DI-9200 User Manual

BioWave Hydro DI-9200 User Manual BiWave Hydr DI-9200 User Manual Assembling Hydr DI 9200: Assembling yur BiWave Hydr DI 9200, is a very shrt and simple prcess. All yu have t d is take the Hydr DI 9200 ut f the bx, make sure its standing

More information

;THI~~Sf\-FEJY _.:.. ;'..»...

;THI~~Sf\-FEJY _.:.. ;'..»... 45 -CHAPTER......... j...,.. 8 ~\..- ;THI~~Sf\-FEJY _.:.. ;'..».......,. np;,llf I~~yeantlfreez~in ah'penc8ntaiil~rr spllledq.l,1thefi()r ~~erifit:p1ightbe acc;~ss:lblle.i t children r ariimals.antifreezeis'txic

More information

Parts Checklist: ZJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Grand Cherokee ZJ

Parts Checklist: ZJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Grand Cherokee ZJ ZJ Frnt 3-Link Lng Arm Upgrade Installatin Instructins 93-98 Jeep Grand Cherkee ZJ Parts Checklist: *BOX 1* Instructins Invice Lg decal 10001 (Qty: 1) Rck-Link decal 13287 (2) Irnrckffrad.cm decal (1)

More information

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better? Slvent Filter What is a Slvent Trap, Slvent Recycler r Slvent Filter? It is a device attached t the end f a threaded barrel that cllects all f the slvent and debris as it is cleaned frm the barrel and

More information

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), SERVICE REPLACES: Please discard ATV 07-02 dated 4/5/07 MODEL: PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), KFX700 (KSV700-A/B/C),

More information

Route Sheet Guidelines

Route Sheet Guidelines Fairfax VA H.O.G. Chapter Rute Sheet Guidelines THIS DOCUMENT IS A WORK IN PROGRESS AND IS NOT FOR GENERAL DISTRIBUTION. ANY INTERIM USE BY AN OFFICER OR VOLUNTEER OF FAIRFAX VA CHAPTER H.O.G. IS FOR THE

More information

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375 GLOBAL LIFT CORP Owner s Manual Superir Series Prfrmance Series S-350 / P-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 SUPERIOR

More information

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems! The HB Series Advantage SGS listed cnfirming t UL Standard 2108 & 8750 Certified t CSA Standard C22.2 N.9 LED Life f 50K+ hurs, under nrmal perating cnditins Lw wattage, lw heat, lw vltage (12DVC & 24VDC

More information

DRIVER S/OWNER OPERATOR APPLICATION FOR EMPLOYMENT

DRIVER S/OWNER OPERATOR APPLICATION FOR EMPLOYMENT Tll: 1-800-265-8789 Tel: 905-457-8789 Fax: 905-457-8372 careers@travelers.ca * www.travelers.ca * DRIVER S/OWNER OPERATOR APPLICATION FOR EMPLOYMENT Please read and sign page 6 befre cmpleting the fllwing

More information

Parts Checklist: WJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* (1) *BOX 2* (1) Jeep Grand Cherokee WJ

Parts Checklist: WJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* (1) *BOX 2* (1) Jeep Grand Cherokee WJ Parts Checklist: *BOX 1* 13319 (1) Instructins Lg decal 10001 (Qty: 1) Rck-Link Decal 13287 (2) Irnrckffrad.cm decal (1) Subframe center 92270 (1) Subframe left uter 92256 (1) Subframe right uter 92275

More information

You have a Chiller, Now What?

You have a Chiller, Now What? Yu have a Chiller, Nw What? Raschell Hickmtt Reginal Sales Manger Dimplex Thermal Slutins Klant Klers Brand Chillers Agenda This presentatin is develped t be a very brief and generic intrductin t anyne

More information

E+ Battery Care Guide

E+ Battery Care Guide Electric Mtin Systems, LLC 45150 Business Curt, Suite 300 Dulles, VA 20166 USA E+ Battery Care Guide Welcme! Yur E+ Hub Battery Pack is a pwerful, sphisticated, and imprtant part f yur E+ Electric Bicycle.

More information

Application of size, weight, and load limitations for vehicles -- Exceptions.

Application of size, weight, and load limitations for vehicles -- Exceptions. Utah Vehicle Cde 41-1a-102. Definitins. As used in this chapter: (10) "Cmmercial vehicle" means a mtr vehicle, trailer, r semitrailer used r maintained fr the transprtatin f persns r prperty that perates:

More information

SERVICE FACTORY DIRECTED MODIFICATION MC IMMEDIATE INSPECTION REPAIR ONLY AS REQUIRED ENGINE PULLEY WEAR

SERVICE FACTORY DIRECTED MODIFICATION MC IMMEDIATE INSPECTION REPAIR ONLY AS REQUIRED ENGINE PULLEY WEAR SERVICE REPLACES: Please discard MC 06-07 dated June 27, 2006 MODEL: 2004-2005 VULCAN 2000 (VN2000-A1/L-A2/L) MC 06-07 Date: July 28, 2006 First Issued: June 27, 2006 Page 1 f 7 TITLE: ENGINE PULLEY WEAR

More information

Parts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ

Parts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ XJ Frnt 3-Link Lng Arm Upgrade Installatin Instructins 84-01 Jeep Cherkee XJ Parts Checklist: *BOX 1* Instructins Invice Lg decal 10001 (1) Rck-Link decal 13287 (2) Irnrckffrad.cm decal (1) Subframe center

More information

Hydro One Electricity Bills. Summer 2010

Hydro One Electricity Bills. Summer 2010 Hydr One Electricity Bills Summer 2010 Agenda Explanatin f Bills Reasns fr High Bills Tax Exemptin Cntact Infrmatin 1. Explanatin f Bills Page 1 f the Bill Balance Infrmatin: Balance Frward Budget Billing

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Accessry Applicatin Publicatins N. All 24039 AIR CONDITIONER ACCORD (DX) 4-DOOR Issue Date SEP 2002 What s New The A/C kit and instructins fr the 2003 Accrd are all new. Fllw

More information

General Faucet Installation Instructions

General Faucet Installation Instructions General Faucet Installatin Instructins Step 1: Psitin the Faucet Begin installing yur faucet by placing the gasket and faucet in psitin n the sink. (Diagram A) Frm under the sink, thread the plastic munting

More information

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS Purpse The purpse f this Plicy is t ensure the safety f emplyees wh transprt students t schl authrized events and thse students being transprted.

More information

PARKING POLICY JULY 2012

PARKING POLICY JULY 2012 1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:

More information

Perkins Car Clearance Individual Clearance Level

Perkins Car Clearance Individual Clearance Level Perkins Car Clearance Individual Clearance Level Name: Prgram: Psitin: Supervisr: The abve staff is cleared t perate Perkins Vehicles at the fllwing levels. This clearance is fr use f vehicles t transprt

More information

{EMS Shock} Student Name: Period:

{EMS Shock} Student Name: Period: {EMS Shck} Student Name: Perid: 5 th Grade Engineering Pulleys Unit Rubric Lab #0016 Pulley Frame Pulley Frame: Student cnstructed the Pulley Frame t lab specificatins. Pulley Frame was nt apprved 0 pints

More information

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS ENFCEMENT ON PRIVATE PROPERTY BY AUTHIZED CITY BY-LAW ENFCEMENT OFFICERS T: Supervisr f Parking Services, City f Brantfrd: I, Of Name (print) Municipal Address (print) Brantfrd, ON Psitin (print) Type

More information

APPLICATION FOR SPECIAL EVENT PERMIT EVENT BASICS

APPLICATION FOR SPECIAL EVENT PERMIT EVENT BASICS Date Applicatin Received: Permit Number: APPLICATION FOR SPECIAL EVENT PERMIT Please return cmpleted applicatin frm with permit fee and paperwrk t: Events Crdinatr, Twn f Beaufrt 701 Frnt Street P.O. Bx

More information

Instruction Manual. Kleensweep KS 32 R ( )

Instruction Manual. Kleensweep KS 32 R ( ) Instructin Manual Kleensweep KS 32 R (6400.40) Intrductin Preface Dear Custmer, We are certain that the excellent qualities f the vehicle will justify the faith yu have shwn in us thrugh yur purchase.

More information

Tips & Technology For Bosch business partners

Tips & Technology For Bosch business partners Tips & Technlgy Fr Bsch business partners Current tpics fr successful wrkshps N. 35/2011 Gasline injectin Invented fr life Lambda sensr Knw-hw frm the market leader Bsch, innvative cmpany and wrld's largest

More information

Golf/Utility Cart Operation Program Originally Endorsed on May 26, 2009 by the University Safety Committee Brooks Baker, Chair

Golf/Utility Cart Operation Program Originally Endorsed on May 26, 2009 by the University Safety Committee Brooks Baker, Chair Glf/Utility Cart Operatin Prgram Originally Endrsed n May 26, 2009 by the University Safety Cmmittee Brks Baker, Chair 1) Intrductin Purpse & Scpe The effective date f this prgram is August 1, 2009. This

More information

72 Mustang Mach 1 tachometer cluster and gauge conversion

72 Mustang Mach 1 tachometer cluster and gauge conversion 72 Mustang Mach 1 tachmeter cluster and gauge cnversin Dated: 02-17-2009 (drafted by a Chevy persn wrking n his first Frd -nt gd-) The fllwing infrmatin pertains t hw I went abut cnverting the standard

More information

Appointment Plus User Instructions

Appointment Plus User Instructions Appintment Plus User Instructins This dcument prvides the user with instructins fr the Appintment Plus System. Appintment Plus System Features This is a tl fr managing the fllwing: Technician Wrk Frce

More information

Operator s Manual with Maintenance Information. Second Edition Fourth Printing Part No

Operator s Manual with Maintenance Information. Second Edition Fourth Printing Part No Operatr s Manual with Maintenance Infrmatin Secnd Editin Furth Printing Part N. 48643 Operatr s Manual Secnd Editin Furth Printing Imprtant Read, understand and bey these safety rules and perating instructins

More information

Installation Guide Contigo 6100

Installation Guide Contigo 6100 Installatin Guide Cmmercial Vehicle Prductivity and Security The is a high-perfrmance beacn designed fr cmmercial prductivity and security. It is ideally suited t installatins in delivery and service fleets

More information

Mandatory Maintenance Vehicle Owner

Mandatory Maintenance Vehicle Owner Mandatry Maintenance Vehicle Owner In accrdance with Québec s Highway Safety Cde, wners f vehicles with grss vehicle weight rating (GVWR)* f 4,500 kg r mre (except tl vehicles) and f tw trucks and minibuses

More information

Wayne County Community College District

Wayne County Community College District Wayne Cunty Cmmunity Cllege District AUT 200 Engine Perfrmance III CREDIT HOURS: 3.00 CONTACT HOURS: 60.00 COURSE DESCRIPTION: This intermediate curse is designed t help the student diagnse and repair

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Accessry Applicatin Publicatins N. All 24107 AIR CONDITIONER ELEMENT (DX) Issue Date DEC 2002 What s New INSTALLATION The A/C kit and instructins fr the 2003 Element are all new.

More information

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS SECURITY SYSTEM KIT CONTENTS SHOCK SENSOR F-D15 WINDOW DECAL (QTY 2) F-D16

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS SECURITY SYSTEM KIT CONTENTS SHOCK SENSOR F-D15 WINDOW DECAL (QTY 2) F-D16 GENUINE ACCESSRIES INSTALLATIN INSTRUCTINS PART NUMBER: 0000-8F-N03 NTE: NT CMPATIBLE WITH REMTE START SYSTEM, PART# 0000-8F-N02 SECURITY SYSTEM KIT CNTENTS APPLICABLE MDELS: 2007>MAZDA CX-9 WITHUT ADVANCED

More information

Operation & Maintenance Manual For Commercial Use Only

Operation & Maintenance Manual For Commercial Use Only Operatin & Maintenance Manual Fr Cmmercial Use Only SWB 26/8 Battery Sweeper 2 Table f cntent 1 Safety infrmatin... 4 1.1 Safety and Warning Symbls... 4 1.2 General infrmatin... 4 1.3 Operating infrmatin...

More information

WELCOME. WEB LOCATION Los Angeles, CA

WELCOME. WEB   LOCATION Los Angeles, CA WELCOME Thank yu fr chsing AC Infinity. We are cmmitted t prduct quality and friendly custmer service. If yu have any questins r suggestins, please dn t hesitate t cntact us. Visit www.acinfinity.cm and

More information

XJ 4-Link Rear Long Arm Instructions

XJ 4-Link Rear Long Arm Instructions Parts Checklist: Instructins Irn Rck Off Rad Decal - (2) Rck-Link Decal 13287 - (2) irnrckffrad.cm Decal - (1) Crssmember - 991162 - (1) Shck crssmember - 91173 - (1) Shck crssmember spacer - 91178 - (2)

More information

READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION!

READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION! www.fabtechmtrsprts.cm 4331 EUCALYPTUS AVE ~~ CHINO, CA 91710 PHONE 909-597-7800 ** FAX 909-597-7185 1994-2001 DODGE RAM 1500 & 2500 4 WHEEL DRIVE FTS3400-50 FRONT DUAL SHOCK SYSTEM PARTS LIST: 1 EA. FT3400-50-100P

More information

INSTALLATION INSTRUCTIONS FOR PART #20010 RT1/RT2/DOM WATER / METHANOL INJECTION SYSTEMS

INSTALLATION INSTRUCTIONS FOR PART #20010 RT1/RT2/DOM WATER / METHANOL INJECTION SYSTEMS Kit Cntents INSTALLATION INSTRUCTIONS FOR PART #20010 RT1/RT2/DOM WATER / METHANOL INJECTION SYSTEMS Parts UHO Pump (Special High Output) 3 Qt Reservir 10 Ft High Pressure Tubing 3 Ft Wire Lm 18 1/8 Silicne

More information

NIEVS PROJECT. First Registration Support Document Version 1.0

NIEVS PROJECT. First Registration Support Document Version 1.0 NIEVS PROJECT First Registratin Supprt Dcument Versin 1.0 CONTENTS CONTENTS... 2 INTRODUCTION... 3 SCOPE OF DOCUMENT... 3 FIRST REGISTRATION MIGRATION ACTIVITIES... 4 AFRL... 4 V55 MIGRATION... 4 SOM...

More information

Installation instructions: 13 Pin Electrical system for towing hitch

Installation instructions: 13 Pin Electrical system for towing hitch General data Part number Westfalia Vehicle Manufacturer Vehicle 321 538 300 153 ZGB 1T0 055 204 Vlkswagen Turan MY 2003> 321 538 391 105-005 - 33/07 Imprtant ntes Read the installatin manual prir t starting

More information

Auxiliary Power Unit (APU) Owner s manual D

Auxiliary Power Unit (APU) Owner s manual D Auxiliary Pwer Unit (APU) Owner s manual 54-8293-D The Dynasys TM APU has been designed fr ease f peratin and maintenance. Review f this manual and the pre-trip inspectins will reduce any ver-the-rad perating

More information

Valid as of: August Minuteman International Inc. 14N845 U.S. Route 20 Pingree Grove, Illinois U.S.A.

Valid as of: August Minuteman International Inc. 14N845 U.S. Route 20 Pingree Grove, Illinois U.S.A. User Manual H26 Intrductin PrefaceIntrductin Dear custmer, It is ur desire that the gd characteristics f the H26 shuld justify the cnfidence yu demnstrated by making this purchase. Prir t the first use,

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transprt Research Labratry Creating the future f transprt CLIENT PROJECT REPORT CPR2188 Survey f vehicle radwrthiness f HCVs and driver cmpliance with EU rules n driving times, breaks and rest perids -

More information

Methanol Recovery Systems

Methanol Recovery Systems Methanl Recvery Systems Methanl Recvery fr bidiesel is an imprtant part f the entire bidiesel prcess and invlves the highest cst f peratin fr a bidiesel plant. Only abut half f the methanl used is actually

More information

Don t be Shocked Be Informed

Don t be Shocked Be Informed Dn t be Shcked Be Infrmed Basics f Hybrid Safety fr the Service Technician Secnd in a 3-part Series by Peter Zaidel As a vehicle service technician, yu are undubtedly prfessinally excited abut hybrid vehicles,

More information

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator TECHNICAL SPECIFICATION SPC-4T Stirling Prcess Crygeneratr Reference 80 8044_00 Issue Date April 20, 2016 Stirling Crygenics is a registered trade name f DH Industries BV Fr mre infrmatin n the Stirling

More information

Installation, Operation and Maintenance Instructions

Installation, Operation and Maintenance Instructions FJ-310A Installatin, Operatin and Maintenance Instructins Sump cleaner ERIEZ MAGNETICS HEADQUARTERS: 2200 ASBURY ROAD, ERIE, PA 16506 1402 U.S.A. WORLD AUTHORITY IN SEPARATION TECHNOLOGIES P.C# 762-766

More information

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010)

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010) Summary f Regulatins fr Cmmercial Driver s Licenses frm the Federal Mtr Carrier Safety Administratin (Excerpts 2010) Classes f License: The Federal standard requires States t issue a CDL t drivers accrding

More information

Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan Ford Customer Service Division

Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan Ford Customer Service Division David J. Jhnsn Frd Mtr Cmpany Directr P. O. Bx 1904 Service Engineering Operatins Dearbrn, Michigan 48121 Frd Custmer Service Divisin TO: All U.S. Frd and Lincln Dealers SUBJECT: Certain 2005-2006 Frd

More information

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin

More information

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES MEDMASTER TROFFER Luminaires fr MRI/Imaging Suites PRODUCT FEATURES: Recessed munt Grid; 2' 2', 2' 4' Nn-ferrus cnstructin safe fr sensitive MRI equipment High-utput, high-cri LED lamp ptins NSF2 rating

More information

TRUCK AND TRANSPORT MECHANIC STATUTORY DECLARATION OF WORK EXPERIENCE

TRUCK AND TRANSPORT MECHANIC STATUTORY DECLARATION OF WORK EXPERIENCE T qualify t challenge certificatin in this trade r be granted authrity t supervise and sign-ff n apprentices in this trade, individuals must have: wrked a minimum f 9,540 hurs perfrming the tasks listed

More information