Continental Gold Drills a New High-Grade Gold and Silver Discovery Over 1,200 Vertical Metres at Buriticá, Colombia

Size: px
Start display at page:

Download "Continental Gold Drills a New High-Grade Gold and Silver Discovery Over 1,200 Vertical Metres at Buriticá, Colombia"

Transcription

1 Cntinental Gld Drills a New High-Grade Gld and Silver Discvery Over 1,200 Vertical Metres at Buriticá, Clmbia Trnt, Ontari, September 13, Cntinental Gld Limited (TSX:CNL; OTCQX:CGOOF) ("Cntinental" r the "Cmpany") is pleased t annunce the results f initial drilling and undergrund channel sampling f ld wrkings in the La Estera and La Man areas, new mineralized vein systems suth f the Yaraguá and Veta Sur depsits in the Cmpany's 100%-wned Buriticá prject in Antiquia, Clmbia. Highlights La Estera (Figures 1 and 2) Drilling and undergrund channel sampling f ld wrkings in the La Estera area has resulted in the discvery f up t three high-grade silver and gld vein systems (Nrthern, Central and Suthern La Estera), lcated apprximately between 100 and 300 metres t the suth f the Veta Sur depsit. Drilling has intersected multiple intervals f vein mineralizatin exhibiting high silvergld in the Suthern La Estera vein system and high-grade gld in the Nrthern La Estera vein system, particularly at depth. Significant intercepts include: BUSY292 intersected g/t Gld and 1,061 g/t Silver (28.0 g/t Gld equivalent) g/t Gld and 121 g/t Silver (13.5 g/t Gld equivalent) g/t Gld and 88 g/t Silver (11.9 g/t Gld equivalent) BUSY282 intersected g/t Gld and 41 g/t Silver (9.1 g/t Gld equivalent) g/t Gld and 8 g/t Silver (10.8 g/t Gld equivalent) The high-grade gld intercepts in BUSY282 are amng the deepest btained t date in all drilling at the Buriticá prject. These intercepts prject vertically up t extensive shallw artisanal wrkings, suggesting vertical extents f precius metal mineralizatin f mre than 1,200 metres in the Nrthern La Estera vein system. This target remains pen alng strike in all directins and at depth. Channel sampling f shallw histrical wrkings at La Estera has encuntered highgrade silver-gld veins: 6.2 g/t Gld and 362 g/t Silver (13.4 g/t Gld equivalent) ver an average width f 1 m, including 27.5 g/t Gld and 1,581 g/t Silver (59.1 g/t Gld equivalent) ver 0.2 m, alng 22 metres 6.8 g/t Gld and 454 g/t Silver (15.9 g/t Gld equivalent) ver an average width f 1.2 m, including 41 g/t Gld and 2,747 g/t Silver (95.9 g/t Gld equivalent) ver 0.2 m, alng 10 metres

2 Page 2 The high-grade silver and gld intercepts in BUSY292 are up t 120 metres alng strike and up t 400 metres deeper than histrical wrkings in the Central La Estera vein system. This system remains pen alng strike and at depth. The distributin f silver and gld sil gechemical anmalies and artisanal wrkings suggest that bth the Suthern, Central and Nrthern La Estera vein systems may have substantial lateral extents. La Man (Figure 1) Lcated apprximately 300 t 400 metres suth f the Yaraguá depsit, the first drilling in Suthern La Man has als intersected multiple intervals f vein mineralizatin exhibiting bth high and mderate gld-silver. Significant intercepts under extensive sil gechemical anmalies include: g/t Gld and 1 g/t Silver (BUSY263) g/t Gld and 9 g/t Silver (BUSY263) g/t Gld and 187 g/t Silver (BUSY269) g/t Gld and 153 g/t Silver (BUSY276) Additinal drilling and surface sampling f the La Man and La Estera systems is underway and will cnfirm, amng ther things, if the Nrthern La Estera and the Suthern La Man systems are cntiguus and cntinuus ver 1,000 metres f ptential strike length as satellite imagery and mapping seemingly indicates. Our team cntinues t be successful in unlcking value at Buriticá and they shuld be cngratulated fr their effrts, cmmented Ari Sussman, CEO. We cntinue t take an aggressive explratin and develpment stance, which, in this instance, resulted in new discveries at La Man and at La Estera with ver 1,200 metres f vertical ptential already utlined. Shrtly after the annuncement f ur updated mineral resurce estimate, which remains n track fr cmpletin prir t mnth s end, we plan t annunce a revised explratin and develpment plan fr Buriticá, which will include aggressive drilling f the La Estera and La Man systems. Details Cntinental's 100%-wned 28,920-hectare prject, Buriticá, cntains several knwn areas f high-grade gld and silver mineralizatin, f base metal carbnate-style ("Stage I") variably verprinted by texturally and chemically distinctive high-grade ("Stage II") mineralizatin. The tw mst extensively explred f these areas (the Yaraguá and Veta Sur systems) are central t this land package. The Yaraguá system has been drill-utlined alng 900 metres f strike and 1,300 vertical metres, and partially sampled in undergrund develpments. The Veta Sur system has been drill intersected alng 570 metres f strike and 1,180 vertical metres. Bth systems are characterized by multiple, steeply-dipping veins and brader, mre disseminated, mineralizatin and bth remain pen at depth and alng strike, at high grades. See Abut Cntinental Gld (belw) fr a précis f the maiden mineral resurce estimate fr Buriticá. This release examines new precius metal discveries in the La Estera and La Man areas, lcated t the suth f Veta Sur and Yaraguá, respectively.

3 Page 3 La Estera Significant drill intercepts in the La Estera system are tabulated belw in Table I and are referenced in Figures 1 and 2. Table I: Drilling Highlights La Estera Drill-hle Frm T Interval* Gld Silver Zinc (%) Elevatin BUSY065** BUSY135** BUSY incl BUSY incl

4 Page 4 Drill-hle Frm T Interval* Gld Silver Zinc (%) Elevatin incl BUSY * Intercepts calculated at 1 g/t gld and 30 g/t silver cut-ff grades with up t 20% internal dilutin and generally tabulated if greater than 10 gram*metres gld equivalent. True widths nt accurately knwn but generally are between 30% and actual true width f the dwn-hle interval. ** Drill-hles previusly released and never reached target depths due t drill limitatins, significant intervals are recalculated herein. Drilling in La Estera targeted sil and rck chip gechemical anmalies. All three drill-hles intersected multiple gld and silver-mineralized intervals which included high-grade intercepts thrugh extensive vertical and hrizntal ranges. The related families f veins lie 100 t 300 metres t the suth f the Veta Sur depsit and are gechemically distinct frm the latter. Up t dwn-hle depths f arund 500 metres (RL s frm 1,900 m t 1,400 m), drill-hles BUSY282, BUSY292 and BUSY305 each intersected multiple vein sets with mderate t high silver-gld (Table I, Figure 2). BUSY065, drilled n a mre westerly azimuth, als intersected very high silver-gld veins at high RL s and shallw depths (Table I, Figure 2). Artisanal wrkings abve and t the east and west f these drill intercepts are cnsistent with extensins f the Suthern La Estera vein system utside f the drilling area. Channel sampling shallw undergrund histrical wrkings at La Estera (further nrth f the mst sutherly veins) encuntered high silver and gld grades with numerus samples assaying mre than 1,000 g/t Silver. Cntinuus sampling intervals include: 6.2 g/t Gld and 362 g/t Silver (13.4 g/t Gld equivalent) ver an average width f 1 m, including 27.5 g/t Gld and 1,581 g/t Silver (59.1 g/t Gld equivalent) ver 0.2 m, alng 22 metres (RL 1,787 m)

5 Page g/t Gld and 454 g/t Silver (15.9 g/t Gld equivalent) ver an average width f 1.2 m, including 41 g/t Gld and 2,747 g/t Silver (95.9 g/t Gld equivalent) ver 0.2 m, alng 10 metres (RL 1,778 m) The silver-rich intercept in BUSY292 frm m (RL 1,651 m), g/t Gld, 1,061 g/t Silver (28.0 g/t Gld equivalent) and 2.6 % Zinc (including g/t Gld, 2,480 g/t Silver (55.9 g/t Gld equivalent) and g/t Gld and 2,060 g/t Silver (47.5 g/t Gld equivalent)) lies further west f and 130 metres deeper than the La Estera undergrund histrical wrkings. A 300-metre deeper gld-rich intercept in BUSY292, frm metres (RL 1,373 metres) yielding g/t Gld and 56 g/t Silver (4.92 g/t Gld equivalent), including g/t Gld, 121 g/t Silver (13.5 g/t Gld equivalent) and g/t Gld, 88 g/t Silver (11.9 g/t Gld equivalent) may als be crrelated with the Central La Estera vein system. These drill intercepts and the near surface sampling are cnsistent with a vertically-extensive Central La Estera vein system and mre than 120 metres f lateral strike. The Central La Estera vein system remains pen alng strike and at depth. Gld and silver sil gechemical anmalies and artisanal wrkings ptentially relating t this vein system extend alng strike fr ver 1,000 metres t the east-sutheast f the Central La Estera vein system (Figure 1). Mre than 200 metres further nrth f the Central La Estera vein system, BUSY282 had several high-grade gld intercepts, with bth high and lw base metal cntents, but gechemically distinct fr the Veta Sur system, 100 metres t the nrth. These intersectins are amng the deepest btained t date in drilling at the Buriticá prject and include: frm 1,154.6 m (RL 832 m), g/t Gld and 41 g/t Silver (9.1 g/t Gld equivalent), including g/t Gld and 154 g/t Silver (35.4 g/t Gld equivalent) frm 1,381 m (RL 620 m), g/t Gld and 8 g/t Silver (10.8 g/t Gld equivalent) The BUSY282 intercepts prject vertically t extensive shallw artisanal wrkings suggesting vertical extents f precius metal mineralizatin f mre than 1,200 metres in the Nrthern La Estera vein system and remains pen alng strike and at depth (Figure 2). Surface sampling and results frm BUSY135 (Table I) are cnsistent with high silver-gld fr the shallw, high elevatin mineralizatin at the Nrthern La Estera vein system. The distributin f artisanal wrkings and sil precius metal anmalies in the Nrthern La Estera vein system (Figure 1) may indicate this system has substantial untested lateral strike extent.

6 Page 6 La Man Significant new drill intercepts in the Suthern La Man area are listed belw in Table II and are referenced in Figure 1. Table II: Drilling Highlights La Man Drill-hle Frm T Interval Gld Silver Zinc (%) Elevatin BUSY BUSY BUSY incl

7 Page 7 Drill-hle Frm T Interval Gld Silver Zinc (%) Elevatin BUSY * Intercepts calculated at 1 g/t gld and 30 g/t silver cut-ff grades with up t 20% internal dilutin. True widths nt accurately knwn but generally are between 30% and actual true width f the dwn-hle interval. ** Drill-hles previusly released and never reached target depths due t drill limitatins, significant intervals are recalculated herein. The first drilling in Suthern La Man, 300 t 400 metres suth f the Yaraguá depsit, targeted extensive precius and base metal sil anmalies. All fur drill-hles intersected multiple intervals f vein mineralizatin within brad, lwer grade envelpes, exhibiting bth high and mderate gld-silver. BUSY263 examined a limited area, but encuntered mineralizatin ver an elevatin range f 250 metres. Mst significant intercepts in this drill-hle are g/t Gld and 1 g/t Silver frm 235 m dwn-hle and g/t Gld and 9 g/t Silver frm m dwn-hle. BUSY269, drilled mre acrss strike, encuntered numerus veins ver a 450 metre range f vertical elevatins, with a best intercept f g/t Gld, 187 g/t Silver and 2.8 % Zinc starting at m dwn-hle. BUSY276 intersected vein mineralizatin including g/t Gld and 153 g/t Silver at 29.8 m dwn-hle, befre being abandned shrt f its target. BUSY243 was drilled t the nrth and intersected silver-gld mineralizatin dwn t elevatins f 1,150 m, suth f the suthern-mst Yaraguá vein families. The distributin f sil precius anmalies and artisanal wrkings in the Suthern La Man area (Figure 1) indicates that the La Man mineralizatin is mre laterally extensive than drilled t date and may prve t be cntiguus with the Nrthern La Estera mineralizatin. Onging drilling and surface sampling is testing the cntinuity f bth the La Man and La Estera systems, in particular t clarify if the Nrthern La Estera and Suthern La Man systems are cntiguus and cntinuus ver 1,000 metres f ptential lateral extent. Technical Infrmatin Vic Wall, PhD, special advisr t the Cmpany and a qualified persn fr the purpse f NI , has prepared r supervised the preparatin f, r apprved, as applicable, the technical infrmatin cntained in this press release. Dr. Wall is a gelgist with 35 years experience in the minerals mining, cnsulting, explratin and research industries. Fllwing a career in Australian and Nrth American academes, he held senir psitins in a number f multinatinal majr and junir minerals cmpanies. A Fellw f the Australian Institute f Gescientists, Dr. Wall is Principal f Vic Wall & Assciates, a Brisbane-based cnsultancy

8 Page 8 that prvides gescientific services t mineral cmpanies and gvernment agencies, wrldwide. The Cmpany utilizes a rigrus, industry-standard QA/QC prgram. Cre is sawn in half with ne-half shipped t a sample preparatin lab in Medellín run by ALS Clmbia Limited ( ALS ) in Clmbia. Samples are then shipped fr analysis t an ALS-certified assay labratry in Lima, Peru. The remainder f the cre is stred in a secured strage facility fr future assay verificatin. Blanks, duplicates and certified reference standards are inserted int the sample stream t mnitr labratry perfrmance and a prtin f the samples are peridically check assayed at ACME Analytical Labratries in Vancuver, British Clumbia and/r Inspectrate America Crp. in Ren, Nevada. The Cmpany des nt receive assay results fr drill-hles in sequential rder; hwever, all significant assay results are publicly-reprted. A cmplete listing f assay results t date fr the Yaraguá and Veta Sur Systems is available n the Cmpany s website at Gld equivalent grade is calculated by dividing silver grades by 50 and adding this figure t the gld grade, assuming 100% metallurgical recvery. Fr additinal technical infrmatin n the Buriticá prject, please refer t the Cmpany s technical reprt (the Technical Reprt ) entitled Mineral Resurce Estimate f the Buriticá Gld Prject, Clmbia dated Octber 24, 2011 as amended Nvember 23, 2011, prepared by Andrew J Vigar, BAppSc Ge, FAusIMM, MSEG, and Martin Recklies, BAppSC Ge, MAIG, each f Mining Assciates Pty Limited, available n SEDAR at n the OTCQX at and n the Cmpany website at Abut Cntinental Gld Cntinental Gld Limited is an advanced-stage explratin and develpment cmpany with an extensive prtfli f 100%-wned gld prjects in Clmbia. Spearheaded by a team with ver 40 years f explratin and mining experience in Clmbia, the Cmpany is fcused n advancing its high-grade Buriticá gld prject t prductin. A maiden mineral resurce estimate fr the Buriticá prject prepared in accrdance with NI cvers tw majr vein systems, with cmbined measured and indicated mineral resurces f 1,110,000 tnnes f mineralized material cntaining 630,000 unces f gld grading 17.8 g/t gld, 1,500,000 unces f silver grading 42 g/t silver, and 18,700,000 punds f zinc grading 0.8% zinc. The inferred mineral resurce is 6,900,000 tnnes f mineralized material cntaining 2,500,000 unces f gld grading 11.4 g/t gld, 9,500,000 unces f silver grading 43 g/t silver and 88,000,000 punds f zinc grading 0.6% zinc. Fr additinal technical infrmatin n the Buriticá prject, please refer t the Technical Reprt. In August 2012, Cntinental achieved an imprtant milestne, receiving frmal apprval fr the mdificatin f its existing Envirnmental Impact Assessment. The amendment allws the Cmpany t build a six-kilmetre switchback rad and begin undergrund develpment by cnstructing a ne-kilmetre access tunnel. With a gal f being the first mdern-day gld prducer in Clmbia, Cntinental will cmmence the cnstructin f the access tunnel in H2 2012, initially prviding access fr undergrund drilling and eventually used fr cmmercial prductin. A Phase III drill prgram is underway at the Buriticá prject t further delineate the resurce and drill new target znes identified within its cncessins. Additinal details n the Buriticá prject and the rest f Cntinental s suite f gld explratin prperties are available at

9 Page 9 Fr further infrmatin, please cntact: Nisha Hasan Directr, Investr Relatins Cntinental Gld Limited inf@cntinentalgld.cm Frward-Lking Statements This press release cntains r refers t frward-lking infrmatin under Canadian securities legislatin, including statements regarding the estimatin f mineral resurces, explratin results, ptential mineralizatin, explratin and mine develpment plans, timing f the cmmencement f peratins and is based n current expectatins that invlve a number f business risks and uncertainties. Frward-lking statements are subject t significant risks and uncertainties, and ther factrs that culd cause actual results t differ materially frm expected results. Readers shuld nt place undue reliance n frward-lking statements. Factrs that culd cause actual results t differ materially frm any frward-lking statement include, but are nt limited t, failure t cnvert estimated mineral resurces t reserves, capital and perating csts varying significantly frm estimates, the preliminary nature f metallurgical test results, delays in btaining r failures t btain required gvernmental, envirnmental r ther prject apprvals, plitical risks, uncertainties relating t the availability and csts f financing needed in the future, changes in equity markets, inflatin, changes in exchange rates, fluctuatins in cmmdity prices, delays in the develpment f prjects and the ther risks invlved in the mineral explratin and develpment industry frward-lking statements are subject t significant risks and uncertainties, and ther factrs that culd cause actual results t differ materially frm expected results. Readers shuld nt place undue reliance n frwardlking statements. These frward-lking statements are made as f the date heref and the Cmpany assumes n respnsibility t update them r revise them t reflect new events r circumstances ther than as required by law. Differences in Reprting f Resurce Estimates This press release was prepared in accrdance with Canadian standards which differ in sme respects frm United States standards. In particular, and withut limiting the generality f the freging, the terms inferred mineral resurces, indicated mineral resurces, measured mineral resurces and mineral resurces used r referenced in this press release are Canadian mining terms as defined in accrdance with Natinal Instrument Standards f Disclsure fr Mineral Prjects under the guidelines set ut in the Canadian Institute f Mining, Metallurgy and Petrleum (the CIM ) Standards n Mineral Resurces and Mineral Reserves (the CIM Standards ). The CIM Standards differ significantly frm standards in the United States. While the terms mineral resurce, measured mineral resurces, indicated mineral resurces, and inferred mineral resurces are recgnized and required by Canadian regulatins, they are nt defined terms under standards in the United States. Inferred mineral resurces have a great amunt f uncertainty as t their existence, and great uncertainty as t their ecnmic and legal feasibility. It cannt be assumed that all r any part f an inferred mineral resurce will ever be upgraded t a higher categry. Under Canadian securities laws, estimates f inferred mineral resurces may nt frm the basis f feasibility r ther ecnmic studies. Readers are cautined nt t assume that all r any part f measured r indicated mineral resurces will ever be cnverted int reserves. Readers are als cautined nt t assume that all r any part f an inferred mineral resurce exists, r is ecnmically r legally mineable. Disclsure f cntained unces in a resurce is permitted disclsure under Canadian regulatins; hwever, United States cmpanies are nly permitted t reprt mineralizatin that des nt cnstitute reserves by standards in the United States as in place tnnage and grade withut reference t unit measures. Accrdingly, infrmatin regarding resurces cntained r referenced in this press release cntaining descriptins f ur mineral depsits may nt be cmparable t similar infrmatin made public by United States cmpanies.

10 Page 10 Figure 1 Plan view f drilling highlights, near surface sampling and artisanal wrkings n LIDAR tpgraphic base

11 Figure 2 Nrth-Suth sectin shwing drilling highlights, near surface sampling and artisanal wrkings

10m at 18g/t Au from Dave Prospect

10m at 18g/t Au from Dave Prospect 23rd April 2012 ASX Annuncement 10m at 18g/t Au frm Dave HIGHLIGHTS Level 2, 9 Clin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscvery.cm e inf@predictivediscvery.cm

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 14 April 2015 Further Update n the Develpment f the Old Pirate High Grade Gld Depsit ABM Resurces NL ( ABM r the Cmpany ) is pleased t annunce an update n the

More information

Third Quarter 2014 Operating Results

Third Quarter 2014 Operating Results 1 22 May 2014 Third Quarter 2014 Operating Results Lndn, England & Baie Verte, Newfundland and Labradr, Canada Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ( Rambler r the Cmpany ), a cpper and

More information

ASX RELEASE QUARTERLY ACTIVITIES REPORT. 31 October 2014 ASX : BGS SEPTEMBER The emerging West African Gold Exploration Company HIGHLIGHTS

ASX RELEASE QUARTERLY ACTIVITIES REPORT. 31 October 2014 ASX : BGS SEPTEMBER The emerging West African Gold Exploration Company HIGHLIGHTS 31 Octber 2014 ASX RELEASE ASX : BGS The emerging West African Gld Explratin Cmpany HIGHLIGHTS QUARTERLY ACTIVITIES REPORT SEPTEMBER 2014 Targeting multi-millin unce gld depsits in Mali and Liberia. Expanding

More information

SIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION

SIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION Wednesday, 28 July 2010 SIGNIFICANT GOLD MINERALISATION AT SUMBA FIRST PASS DRILLING AND TRENCHING AT MASU PROJECT ENCOUNTERS SIGNIFICANT GOLD MINERALISATION Hillgrve Resurces Ltd (ASX:HGO) is pleased

More information

Positioned for Major Gold Discovery, West Africa

Positioned for Major Gold Discovery, West Africa ASX: ERX Psitined fr Majr Gld Discvery, West Africa Cte d Ivire 121 Mining Investment, Hng Kng Octber 2018 Cmpetent Persns Statement & Disclaimer Cautinary Statement Previusly Reprted Explratin Results

More information

THE YARAMOKO GOLD PROJECT ROBIN MILLS, Roxgold Non-Executive Director & Sr. Operating Partner of Appian Capital Advisory

THE YARAMOKO GOLD PROJECT ROBIN MILLS, Roxgold Non-Executive Director & Sr. Operating Partner of Appian Capital Advisory THE YARAMOKO GOLD PROJECT ROBIN MILLS, Rxgld Nn-Executive Directr & Sr. Operating Partner f Appian Capital Advisry The Jburg Indaba 6 TH, Octber, 2016 CAUTIONARY STATEMENT This presentatin cntains frward-lking

More information

EPITHERMAL GOLD IN NEVADA. Corporate Presentation January 2018

EPITHERMAL GOLD IN NEVADA. Corporate Presentation January 2018 EPITHERMAL GOLD IN NEVADA Crprate Presentatin January 2018 Frward Lking Statements This presentatin by Discvery Harbur Resurces Inc. (the Cmpany ) cntains frwardlking statements, including, in particular,

More information

New Gold Achieves Strong Operational and Financial Performance in Second Quarter 2012 and Announces Commercial Production at New Afton

New Gold Achieves Strong Operational and Financial Performance in Second Quarter 2012 and Announces Commercial Production at New Afton New Gld Achieves Strng Operatinal and Financial Perfrmance in Secnd Quarter 2012 and Annunces Cmmercial Prductin at New Aftn (All figures are in US dllars unless therwise indicated) August 1, 2012 New

More information

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents

More information

Exploration, Drilling and Enhanced Tenement Portfolio The Tasmanian Frontier

Exploration, Drilling and Enhanced Tenement Portfolio The Tasmanian Frontier 209+ ADDRESS PHONE EMAIL PO Bx 35 +61 (8) 9295 0388 inf@frntierresurces.cm.au Nrth Perth FAX WEBSITE WA 6906 Australia +61 (8) 9295 3480 www.frntierresurces.cm.au ABN 96 095 684 389 ASX : FNT ASX Limited

More information

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM PROGRAM OVERVIEW Ecnmic Vitality is a critical factr in ensuring Castle Rck s lng-term success and in achieving its Visin f being a Self-Sufficient

More information

For personal use only

For personal use only ASX Annuncement 16 March 2017 ASX Cde: ARM Aurra Minerals Grup f Cmpanies Diversified Minerals Explratin via direct and indirect interests Predictive Discvery Limited (ASX: PDI) 39.6% - Gld Explratin /

More information

HANDLING AND STORAGE PRACTICE

HANDLING AND STORAGE PRACTICE PREFERRED RELIABILITY PRACTICES Practice N. PD-ED-1109 Page 1 f 5 Ni-H SPACECRAFT BATTERY HANDLING AND STORAGE PRACTICE Practice: Develp and implement handling and strage prcedures t ensure reliable peratin,

More information

For personal use only

For personal use only ASX Annuncement Predictive Discvery Limited is a gld explratin cmpany with strng technical capabilities fcused n a large gld explratin prtfli in West Africa. ASX: PDI Issued Capital: 163 millin shares

More information

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified

More information

Design Standard - Fume Hoods & Fume Hood Exhausts

Design Standard - Fume Hoods & Fume Hood Exhausts 1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an

More information

PARKING POLICY JULY 2012

PARKING POLICY JULY 2012 1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:

More information

For personal use only

For personal use only STREET ADDRESS Unit 17, Level 2 100 Railway Rad Subiac, Western Australia 6008 POSTAL ADDRESS PO Bx 8129 Subiac East 6008 CONTACT DETAILS Tel: +61 (0)8 9380 9920 Fax: +61 (0)8 9381 5064 inf@indusenergy.cm.au

More information

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first

More information

For personal use only

For personal use only Suthern Crss Gldfields Ltd is an Australian explratin cmpany ffering investrs a cmpelling cmbinatin f near term cash flw and utstanding explratin ptential. The Cmpany has a dminant 4,000km 2 tenement and

More information

Lithium Battery Shipping Overview

Lithium Battery Shipping Overview Lithium batteries are used in many electrnic devices such as cameras, cell phnes, laptp cmputers, medical equipment and pwer tls. When shipping r imprting lithium batteries, including thse cntained in

More information

PROJE CT-BASED LEARNING: ABS PLASTIC DERBY

PROJE CT-BASED LEARNING: ABS PLASTIC DERBY PROJE CT-BASED LEARNING: ABS PLASTIC DERBY Descriptin D yu remember the pine wd derby cars yu designed and built when yu were a child? D yu remember hw difficult it was t get the shape yu wanted in the

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transprt Research Labratry Creating the future f transprt CLIENT PROJECT REPORT CPR2188 Survey f vehicle radwrthiness f HCVs and driver cmpliance with EU rules n driving times, breaks and rest perids -

More information

L2L DRIVING SCHOOL. Portfolio. Company Driver Assessments & Risk Management WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY

L2L DRIVING SCHOOL. Portfolio. Company Driver Assessments & Risk Management WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY Cmpany Driver Assessments & Risk Management Prtfli WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY L2L DRIVING SCHOOL Learners T License Driving Schl Intrductin At Learners t License we pride urselves in assisting

More information

ENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100%

ENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100% ENDEAVOUR TO ACQUIRE ETRUSCAN 45% MINORITY INTEREST WITH PREMIUM CASH AND SHARE OFFER TO OWN 100% June 28, 2010 Halifax, Nva Sctia and Gerge Twn, Grand Cayman, June 28, 2010 - Etruscan Resurces Inc. (

More information

Transparency in the Mining Sector Taxes and Value Distribution

Transparency in the Mining Sector Taxes and Value Distribution Transparency in the Mining Sectr Taxes and Value Distributin A presentatin by Edward Bickham 17 April 2014 Senir Adviser, Gld fr Develpment, Wrld Gld Cuncil UKSIF and Sustainalytics Seminar Edinburgh Transparency

More information

Mining the Territory. 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gold Pour from Edna Beryl

Mining the Territory. 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gold Pour from Edna Beryl 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gld Pur frm Edna Beryl 19 February 2018.Restructure f the JV with Evlutin (NT) 10 April 2018..High grade Cbalt, Cpper and Gld at Jasper

More information

Texas Christian University Policy

Texas Christian University Policy Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines

More information

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings Prpsed Changes t Ontari s Building Cde Summer and Fall 2017 Cnsultatin: Electric Vehicle Charging in Multi-Unit Residential Buildings Purpse T prvide infrmatin n prpsed changes t the Building Cde regarding

More information

LKQ CORPORATION (Exact name of registrant as specified in its charter)

LKQ CORPORATION (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 8-K Current Reprt Pursuant t Sectin 13 r 15(d) f The Securities Exchange Act f 1934 Date f Reprt (Date f earliest event reprted):

More information

Underground Storage Tank Management Practices

Underground Storage Tank Management Practices Prgram #: Envirnmental Management Prgram Revisin # 1.0 Implementatin Date 1/30/08 Page #: 1 f 13 Authr: Envirnmental Prgrams Apprval: W. Brewer Undergrund Strage Tank Management Practices 1.0 Purpse /

More information

Step-out drilling following up on previous intercepts on 800m spaced sections (refer to ASX release dated 19 June 2018) includes:

Step-out drilling following up on previous intercepts on 800m spaced sections (refer to ASX release dated 19 June 2018) includes: ASX ANNOUNCEMENT & MEDIA RELEASE 30 January 2019 QUARTERLY REPORT FOR THE PERIOD ENDING 31 December 2018 Alicant Minerals Ltd ( Alicant r the Cmpany ) (ASX: AQI) is pleased t prvide its quarterly activities

More information

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin

More information

POSITIVE PRELIMINARY PIT OPTIMISATION AND METALLURGY RESULTS FOR MAKABINGUI GOLD PROJECT, SENEGAL. Highlights. 31 October 2013

POSITIVE PRELIMINARY PIT OPTIMISATION AND METALLURGY RESULTS FOR MAKABINGUI GOLD PROJECT, SENEGAL. Highlights. 31 October 2013 Bassari Resurces Limited is an Australian listed cmpany fcused n discvering multimillin unce gld depsits in the Birimian Gld Belt, Senegal, West Africa. FAST FACTS ASX Cde BSR Issued Capital 771,319,369

More information

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

ADVISORY: General Motors Upfitter Integration  Bulletin #108d P a g e 1 May 18, 2016 Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:

More information

Hawthorn Resources Limited March 2011 Quarterly Report

Hawthorn Resources Limited March 2011 Quarterly Report Hawthrn Resurces Limited Quarterly Activities Reprt MARCH 2011 ASX Release 29 April 2011 ABN 44 009 157 439 Hawthrn Resurces Limited Level 2, 90 William Street Melburne VIC 3000 Australia Tel: +61 3 9605

More information

Franchised Hauler Exemption for Recycling Application

Franchised Hauler Exemption for Recycling Application Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler

More information

Route Sheet Guidelines

Route Sheet Guidelines Fairfax VA H.O.G. Chapter Rute Sheet Guidelines THIS DOCUMENT IS A WORK IN PROGRESS AND IS NOT FOR GENERAL DISTRIBUTION. ANY INTERIM USE BY AN OFFICER OR VOLUNTEER OF FAIRFAX VA CHAPTER H.O.G. IS FOR THE

More information

{EMS Shock} Student Name: Period:

{EMS Shock} Student Name: Period: {EMS Shck} Student Name: Perid: 5 th Grade Engineering Pulleys Unit Rubric Lab #0016 Pulley Frame Pulley Frame: Student cnstructed the Pulley Frame t lab specificatins. Pulley Frame was nt apprved 0 pints

More information

3000-series Remote Start System with Keyless Entry. Owner's Guide

3000-series Remote Start System with Keyless Entry. Owner's Guide 3000-series Remte Start System with Keyless Entry Owner's Guide Cngratulatins Cngratulatins n the purchase f yur state-f-the-art remte start system with keyless entry. Reading this Owner s Guide prir

More information

Temporary Use and Vendor Stand Online Permit Submittal

Temporary Use and Vendor Stand Online Permit Submittal Temprary Use and Vendr Stand Online Permit Submittal A Temprary Use Permit is an pen-air small business that is there fr a limited time fr the uses listed belw. Temprary Use Duratin Extensin Agricultural

More information

Quarterly Production Summary

Quarterly Production Summary 30 Nvember 2018 Vast Resurces plc ( Vast r the Cmpany ) ly Prductin Summary Vast Resurces plc, the AIM listed mining cmpany with peratins in Rmania and Zimbabwe, presents its peratinal update and prductin

More information

Multiple +1% Copper Intersections from Latest Chanape Drilling

Multiple +1% Copper Intersections from Latest Chanape Drilling 12 March 2014 Multiple +1% Cpper Intersectins frm Latest Chanape Drilling HIGHLIGHTS Assay results frm the latest drilling received with multiple znes f +1% Cu Intersectins include: 97m dwn-hle interval

More information

COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN. Financial Information for the Nine Months Ended September 30, 2010

COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN. Financial Information for the Nine Months Ended September 30, 2010 PRESS RELEASE Clermnt-Ferrand Octber 26, 2010 COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN Financial Infrmatin fr the Nine Mnths Ended September 30, 2010 2010 Nine-Mnth Net Sales Up 19.4% t 13 Billin

More information

Pre-Planning Delivery Guide

Pre-Planning Delivery Guide Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur

More information

DriveCam Unit Installation Instructions

DriveCam Unit Installation Instructions DriveCam Unit Installatin Instructins Installatin f the DriveCam Unit is nt cmplicated, thugh care must be taken t avid specific prblems. Sme vehicles require additinal cnsideratin t determine the ptimum

More information

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS 120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was

More information

Options to Expand the Current O-Train Service & to Provide Service on the Local VIA Route to Fallowfield Technical Memo

Options to Expand the Current O-Train Service & to Provide Service on the Local VIA Route to Fallowfield Technical Memo DOCUMENT 3 Octber 2008 Optins t Expand the Current O-Train Service & t Prvide Service n the Lcal VIA Rute t Fallwfield Technical Mem One f the findings f the Mayr s Task Frce n Transprtatin Reprt, as well

More information

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY Dc N: DRIVING Issue Date JAN 1995 Revisin Versin Revisin N. 02 Next Revisin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance

More information

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375 GLOBAL LIFT CORP Owner s Manual Rtatinal Series R-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 ROTATIONAL SERIES POOL LIFTS R-375

More information

Memorandum. Recommendations: 1.0 Background monitoring and recommendations

Memorandum. Recommendations: 1.0 Background monitoring and recommendations Memrandum T: Bassett Creek Watershed Management Cmmissin Recmmendatins: 1. Perfrm additinal mnitring f Schaper Pnd in 2018 including water quality mnitring lngitudinally thrugh the pnd, a bathymetric survey,

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Persn Requesting Review Applicatin Date: Name: Address: City/State/Zip:

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Permit# _ Persn Requesting Review Applicatin Date: Name: Address:

More information

Traffic Impact Statement and Vehicle Access Guideline

Traffic Impact Statement and Vehicle Access Guideline TABLE OF CONTENTS 1 TRAFFIC IMPACT STATEMENT AND VEHICLE ACCESS GUIDELINE... 2 1.1 TRAFFIC IMPACT STATEMENT... 2 1.2 VEHICLE ACCESS... 3 1.3 OCCASIONAL ACCESS... 3 1.4 REGULAR ACCESS MAJOR ROAD NETWORK...

More information

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events STE 120 HE ALTH CARE AGENCY/PUBLIC HE ALTH ENVIRONMENTAL HEALTH Prepackaged Fd Bths with Open Sampling r Beverage Dispensing at Cmmunity Events WHY THIS INFORMATION IS IMPORTANT A temprary fd bth, r hw

More information

EnergyBar 6. Setup Guide

EnergyBar 6. Setup Guide EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers

More information

E+ Battery Care Guide

E+ Battery Care Guide Electric Mtin Systems, LLC 45150 Business Curt, Suite 300 Dulles, VA 20166 USA E+ Battery Care Guide Welcme! Yur E+ Hub Battery Pack is a pwerful, sphisticated, and imprtant part f yur E+ Electric Bicycle.

More information

GLOBAL LIFT CORP Owner s Manual

GLOBAL LIFT CORP Owner s Manual GLOBAL LIFT CORP Owner s Manual 39 N. Caseville Rad PO Bx 559 Pigen, MI 48755 Tll Free: 866-712-0606 Fax: 989-453-3050 www.glballiftcrp.cm Page 1 COMMERCIAL SERIES POOL LIFTS C-350 ~ C-450 ~ C-550 TABLE

More information

Virginia s UST Compliance Program VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

Virginia s UST Compliance Program VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Virginia s UST Cmpliance Prgram BET TY LAMP OFFICE OF SPILL RESPONSE AND REMEDIATION VIRGINIA DEQ Revised Federal UST Regulatin Published in the July 15, 2015 Federal Register Effective Octber 13, 2015

More information

Twin Bonanza Gold Camp Discovery Success:

Twin Bonanza Gold Camp Discovery Success: QUARTERLY REPORT Fr the 3 Mnths Ended 31 March 2012 CORPORATE Strng Cash Psitin 31st March 2012 >$26 Millin. Share Placement and Optin Exercise fr net prceeds f $18.73 Millin. BUSINESS GOLD EXPLORATION

More information

PREFERRED RELIABILITY PRACTICES. Practice:

PREFERRED RELIABILITY PRACTICES. Practice: PREFERRED RELIABILITY PRACTICES PRACTICE NO. PD-EC-1103 PAGE 1 f 6 Octber 1995 Ni-Cd CONVENTIONAL SPACECRAFT BATTERY HANDLING AND STORAGE Practice: Flight prjects develp and implement handling and strage

More information

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375 GLOBAL LIFT CORP Owner s Manual Superir Series Prfrmance Series S-350 / P-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 SUPERIOR

More information

PSS INSTALLATION INSTRUCTIONS

PSS INSTALLATION INSTRUCTIONS PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd

More information

ABTQ-103 rev 01 Last review:

ABTQ-103 rev 01 Last review: INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH PCS Cntrl Statin Purpse f Instructins Wrking in hazardus areas, the safety f persnnel and plant depends n cmplying with all relevant safety

More information

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS ENFCEMENT ON PRIVATE PROPERTY BY AUTHIZED CITY BY-LAW ENFCEMENT OFFICERS T: Supervisr f Parking Services, City f Brantfrd: I, Of Name (print) Municipal Address (print) Brantfrd, ON Psitin (print) Type

More information

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS Purpse The purpse f this Plicy is t ensure the safety f emplyees wh transprt students t schl authrized events and thse students being transprted.

More information

PRE-PLANNING & DELIVERY GUIDE

PRE-PLANNING & DELIVERY GUIDE TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time

More information

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins

More information

Proposed Supplemental Agreement #1 FCC Recycle Processing Services Contract

Proposed Supplemental Agreement #1 FCC Recycle Processing Services Contract Memrandum DATE February 20, 2019 CITY OF DALLAS TO Hnrable Members f the Quality f Life, Arts & Culture Cmmittee: Sandy Greysn (Chair), Mark Claytn (Vice Chair), Rickey D. Callahan, Jennifer S. Gates,

More information

RICHARD L. OREAIR & CO. Safety Management System

RICHARD L. OREAIR & CO. Safety Management System SAFETY Dc N: Revisin Date: Revisin N. 2 Initial Versin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance with lcal regulatry

More information

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs Webinar: Ontari s 2012 Building Cde: Electric Vehicle Charging Presented by the Ministry f Municipal Affairs Ntice This presentatin is intended fr general infrmatin purpses related t electric vehicle charging

More information

Texas: Texas Transportation Code link: TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC

Texas: Texas Transportation Code link:  TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC Texas: Texas Transprtatin Cde link: http://www.statutes.legis.state.tx.us/?link=tn TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC (17) "Semitrailer" means a vehicle with r withut mtive pwer, ther than

More information

Onboarding Class Details and Travel Guide. Onboarding Better. Together.

Onboarding Class Details and Travel Guide. Onboarding Better. Together. Onbarding Class Details and Travel Guide Onbarding Better. Tgether. Onbarding Class Details and Travel Guide Table f Cntents Reference this guide fr the fllwing infrmatin: Class details by lcatin McLean

More information

ASX Announcement and Media Release KALAMAZOO PROCEEDS WITH PURCHASE OF THREE HIGHLY PROSPECTIVE GOLD PROJECTS IN WA S PILBARA

ASX Announcement and Media Release KALAMAZOO PROCEEDS WITH PURCHASE OF THREE HIGHLY PROSPECTIVE GOLD PROJECTS IN WA S PILBARA ASX Annuncement and Media Release 17 April 2018 KALAMAZOO PROCEEDS WITH PURCHASE OF THREE HIGHLY PROSPECTIVE GOLD PROJECTS IN WA S PILBARA HIGHLIGHTS: Kalamaz t prceed with the purchase f three highly

More information

ACCESSORY DWELLING UNITS (ADU)

ACCESSORY DWELLING UNITS (ADU) ACCESSORY DWELLING UNITS (ADU) San Francisc Public Wrks: Bureau f Street Use & Mapping Bureau f Urban Frestry Overview San Francisc Public Wrks Cde (SFPW) gverns permit requirements fr wrk in the public

More information

SOMSAS Student User Manual Overseas Short Term Programs

SOMSAS Student User Manual Overseas Short Term Programs SOMSAS Student User Manual Overseas Shrt Term Prgrams Table f cntents WHAT IS SOMSAS? 2 CREATE A NEW APPLICATION 2 Shrt Term Prgram 3 ADD SUBJECTS TO YOUR APPLICATION 3 Hst Institutin Details 4 Partner

More information

General Faucet Installation Instructions

General Faucet Installation Instructions General Faucet Installatin Instructins Step 1: Psitin the Faucet Begin installing yur faucet by placing the gasket and faucet in psitin n the sink. (Diagram A) Frm under the sink, thread the plastic munting

More information

Comparison of Air Emission Standards

Comparison of Air Emission Standards Cmparisn f Air Emissin Standards CSSD Perfrmance Standards (Issued August 19, 2013) and Pennsylvania General Plan Apprval and/r General Operating Permit BAQ-GPA/GP-5 GP-5 (Issued February 1, 2013). 1/14/2014

More information

Mobile Delineator Safe Work Practice Template with Application for Approval

Mobile Delineator Safe Work Practice Template with Application for Approval Mbile Delineatr Safe Wrk Practice Template with Applicatin fr Apprval [Insert yur cmpany name and graphic, if desired. Expand space as required] [Insert yur cmpany dcument reference number, if desired.

More information

Report of the Service Director to the General Licensing Regulatory Board to be held on the 25 October 2017 ENFORCEMENT UPDATE. 1.

Report of the Service Director to the General Licensing Regulatory Board to be held on the 25 October 2017 ENFORCEMENT UPDATE. 1. Reprt f the Service Directr t the General Licensing Regulatry Bard t be held n the 25 Octber 2017 ENFORCEMENT UPDATE 1. Purpse f Reprt The purpse f this reprt, is t prvide Members with an verview f the

More information

Building an ADDITION to an existing residence

Building an ADDITION to an existing residence Building an ADDITION t an existing residence Obtaining a permit fr yur cnstructin is a prcess that invlves review and apprval by multiple agencies. Brward Cunty Develpment and Envirnmental Regulatin Divisin,

More information

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better? Slvent Filter What is a Slvent Trap, Slvent Recycler r Slvent Filter? It is a device attached t the end f a threaded barrel that cllects all f the slvent and debris as it is cleaned frm the barrel and

More information

Ethics and Campaign Filing. Shaun Adams, Esq. Associate Legislative Director ACCG Phone:

Ethics and Campaign Filing. Shaun Adams, Esq. Associate Legislative Director ACCG   Phone: Ethics and Campaign Filing Shaun Adams, Esq. Assciate Legislative Directr ACCG Email: sadams@accg.rg Phne: 404-576-9119 Overview Part I Review f the Filing Prcess Understanding the Exemptin Affidavit Electin

More information

Compliance Monitoring Procedure

Compliance Monitoring Procedure Cmpliance Mnitring Prcedure fr Rules f Participatin 4CDc_002a_Cmpliance Mnitring Prcedure_v1.0_en Versin: Nvember 2014 Index 1. Intrductin... 2 2. Type f requirements, Mnitring and Sanctins... 3 3. Annex1

More information

Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan Ford Customer Service Division

Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan Ford Customer Service Division David J. Jhnsn Frd Mtr Cmpany Directr P. O. Bx 1904 Service Engineering Operatins Dearbrn, Michigan 48121 Frd Custmer Service Divisin TO: All U.S. Frd and Lincln Dealers SUBJECT: Certain 2005-2006 Frd

More information

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 Guidelines fr Maintenance and Inspectin Prgrams fr Natural Gas and Prpane Appliances and their Fuel Features In Schls The Ontari Gas Utilizatin Cde states

More information

Estimating Economic Impacts of Energy Deployment National Association of State Energy Officials Regional Meeting David Keyser June 5, 2013

Estimating Economic Impacts of Energy Deployment National Association of State Energy Officials Regional Meeting David Keyser June 5, 2013 Estimating Ecnmic Impacts f Energy Deplyment Natinal Assciatin f State Energy Officials Reginal Meeting David Keyser June 5, 2013 NREL is a natinal labratry f the U.S. Department f Energy, Office f Energy

More information

WORLD COAL AUGUST VOLUME 20 NUMBER World Leader in Material Handling and Coal Preparation

WORLD COAL AUGUST VOLUME 20 NUMBER World Leader in Material Handling and Coal Preparation WORLD COAL AUGUST 2011 AUGUST 2011 - VOLUME 20 NUMBER 08 www.energyglbal.cm Wrld Leader in Material Handling and Cal Preparatin Smth peratins, n s r a L d i v Da., C n t r e t s e A.W. Chnes a simple US,

More information

C-BOA Tool Validation of Energy Savings Estimation Methods

C-BOA Tool Validation of Energy Savings Estimation Methods C-BOA Tl Validatin f Energy Estimatin Methds February 21, 2012 1 f 7 Table f Cntents Summary... 3 Recmmendatin... 3 Evaluatin Apprach... 3 Technical Advisry Grup Oversight... 3 Prject Specificatins...

More information

Investor Presentation

Investor Presentation 13 July 2017 Edna Beryl Mine Opening (NT) 20 December 2017 First Gld Pur frm Edna Beryl 19 February 2018.Restructure f the JV with Evlutin (NT) 10 April 2018..High grade Cbalt, Cpper and Gld at Jasper

More information

U.~ ANNUAL MEETING - JUNE Codend Mesh Selection Studies of Yellowtail Flounder Limanda ferruginea (Storer); F. E. Lux

U.~ ANNUAL MEETING - JUNE Codend Mesh Selection Studies of Yellowtail Flounder Limanda ferruginea (Storer); F. E. Lux INTERNATIONAL COMMISSION FOR Serial. N. 86 (D.c.S) ~, U.~ \".., THE RESTRICTED NORTHWEST ATLANTIC ASHERIES ICNAF Res. Dc.68/9l ANNUAL MEETING - JUNE 1968 Cdend Mesh Selectin Studies f Yellwtail Flunder

More information

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...

More information

TEAM INTRODUCTIONS. GARVER Matthew Youngblood - Project Manager / Bridge Lead Jenny Sallee - Roadway Lead Kirsten McCullough - Environmental Lead

TEAM INTRODUCTIONS. GARVER Matthew Youngblood - Project Manager / Bridge Lead Jenny Sallee - Roadway Lead Kirsten McCullough - Environmental Lead TEAM INTRODUCTIONS ODOT Paul Rachel - Divisin 3 Engineer Siv Sundaram - Envirnmental Prgrams Sctt Sundermeyer - Cultural Resurces Nick Grank & Diana Barlw - Right-f-Way & Utilities Frank Resler III - Public

More information

Ann Arbor Station Environmental Review

Ann Arbor Station Environmental Review Ann Arbr Statin Envirnmental Review Leadership Advisry Grup May 13, 2015 Agenda Prject Update Review f Activities 2 ~ Last meeting September 15 (Site Tur) ~ Eliminatin f Nrth Main Street (Build Alternative

More information

BEFORE THE SURFACE TRANSPORTATION BOARD FINANCE DOCKET NO ARKANSAS ELECTRIC COOPERATIVE CORPORATION PETITION FOR DECLATORY ORDER

BEFORE THE SURFACE TRANSPORTATION BOARD FINANCE DOCKET NO ARKANSAS ELECTRIC COOPERATIVE CORPORATION PETITION FOR DECLATORY ORDER BEFORE THE SURFACE TRANSPORTATION BOARD FINANCE DOCKET NO. 35305 ARKANSAS ELECTRIC COOPERATIVE CORPORATION PETITION FOR DECLATORY ORDER Reply Verified Statement Of Thmas D. Crwley President L.E. Peabdy

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid March May 2018 Infrmatin Paper Reference: CRU/18/121 Date Published: 26/07/2018 Clsing

More information

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm) Hw t Install the Batteries Hw t Hld the Lamp: The InteliEnergy Lamp selectin switches utilize the same technlgy as cell phnes: Capacitive Tuch. This assures the ultimate in lngevity because there are n

More information

NIEVS PROJECT. First Registration Support Document Version 1.0

NIEVS PROJECT. First Registration Support Document Version 1.0 NIEVS PROJECT First Registratin Supprt Dcument Versin 1.0 CONTENTS CONTENTS... 2 INTRODUCTION... 3 SCOPE OF DOCUMENT... 3 FIRST REGISTRATION MIGRATION ACTIVITIES... 4 AFRL... 4 V55 MIGRATION... 4 SOM...

More information

Application of size, weight, and load limitations for vehicles -- Exceptions.

Application of size, weight, and load limitations for vehicles -- Exceptions. Utah Vehicle Cde 41-1a-102. Definitins. As used in this chapter: (10) "Cmmercial vehicle" means a mtr vehicle, trailer, r semitrailer used r maintained fr the transprtatin f persns r prperty that perates:

More information