1 ( pages) ICM Prject Statin Infrastructure and Equipment Statins Switchgear Transfrmer Statins Segment Trnt Hydr Electric System Limited (THESL)

2 I EXECUTIVE SUMMARY 0. Prject Descriptin Switchgear perating at.kv in many dwntwn Transfrmer Statins (TS) are past the end f their useful lives and rely n bslete technlgy such as brick and mrtar enclsures, nn arc resistant designs with air blast r air magnetic circuit breakers and mechanical relays and are in pr cnditin (See Sectin II, ). The existing nn arc resistant switchgear des nt channel the energy released during an internal arc fault t minimize ptential injury t persnnel and minimize damage t surrunding equipment. As a result, this switchgear can cause damage that impacts the entire statin, interrupting service t thusands f custmers. This equipment has been kept in service via increased maintenance, custm fabricatin and harvesting parts frm spares. The asset cnditin cntinues t deterirate and safety cncerns are increasing. Switchgear requiring replacement in 0, 0, and 0 include the A T switchgear at Strachan TS, A E switchgear at Carlaw TS, A W and A W switchgear at Wiltshire TS, A WR switchgear at Windsr TS and A DX at Duplex TS. All but ne f these are mre than years ld. The ttal cst f this segment is apprximately $. millin fr the jbs shwn in Table 0 Table : Jb Csts Estimate Jb Title Year Custmer Jb Year Cst Number Installed Lad Estimate Served ($M) (MVA) Strachan TS A switchgear 0 0. replacement preparatin Strachan TS A switchgear 0. replacement

3 Estimate Jb Title Year Custmer Jb Year Cst Number Installed Lad Estimate Served ($M) (MVA) S0 Strachan TS Lad Transfer frm A T t A T Switchgear Carlaw TS A E switchgear 0. replacement 0 Wiltshire TS A W switchgear replacement Wiltshire TS A W 0. switchgear replacement Windsr TS A WR 0. switchgear replacement 0 Duplex TS A DX switchgear 0. replacement Ttal. These switchgear were selected fr replacement based n the fllwing cnsideratins: Obslescence (brick structures, nn arc resistant design, bslete breakers) Age Cnditin Space available fr transitin switchgear, and Statin egress fr cabling All the switchgear listed are t be replaced with,000a air insulated, arc resistant type C switchgear with duble bus, duble breaker r breaker and half cnfiguratin except Duplex

4 switchgear which will be replaced with gas insulated switchgear (GIS) due t space cnstraints. These switchgear will be fitted with mdern vacuum circuit breakers and digital relays.. Why the Prject is Needed Nw 0 Mst f the equipment prpsed fr replacement is ver 0 years ld ( years n average) and well past their design useful life. THESL has been able t cntinue perating this equipment because it has paid particular attentin t equipment maintenance and has had veteran statin mechanics ver the years that have been able t harvest spare equipment fr parts that are n lnger manufactured. In sme cases, THESL has been frced t custm fabricate certain parts which is expensive, unreliable, and unsustainable. The cst t repair bslete equipment using custm fabricated parts is mre than twice the cst when spare parts are supplied by manufacturers. THESL has had several incidents f internal arc faults in its nn arc resistant switchgear. Fr example, an internal arc fault at Terauley TS in 00 resulted in an explsin in the circuit breaker cmpartment and caused the frnt dr t fly away frm its munts as shwn in Figures and, damaging ther equipment in the vicinity. Frtunately n THESL persnnel were in the vicinity when the explsin ccurred.

5 Figure : [00] Pthead failed inside Terauley TS switchgear Figure : [00] Impact f internal arc fault in a switchgear Internal arc faults can be destructive because f the energy levels reached within the cnfined cmpartment. The risk f this type f event n nn arc resistant switchgear increases as switchgear ages. This incident resulted in a lss f service t, custmers fr hurs.

6 The asset cnditin assessment fr switchgear have cnfirmed that their cnditin is categrized as pr, based n the 00 Kinetrics study reprt. That reprt recmmends that switchgear in the pr categry be replaced within three years. 0 In additin t the cnsequences f in service failures, the existing circuit breakers in all f the switchgear, except Duplex TS, are air blast circuit breakers which are bslete. These breakers have much higher maintenance csts. The maintenance f air blast circuit breakers is labur intensive and takes at least twice as lng as mdern vacuum circuit breaker. Replacement parts fr the air blast circuit breakers are n lnger manufactured, and they must be custm manufactured when required. In additin, the air supply systems assciated with the air blast breakers have als reached end f life. At least ne air supply system ut f a ppulatin f fails per year and the average cst f repair is $,000 per incident n tp f the planned maintenance which csts $,00 per year per statin.. Why the Prject is the Preferred Alternative 0 THESL cnsidered the fllwing ptins, which are fully discussed in Sectin IV: ) Cntinue t maintain and perate the existing equipment ) Transfer lad t adjacent TS ) Replace Existing Switchgear with an Arc Resistant Design and Vacuum Breakers Optin is essentially a run t failure scenari with replacement f existing switchgear when failure ccurs. This ptin has the ptential t defer capital investment, but replacement will eventually be required and will cst apprximately 0% mre if dne n an emergency basis. In the interim, the ptential fr damage t ther equipment and injury will remain (See Sectin IV, ). Given the age and cnditin f this switchgear and the difficulty in btaining spare parts, this ptin is nt preferred. 0 Optin is nt feasible because in rder t undertake a transfer, the receiving TS wuld require spare capacity, sufficient feeder psitins, and physical space fr additinal infrastructure. The

7 lcatin f the receiving statin wuld als need t be sufficiently clse t the lad centre t avid a vltage drp. These cnditins cannt be met fr any f the TS addressed by this segment (See Sectin IV, ). 0 Optin, which wuld install new arc resistant design switchgear and vacuum breakers is the preferred alternative because it ffers the fllwing benefits (See Sectin IV, ): Mitigate the safety risk t the perating persnnel and damage t equipment in the TS due t the arc resistant design f the switchgear. Minimize the maintenance and perating cst since the new switchgear will eliminate the air blast circuit breakers alng with the air supply system (air cmpressrs) whse maintenance cst is at least twice that f mdern vacuum circuit breakers. The cnfiguratin f the switchgear will als be duble bus duble breaker r breaker and half and this type f cnfiguratin cuts maintenance and perating time at least by half. Increase reliability because arc resistant switchgear with duble bus duble breaker r breaker and half cnfiguratin is mre reliable. In cntrast t the existing switchgear, the new switchgear will allw any circuit breaker t be taken ut f service withut requiring lad transfer. 0 Carrying ut immediate wrk n this asset class is expected t result in the avided estimated risk cst f apprximately $ millin, as ppsed t executing this wrk in 0 as shwn in the Business Case Evaluatin in Appendix. Therefre, there are ecnmic benefits t ratepayers fr executing this wrk nw. As a practical matter given available resurces, jbs are scheduled ver three years t allw engineering, prcurement, cnstructin and cmmissining and are clsely crdinated with feeder transfers t minimize custmer utages and limit single supply cntingency.

8 II DESCRIPTION OF WORK. Strachan TS A T Switchgear.. Jb Descriptin The bjective f these jbs is t design and install.kv switchgear t replace the existing A T switchgear at Strachan TS with 000A air insulated arc resistant type C switchgear with duble bus, duble breaker r breaker and half switchgear in Scpe f Wrk A T... Scpe f wrk in 0 Remve the existing decmmissined A T switchgear frm Building A Prepare the space vacated by the A T switchgear in Strachan TS building A t install new A T that will replace existing A T switchgear 0... Scpe f wrk in 0 Design, prcure, and purchase a new.kv, MVA, wire air insulated arc resistant type C switchgear and fit int the space vacated by A T switchgear Install, cmmissin and energize the new A T switchgear Crdinate with Hydr One n purchase, installatin and cmmissining f incming feeder cells and cnfiguring the new bus as wire

9 ... Scpe f wrk in 0 Transfer lad frm the existing A T switchgear t the new A T switchgear. Decmmissin the existing A T switchgear.. Jb Cst Table : Strachan TS Csts Jb Estimate Number Jb Title Jb Year Ttal Estimated Cst ($M) Strachan TS A T switchgear 0 0. replacement preparatin Strachan TS A T switchgear 0. replacement S0 Strachan TS Lad Transfer frm A T t A T Switchgear 0 0.0

10 Figure : Lcatin f Strachan TS

11 . Carlaw TS A E.. Jb Descriptin Carlaw TS A E The bjective f this jb is t cmplete the secnd part f a tw part replacement jb f the Carlaw TS A E switchgear. The first part f this jb invlved purchasing f the switchgear in 0. The secnd part invlves cmmissining f the new switchgear and the statin lad transfer frm the existing t the new switchgear in Scpe f Wrk A E Prepare drawings t cmmissin the switchgear Cmmissin and energize the new switchgear Transfer lad frm the existing A E t new A0 E switchgear Decmmissin and remve existing A E switchgear.. Jb Csts Table : Carlaw TS Csts Jb Estimate Number Jb Title Jb Year Ttal Estimated Cst ($M) 0 Carlaw TS A E switchgear 0. replacement 0

12 Figure : Lcatin f Carlaw TS. Wiltshire TS A W and A W Switchgear 0.. Jb Descriptin The bjective f these jbs is t design, purchase and install.kv switchgear t replace the bslete A W and A W switchgear at Wiltshire TS with 000A air insulated arc resistant type C switchgear with a breaker and half cnfiguratin in 0, and 0, respectively. Preparatin f flr space in Building A is required t accmmdate the new switchgear in place f the decmmissined switchgear.

13 0.. Scpe f Wrk A W Design the prpsed new A W switchgear t fit int the space that is currently ccupied by the bslete A W switchgear Prcure and purchase a new.kv, MVA, wire, air insulated, arc resistant type switchgear and replace the aging and bslete A W ( wire) switchgear Prepare the flr space where the decmmissined A W was lcated t make space fr installatin f the prpsed A W switchgear Mdify and/ r cnstruct any necessary civil infrastructures within Wiltshire statin prperty bundary t facilitate the feeder transfer frm the existing and bslete A W switchgear t the prpsed new switchgear A W Install and cmmissin the new A W switchgear Crdinate with Hydr One t prvide supprt fr relcatin f the HONI incming LV supply cables frm the existing lcatin t the new switchgear lcatin Energize and transfer lad frm the A W t the new A W switchgear Decmmissin and remve the A W switchgear 0.. Scpe f Wrk A W Design the prpsed new A W switchgear t fit int the space that is currently ccupied by the bslete A W switchgear Prepare the flr space by remving the decmmissined A W t make space fr installatin f the prpsed A W switchgear Prcure and purchase a new.kv, MVA, wire, air insulated, arc resistant type switchgear t replace the aging and bslete A W ( wire) switchgear Install and cmmissin the new A W switchgear Transfer lad frm the existing A W switchgear t the new A W switchgear Crdinate with Hydr One t prvide supprt fr relcatin f the HONI incming LV supply cables frm the existing lcatin t the new switchgear lcatin Decmmissin the A W switchgear and remve the brick structure frm Wiltshire TS

14 .. Jb Csts Table : Wiltshire TS Csts Jb Jb Title Jb Ttal Cst Estimate Year ($M) Number 0 Wiltshire TS A W switchgear replacement 0.0 WiltshireTS A W switchgear replacement 0. Figure : Lcatin f Wiltshire TS

15 . Windsr TS A WR Switchgear.. Jb Descriptin The bjective f this sjb is t replace the existing A WR switchgear at Windsr TS with 000A air insulated, arc resistant type C type switchgear with duble bus, duble breaker r breakerand half switchgear in Scpe f Wrk A WR Design the prpsed new A 0WR switchgear t fit int the space that is currently ccupied by the bslete A 0WR Decmmissin and remve the A 0WR nce lad is transferred t Bremner TS Prcure new.kv, MVA, wire, air insulated arc resistant type switchgear Install and cmmissin the new A 0WR switchgear Energize the A 0WR and transfer lad frm the A WR switchgear Crdinate with Hydr One n purchase, installatin and cmmissining f incming feeder cells and cnfiguring the new bus as wire Decmmissin and remve the existing A WR switchgear in Windsr TS building.. Jb Csts 0 Table : Windsr TS Csts Jb Estimate Number Jb Title Jb Year Ttal Estimated Cst ($M) Windsr TS A WR switchgear replacement 0.

16 Figure : Lcatin f Windsr TS. Duplex TS A DX Switchgear.. Jb Descriptin The bjective f this jb is t design and purchase new.kv 000A gas insulated switchgear (GIS) t replace the existing A DX switchgear in Scpe f Wrk A DX Design the prpsed A DX switchgear Prcure and purchase a new.kv, MVA, gas insulated switchgear Install and cmmissin the new A DX switchgear Transfer lad frm the existing A DX switchgear t the new A DX switchgear Crdinate wrk with Hydr One t migrate the HONI incming LV supply cables frm the existing switchgear t the new switchgear lcatin.

17 Decmmissin the A DX switchgear and remve it frm Duplex TS.. Jb Csts Table : Duplex TS Csts Jb Estimate Jb Title Jb Year Ttal Cst ($M) Number 0 Duplex TS A DX switchgear replacement 0. Figure : Lcatin f Duplex TS

18 III Need 0. Overview All the switchgear in this segment are nn arc resistant designs and past their useful lives. Nnarc resistant designs d nt cntain the energy released during fault cnditins. When an internal arc fault ccurs in this type f switchgear, the energy released has the ptential t damage adjacent equipment and pse ptential safety risks t persnnel wrking in the vicinity. Even thugh statin wrkers are nt present inside statins n a daily basis, they d mnthly rutine inspectins in all THESL statins and d planned maintenance and capital wrk in statins. If an internal arc fault ccurs while statin wrkers are in the vicinity there is a ptential that a wrker culd be injured. A catastrphic failure als increases the severity f cllateral damage t adjacent equipment and culd ptentially cause a cmplete statin utage. The prbability f failure cntinues t increase with time as the cnditin f the equipment cntinues t deterirate. Table prvides the impact resulting frm the failure f ne switchgear and the impact resulting frm a whle statin utage frm cllateral damage. The impact is presented in terms f lad at risk and expected duratin f utage. Table : Lad at Risk and Duratin Substatin Name Failure f One Switchgear Lad at Risk Duratin(hurs) (MVA) Failure f the Entire Substatin Lad at Risk Duratin (hurs) (MVA) Strachan TS Carlaw TS Wiltshire TS 0 0 Duplex TS Windsr TS 0 Failure f any switchgear is expected t result in extended utages given that the lading and cnditin f the ther switchgear within the statin limits the ability t pick up the lad.

19 Table belw includes a list f substatins in the area and the spare capacity. Table : Substatins with Spare Capacity % Rated Peak Available Name f Supprting (MVA) Lad Capacity In Statin Substatin Substatin Name Capacity (MVA) Supprting Substatin (MVA) Strachan TS Dufferin TS Carlaw TS Gerrard TS and Main TS Wiltshire TS 0 Dufferin TS Duplex TS Glengrve TS and Leaside TS Windsr TS 0 0 Terauley TS 0 In additin t being nn arc resistant design, the existing circuit breakers that are fitted in these switchgear are f air blast type (with the exceptin f Duplex), and are bslete. The maintenance fr this type f circuit breaker is labur intensive. Replacement parts fr the air blast circuit breakers are n lnger manufactured. Any parts required must be custm manufactured and are btained at high cst. The air blast system has additinal $,00 maintenance cst per year t maintain the air supply system needed fr breaker peratin. In additin t the switchgear being nn arc resistant design, past their useful lives, and fitted with bslete air blast breakers, the replacement f switchgear included in this segment is als driven by the fllwing cncerns:. Strachan TS This switchgear was installed in. Frm the Asset Cnditin Assessment ( ACA ) update reprt in 0 and 0, these switchgear were assigned a Health Index (HI) f (ut f 00) which is cnsidered in the Pr categry as per the Asset Cnditin Assessment ( ACA ) f

20 00. As per Kinetrics s recmmendatin, switchgear in pr categry shuld be replaced within the next three years. If the A T switchgear fails MVA f lad will be lst 0. Carlaw TS The A E switchgear was installed in. Frm the Asset Cnditin Assessment ( ACA ) update reprt in 00, the A E switchgear has a (ut f 00) which is cnsidered as pr categry. As per Kinetrics s recmmendatin, switchgear in pr categry shuld be replaced within the next three years. The basic design f the switchgear is an pen brick structure. This design pses safety cncerns. While cntrls and PPE are in place t address risk, nnetheless, the nature f the equipment requires that during maintenance persnnel are expsed t live high vltage parts f the switchgear. During peratin, persnnel must stand clear since there is n barrier between them and the high vltage equipment. Unlike ther types f switchgear such as metal clad switchgear where the different parts f the switchgear are lcated inside a metal enclsure and are perated frm utside f the enclsure, the switchgear in an pen brick structure has t be pened first while it is live and then perated as shwn in Figure belw.

21 Figure : Carlaw TS.kV live parts f a switchgear in an pen brick structure If the A E switchgear fails MVA f lad will be lst. 0. Wiltshire TS The existing Wiltshire TS A W and A W switchgear were installed in. Frm the Asset Cnditin Assessment ( ACA ) update reprt in 0, these switchgear were assigned a Health Index (HI) f 0 and (ut f 00) respectively which is cnsidered in the Pr categry, which means they require replacement within three years. These switchgear are als in an pen brick structure with similar limitatins t thse at Carlaw TS. The Wiltshire TS switchgear supplies a large pumping statin, which is a critical custmer. If the A W r A W switchgear fails, MVA and 0 MVA lad will be lst, respectively. 0

22 . Duplex TS In additin t the age f the switchgear, there is additinal risk f the basement being flded with water frm the Hydr One deluge system which is lcated n the main flr abve the switchgear. T mitigate this risk, and t address the aging issue f the switchgear, THESL plans t replace in stages all the switchgear at Duplex TS which are lcated in the basement with water resistant, gas insulated switchgear (GIS). The A DX switchgear is the first t be replaced. If the A DX switchgear fails, MVA f lad will be lst. 0. Windsr TS The A WR switchgear was installed in. Frm the Asset Cnditin Assessment ( ACA ) update reprt in 0, Windsr TS A WR switchgear was assigned a Health Index (HI) f 0 (ut f 00) which is cnsidered in the Pr categry, and it needs replacement within three years. The Windsr TS switchgear supprts the financial district, which includes many large custmers. If the A WR switchgear fails, MVA f lad will be lst.

23 IV Preferred Alternative THESL cnsidered three alternatives: Cntinue t Maintain and Operate the Existing Equipment; Transfer lad t adjacent statins; and Replace the existing switchgear with arc resistant design. 0. Optin : Cntinue t Maintain and Operate the Existing Equipment This ptin is essentially a run t failure scenari with replacement f existing switchgear when failure ccurs. This ptin will defer capital investment but cntinuus repair f the switchgear will be required as it will cntinue t deterirate. This ptin is expected t result in: Decreased system reliability. N mitigatin f ptential safety risks t THESL persnnel Increased maintenance and perating csts Increased system reliability risk Increase risk f damaging equipment in the surrunding area in an eventful failure. It is estimated that replacement f switchgear under emergency cnditins versus planned equipment replacement will increase the csts by at least 0% Optin : Transfer Lad t Adjacent Statins Transferring lad frm the switchgear planned t be replaced t ther switchgear in the vicinity and decmmissin these switchgear was cnsidered. This ptin wuld defer mst f the capital investment required, if feasible. Fr this ptin t be feasible, fur cnditins need t be met: (a) The supprting switchgear must have spare capacity t take additinal lad. This cnditin cannt be met because there is nt enugh capacity at the receiving statins t accmmdate the required lad transfer. The receiving statins wuld be verladed when lad is transferred r will reach capacity shrtly as lad grws as shwn in Tables and belw.

24 0 (b) The supprting switchgear must have enugh feeder psitins t accept the transferred feeders. This cnditin cannt be met fr all f the switchgear prpsed t be replaced. As shwn in Table, Gerrard TS, Main TS, and Terauley TS dn t have enugh spare feeder psitins t transfer lad frm Carlaw and Windsr TS, respectively. There are enugh feeder psitins in the receiving statins fr the rest f the switchgear prpsed t be replaced. Hwever, as discussed in the previus paragraph (a), there is insufficient available capacity in the receiving statins. (c) Physical space fr undergrund infrastructure must be available if lad is t be transferred t anther statin. THESL shares undergrund space with ther utilities such as Enbridge, Bell, Rgers, and Water and Sewer. Finding space t build undergrund infrastructure in rder t install cables t transfer the lad is challenging. (d) Vltage drp prblem des nt ccur as a result f lad transfer t neighbring statin. This cnditin cannt be met as the supplying statin will be far frm the lad center and vltage drp will be a prblem. Table : Switchgear Lad Transfer t switchgear within statin Switchgear t be Cnnected Lad t be % Lading at the Decmmissined Custmers transferred(mva) Receiving Statin(s) After Lad transfer Strachan TS A switchgear,0 Carlaw TS A E switchgear, 0 Wiltshire TS A W switchgear, Duplex TS A DX switchgear,0 Wiltshire TS A W switchgear 0, 0 00 Windsr TS A WR switchgear.

25 Table : Switchgear Lad Transfer t Neighbring Statin(s) Switchgear T be Lad t be Lad t be Cmbined Statins Decmmissined transferred (MVA) transferred t Percentage (%) Lading After Lad transferred Strachan TS A Dufferin TS 0 switchgear Carlaw TS A E switchgear Wiltshire TS A W switchgear Duplex TS A DX switchgear Wiltshire TS A W switchgear Gerrard TS, Main TS Dufferin TS, Bridgeman TS, Glengrve TS, Leaside TS, 0 Dufferin TS, Bridgeman TS 0 Windsr TS A WR Terauley TS 0 switchgear

26 Table : Number f feeder psitins required and available Switchgear Lad t be Number f Statin lad t be Number f available transferred frm feeders t be transferred t spare feeder psitins transferred Strachan TS A T switchgear Dufferin TS 0 Carlaw TS A E switchgear Gerrard TS and Wiltshire TS A W switchgear Main TS 0 Dufferin TS and Bridgemen TS Duplex TS A DX switchgear Glengrve TS and Wiltshire TS A W switchgear Leaside TS Dufferin TS and Bridgemen TS Windsr TS A WR Terauley TS switchgear 0. Optin : Replace the Existing Switchgear with Arc Resistant Design with Vacuum Breakers Replace existing switchgear with air insulated, arc resistant switchgear r gas insulated switchgear (GIS) with duble bus duble breaker r breaker and half cnfiguratin is recmmended. This ptin requires capital investment t replace the switchgear and is expected t: Mitigate the safety risk t the perating persnnel f THESL due t the arc resistant design f the switchgear. Arc resistant switchgear cntains the pressure due t internal arc fault and channels the energy thrugh the vents lcated n tp f switchgear. This is expected t mitigate the safety risk t persnnel and damage t equipment in the vicinity including causing utage t the whle statin. Minimize the maintenance and perating cst since the new switchgear will eliminate the air blast circuit breakers alng with the air supply system (air cmpressrs) whse

27 maintenance cst is at least twice that f mdern vacuum circuit breakers. The cnfiguratin f the switchgear will als be duble bus duble breaker r breaker and half and this type f cnfiguratin cuts the maintenance and perating time at least by half. Therefre, the verall maintenance and perating cst will be reduced. Increase reliability because switchgear that is arc resistant with duble bus duble breaker r breaker and half cnfiguratin is mre reliable. Unlike in the existing switchgear, any circuit breaker may be taken ut f service withut requiring lad t be transferred. 0 THESL cnsidered the fllwing five bus cnfiguratins fr this replacement ptin:.. Single bus Lwest cst Failure f bus r any circuit breaker results in shutdwn f entire statin Difficult t d any maintenance withut shutting dwn statin.. Duble bus, duble breaker 0 Has flexibility in permitting feeder circuit t be cnnected t either bus Either f the main buses can be taken ut f service at any time fr maintenance All switching is dne remtely Bus failure des nt remve any feeder circuits frm service High reliability, circuit is supplied frm either bus and circuit breaker Easier circuit breaker maintenance; any breaker can be taken ut f service fr maintenance withut interrupting the lad f a circuit. Mst expensive, each circuit has tw dedicated breakers.. Duble bus, single breaker Lw initial cst Switching is smewhat cmplicated Less flexible, failure f either the tie breaker r bus results in the switchgear ut f service Bus tie breaker failure takes entire statin ut f service 0.. Ring bus Lw initial cst

28 Flexible peratin during circuit maintenance, any breaker can be taken ut f service withut interrupting lad Each circuit requires ne circuit breaker Autmatic reclsing and prtective relaying circuitry is rather cmplex Fault in ne circuit takes tw breakers ut f service.. Breaker and a half 0 Mst flexible High reliability peratin Breaker and half per circuit All switching is dne remtely using circuit breakers Simple peratin Either main bus can be taken ut f service at any time Bus failure des nt remve any feeder circuits frm service Breaker failure f bus side remves nly ne circuit Breaker can be taken ut f service withut discnnecting lad 0 The tw types f bus cnfiguratins that are preferred are duble bus duble breaker and breaker and half cnfiguratins in rder t btain high reliability and flexibility in the heavily laded dwntwn area. Breaker and half cnfiguratin is hwever, preferable if existing circuits can be cnnected in a back t back setting, but this is nt always pssible in an existing statin with multiple switchgear. The egress f the feeders may make it difficult t rerute feeder cables t cnnect them back t back s switchgear cnfiguratin will be selected depending n the site. As such, the site specific cnditins dictate the bus architecture. 0.. Avided Risk Cst The recent Dufferin transfrmer statin utage in 00 assciated with a failed water deluge system prvides insight int ptential reliability impacts assciated with a cmplete statin utage. Ttal peak lad fr Dufferin TS n January, 00 was MW. In that case,, custmers were interrupted (CI) and withut service fr ver hurs resulting in,,0 custmer minutes f utage (CMO).

29 The anticipated effectiveness f the Switchgear TS replacement segment can be highlighted by determining hw much cst is avided by executing this wrk immediately as ppsed t executing in 0 as explained in the Business Case Evaluatin fund in Appendix. These avided csts include quantified risks, taking int accunt the assets prbability f failure, and multiplying this with varius direct and indirect cst attributes assciated with in service asset failures, including the csts f custmer interruptins, emergency repairs and replacement. 0 Carrying ut immediate wrk n this asset class is expected t result in the avided estimated risk cst f apprximately $ millin, as ppsed t executing this wrk in 0. Therefre, there are ecnmic benefits t ratepayers fr executing this wrk nw. As a practical matter given available resurces, jbs are scheduled ver three years t allw engineering, prcurement, cnstructin and cmmissining and are clsely crdinated with feeder transfers t minimize custmer utages and limit single supply cntingency. 0. Preferred Alternative Based n a cmparisn f the alternatives, replacement f existing switchgear is the preferred ptin based n reduced utage risk, technical viability and because it is the mst cst effective ptin.

30 Appendix Statins Switchgear TS Business Case Evaluatin (BCE) Prcess 0 The business case evaluatin (BCE) prcess invlves the calculatin f the net benefit f a capital jb and incrprates quantified estimated risk, which is calculated based upn the assets prbability and impact f failure. The prbability f asset failure is determined based upn the asset s age and cnditin. The impact f asset failure is derived based upn the varius direct and indirect cst attributes assciated with in service asset failures, including the csts f custmer interruptins, emergency repairs and replacement. The multiplicatin f the prbability and impact f asset failure respectively prvides the quantified estimated risk f asset failure.. Life Cycle Cst and Optimal Interventin Timing Results 0 Calculatin f the prbability f failure relies n the assets Hazard Distributin Functin ( HDF ), which represents a cnditinal prbability f an asset failing frm the remaining ppulatin that has survived up till that time. These functins are validated either directly by THESL r thrugh the assistance f asset life studies frm third party cnsultants. The impacts f failure are then quantified by accunting fr the direct csts assciated with the materials and labur required t replace an asset upn failure, as well as the indirect csts. These indirect csts wuld include the csts f custmer interruptins, emergency repairs and asset replacements. The final estimated risk cst is prduced that represents the prduct f a hazard rate functin fr the given asset and its crrespnding impact csts. Lastly, as shwn in Figure, the lifecycle cst is prduced, representing the ttal perating csts fr a new asset, taking int accunt the annualized risk and capital ver its entire lifecycle. The ptimal interventin time wuld then be the red marker at which the Equivalent Annualized Cst ( EAC ) is at its lwest.

31 New Asset Ttal Csts ($) Annualized Risk Cst Annualized Capital Cst Life Cycle Cst EAC Age (years) Figure : Typical Example f Optimal Interventin Time (New Assets) This EAC value frm the lifecycle cst curve wuld then need t be crss referenced against the ttal csts f the existing asset t determine ptimal replacement timing, as shwn by the green marker in Figure. This specific pint in time wuld indicate that the existing asset has reached its ecnmic end f life at years f age and requires interventin. Nte that fr the existing asset, there is n capital cst cmpnent, as this is a sunk cst. Therefre, the existing asset csts are cmprised exclusively f the estimated risks that are remaining. 0

32 Ttal Csts ($) New Asset Existing Asset Ttal Csts ($) years Age (years) Age (years) Annualized Risk Cst Annualized Capital Cst Life Cycle Cst EAC Risk Cst (Existing Asset) Optimal Interventin Time Figure : Typical Example f Optimal Interventin Time (Existing Assets) Nte that fr the example in Figure, shuld the asset be replaced prir t the year ptimal interventin time, this wuld represent a sacrificed life t the asset. Shuld the asset be replaced after the ptimal interventin time, this wuld represent an excess estimated risk.. Prject Evaluatin Results 0 The Statins Switchgear TS segment represents an in kind replacement prject in which the existing switchgear assets are being replaced with new standardized versins f thse assets, hwever the verall cnfiguratin assciated with this infrastructure remains the same. In kind prjects are evaluated by calculating the avided estimated risk cst f executing the prject immediately in 0 as ppsed t delaying it. Within the ICM applicatin, the deferral time has been set t 0, as this wuld represent the next available year when THESL may file a new Cst f Service EDR applicatin. In rder t calculate the avided estimated risk cst f perfrming a prject in 0 as ppsed t 0, the varius csts and benefits assciated with executing a prject in a particular year is taken int accunt. 0 When a prject analysis is undertaken, assets within the prject may be befre, at, r beynd their ptimal replacement time, thus sme assets will have sacrificed ecnmic life and thers

33 will have incurred excess risk. The cumulative sacrificed life and excess risk f the assets invlved becmes a cst against the prject, as shwn by the red curve in Figure. There may be benefits achieved by perfrming multiple asset replacements tgether as part f a linear prject, and typically these benefits wuld be weighed against the ttal csts in rder t prduce an verall prject net cst calculatin. Hwever, in this instance, the Statins Switchgear TS segment cnsists f targeted asset replacements being perfrmed acrss the City f Trnt, and therefre these benefits wuld nt be applicable. Therefre, the ttal Prject Net Cst is directly prprtinal t the ttal csts including sacrificed life and excess risk. 0 Nte that the Prject Net Cst in Figure is pltted with time, in years, as the abscissa and the ttal csts as the rdinate. As such, the minimum pint f this curve prvides the highest Net Prject Benefit and defines the ptimal year t execute the specific prject. Figure : Typical Example f Prject Net Benefit Analysis

34 The effectiveness f the Statins Switchgear TS prject can therefre be measured by calculating the ttal avided estimated risk cst f executing this wrk immediately in 0, as ppsed t waiting until 0. In rder t calculate the avided estimated risk cst, the Prject Net Cst in 0 is subtracted frm the present value f the Prject Net Cst frm 0. An example f this avided estimated risk cst is shaded in blue in Figure. 0 Since the ptimal year is the lwest pint n the graph in Figure, it means that estimated risk csts fr the prject assets in 0 will exceed the estimated risks that exist tday. By perfrming the wrk immediately as ppsed t waiting until 0, THESL can eliminate these estimated risks. Therefre, these avided csts represent the benefits f the in kind prject executin. The frmula fr this calculatin is detailed belw: Avided Estimated Cst = PV(PROJECT NET_COST (0)) PROJECT NET_COST (0) Where: PROJECT NET_COST (0): Represents the ttal prject net csts in 0. 0 PV(PROJECT NET_COST (0)): Represents the present value f ttal prject net csts in 0. Within the TS Switchgear segment, individual ptimal interventin timing results were calculated fr each f the switchgear TS assets, based upn the prcesses identified in Sectin.. Each f these assets may pssess an individual sacrificed life and an excess risk value, which are aggregated t prduce the verall Prject Net Cst year by year. 0 As nted in the frmula abve, this Prject Net Cst was then calculated fr all individual switchgear assets within this prject at years 0 and 0 respectively. Prject Net Csts quantified in 0 were brught back t a present value and the difference between this value and the Prject Net Cst quantified in 0 was taken as the Avided Estimated Risk Cst. The final results are prvided in Table belw:

35 Table : Summary f values used in the determinatin f Avided Estimated Risk Cst Business Case Element Estimated Cst (in Millins) Present Value f Prject Net Cst in 0 (PV(PROJECT NET_COST (0)) $. Prject Net Cst in 0 (PROJECT NET_COST (0)) $ 0.0 Avided Estimated Risk Cst = $.0 (PV(PROJECT NET_COST (0)) PROJECT NET_COST (0)) When this avided estimated risk cst is calculated as a psitive value, it means that estimated risk csts fr the jb assets in 0 will exceed the estimated risks that exist tday. By perfrming the wrk immediately as ppsed t waiting until 0, we can eliminate these estimated risks. Therefre, these avided estimated risk csts represent the benefits f jb executin.

Design Standard - Fume Hoods & Fume Hood Exhausts

Design Standard - Fume Hoods & Fume Hood Exhausts 1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an

More information

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents

More information

Hub/Remote Operations in version 3.0

Hub/Remote Operations in version 3.0 Hub/Remte Operatins in versin 3.0 In StckTrac Enterprise 3.0, the Hub and Remte perate quite a bit differently than they did in 2.0. In 2.0, the shps stred their business fr the day int daily files which

More information

C-BOA Tool Validation of Energy Savings Estimation Methods

C-BOA Tool Validation of Energy Savings Estimation Methods C-BOA Tl Validatin f Energy Estimatin Methds February 21, 2012 1 f 7 Table f Cntents Summary... 3 Recmmendatin... 3 Evaluatin Apprach... 3 Technical Advisry Grup Oversight... 3 Prject Specificatins...

More information

DriveCam Unit Installation Instructions

DriveCam Unit Installation Instructions DriveCam Unit Installatin Instructins Installatin f the DriveCam Unit is nt cmplicated, thugh care must be taken t avid specific prblems. Sme vehicles require additinal cnsideratin t determine the ptimum

More information

Installation Guide Contigo 6100

Installation Guide Contigo 6100 Installatin Guide Cmmercial Vehicle Prductivity and Security The is a high-perfrmance beacn designed fr cmmercial prductivity and security. It is ideally suited t installatins in delivery and service fleets

More information

E+ Battery Care Guide

E+ Battery Care Guide Electric Mtin Systems, LLC 45150 Business Curt, Suite 300 Dulles, VA 20166 USA E+ Battery Care Guide Welcme! Yur E+ Hub Battery Pack is a pwerful, sphisticated, and imprtant part f yur E+ Electric Bicycle.

More information

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator TECHNICAL SPECIFICATION SPC-4T Stirling Prcess Crygeneratr Reference 80 8044_00 Issue Date April 20, 2016 Stirling Crygenics is a registered trade name f DH Industries BV Fr mre infrmatin n the Stirling

More information

Methanol Recovery Systems

Methanol Recovery Systems Methanl Recvery Systems Methanl Recvery fr bidiesel is an imprtant part f the entire bidiesel prcess and invlves the highest cst f peratin fr a bidiesel plant. Only abut half f the methanl used is actually

More information

SAE Eco-Marathon. By Travis Moore, Nikolaus Glassy, John Gamble, and Abdulrahman Alshodokhi Team 14

SAE Eco-Marathon. By Travis Moore, Nikolaus Glassy, John Gamble, and Abdulrahman Alshodokhi Team 14 SAE Ec-Marathn By Travis Mre, Niklaus Glassy, Jhn Gamble, and Abdulrahman Alshdkhi Team 14 Prject Frmulatin and Prject Plan Dcument Submitted twards partial fulfillment f the requirements fr Mechanical

More information

PV-70 Remotely Operated Cryogenic Globe Valve Installation, Operation, and Maintenance Manual

PV-70 Remotely Operated Cryogenic Globe Valve Installation, Operation, and Maintenance Manual PV-70 Remtely Operated Crygenic Glbe Valve Installatin, Operatin, and NOTIC: Printed cpies are uncntrlled. Page 1 f 12 TABL OF CONTNTS 1. INSTALLATION... 2 2. OPRATION... 4 3. MAINTNANC... 4 4. PRSSUR

More information

EDBRO RIGID INCLINOMETER

EDBRO RIGID INCLINOMETER EDBRO RIGID INCLINOMETER RINC01 Installatin & Operating Instructins E5542 rev 1 (June 2010) Edbr PLC Nelsn Street, Bltn BL3 2JJ UK Tel: +44 (0) 120 4528888 Fax: +44 (0) 120 4531957 E-mail: pstmaster@edbr.cm

More information

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm) Hw t Install the Batteries Hw t Hld the Lamp: The InteliEnergy Lamp selectin switches utilize the same technlgy as cell phnes: Capacitive Tuch. This assures the ultimate in lngevity because there are n

More information

The Benefits of Coiled or Continuous Rod

The Benefits of Coiled or Continuous Rod The Benefits f Ciled r Cntinuus Rd Pr-Rd ciled rd prvides a superir alternative t cnventinal sucker rd fr bth reciprcating and PC pump systems. Remving almst all the cnnectins frm the rd string can substantially

More information

Tips & Technology For Bosch business partners

Tips & Technology For Bosch business partners Tips & Technlgy Fr Bsch business partners Current tpics fr successful wrkshps N. 35/2011 Gasline injectin Invented fr life Lambda sensr Knw-hw frm the market leader Bsch, innvative cmpany and wrld's largest

More information

Energy Infrastructure Modernization Act Transforming Illinois Electric Grid. RMAP Overview

Energy Infrastructure Modernization Act Transforming Illinois Electric Grid. RMAP Overview Energy Infrastructure Mdernizatin Act Transfrming Illinis Electric Grid RMAP Overview Passage f the Energy Infrastructure Mdernizatin Act ushers in a new era f utility service and cnsumer benefits 2 VISION

More information

72 Mustang Mach 1 tachometer cluster and gauge conversion

72 Mustang Mach 1 tachometer cluster and gauge conversion 72 Mustang Mach 1 tachmeter cluster and gauge cnversin Dated: 02-17-2009 (drafted by a Chevy persn wrking n his first Frd -nt gd-) The fllwing infrmatin pertains t hw I went abut cnverting the standard

More information

WORLD COAL AUGUST VOLUME 20 NUMBER World Leader in Material Handling and Coal Preparation

WORLD COAL AUGUST VOLUME 20 NUMBER World Leader in Material Handling and Coal Preparation WORLD COAL AUGUST 2011 AUGUST 2011 - VOLUME 20 NUMBER 08 www.energyglbal.cm Wrld Leader in Material Handling and Cal Preparatin Smth peratins, n s r a L d i v Da., C n t r e t s e A.W. Chnes a simple US,

More information

ACCESSORY DWELLING UNITS (ADU)

ACCESSORY DWELLING UNITS (ADU) ACCESSORY DWELLING UNITS (ADU) San Francisc Public Wrks: Bureau f Street Use & Mapping Bureau f Urban Frestry Overview San Francisc Public Wrks Cde (SFPW) gverns permit requirements fr wrk in the public

More information

Self Consumption in residential systems

Self Consumption in residential systems Self Cnsumptin in residential systems Brad Bassett Sr. Applicatin Engineer Jan 27, 2017 San Dieg, CA What is Self Cnsumptin? A direct grid tie system is where slar energy prduced, pwers the huse lads as

More information

Tools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar)

Tools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar) Tls Required Phillips Screw Driver (crner lamps) Flat Head Screw Driver (ptinal fr headlight cver) Pliers (handy t have) Electrical Tape Sturdy Cpper Wire (t use as a wire fish) 10mm Scket r Wrench (grund

More information

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better? Slvent Filter What is a Slvent Trap, Slvent Recycler r Slvent Filter? It is a device attached t the end f a threaded barrel that cllects all f the slvent and debris as it is cleaned frm the barrel and

More information

HANDLING AND STORAGE PRACTICE

HANDLING AND STORAGE PRACTICE PREFERRED RELIABILITY PRACTICES Practice N. PD-ED-1109 Page 1 f 5 Ni-H SPACECRAFT BATTERY HANDLING AND STORAGE PRACTICE Practice: Develp and implement handling and strage prcedures t ensure reliable peratin,

More information

ABTQ-103 rev 01 Last review:

ABTQ-103 rev 01 Last review: INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH PCS Cntrl Statin Purpse f Instructins Wrking in hazardus areas, the safety f persnnel and plant depends n cmplying with all relevant safety

More information

PSS INSTALLATION INSTRUCTIONS

PSS INSTALLATION INSTRUCTIONS PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd

More information

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), SERVICE REPLACES: Please discard ATV 07-02 dated 4/5/07 MODEL: PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), KFX700 (KSV700-A/B/C),

More information

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE 1. INTRODUCTION... 3 2. PRECAUTIONS... 3 3. INSPECTION UPON RECEIPT OF GOODS... 4 3.1 GENERAL... 4 3.2 VISIBLE DAMAGE... 4 3.3 CONCEALED DAMAGE...

More information

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

ADVISORY: General Motors Upfitter Integration  Bulletin #108d P a g e 1 May 18, 2016 Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:

More information

DISD NATHAN ADAMS ELEMENTARY SCHOOL

DISD NATHAN ADAMS ELEMENTARY SCHOOL TRAFFIC MANAGEMENT PLAN FOR DISD NATHAN ADAMS ELEMENTARY SCHOOL IN DALLAS, TEXAS DESHAZO PROJECT NO. 15235 Prepared fr: Masterplan 900 Jacksn Street, Suite 640 Dallas, Texas 75202 Prepared by: Texas Registered

More information

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change Technical Manual eluma Aluminum Frame LED Panels patents pending TM Technical Specificatins Subject t Change TABLE OF CONTENTS General Specificatins.. Page 3 Prfile Specificatins EL001.. Page 4 Prfile

More information

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS 120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was

More information

HYDRAULIC BEARING PULLER

HYDRAULIC BEARING PULLER HYDRAULIC BEARING PULLER Parag Ambre 1, Akash Muppid 2, Prf. Nitin Mre 3, Anil Birajdar 4, Sandip Barathe 4 1,2,4,5 BE Mechanical, Dr. D.Y. Patil Schl f Engineering, Pune. 3 Faculty, Dr. D.Y. Patil Schl

More information

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES Revised July 11, 2018 Prepared by: City f Elk Grve Public Wrks Department 1. INTRODUCTION BACKGROUND In 2002, the Public Wrks Department develped the

More information

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems! The HB Series Advantage SGS listed cnfirming t UL Standard 2108 & 8750 Certified t CSA Standard C22.2 N.9 LED Life f 50K+ hurs, under nrmal perating cnditins Lw wattage, lw heat, lw vltage (12DVC & 24VDC

More information

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first

More information

Economics of Energy Storage

Economics of Energy Storage Ecnmics f Energy Strage Travis Simpkins, PhD June 8, 2016 NREL is a natinal labratry f the U.S. Department f Energy, Office f Energy Efficiency and Renewable Energy, perated by the Alliance fr Sustainable

More information

Pre-Planning Delivery Guide

Pre-Planning Delivery Guide Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur

More information

/2017. Flexline rapid clamping systems with drive chain clamping element, T-slot and adjustment track

/2017. Flexline rapid clamping systems with drive chain clamping element, T-slot and adjustment track Traveling unit chain (adjustment track) in 3 lengths s in varius designs Mtr Advantages 8 different clamping elements 4 different T-slts 3 different adjustment tracks drive mtr and die mnitr attachable

More information

SEAT VALVES FEATURES. Cracking pressure depends on the area ratio of individual combination of spool and sleeve.

SEAT VALVES FEATURES. Cracking pressure depends on the area ratio of individual combination of spool and sleeve. SET VLVES FETURES Veljan Seat Valves are bdy type munting series VD4S and cartridge units series VCR. The cmplete range f cartridges - bdy munted VD4S and manifld munted VCR are sized frm /8 t 1 1/2 permit

More information

PRE-PLANNING & DELIVERY GUIDE

PRE-PLANNING & DELIVERY GUIDE TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time

More information

Genesys Certification Study Guide

Genesys Certification Study Guide Genesys Certificatin Study Guide Genesys Certified Prfessinal 8 System Cnsultant, iwd Slutin (GCP8 - CiWD) Exam Cde Type f Exam Number f Items GCP8-CiWD (Prmetric cde: GE0_809) Written, multiple-chice

More information

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved Hw t Sweat (Slder) Cpper Pipe By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t attach pieces f cpper pipe by sweating r sldering the metal tgether. This is a helpful skill

More information

GLOBAL LIFT CORP Owner s Manual

GLOBAL LIFT CORP Owner s Manual GLOBAL LIFT CORP Owner s Manual 39 N. Caseville Rad PO Bx 559 Pigen, MI 48755 Tll Free: 866-712-0606 Fax: 989-453-3050 www.glballiftcrp.cm Page 1 COMMERCIAL SERIES POOL LIFTS C-350 ~ C-450 ~ C-550 TABLE

More information

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs Webinar: Ontari s 2012 Building Cde: Electric Vehicle Charging Presented by the Ministry f Municipal Affairs Ntice This presentatin is intended fr general infrmatin purpses related t electric vehicle charging

More information

Generator/Loadbank Quick Connection Switchboard

Generator/Loadbank Quick Connection Switchboard / Generatr/Ladbank Quick Cnnectin Switchbard FS2-Series Generatr/Ladbank Quick Cnnectin Slutins Brchure www.apt-pwer.cm 433 N. 36 th Street Lafayette, IN 47905 (765) 446-2343 ALN: 516 Rev. 01 Standard

More information

City of San Luis Obispo Zoning Regulations December 2013

City of San Luis Obispo Zoning Regulations December 2013 City f San Luis Obisp Zning Regulatins December 2013 parking areas, parking f vehicles fr purpses f vernight camping r sleeping is prhibited by and shall be subject t enfrcement in accrdance with Chapter

More information

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm Website: www.vestil.cm 0317 DCR-205-DC, MANUAL DCR-205-XX-DC Pwered Drum Rtatrs

More information

Texas Christian University Policy

Texas Christian University Policy Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines

More information

General Faucet Installation Instructions

General Faucet Installation Instructions General Faucet Installatin Instructins Step 1: Psitin the Faucet Begin installing yur faucet by placing the gasket and faucet in psitin n the sink. (Diagram A) Frm under the sink, thread the plastic munting

More information

Installation Guide Contigo 6150 & 6151

Installation Guide Contigo 6150 & 6151 Installatin Guide Cntig 6150 & 6151 Cmmercial Vehicle Prductivity and Security The Cntig 6150 & 6151* (cllectively knwn as the Cntig 615X) are highperfrmance beacns designed fr cmmercial prductivity and

More information

EnergyBar 6. Setup Guide

EnergyBar 6. Setup Guide EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers

More information

Aviatrix GCloud Cloud Connect Startup Guide

Aviatrix GCloud Cloud Connect Startup Guide Clud Cntrller Startup Guide Aviatrix GClud Clud Cnnect Startup Guide Versin 10-16-2016 Cpyright 2014-2016 Aviatrix Systems, Inc. All rights reserved. Aviatrix Systems Page 0 GClud Cntrller Startup Guide

More information

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM PROGRAM OVERVIEW Ecnmic Vitality is a critical factr in ensuring Castle Rck s lng-term success and in achieving its Visin f being a Self-Sufficient

More information

LT-F Compact Treaded All Terrain Surveillance & Inspection Robot

LT-F Compact Treaded All Terrain Surveillance & Inspection Robot Rbts, Parts, and Custm Slutins www.superdridrbts.cm Tll Free: (866) SDRbts Phne: (919) 557-9162 Fax: 775-416-2596 1421 E. Brad Street #101 Fuquay Varina, NC 27526 LT-F Cmpact Treaded All Terrain Surveillance

More information

VYLEATER DAILY HOUSEKEEPING & PREVENTATIVE MAINTENANCE PROCEDURES. Follow these procedures to keep your Vyleater running smoothly.

VYLEATER DAILY HOUSEKEEPING & PREVENTATIVE MAINTENANCE PROCEDURES. Follow these procedures to keep your Vyleater running smoothly. VYLEATER DAILY HOUSEKEEPING & PREVENTATIVE MAINTENANCE PROCEDURES! WARNING! Failure t fllw these prcedures may cause an verlad cnditin that culd result in the Vyleater becming severely damaged. Fllw these

More information

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin

More information

Texas: Texas Transportation Code link: TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC

Texas: Texas Transportation Code link:  TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC Texas: Texas Transprtatin Cde link: http://www.statutes.legis.state.tx.us/?link=tn TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC (17) "Semitrailer" means a vehicle with r withut mtive pwer, ther than

More information

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By

More information

PARKING POLICY JULY 2012

PARKING POLICY JULY 2012 1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:

More information

PROJE CT-BASED LEARNING: ABS PLASTIC DERBY

PROJE CT-BASED LEARNING: ABS PLASTIC DERBY PROJE CT-BASED LEARNING: ABS PLASTIC DERBY Descriptin D yu remember the pine wd derby cars yu designed and built when yu were a child? D yu remember hw difficult it was t get the shape yu wanted in the

More information

MTU UP! Marek Hajduczenia, PhD.

MTU UP! Marek Hajduczenia, PhD. MTU UP! Marek Hajduczenia, PhD marek.hajduczenia@mybrighthuse.cm MTU in EPON (1) When 1G-EPON standard was first published, 802.3-2005 supprted MTU up t 1500B. Life was simple. 802.3-2008 added differentiatin

More information

BioWave Hydro DI-9200 User Manual

BioWave Hydro DI-9200 User Manual BiWave Hydr DI-9200 User Manual Assembling Hydr DI 9200: Assembling yur BiWave Hydr DI 9200, is a very shrt and simple prcess. All yu have t d is take the Hydr DI 9200 ut f the bx, make sure its standing

More information

Gearbox Installation Manual

Gearbox Installation Manual Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre

More information

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves)

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves) Truble Shting Guide fr AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves) AFVK-SP, AFVK-SP-H/L, AFVK-SP-MH/L AFVK-SP Series Valve Kit Truble Shting Guide (AF-4000 Series) TABLE OF CONTENTS General Infrmatin

More information

12V FRONT TERMINAL FLAT PLATE AGM/GEL BATTERY

12V FRONT TERMINAL FLAT PLATE AGM/GEL BATTERY 12V FRONT TERMINAL FLAT PLATE AGM/GEL BATTERY SEC - 12 - FTA/FTG inf@secbattery.cm / www.secbattery.cm SEC Industrial Battery C. Ltd. Battery Pr le DESIGN LIFE 12 year design life in flat service @ 25

More information

03-06 TJ Long Arm Upgrade Instructions

03-06 TJ Long Arm Upgrade Instructions Parts List: Instructins Irn Rck Off Rad lg decal (2) Irnrckffrad.cm decal (1) Belly skid plate 85046 (1) Left lng arm frame munt 85121 (1) Right lng arm frame munt 85122 (1) Left LCA munt gusset plate

More information

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375 GLOBAL LIFT CORP Owner s Manual Superir Series Prfrmance Series S-350 / P-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 SUPERIOR

More information

Lithium Battery Shipping Overview

Lithium Battery Shipping Overview Lithium batteries are used in many electrnic devices such as cameras, cell phnes, laptp cmputers, medical equipment and pwer tls. When shipping r imprting lithium batteries, including thse cntained in

More information

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375 GLOBAL LIFT CORP Owner s Manual Rtatinal Series R-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 ROTATIONAL SERIES POOL LIFTS R-375

More information

Route Sheet Guidelines

Route Sheet Guidelines Fairfax VA H.O.G. Chapter Rute Sheet Guidelines THIS DOCUMENT IS A WORK IN PROGRESS AND IS NOT FOR GENERAL DISTRIBUTION. ANY INTERIM USE BY AN OFFICER OR VOLUNTEER OF FAIRFAX VA CHAPTER H.O.G. IS FOR THE

More information

Minnesota Licensing and Registration System (MNLARS) Frequently Asked Questions

Minnesota Licensing and Registration System (MNLARS) Frequently Asked Questions Minnesta Licensing and Registratin System (MNLARS) Frequently Asked Questins The fllwing cntent was received frm the Minnesta Department f Public Safety in respnse t a request n Octber 12, 2017. Can I

More information

WELCOME. WEB LOCATION Los Angeles, CA

WELCOME. WEB   LOCATION Los Angeles, CA WELCOME Thank yu fr chsing AC Infinity. We are cmmitted t prduct quality and friendly custmer service. If yu have any questins r suggestins, please dn t hesitate t cntact us. Visit www.acinfinity.cm and

More information

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events STE 120 HE ALTH CARE AGENCY/PUBLIC HE ALTH ENVIRONMENTAL HEALTH Prepackaged Fd Bths with Open Sampling r Beverage Dispensing at Cmmunity Events WHY THIS INFORMATION IS IMPORTANT A temprary fd bth, r hw

More information

Presenter Tony Simon, Energy Engineer Energy/Facilities Connections Conference Leavenworth, WA May 2015

Presenter Tony Simon, Energy Engineer Energy/Facilities Connections Conference Leavenworth, WA May 2015 1 Pwer Factr Crrectin What is it Gd Fr? Presenter Tny Simn, Energy Engineer Energy/Facilities Cnnectins Cnference Leavenwrth, WA May 2015 Tny s Backgrund Aircraft Maintenance Backgrund FAA Airframe & Pwerplant

More information

Uninterruptible Current Supply USV V / 1.2 Ah

Uninterruptible Current Supply USV V / 1.2 Ah Uninterruptible Current Supply USV 011 +24 V / 1.2 Ah The USV 011 Uninterruptible current supply is used t buffer the +24 V supply f an Industry PC (C-IPC, SIPC). The +24 V supply is nrmally cnnected t

More information

Mobile Delineator Safe Work Practice Template with Application for Approval

Mobile Delineator Safe Work Practice Template with Application for Approval Mbile Delineatr Safe Wrk Practice Template with Applicatin fr Apprval [Insert yur cmpany name and graphic, if desired. Expand space as required] [Insert yur cmpany dcument reference number, if desired.

More information

3000-series Remote Start System with Keyless Entry. Owner's Guide

3000-series Remote Start System with Keyless Entry. Owner's Guide 3000-series Remte Start System with Keyless Entry Owner's Guide Cngratulatins Cngratulatins n the purchase f yur state-f-the-art remte start system with keyless entry. Reading this Owner s Guide prir

More information

MT Pressure Switch INSTALLATION AND OPERATING INSTRUCTIONS. Kaustubha Udyog (Orion Instruments)

MT Pressure Switch INSTALLATION AND OPERATING INSTRUCTIONS. Kaustubha Udyog (Orion Instruments) PRESSURE SWITCHES PRESSURE DIFFERENCE SWITCHES VACUUM SWITCHES Frm 1.5 mbar t 600 bar INSTALLATION AND OPERATING INSTRUCTIONS MT Pressure Switch Cnstructin The pressure switch is hused in a tugh Aluminium

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Permit# _ Persn Requesting Review Applicatin Date: Name: Address:

More information

You have a Chiller, Now What?

You have a Chiller, Now What? Yu have a Chiller, Nw What? Raschell Hickmtt Reginal Sales Manger Dimplex Thermal Slutins Klant Klers Brand Chillers Agenda This presentatin is develped t be a very brief and generic intrductin t anyne

More information

Multi Unit Residential Building Charging Program: Application Guide

Multi Unit Residential Building Charging Program: Application Guide Multi Unit Residential Building Charging Prgram: Applicatin Guide Updated May 13, 2016 A prgram funded by the Prvince f British Clumbia. We are pleased t annunce the Multi Unit Residential Building Charging

More information

{EMS Shock} Student Name: Period:

{EMS Shock} Student Name: Period: {EMS Shck} Student Name: Perid: 5 th Grade Engineering Pulleys Unit Rubric Lab #0016 Pulley Frame Pulley Frame: Student cnstructed the Pulley Frame t lab specificatins. Pulley Frame was nt apprved 0 pints

More information

Options to Expand the Current O-Train Service & to Provide Service on the Local VIA Route to Fallowfield Technical Memo

Options to Expand the Current O-Train Service & to Provide Service on the Local VIA Route to Fallowfield Technical Memo DOCUMENT 3 Octber 2008 Optins t Expand the Current O-Train Service & t Prvide Service n the Lcal VIA Rute t Fallwfield Technical Mem One f the findings f the Mayr s Task Frce n Transprtatin Reprt, as well

More information

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins

More information

Testing and Reporting Requirements for Linear Replacement Lamps

Testing and Reporting Requirements for Linear Replacement Lamps Testing and Reprting Requirements fr Linear Replacement Lamps The DLC defines all tube-style LED prducts that use the lamp hlders (i.e. sckets r tmbstnes) in the luminaire t mechanically r electrically

More information

Prior Authorization Criteria for Manual Wheelchairs to Change

Prior Authorization Criteria for Manual Wheelchairs to Change Prir Authrizatin Criteria fr Manual Wheelchairs t Change Infrmatin psted Octber 30, 2009 Effective fr dates f service n r after Nvember 1, 2009, prir authrizatin criteria fr manual wheelchairs will change

More information

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction I n t e r n a t i n a l T e l e c m m u n i c a t i n U n i n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU FG Distractin Versin 1.0 (03/2013) ITU-T Fcus Grup n Driver Distractin Reprt n Vehicle-t-Applicatins

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Persn Requesting Review Applicatin Date: Name: Address: City/State/Zip:

More information

SWP200 SERIES: PHOTOVOLTAIC KITS FOR WATER PUMPING

SWP200 SERIES: PHOTOVOLTAIC KITS FOR WATER PUMPING File ref.: KITswp0_ing Rev. 00-04.0 SWP0 SERIES: PHOTOVOLTAIC KITS FOR WATER PUMPING Water is ne f the few resurces, withut which mankind cannt d. Man has t supply with certain quantities f water in rder

More information

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified

More information

VALVE-REGULATED SEALED LEAD ACID BATTERY. FMJ GEL Series. High Performance. Product Guide

VALVE-REGULATED SEALED LEAD ACID BATTERY. FMJ GEL Series. High Performance. Product Guide VALVE-REGULATED SEALED LEAD ACID BATTERY FMJ GEL Series High Perfrmance Prduct Guide Cntents Intrductin...01 Technical Features...01 Applicatins...02 Certificatin...02 Standards...02 General Specificatins...02

More information

EnergyCell PLC Series. Owner s Manual

EnergyCell PLC Series. Owner s Manual EnergyCell PLC Series Owner s Manual Abut OutBack Pwer Technlgies OutBack Pwer Technlgies is a leader in advanced energy cnversin technlgy. OutBack prducts include true sine wave inverter/chargers, maximum

More information

Static Switches for their use on Capacitors Batteries connection

Static Switches for their use on Capacitors Batteries connection Static Switches fr their use n Capacitrs Batteries cnnectin Rger Camell, Quim López, Miquel Teixidó, Hectr Rivas, Antni Sudrià CITCEA UPC Barcelna, Spain Abstract Nwadays, mst f the Reactive Pwer Cmpensatin

More information

Frequently Asked Fleet Card Questions HuskyPRO Universal Fuel Card

Frequently Asked Fleet Card Questions HuskyPRO Universal Fuel Card Frequently Asked Fleet Card Questins HuskyPRO Universal Fuel Card General Fleet Card Accunt Questins Hw can the HuskyPRO Universal Fuel Card Prgram help me manage my business fleet fuel expenses? HuskyPRO

More information

Advanced 3 Million Wireless USB Limousine Underbody Kit

Advanced 3 Million Wireless USB Limousine Underbody Kit Advanced 3 Millin Wireless USB Limusine Underbdy Kit Warning: Please check yur state and lcal laws befre installing this LED underbdy kit. Every state has different plicies and prcedures in place regarding

More information

REACHING THE TARGETS. Figure 16 Guidebook Overview Map: Reaching targets and objectives. Coalition for Energy Savings

REACHING THE TARGETS. Figure 16 Guidebook Overview Map: Reaching targets and objectives. Coalition for Energy Savings II REACHING THE TARGETS Part II details the main elements f the EED, prviding a backgrund fr each f the subject areas, the requirements f the EED and recmmendatins fr effective implementatin and mnitring.

More information

MOTOR AND GENERATORS TEXTBOOK

MOTOR AND GENERATORS TEXTBOOK ALAN NGUYEN S MOTOR AND GENERATORS TEXTBOOK (SAMPLE) 1. Edisn vs Westinghuse Students: Analyse secndary infrmatin n the cmpetitin between Westinghuse and Edisn t supply electricity t cities. Actin Verbs:

More information

NIEVS PROJECT. First Registration Support Document Version 1.0

NIEVS PROJECT. First Registration Support Document Version 1.0 NIEVS PROJECT First Registratin Supprt Dcument Versin 1.0 CONTENTS CONTENTS... 2 INTRODUCTION... 3 SCOPE OF DOCUMENT... 3 FIRST REGISTRATION MIGRATION ACTIVITIES... 4 AFRL... 4 V55 MIGRATION... 4 SOM...

More information

Lake Sands District Pinewood Derby Official Rules

Lake Sands District Pinewood Derby Official Rules Lake Sands District Pinewd Derby Derby Car Specificatins fr Cub Scuts and Yuth Open Length, Width and Clearance: Width Maximum verall width, including wheels and axles, shall nt exceed 2-3/4 inches. Minimum

More information

SECOND DRAFT Testing and Reporting Requirements for Linear Replacement Lamps

SECOND DRAFT Testing and Reporting Requirements for Linear Replacement Lamps SECOND DRAFT Testing and Reprting Requirements fr Nte: This draft represents updates t the existing Testing and Reprting Requirements fr t include 3-ft, 8-ft, and 2G11 base lamps. All changes frm the existing

More information