"'- COUNTY ROAD 209 CR 759 TO US 17 @ CR 209 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

Size: px
Start display at page:

Download ""'- COUNTY ROAD 209 CR 759 TO US 17 @ CR 209 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION"

Transcription

1 JBATTLE 4/18/216 6:32:4 PM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submittals\Clay\CR 29\dgn\plan YEAR "'- SIDE SWIPE COLLISION COLLISION W /DEER RIGHT ANGLE COLLISION '\../- COLLISION W/DITCH - OVERTURNED VEHICLE COLLISION W/PEDESTRIAN ~- HEAD-ON COLLISION COLLISION W/TREE LEFT TURN COLLISION Jr'-" RAN OFF ROAD REAR END COLLISION... BACKED @ IN ll!ry SEVERITY I - NO INJURY K A B 2 - POSSIBLE INJURY INCAPACITATING 5 - FATALITY c DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 29 CLAY COUNTY ROAD 29 CR 759 TO US 17 23

2 JBATTLE 4/18/216 6:32:46 PM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\p/an ~ SIDE SWIPE COLLISION ~- RIGHT OVERTURNED COLLISION W/DEER ANGLE COLLISION '\,J- COLLISION W/DITCH VEHICLE HEAD-ON COLLISION LEFT TURN COLLISION REAR END COLLISION - COLLISION W/PEDESTRIAN ~- COLLISION W/TREE ~ - RAN OFF ROAD BACKED @ lol l!lbr 2EllElllTY 1 - NO INJURY K A B 2 - POSSIBLE INJURY INCAPACITATING S - FATALITY c Feet I CR 29 1 REVISIONS DESCRIPTION DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 29 CLAY COUNTY ROAD 29 CR 759 TO US 17 24

3 JBATTLE 4/18/216 6:32:53 PM R:\PROJECT\2 Safety\TW_19_HSIP _Liason\App/ication Submittals\Clay\CR 29\dgn\plan LEGEND: "'- SIDE SWIPE COLLISION COLLISION W/DEER RIGHT ANGLE COLLISION COLLISION W/DITCH '-"- - OVERTURNED VEHICLE COLLISION W/PEDESTRIAN - HEAD-ON COLLISION COLLISION W/TREE _f LEFT TURN COLLISION lff'./"" - RAN OFF ROAD ~ REAR END COLLISION BACKED INTO @- IN ll!ry SEVERITY 1 - NO INJURY K A B 2 - POSSIBLE INJURY INCAPACIT AT/NG 5 - FATALITY c DATE REVISIONS DATE METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD ND. COUNTY FINANCIAL PROJECT ld CR 29 CLAY COUNTY ROAD 29 CR 759 TO US 17 25

4 JBATTLE 4/18/216 6:32:59 PM R:\PROJECT\D2 Safety\TW_19_HS!P _Liason\App/ication Submittals\Clay\CR 29\dgn\plan YEAR SIDE SWIPE COLLISION RIGHT ANGLE COLLISION OVERTURNED VEHICLE HEAD-ON COLLISION LEFT TURN COLLISION REAR END COLLISION "'- COLLISION W/DEER '\./- COLLISION W/DITCH - COLLISION W/PEDESTRIAN - COLLISION W/TREE RAN OFF ROAD """'... BACKED @ IN ll/ry SEVER TTY 1 - NO INJURY K A B 2 - POSSIBLE INJURY INCAPACIT AT/NG 5 - FATALITY c DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 29 CLAY COUNTY ROAD 29 CR 759 TO US 17 26

5 Appendix C Concept, Quantities, and Cost Estimate

6 metricits 5/5/216 9:4:44 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 315C\dgn\Cot DATE DESCRIPTION DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 315 CLAY COUNTY ROAD 515C CONCEPTUAL DffAGRAM 1

7 metricits 5/5/216 9:8:37 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 315C\dgn\Cot METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD ND. COUNTY FINANCIAL PROJECT ID CR 315 CLAY COUNTY ROAD 515C CONCEPTUAL DffAGRAM SHEET NO. 2

8 metricits 5/5/216 9:9:18 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 315C\dgn\Cot DATE DESCRIPTION DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 315 CLAY COUNTY ROAD 515C CONCEPTUAL DffAGRAM SHEET NO. 3

9 metricits 5/5/216 8:49:37 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 315C\dgn\Cot REVISIONS DATE DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ld CR 315 CLAY COUNTY ROAD 515C CONCEPTUAL DffAGRAM SHEET NO. 4

10 metricits 5/5/216 8:56:9 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 315C\dgn\Cot DATE DESCRIPTION DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 315 CLAY COUNTY ROAD 515C CONCEPTUAL DffAGRAM SHEET NO. 5

11 JBATTLE 4/18/216 6:44:29 PM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 315C\dgn\CR SEE CONCEPTUAL DIAGRAM PAGE 1 Ci. CR 315C Za Feet MP MPH ZONE MP 1.3 Ci. CR 315C MP MPH ZONE 5 MPH ZON SEE CONCEPTUAL DIAGRAM PAGES 2 THRU 4 Ci. CR 315C SEE CONCEPTUAL DIAGRAM PAGE 5 MP MPH ZONE END PROJECT MP DATE DESCRIPTION REVISIONS DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL (94) FAX. (94) CERT/FICA TE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ld SW lloth CLAY COUNTY ROAD 515C PROJECT LAYOUT SHEET NO. 1

12 LRE - R3: Project Details by Sequence Report Page 1 of 2 5/4/216 Date: 5/4/216 8:8:2 PM FDOT Long Range Estimating System - Production R3: Project Details by Sequence Report Project: CR315C Letting Date: 1/299 Description: CR 315C from Putnam County Line to CR Safety Signage District: 2 County: 71 CLAY Market Area: 5 Units: English Contract Class: Lump Sum Project: N Design/Build: N Project Length: 1. MI Project Manager: Version 2 Project Grand Total $5, Description: CR 315C from Putnam County Line to CR Safety Signage Only Sequence: 1 MIS - Miscellaneous Construction Net Length: 2.2 MI 11,616 LF Description: Safety Signage Only Pay Items SIGNING COMPONENT Pay item Description Quantity Unit SINGLE POST SIGN, F&I GM, <12 SF Unit Price Extended Amount 17. AS $ $4, Signing Component Total $4, Sequence 1 Total $4,231.98

13 LRE - R3: Project Details by Sequence Report Page 2 of 2 5/4/216 Date: 5/4/216 8:8:2 PM FDOT Long Range Estimating System - Production R3: Project Details by Sequence Report Project: CR315C Letting Date: 1/299 Description: CR 315C from Putnam County Line to CR Safety Signage District: 2 County: 71 CLAY Market Area: 5 Units: English Contract Class: Lump Sum Project: N Design/Build: N Project Length: 1. MI Project Manager: Version 2 Project Grand Total $5, Description: CR 315C from Putnam County Line to CR Safety Signage Only Project Sequences Subtotal $4, Maintenance of Traffic 1. % $ Mobilization 1. % $ Project Sequences Total $5,12.7 Project Unknowns. % $. Design/Build. % $. Non-Bid Components: Pay item Description Quantity Unit INITIAL CONTINGENCY AMOUNT (DO NOT BID) Unit Price Extended Amount LS $256.3 $256.3 Project Non-Bid Subtotal $256.3 Version 2 Project Grand Total $5,376.73

14 JBATTLE 5/5/216 1:6:16 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\Conc DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 29 CLAY COUNTY ROAD 29 CONCEPTUAL DffAGRAM SHEET NO. 1

15 JBATTLE 5/5/216 11:38:42 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\Conc DATE DESCRIPTION DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 29 CLAY COUNTY ROAD 29 CONCEPTUAL DffAGRAM SHEET NO. 2

16 JBATTLE 5/5/216 1:8:9 AM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\Conc DATE DESCRIPTION DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERTIFICATE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID CR 29 CLAY COUNTY ROAD 29 CONCEPTUAL DffAGRAM SHEET NO. 3

17 JBATTLE 5/5/216 12:7:39 PM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\CR; BEGIN PROJECT MP. (i_ CR 29 a~ IJ.J~ S: "'1 :... Lt) : G:l <o QLO o:~!"\j,_. Qc:) ao : ' <:...; : : Cl.. Vl Cl.. Vl Cl.. : Cl.. ~::;: ::5::;: :::;: <:(::;: IJ.J <:( I- <:( I- <:( Zs a S: S: <: <: IJ.J IJ.J MP a... a ::r: ::r: Feet a :,_ IJ.J... c:) <: IJ.J Cl.. ::r: ::;: 45MPH ZONE <:... <: f:: <( Lt) ~!"\j Vl c:) ~Cl.. u::;: <:...,_ I-... ~~ :::irri o. <:o <:(Cl.. ~::;: INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS 55 MPH ZONE MP 1.3 a... : ' <o Vl...; : Cl.. ~::;:... : <:( ::;: aoi C::!"\J arri : Lt) :::J!"\j :" "'1 : "l <o (i_ CR 29 ~r-.j IJ.J!"\j S: r-.j OCl.. ::JC!.. 3Cl.. LL..:;: ~::;: c3::;: <: a ::r:... IJ.J <:... Cl.. MP MPH ZONE INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS SEE CONCEPTUAL DIAGRAM PAGE 1 AND TYPICAL SECTION INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS DATE DESCRIPTION REVISIONS DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL (94) FAX (94) CERT/FICA TE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ld CR 29 CLAY CR 29 PROJECT LAYOUT SHEET NO. 1

18 JBATTLE 5/5/216 12:7:47 PM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\CR; Zs Feet Ii. CR 29 MP 2.6 MP MPH ZONE 45 MPH ZONE INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS SEE CONCEPTUAL DIAGRAM PAGE 2 Ii. CR 29 MP 3.8 MP MPH ZONE INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS REVISIONS DATE DESCRIPTION DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL (94) FAX. (94) CERT/FICA TE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ld CR 29 CLAY CR 29 PROJECT LAYOUT SHEET NO. 2

19 JBATTLE 5/5/216 12:7:58 PM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\CR; Za Feet Ii. CR 29 SEE CONCEPTUAL DIAGRAM PAGE 3 AND TYPICAL SECTION MP 5.4 MP MPH ZONE 35 MPH ZONE INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS SEE CONCEPTUAL DIAGRAM PAGE I AND TYPICAL SECTION INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS INSTALL PROFILED THERMOPLASTIC CENTERLINE AND EDGELINE MARKINGS END PROJECT MP Ii. CR 29 QO'\ ex: \ l/) Lu Cl.. ~~ ex: MP MPH ZONE DATE DESCRIPTION REVISIONS DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL (94) FAX (94) CERT/FICA TE OF AUTHORIZATION 2294 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ld CR 29 CLAY CR 29 PROJECT LAYOUT SHEET NO. 3

20 JBATTLE 5/5/216 12:6:1 PM R:\PROJECT\D2 Safety\TW_19_HSIP _Liason\App/ication Submitta/s\C/ay\CR 29\dgn\CR; Ci_ CONST. rr/w LINE R/W LINE~ R/W VARIES (3' MIN.) R/W VARIES (3' MIN.) I PROPOSED ROADWAY WITH SHOULDERS 1' MIN. TREATMENT // (INDEX 15) EXISTING ROADWAY 11' 11' 4' SHLDR. PAVT. Natural Ground I l I 1 L ~ SAFETY EDGE Natural Ground L_j EXISTING BASE_} TYPE B STABILIZATION 1' 4' 2'-8" PROPOSED SHOULDER SOD TYPICAL SECTION CR 29 EAST OF MARINERS RD TO EAST OF HANDS DR AND WATKINS RD TO EAST OF WATKINS RD PROPOSED SHOULDER PAVEMENT OPTIONAL BASE GROUP 1 WITH AND FRICTION COURSE FC-12.5 (1 1/2") (PG 76-22) (TRAFFIC C) OPTIONAL BASE *SEE FIGURE A SHOULDER SUPER ELEVATION IN THE PPM FOR SHOULDER SLOPE REQUIREMENTS. SHOULDER PAVEMENT DETAIL REVISIONS DATE DESCRIPTION DATE DESCRIPTION METRIC ENGINEERING, INC MARCO BEACH DRIVE SUITE1 JACKSONVILLE, FLORIDA TEL. (94) FAX. (94) CERT/FICA TE OF AUTHORIZATION 2294 CR-29 CLAY STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ld TYPllCAL SECTllON CR-29 CURVES SHEET NO. 1

21 !::; 6" White Profiled Thermoplastic Std. Thermoplastic Markings '- Q I "' '-' i::i :g 1' c: rn ct: c: IJJ "' 1::l ~ I QJ V) I ~ \:>'... Std. Thermoplastic Markings 6" White Profiled Thermoplastic 6" Yellow Prof~ Thermoplastic Traffic Flow-+ +- Traffic Flow..._ 6" Yellow Profiled Thermoplastic Std. Thermoplastic Markings TYPICAL RURAL INTERSECTION WITHOUT TURN LANES 6" Double Yellow Profiled Thermoplastic... Traffic Flow-+ 6" White Profiled Thermoplastic 6" Double Yellow Profiled Thermoplastic 6" White Profiled Thermoplastic F Std. Thermoplastic Markings I /c.,~ Std. Thermoplastic Markings Std. Thermoplastic Markings d "'... 6" White Profiled Thermoplastic 6" White Profiled Thermoplastic +- Traffic Flow 6" White Profiled Thermoplastic Std. Thermoplastic Markings--~ Std. Thermoplastic Markings 6" White Profiled Thermoplastic 6" Double Yellow Profiled Thermoplastic 6" White Profiled Thermoplastic 6" Double Yellow Profiled Thermoplastic TYPICAL RURAL INTERSECTION WITH TURN LANES GENERAL NOTES: I. Remove raised retroreflective pavement markers when in conflict with the installation of the centerline profiled thermoplastic pavement markings. The cost of removal is included in the cost of the profiled thermoplastic pavement marking. 2. Replacement of retroref/ective pavement markers removed during the installation of the centerline profiled thermoplastic pavement markings will be paid for under Pay Item 76. PROFILED THERMOPLASTIC MARKINGS 2 LANE ROADWAYS LAST REVISION <: DESCRIPTION: V) ::.. IJJ ct: FY DESIGN STANDARDS SPEC][AL MARK][NG AREAS INDEX NO SHEET NO. 13of14

22 LRE - R3: Project Details by Sequence Report Page 1 of 4 5/5/216 Date: 5/5/216 3:48:7 PM FDOT Long Range Estimating System - Production R3: Project Details by Sequence Report Project: CR Letting Date: 1/299 Description: CR 29 from CR 739 (Henley Rd) to US-17 - Safety Improvements District: 2 County: 71 CLAY Market Area: 5 Units: English Contract Class: Lump Sum Project: N Design/Build: N Project Length: 1. MI Project Manager: Version 2 Project Grand Total $412, Description: CR 29 from CR 739 (Henley Rd) to US-17 - Safety Improvements with Left Turn Lane at Sandridge Drive Sequence: 1 MIS - Miscellaneous Construction Net Length: 1. MI 5,28 LF Description: Safety Improvements EARTHWORK COMPONENT User Input Data Description Value Standard Clearing and Grubbing Limits L/R. /. Incidental Clearing and Grubbing Area. X-Items Pay item Description Quantity Unit Unit Price Extended Amount CLEARING & GRUBBING.77 AC $19,718.8 $15, REGULAR EXCAVATION 138. CY $9.2 $1, EMBANKMENT 416. CY $1.97 $4, Earthwork Component Total $21,16.4 ROADWAY COMPONENT X-Items Pay item Description Quantity Unit Unit Price Extended Amount 16-4 TYPE B STABILIZATION 3,11. SY $4.13 $12, OPTIONAL BASE,BASE GROUP 1 1,245. SY $1.78 $13, ASPH CONC FC,TRAFFIC C,FC TN $13.14 $1, ,PG PERFORMANCE TURF, SOD 2,494. SY $3.5 $7, PROFILED THERMOPLAST,STD, 13. GM $5,632. $73,216. WHITE,SOLID,6" PROFILED THERMOPLAST,STD, 6.5 GM $5,83.6 $37, YELLO,SOLID,6" PROFILED THERMOPLAST,STD, YELLO,SKIP,6" 6.5 GM $4, $27, Roadway Component Total $182,613.74

23 LRE - R3: Project Details by Sequence Report Page 2 of 4 5/5/216 Sequence 1 Total $23,629.78

24 LRE - R3: Project Details by Sequence Report Page 3 of 4 5/5/216 Sequence: 2 MIS - Miscellaneous Construction Net Length:.3 MI 1,584 LF Description: Turn Lane at Sandridge X-Items ROADWAY COMPONENT Pay item Description Quantity Unit Unit Price Extended Amount CLEARING & GRUBBING.72 AC $19,718.8 $14, MAILBOX, F&I SINGLE 4. EA $ $ REGULAR EXCAVATION 417. CY $9.2 $3, EMBANKMENT 1. CY $1.97 $1, TYPE B STABILIZATION 1,137. SY $4.13 $4, OPTIONAL BASE,BASE GROUP 9 1,193. SY $24.32 $29, TURNOUT CONSTRUCTION- ASPHALT SUPERPAVE ASPH CONC, TRAF C, PG76-22,PMA ASPH CONC FC,TRAFFIC C,FC- 9.5,PG THERMOPLASTIC, STD-OTH, WHITE, SOLID, 6" THERMOPLASTIC, STD- OTH,YELLOW, SOLID, 6" 32. TN $ $6, TN $ $24, TN $ $11, GM $4, $1, GM $4, $1, THERMOPLASTIC, REMOVE 1,5. SF $2.1 $3,15. Roadway Component Total $11,565.3 DRAINAGE COMPONENT Pay Items Pay item Description Quantity Unit Unit Price Extended Amount PIPE CULV, OPT MATL, 96. LF $61.88 $5,94.48 ROUND,24"SD MITERED END SECT, OPTIONAL RD, 24" SD 8. EA $1, $13, Drainage Component Total $19, Sequence 2 Total $121,94.26

25 LRE - R3: Project Details by Sequence Report Page 4 of 4 5/5/216 Date: 5/5/216 3:48:7 PM FDOT Long Range Estimating System - Production R3: Project Details by Sequence Report Project: CR Letting Date: 1/299 Description: CR 29 from CR 739 (Henley Rd) to US-17 - Safety Improvements District: 2 County: 71 CLAY Market Area: 5 Units: English Contract Class: Lump Sum Project: N Design/Build: N Project Length: 1. MI Project Manager: Version 2 Project Grand Total $412, Description: CR 29 from CR 739 (Henley Rd) to US-17 - Safety Improvements with Left Turn Lane at Sandridge Drive Project Sequences Subtotal $324, Maintenance of Traffic 1. % $32, Mobilization 1. % $35, Project Sequences Total $392,916.8 Project Unknowns. % $. Design/Build. % $. Non-Bid Components: Pay item Description Quantity Unit Unit Price Extended Amount INITIAL CONTINGENCY AMOUNT (DO NOT BID) LS $19,645.8 $19,645.8 Project Non-Bid Subtotal $19,645.8 Version 2 Project Grand Total $412,561.88

26 Appendix D FHWA Crash Modification Factors, Benefit/Cost, and Net Present Value

27 CMF / CRF Details CMF ID: 1856 Install a combination of chevron signs, curve warning signs, and/or sequential flashing beacons Description: Along a curve with a small radius, large deflection angle, available sight distance smaller than stopping sight distance, and superelevation smaller than demanded at design and operating speed Prior Condition: No curve delineation treatment Category: Signs Study: Safety Evaluation of Curve Delineation Improvements An Empirical Bayes Observational Before-After Study, Montella, 29 Star Quality Rating: [View score details] Crash Modification Factor (CMF) Value:.585 Adjusted Standard Error: Unadjusted Standard Error:.7

28 Crash Reduction Factor (CRF) Value: 41.5 (This value indicates a decrease in crashes) Adjusted Standard Error: Unadjusted Standard Error: 7 Applicability Crash Type: Run off road Crash Severity: All Roadway Types: Principal Arterial Other Freeways and Expressways Number of Lanes: 4 Road Division Type: Speed Limit: Area Type: Not specified Traffic Volume: 74 to Time of Day: All If countermeasure is intersection-based Intersection Type: Intersection Geometry: Traffic Control:

29 Major Road Traffic Volume: Minor Road Traffic Volume: Development Details Date Range of Data Used: 21 to 25 Municipality: Trans European Road Network, Italy State: Country: Type of Methodology Used: Before/after using empirical Bayes or full Bayes Sample Size Used: Sites Before Sample Size Used: 14 Sites After Sample Size Used: 14 Sites Other Details Included in Highway Safety Manual? No Date Added to Clearinghouse: Comments:

30 This site is funded by the U.S. Department of Transportation Federal Highway Administration and maintained by the University of North Carolina Highway Safety Research Center The information contained in the Crash Modification Factors (CMF) Clearinghouse is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in the CMF Clearinghouse. The information contained in the CMF Clearinghouse does not constitute a standard, specification, or regulation, nor is it a substitute for sound engineering judgment.

31 FORM 511 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION SAFETY OFFICE ANNUAL BENEFIT COST ANALYSIS SUBMITTED BY Metric Engineering DATE SUBMITTED 5/4/216 PROJECT NO. CR 315C FPID NO. N/A PROJECT INFORMATION FACILITY DESCRIPTION DISTRICT 2 COUNTY Clay SECTION N/A U.S. ROAD N/A SR N/A SPEED (MPH) 55/45 B.M.P. E.M.P. LENGTH 2.9 NODE ALTERNATIVE NO. SAFETY PRIORITY ENV. STUDY SKID (ID) LOCATION FACILITY TYPE CR 315C from Putnam County Line to CR Lane Undivided Rural Road CAUSE OF CRASH PROBLEM Predominant crash type: seven (7) off-road crashes, 1 rear end, 1 roll-over, 1 hit object in road, and 1 back into. Primary contributing cause was Careless Driving and 1 DUI. PROPOSED IMPROVEMENTS - Install new CURVE (W1-2a) warning signs for NB CR 315C at the horizontal curves of Painted Pony Ave and Heskett Ln (LIST AND DISCUSS): - Install CHEVRON (W1-8) warning signs with bright sticks for the horizontal curves at Heskett Lane and approaching CR Install a new STOP AHEAD (W3-1) warning sign at SB CR 315C in advance of CR 214 CRASH REDUCTION METHOD The Crash Reduction Factors (CRF) were selected using the Crash Modification Factors Clearinghouse: (EXPLAIN CRF AND SOURCE) - Install a combination of chevron signs, curve warning signs: Off-Road Crashes 41.5% HIGH CRASH LISTINGS N/A 3. CRASH TYPES NO. OF CRASHES CRASH TYPE AND FREQUENCY FATAL (K) CRF % PREVENTED CRASH INFORMATION FOR FACILITY No. Years. A. COST PER CRASH: $ 589, B. CRASH CLEANUP: $1 per year. C. INTEREST (DISCOUNT) RATE: 4.%.. ANNUAL COST OF IMPROVEMENTS INJURY (A, B, C) CRF % PREVENTED TYPE COST LIFE (YR) CRF COST/YR Install chevron signs and curve warning signs %.83 A. ROADWAY. B. SIGNING $ 4, $ C. SHOULDER D. SIGNALS E. MOT $ $ PDO (O) CRF % PREVENTED F. MOBILIZATION $ $ Install chevron signs and curve warning signs 1 42%.42 G. CONTIGENCY $ $ H. PE/CEI $ 26, $ 3,248.. SUBTOTAL $ 31, $ 4, CRASH CLEANUP $ TOTAL ANNUAL COST $ 4, TOTAL CRASHES (ALL TYPES) 2 1 NET PRESENT VALUE TOTAL CRASHES TO BE PREVENTED BENEFIT A. CURRENT YEAR B. PROJECT COMPLETION YEAR A. TOTAL CRASH BENEFIT $ 733, NPV $ 985,84. B. TOTAL ANNUAL BENEFIT: $ 146, Prepared By: J. Alegre Date: 5/4/216 BENEFIT/COST Approved By: Date: Benefit Cost (3)

32 CMF / CRF Details CMF ID: 478 Upgrade unpaved or non-existent shoulders to composite shoulders Description: Upgrade shoulders on rural two-lane roads from unpaved or non-existent shoulders to composite shoulders. Prior Condition: Unpaved shoulders less than or equal to 5 feet on rural two-lane roads. Category: Shoulder treatments Study: Estimation of Safety Effectiveness of Composite Shoulders on Rural Two-Lane Highways, Zeng, H. and S.D. Schrock, 212 Star Quality Rating: [View score details] Crash Modification Factor (CMF) Value:.861 Adjusted Standard Error: Unadjusted Standard Error:.145

33 Crash Reduction Factor (CRF) Value: 13.9 (This value indicates a decrease in crashes) Adjusted Standard Error: Unadjusted Standard Error: 14.5 Applicability Crash Type: All Crash Severity: All Roadway Types: Not Specified Number of Lanes: 2 Road Division Type: Undivided Speed Limit: Area Type: Rural Traffic Volume: 38 to 234 Annual Average Daily Traffic (AADT) Time of Day: All If countermeasure is intersection-based Intersection Type: Intersection Geometry: Traffic Control:

34 Major Road Traffic Volume: Minor Road Traffic Volume: Development Details Date Range of Data Used: 2 to 29 Municipality: State: KS Country: USA Type of Methodology Used: Before/after using empirical Bayes or full Bayes Sample Size Used: Crashes Before Sample Size Used: 112 Crashes After Sample Size Used: 142 Crashes Other Details Included in Highway Safety Manual? No Date Added to Clearinghouse:

35 Comments: This CMF is also contained in the report, Zeng, H., S. Schrock, and T. Mulinazzi. "Evaluation of Safety Effectiveness of Composite Shoulders, Wide Unpaved Shoulders, and Wide Paved Shoulders in Kansas," Report No. K-TRAN: KU-11-1, Kansas DOT, Topeka, KS, March 213. This site is funded by the U.S. Department of Transportation Federal Highway Administration and maintained by the University of North Carolina Highway Safety Research Center The information contained in the Crash Modification Factors (CMF) Clearinghouse is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in the CMF Clearinghouse. The information contained in the CMF Clearinghouse does not constitute a standard, specification, or regulation, nor is it a substitute for sound engineering judgment.

36 CMF / CRF Details CMF ID: 6948 Install centerline and shoulder rumble strips Description: Milled or rolled rumble strips. Prior Condition: There are no existing rumble strips Category: Roadway Study: Safety Evaluation of Centerline Plus Shoulder Rumble Strips, Persaud et al., 215 Star Quality Rating: [View score details] Crash Modification Factor (CMF) Value:.758 Adjusted Standard Error: Unadjusted Standard Error:.5 Crash Reduction Factor (CRF)

37 Value: 24.2 (This value indicates a decrease in crashes) Adjusted Standard Error: Unadjusted Standard Error: 5 Applicability Crash Type: Run off road Crash Severity: All Roadway Types: Not specified Number of Lanes: 2 Road Division Type: Undivided Speed Limit: Area Type: Rural Traffic Volume: 154 to Annual Average Daily Traffic (AADT) Time of Day: All If countermeasure is intersection-based Intersection Type: Intersection Geometry: Traffic Control: Major Road Traffic Volume:

38 Minor Road Traffic Volume: Development Details Date Range of Data Used: Municipality: State: MO Country: USA Type of Methodology Used: Before/after using empirical Bayes or full Bayes Sample Size Used: Other Details Included in Highway Safety Manual? No Date Added to Clearinghouse: Comments: CMF for run-off-road crashes excludes intersection-related and animal crashes. This site is funded by the U.S. Department of Transportation Federal Highway Administration and maintained by the University of North Carolina Highway Safety Research Center The information contained in the Crash Modification Factors (CMF) Clearinghouse is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the

39 use of the information contained in the CMF Clearinghouse. The information contained in the CMF Clearinghouse does not constitute a standard, specification, or regulation, nor is it a substitute for sound engineering judgment.

40 CMF / CRF Details CMF ID: 7852 Install left-turn lane Description: Prior Condition: Intersections without left-turn lanes Category: Intersection geometry Study: Validation and Application of Highway Safety Manual (Part D) in Florida, Abdel-Aty et al., 214 Star Quality Rating: [View score details] Crash Modification Factor (CMF) Value:.73 Adjusted Standard Error: Unadjusted Standard Error:.17 Crash Reduction Factor (CRF)

41 Value: 27 (This value indicates a decrease in crashes) Adjusted Standard Error: Unadjusted Standard Error: 17 Applicability Crash Type: All Crash Severity: Fatal,Serious injury,minor injury Roadway Types: Not specified Number of Lanes: Road Division Type: Speed Limit: Area Type: Rural Traffic Volume: Time of Day: All If countermeasure is intersection-based Intersection Type: Intersection Geometry: 3-leg Traffic Control: Stop-controlled Major Road Traffic Volume:

42 Minor Road Traffic Volume: Development Details Date Range of Data Used: 27 to 211 Municipality: State: FL Country: USA Type of Methodology Used: Before/after using empirical Bayes or full Bayes Sample Size Used: Other Details Included in Highway Safety Manual? No Date Added to Clearinghouse: Mar Comments: This site is funded by the U.S. Department of Transportation Federal Highway Administration and maintained by the University of North Carolina Highway Safety Research Center The information contained in the Crash Modification Factors (CMF) Clearinghouse is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in the CMF Clearinghouse. The information contained

43 in the CMF Clearinghouse does not constitute a standard, specification, or regulation, nor is it a substitute for sound engineering judgment.

44 FORM 511 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION SAFETY OFFICE ANNUAL BENEFIT COST ANALYSIS SUBMITTED BY Metric Engineering DATE SUBMITTED 5/5/216 PROJECT NO. CR 29 FPID NO. N/A PROJECT INFORMATION FACILITY DESCRIPTION DISTRICT 2 COUNTY Clay SECTION N/A U.S. ROAD N/A SR N/A SPEED (MPH) 55/45 B.M.P. E.M.P. LENGTH 6.25 NODE ALTERNATIVE NO. SAFETY PRIORITY ENV. STUDY SKID (ID) LOCATION FACILITY TYPE CR 29 from CR 739 (Henley Road) to US-17 2-Lane Undivided Rural Road CAUSE OF CRASH PROBLEM Predominant crash type: twenty-three (23) off-road, fourteen (14) rear-end, seven (7) roll-over, seven (7) sideswipe, four (4) animal, three (3) left turn, two (2) right turn, 1 right angle, 1 head-on, and 1 pedestrian, with careless driving as the predominant contributing cause, as well as four (4) DUI. A total of sixty-five (65) collisions, including four (4) fatalities. PROPOSED IMPROVEMENTS Install 4 feet wide paved shoulder along two (2) horizontal curves, east of Hands Drive and east of Watkins Road. Also, install (LIST AND DISCUSS): thermoplastic centerline and shoulder rumble strips from CR 739 to CR 315B. Also install a WB CR 29 Left Turn Lane at CR 739B (Sandridge Rd) CRASH REDUCTION METHOD The Crash Reduction Factors (CRF) were selected using the Crash Modification Factors Clearinghouse: (EXPLAIN CRF AND SOURCE) - Upgrade unpaved or non-existent shoulders to composite shoulders: 13.9% - Install profiled thermoplastic centerline and edgeline markings: 24.2% - Install left turn lane: 27.% HIGH CRASH LISTINGS N/A 3. CRASH TYPES NO. OF CRASHES CRASH TYPE AND FREQUENCY FATAL (K) CRF % PREVENTED CRASH INFORMATION FOR FACILITY No. Years Upgrade non-existent shoulders to composite sho 14%. A. COST PER CRASH: $ 589, Install centerline and shoulder rumble strips 1 24%.24 B. CRASH CLEANUP: $1 per year Install left turn lane 27%. C. INTEREST (DISCOUNT) RATE: 4.%.. ANNUAL COST OF IMPROVEMENTS INJURY (A, B, C) CRF % PREVENTED TYPE COST LIFE (YR) CRF COST/YR Upgrade non-existent shoulders to composite sho %.56 A. ROADWAY $ 284, $ 2,91 Install centerline and shoulder rumble strips % 2.66 B. DRAINAGE $ 19, $ 1, Install left turn lane %.81 C. EARTHWORK $ 21, $ 1, D. SIGNING E. MOT $ 32, $ 4,3.55 PDO (O) CRF % PREVENTED F. MOBILIZATION $ 35, $ 4,43.91 Upgrade non-existent shoulders to composite sho %.44 G. CONTIGENCY $ 19, $ 2, Install centerline and shoulder rumble strips % 1.94 H. PE/CEI $ 128, $ 15, Install left turn lane 27%. SUBTOTAL $ 54, $ 5, CRASH CLEANUP $ TOTAL ANNUAL COST $ 5, TOTAL CRASHES (ALL TYPES) NET PRESENT VALUE TOTAL CRASHES TO BE PREVENTED BENEFIT A. CURRENT YEAR B. PROJECT COMPLETION YEAR A. TOTAL CRASH BENEFIT $ 3,914, NPV $ 8,553, B. TOTAL ANNUAL BENEFIT: $ 782, Prepared By: J. Alegre Date: 5/5/216 BENEFIT/COST Approved By: Date: Benefit Cost (LTL)

45 Appendix E 214 Traffic Counts, Turning Movement Counts, and Speed Data

46 FOOT Florida Traffic Online Map Selected Features Portable Traffic Monitoring Sites Telemetered Traffic Monitoring Sites I I I I I I I.., I 4g I "', ~ I.. / ~t,,..,"" q;. ~ I'./,,. I PUTNAM _,,,., AADT /'/ Lan th.>~ 15 /'/ /'/ /'/ /'/ Mtc!th.an.1lb ~ Toll Roads "6:' lnterst.ates ;V I'~ Roads Rivers Lakes County Lines Airports Cities and Towns Alabama-Georgia County Boundaries I I I I / / /,I This map was printed from the FOOT Florida Traffic Online ArclMS mapping application - (htlp://www2.dotstala. fl.uslftor1datrafllconllnal). For more information regarding FOOT Florida Traffic data, please contact the FTI Support Group of the FOOTfTransportation Statistics Office at ortdditty: 85/ For more Information regarding the Florlda Traffic Onllne site, please contact the GIS Section Manager of the FDOTfTransportation Statistics Office at ortddmy: 85/ DISCLAIMER: This product has been compiled from the most accurate source data from the Florida Department of Transportation's Transportation Statistics Office. However, this product Is for reference purposes only and Is not to be construed as a legal document or survey instrument. Any reliance on the information contained herein Is at the user's own risk. The Florlda Department of Transportation assumes no responslblllty for any use of the information contained herein or any loss resulting therefrom. ~ u

47 i( 1 Oakleaf Plantation r J 23 lluval J acksonville FOOT Florida Traffic Online Map Selected Features Portable Traffic Monitoring Sites Telemel<!red Traffic Monitoring Sites.. ~ AADT Lan th.:tn. 15 it/ it/ it/ it/ MOH th.an. ilbooo it/ Toll Roads Inters late s ~ Roads County Lines /~ Airports Cities and Towns Alabama-Georg.ia County Boundaries 28 4_5- """"\ 1,,,--a- -a3_oo ~.,.,,..i.;;~.u..-.::. 9e~o.::. o_,_..'i " Si<'1'6,_. Penney Fann> ~ ill ~ ted for FOOTfTnmStat 2' 21'S This map was printed from the FOOT Florida Traffic Online ArclMS mapping application - ( fl.uslflortdalrafllconllnal). For more information regarding FOOT Florida Traffic data, please contact the FTI Support Group of the FOOTITransportation Statistics Office at ortdditiy: 85/ For more information regarding the Florida Traffic Online site, please contact the GIS Section Manager of the FOOTfTransportation Statistics Office at or TDD/TTY: 85/ DISCLAIMER: This product has been compiled from the most accurate source data from the Florida Department of Transportation's Transportation Statistics Office. However, this product is for reference purposes only and is not to be construed as a legal document or survey instrument. Any reliance on the information contained herein is at the user's own risk. The Florida Department of Transportation assumes no responsibility for any use of the information contained herein or any loss resulting therefrom.

48 Clay County Department of Engineering and Public Works Green Cove Springs, FL 3243 Location: CR CR 739B (Sandridge Rd) File Name : CR29@SAN Site Code : Start Date : 5/3/216 Page No : 1 Groups Printed- Autos - Trucks - Turns CR 29 Southbound N/A Westbound CR 29 Northbound CR 739B (Sandridge Rd) Eastbound Start Time Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Int. Total 6:3 AM :45 AM Total : AM :15 AM :3 AM :45 AM Total : AM :15 AM :3 AM :45 AM Total : AM :15 AM :3 AM :45 AM Total : AM :15 AM :3 AM :45 AM Total : AM :15 AM :3 AM :45 AM Total : PM :15 PM :3 PM :45 PM Total : PM :15 PM :3 PM :45 PM Total : PM :15 PM :3 PM :45 PM Total : PM :15 PM :3 PM :45 PM Total : PM :15 PM :3 PM

49 Clay County Department of Engineering and Public Works Green Cove Springs, FL 3243 Location: CR CR 739B (Sandridge Rd) File Name : CR29@SAN Site Code : Start Date : 5/3/216 Page No : 2 Groups Printed- Autos - Trucks - Turns CR 29 Southbound N/A Westbound CR 29 Northbound CR 739B (Sandridge Rd) Eastbound Start Time Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Int. Total 4:45 PM Total : PM :15 PM :3 PM :45 PM Total Grand Total Apprch % Total % Autos % Autos Trucks % Trucks U-Turns % U-Turns

50 Clay County Department of Engineering and Public Works Green Cove Springs, FL 3243 Location: CR CR 739B (Sandridge Rd) File Name : CR29@SAN Site Code : Start Date : 5/3/216 Page No : 3 CR 29 Southbound N/A Westbound CR 29 Northbound CR 739B (Sandridge Rd) Eastbound Start Time Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Int. Total Peak Hour Analysis From 6:3 AM to 9:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 6:3 AM 6:3 AM :45 AM : AM :15 AM Total Volume % App. Total PHF CR 29 Out In Total Right 279 Thru Left U-Turns Peak Hour Data CR 739B (Sandridge Rd) Out In Total Left Thru 421 Right U-Turns Peak Hour Begins at 6:3 AM Autos Trucks U-Turns North Right Thru Left U-Turns Out In Total N/A Left 85 Thru 145 Right U-Turns Out In Total CR 29

51 Clay County Department of Engineering and Public Works Green Cove Springs, FL 3243 Location: CR CR 739B (Sandridge Rd) File Name : CR29@SAN Site Code : Start Date : 5/3/216 Page No : 4 CR 29 Southbound N/A Westbound CR 29 Northbound CR 739B (Sandridge Rd) Eastbound Start Time Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Int. Total Peak Hour Analysis From 1: AM to 1:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:3 AM 11:3 AM :45 AM : PM :15 PM Total Volume % App. Total PHF CR 29 Out In Total Right 132 Thru Left U-Turns Peak Hour Data CR 739B (Sandridge Rd) Out In Total Left Thru 264 Right U-Turns Peak Hour Begins at 11:3 AM Autos Trucks U-Turns North Right Thru Left U-Turns Out In Total N/A Left 23 Thru 13 Right U-Turns Out In Total CR 29

52 Clay County Department of Engineering and Public Works Green Cove Springs, FL 3243 Location: CR CR 739B (Sandridge Rd) File Name : CR29@SAN Site Code : Start Date : 5/3/216 Page No : 5 CR 29 Southbound N/A Westbound CR 29 Northbound CR 739B (Sandridge Rd) Eastbound Start Time Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Left Thru Right U-Turns App. Total Int. Total Peak Hour Analysis From 2: PM to 5:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 2:45 PM 2:45 PM : PM :15 PM :3 PM Total Volume % App. Total PHF CR 29 Out In Total Right 138 Thru Left U-Turns Peak Hour Data CR 739B (Sandridge Rd) Out In Total Left Thru 377 Right U-Turns Peak Hour Begins at 2:45 PM Autos Trucks U-Turns North Right Thru Left U-Turns Out In Total N/A Left 362 Thru 21 Right U-Turns Out In Total CR 29

53 MH Corbin Traffic Analyzer Study Computer Generated Summary Report City: Street: Sandridge Road Location: West of CR 29 A study of vehicle traffic was conducted with the device having serial number The study was done in the Westbound lane at Sandridge Road in, FL in Clay county. The study began on 1/26/216 at 12: AM and concluded on 1/28/216 at 12: AM, lasting a total of 48. hours. Traffic statistics were recorded in 15 minute time periods. The total recorded volume showed 5,442 vehicles passed through the location with a peak volume of 11 on 1/27/216 at [5:15 PM-5:3 PM] and a minimum volume of on 1/26/216 at [2:3 AM-2:45 AM]. The AADT count for this study was 2,721. SPEED Chart 1 lists the values of the speed bins and the total traffic volume for each bin. At least half the vehicles were traveling in the 25-3 MPH range or lower. The average speed for all classifed vehicles was 29 MPH with 1.59% vehicles exceeding the posted speed of 45 MPH..95% percent of the total vehicles were traveling in excess of 55 MPH. The mode speed for this traffic study was 25MPH and the 85th percentile was MPH. < to to to to to to to to to to to to to to to > CLASSIFICATION CHART 1 Chart 2 lists the values of the classification bins and the total traffic volume accumulated for each bin. Most of the vehicles classified during the study were Vans & Pickups. The number of Passenger Vehicles in the study was 1992 which represents 42 percent of the total classified vehicles. The number of Vans & Pickups in the study was 2328 which represents 49 percent of the total classified vehicles. The number of Busses & Trucks in the study was 34 which represents 7 percent of the total classified vehicles. The number of Tractor Trailers in the study was 139 which represents 3 percent of the total classified vehicles. < to to to to > CHART 2 HEADWAY During the peak traffic period, on 1/27/216 at [5:15 PM-5:3 PM] the average headway between vehicles was seconds. During the slowest traffic period, on 1/26/216 at [2:3 AM-2:45 AM] the average headway between vehicles was 9 seconds. WEATHER The roadway surface temperature over the period of the study varied between 43. and 75. degrees F. 1/28/216 11:37 AM Page: 1

54 MH Corbin Traffic Analyzer Study Computer Generated Summary Report City: Street: CR 29 Location: South of Sandridge Road A study of vehicle traffic was conducted with the device having serial number The study was done in the Southbound lane at CR 29 in, FL in Clay county. The study began on 1/26/216 at 12: AM and concluded on 1/28/216 at 12: AM, lasting a total of 48. hours. Traffic statistics were recorded in 15 minute time periods. The total recorded volume showed 9,344 vehicles passed through the location with a peak volume of 183 on 1/26/216 at [6:3 AM-6:45 AM] and a minimum volume of on 1/26/216 at [12:3 AM-12:45 AM]. The AADT count for this study was 4,672. SPEED Chart 1 lists the values of the speed bins and the total traffic volume for each bin. At least half the vehicles were traveling in the 25-3 MPH range or lower. The average speed for all classifed vehicles was 37 MPH with 32.6% vehicles exceeding the posted speed of 45 MPH. 5.16% percent of the total vehicles were traveling in excess of 55 MPH. The mode speed for this traffic study was 25MPH and the 85th percentile was 5.87 MPH. < to to to to to to to to to to to to to to to > CLASSIFICATION CHART 1 Chart 2 lists the values of the classification bins and the total traffic volume accumulated for each bin. Most of the vehicles classified during the study were Passenger Vehicles. The number of Passenger Vehicles in the study was 4491 which represents 53 percent of the total classified vehicles. The number of Vans & Pickups in the study was 3382 which represents 4 percent of the total classified vehicles. The number of Busses & Trucks in the study was 411 which represents 5 percent of the total classified vehicles. The number of Tractor Trailers in the study was 226 which represents 3 percent of the total classified vehicles. < to to to to > CHART 2 HEADWAY During the peak traffic period, on 1/26/216 at [6:3 AM-6:45 AM] the average headway between vehicles was seconds. During the slowest traffic period, on 1/26/216 at [12:3 AM-12:45 AM] the average headway between vehicles was 9 seconds. WEATHER The roadway surface temperature over the period of the study varied between 43. and 77. degrees F. 1/28/216 11:38 AM Page: 1

55 MH Corbin Traffic Analyzer Study Computer Generated Summary Report City: Street: CR 29 Location: North of Sandridge Road A study of vehicle traffic was conducted with the device having serial number 432. The study was done in the Southbound lane at CR 29 in, FL in Clay county. The study began on 1/26/216 at 12: AM and concluded on 1/28/216 at 12: AM, lasting a total of 48. hours. Traffic statistics were recorded in 15 minute time periods. The total recorded volume showed 4,236 vehicles passed through the location with a peak volume of 72 on 1/27/216 at [7:15 AM-7:3 AM] and a minimum volume of on 1/26/216 at [12:3 AM-12:45 AM]. The AADT count for this study was 2,118. SPEED Chart 1 lists the values of the speed bins and the total traffic volume for each bin. At least half the vehicles were traveling in the 5-55 MPH range or lower. The average speed for all classifed vehicles was 52 MPH with 84.83% vehicles exceeding the posted speed of 45 MPH % percent of the total vehicles were traveling in excess of 55 MPH. The mode speed for this traffic study was 5MPH and the 85th percentile was MPH. < to to to to to to to to to to to to to to to > CLASSIFICATION CHART 1 Chart 2 lists the values of the classification bins and the total traffic volume accumulated for each bin. Most of the vehicles classified during the study were Vans & Pickups. The number of Passenger Vehicles in the study was 144 which represents 38 percent of the total classified vehicles. The number of Vans & Pickups in the study was 189 which represents 49 percent of the total classified vehicles. The number of Busses & Trucks in the study was 317 which represents 8 percent of the total classified vehicles. The number of Tractor Trailers in the study was 188 which represents 5 percent of the total classified vehicles. < to to to to > CHART 2 HEADWAY During the peak traffic period, on 1/27/216 at [7:15 AM-7:3 AM] the average headway between vehicles was seconds. During the slowest traffic period, on 1/26/216 at [12:3 AM-12:45 AM] the average headway between vehicles was 9 seconds. WEATHER The roadway surface temperature over the period of the study varied between 43. and 77. degrees F. 1/28/216 11:34 AM Page: 1

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation TRAFFIC IMPACT DATA For Dillons #98 On-Site Relocation COMMERCIAL DEVELOPMENT 1740 Massachusetts Street Lawrence, KS Revised April 6, 2011 Prepared by: Pickering Firm, Inc. Introduction The project site

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Safety Assessment for Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Prepared by: VIRGINIA DEPARTMENT OF TRANSPORTATION Northwestern Regional Operations - Traffic

More information

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Southern Windsor County 2016 Traffic Count Program Summary April 2017 Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern

More information

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017 Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Benefit-Cost Analysis of Curve Safety Treatments. Bryan Wilson, Brad Brimley Texas A&M Transportation Institute

Benefit-Cost Analysis of Curve Safety Treatments. Bryan Wilson, Brad Brimley Texas A&M Transportation Institute Benefit-Cost Analysis of Curve Safety Treatments Bryan Wilson, Brad Brimley Texas A&M Transportation Institute B/C Analysis B/C analysis encouraged by TxDOT HSIP HSIP calls the ratio a Safety Improvement

More information

Effectiveness of Median Cable Barriers and Rumble Strips

Effectiveness of Median Cable Barriers and Rumble Strips Effectiveness of Median Cable Barriers and Rumble Strips Chris Poole, Iowa Department of Transportation Peter Savolainen, Iowa State University Mid-Continent Transportation Research Symposium August 16,

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information

Page 1 of KA

Page 1 of KA Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois

Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois Priscilla Tobias, P.E. Mouyid Islam, Ph.D. Kim Kolody, P.E. Optional Agenda Image Title Background Workflow

More information

s Contact the Area Construction Engineer at for RAP sample location. Page 2 of 10

s Contact the Area Construction Engineer at for RAP sample location. Page 2 of 10 Page 1 of 10 Page 2 of 10 Page 3 of 10 Ú City limit or Urban boundary No Centerline rumble strips Centerline rumble strips City connecting link or Urbanized (Unincorporated city) TYPICAL CITY CONNECTING

More information

Safety Evaluation of Restricted Crossing U-Turn (RCUT or J-Turn) Projects in Louisiana

Safety Evaluation of Restricted Crossing U-Turn (RCUT or J-Turn) Projects in Louisiana Safety Evaluation of Restricted Crossing U-Turn (RCUT or J-Turn) Projects in Louisiana Xiaoduan Sun University of Louisiana at Lafayette 2018 Louisiana Transportation Engineering Conference Outline Project

More information

APPENDIX A. OC Transpo Maps & Route Information

APPENDIX A. OC Transpo Maps & Route Information APPENDIX A OC Transpo Maps & Route Information OC Transpo Route 99 APPENDIX B Traffic Count Information & Collision Data VEHICULAR TURNING MOVEMENTS (15 Min. Volumes) Limebank Road & Spratt Road

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Speed Limit Study: Traffic Engineering Report

Speed Limit Study: Traffic Engineering Report Speed Limit Study: Traffic Engineering Report This report documents the engineering and traffic investigation required by Vermont Statutes Annotated Title 23, Chapter 13 1007 for a municipal legislative

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Study Area and Location District PSA Ward ANC Phase Description

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

59-2 KA Page 1 of 16

59-2 KA Page 1 of 16 59-2 KA 4812-01 Page 1 of 16 Area office to Page 2 of 16 Rock Wedge TYPICAL SECTION C 2.0 in. Overlay 2.0 in. Mill Rock Wedge 1:1 @ edge of Asphalt Match Existing Surface 30.0 ft wedge 2.0ft+ not to scale

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

1 TO 2 2 TO 12 TO 1 10 TO TO 12

1 TO 2 2 TO 12 TO 1 10 TO TO 12 STATION: New York State Department of Transportation Traffic Count Hourly Report Page of ROAD #: CR CR ROAD NAME: KINNE ST FROM: JCT JAMES/KINNE : KIRKVILLE RD COUNTY: Onondaga : Northbound FACR GROUP:

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6 Block New York Avenue NE Study Area and Location District PSA Ward ANC Phase Description 5 55 5 5B

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Over-Dimensional Vehicle Restriction Study for US 129 in TN Over-Dimensional Vehicle Restriction Study for US 129 in TN July 30,2015 TDOT Region 1 US 129 Location Map US 129 Topography and Scenery Operational and Safety Study August 2014, US129 Operational and

More information

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 4 Block 4th Street SW Study Area and Location District PSA Ward ANC Phase Description 27 6 6D Existing

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

1 TO 2 2 TO 3 12 TO 1 10 TO TO 12

1 TO 2 2 TO 3 12 TO 1 10 TO TO 12 STATION: New York State Department of Transportation Traffic Count Hourly Report Page of ROUTE #: NY ROAD NAME: FROM: RT CENTRAL SQUARE : ACC RT I COUNTY: Oswego : Northbound FACR GROUP: REC. SERIAL #:

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

1 TO 2 2 TO 3 3 TO 4 11 TO TO 1

1 TO 2 2 TO 3 3 TO 4 11 TO TO 1 STATION: New York State Department of Transportation Traffic Count Hourly Report Page of ROUTE #: NY ROAD NAME: FROM: RT : END / OLAP COUNTY: Onondaga : Eastbound FACR GROUP: REC. SERIAL #: AP FUNC. CLASS:

More information

Missouri Seat Belt Usage Survey for 2017

Missouri Seat Belt Usage Survey for 2017 Missouri Seat Belt Usage Survey for 2017 Conducted for the Highway Safety & Traffic Division of the Missouri Department of Transportation by The Missouri Safety Center University of Central Missouri Final

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

TABLE OF CONTENTS. P a g e i

TABLE OF CONTENTS. P a g e i P a g e i TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 1 INTRODUCTION... 2 2 EXISTING CONDITIONS... 3 3 QUALITATIVE ASSESSMENT... 18 4 IMPROVEMENT CONCEPT... 23 5 CONCLUSION... 27 APPENDIX... 28 Section 79230:

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

BARTON COUNTY GENERAL HIGHWAY MAP PREPARED BY THE KANSAS NE 120 RD NE 100 RD NE 80 RD NE 70 RD NE 50 RD NE 60 RD T18S T19S. County Ellsworth County

BARTON COUNTY GENERAL HIGHWAY MAP PREPARED BY THE KANSAS NE 120 RD NE 100 RD NE 80 RD NE 70 RD NE 50 RD NE 60 RD T18S T19S. County Ellsworth County TS TS NW 0 RD! Stickney! Millard!!!!! NE 00 RD NE 0 RD NE 0 RD! NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 00 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE NW 0 AVE N SUSANK RD NE 0 AVE

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Presented March 6, 2013 by Alan Plunkett, INDOT Bill Smith, INDOT Tom Brennan, Purdue Alan Plunkett/Bill Smith US 231 MOTIVATION

More information

Chapter 4 COLLISION REDUCTION PROGRAM

Chapter 4 COLLISION REDUCTION PROGRAM Chapter 4 COLLISION REDUCTION PROGRAM Table of Contents 4.0 Background...4-3 4.1 Safety Improvement Projects SHOPP 201.010 Program...4-3 4.1.1 Spot Improvements..4-3 4.1.2 Wet Improvements...4-4 4.1.3

More information

Plainfield, Indiana Speed Limit Study

Plainfield, Indiana Speed Limit Study March 21 st, 2017 Prepared on behalf of: Town of Plainfield Building and Engineering Department 206 W. Main Street Plainfield, IN 46168 (317) 839-2561 Prepared by: Thomas S. Vandenberg, PE, PTOE Matthew

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Qualitative Assessment US 1 at Old Dixie Highway 1

Qualitative Assessment US 1 at Old Dixie Highway 1 Qualitative Assessment US 1 at Old Dixie Highway 1 Project Location Map NOT TO SCALE US 1 at Old Dixie Highway LEGEND STUDY INTERSECTION Feature Summary of Existing Conditions Description Main Street US

More information

High Risk Rural Road Program Road Safety Audit Report

High Risk Rural Road Program Road Safety Audit Report High Risk Rural Road Program Road Safety Audit Report Pasco County Audit Date: December 10-11, 2009 Task Work Order No. 16 District-wide Road Safety Audit Study FPN No.: 421040-1 prepared for: Florida

More information

AASHTO Policy on Geometric Design of Highways and Streets

AASHTO Policy on Geometric Design of Highways and Streets AASHTO Policy on Geometric Design of Highways and Streets 2001 Highlights and Major Changes Since the 1994 Edition Jim Mills, P.E. Roadway Design Office 605 Suwannee Street MS-32 Tallahassee, FL 32399-0450

More information

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo

Kansas City Missouri Public Works 414 East 12th Street Kansas City, Mo Page No : 1 Groups Printed- Unshifted Southbound Westbound Northbound Eastbound Start Time Peds App. Total Peds App. Total Peds App. Total Peds App. Total Exclu. Total Inclu. Total Int. Total 07:00 AM

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

HSIP FUNDING APPLICATION

HSIP FUNDING APPLICATION HSIP FUNDING APPLICATION Lucas County - Sylvania Ave at Centennial Rd DATE 10/6/2011 Project Information: COUNTY Lucas County LOCATION TYPE Intersection PROJECT SERVICE LIFE 20 years SEGMENT INFORMATION

More information

Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development of Safety Performance Functions

Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development of Safety Performance Functions LATIN AMERICAN AND CARIBBEAN CONFERENCE FOR ENGINEERING AND TECHNOLOGY (LACCEI 2014) Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development

More information

Study Area and Location District PSA Ward ANC Phase Description C Existing 100 Block Michigan Avenue Northeast Westbound

Study Area and Location District PSA Ward ANC Phase Description C Existing 100 Block Michigan Avenue Northeast Westbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1 Block Michigan Avenue NE W/B Study Area and Location District PSA Ward ANC Phase Description 5 45

More information

Smoothness Specification Update

Smoothness Specification Update Florida Department of TRANSPORTATION Smoothness Specification Update 38 th Annual Asphalt Conference September 9, 2014 Intents Separate Rolling Straightedge from Laser Profiler Create Ride Quality (Smoothness)

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

STATE HIGHWAY ADMINISTRATION RESEARCH REPORT. Safety Analysis for the Prioritized Three Safety Improvement Locations on I-495

STATE HIGHWAY ADMINISTRATION RESEARCH REPORT. Safety Analysis for the Prioritized Three Safety Improvement Locations on I-495 Task SHA/MSU/4-1 Martin O Malley, Governor Anthony G. Brown, Lt. Governor James T. Smith Jr., Secretary Melinda B. Peters, Administrator STATE HIGHWAY ADMINISTRATION RESEARCH REPORT Safety Analysis for

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Act 229 Evaluation Report

Act 229 Evaluation Report R22-1 W21-19 W21-20 Act 229 Evaluation Report Prepared for Prepared by Table of Contents 1. Documentation Page 3 2. Executive Summary 4 2.1. Purpose 4 2.2. Evaluation Results 4 3. Background 4 4. Approach

More information

Study Area and Location District PSA Ward ANC Phase Description C Proposed 2600 Block Lincoln Road Northeast Northbound

Study Area and Location District PSA Ward ANC Phase Description C Proposed 2600 Block Lincoln Road Northeast Northbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 2600 Block Lincoln Road NE Study Area and Location District PSA Ward ANC Phase Description 5 502 5 5C

More information

DIVISION V SURFACINGS AND PAVEMENTS

DIVISION V SURFACINGS AND PAVEMENTS 36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Characterization of Combined Use of County Road Segment

Characterization of Combined Use of County Road Segment Department of Public Works Inyo County, California Characterization of Combined Use of County Road Segment Segment Name: _Lone Pine No. 1_ Purpose: Which of the following does the combined-use segment

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

2002 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 129

2002 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 129 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Special Locality Report 129 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration

More information

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Bill Kenny P.Eng, Director: Design, Project Management and Training, Technical Standards Branch. - July 2011 What are Rumble Strips? A preventative

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

AusRAP assessment of Peak Downs Highway 2013

AusRAP assessment of Peak Downs Highway 2013 AusRAP assessment of Peak Downs Highway 2013 SUMMARY The Royal Automobile Club of Queensland (RACQ) commissioned an AusRAP assessment of Peak Downs Highway based on the irap protocol. The purpose is to

More information

Interstate Drive Extension

Interstate Drive Extension Interstate Drive Extension Sponsor County Highway Project No. RB19-000004 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,700,000.00 $2,150,000.00 Project Description This project continues

More information

Transportation accomplishments

Transportation accomplishments 1 1 Welcome Transportation accomplishments Federal Funding State Funding Challenges Future Projects 2 Transportation Project: The NDDOT had a record construction season in 2011. Completed $595.6 million

More information

2016 Kansas Traffic Crash Facts. Definitions

2016 Kansas Traffic Crash Facts. Definitions Definitions SPECIAL NOTE: Prior to 2005, the minimum criteria for reporting motor vehicle crashes for statistical purposes in Kansas were a non-injury crash occurring on or from a public roadway with over

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by: State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report Prepared for: City of Morro Bay Prepared by: (Caltrans Project No. 0515000104, EA 0F670) State Route 1/State Route

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 1.2 APPLICABILITY... 1.3 DEFINITIONS... 1.4 STATE ENABLING LEGISLATION... 2.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 2.6 ESTABLISHING

More information

CUY SAFETY STUDY KINSMAN RD (US 422) AT E. 93 RD ST CLEVELAND, OHIO - ODOT DISTRICT 12. October 13, LJB Inc.

CUY SAFETY STUDY KINSMAN RD (US 422) AT E. 93 RD ST CLEVELAND, OHIO - ODOT DISTRICT 12. October 13, LJB Inc. CUY-422-4.34 SAFETY STUDY KINSMAN RD (US 422) AT E. 93 RD ST CLEVELAND, OHIO - ODOT DISTRICT 12 October 13, 2014 PREPARED BY: LJB Inc. 2500 Newmark Drive Miamisburg, OH 45342 (937) 259-5000 Elizabeth L.

More information

Crash Reconstruction Crash Report and assessment Road Safety Reviews Road Safety Assessment Case Studies/Evaluation

Crash Reconstruction Crash Report and assessment Road Safety Reviews Road Safety Assessment Case Studies/Evaluation Road Assessments Crash Reconstruction Crash Report and assessment Road Safety Reviews Road Safety Assessment Case Studies/Evaluation Crash Reconstruction Illinois State Police Illinois Crash Report Assessment

More information

Buffalo Drive Road Safety Audit

Buffalo Drive Road Safety Audit UPWP Task 6410-11 Contract No: 11-050 Buffalo Drive Road Safety Audit CC 215 to Blue Diamond Road (SR 160) PRE CONSTRUCTION PHASE AUDIT Prepared for: Regional Transportation Commission of Southern Nevada

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Chapter III Geometric design of Highways. Tewodros N.

Chapter III Geometric design of Highways. Tewodros N. Chapter III Geometric design of Highways Tewodros N. www.tnigatu.wordpress.com tedynihe@gmail.com Introduction Appropriate Geometric Standards Design Controls and Criteria Design Class Sight Distance Design

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

Local Road Safety Program. Marie B. Walsh, Director Louisiana LTAP January 10, 2011 Louisiana Transportation Conference

Local Road Safety Program. Marie B. Walsh, Director Louisiana LTAP January 10, 2011 Louisiana Transportation Conference Local Road Safety Program Marie B. Walsh, Director Louisiana LTAP January 10, 2011 Louisiana Transportation Conference Local Road Safety Program Addresses the ALL public road inclusion of SAFETEA-LU Primary

More information

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT MICHIGAN OHIO UNIVERSITY TRANSPORTATION CENTER Alternate energy and system mobility to stimulate economic development. Report No: MIOH UTC TS41p1-2 2012-Final TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION

More information