1 COST ESTIMATES: Curb-Running

2 PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway Sections 1 to 6 - Roadway Items $ 49,346,740 Section 8 - Minor Items $ 2,467,337 Section 9 - Roadway Mobilization $ 5,181,408 Section 10 - Roadway Additions $ 12,953,519 $ 69,949,004 Ic-Off-Site Improvements $ 21,402,784 II- Masonic Alternative Cost $ 4,246,932 III- Fillmore Alternative Cost $ 6,011,386 III- Right of Way Items $ - SF Arts Commission at 2% 2% $ 2,032,202 Total Capital Outlay $ 103,642,308 Capital Outlay Support 30% 31,092,692 Total Project Feasibility Cost Estimate (Q Dollars) $ 134,800,000 Yearly Escalation Cost (5% per year) $ 6,740,000 Escalated Project Cost for the Year 2010 $ 26,960,000 Total Project Feasibility Cost Estimate (Q Dollars) $ 161,760,000 General Notes I- Roadway Items: All Roadway Items excluding Ic-Off-site Improvements include Limited and Local Station improvements and pedestrian safety enhancements along the corridor outside of the project limits(48th to 33rd) and (Gought st to Market St) II- Geary at Masonic Alternative Cost, including all roadway items on Geary from Collins to Presidio. III- Geary at Fillmore Alternative Cost, including all roadway items on Geary from Steiner to Webster. IV- Right of Way Items - Needs to be checked with DPT and DPW SF Arts Commission at 2% (1) The 2% allowance for the SF Arts Commission is based upon the Commission's current policy. Capital Outlay Support (1) Capital Outlay Support is comprised of project management, detailed design, construction engineering, and construction administration.

3 PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 I. ROADWAY ITEMS Unit Specifics (if applicable) Fillmore Masonic/ Total Section 1 Earthwork /Geary Geary All other Quantity Unit Unit Price Item Cost Notes Roadway Excavation 43,009 43,010 CY $ 20 $ 860,200 Based on assumed structural section shown in Sect. V. Includes all removal within footprint of new Running way. Remove Existing Pavement 4,075 4,080 CY $ 35 $ 142,800 Applicable in areas where Roadway Ex. Does not apply Cold Plane Existing Pavement - SY $ - N/A. No existing street resurfacing assumed. Remove Existing Curb and Gutter 14,368 14,370 LF $ 20 $ 287,400 Remove Existing Sidewalk 1,344 1,350 CY $ 30 $ 40,500 Remove Concrete (Parking Pad) 5,985 5,990 CY $ 100 $ 599,000 Includes removal of pavement, Concrete Curb, SW and any excavation needed to accommodate the new ADA Parking Pad, based on structural section shown in Sect. V. Clearing & Grubbing 22,994 23,000 SY $ 2 $ 46,000 Applies to landscaping in existing medians If outside of excavation footprint. Subtotal Earthwork $ 1,975,900 Section 2 Pavement Structural Section Asphalt Concrete TON $ $ 18,700 Based on assumed structural section shown in Sect. V. Asphalt Concrete (Colored) - TON $ - PCC Base 13,482 13,482 SF $ $ 134,820 Based on new street structural section shown in Sect. V. PCC Pavement (Colored) 13,795 13,800 CY $ 300 $ 4,140,000 Running way pavement assumed to be colored PCC. Minor Concrete (Station Platform) 1,105 1,110 CY $ 650 $ 721,500 N/A for Side Running option. Station will be place son existing Sidewalks Minor Concrete (Median Pavement) CY $ 360 $ 21,600 Median paving for all median noses and medians too thin to be landscaped Minor Concrete (Median Curb) 8,761 8,770 LF $ 16 $ 140,320 Minor Concrete (Rolled Curb) - - LF $ 25 $ - N/A for Side Running option Minor Concrete (Curb and Gutter) 17,771 17,780 LF $ 60 $ 1,066,800 Minor Concrete (Curb Ramp) CY $ 570 $ 153,900 Minor Concrete (Sidewalk) 162, ,140 SF $ 15 $ 2,432,100 Based on assumed structural section shown in Sect. V. Minor Concrete (SW Reconstruct) 82,740 82,740 SF $ 15 $ 1,241,100 Based on assumed structural section shown in Sect. V. Minor Concrete (Parking Pad) 1,975 1,980 CY $ 650 $ 1,287,000 Based on assumed structural section shown in Sect. V. Aggregate Base 29,265 29,270 CY $ 60 $ 1,756,200 Based on assumed structural sections shown in Sect. V. Aggregate Base (SW Reconstruct) 1,011 1,020 CY $ 60 $ 61,200 Based on assumed structural sections shown in Sect. V. Aggregate Base (Parking Pad) 3,980 3,990 CY $ 60 $ 239,400 Based on assumed structural sections shown in Sect. V. Aggregate Subbase - CY $ - Subtotal Pavement Structural Section $ 13,414,640 Section 3 Drainage $ - Reconstruct Drainage Inlet EA $ 10,000 $ 2,130,000 Quantity based on the TA's field survey Drainage Inlet - EA $ 5,000 $ - Drainage Pipe - LF $ 60 $ - Subtotal Drainage $ 2,130,000 Section 4 Specialty Items Utility Relocations (Unknowns) 19,023 19,100 LF $ 50 $ 955,000 Assumed for any misc. utility relocation/modification on a per ft of roadway basis. Relocate Fire Hydrants (low Pressure) EA $ 12,000 $ 1,116,000 Relocate Fire Hydrant and water line. Relocate Fire Hydrants (High Pressure) 6 6 EA $ 30,000 $ 180,000 Relocate Fire Hydrant and water line. Relocate Existing Power Poles EA $ 8,000 $ 376,000 Landscaping Median 206, ,000 SF $ 20 $ 4,140,000 All medians assumed to be relandscaped Street Trees EA $ 350 $ 108,500 Unit cost per TA recommendation Imported Borrow/Fill 0 - CY $ 3 $ - Assumes available fill dirt in vicinity Remove Retaining Wall 0 - SF $ 11 $ - Assumes a 12" thick retaining wall Remove Pedestrian Bridge 0 - CY $ 115 $ - Aassumes a 4' thick bridge deck Remove Bridge 0 - CY $ 115 $ - Aassumes a 3.5' thick bridge deck Urban Design BLOCK $ 50,000 $ 2,500,000 Resident Engineer Office Space - YEAR $ - Water Pollution Control 1 LS $ 50,000 $ 50,000 Hazardous Waste Mitigation Work $ - Environmental Mitigation $ - Subtotal Specialty Items $ 9,425,500

4 PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 I. ROADWAY ITEMS Section 5 Traffic Items Relocated Existing Street Lights 7 7 EA $ 6,000 $ 42,000 Assumed to relocated all Street lights Modify Traffic Signals EA $ 30,000 $ 1,020,000 Assumed at every traffic signal Remove Existing Striping 0 - LF $ 6.15 $ - Traffic Stripes 72,662 72,700 LF $ 3.00 $ 218,100 Quantified for one representative block and apply along corridor. Slurry Seal Existing Street 83,585 83,600 SY $ 1 $ 83,600 Assumed for all unaltered existing pavement Pavement Markings 11,532 11,600 SF $ 3 $ 34,800 Muni OCS (Replace) - MILE $ - Muni OCS Intrsctns (Complex) - EA $ - Muni OCS Intrsctns (Semi-complex) - EA $ - Muni OCS Intrsctns (Simple) - EA $ - Roadside Signs EA $ 1,000 $ 196,000 Quantified for one representative block and apply along corridor. Traffic Control Systems 330 WKDY $ 3,000 $ 990,000 Transportation Management Plan LS $ 75,000 $ - Temporary Lighting $ - Subtotal Traffic Items $ 2,584,500 Section 6 BRT Platform Items Generally based on 3rd Street Light Rail Costs Canopy: Structure & Glass Roof EA $ 153,500 $ 2,763,000 Windscreens EA $ 43,000 $ 774,000 Display Cases EA $ 13,800 $ 248,400 Seating EA $ 1,500 $ 27,000 Finishes - painting, tile, pavers EA $ 70,700 $ 1,272,600 Rails & Edge Guards EA $ 49,600 $ 892,800 Signage EA $ 21,400 $ 385,200 Signage - Spare EA $ 25,200 $ 453,600 Lighting EA $ 39,400 $ 709,200 CCTV and Comms with fiber EA $ 88,500 $ 1,593,000 Ticket Vending Machines (TVM) EA $ 150,000 $ 2,700,000 TVM Signage EA $ 1,100 $ 19,800 TVM Signage - Spare EA $ 400 $ 7,200 Regular Bus Stop Shelter EA $ 10,000 $ 180,000 $ - BRT Platform Items $ 12,025,800 Section 7 Local Platform Items Generally based on 3rd Street Light Rail Costs Canopy: Structure & Glass Roof - EA $ 153,500 $ - Windscreens - EA $ 43,000 $ - Display Cases EA $ 13,800 $ 331,200 Seating EA $ 1,500 $ 36,000 Finishes - painting, tile, pavers - EA $ 70,700 $ - Rails & Edge Guards - EA $ 49,600 $ - Signage EA $ 21,400 $ 513,600 Signage - Spare - EA $ 25,200 $ - Lighting EA $ 39,400 $ 945,600 CCTV and Comms with fiber EA $ 88,500 $ 2,124,000 Ticket Vending Machines (TVM) EA $ 150,000 $ 3,600,000 TVM Signage - EA $ 1,100 $ - TVM Signage - Spare - EA $ 400 $ - Regular Bus Stop Shelter EA $ 10,000 $ 240,000 $ - Local Platform Items $ 7,790,400 Total Roadway Items (Section 1 thru 7) $ 49,346,740

5 Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 I. ROADWAY ITEMS PROJECT FEASIBILITY COST ESTIMATE SUMMARY Section 8 Minor Items Section 9 Roadway Mobilization Item cost $ 49,346,740 x 5% $ 2,467,337 (Subtotal Section 1 thru 6) TOTAL MINOR ITEMS $ 2,467,337 Item cost $ 51,814,077 x 10% $ 5,181,408 (Subtotal Section 1 thru 7) TOTAL ROADWAY MOBILIZATION $ 5,181,408 Section 10 Roadway Additions Item cost Supplemental Work $ 51,814,077 x 5% $ 2,590,704 (Subtotal Section 1 thru 7) Contingencies $ 51,814,077 x 20% $ 10,362,815 (Subtotal Section 1 thru 7) TOTAL ROADWAY ADDITIONS $ 12,953,519 Notes: Percentages for Sections 7, 8, and 9 are based on Caltrans' Project Development Procedure Manual TOTAL ROADWAY ITEMS $ 69,949,004 (Subtotal Sections 1 thru 9)

6 COST ESTIMATES: Center-Side

7 PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Center Lanes with Side Medians (Middle Running) Percent Cost Total Project Capital Outlay I- Roadway Items Sections 1 thru 6 - Roadway Items $ 74,374,220 Section 7 - Minor Items $ 3,718,711 Sections 8 - Roadway Mobilization $ 7,809,293 Sect. 9 - Roadway Additions $ 27,332,526 $ 113,234,750 II- Structures Items $ - III- Right of Way Items $ - SF Arts Commission at 2% 2% $ 2,264,695 Total Capital Outlay $ 115,499,445 Capital Outlay Support 30% 34,649,833 Total Project Feasibility Cost Estimate (Q Dollars) $ 150,200,000 Escalated Project Cost for the year 2012 Yearly Escalation Cost 18% $27,036,000 Total Project Feasibility Cost Estimate (Q Dollars) $ 177,236,000 General Notes I- Roadway Items: II- Structures Items from Geary at Masonic and Fillmore are included under Roadway Items III- Right of Way Items - Needs to be checked with DPT and DPW SF Arts Commission at 2% (1) The 2% allowance for the SF Arts Commission is based upon the Commission's current policy. Capital Outlay Support (1) Capital Outlay Support is comprised of project management, detailed design, construction engineering, and construction administration.

8 Geary Bus Rapid Transit Study Alternative: Center Lanes with Side Medians (Middle Running) I. ROADWAY ITEMS PROJECT FEASIBILITY COST ESTIMATE SUMMARY Unit Specifics (if applicable) Fillmore Masonic/ Total Section 1 Earthwork /Geary Geary All other Quantity Unit Unit Price Item Cost Notes Based on assumed structural section shown in Sect. IV. Includes all removal Roadway Excavation ,998 38,000 CY $ 20 $ 760,000 within footprint of new Running way. Remove Existing Pavement ,144 12,150 CY $ 35 $ 425,250 Applicable in areas where Roadway Ex. Does not apply Cold Plane Existing Pavement - SY $ - N/A. No existing street resurfacing assumed. Remove Existing Curb and Gutter ,994 13,000 LF $ 20 $ 260,000 Remove Existing Sidewalk 0 0 1,451 1,460 CY $ 30 $ 43,800 Remove Concrete (Parking Pad) 5,985 5,990 CY $ 100 $ 599,000 Includes removal of pavement, Concrete Curb, SW and any excavation needed to accommodate the new ADA Parking Pad, based on structural section shown in Sect IV. Imported Borrow/Fill CY $ 3 $ - Assumes available fill dirt in vicinity Clearing & Grubbing SY $ 2 $ - Applies to landscaping in existing medians If outside of excavation footprint. Subtotal Earthwork $ 2,088,050 Section 2 Pavement Structural Section Asphalt Concrete TON $ $ 18,700 Based on assumed structural section shown in Sect. IV. Asphalt Concrete (Colored) - TON $ - PCC Base ,482 13,490 SF $ $ 134,900 Based on assumed structural section shown in Sect. IV. PCC Pavement (Colored) ,188 12,190 CY $ 300 $ 3,657,000 Running way pavement assumed to be colored PCC. Minor Concrete (Station Platform) 0 0 1,271 1,280 CY $ 650 $ 832,000 Minor Concrete (Median Pavement) CY $ 360 $ 21,600 Median paving for all median noses and medians too thin to be landscaped Minor Concrete (Median Curb) ,268 49,270 LF $ 16 $ 788,320 Minor Conc LF $ 25 $ - N/A for median running with side platforms. Minor Concrete (Curb and Gutter) ,749 16,750 LF $ 60 $ 1,005,000 Minor Concrete (Curb Ramp) CY $ 570 $ 159,600 Minor Concrete (Sidewalk) 0 180, ,140 SF $ 15 $ 2,702,100 Based on assumed structural section shown in Sect. IV. Minor Concrete (SW Reconstruct) 80,800 80,800 SF $ 15 $ 1,212,000 Based on assumed structural section shown in Sect. IV. Minor Concrete (Parking Pad) 1,975 1,980 CY $ 650 $ 1,287,000 Based on assumed structural section shown in Sect. IV. Aggregate Base ,860 25,870 CY $ 60 $ 1,552,200 Based on assumed structural sections shown in Sect. IV. Aggregate Base (SW Reconstruct) CY $ 60 $ 59,400 Based on assumed structural sections shown in Sect. IV. Aggregate Base (Parking Pad) 3,980 3,990 CY $ 60 $ 239,400 Based on assumed structural sections shown in Sect. IV. Aggregate Subbase - CY $ - Subtotal Pavement Structural Section $ 13,669,220 Section 3 Drainage $ - Reconstruct Drainage Inlet EA $ 10,000 $ 2,130,000 Quantity based on the TA's field survey Drainage Inlet - EA $ 5,000 $ - Drainage Pipe - LF $ 60 $ - Subtotal Drainage $ 2,130,000 Section 4 Specialty Items Utility Relocations (Unknowns) ,574 18,600 LF $ 50 $ 930,000 Assumed for any misc. utility relocation/modification on a per ft of roadway basis. Relocate Ex. Fire Hydrant (High Press EA $ 12,000 $ 1,212,000 Relocate Fire Hydrant and water line. Relocate Ex. Fire Hydrants (Low Pressure) 8 8 EA $ 30,000 $ 240,000 Relocate Fire Hydrant and water line. Relocate Existing Power Poles EA $ 8,000 $ 296,000 Landscaping Median , ,200 SF $ 20 $ 4,664,000 Street Trees EA $ 350 $ 108,500 Unit cost per TA recommendation Remove Retaining Wall SF $ 11 $ - Remove Pedestrian Bridge CY $ 115 $ 51,750 Remove Bridge CY $ 115 $ - Retaining Wall SF $ 50 $ - Concrete Slab (Tunnel) SF $ 205 $ - Remove Concrete Slab (Tunnel) SF $ 100 $ -

9 Geary Bus Rapid Transit Study Alternative: Center Lanes with Side Medians (Middle Running) I. ROADWAY ITEMS PROJECT FEASIBILITY COST ESTIMATE SUMMARY Urban Design BLOCK $ 50,000 $ 2,750,000 Resident Engineer Office Space - YEAR $ - Water Pollution Control 1 LS $ 50,000 $ 50,000 Hazardous Waste Mitigation Work $ - Environmental Mitigation $ - Subtotal Specialty Items $ 10,302,250

10 Geary Bus Rapid Transit Study Alternative: Center Lanes with Side Medians (Middle Running) I. ROADWAY ITEMS PROJECT FEASIBILITY COST ESTIMATE SUMMARY Section 5 Traffic Items Relocated Existing Street Lights EA $ 6,000 $ 948,000 Assumed to relocated all Street lights Modify Traffic Signals EA $ 30,000 $ 1,230,000 Assumed at every traffic signal Remove Existing Striping - LF $ 6.25 $ - Quantified for one representative block and apply along corridor. Traffic Stripes ,754 70,800 LF $ 3.00 $ 212,400 Quantified for one representative block and apply along corridor. Slurry Seal Existing Street , ,800 SY $ 1 $ 125,800 Assumed for all unaltered existing pavement Pavement Markings ,532 11,600 SF $ 3 $ 34,800 Muni OCS (Replace) - MILE $ - Muni OCS Intrsctns (Complex) - EA $ - Muni OCS Intrsctns (Semi-complex) - EA $ - Muni OCS Intrsctns (Simple) - EA $ - Roadside Signs EA $ 1,000 $ 196,000 Quantified for one representative block and apply along corridor. Traffic Control Systems 330 WKDY $ 3,000 $ 990,000 Transportation Management Plan LS $ 75,000 $ - Temporary Lighting $ - Subtotal Traffic Items $ 3,737,000 Section 6 BRT Platform Items Generally based on 3rd Street Light Rail Costs Canopy: Structure & Glass Roof EA $ 153,500 $ 4,451,500 Windscreens EA $ 43,000 $ 1,247,000 Display Cases EA $ 13,800 $ 400,200 Seating EA $ 1,500 $ 43,500 Finishes - painting, tile, pavers EA $ 70,700 $ 2,050,300 Rails & Edge Guards EA $ 49,600 $ 1,438,400 Signage EA $ 21,400 $ 620,600 Signage - Spare EA $ 25,200 $ 730,800 Lighting EA $ 39,400 $ 1,142,600 CCTV and Comms with fiber EA $ 88,500 $ 2,566,500 Ticket Vending Machines (TVM) EA $ 150,000 $ 4,350,000 TVM Signage EA $ 1,100 $ 31,900 TVM Signage - Spare EA $ 400 $ 11,600 Regular Bus Stop Shelter EA $ 10,000 $ 290,000 Underground Ventilation System 1 1 EA $ 1,000,000 $ 1,000,000 Elevators 0 - EA $ 162,000 $ - Includes elevator shaft and pedestrian access structure Staiways 0 - EA $ 37,500 $ - Based on a 25' verical rise stairways BRT Platform Items $ 20,374,900 Section 7 Local Platform Items Generally based on 3rd Street Light Rail Costs Canopy: Structure & Glass Roof - EA $ 153,500 $ - Windscreens - EA $ 43,000 $ - Display Cases EA $ 13,800 $ 938,400 Seating EA $ 1,500 $ 102,000 Finishes - painting, tile, pavers - EA $ 70,700 $ - Rails & Edge Guards - EA $ 49,600 $ - Signage EA $ 21,400 $ 1,455,200 Signage - Spare - EA $ 25,200 $ - Lighting EA $ 39,400 $ 2,679,200 CCTV and Comms with fiber EA $ 88,500 $ 6,018,000 Ticket Vending Machines (TVM) EA $ 150,000 $ 10,200,000 TVM Signage - EA $ 1,100 $ - TVM Signage - Spare - EA $ 400 $ - Regular Bus Stop Shelter EA $ 10,000 $ 680,000 $ - Local Platform Items $ 22,072,800 Total Roadway Items (Section 1 thru 7) $ 74,374,220

11 Geary Bus Rapid Transit Study Alternative: Center Lanes with Side Medians (Middle Running) I. ROADWAY ITEMS PROJECT FEASIBILITY COST ESTIMATE SUMMARY Section 7 Minor Items Section 8 Roadway Mobilization Item cost $ 74,374,220 x 5% $ 3,718,711 (Subtotal Section 1 thru 6) TOTAL MINOR ITEMS $ 3,718,711 Item cost $ 78,092,931 x 10% $ 7,809,293 (Subtotal Section 1 thru 7) TOTAL ROADWAY MOBILIZATION $ 7,809,293 Section 9 Roadway Additions Item cost Supplemental Work $ 78,092,931 x 5% $ 3,904,647 (Subtotal Section 1 thru 7) Contingencies $ 78,092,931 x 30% $ 23,427,879 (Subtotal Section 1 thru 7) TOTAL ROADWAY ADDITIONS $ 27,332,526 Notes: Percentages for Sections 7, 8, and 9 are based on Caltrans' Project Development Procedure Manual TOTAL ROADWAY ITEMS $ 113,234,750 (Subtotal Sections 1 thru 9)

12 COST ESTIMATES: Geary at Fillmore and at Masonic

13 PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Fillmore & Masonic Curb Running Percent Cost Total Project Capital Outlay I- Roadway Sections 1 to 6 - Roadway Items $ 7,814,510 Section 7 - Minor Items $ 390,726 Sections 8 - Roadway Mobilization $ 820,524 Sect. 9 - Roadway Additions $ 2,051,309 $ 11,077,068 II- Structures Items $ - III- Right of Way Items $ - SF Arts Commission at 2% 2% $ 221,541 Total Capital Outlay $ 11,298,609 Capital Outlay Support 50% 5,649,305 Total Project Feasibility Cost Estimate (Q Dollars) $ 17,000,000 Escalated Project Cost for the year 2012 Yearly Escalation Cost (3% per year) 18% $3,060,000 Total Project Feasibility Cost Estimate (Q Dollars) $ 20,060,000 General Notes I- Roadway Items: II- Structures Items from Geary at Masonic and Fillmore are included under Roadway Items III- Right of Way Items - Needs to be checked with DPT and DPW SF Arts Commission at 2% (1) The 2% allowance for the SF Arts Commission is based upon the Commission's current policy. Capital Outlay Support (1) Capital Outlay Support is comprised of project management, detailed design, construction engineering, and construction administration.

14 COST ESTIMATES: Geary at Fillmore and at Masonic

15 PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Fillmore & Masonic Center Percent Cost Total Project Capital Outlay I- Roadway Items Sections 1 thru 6 - Roadway Items $ 11,939,740 Section 7 - Minor Items $ 596,987 Sections 8 - Roadway Mobilization $ 1,253,673 Sect. 9 - Roadway Additions $ 6,895,200 $ 20,685,600 II- Structures Items $ - III- Right of Way Items $ - SF Arts Commission at 2% 2% $ 413,712 Total Capital Outlay $ 21,099,312 Capital Outlay Support 50% 10,549,656 Total Project Feasibility Cost Estimate (Q Dollars) $ 31,700,000 Escalated Project Cost for the year 2012 Yearly Escalation Cost 18% $5,706,000 Total Project Feasibility Cost Estimate (Q Dollars) $ 37,406,000 General Notes I- Roadway Items: II- Structures Items from Geary at Masonic and Fillmore are included under Roadway Items III- Right of Way Items - Needs to be checked with DPT and DPW SF Arts Commission at 2% (1) The 2% allowance for the SF Arts Commission is based upon the Commission's current policy. Capital Outlay Support (1) Capital Outlay Support is comprised of project management, detailed design, construction engineering, and construction administration.

16 Geary Bus Rapid Transit Study Alternative: Fillmore & Masonic Center Alternative: Fillmore & Masonic Center PROJECT FEASIBILITY COST ESTIMATE SUMMARY Unit Specifics (if applicable) Fillmore Masonic/ Total Section 1 Earthwork /Geary Geary All other Quantity Unit Unit Price Item Cost Notes Based on assumed structural section shown in Sect. IV. Includes all removal Roadway Excavation 0 6,188 6,190 CY $ 20 $ 123,800 within footprint of new Running way. Remove Existing Pavement 0 1,676 1,680 CY $ 35 $ 58,800 Applicable in areas where Roadway Ex. Does not apply Cold Plane Existing Pavement - SY $ - N/A. No existing street resurfacing assumed. Remove Existing Curb and Gutter LF $ 20 $ - Remove Existing Sidewalk CY $ 30 $ - Remove Concrete (Parking Pad) - CY $ 100 $ - Includes removal of pavement, Concrete Curb, SW and any excavation needed to accommodate the new ADA Parking Pad, based on structural section shown in Sect IV. Imported Borrow/Fill 21,400 7,780 29,180 CY $ 3 $ 87,540 Assumes available fill dirt in vicinity Clearing & Grubbing SY $ 2 $ - Applies to landscaping in existing medians If outside of excavation footprint. Subtotal Earthwork $ 270,140 Section 2 Pavement Structural Section Asphalt Concrete TON $ $ 55,000 Based on assumed structural section shown in Sect. IV. Asphalt Concrete (Colored) - TON $ - PCC Base 24,700 10,023 34,730 SF $ $ 347,300 Based on assumed structural section shown in Sect. IV. PCC Pavement (Colored) 710 1,807 2,520 CY $ 300 $ 756,000 Running way pavement assumed to be colored PCC. Minor Concrete (Station Platform) CY $ 650 $ 221,000 Minor Concrete (Median Pavement) CY $ 360 $ 10,800 Median paving for all median noses and medians too thin to be landscaped Minor Concrete (Median Curb) 3,280 6,500 9,780 LF $ 16 $ 156,480 Minor Conc LF $ 25 $ - N/A for median running with side platforms. Minor Concrete (Curb and Gutter) LF $ 60 $ 49,200 Minor Concrete (Curb Ramp) - CY $ 570 $ - Minor Concrete (Sidewalk) 15,650 15,650 SF $ 15 $ 234,750 Based on assumed structural section shown in Sect. IV. Minor Concrete (SW Reconstruct) - SF $ 15 $ - Based on assumed structural section shown in Sect. IV. Minor Concrete (Parking Pad) - CY $ 650 $ - Based on assumed structural section shown in Sect. IV. Aggregate Base 1,509 3,841 5,350 CY $ 60 $ 321,000 Based on assumed structural sections shown in Sect. IV. Aggregate Base (SW Reconstruct) - CY $ 60 $ - Based on assumed structural sections shown in Sect. IV. Aggregate Base (Parking Pad) - CY $ 60 $ - Based on assumed structural sections shown in Sect. IV. Aggregate Subbase - CY $ - Subtotal Pavement Structural Section $ 2,151,530 Section 3 Drainage $ - Reconstruct Drainage Inlet - EA $ 10,000 $ - Quantity based on the TA's field survey Drainage Inlet - EA $ 5,000 $ - Drainage Pipe - LF $ 60 $ - Subtotal Drainage $ - Section 4 Specialty Items Utility Relocations (Unknowns) 982 2,126 3,200 LF $ 50 $ 160,000 Assumed for any misc. utility relocation/modification on a per ft of roadway basis. Relocate Ex. Fire Hydrant (High Press EA $ 12,000 $ - Relocate Fire Hydrant and water line. Relocate Ex. Fire Hydrants (Low Pressure) - EA $ 30,000 $ - Relocate Fire Hydrant and water line. Relocate Existing Power Poles EA $ 8,000 $ - Landscaping Median 22,840 27,880 50,800 SF $ 20 $ 1,016,000 Street Trees EA $ 350 $ 21,000 Unit cost per TA recommendation Remove Retaining Wall 5,370 20,600 25,970 SF $ 11 $ 285,670 Remove Pedestrian Bridge CY $ 115 $ - Remove Bridge CY $ 115 $ 78,200 Retaining Wall 0 20,600 20,600 SF $ 50 $ 1,030,000 Concrete Slab (Tunnel) SF $ 205 $ 147,600 Remove Concrete Slab (Tunnel) SF $ 100 $ 72,000

17 Geary Bus Rapid Transit Study Alternative: Fillmore & Masonic Center Alternative: Fillmore & Masonic Center PROJECT FEASIBILITY COST ESTIMATE SUMMARY Urban Design - BLOCK $ 50,000 $ - Resident Engineer Office Space - YEAR $ - Water Pollution Control 1 LS $ 50,000 $ 50,000 Hazardous Waste Mitigation Work $ - Environmental Mitigation $ - Subtotal Specialty Items $ 2,860,470

18 Geary Bus Rapid Transit Study Alternative: Fillmore & Masonic Center Alternative: Fillmore & Masonic Center PROJECT FEASIBILITY COST ESTIMATE SUMMARY Section 5 Traffic Items Relocated Existing Street Lights EA $ 6,000 $ 138,000 Assumed to relocated all Street lights Modify Traffic Signals - EA $ 30,000 $ - Assumed at every traffic signal Remove Existing Striping - LF $ 6.25 $ - Quantified for one representative block and apply along corridor. Traffic Stripes 4,174 9,036 13,300 LF $ 3.00 $ 39,900 Quantified for one representative block and apply along corridor. Slurry Seal Existing Street 4,364 9,449 13,900 SY $ 1 $ 13,900 Assumed for all unaltered existing pavement Pavement Markings ,000 SF $ 3 $ 3,000 Muni OCS (Replace) - MILE $ - Muni OCS Intrsctns (Complex) - EA $ - Muni OCS Intrsctns (Semi-complex) - EA $ - Muni OCS Intrsctns (Simple) - EA $ - Roadside Signs EA $ 1,000 $ 28,000 Quantified for one representative block and apply along corridor. Traffic Control Systems 330 WKDY $ 3,000 $ 990,000 Transportation Management Plan LS $ 75,000 $ - Temporary Lighting $ - Subtotal Traffic Items $ 1,212,800 Section 6 BRT Platform Items Generally based on 3rd Street Light Rail Costs Canopy: Structure & Glass Roof 4 4 EA $ 153,500 $ 614,000 Windscreens 4 4 EA $ 43,000 $ 172,000 Display Cases 4 4 EA $ 13,800 $ 55,200 Seating 4 4 EA $ 1,500 $ 6,000 Finishes - painting, tile, pavers 4 4 EA $ 70,700 $ 282,800 Rails & Edge Guards 4 4 EA $ 49,600 $ 198,400 Signage 4 4 EA $ 21,400 $ 85,600 Signage - Spare 4 4 EA $ 25,200 $ 100,800 Lighting 4 4 EA $ 39,400 $ 157,600 CCTV and Comms with fiber 4 4 EA $ 88,500 $ 354,000 Ticket Vending Machines (TVM) 4 4 EA $ 150,000 $ 600,000 TVM Signage 4 4 EA $ 1,100 $ 4,400 TVM Signage - Spare 4 4 EA $ 400 $ 1,600 Regular Bus Stop Shelter 4 4 EA $ 10,000 $ 40,000 Underground Ventilation System 1 1 EA $ 1,000,000 $ 1,000,000 Elevators 2 2 EA $ 162,000 $ 324,000 Includes elevator shaft and pedestrian access structure Staiways 4 4 EA $ 37,500 $ 150,000 Based on a 25' verical rise stairways BRT Platform Items $ 4,146,400 Section 7 Local Platform Items Generally based on 3rd Street Light Rail Costs Canopy: Structure & Glass Roof - EA $ 153,500 $ - Windscreens - EA $ 43,000 $ - Display Cases 4 4 EA $ 13,800 $ 55,200 Seating 4 4 EA $ 1,500 $ 6,000 Finishes - painting, tile, pavers - EA $ 70,700 $ - Rails & Edge Guards - EA $ 49,600 $ - Signage 4 4 EA $ 21,400 $ 85,600 Signage - Spare - EA $ 25,200 $ - Lighting 4 4 EA $ 39,400 $ 157,600 CCTV and Comms with fiber 4 4 EA $ 88,500 $ 354,000 Ticket Vending Machines (TVM) 4 4 EA $ 150,000 $ 600,000 TVM Signage - EA $ 1,100 $ - TVM Signage - Spare - EA $ 400 $ - Regular Bus Stop Shelter 4 4 EA $ 10,000 $ 40,000 $ - Local Platform Items $ 1,298,400 Total Roadway Items (Section 1 thru 7) $ 11,939,740

19 Geary Bus Rapid Transit Study Alternative: Fillmore & Masonic Center Alternative: Fillmore & Masonic Center PROJECT FEASIBILITY COST ESTIMATE SUMMARY Section 7 Minor Items Section 8 Roadway Mobilization Item cost $ 11,939,740 x 5% $ 596,987 (Subtotal Section 1 thru 6) TOTAL MINOR ITEMS $ 596,987 Item cost $ 12,536,727 x 10% $ 1,253,673 (Subtotal Section 1 thru 7) TOTAL ROADWAY MOBILIZATION $ 1,253,673 Section 9 Roadway Additions Item cost Supplemental Work $ 12,536,727 x 5% $ 626,836 (Subtotal Section 1 thru 7) Contingencies $ 12,536,727 x 50% $ 6,268,364 (Subtotal Section 1 thru 7) TOTAL ROADWAY ADDITIONS $ 6,895,200 Notes: Percentages for Sections 7, 8, and 9 are based on Caltrans' Project Development Procedure Manual TOTAL ROADWAY ITEMS $ 20,685,600 (Subtotal Sections 1 thru 9)

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

County of Santa Cruz 0579

County of Santa Cruz 0579 County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701

More information

B E C K E R & F R O N D O R F Construction Cost Consulting Project Management

B E C K E R & F R O N D O R F Construction Cost Consulting Project Management Project: Okehocking Nature Center Number: 07142E2 Client: M2 Architecture Date: June 5, 2009 Phase: DD B E C K E R & F R O N D O R F Construction Cost Consulting Project Management ESTIMATE SUMMARY CODE

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Bus Rapid Transit: Basic Design for Non-Transit Planners

Bus Rapid Transit: Basic Design for Non-Transit Planners Bus Rapid Transit: Basic Design for Non-Transit Planners Paul Bignardi, AICP - Principal Planner San Francisco Municipal Transportation Agency Graham Carey, PE Principal careybrt Consulting Peter Gabancho,

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

Durham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team

Durham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team Durham-Orange County Corridor Alternatives Analysis Volume 3: Capital Cost Estimates Operations and Maintenance Cost Estimates Travel Time and Distance Calculations Ridership Summaries and Station to Station

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III Capital Programs & Construction SFMTA Shari Tavafrashti Principal Engineer SFCTA 1 Project Purpose and Need Improve transit reliability,

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

ESTIMATE PREPARATION ASSISTANCE

ESTIMATE PREPARATION ASSISTANCE S T I P D i s t r i c t 1 C l a r k N o ESTIMATE PREPARATION ASSISTANCE PROJECT ESTIMATE INFORMATION TP a. Estimate prepared by (user's name): Paul H. Judd b. Date of initial estimate: 8/11/2010 c. Date

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative PRELIMINARY ORDER OF MAGNITUDE CAPITAL COST ESTIMATING METHODOLOGY Technical Memorandum December 2011 Prepared for: Metropolitan Atlanta Rapid Transit Authority Atlanta, GA

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

APPENDIX G. Greenhouse Gas and Climate Change Analysis

APPENDIX G. Greenhouse Gas and Climate Change Analysis APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13

More information

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Oaks Commerce Center

Oaks Commerce Center Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014 Expo Line Project Westside/Central Metro Service Council November 2014 2 Expo Line Project Description Phase 2 Expo Line from Culver City to Santa Monica: 6.6 mile corridor 7 new Stations 64,000 Daily

More information

APPENDIX H COST ESTIMATES

APPENDIX H COST ESTIMATES APPENDIX H COST ESTIMATES H-1 HDR ENGINEERING, INC. TBPE FIRM NO. F-754 COST ESTIMATING TEMPLATE PRELIMINARY NOT TO BE USED FOR PERMITTING, BIDDING, OR CONSTRUCTION PREPARED BY: PHILIP A. FULTON, PE PE

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015 Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015 Meeting Agenda Phase 2 Construction Update Meeting Meeting Purpose and Format Construction Update Expo Bikeway

More information

I-15/ CAJALCO ROAD INTERCHANGE IMPROVEMENTS Final Report

I-15/ CAJALCO ROAD INTERCHANGE IMPROVEMENTS Final Report 2013 Jesse Morton (Project Manager) Said Yahya (Project Manager) Ziad Abourazra Danee Berumen Marion Cartas Brandon Chan Joie Edles Luis Fernandez Ruben Hovanesian Gerard Nepomuceno Andrew Osaki Advisor:

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

Schematic Layout Development

Schematic Layout Development Schematic Layout Development Northeast Hangar Area Manassas Regional Airport Manassas, Virginia November 2015 Introduction In response to the continuing development demand at Manassas Regional Airport,

More information

City of Grand Island Tuesday, June 26, 2018 Council Session

City of Grand Island Tuesday, June 26, 2018 Council Session City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

APPENDIX C: COSTS BACK-UP

APPENDIX C: COSTS BACK-UP APPENDIX C: COSTS BACK-UP SECTION 2010-2015 Executive Recap DESCRIPTION MAC LTCP PLAN RANGE LOW HIGH Humphrey Terminal Expansion - Phase I (Add 17 Gates) $224,077,000 - $263,620,000 OTHER PHASE SCOPE

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

Interstate Drive Extension

Interstate Drive Extension Interstate Drive Extension Sponsor County Highway Project No. RB19-000004 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,700,000.00 $2,150,000.00 Project Description This project continues

More information

Sidewalk Management APWA San Clemente Sidewalk Management 1. Scope of Assignment

Sidewalk Management APWA San Clemente Sidewalk Management 1. Scope of Assignment Sidewalk Management APWA Congress 2006 Kansas City, Missouri Michael Robson September 12, 2006 Scope of Assignment Sidewalk Sidewalk Condition Evaluation Obstruction by Type ADA Ramp & Compliance Integrate

More information

WEST CONTRA COSTA HIGH-CAPACITY TRANSIT STUDY TASK NUMBER 13.2: REFINED PRELIMINARY SCREENING COST ESTIMATE

WEST CONTRA COSTA HIGH-CAPACITY TRANSIT STUDY TASK NUMBER 13.2: REFINED PRELIMINARY SCREENING COST ESTIMATE TASK NUMBER 13.2: REFINED PRELIMINARY SCREENING COST ESTIMATE PRELIMINARY ESTIMATE OF PROBABLE CONSTRUCTION COST (AN OPINION OF PROBABLE CONSTRUCTION COST) BASED ON DRAFT TM #11 ALTERNATIVE REFINEMENT

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

Cost to extending KC Streetcar north approximately ½ mile

Cost to extending KC Streetcar north approximately ½ mile Technical Memorandum September 22, 2015 Attention: Jason Waldron, PE From: Lucas L. Olson, PE; Cory Imhoff, PE RE: Cost to extending KC Streetcar north approximately ½ mile HDR was asked for their opinion

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

City of West Branch. Office of the City Administrator

City of West Branch. Office of the City Administrator City of West Branch Office of the City Administrator To: City Council and Mayor From: Matt Muckler, City Administrator Date: October 15, 2016 Weekly Council Update South Downey Construction Schedule: Rathje

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING

More information

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014 TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...

More information

Appendix C. Cost Estimates

Appendix C. Cost Estimates O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16

More information

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs To Barrow Emerson, SamTrans Melissa Reggiardo, SamTrans Date 9/13/2014 Copies Reference number From Subject Corey Wong, Arup Steve Crosley, Fehr + Peers ECR BRT Phasing Plan File reference 1 Introduction

More information

Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines

Appendix A Transit Bus Stop Accessibility Criteria & Guidelines Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines Public Works Department, Transportation Division January 2014 Transit Bus Stop Accessibility Criteria & Guidelines These criteria and guidelines

More information

Appendix C Preferred Solution

Appendix C Preferred Solution Appendix C Preferred Solution C.1 Conceptual Design Drawings C.2 Preferred Option Ideas and Inspiration C.3 Concept Renderings C.4 Cost Estimate Appendix C.1 Conceptual Design Drawings Plan View Brock

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

ALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c. PH

ALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c.   PH 1600 PRINCE ST. SUITE 114 ALEXANDRIA, VIRGINIA 22314 PH. 703.549.9556 www.archdesigngroup.com ADG, INC. COPYRIGHT c C-1 1 2 3 4 5 6 E D Tie Prop. Sidewalk, Curb & Gutter Into Existing Prop. Storm Drain

More information

TECHNICAL MEMORANDUM. Nathan D. Maier Consulting Engineers

TECHNICAL MEMORANDUM. Nathan D. Maier Consulting Engineers TECHNICAL MEMORANDUM To: John Hoppie, DART From: URS Corporation Peng Zhao, PE Chad Allen, PE Lakhbir Chauhan, PE Herb Miller, PE Nancy Stavish Nathan D. Maier Consulting Engineers Bill Wallace, PE Heidi

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information