1 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA Prepared for: THE TOWN OF ASHLAND BOARD OF SELECTMEN AND PLANNING DEPARTMENT Prepared by: June 3, 216

2 Hydrologic/Hydraulic Analysis Report Trolley Brook Culvert, Ashland, MA June 3, 216 TABLE OF CONTENTS SUBJECT PAGE PURPOSE 3 INTRODUCTION AND WATERSHED DESCRIPTION 3 METHODOLOGY 3 DATA AND ASSUMPTIONS 4 SUMMARY 6 CONCLUSION 7 RECOMMENDATIONS 7 8 APPENDICES A HydroCAD Report Existing Flows to Culvert B HydroCAD Report Proposed Flows to Culvert C Existing HydroCAD Report 1 Yr Storm with Node Summaries D Proposed HydroCAD Report 1 Yr Storm with Node Summaries E NRCS Soils Data F Rainfall Data Obtained from NOAA Atlas 14 G Trolley Brook Plan and Profiles H Observation Photos I Compiled Watershed Plan Note Photo on cover from: Google Earth Page 2 of 8

3 Hydrologic/Hydraulic Analysis Report Trolley Brook Culvert, Ashland, MA June 3, 216 PURPOSE The Town is concerned about the stormwater runoff impacts of the proposed Rail Transit District Apartments Project on the existing Trolley Brook Culvert. A hydrologic model was developed to analyzed the impacts. This report is provided to summarize the development of the model and summarize the analysis. INTRODUCTION AND WATERSHED DESCRIPTION The 193± feet long culvert conveys stream and stormwater runoff flow between Megunko Road and the railroad tracks through downtown and outlets at the Sudbury River behind the Town library. The project watershed area (316± acres) includes Lorraine Drive, portions of Pennock Road, Wilbur Drive and the Middle School to the South; the Rail Transit District Apartment site and High Street Bridge over the MBTA tracks to the west; the south side of Pleasant Street to the north; and the Library and west of the residences on Cherry Street to the East. Just over half the area (179± acres) is presently wooded, 37± acres are wetlands, 39± acres are fields (Nyanza landfill and Middle school athletic fields), 32± acres are residential areas, 37± acres of industrial/commercial sites with another 17± acres of roof/roads. Natural Resources Conservation Service (NRCS) mapping indicates that soils (47±%) within the watershed are predominately hydrologic group rating A soils, 16±% are C soils, 1±% are D soils, 21±% are unrated. The watershed area to the Trolley Brook Culvert is complex and sizable with stormwater runoff from 316± acres of land contributory to the inlet off Megunko Road. The culvert also serves to convey stormwater runoff from a section of the downtown area with drainage connections at each junction (drain manhole). Existing wetland areas, streams and culverts help capture, contain and control peak rates of runoff. The fire station has been flooded during previous large storm events. The Rail Transit District Apartments Project is proposed to develop 3± acres of woodland to construct 398 unit apartment complex with associated access drives, parking areas and utilities. Prior review of the calculations provided indicates that the peak rate of runoff will be maintained from the developed area; however, the volume of runoff will be increased which discharges to the north wetlands and thence to Chemical Brook to the culvert. METHODOLOGY The hydrologic analysis was complete using HydroCAD, a computer program that models the hydrology using the Urban Hydrology for Small Watersheds TR (SCS) method and routing and hydraulics using TR 2 methodology. The analysis was completed for a Type III 24 hour storm using Dynamic Storage Indication Method to account for tailwater. Page 3 of 8

4 Hydrologic/Hydraulic Analysis Report Trolley Brook Culvert, Ashland, MA June 3, 216 DATA AND ASSUMPTIONS The following data was compiled and assumptions were made to complete the analysis. Watershed plans were compiled and developed from the following sources: Town GIS provided by the Ashland Engineering Department Site Plan (1) entitled AS BUILT PLAN LORRAINE DRIVE dated August 1, 21, revised September 18, 21, Prepared by GLM Engineering Consultants, Inc., 17 Washington Street, Holliston, MA Site Plan (1) entitled Parking & Traffic Control Key Plan, Jefferson at Ashland Station Ashland Massachusetts, dated 2/2/22, revised 4/1/28, Prepared by Allen & Major Associates, Inc. Document entitled Stormwater Management Report, Ashland Rail Transit Apartments Ashland, MA dated 9/28/1, Prepared by Kelly Engineering Group, Inc. Site Plan (17) entitled Site Development Plans for Ashland Rail Transit Apartments M.B.T.A. Access Road Ashland, MA, dated September 28, 21, revised 3/7/216, Prepared by Kelly Engineering Group, Inc. Site Plan (24) entitled Access and Utility Easement Exhibit Plan of Land in Ashland, MA, dated 12//7, Prepared by Hancock Associates, 1 Centre Street, Danvers, MA 1923 Plans (2) Attachment A, entitled Existing Drainage Exhibit and Attachment B, entitled Proposed Drainage Exhibit dated 9/28/1, Prepared by Kelly Engineering Group, Inc. Google Earth and Google Maps Hydrologic soils data and group ratings obtained from Natural Resources Conservation Service Web Soil Survey ( o B/D and C/D soils were modeled as D soils assuming saturated conditions o Nyanza grass cap was assumed to be C soils o Udorthents were assumed as A soils due to classification of surrounding soils Note that previous calculations for the Rail Transit District Apartments Project, utilize a D rating for the Paxton soils on the project site where these calculations use the NRSC rating of C for these soils. Field survey of the culvert completed by Borderland Engineering, Inc. Field observations on April 19, May 11 & 24 and June 1, 7 & 8 Nyanza landfill drainage system plans were not available and PSC did not have access to the site for this report. MBTA Access Road plans and calculations were not available and subsurface infiltration system sizes could not be verified and therefore are not included in this analysis. Page 4 of 8

5 Hydrologic/Hydraulic Analysis Report Trolley Brook Culvert, Ashland, MA June 3, 216 Rainfall data obtained from NOAA Atlas 14, Volume 1, Version 2, 24 hour rainfall ( for the following events: 1 Yr = 2.73 in. 2 Yr. = 3.36 in. Yr. = 4.4 in. 1 Yr. =.2 in. 2 Yr. = 6.43 in. Yr. = 7.34 in. 1 Yr. = 8.2 in. Note that previous calculation for the culvert and the Rail Transit District Apartments project utilized TP 4 data which uses 6. inches of rainfall for a 1 year, 24 hour rainfall event (slightly more than the 2 year NOAA Atlas 14 storm event). 1 minute minimum time of concentration (Tc) was assumed for urbanized areas. Tail water (flood) elevations associated with the Charles River were not used assuming the peak elevations for the river will be hours later than the peak for this watershed. SUMMARY Analysis of the model concentrates on the impacts of the development on flooding of the culvert. Appendices C and D includes a complete HydroCAD report for the existing and proposed 1 year storm events with node summaries for the entire watershed for the 2,, 2, and 1 year storm events. However, the Town is primarily concerned about the impact of the development on the existing culvert through the downtown area summaries of which are outlined in the tables below. Backup data for these tables is provided in Appendices C and D. Although there is a large percentage of highly permeable soils and wetlands that absorb and store significant quantities of the stormwater runoff within the watershed, the culvert is unable to accommodate peak runoff from all storm events. The model indicates the culvert is surcharged under the 2 year storm event and is not able to accommodate the year storm. Due to the proposed project s distance from the culvert and that stormwater management measure are proposed to control the peak rate of runoff from the site Table 1 shows that the peak rate of runoff will not be measurably exceeded at the culvert until the year storm event. This is due to the increase of the second peak coinciding with runoff flows from the Middle School and Megunko Hill residential properties. Table 2 however shows a measurable increase in the volume of runoff reaching the culvert starting at the 2 year storm event and Table 3 shows the increase in flooding at the entrance to the culvert (flow that the culvert cannot accommodate). The substantial increase for the 1 year storm event is due, again, to the increase of the second peak runoff flows. The culvert is not allowed to catch up before incoming flow from the development area and upper reaches of the watershed area causes combined flows to again exceed the inlet capacity of the culvert. Page of 8

6 Hydrologic/Hydraulic Analysis Report Trolley Brook Culvert, Ashland, MA June 3, 216 TABLE 1 PEAK STORMWATER RUNOFF FLOWS TO ENTRANCE TO CULVERT Storm Event (Year) Rain (in) Existing Proposed Change % % % % % % 9% 1% Flows measured in cubic feet per second () TABLE 2 VOLUME OF STORMWATER RUNOFF FLOWS TO ENTRANCE TO CULVERT Storm Event (Year) Rain (in) Existing Proposed Change % % % 7% 7% 7% 6% 6% Volumes measured in acre feet (af) TABLE 3 VOLUME OF STORMWATER RUNOFF FLOODING AT ENTRANCE TO CULVERT Storm Existing Future Flooding Year Total Primary Secondary Total Primary Secondary af % % % % % % Primary is flow that is conveyed by the culvert Secondary is flow that cannot currently be accommodated by the culvert Page 6 of 8

7 Hydrologic/Hydraulic Analysis Report Trolley Brook Culvert, Ashland, MA June 3, 216 CONCLUSION The proposed Rail Transit District Apartments Project has raised the focus on flooding issues associated with the culvert system that conveys water from Trolley Brook through the downtown area. Concerns are highlighted by the following reports, data and observations. I. Properties (notably the Fire Station) along the culvert have experienced flooding during larger storm events. II. III. IV. Climate data indicates that larger storm events are occurring with greater frequency. Currently the head losses due to inlet blockage, sharp bends, reverse flow or flat pipes, differential vertical pipe alignment through structures, inefficient culvert materials, blockage from protruding pipe connections and tail water elevations reduce the flow capacity of the culvert. Hydrologic calculations for the Rail Transit District Apartments Project within the watershed indicate an increase in the volume of stormwater runoff that the culvert needs to accommodate. V. The culvert is currently surcharged during the 2 year storm event and its capacity is exceeded for the year storm event. VI. VII. The proposed development will increase in the peak rate of runoff for the and 1 year storm events. The additional volume of runoff from the proposed development will increase flooding of the culvert significantly for the 1 year and higher storms. RECOMMENDATIONS 1. In order to maintain the current (existing condition) frequency and severity of flooding, the stormwater management system for the Rail Transit District Apartments project would need to be revised so post development runoff volumes do not exceed existing runoff volumes. This would require additional best management practices (BMPs) and/or low impact development (LID) techniques to provide additional infiltration on site. 2. Interim maintenance items to maximize capacity of existing culvert. a. Install a self cleaning trash rack to replace bars at the inlet. b. Cut and remove pipe sections, where possible, that extend into the culvert. c. Locate and expose the two junctions that could not be located during field survey to observe the invert elevations, condition and potential capacity issues. d. Investigate the reason 18 inches of water was observed in DMH9 in Front Street. Page 7 of 8

8 Hydrologic/Hydraulic Analysis Report Trolley Brook Culvert, Ashland, MA June 3, For MassDOT projects, culverts of this significance are required to be sized to convey the 2 to year storm event. Each of the following options will require additional evaluation of land rights, construction issues, permitting, long term impacts, and costs. a. Option 1: Provide LID techniques and BMPs up gradient of the culvert to reduce and control runoff from the watershed. This requires utilizing limited upland (not within wetland resource) areas and outside the Nyanza cap and contamination area. b. Option 2: Replace the existing culvert with a 6 foot wide by 4 foot high box culvert or equivalent. This will increase flow downgradient of the culvert and possibly increase flooding frequency and severity and at a significant construction cost. c. Option 3: Provide a bypass capability within the watershed that would convey flow in excess of the existing capacity of the culvert to the Sudbury River. Land acquisition permitting and downgradient impacts will need to be evaluated. Page 8 of 8

9 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX A HydroCAD Report Existing Flows to Culvert

10 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 1 Summary for Pond C: Inlet to Culvert [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 1.33" for 1 Year St event = hrs, Volume= 32. af = hrs, Volume= 32. af, Atten= %, Lag=. min Primary = hrs, Volume= 32. af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.4 hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=189.49' TW=188.99' (Dynamic Tailwater) 1=Culvert (Outlet Controls 4.6 fps) Secondary OutFlow hrs HW=187.2' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir ( Controls. ) Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 2 Pond C: Inlet to Culvert Area=288.2 ac Peak Elev=189.' Primary Secondary

11 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 3 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 4 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

12 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 6 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.' above defined flood level [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 1.46" for 2 Year St event = 12.4 hrs, Volume= af = 12.4 hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=.8 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.2' TW=19.6' (Dynamic Tailwater) 1=Culvert (Inlet Controls 3.88 fps) Secondary OutFlow hrs HW=191.2' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir fps)

13 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 7 Pond C: Inlet to Culvert Primary Secondary Area=288.2 ac Peak Elev=191.2' Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 8 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () ()

14 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 9 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 1 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

15 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 11 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.66' above defined flood level [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 1.88" for Year St event = hrs, Volume= 4.4 af = hrs, Volume= 4.4 af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume=.82 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.46' TW=191.19' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.1 fps) Secondary OutFlow hrs HW=191.8' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 2.23 fps) Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 12 Pond C: Inlet to Culvert Area=288.2 ac Peak Elev=191.86' Primary Secondary

16 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 13 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 14 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

17 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 14 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 16 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.81' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 2.3" for 1 Year St event hrs, Volume=.188 af hrs, Volume=.188 af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume= 2.41 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.67' TW=191.4' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.2 fps) Secondary OutFlow hrs HW=192.1' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 2.6 fps)

18 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 17 Pond C: Inlet to Culvert Area=288.2 ac Peak Elev=192.1' Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 18 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () ()

19 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 19 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

20 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 21 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.9' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 2.97" for 2 Year St event = 12.4 hrs, Volume= af = 12.4 hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.81' TW=191.14' (Dynamic Tailwater) 1=Culvert (Inlet Controls 3.94 fps) Secondary OutFlow hrs HW=192.13' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 2.84 fps) Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 22 Pond C: Inlet to Culvert Primary Secondary Area=288.2 ac Peak Elev=192.1'

21 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 23 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 24 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

22 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 2 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 26 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked 1.4' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert 12.4 hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 3.3" for Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = 12.4 hrs, Volume= af Secondary = 12.4 hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.4 hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow 12.4 hrs HW=191.89' TW=191.73' (Dynamic Tailwater) 1=Culvert (Inlet Controls 1.91 fps) Secondary OutFlow 12.4 hrs HW=192.22' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 3.2 fps)

23 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 27 Pond C: Inlet to Culvert Area=288.2 ac Peak Elev=192.24' Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 28 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () ()

24 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 29 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 3 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

25 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 31 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked 1.8' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 4.13" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.99' TW=191.7' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.37 fps) Secondary OutFlow hrs HW=192.27' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 3.11 fps) Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 32 Pond C: Inlet to Culvert Area=288.2 ac Peak Elev=192.28' Primary Secondary

26 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 33 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 34 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

27 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 3 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 36 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

28

29 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX B HydroCAD Report Proposed Flows to Culvert

30 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 1 Summary for Pond C: Inlet to Culvert [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = 294. ac, 19.89% Impervious, Depth > 1.31" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.4 hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=189.49' TW=188.99' (Dynamic Tailwater) 1=Culvert (Outlet Controls 4.6 fps) Secondary OutFlow hrs HW=187.2' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir ( Controls. ) Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 2 Pond C: Inlet to Culvert Area=294. ac Peak Elev=189.' Primary Secondary

31 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 3 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 4 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

32 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 6 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.' above defined flood level [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = 294. ac, 19.89% Impervious, Depth > 1.1" for 2 Year St event = 12.4 hrs, Volume= 37.7 af = 12.4 hrs, Volume= 37.7 af, Atten= %, Lag=. min Primary = 12. hrs, Volume= af Secondary hrs, Volume=.8 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow 12. hrs HW=191.2' TW=19.' (Dynamic Tailwater) 1=Culvert (Inlet Controls 3.88 fps) Secondary OutFlow hrs HW=191.2' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir fps)

33 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 7 Pond C: Inlet to Culvert Primary Secondary Area=294. ac Peak Elev=191.2' Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 8 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () ()

34 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 9 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 1 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

35 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 11 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.68' above defined flood level [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = 294. ac, 19.89% Impervious, Depth > 1.96" for Year St event = 12.4 hrs, Volume= af = 12.4 hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume=.832 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.39' TW=19.66' (Dynamic Tailwater) 1=Culvert (Inlet Controls 4.13 fps) Secondary OutFlow hrs HW=191.88' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 2.3 fps) Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 12 Pond C: Inlet to Culvert Area=294. ac Peak Elev=191.88' Primary Secondary

36 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 13 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 14 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

37 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 1 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 16 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.83' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert 12.3 hrs [63] Warning: Exceeded Reach TB1 INLET depth by 12.3 hrs Area = 294. ac, 19.89% Impervious, Depth > 2.41" for 1 Year St event hrs, Volume= 8.93 af hrs, Volume= 8.93 af, Atten= %, Lag=. min Primary = hrs, Volume= 3.41 af Secondary = 12.3 hrs, Volume=.466 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.3 hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.66' TW=191.29' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.92 fps) Secondary OutFlow 12.3 hrs HW=192.' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir 2.4 fps)

38 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 17 Pond C: Inlet to Culvert Area=294. ac Peak Elev=192.3' Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 18 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () ()

39 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 19 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

40 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 21 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.94' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = 294. ac, 19.89% Impervious, Depth > 3.1" for 2 Year St event = 12.4 hrs, Volume= af = 12.4 hrs, Volume= af, Atten= %, Lag=. min Primary = 12.1 hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow 12.1 hrs HW=191.82' TW=191.3' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.63 fps) Secondary OutFlow hrs HW=192.14' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 2.8 fps) Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 22 Pond C: Inlet to Culvert Primary Secondary Area=294. ac Peak Elev=192.14'

41 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 23 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 24 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

42 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 2 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 26 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked 1.4' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = 294. ac, 19.89% Impervious, Depth > 3.68" for Year St event = 13.8 hrs, Volume= af = 13.8 hrs, Volume= af, Atten= %, Lag=. min Primary = 12.9 hrs, Volume= af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow 12.9 hrs HW=191.94' TW=191.61' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.77 fps) Secondary OutFlow hrs HW=192.23' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 3.4 fps)

43 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 27 Pond C: Inlet to Culvert Area=294. ac Peak Elev=192.24' Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 28 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () ()

44 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 29 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 3 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

45 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 31 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked 1.7' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = 294. ac, 19.89% Impervious, Depth > 4.29" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = 18.4 hrs, Volume= 6.88 af Secondary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow 18.4 hrs HW=191.8' TW=19.94' (Dynamic Tailwater) 1=Culvert (Inlet Controls 4.48 fps) Secondary OutFlow hrs HW=192.26' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 3.9 fps) Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 32 Pond C: Inlet to Culvert Area=294. ac Peak Elev=192.27' Primary Secondary

46 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 33 for Pond C: Inlet to Culvert Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 34 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

47 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 3 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () () Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 36 for Pond C: Inlet to Culvert (continued) Time (hours) () Elevation (feet) () Primary Secondary () ()

48

49 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX C Existing HydroCAD Report Including: Existing 1 Year Storm Event With Node Summaries for 2,, 2, & 1 Year Storm Events

50

51 N1 NW MBTA W4 ND1 NW MBTA Wetlands N2 Metcalf Ave RN1 Swale CB ND2 24" RCP Pipe N3 Foster Ave N4 6 Pleasant N Tilton Ave N6 Police/Fire N7 Downtown N8 Library CB C11 CB C12 DMH-12 CB C13 DMH-13 RC1 To Sudbury River W3 MBTA CB-1 MBTA Park RW1 Thru North Wetlands DW3 MBTA Detention W7 Chemical Brook W8 Megunko Road C1 CB DMH - 1 C2 CB DMH-2 C3 CB DMH-3 C4 CB DMH4 C CB DMH- C6 CB DMH-6 CB C6a CB C7 CB DMH-7 C8 CB DMH-8 C9 CB DMH-9 CB C1 DMH-1 DMH-11 W2 CB DW2 DW4 CB1 C CB MBTA Culvert MBTA Culverts No. Wetlands Chemical Brook S9 DS Inlet to Culvert TB1 W1 MBTA CB-2 S3 MBTA RD. CB-3 DW1 W6 No. Wetlands Nyanza-W Ret/Det S6 W Nyanza south Nyanza West Settle Ponds Settle Ponds Trolley Brook DS6 S8 Trolley Brook Nyanza east DS4 DS3 East Wetlands Nyanza South SR1 S7 East Wetlands S FL Flooding DS1 To East Wetlands SE Wetlands S1 Lorraine Dr Lorraine Detention DS2 S2 Middle School Culvert Middle School S4 South Wetlands Subcat Reach Pond Link Routing Diagram for Trolley Brook Culvert - EXISTING Condition, Printed 6/17/216

52

53 Trolley Brook Culvert - EXISTING Condition Printed 6/17/216 Page 1 Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) acre lots, 2% imp, HSG A (S1, S2) acre lots, 2% imp, HSG C (S1) /2 acre lots, 2% imp, HSG A (N1, N2, N3) /3 acre lots, 3% imp, HSG A (N4, N) >7% Grass cover, Good, HSG A (S2) >7% Grass cover, Good, HSG C (W6) Gravel roads, HSG C (S6, S9, W, W6) Meadow, non-grazed, HSG C (S6, S8, S9, W, W7) Paved parking, HSG A (S2, S) Paved parking, HSG D (W4) Paved roads w/curbs & sewers, HSG A (S4, W6) Urban commercial, 8% imp, HSG A (N6, N7, N8) Urban industrial, 72% imp, HSG A (N1, N2, N3, N4, S7, S8, W7, W8) Water Surface, HSG A (S1, S7, S9, W).6 98 Water Surface, HSG D (W4) Woods, Good, HSG A (N1, S2, S3, S4, S, S6, S7, S8, S9, W1, W2, W3, W, W6, W7) Woods, Good, HSG C (S2, S3, W1, W2, W3, W6) Woods, Good, HSG D (S2, S3, S, S6, S7, S8, W1, W2, W3, W, W6) TOTAL AREA Trolley Brook Culvert - EXISTING Condition Printed 6/17/216 Page 2 Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 2. HSG A N1, N2, N3, N4, N, N6, N7, N8, S1, S2, S3, S4, S, S6, S7, S8, S9, W1, W2, W3, W, W6, W7, W8. HSG B 76.2 HSG C S1, S2, S3, S6, S8, S9, W1, W2, W3, W, W6, W HSG D S2, S3, S, S6, S7, S8, W1, W2, W3, W4, W, W6. Other 31.9 TOTAL AREA

54 Trolley Brook Culvert - EXISTING Condition Printed 6/17/216 Page 3 Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) (acres) Total Cover Ground Subcatchment Numbers acre lots, 2% imp S1, S /2 acre lots, 2% imp N1, N2, N /3 acre lots, 3% imp N4, N >7% Grass cover, Good S2, W Gravel roads S6, S9, W, W Meadow, non-grazed S6, S8, S9, W, W Paved parking S2, S, W Paved roads w/curbs & sewers S4, W Urban commercial, 8% imp N6, N7, N Urban industrial, 72% imp N1, N2, N3, N4, S7, S8, W7, W Water Surface S1, S7, S9, W4, W Woods, Good N1, S2, S3, S4, S, S6, S7, S8, S9, W1, W2, W3, W, W6, W TOTAL AREA Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=1.31" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=2.31" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=2.7" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=2.74" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=1.24" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=4.1" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=4.1" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=4.1" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=2.39" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=.8" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=7. ac.% Impervious Runoff Depth=.98" Flow Length=1,98' Tc=38.8 min CN=3 Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.7" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.22" Flow Length=9' Tc=37.7 min CN=38 Runoff=.3.36 af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=1.2" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=1.24" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=2.74" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=1.31" Flow Length=1' Tc=13.8 min CN=8 Runoff= af

55 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Subcatchment W1: MBTA CB-2 Runoff Area=4. ac.% Impervious Runoff Depth=.68" Flow Length=1,31' Tc=19.4 min CN=48 Runoff= af Subcatchment W2: MBTA Culvert Runoff Area=16.3 ac.% Impervious Runoff Depth=1.4" Flow Length=1,3' Tc=31.3 min CN=4 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=12. ac.% Impervious Runoff Depth=1.9" Flow Length=1,13' Tc=2.3 min CN=66 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=.1" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=1.9" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=1.38" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=2.93" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=3.21" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.11' Max Vel=2.8 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.28' Max Vel=1.8 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.62' Max Vel=.1 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.61' Max Vel=4.43 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.7' Max Vel=2.67 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.1' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=192.27' = af Primary= af Secondary= af = af Pond C1: DMH-1 Peak Elev=187.28' = af Primary= af Secondary=.. af = af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Pond C11: DMH-11 Peak Elev=186.49' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=18.' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=181.86' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.48' = af Primary= af Secondary=.72.7 af = af Pond C3: DMH-3 Peak Elev=19.7' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=19.1' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=189.64' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=189.71' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=189.6' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=188.89' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=188.92' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=188.3' = af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=281.74' Storage=33,938 cf = af Discarded= af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=234.43' Storage=.629 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=2.14' Storage=1,386 cf = af Discarded=.8.48 af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=193.43' Storage= af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=216.' Storage=.24 af = af =.. af Pond DS6: Trolley Brook Peak Elev=192.47' Storage=2,26 cf = af Primary= af Secondary=.. af = af

56 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Pond DW1: Nyanza-W Ret/Det Peak Elev=21.81' Storage=77,12 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=249.81' = af = af Pond DW3: MBTA Detention Peak Elev=199.28' Storage=.927 af = af = af Pond DW4: No. Wetlands Peak Elev=197.8' Storage=.214 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=194.82' Storage=23,92 cf = af Discarded= af Primary=.4.29 af = af Pond ND2: 24" RCP Pipe Peak Elev=193.39' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = 31.9 ac Runoff Volume = af Average Runoff Depth = 1.44" 8.71% Pervious = ac 19.29% Impervious = ac Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 8 Summary for Subcatchment N1: NW MBTA Runoff = 12.3 hrs, Volume=.9 af, Depth= 1.31" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 4 1/2 acre lots, 2% imp, HSG A Urban industrial, 72% imp, HSG A Woods, Good, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Grass: Short n=.1 P2= 3.2" Shallow Concentrated Flow, Paved Kv= 2.3 fps Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment N1: NW MBTA Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=8.3 ac Runoff Volume=.9 af Runoff Depth=1.31" Flow Length=7' Tc=19. min CN=8 1

57 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 9 Summary for Subcatchment N2: Metcalf Ave Runoff hrs, Volume=.423 af, Depth= 2.31" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 4 1/2 acre lots, 2% imp, HSG A Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Min Tc Subcatchment N2: Metcalf Ave Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.2 ac Runoff Volume=.423 af Runoff Depth=2.31" Tc=1. min CN=71 1 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 1 Summary for Subcatchment N3: Foster Ave Runoff = hrs, Volume=.62 af, Depth= 2.7" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 4 1/2 acre lots, 2% imp, HSG A Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Min Tc Subcatchment N3: Foster Ave Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.9 ac Runoff Volume=.62 af Runoff Depth=2.7" Tc=1. min CN=74 2 1

58 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 11 Summary for Subcatchment N4: 6 Pleasant Runoff = hrs, Volume=.8 af, Depth= 2.74" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban industrial, 72% imp, HSG A.8 7 1/3 acre lots, 3% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N4: 6 Pleasant Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3. ac Runoff Volume=.8 af Runoff Depth=2.74" Tc=1. min CN=76 Runoff Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 12 Summary for Subcatchment N: Tilton Ave Runoff = hrs, Volume=.393 af, Depth= 1.24" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description /3 acre lots, 3% imp, HSG A % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N: Tilton Ave Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3.8 ac Runoff Volume=.393 af Runoff Depth=1.24" Tc=1. min CN=7 1

59 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 13 Summary for Subcatchment N6: Police/Fire Runoff = hrs, Volume=.936 af, Depth= 4.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban commercial, 8% imp, HSG A.42 1.% Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N6: Police/Fire Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.8 ac Runoff Volume=.936 af Runoff Depth=4.1" Tc=1. min CN=89 Runoff Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 14 Summary for Subcatchment N7: Downtown Runoff = hrs, Volume= af, Depth= 4.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban commercial, 8% imp, HSG A.1 1.% Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N7: Downtown Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3.4 ac Runoff Volume=1.137 af Runoff Depth=4.1" Tc=1. min CN=89 4 2

60 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 1 Summary for Subcatchment N8: Library Runoff = hrs, Volume=.267 af, Depth= 4.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 89 Urban commercial, 8% imp, HSG A.12 1.% Pervious Area.68 8.% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N8: Library Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=.8 ac Runoff Volume=.267 af Runoff Depth=4.1" Tc=1. min CN=89 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 16 Summary for Subcatchment S1: Lorraine Dr Runoff = hrs, Volume= 4.44 af, Depth= 2.39" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description acre lots, 2% imp, HSG C acre lots, 2% imp, HSG A.2 98 Water Surface, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Lawn Grass: Short n=.1 P2= 3.2" Shallow Concentrated Flow, Paved Kv= 2.3 fps 3.9 1, Pipe Channel, Drain System 1." Round Area= 1.2 sf Perim= 3.9' r=.31' n= , Total Subcatchment S1: Lorraine Dr Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=22.3 ac Runoff Volume=4.44 af Runoff Depth=2.39" Flow Length=2,' Tc=16.3 min CN=72 Runoff

61 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 17 Summary for Subcatchment S2: Middle School Runoff = hrs, Volume= 4.18 af, Depth=.8" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved parking, HSG A Woods, Good, HSG A Woods, Good, HSG D 6. 7 Woods, Good, HSG C >7% Grass cover, Good, HSG A acre lots, 2% imp, HSG A 63. Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Short Grass Pasture Kv= 7. fps 4.2 2,3 Total Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Subcatchment S2: Middle School Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=63. ac Runoff Volume=4.18 af Runoff Depth=.8" Flow Length=2,3' Tc=4.2 min CN= Runoff

62 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 19 Summary for Subcatchment S3: MBTA RD. CB-3 Runoff = hrs, Volume=.71 af, Depth=.98" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description 3. 3 Woods, Good, HSG A Woods, Good, HSG C.6 77 Woods, Good, HSG D 7. 3 Weighted Average 7. 1.% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, n=.6 P2= 3.2" 1.9 1, Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps ,98 Total Subcatchment S3: MBTA RD. CB-3 Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=7. ac Runoff Volume=.71 af Runoff Depth=.98" Flow Length=1,98' Tc=38.8 min CN=3 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 Summary for Subcatchment S4: South Wetlands Runoff 1.98 hrs, Volume=.123 af, Depth=.7" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved roads w/curbs & sewers, HSG A Woods, Good, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps ,8 Total 1 1 Subcatchment S4: South Wetlands Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=22.4 ac Runoff Volume=.123 af Runoff Depth=.7" Flow Length=1,8' Tc=41.2 min CN=33 Runoff

63 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 21 Summary for Subcatchment S: SE Wetlands Runoff hrs, Volume=.36 af, Depth=.22" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A. 98 Paved parking, HSG A Woods, Good, HSG D Weighted Average % Pervious Area. 2.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment S: SE Wetlands Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=17. ac Runoff Volume=.36 af Runoff Depth=.22" Flow Length=9' Tc=37.7 min CN=38 Runoff Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 22 Summary for Subcatchment S6: Nyanza south Runoff = 12.7 hrs, Volume= 2.16 af, Depth= 1.2" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.9 89 Gravel roads, HSG C Meadow, non-grazed, HSG C Woods, Good, HSG A Woods, Good, HSG D Weighted Average % Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps ,3 Total Subcatchment S6: Nyanza south Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=17. ac Runoff Volume=2.16 af Runoff Depth=1.2" Flow Length=1,3' Tc=36.4 min CN=61 2

64 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 23 Summary for Subcatchment S7: East Wetlands Runoff = 12.3 hrs, Volume= 2.94 af, Depth= 1.24" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A Water Surface, HSG A Woods, Good, HSG D Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment S7: East Wetlands Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=28.1 ac Runoff Volume=2.94 af Runoff Depth=1.24" Flow Length=8' Tc=32.7 min CN=7 Runoff Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 24 Summary for Subcatchment S8: Nyanza east Runoff = hrs, Volume= af, Depth= 2.74" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Meadow, non-grazed, HSG C. 3 Woods, Good, HSG A Woods, Good, HSG D.3 81 Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Grass: Dense n=.24 P2= 3.2" Shallow Concentrated Flow, Grassed Waterway Kv= 1. fps Total Subcatchment S8: Nyanza east Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=13. ac Runoff Volume=2.971 af Runoff Depth=2.74" Flow Length=9' Tc=1.3 min CN=76

65 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 Summary for Subcatchment S9: Settle Ponds Runoff = hrs, Volume=.24 af, Depth= 1.31" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.2 89 Gravel roads, HSG C.9 71 Meadow, non-grazed, HSG C.9 3 Woods, Good, HSG A.2 98 Water Surface, HSG A Weighted Average % Pervious Area.2 9.9% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment S9: Settle Ponds Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.2 ac Runoff Volume=.24 af Runoff Depth=1.31" Flow Length=1' Tc=13.8 min CN=8 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 26 Summary for Subcatchment W1: MBTA CB-2 Runoff = 12.4 hrs, Volume=.228 af, Depth=.68" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A Woods, Good, HSG C.2 77 Woods, Good, HSG D Weighted Average 4. 1.% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, n=.6 P2= 3.2" Shallow Concentrated Flow, Unpaved Kv= 16.1 fps Shallow Concentrated Flow, Unpaved Kv= 16.1 fps ,31 Total Subcatchment W1: MBTA CB-2 Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=4. ac Runoff Volume=.228 af Runoff Depth=.68" Flow Length=1,31' Tc=19.4 min CN=48

66 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 27 Summary for Subcatchment W2: MBTA Culvert Runoff = 12.2 hrs, Volume= af, Depth= 1.4" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description 6. 3 Woods, Good, HSG A Woods, Good, HSG C Woods, Good, HSG D Weighted Average % Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, n=.6 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps ,3 Total Subcatchment W2: MBTA Culvert Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=16.3 ac Runoff Volume=1.416 af Runoff Depth=1.4" Flow Length=1,3' Tc=31.3 min CN=4 Runoff Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 28 Summary for Subcatchment W3: MBTA CB-1 Runoff = hrs, Volume= af, Depth= 1.9" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A Woods, Good, HSG C.9 77 Woods, Good, HSG D Weighted Average % Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, n=.6 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps 2.3 1,13 Total Subcatchment W3: MBTA CB-1 Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=12. ac Runoff Volume=1.979 af Runoff Depth=1.9" Flow Length=1,13' Tc=2.3 min CN=66

67 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 29 Summary for Subcatchment W4: MBTA Park Runoff = hrs, Volume= 1.88 af, Depth=.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved parking, HSG D.6 98 Water Surface, HSG D Weighted Average 4. 1.% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment W4: MBTA Park Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=4. ac Runoff Volume=1.88 af Runoff Depth=.1" Tc=1. min CN=98 Runoff Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 3 Summary for Subcatchment W: Nyanza West Runoff = hrs, Volume= af, Depth= 1.9" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A Water Surface, HSG A Meadow, non-grazed, HSG C. 77 Woods, Good, HSG D.6 89 Gravel roads, HSG C Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Grassed Waterway Kv= 1. fps Total Subcatchment W: Nyanza West Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=13.7 ac Runoff Volume=2.169 af Runoff Depth=1.9" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff

68 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 31 Summary for Subcatchment W6: No. Wetlands Runoff = hrs, Volume= af, Depth= 1.38" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved roads w/curbs & sewers, HSG A.2 89 Gravel roads, HSG C >7% Grass cover, Good, HSG C Woods, Good, HSG A Woods, Good, HSG C Woods, Good, HSG D Woods, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Channel Flow, Area= 1. sf Perim= 11.' r=.91' n= , Total Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 32 Subcatchment W6: No. Wetlands Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=32. ac Runoff Volume=3.676 af Runoff Depth=1.38" Flow Length=1,' Tc=2.1 min CN=9

69 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 33 Summary for Subcatchment W7: Chemical Brook Runoff = hrs, Volume= af, Depth= 2.93" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description. 3 Woods, Good, HSG A.2 71 Meadow, non-grazed, HSG C Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Grass: Dense n=.24 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps 1. 1, Shallow Concentrated Flow, Unpaved Kv= 16.1 fps ,8 Total Subcatchment W7: Chemical Brook Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=9.9 ac Runoff Volume=2.413 af Runoff Depth=2.93" Flow Length=1,8' Tc=26.9 min CN=78 Runoff Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 34 Summary for Subcatchment W8: Megunko Road Runoff = hrs, Volume=.882 af, Depth= 3.21" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban industrial, 72% imp, HSG A % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Fallow n=. P2= 3.2" Shallow Concentrated Flow, Unpaved Kv= 16.1 fps Total Subcatchment W8: Megunko Road Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3.3 ac Runoff Volume=.882 af Runoff Depth=3.21" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff

70 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 3 Summary for Reach CB1: Chemical Brook Area = 92.9 ac, 14.23% Impervious, Depth > 1.16" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= 1%, Lag= 7.3 min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 2.8 fps, Min. Travel Time= 9.7 min Avg. Velocity = 1.1 fps, Avg. Travel Time= 24.8 min Peak Storage= 1, hrs Average Depth at Peak Storage= 1.11' Bank-Full Depth= 2.' Flow Area= 18. sf, Capacity= ' x 2.' deep channel, n=.22 Earth, clean & straight Side Slope Z-value= 3. '/' Top Width= 1.' Length= 1,.' Slope=.23 '/' Inlet Invert= 19.', Outlet Invert= 192.' Reach CB1: Chemical Brook Area=92.9 ac Avg. Flow Depth=1.11' Max Vel=2.8 fps n=.22 L=1,.' S=.23 '/' Capacity=64.47 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 36 Summary for Reach FL: Flooding [4] Hint: Not Described (=) = hrs, Volume= 2.64 af = hrs, Volume= 2.64 af, Atten= %, Lag=. min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Reach FL: Flooding

71 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 37 Summary for Reach RC1: To Sudbury River [4] Hint: Not Described (=) Area = 31.9 ac, 19.29% Impervious, Depth > 2.19" for 1 Year St event = hrs, Volume= 7.89 af = hrs, Volume= 7.89 af, Atten= %, Lag=. min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Reach RC1: To Sudbury River Area=31.9 ac Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 38 Summary for Reach RN1: Swale Area = 1. ac, 41.2% Impervious, Depth =.78" for 1 Year St event hrs, Volume=.682 af = hrs, Volume=.682 af, Atten= 7%, Lag= 2. min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 1.8 fps, Min. Travel Time= 3.8 min Avg. Velocity =.69 fps, Avg. Travel Time= 1.2 min Peak Storage= 1, hrs Average Depth at Peak Storage=.28' Bank-Full Depth= 2.' Flow Area= 32. sf, Capacity= ' x 2.' deep channel, n=.22 Earth, clean & straight Side Slope Z-value= 4. '/' Top Width= 24.' Length= 42.' Slope=.48 '/' Inlet Invert= 192.', Outlet Invert= 19.' Reach RN1: Swale Area=1. ac Avg. Flow Depth=.28' Max Vel=1.8 fps n=.22 L=42.' S=.48 '/' Capacity=

72 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 39 Summary for Reach RW1: Thru North Wetlands Area = 12. ac,.% Impervious, Depth = 1.9" for 1 Year St event = hrs, Volume= af = hrs, Volume= 1.96 af, Atten= 84%, Lag= 78. min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity=.1 fps, Min. Travel Time= 24.9 min Avg. Velocity =.4 fps, Avg. Travel Time= min Peak Storage= 39, hrs Average Depth at Peak Storage=.62' Bank-Full Depth= 2.' Flow Area= 14. sf, Capacity= ' x 2.' deep channel, n=.4 Sheet flow: Woods+light brush Side Slope Z-value= 2. '/' Top Width= 11.' Length= 1,.' Slope=.2 '/' Inlet Invert= 22.', Outlet Invert= 199.' Reach RW1: Thru North Wetlands Area=12. ac Avg. Flow Depth=.62' Max Vel=.1 fps n=.4 L=1,.' S=.2 '/' Capacity=27.3 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Summary for Reach SR1: To East Wetlands Area = 8.3 ac, 16.67% Impervious, Depth = 1.17" for 1 Year St event = hrs, Volume= 8.3 af = hrs, Volume= 8.3 af, Atten= %, Lag= 3.2 min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 4.43 fps, Min. Travel Time= 3.8 min Avg. Velocity = 1.14 fps, Avg. Travel Time= 14.6 min Peak Storage= 7, hrs Average Depth at Peak Storage=.61' Bank-Full Depth= 2.' Flow Area= 66. sf, Capacity= ' x 2.' deep channel, n=.3 Earth, grassed & winding Side Slope Z-value= 1. '/' Top Width= 63.' Length= 1,.' Slope=.33 '/' Inlet Invert= 229.', Outlet Invert= 196.' Reach SR1: To East Wetlands Area=8.3 ac Avg. Flow Depth=.61' Max Vel=4.43 fps n=.3 L=1,.' S=.33 '/' Capacity=611.72

73 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 41 Summary for Reach TB1: Trolley Brook Area = 192. ac, 1.61% Impervious, Depth > 2.83" for 1 Year St event = 12. hrs, Volume= af = 12.6 hrs, Volume= af, Atten= %, Lag=.8 min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 2.67 fps, Min. Travel Time= 1.1 min Avg. Velocity = 1.1 fps, Avg. Travel Time= 2. min Peak Storage= 2, hrs Average Depth at Peak Storage=.7' Bank-Full Depth= 6.' Flow Area= 198. sf, Capacity= 1, ' x 6.' deep channel, n=.3 Side Slope Z-value= 3. '/' Top Width= 1.' Length= 18.' Slope=.6 '/' Inlet Invert= 188.', Outlet Invert= 187.' Reach TB1: Trolley Brook Area=192. ac Avg. Flow Depth=.7' Max Vel=2.67 fps n=.3 L=18.' S=.6 '/' Capacity=1, Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 42 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.81' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert hrs [63] Warning: Exceeded Reach TB1 INLET depth by hrs Area = ac, 1.81% Impervious, Depth > 2.3" for 1 Year St event hrs, Volume=.188 af hrs, Volume=.188 af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume= 2.41 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.67' TW=191.4' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.2 fps) Secondary OutFlow hrs HW=192.1' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir Controls 2.6 fps)

74 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 43 Pond C: Inlet to Culvert Area=288.2 ac Peak Elev=192.1' Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 44 Summary for Pond C1: DMH - 1 [8] Warning: Exceeded Pond C hrs ( af) [8] Warning: Exceeded Pond ND hrs ( af) Area = 3.1 ac, 17.64% Impervious, Depth > 2.16" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume=.7 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 193.' Device Routing Invert Outlet Devices #1 Primary 186.' 36." Round Culvert L= 19.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= 186.' / 18.63' S=.34 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 192.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=191.34' TW=191.3' (Dynamic Tailwater) 1=Culvert (Outlet Controls 1.2 fps) Secondary OutFlow hrs HW=192.27' TW=.' (Dynamic Tailwater) 2=Orifice/Grate (Weir Controls 1.69 fps) Pond C1: DMH Area=3.1 ac Peak Elev=192.27' Primary Secondary

75 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Summary for Pond C1: DMH-1 [8] Warning: Exceeded Pond C hrs ( af) Area = 31.1 ac, 19.12% Impervious, Depth > 2.18" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.1 hrs Flood Elev= 188.' Device Routing Invert Outlet Devices #1 Primary 179.' 48." W x 44." H Box Culvert L= 19.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 179.' / 177.9' S=.6 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 188.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=186.8' TW=186.23' (Dynamic Tailwater) 1=Culvert (Outlet Controls 2.84 fps) Secondary OutFlow hrs HW=179.1' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C1: DMH-1 Primary Secondary Area=31.1 ac Peak Elev=187.28' Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 46 Summary for Pond C11: DMH-11 [8] Warning: Exceeded Pond C hrs ( af) Area = 31.1 ac, 19.12% Impervious, Depth > 2.18" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 187.' Device Routing Invert Outlet Devices #1 Primary 178.' 36." Round Culvert L= 87.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 178.' / 177.6' S=.46 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 187.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=186.23' TW=184.88' (Dynamic Tailwater) 1=Culvert (Inlet Controls 6.98 fps) Secondary OutFlow hrs HW=178.3' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C11: DMH-11 Primary Secondary Area=31.1 ac Peak Elev=186.49'

76 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 47 Summary for Pond C12: DMH-12 [8] Hint: Peaked.' above defined flood level Area = 31.1 ac, 19.12% Impervious, Depth > 2.18" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 18.' Device Routing Invert Outlet Devices #1 Primary 177.' 36." Round Culvert L= 49.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 177.' / 177.4' S=.2 '/' Cc=.9 n=.2, Flow Area= 7.7 sf #2 Secondary 18.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=184.88' TW=181.82' (Dynamic Tailwater) 1=Culvert (Outlet Controls 8.86 fps) Secondary OutFlow hrs HW=177.4' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C12: DMH-12 Primary Secondary Area=31.1 ac Peak Elev=18.' Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 48 Summary for Pond C13: DMH-13 Area = 31.9 ac, 19.29% Impervious, Depth > 2.19" for 1 Year St event = hrs, Volume= 7.89 af = hrs, Volume= 7.89 af, Atten= %, Lag=. min Primary = hrs, Volume= 7.89 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 18.' Device Routing Invert Outlet Devices #1 Primary 177.4' 48." W x 44." H Box Culvert L= 137.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 177.4' / 177.3' S=.7 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 18.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=181.82' TW=.' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) Secondary OutFlow hrs HW=177.41' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C13: DMH-13 Primary Secondary Area=31.9 ac Peak Elev=181.86'

77 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 49 Summary for Pond C2: DMH-2 [8] Hint: Peaked.38' above defined flood level [8] Warning: Exceeded Pond C hrs ( af) Area = 3.1 ac, 17.64% Impervious, Depth > 2.16" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=.7 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.1' Device Routing Invert Outlet Devices #1 Primary 18.8' 36." Round Culvert L= 26.' CPP, square edge headwall, Ke=. Inlet / Outlet Invert= 18.4' / 18.8' S= -.16 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.1' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=191.26' TW=19.19' (Dynamic Tailwater) 1=Culvert (Outlet Controls 4.74 fps) Secondary OutFlow hrs HW=191.2' TW=.' (Dynamic Tailwater) 2=Orifice/Grate (Weir 1. fps) Pond C2: DMH Area=3.1 ac Peak Elev=191.48' Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Summary for Pond C3: DMH-3 [8] Hint: Peaked.' above defined flood level Area = 3.1 ac, 17.64% Impervious, Depth > 2.16" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= 4.87 af Secondary = hrs, Volume=.31 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 19.2' Device Routing Invert Outlet Devices #1 Primary 18.6' 36." Round Culvert L= 18.6' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert=.' / 18.6' S= -1. '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 19.2' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=19.19' TW=188.9' (Dynamic Tailwater) 1=Culvert (Outlet Controls fps) Secondary OutFlow hrs HW=19.6' TW=.' (Dynamic Tailwater) 2=Orifice/Grate (Weir Controls 2.2 fps) Pond C3: DMH Area=3.1 ac Peak Elev=19.7' Primary Secondary

78 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 1 Summary for Pond C4: DMH4 Area = 38.9 ac, 17.8% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume=.262 af = hrs, Volume=.262 af, Atten= %, Lag=. min Primary = hrs, Volume=.262 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.7' Device Routing Invert Outlet Devices #1 Primary 18.' 48." Round Culvert L= 176.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 18.' / 18.1' S=.23 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 191.7' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=188.9' TW=188.66' (Dynamic Tailwater) 1=Culvert (Outlet Controls 3.13 fps) Secondary OutFlow hrs HW=18.3' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C4: DMH Area=38.9 ac Peak Elev=19.1' Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 Summary for Pond C: DMH- [8] Warning: Exceeded Pond C hrs ( af) Area = 38.9 ac, 17.8% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume=.262 af = hrs, Volume=.262 af, Atten= %, Lag=. min Primary = hrs, Volume=.262 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.2 hrs Flood Elev= 19.9' Device Routing Invert Outlet Devices #1 Primary 18.' 48." Round Culvert L= 128.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 18.' / 184.6' S=.31 '/' Cc=.9 n=.12, Flow Area= 12.7 sf #2 Secondary 191.3' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=188.66' TW=188.18' (Dynamic Tailwater) 1=Culvert (Outlet Controls 4.3 fps) Secondary OutFlow hrs HW=18.3' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C: DMH Area=38.9 ac Peak Elev=189.64' Primary Secondary

79 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 3 Summary for Pond C6: DMH-6 [8] Warning: Exceeded Pond C hrs ( af) Area = 38.9 ac, 17.8% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume=.262 af = hrs, Volume=.262 af, Atten= %, Lag=. min Primary = hrs, Volume=.262 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 19.9' Device Routing Invert Outlet Devices #1 Primary 184.' 48." Round Culvert L= 164.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 184.' / 182.6' S=.116 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 19.9' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=188.18' TW=187.18' (Dynamic Tailwater) 1=Culvert (Outlet Controls fps) Secondary OutFlow hrs HW=184.2' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C6: DMH Area=38.9 ac Peak Elev=189.71' Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Summary for Pond C6a: CB [8] Hint: Peaked.6' above defined flood level [8] Warning: Exceeded Pond C hrs ( af) Area = ac, 18.4% Impervious, Depth > 2.16" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary = hrs, Volume=.18 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 189.' Device Routing Invert Outlet Devices #1 Primary 182.6' 48." Round Culvert L= 6.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 182.' / 182.6' S= -.18 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 189.' 24." x 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=187.18' TW=186.81' (Dynamic Tailwater) 1=Culvert (Inlet Controls 3.6 fps) Secondary OutFlow hrs HW=189.38' TW=.' (Dynamic Tailwater) 2=Orifice/Grate (Weir Controls 2.3 fps) Pond C6a: CB Area=311.7 ac Peak Elev=189.6' Primary Secondary

80 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Summary for Pond C7: DMH-7 [8] Warning: Exceeded Pond C6a 12.2 hrs ( af) Area = ac, 18.4% Impervious, Depth > 2.16" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.2 hrs Flood Elev= 194.' Device Routing Invert Outlet Devices #1 Primary 182.' 48." Round Culvert L= 132.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 182.' / 181.' S=.76 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 191.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=186.81' TW=186.89' (Dynamic Tailwater) 1=Culvert ( Controls. ) Secondary OutFlow hrs HW=182.2' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C7: DMH Area=311.7 ac Peak Elev=188.89' Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Summary for Pond C8: DMH-8 [8] Warning: Exceeded Pond C hrs ( af) Area = ac, 18.4% Impervious, Depth > 2.16" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.2 hrs Flood Elev= 191.' Device Routing Invert Outlet Devices #1 Primary 18.8' 48." W x 44." H Box Culvert L= 219.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 18.8' / 179.1' S=.78 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 191.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=186.89' TW=186.27' (Dynamic Tailwater) 1=Culvert (Outlet Controls 2.71 fps) Secondary OutFlow hrs HW=18.81' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C8: DMH Area=311.7 ac Peak Elev=188.92' Primary Secondary

81 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Summary for Pond C9: DMH-9 [8] Warning: Exceeded Pond C hrs ( af) Area = 31.1 ac, 19.12% Impervious, Depth > 2.18" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.1 hrs Flood Elev= 188.' Device Routing Invert Outlet Devices #1 Primary 179.3' 48." W x 44." H Box Culvert L= 88.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 179.3' / 179.' S=.34 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 188.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=187.69' TW=186.8' (Dynamic Tailwater) 1=Culvert (Outlet Controls 4.31 fps) Secondary OutFlow hrs HW=179.31' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C9: DMH-9 Primary Secondary Area=31.1 ac Peak Elev=188.3' Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 8 Summary for Pond DS1: Lorraine Detention Area = 22.3 ac, 2.72% Impervious, Depth = 2.39" for 1 Year St event = hrs, Volume= 4.44 af = hrs, Volume= 4.44 af, Atten= 36%, Lag= 14.1 min Discarded hrs, Volume=.249 af Primary = hrs, Volume= af Secondary = hrs, Volume=.36 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area= 8,27 sf Storage= 33,938 cf Plug-Flow detention time= 2.2 min calculated for 4.44 af (1% of inflow) Center-of-Mass det. time= 2.2 min ( ) Volume Invert Avail.Storage Storage Description #1 27.' 9,638 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ,7 1,388 1, , 7,7 9, , 27, 36, , 23, 9, ' Device #1 #2 #3 Coef. (English) Head (feet) Outlet Devices 12." Round Culvert L= 1.' RCP, square edge headwall, Ke= Inlet / Outlet Invert= 27.3' / 274.' S=.13 '/' Cc=.9 n=.13, Flow Area=.79 sf 1." Round Culvert L= 1.' RCP, square edge headwall, Ke= Inlet / Outlet Invert= ' / 276.' S=.163 '/' Cc=.9 n=.13, Flow Area= 1.23 sf 12." Round Culvert L= 2.' RCP, square edge headwall, Ke= Inlet / Outlet Invert= 277.2' / 277.' S=.26 '/' Cc=.9 n=.13, Flow Area=.79 sf Discarded OutFlow hrs HW=281.74' (Free Discharge) =Exfiltration (Exfiltration Controls.46 ) Primary OutFlow hrs HW=281.74' TW=229.' (Dynamic Tailwater) 1=Culvert (Barrel Controls 9.67 fps) 2=Culvert (Barrel Controls 8.68 fps) 3=Culvert (Inlet Controls 9.28 fps) Secondary OutFlow hrs HW=281.74' TW=233.36' (Dynamic Tailwater) 4=Broad-Crested Rectangular Weir (Weir Controls 1.22 fps)

82 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 9 Pond DS1: Lorraine Detention Area=22.3 ac Peak Elev=281.74' Storage=33,938 cf Discarded Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Summary for Pond DS2: Middle School Culvert Area = 63. ac, 1.24% Impervious, Depth =.8" for 1 Year St event = hrs, Volume= af = hrs, Volume= 4.14 af, Atten= 31%, Lag= 2.6 min Primary = hrs, Volume= 4.14 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area=.77 ac Storage=.629 af Plug-Flow detention time= 2.1 min calculated for 4.14 af (98% of inflow) Center-of-Mass det. time= 42. min ( ) Volume Invert Avail.Storage Storage Description #1 232.' af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) Device Routing Invert Outlet Devices #1 Primary 233.' 36." Round Culvert L=.' RCP, square edge headwall, Ke=. Inlet / Outlet Invert= 233.' / 231.9' S=.22 '/' Cc=.9 n=.13, Flow Area= 7.7 sf Primary OutFlow hrs HW=234.43' TW=229.6' (Dynamic Tailwater) 1=Culvert (Inlet Controls 4.7 fps)

83 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 61 Pond DS2: Middle School Culvert Area=63. ac Peak Elev=234.43' Storage=.629 af 36." Round Culvert n=.13 L=.' S=.22 '/' Primary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 62 Summary for Pond DS3: Nyanza South Area = 24. ac,.% Impervious, Depth = 1.36" for 1 Year St event = 12.8 hrs, Volume= af = 12.9 hrs, Volume= af, Atten= %, Lag=.8 min Discarded 12.9 hrs, Volume=.48 af Primary = 12.9 hrs, Volume= af Secondary = 12.9 hrs, Volume=.847 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.9 hrs Surf.Area= 1,42 sf Storage= 1,386 cf Plug-Flow detention time= 3.1 min calculated for af (1% of inflow) Center-of-Mass det. time= 3.1 min ( ) Volume Invert Avail.Storage Storage Description #1 198.' 124,8 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ,2 1,2 1, , 39,6 4, , 84, 124,8 Device Routing Invert Outlet Devices #1 Primary 198.6' 24." Round Culvert L= 33.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 198.6' / 197.4' S=.36 '/' Cc=.9 n=.13, Flow Area= 3.14 sf #2 Secondary 199.1' 32." W x 22." H Box Culvert L=.' Box, headwall w/3 square edges, Ke=. Inlet / Outlet Invert= 199.1' / 197.9' S=.24 '/' Cc=.9 n=.2, Flow Area= 4.89 sf #3 Discarded 198.' 2.41 in/hr Exfiltration over Surface area Discarded OutFlow 12.9 hrs HW=2.14' (Free Discharge) 3=Exfiltration (Exfiltration Controls.8 ) Primary OutFlow 12.9 hrs HW=2.14' TW=192.46' (Dynamic Tailwater) 1=Culvert (Barrel Controls 4.44 fps) Secondary OutFlow 12.9 hrs HW=2.14' TW=192.99' (Dynamic Tailwater) 2=Culvert (Inlet Controls 3.27 fps)

84 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 63 Pond DS3: Nyanza South Area=24. ac Peak Elev=2.14' Storage=1,386 cf Discarded Primary Secondary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 64 Summary for Pond DS4: East Wetlands Area = 12.8 ac, 16.99% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume= af, Incl. 2. Base Flow = hrs, Volume= 2.69 af, Atten= 68%, Lag= min Primary = hrs, Volume= 2.69 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Starting Elev= 192.' Surf.Area=.44 ac Storage= 8.1 af Peak Elev= hrs Surf.Area= ac Storage= af (6.296 af above start) Plug-Flow detention time= 1,3.1 min calculated for af (64% of inflow) Center-of-Mass det. time= min ( 1, ,94.1 ) Volume Invert Avail.Storage Storage Description # ' af Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) ' Device #1 #2 #3 Coef. (English) Head (feet) Outlet Devices 36." Round Culvert L= 7.' CPP, square edge headwall, Ke= Inlet / Outlet Invert= 191.3' / 19.4' S=.129 '/' Cc=.9 n=.12, Flow Area= 7.7 sf 6.1' long x 3.' rise Sharp-Crested Rectangular Weir 2 End Contraction(s) 12." Round Culvert L= 3.' RCP, sq.cut end projecting, Ke= Inlet / Outlet Invert= 192.6' / 192.' S=.33 '/' Cc=.9 n=.12, Flow Area=.79 sf Primary OutFlow hrs HW=193.43' TW=191.92' (Dynamic Tailwater) 1=Culvert (Passes of potential flow) 2=Sharp-Crested Rectangular Weir (Weir Controls 3.16 fps) 3=Culvert (Barrel Controls 3.2 fps) Secondary OutFlow hrs HW=192.' TW=189.78' (Dynamic Tailwater) 4=Broad-Crested Rectangular Weir ( Controls. )

85 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Pond DS4: East Wetlands Primary Secondary Area=12.8 ac Peak Elev=193.43' Storage= af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 66 Summary for Pond DS: Settle Ponds Area = 2.2 ac, 9.9% Impervious, Depth = 1.31" for 1 Year St event = hrs, Volume=.24 af hrs, Volume=. af, Atten= 1%, Lag=. min Primary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area=.27 ac Storage=.24 af Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 21.' 1.92 af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) Device Routing Invert Outlet Devices #1 Primary 219.7'.' long x 2.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=21.' TW=189.78' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir ( Controls. ) Pond DS: Settle Ponds Primary Area=2.2 ac Peak Elev=216.' Storage=.24 af 1.

86 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 67 Summary for Pond DS6: Trolley Brook Area = 192. ac, 1.61% Impervious, Depth > 2.84" for 1 Year St event = hrs, Volume= af, Incl. 2. Base Flow = 12. hrs, Volume= af, Atten= 22%, Lag= 19.1 min Primary = 12. hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12. hrs Surf.Area= 2,849 sf Storage= 2,26 cf Flood Elev= 19.8' Surf.Area= 98,3 sf Storage= 218,928 cf Plug-Flow detention time= 6. min calculated for af (1% of inflow) Center-of-Mass det. time= 4.2 min ( 1, ,812.6 ) Volume Invert Avail.Storage Storage Description # ' 48,63 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , 4,12 4, , 8,7 13, , 226, 239, , 111, 3, , 13, 48, ' Device #1 Coef. (English) Head (feet) Outlet Devices 24." Round Culvert X 2. L= 7.' CPP, projecting, no headwall, Ke=.9 Inlet / Outlet Invert= 189.7' / 189.4' S=.4 '/' Cc=.9 n=.12, Flow Area= 3.14 sf Primary OutFlow 12. hrs HW=192.47' TW=188.7' (Dynamic Tailwater) 1=Culvert (Barrel Controls fps) Secondary OutFlow hrs HW=189.78' TW=188.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir ( Controls. ) Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 68 Pond DS6: Trolley Brook Area=192. ac Peak Elev=192.47' Storage=2,26 cf Primary Secondary

87 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 69 Summary for Pond DW1: Nyanza-W Ret/Det Area = 13.7 ac, 7.3% Impervious, Depth = 1.9" for 1 Year St event = hrs, Volume= af hrs, Volume= 1.81 af, Atten= 97%, Lag= min Primary hrs, Volume= 1.81 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area= 4,423 sf Storage= 77,12 cf Plug-Flow detention time= 1,33. min calculated for 1.81 af (% of inflow) Center-of-Mass det. time= 9.6 min ( 1, ) Volume Invert Avail.Storage Storage Description #1 199.' 299,7 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , 2. 2, 17,7 17, , 67, 84, , 96, 18, , 119, 299,7 24.7' Device #1 Coef. (English) Head (feet) Limited to weir flow at low heads Outlet Devices 24." Round Culvert L= 2.' CPP, square edge headwall, Ke= Inlet / Outlet Invert= 199.' / 196.2' S=.137 '/' Cc=.9 n=.12, Flow Area= 3.14 sf Primary OutFlow hrs HW=21.81' TW=197.7' (Dynamic Tailwater) 1=Culvert (Passes.48 of 2.38 potential flow) 2=Orifice/Grate (Orifice 4.3 fps) Secondary OutFlow hrs HW=199.' TW=196.' (Dynamic Tailwater) 3=Broad-Crested Rectangular Weir ( Controls. ) Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Pond DW1: Nyanza-W Ret/Det Area=13.7 ac Peak Elev=21.81' Storage=77,12 cf Primary Secondary

88 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 71 Summary for Pond DW2: MBTA Culverts Area = 16.3 ac,.% Impervious, Depth = 1.4" for 1 Year St event = 12.2 hrs, Volume= af = 12.2 hrs, Volume= af, Atten= %, Lag=. min Primary = 12.2 hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.2 hrs Flood Elev= 24.' Device Routing Invert Outlet Devices #1 Primary ' 36." Round Culvert L=.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= ' / ' S=.6 '/' Cc=.9 n=.13, Flow Area= 7.7 sf #2 Primary 249.2' 36." Round Culvert L=.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= 249.2' / ' S=.94 '/' Cc=.9 n=.13, Flow Area= 7.7 sf Primary OutFlow 12.2 hrs HW=249.81' TW=196.97' (Dynamic Tailwater) 1=Culvert (Inlet Controls 3.87 fps) 2=Culvert (Inlet Controls 3.18 fps) Pond DW2: MBTA Culverts Area=16.3 ac Peak Elev=249.81' Primary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 72 Summary for Pond DW3: MBTA Detention Area = 4. ac,1.% Impervious, Depth =.1" for 1 Year St event = hrs, Volume= 1.88 af = hrs, Volume= af, Atten= 81%, Lag= 28.7 min Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area=.4 ac Storage=.927 af Plug-Flow detention time= min calculated for af (99% of inflow) Center-of-Mass det. time= min ( 1, ) Volume Invert Avail.Storage Storage Description #1 197.' 2.47 af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) ' Device #1 Coef. (English) Head (feet) Outlet Devices Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet). 4. Width (feet).. Primary OutFlow hrs HW=199.28' TW=197.' (Dynamic Tailwater) 1=Custom Weir/Orifice (Weir Controls 4.37 fps) 2=Broad-Crested Rectangular Weir ( Controls. )

89 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 73 Pond DW3: MBTA Detention Area=4. ac Peak Elev=199.28' Storage=.927 af Primary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 74 Summary for Pond DW4: No. Wetlands Area = 83. ac, 7.9% Impervious, Depth > 1.48" for 1 Year St event = hrs, Volume= af = hrs, Volume= 6.74 af, Atten= 8%, Lag= min Primary = hrs, Volume= 6.74 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area= 4.92 ac Storage=.214 af Plug-Flow detention time= min calculated for 6.74 af (64% of inflow) Center-of-Mass det. time= 389. min ( 1,46.2-1,71.3 ) Volume Invert Avail.Storage Storage Description #1 196.' 19.3 af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) Device Routing Invert Outlet Devices #1 Primary 197.' 12.' long x.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=197.8' TW=196.22' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir (Weir Controls 1.8 fps)

90 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Pond DW4: No. Wetlands Area=83. ac Peak Elev=197.8' Storage=.214 af Primary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 76 Summary for Pond ND1: NW MBTA Wetlands Area = 8.3 ac, 37.98% Impervious, Depth = 1.31" for 1 Year St event = 12.3 hrs, Volume=.9 af 1.78 hrs, Volume=.791 af, Atten= 91%, Lag= 28.4 min Discarded 1.78 hrs, Volume=.32 af Primary 1.78 hrs, Volume=.29 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 1.78 hrs Surf.Area= 32,76 sf Storage= 23,92 cf Plug-Flow detention time= min calculated for.791 af (87% of inflow) Center-of-Mass det. time= 88.6 min ( 1, ) Volume Invert Avail.Storage Storage Description #1 194.' 69, cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , , 69, 69, Device Routing Invert Outlet Devices #1 Discarded 194.' 1.2 in/hr Exfiltration over Horizontal area from 194.' - 19.' Excluded Horizontal area = 2, sf #2 Primary 194.7'.' long x 2.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Discarded OutFlow 1.78 hrs HW=194.82' (Free Discharge) 1=Exfiltration (Exfiltration Controls.18 ) Primary OutFlow 1.78 hrs HW=194.82' TW=192.1' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir fps)

91 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 77 Pond ND1: NW MBTA Wetlands Area=8.3 ac Peak Elev=194.82' Storage=23,92 cf Discarded Primary Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 78 Summary for Pond ND2: 24" RCP Pipe [7] Hint: Peaked at ' (Flood elevation advised) [63] Warning: Exceeded Reach RN1 INLET depth by 12.1 hrs Area = 13.4 ac, 4.31% Impervious, Depth = 1.17" for 1 Year St event = hrs, Volume= 1.32 af = hrs, Volume= 1.32 af, Atten= %, Lag=. min Primary = hrs, Volume= 1.32 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.1 hrs Device Routing Invert Outlet Devices #1 Primary 19.' 24." Round Culvert L= 33.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= 19.' / 189.' S=.3 '/' Cc=.9 n=.13, Flow Area= 3.14 sf Primary OutFlow hrs HW=192.86' TW=191.77' (Dynamic Tailwater) 1=Culvert (Outlet Controls 3.63 fps) Pond ND2: 24" RCP Pipe Primary Area=13.4 ac Peak Elev=193.39' 24." Round Culvert n=.13 L=33.' S=.3 '/' 2

92 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 79 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=.19" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=.61" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=.74" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=.84" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=.17" Tc=1. min CN=7 Runoff=.21.4 af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=1.66" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=1.66" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=1.66" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=.6" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=." Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=7. ac.% Impervious Runoff Depth=.9" Flow Length=1,98' Tc=38.8 min CN=3 Runoff=.9.4 af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=." Flow Length=1,8' Tc=41.2 min CN=33 Runoff=.. af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=." Flow Length=9' Tc=37.7 min CN=38 Runoff=.. af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=.27" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=.17" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=.84" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=.19" Flow Length=1' Tc=13.8 min CN=8 Runoff=.1.3 af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 8 Subcatchment W1: MBTA CB-2 Runoff Area=4. ac.% Impervious Runoff Depth=.3" Flow Length=1,31' Tc=19.4 min CN=48 Runoff=.1.9 af Subcatchment W2: MBTA Culvert Runoff Area=16.3 ac.% Impervious Runoff Depth=.11" Flow Length=1,3' Tc=31.3 min CN=4 Runoff=.26.1 af Subcatchment W3: MBTA CB-1 Runoff Area=12. ac.% Impervious Runoff Depth=.42" Flow Length=1,13' Tc=2.3 min CN=66 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=2." Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=.42" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=.22" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=.94" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=1.11" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff=3..3 af Reach CB1: Chemical Brook Avg. Flow Depth=.6' Max Vel=1.83 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding =.. af =.. af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.11' Max Vel=1.4 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.19' Max Vel=. fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.29' Max Vel=2.87 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.39' Max Vel=1.88 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=189.' = af Primary= af Secondary=.. af = af Pond C1: DMH - 1 Peak Elev=189.2' = af Primary= af Secondary=.. af = af Pond C1: DMH-1 Peak Elev=182.4' = af Primary= af Secondary=.. af = af

93 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 81 Pond C11: DMH-11 Peak Elev=181.3' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=18.83' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=18.11' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=188.63' = af Primary= af Secondary=.. af = af Pond C3: DMH-3 Peak Elev=188.8' = af Primary= af Secondary=.. af = af Pond C4: DMH4 Peak Elev=187.73' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=187.3' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=186.28' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=184.91' = af Primary= af Secondary=.. af = af Pond C7: DMH-7 Peak Elev=184.44' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=183.29' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=182.43' = af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=277.9' Storage=8,884 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS2: Middle School Culvert Peak Elev=233.18' Storage=.11 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=199.17' Storage=49 cf = af Discarded=.4.34 af Primary= af Secondary=.1. af = af Pond DS4: East Wetlands Peak Elev=192.82' Storage=1.287 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=21.67' Storage=.3 af =.1.3 af =.. af Pond DS6: Trolley Brook Peak Elev=191.1' Storage=4,42 cf = af Primary= af Secondary=.. af = af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 82 Pond DW1: Nyanza-W Ret/Det Peak Elev=2.13' Storage=2,97 cf = af Primary=.. af Secondary=.. af =.. af Pond DW2: MBTA Culverts Peak Elev=249.14' =.26.1 af =.26.1 af Pond DW3: MBTA Detention Peak Elev=198.48' Storage=.1 af = af = af Pond DW4: No. Wetlands Peak Elev=197.13' Storage=2.9 af = af =.. af Pond ND1: NW MBTA Wetlands Peak Elev=194.18' Storage=4,3 cf = af Discarded=.4.11 af Primary=.. af =.4.11 af Pond ND2: 24" RCP Pipe Peak Elev=19.86' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = 31.9 ac Runoff Volume = 8.61 af Average Runoff Depth =.33" 8.71% Pervious = ac 19.29% Impervious = ac

94 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 83 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=.4" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=.98" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=1.14" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=1.26" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=.36" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=2.23" Tc=1. min CN=89 Runoff=6.3.2 af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=2.23" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=2.23" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=1.3" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=.16" Flow Length=2,3' Tc=4.2 min CN= Runoff=1.6.8 af Subcatchment S3: MBTA RD. CB-3 Runoff Area=7. ac.% Impervious Runoff Depth=.24" Flow Length=1,98' Tc=38.8 min CN=3 Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=." Flow Length=1,8' Tc=41.2 min CN=33 Runoff=.. af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=." Flow Length=9' Tc=37.7 min CN=38 Runoff=.1.1 af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=.1" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=.36" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=1.26" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=.4" Flow Length=1' Tc=13.8 min CN=8 Runoff=.4.73 af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 84 Subcatchment W1: MBTA CB-2 Runoff Area=4. ac.% Impervious Runoff Depth=.12" Flow Length=1,31' Tc=19.4 min CN=48 Runoff=.7.39 af Subcatchment W2: MBTA Culvert Runoff Area=16.3 ac.% Impervious Runoff Depth=.27" Flow Length=1,3' Tc=31.3 min CN=4 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=12. ac.% Impervious Runoff Depth=.73" Flow Length=1,13' Tc=2.3 min CN=66 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=3.13" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=.73" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=.44" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=1.39" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=1.6" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=.7' Max Vel=2.8 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding =.7.8 af =.7.8 af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.16' Max Vel=1.3 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.29' Max Vel=.7 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.4' Max Vel=3.47 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.48' Max Vel=2.13 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=191.2' = af Primary= af Secondary=.7.8 af = af Pond C1: DMH - 1 Peak Elev=19.67' = af Primary= af Secondary=.. af = af Pond C1: DMH-1 Peak Elev=183.6' = af Primary= af Secondary=.. af = af

95 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 8 Pond C11: DMH-11 Peak Elev=183.13' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=182.16' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=18.79' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=19.7' = af Primary= af Secondary=.. af = af Pond C3: DMH-3 Peak Elev=189.1' = af Primary= af Secondary=.. af = af Pond C4: DMH4 Peak Elev=188.36' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=187.6' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=186.92' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=18.8' = af Primary= af Secondary=.. af = af Pond C7: DMH-7 Peak Elev=18.37' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=184.62' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=183.98' = af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=278.72' Storage=12,941 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS2: Middle School Culvert Peak Elev=233.42' Storage=.176 af =1.6.8 af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=199.41' Storage=92 cf = af Discarded=..38 af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=192.93' Storage=1.97 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=21.8' Storage=.73 af =.4.73 af =.. af Pond DS6: Trolley Brook Peak Elev=191.32' Storage=6,879 cf = af Primary= af Secondary=.. af = af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 86 Pond DW1: Nyanza-W Ret/Det Peak Elev=2.66' Storage=36,79 cf = af Primary=.. af Secondary=.. af =.. af Pond DW2: MBTA Culverts Peak Elev=249.34' = af = af Pond DW3: MBTA Detention Peak Elev=198.69' Storage=.612 af = af = af Pond DW4: No. Wetlands Peak Elev=197.47' Storage=3.47 af = af =.. af Pond ND1: NW MBTA Wetlands Peak Elev=194.3' Storage=9,273 cf = af Discarded= af Primary=.. af = af Pond ND2: 24" RCP Pipe Peak Elev=191.24' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = 31.9 ac Runoff Volume = af Average Runoff Depth =." 8.71% Pervious = ac 19.29% Impervious = ac

96 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 87 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=.8" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=1.67" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=1.9" Tc=1. min CN=74 Runoff=..48 af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=2." Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=.8" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=3.2" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=3.2" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=3.2" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=1.7" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=.46" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=7. ac.% Impervious Runoff Depth=.6" Flow Length=1,98' Tc=38.8 min CN=3 Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.1" Flow Length=1,8' Tc=41.2 min CN=33 Runoff=.3.1 af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.7" Flow Length=9' Tc=37.7 min CN=38 Runoff=.16.1 af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=1.2" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=.8" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=2." Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=.8" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 88 Subcatchment W1: MBTA CB-2 Runoff Area=4. ac.% Impervious Runoff Depth=.38" Flow Length=1,31' Tc=19.4 min CN=48 Runoff= af Subcatchment W2: MBTA Culvert Runoff Area=16.3 ac.% Impervious Runoff Depth=.6" Flow Length=1,3' Tc=31.3 min CN=4 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=12. ac.% Impervious Runoff Depth=1.33" Flow Length=1,13' Tc=2.3 min CN=66 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=4.16" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=1.33" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=.91" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=2.21" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=2.46" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=.96' Max Vel=2.38 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.23' Max Vel=1.64 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.47' Max Vel=.9 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.' Max Vel=3.9 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.62' Max Vel=2.49 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=191.86' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=191.94' = af Primary= af Secondary=.. af = af Pond C1: DMH-1 Peak Elev=186.3' = af Primary= af Secondary=.. af = af

97 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 89 Pond C11: DMH-11 Peak Elev=18.36' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=184.3' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=181.63' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.3' = af Primary= af Secondary=2.3.7 af = af Pond C3: DMH-3 Peak Elev=189.97' = af Primary= af Secondary=.. af = af Pond C4: DMH4 Peak Elev=189.18' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=188.82' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=188.7' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=188.2' = af Primary= af Secondary=.. af = af Pond C7: DMH-7 Peak Elev=187.86' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=187.68' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=186.83' = af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=28.3' Storage=22,947 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS2: Middle School Culvert Peak Elev=233.9' Storage=.33 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=199.81' Storage=979 cf = af Discarded=.6.44 af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=193.17' Storage=12.62 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=216.21' Storage=.17 af = af =.. af Pond DS6: Trolley Brook Peak Elev=191.91' Storage=12,173 cf = af Primary= af Secondary=.. af = af Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 9 Pond DW1: Nyanza-W Ret/Det Peak Elev=21.32' Storage=8,2 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=249.61' = af = af Pond DW3: MBTA Detention Peak Elev=199.2' Storage=.788 af = af = af Pond DW4: No. Wetlands Peak Elev=197.7' Storage=4.18 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=194.7' Storage=19,842 cf = af Discarded= af Primary=.. af = af Pond ND2: 24" RCP Pipe Peak Elev=192.41' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = 31.9 ac Runoff Volume = af Average Runoff Depth = 1." 8.71% Pervious = ac 19.29% Impervious = ac

98 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 91 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=2.3" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=3.2" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=3." Tc=1. min CN=74 Runoff=1..88 af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=3.7" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=1.94" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=.1" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=.1" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=.1" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=3.3" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=1.36" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=7. ac.% Impervious Runoff Depth=1.6" Flow Length=1,98' Tc=38.8 min CN=3 Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.2" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.1" Flow Length=9' Tc=37.7 min CN=38 Runoff= af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=2.3" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=1.94" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=3.7" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=2.3" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 92 Subcatchment W1: MBTA CB-2 Runoff Area=4. ac.% Impervious Runoff Depth=1.2" Flow Length=1,31' Tc=19.4 min CN=48 Runoff=3..41 af Subcatchment W2: MBTA Culvert Runoff Area=16.3 ac.% Impervious Runoff Depth=1.69" Flow Length=1,3' Tc=31.3 min CN=4 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=12. ac.% Impervious Runoff Depth=2.76" Flow Length=1,13' Tc=2.3 min CN=66 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=6.19" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=2.76" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=2.12" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=3.96" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=4.28" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.29' Max Vel=2.8 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.3' Max Vel=2.1 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.82' Max Vel=.12 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.72' Max Vel=4.92 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.77' Max Vel=2.82 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.1' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=192.41' = af Primary= af Secondary= af = af Pond C1: DMH-1 Peak Elev=188.43' = af Primary= af Secondary= af = af

99 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 93 Pond C11: DMH-11 Peak Elev=187.46' = af Primary= af Secondary=1.6.1 af = af Pond C12: DMH-12 Peak Elev=18.72' = af Primary= af Secondary= af = af Pond C13: DMH-13 Peak Elev=182.23' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.83' = af Primary= af Secondary= af = af Pond C3: DMH-3 Peak Elev=191.2' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=19.97' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=191.21' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=19.7' = af Primary= af Secondary=.43. af = af Pond C6a: CB Peak Elev=19.29' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=19.6' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=19.11' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=189.22' = af Primary= af Secondary= af = af Pond DS1: Lorraine Detention Peak Elev=282.4' Storage=4,33 cf = af Discarded=.6.28 af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=23.17' Storage=1.431 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=2.61' Storage=2,274 cf = af Discarded=.13.6 af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=193.96' Storage=17.94 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=217.4' Storage=.372 af = af =.. af Pond DS6: Trolley Brook Peak Elev=193.16' Storage=4,21 cf = af Primary= af Secondary=.. af = af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 94 Pond DW1: Nyanza-W Ret/Det Peak Elev=22.6' Storage=11,944 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=2.6' = af = af Pond DW3: MBTA Detention Peak Elev=199.63' Storage=1.114 af = af = af Pond DW4: No. Wetlands Peak Elev=198.' Storage=6.28 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=194.96' Storage=28,32 cf = af Discarded=.21.7 af Primary= af = af Pond ND2: 24" RCP Pipe Peak Elev=194.7' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = 31.9 ac Runoff Volume = 6.4 af Average Runoff Depth = 2.14" 8.71% Pervious = ac 19.29% Impervious = ac

100 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 9 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=2.64" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=4.1" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=4.34" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=4.6" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=2.4" Tc=1. min CN=7 Runoff=9.4.8 af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=6.4" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=6.4" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=6.4" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=4.12" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=1.86" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=7. ac.% Impervious Runoff Depth=2.1" Flow Length=1,98' Tc=38.8 min CN=3 Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.46" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.82" Flow Length=9' Tc=37.7 min CN=38 Runoff= af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=2.9" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=2.4" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=4.6" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=2.64" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 96 Subcatchment W1: MBTA CB-2 Runoff Area=4. ac.% Impervious Runoff Depth=1.67" Flow Length=1,31' Tc=19.4 min CN=48 Runoff=4..7 af Subcatchment W2: MBTA Culvert Runoff Area=16.3 ac.% Impervious Runoff Depth=2.24" Flow Length=1,3' Tc=31.3 min CN=4 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=12. ac.% Impervious Runoff Depth=3.47" Flow Length=1,13' Tc=2.3 min CN=66 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=7.1" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=3.47" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=2.74" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=4.78" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=.12" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.42' Max Vel=2.9 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.4' Max Vel=2.26 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.97' Max Vel=.13 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.79' Max Vel=.2 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.82' Max Vel=2.93 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.24' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=192.4' = af Primary= af Secondary= af = af Pond C1: DMH-1 Peak Elev=188.76' = af Primary= af Secondary= af = af

101 Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 97 Pond C11: DMH-11 Peak Elev=187.64' = af Primary= af Secondary= af = af Pond C12: DMH-12 Peak Elev=18.26' = af Primary= af Secondary=2.9.3 af = af Pond C13: DMH-13 Peak Elev=182.1' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.87' = af Primary= af Secondary= af = af Pond C3: DMH-3 Peak Elev=191.18' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=191.18' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=191.37' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=19.84' = af Primary= af Secondary= af = af Pond C6a: CB Peak Elev=19.36' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=19.79' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=19.1' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=189.8' = af Primary= af Secondary= af = af Pond DS1: Lorraine Detention Peak Elev=282.83' Storage=44,28 cf = af Discarded= af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=23.73' Storage=2.37 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=21.1' Storage=3,34 cf = af Discarded= af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=194.' Storage= af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=217.42' Storage=.48 af = af =.. af Pond DS6: Trolley Brook Peak Elev=193.78' Storage=67,618 cf = af Primary= af Secondary=.. af = af Trolley Brook Culvert - EXISTING Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 98 Pond DW1: Nyanza-W Ret/Det Peak Elev=23.23' Storage=14,748 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=2.24' = af = af Pond DW3: MBTA Detention Peak Elev=199.88' Storage=1.24 af = af = af Pond DW4: No. Wetlands Peak Elev=198.23' Storage=7.218 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=19.12' Storage=33,847 cf = af Discarded= af Primary= af = af Pond ND2: 24" RCP Pipe Peak Elev=196.9' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = 31.9 ac Runoff Volume = af Average Runoff Depth = 2.74" 8.71% Pervious = ac 19.29% Impervious = ac

102 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 99 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=3.29" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=4.8" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=.1" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=.39" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=3.18" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=6.93" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=6.93" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=6.93" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=4.91" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=2.4" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=7. ac.% Impervious Runoff Depth=2.73" Flow Length=1,98' Tc=38.8 min CN=3 Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.72" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=1.17" Flow Length=9' Tc=37.7 min CN=38 Runoff= af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=3.64" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=3.18" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=.39" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=3.29" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 1 Subcatchment W1: MBTA CB-2 Runoff Area=4. ac.% Impervious Runoff Depth=2.19" Flow Length=1,31' Tc=19.4 min CN=48 Runoff= af Subcatchment W2: MBTA Culvert Runoff Area=16.3 ac.% Impervious Runoff Depth=2.84" Flow Length=1,3' Tc=31.3 min CN=4 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=12. ac.% Impervious Runoff Depth=4.21" Flow Length=1,13' Tc=2.3 min CN=66 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=8.1" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=4.21" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=3.41" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=.62" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=.98" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.6' Max Vel=3.11 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.44' Max Vel=2.4 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=1.11' Max Vel=.14 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.83' Max Vel=.37 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.86' Max Vel=3.1 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.28' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=192.9' = af Primary= af Secondary= af = af Pond C1: DMH-1 Peak Elev=188.' = af Primary= af Secondary=1.1.6 af = af

103 Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 11 Pond C11: DMH-11 Peak Elev=188.26' = af Primary= af Secondary= af = af Pond C12: DMH-12 Peak Elev=186.16' = af Primary= af Secondary= af = af Pond C13: DMH-13 Peak Elev=182.93' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=192.1' = af Primary= af Secondary= af = af Pond C3: DMH-3 Peak Elev=191.3' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=191.64' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=191.32' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=19.81' = af Primary= af Secondary=.91.1 af = af Pond C6a: CB Peak Elev=19.73' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=19.93' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=19.3' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=189.21' = af Primary= af Secondary= af = af Pond DS1: Lorraine Detention Peak Elev=283.1' Storage=48,19 cf = af Discarded= af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=236.32' Storage=3.642 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=21.72' Storage=,947 cf = af Discarded= af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=19.26' Storage= af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=217.8' Storage=.64 af = af =.. af Pond DS6: Trolley Brook Peak Elev=194.31' Storage=98,44 cf = af Primary= af Secondary=.. af = af Trolley Brook Culvert - EXISTING Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 12 Pond DW1: Nyanza-W Ret/Det Peak Elev=23.8' Storage=172,768 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=2.42' = af = af Pond DW3: MBTA Detention Peak Elev=2.13' Storage=1.392 af = af = af Pond DW4: No. Wetlands Peak Elev=198.42' Storage=8.32 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=19.29' Storage=4,96 cf = af Discarded= af Primary= af = af Pond ND2: 24" RCP Pipe Peak Elev=197.93' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = 31.9 ac Runoff Volume = 88.7 af Average Runoff Depth = 3.36" 8.71% Pervious = ac 19.29% Impervious = ac

104

105 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX D Proposed HydroCAD Report Including: Proposed 1 Year Storm Event With Node Summaries for 2,, 2, & 1 Year Storm Events

106

107 N1 NW MBTA W4 ND1 NW MBTA Wetlands N2 Metcalf Ave RN1 Swale CB ND2 24" RCP Pipe N3 Foster Ave N4 6 Pleasant N Tilton Ave N6 Police/Fire N7 Downtown N8 Library CB C11 CB C12 DMH-12 CB C13 DMH-13 RC1 To Sudbury River W3 MBTA CB-1 W2 RDAP Development DRP RDP MBTA Park RW1 Thru North Wetlands CB DW2 MBTA Culverts DW3 MBTA Detention DW4 No. Wetlands W7 Chemical Brook CB1 Chemical Brook S9 W8 Megunko Road DS C1 CB DMH - 1 C CB Inlet to Culvert C2 CB DMH-2 TB1 C3 CB DMH-3 C4 CB DMH4 C CB DMH- C6 CB DMH-6 CB C6a CB C7 CB DMH-7 C8 CB DMH-8 C9 CB DMH-9 CB C1 DMH-1 DMH-11 W1 MBTA CB-2-Direct S3 MBTA RD. CB-3 DW1 W W6 No. Wetlands Nyanza-W Ret/Det S6 Nyanza south Nyanza West Settle Ponds Settle Ponds S8 Nyanza east DS3 Nyanza South SR1 DS6 Trolley Brook DS4 Trolley Brook East Wetlands S7 East Wetlands S FL Flooding DS1 To East Wetlands SE Wetlands S1 Lorraine Dr Lorraine Detention DS2 S2 Middle School Culvert Middle School S4 South Wetlands Subcat Reach Pond Link Routing Diagram for Trolley Brook Culvert - PROPOSED Condition, Printed 6/17/216

108

109 Trolley Brook Culvert - PROPOSED Condition Printed 6/17/216 Page 1 Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) acre lots, 2% imp, HSG A (S1, S2) acre lots, 2% imp, HSG C (S1) /2 acre lots, 2% imp, HSG A (N1, N2, N3) /3 acre lots, 3% imp, HSG A (N4, N) >7% Grass cover, Good, HSG A (S2, S3, W1, W2, W3) >7% Grass cover, Good, HSG C (W1, W2, W6) Gravel roads, HSG C (S6, S9, W, W6) Meadow, non-grazed, HSG C (S6, S8, S9, W, W7) Paved parking & roofs, HSG A (W2) Paved parking, HSG A (S2, S) Paved parking, HSG D (W4) Paved roads w/curbs & sewers, HSG A (S4, W6) Urban commercial, 8% imp, HSG A (N6, N7, N8) Urban industrial, 72% imp, HSG A (N1, N2, N3, N4, S7, S8, W7, W8) Water Surface, HSG A (S1, S7, S9, W2, W).6 98 Water Surface, HSG D (W4) Woods, Good, HSG A (N1, S2, S3, S4, S, S6, S7, S8, S9, W1, W3, W, W6, W7) Woods, Good, HSG C (S2, S3, W2, W3, W6) Woods, Good, HSG D (S2, S3, S, S6, S7, S8, W2, W, W6) TOTAL AREA Trolley Brook Culvert - PROPOSED Condition Printed 6/17/216 Page 2 Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers HSG A N1, N2, N3, N4, N, N6, N7, N8, S1, S2, S3, S4, S, S6, S7, S8, S9, W1, W2, W3, W, W6, W7, W8. HSG B 71.1 HSG C S1, S2, S3, S6, S8, S9, W1, W2, W3, W, W6, W HSG D S2, S3, S, S6, S7, S8, W2, W4, W, W6. Other TOTAL AREA

110 Trolley Brook Culvert - PROPOSED Condition Printed 6/17/216 Page 3 Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) (acres) Total Cover Ground Subcatchment Numbers acre lots, 2% imp S1, S /2 acre lots, 2% imp N1, N2, N /3 acre lots, 3% imp N4, N >7% Grass cover, Good S2, S3, W1, W2, W3, W Gravel roads S6, S9, W, W Meadow, non-grazed S6, S8, S9, W, W Paved parking S2, S, W Paved parking & roofs W Paved roads w/curbs & sewers S4, W Urban commercial, 8% imp N6, N7, N Urban industrial, 72% imp N1, N2, N3, N4, S7, S8, W7, W Water Surface S1, S7, S9, W2, W4, W Woods, Good N1, S2, S3, S4, S, S6, S7, S8, S9, W1, W2, W3, W, W6, W TOTAL AREA Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=1.31" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=2.31" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=2.7" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=2.74" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=1.24" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=4.1" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=4.1" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=4.1" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=2.39" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=.8" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=6.6 ac.% Impervious Runoff Depth=1.11" Flow Length=1,98' Tc=38.8 min CN= Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.7" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.22" Flow Length=9' Tc=37.7 min CN=38 Runoff=.3.36 af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=1.2" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=1.24" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=2.74" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=1.31" Flow Length=1' Tc=13.8 min CN=8 Runoff= af

111 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Subcatchment W1: MBTA CB-2-Direct Runoff Area=2. ac.% Impervious Runoff Depth=.18" Flow Length=1,31' Tc=19.4 min CN=37 Runoff=.6.38 af Subcatchment W2: RDAP Development Runoff Area=3.7 ac 42.2% Impervious Runoff Depth=3.21" Tc=2.7 min CN=81 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=.8 ac.% Impervious Runoff Depth=.63" Flow Length=' Tc=1.4 min CN=47 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=.1" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=1.9" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=1.38" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=2.93" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=3.21" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.11' Max Vel=2.8 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.28' Max Vel=1.8 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.14' Max Vel=.4 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.61' Max Vel=4.43 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.7' Max Vel=2.67 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.3' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=192.38' = af Primary= af Secondary= af = af Pond C1: DMH-1 Peak Elev=187.4' = af Primary= af Secondary=.. af = af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Pond C11: DMH-11 Peak Elev=186.83' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=184.74' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=181.82' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.9' = af Primary= af Secondary= af = af Pond C3: DMH-3 Peak Elev=19.' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=19.8' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=189.8' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=189.77' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=189.' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=189.22' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=189.21' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=188.3' = af Primary= af Secondary=.. af = af Pond DRP: RDP Peak Elev=272.92' Storage=11,663 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=281.74' Storage=33,938 cf = af Discarded= af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=234.43' Storage=.629 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=2.16' Storage=1,414 cf = af Discarded=.8.48 af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=193.43' Storage=14.4 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=216.' Storage=.24 af = af =.. af

112 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Pond DS6: Trolley Brook Peak Elev=192.47' Storage=2,418 cf = af Primary= af Secondary=.. af = af Pond DW1: Nyanza-W Ret/Det Peak Elev=21.81' Storage=77,12 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=2.8' = af = af Pond DW3: MBTA Detention Peak Elev=199.28' Storage=.927 af = af = af Pond DW4: No. Wetlands Peak Elev=198.1' Storage=6.3 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=194.82' Storage=23,92 cf = af Discarded= af Primary=.4.29 af = af Pond ND2: 24" RCP Pipe Peak Elev=193.27' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = ac Runoff Volume = af Average Runoff Depth = 1.6" 77.% Pervious = ac 22.9% Impervious = ac Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 8 Summary for Subcatchment N1: NW MBTA Runoff = 12.3 hrs, Volume=.9 af, Depth= 1.31" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 4 1/2 acre lots, 2% imp, HSG A Urban industrial, 72% imp, HSG A Woods, Good, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Grass: Short n=.1 P2= 3.2" Shallow Concentrated Flow, Paved Kv= 2.3 fps Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment N1: NW MBTA Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=8.3 ac Runoff Volume=.9 af Runoff Depth=1.31" Flow Length=7' Tc=19. min CN=8 1

113 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 9 Summary for Subcatchment N2: Metcalf Ave Runoff hrs, Volume=.423 af, Depth= 2.31" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 4 1/2 acre lots, 2% imp, HSG A Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Min Tc Subcatchment N2: Metcalf Ave Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.2 ac Runoff Volume=.423 af Runoff Depth=2.31" Tc=1. min CN=71 1 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 1 Summary for Subcatchment N3: Foster Ave Runoff = hrs, Volume=.62 af, Depth= 2.7" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 4 1/2 acre lots, 2% imp, HSG A Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Min Tc Subcatchment N3: Foster Ave Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.9 ac Runoff Volume=.62 af Runoff Depth=2.7" Tc=1. min CN=74 2 1

114 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 11 Summary for Subcatchment N4: 6 Pleasant Runoff = hrs, Volume=.8 af, Depth= 2.74" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban industrial, 72% imp, HSG A.8 7 1/3 acre lots, 3% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N4: 6 Pleasant Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3. ac Runoff Volume=.8 af Runoff Depth=2.74" Tc=1. min CN=76 Runoff Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 12 Summary for Subcatchment N: Tilton Ave Runoff = hrs, Volume=.393 af, Depth= 1.24" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description /3 acre lots, 3% imp, HSG A % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N: Tilton Ave Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3.8 ac Runoff Volume=.393 af Runoff Depth=1.24" Tc=1. min CN=7 1

115 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 13 Summary for Subcatchment N6: Police/Fire Runoff = hrs, Volume=.936 af, Depth= 4.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban commercial, 8% imp, HSG A.42 1.% Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N6: Police/Fire Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.8 ac Runoff Volume=.936 af Runoff Depth=4.1" Tc=1. min CN=89 Runoff Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 14 Summary for Subcatchment N7: Downtown Runoff = hrs, Volume= af, Depth= 4.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban commercial, 8% imp, HSG A.1 1.% Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N7: Downtown Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3.4 ac Runoff Volume=1.137 af Runoff Depth=4.1" Tc=1. min CN=89 4 2

116 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 1 Summary for Subcatchment N8: Library Runoff = hrs, Volume=.267 af, Depth= 4.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.8 89 Urban commercial, 8% imp, HSG A.12 1.% Pervious Area.68 8.% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment N8: Library Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=.8 ac Runoff Volume=.267 af Runoff Depth=4.1" Tc=1. min CN=89 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 16 Summary for Subcatchment S1: Lorraine Dr Runoff = hrs, Volume= 4.44 af, Depth= 2.39" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description acre lots, 2% imp, HSG C acre lots, 2% imp, HSG A.2 98 Water Surface, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Lawn Grass: Short n=.1 P2= 3.2" Shallow Concentrated Flow, Paved Kv= 2.3 fps 3.9 1, Pipe Channel, Drain System 1." Round Area= 1.2 sf Perim= 3.9' r=.31' n= , Total Subcatchment S1: Lorraine Dr Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=22.3 ac Runoff Volume=4.44 af Runoff Depth=2.39" Flow Length=2,' Tc=16.3 min CN=72 Runoff

117 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 17 Summary for Subcatchment S2: Middle School Runoff = hrs, Volume= 4.18 af, Depth=.8" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved parking, HSG A Woods, Good, HSG A Woods, Good, HSG D 6. 7 Woods, Good, HSG C >7% Grass cover, Good, HSG A acre lots, 2% imp, HSG A 63. Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Short Grass Pasture Kv= 7. fps 4.2 2,3 Total Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Subcatchment S2: Middle School Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=63. ac Runoff Volume=4.18 af Runoff Depth=.8" Flow Length=2,3' Tc=4.2 min CN= Runoff

118 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 19 Summary for Subcatchment S3: MBTA RD. CB-3 Runoff = hrs, Volume=.69 af, Depth= 1.11" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description. 39 >7% Grass cover, Good, HSG A Woods, Good, HSG A Woods, Good, HSG C. 77 Woods, Good, HSG D 6.6 Weighted Average % Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, n=.6 P2= 3.2" 1.9 1, Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps ,98 Total Subcatchment S3: MBTA RD. CB-3 Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=6.6 ac Runoff Volume=.69 af Runoff Depth=1.11" Flow Length=1,98' Tc=38.8 min CN= Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 Summary for Subcatchment S4: South Wetlands Runoff 1.98 hrs, Volume=.123 af, Depth=.7" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved roads w/curbs & sewers, HSG A Woods, Good, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps ,8 Total 1 1 Subcatchment S4: South Wetlands Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=22.4 ac Runoff Volume=.123 af Runoff Depth=.7" Flow Length=1,8' Tc=41.2 min CN=33 Runoff

119 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 21 Summary for Subcatchment S: SE Wetlands Runoff hrs, Volume=.36 af, Depth=.22" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A. 98 Paved parking, HSG A Woods, Good, HSG D Weighted Average % Pervious Area. 2.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment S: SE Wetlands Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=17. ac Runoff Volume=.36 af Runoff Depth=.22" Flow Length=9' Tc=37.7 min CN=38 Runoff Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 22 Summary for Subcatchment S6: Nyanza south Runoff = 12.7 hrs, Volume= 2.16 af, Depth= 1.2" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.9 89 Gravel roads, HSG C Meadow, non-grazed, HSG C Woods, Good, HSG A Woods, Good, HSG D Weighted Average % Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps ,3 Total Subcatchment S6: Nyanza south Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=17. ac Runoff Volume=2.16 af Runoff Depth=1.2" Flow Length=1,3' Tc=36.4 min CN=61 2

120 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 23 Summary for Subcatchment S7: East Wetlands Runoff = 12.3 hrs, Volume= 2.94 af, Depth= 1.24" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A Water Surface, HSG A Woods, Good, HSG D Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment S7: East Wetlands Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=28.1 ac Runoff Volume=2.94 af Runoff Depth=1.24" Flow Length=8' Tc=32.7 min CN=7 Runoff Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 24 Summary for Subcatchment S8: Nyanza east Runoff = hrs, Volume= af, Depth= 2.74" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Meadow, non-grazed, HSG C. 3 Woods, Good, HSG A Woods, Good, HSG D.3 81 Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Grass: Dense n=.24 P2= 3.2" Shallow Concentrated Flow, Grassed Waterway Kv= 1. fps Total Subcatchment S8: Nyanza east Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=13. ac Runoff Volume=2.971 af Runoff Depth=2.74" Flow Length=9' Tc=1.3 min CN=76

121 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 Summary for Subcatchment S9: Settle Ponds Runoff = hrs, Volume=.24 af, Depth= 1.31" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description.2 89 Gravel roads, HSG C.9 71 Meadow, non-grazed, HSG C.9 3 Woods, Good, HSG A.2 98 Water Surface, HSG A Weighted Average % Pervious Area.2 9.9% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Total Subcatchment S9: Settle Ponds Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2.2 ac Runoff Volume=.24 af Runoff Depth=1.31" Flow Length=1' Tc=13.8 min CN=8 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 26 Summary for Subcatchment W1: MBTA CB-2-Direct Runoff hrs, Volume=.38 af, Depth=.18" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A >7% Grass cover, Good, HSG A.2 74 >7% Grass cover, Good, HSG C Weighted Average 2. 1.% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, n=.6 P2= 3.2" Shallow Concentrated Flow, Unpaved Kv= 16.1 fps Shallow Concentrated Flow, Unpaved Kv= 16.1 fps ,31 Total Subcatchment W1: MBTA CB-2-Direct Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=2. ac Runoff Volume=.38 af Runoff Depth=.18" Flow Length=1,31' Tc=19.4 min CN=37 Runoff

122 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 27 Summary for Subcatchment W2: RDAP Development Runoff = hrs, Volume= 8.2 af, Depth= 3.21" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description * Paved parking & roofs, HSG A 6. 7 Woods, Good, HSG C Woods, Good, HSG D >7% Grass cover, Good, HSG C Water Surface, HSG A >7% Grass cover, Good, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 2.7 Direct Entry, From Permit Calcs Subcatchment W2: RDAP Development Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3.7 ac Runoff Volume=8.2 af Runoff Depth=3.21" Tc=2.7 min CN= Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 28 Summary for Subcatchment W3: MBTA CB-1 Runoff = hrs, Volume=.34 af, Depth=.63" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A 2. 7 Woods, Good, HSG C >7% Grass cover, Good, HSG A.8 47 Weighted Average.8 1.% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) ().7..1 Sheet Flow, Grass: Dense n=.24 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Shallow Concentrated Flow, Woodland Kv=. fps 1.4 Total Subcatchment W3: MBTA CB-1 Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=.8 ac Runoff Volume=.34 af Runoff Depth=.63" Flow Length=' Tc=1.4 min CN=47

123 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 29 Summary for Subcatchment W4: MBTA Park Runoff = hrs, Volume= 1.88 af, Depth=.1" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved parking, HSG D.6 98 Water Surface, HSG D Weighted Average 4. 1.% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () 1. Direct Entry, Subcatchment W4: MBTA Park Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=4. ac Runoff Volume=1.88 af Runoff Depth=.1" Tc=1. min CN=98 Runoff Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 3 Summary for Subcatchment W: Nyanza West Runoff = hrs, Volume= af, Depth= 1.9" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Woods, Good, HSG A Water Surface, HSG A Meadow, non-grazed, HSG C. 77 Woods, Good, HSG D.6 89 Gravel roads, HSG C Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Grassed Waterway Kv= 1. fps Total Subcatchment W: Nyanza West Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=13.7 ac Runoff Volume=2.169 af Runoff Depth=1.9" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff

124 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 31 Summary for Subcatchment W6: No. Wetlands Runoff = hrs, Volume= af, Depth= 1.38" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Paved roads w/curbs & sewers, HSG A.2 89 Gravel roads, HSG C >7% Grass cover, Good, HSG C Woods, Good, HSG A Woods, Good, HSG C Woods, Good, HSG D Woods, Good, HSG D Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Woods: Light underbrush n=.4 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps Channel Flow, Area= 1. sf Perim= 11.' r=.91' n= , Total Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 32 Subcatchment W6: No. Wetlands Runoff Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=32. ac Runoff Volume=3.676 af Runoff Depth=1.38" Flow Length=1,' Tc=2.1 min CN=9

125 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 33 Summary for Subcatchment W7: Chemical Brook Runoff = hrs, Volume= af, Depth= 2.93" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description. 3 Woods, Good, HSG A.2 71 Meadow, non-grazed, HSG C Urban industrial, 72% imp, HSG A Weighted Average % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Grass: Dense n=.24 P2= 3.2" Shallow Concentrated Flow, Woodland Kv=. fps 1. 1, Shallow Concentrated Flow, Unpaved Kv= 16.1 fps ,8 Total Subcatchment W7: Chemical Brook Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=9.9 ac Runoff Volume=2.413 af Runoff Depth=2.93" Flow Length=1,8' Tc=26.9 min CN=78 Runoff Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 34 Summary for Subcatchment W8: Megunko Road Runoff = hrs, Volume=.882 af, Depth= 3.21" Runoff by SCS TR-2 method, UH=SCS, Weighted-CN, Time Span=.-72. hrs, dt=.1 hrs Type III 24-hr 1 Year St Rainfall=.2" Area (ac) CN Description Urban industrial, 72% imp, HSG A % Pervious Area % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) () Sheet Flow, Fallow n=. P2= 3.2" Shallow Concentrated Flow, Unpaved Kv= 16.1 fps Total Subcatchment W8: Megunko Road Type III 24-hr 1 Year St Rainfall=.2" Runoff Area=3.3 ac Runoff Volume=.882 af Runoff Depth=3.21" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff

126 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 3 Summary for Reach CB1: Chemical Brook Area = 99.1 ac, 26.36% Impervious, Depth > 1.4" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= 1%, Lag= 7.3 min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 2.8 fps, Min. Travel Time= 9.7 min Avg. Velocity = 1.4 fps, Avg. Travel Time= 24.1 min Peak Storage= 1, hrs Average Depth at Peak Storage= 1.11' Bank-Full Depth= 2.' Flow Area= 18. sf, Capacity= ' x 2.' deep channel, n=.22 Earth, clean & straight Side Slope Z-value= 3. '/' Top Width= 1.' Length= 1,.' Slope=.23 '/' Inlet Invert= 19.', Outlet Invert= 192.' Reach CB1: Chemical Brook Area=99.1 ac Avg. Flow Depth=1.11' Max Vel=2.8 fps n=.22 L=1,.' S=.23 '/' Capacity=64.47 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 36 Summary for Reach FL: Flooding [4] Hint: Not Described (=) = hrs, Volume=.7 af = hrs, Volume=.7 af, Atten= %, Lag=. min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Reach FL: Flooding

127 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 37 Summary for Reach RC1: To Sudbury River [4] Hint: Not Described (=) Area = ac, 22.9% Impervious, Depth > 2.18" for 1 Year St event = hrs, Volume= 8.31 af = hrs, Volume= 8.31 af, Atten= %, Lag=. min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Reach RC1: To Sudbury River Area=321.7 ac Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 38 Summary for Reach RN1: Swale Area = 1. ac, 41.2% Impervious, Depth =.78" for 1 Year St event hrs, Volume=.682 af = hrs, Volume=.682 af, Atten= 7%, Lag= 2. min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 1.8 fps, Min. Travel Time= 3.8 min Avg. Velocity =.69 fps, Avg. Travel Time= 1.2 min Peak Storage= 1, hrs Average Depth at Peak Storage=.28' Bank-Full Depth= 2.' Flow Area= 32. sf, Capacity= ' x 2.' deep channel, n=.22 Earth, clean & straight Side Slope Z-value= 4. '/' Top Width= 24.' Length= 42.' Slope=.48 '/' Inlet Invert= 192.', Outlet Invert= 19.' Reach RN1: Swale Area=1. ac Avg. Flow Depth=.28' Max Vel=1.8 fps n=.22 L=42.' S=.48 '/' Capacity=

128 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 39 Summary for Reach RW1: Thru North Wetlands Area =.8 ac,.% Impervious, Depth =.63" for 1 Year St event = hrs, Volume=.34 af hrs, Volume=.289 af, Atten= 9%, Lag= min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity=.4 fps, Min. Travel Time= 8.4 min Avg. Velocity =.2 fps, Avg. Travel Time= 1,73.8 min Peak Storage= 7, hrs Average Depth at Peak Storage=.14' Bank-Full Depth= 2.' Flow Area= 14. sf, Capacity= ' x 2.' deep channel, n=.4 Sheet flow: Woods+light brush Side Slope Z-value= 2. '/' Top Width= 11.' Length= 1,.' Slope=.2 '/' Inlet Invert= 22.', Outlet Invert= 199.' Reach RW1: Thru North Wetlands Area=.8 ac Avg. Flow Depth=.14' Max Vel=.4 fps n=.4 L=1,.' S=.2 '/' Capacity= Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Summary for Reach SR1: To East Wetlands Area = 8.3 ac, 16.67% Impervious, Depth = 1.17" for 1 Year St event = hrs, Volume= 8.3 af = hrs, Volume= 8.3 af, Atten= %, Lag= 3.2 min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 4.43 fps, Min. Travel Time= 3.8 min Avg. Velocity = 1.14 fps, Avg. Travel Time= 14.6 min Peak Storage= 7, hrs Average Depth at Peak Storage=.61' Bank-Full Depth= 2.' Flow Area= 66. sf, Capacity= ' x 2.' deep channel, n=.3 Earth, grassed & winding Side Slope Z-value= 1. '/' Top Width= 63.' Length= 1,.' Slope=.33 '/' Inlet Invert= 229.', Outlet Invert= 196.' Reach SR1: To East Wetlands Area=8.3 ac Avg. Flow Depth=.61' Max Vel=4.43 fps n=.3 L=1,.' S=.33 '/' Capacity=611.72

129 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 41 Summary for Reach TB1: Trolley Brook Area = ac, 1.6% Impervious, Depth > 2.84" for 1 Year St event = 12. hrs, Volume= af = 12.6 hrs, Volume= af, Atten= %, Lag=.8 min Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Max. Velocity= 2.67 fps, Min. Travel Time= 1.1 min Avg. Velocity = 1.1 fps, Avg. Travel Time= 2. min Peak Storage= 2, hrs Average Depth at Peak Storage=.7' Bank-Full Depth= 6.' Flow Area= 198. sf, Capacity= 1, ' x 6.' deep channel, n=.3 Side Slope Z-value= 3. '/' Top Width= 1.' Length= 18.' Slope=.6 '/' Inlet Invert= 188.', Outlet Invert= 187.' Reach TB1: Trolley Brook Area=191.6 ac Avg. Flow Depth=.7' Max Vel=2.67 fps n=.3 L=18.' S=.6 '/' Capacity=1, Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 42 Summary for Pond C: Inlet to Culvert [8] Hint: Peaked.83' above defined flood level [61] Hint: Exceeded Reach CB1 outlet invert 12.3 hrs [63] Warning: Exceeded Reach TB1 INLET depth by 12.3 hrs Area = 294. ac, 19.89% Impervious, Depth > 2.41" for 1 Year St event hrs, Volume= 8.93 af hrs, Volume= 8.93 af, Atten= %, Lag=. min Primary = hrs, Volume= 3.41 af Secondary = 12.3 hrs, Volume=.466 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.3 hrs Flood Elev= 191.2' Device Routing Invert Outlet Devices #1 Primary 187.' 36." Round Culvert L= 82.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 187.' / 186.4' S=.73 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.2' 2.' long x 1.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=191.66' TW=191.29' (Dynamic Tailwater) 1=Culvert (Inlet Controls 2.92 fps) Secondary OutFlow 12.3 hrs HW=192.' TW=.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir 2.4 fps)

130 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 43 Pond C: Inlet to Culvert Area=294. ac Peak Elev=192.3' Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 44 Summary for Pond C1: DMH - 1 [8] Warning: Exceeded Pond C hrs ( af) [8] Warning: Exceeded Pond ND hrs ( af) Area = 31.9 ac, 21.46% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume=.643 af = hrs, Volume=.643 af, Atten= %, Lag=. min Primary = hrs, Volume=.636 af Secondary = hrs, Volume=.7 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 193.' Device Routing Invert Outlet Devices #1 Primary 186.' 36." Round Culvert L= 19.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= 186.' / 18.63' S=.34 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 192.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=191.3' TW=191.18' (Dynamic Tailwater) 1=Culvert (Outlet Controls 2.8 fps) Secondary OutFlow hrs HW=192.3' TW=.' (Dynamic Tailwater) 2=Orifice/Grate (Weir Controls 1.9 fps) Pond C1: DMH Area=31.9 ac Peak Elev=192.38' Primary Secondary

131 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Summary for Pond C1: DMH-1 [8] Warning: Exceeded Pond C hrs ( af) Area = 32.9 ac, 22.79% Impervious, Depth > 2.17" for 1 Year St event = hrs, Volume= 8.42 af = hrs, Volume= 8.42 af, Atten= %, Lag=. min Primary = hrs, Volume= 8.42 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 188.' Device Routing Invert Outlet Devices #1 Primary 179.' 48." W x 44." H Box Culvert L= 19.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 179.' / 177.9' S=.6 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 188.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=186.91' TW=186.6' (Dynamic Tailwater) 1=Culvert (Outlet Controls 3.31 fps) Secondary OutFlow hrs HW=179.1' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C1: DMH-1 Primary Secondary Area=32.9 ac Peak Elev=187.4' Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 46 Summary for Pond C11: DMH-11 [8] Warning: Exceeded Pond C1 12. hrs ( af) Area = 32.9 ac, 22.79% Impervious, Depth > 2.17" for 1 Year St event = hrs, Volume= 8.42 af = hrs, Volume= 8.42 af, Atten= %, Lag=. min Primary = hrs, Volume= 8.42 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 187.' Device Routing Invert Outlet Devices #1 Primary 178.' 36." Round Culvert L= 87.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 178.' / 177.6' S=.46 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 187.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=186.6' TW=184.61' (Dynamic Tailwater) 1=Culvert (Inlet Controls 7.24 fps) Secondary OutFlow hrs HW=178.3' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C11: DMH-11 Primary Secondary Area=32.9 ac Peak Elev=186.83'

132 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 47 Summary for Pond C12: DMH-12 Area = 32.9 ac, 22.79% Impervious, Depth > 2.17" for 1 Year St event = hrs, Volume= 8.42 af = hrs, Volume= 8.42 af, Atten= %, Lag=. min Primary = hrs, Volume= 8.42 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 18.' Device Routing Invert Outlet Devices #1 Primary 177.' 36." Round Culvert L= 49.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 177.' / 177.4' S=.2 '/' Cc=.9 n=.2, Flow Area= 7.7 sf #2 Secondary 18.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=184.61' TW=181.76' (Dynamic Tailwater) 1=Culvert (Outlet Controls 8.4 fps) Secondary OutFlow hrs HW=177.4' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C12: DMH-12 Primary Secondary Area=32.9 ac Peak Elev=184.74' Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 48 Summary for Pond C13: DMH-13 Area = ac, 22.9% Impervious, Depth > 2.18" for 1 Year St event = hrs, Volume= 8.31 af = hrs, Volume= 8.31 af, Atten= %, Lag=. min Primary = hrs, Volume= 8.31 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 18.' Device Routing Invert Outlet Devices #1 Primary 177.4' 48." W x 44." H Box Culvert L= 137.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 177.4' / 177.3' S=.7 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 18.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=181.76' TW=.' (Dynamic Tailwater) 1=Culvert (Barrel Controls 4.99 fps) Secondary OutFlow hrs HW=177.41' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C13: DMH-13 Primary Secondary Area=321.7 ac Peak Elev=181.82'

133 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 49 Summary for Pond C2: DMH-2 [8] Hint: Peaked.49' above defined flood level Area = 31.9 ac, 21.46% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume=.636 af = hrs, Volume=.636 af, Atten= %, Lag=. min Primary = hrs, Volume=.6 af Secondary = hrs, Volume=.1 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.1' Device Routing Invert Outlet Devices #1 Primary 18.8' 36." Round Culvert L= 26.' CPP, square edge headwall, Ke=. Inlet / Outlet Invert= 18.4' / 18.8' S= -.16 '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 191.1' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=191.17' TW=189.88' (Dynamic Tailwater) 1=Culvert (Outlet Controls fps) Secondary OutFlow hrs HW=191.8' TW=.' (Dynamic Tailwater) 2=Orifice/Grate (Weir Controls 2.26 fps) Pond C2: DMH Area=31.9 ac Peak Elev=191.9' Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Summary for Pond C3: DMH-3 [8] Hint: Peaked.3' above defined flood level Area = 31.9 ac, 21.46% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume=.6 af = hrs, Volume=.6 af, Atten= %, Lag=. min Primary = hrs, Volume=.8 af Secondary = hrs, Volume=.24 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 19.2' Device Routing Invert Outlet Devices #1 Primary 18.6' 36." Round Culvert L= 18.6' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert=.' / 18.6' S= -1. '/' Cc=.9 n=.12, Flow Area= 7.7 sf #2 Secondary 19.2' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=189.88' TW=188.76' (Dynamic Tailwater) 1=Culvert (Outlet Controls fps) Secondary OutFlow hrs HW=19.4' TW=.' (Dynamic Tailwater) 2=Orifice/Grate (Weir Controls 1.92 fps) Pond C3: DMH Area=31.9 ac Peak Elev=19.' Primary Secondary

134 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 1 Summary for Pond C4: DMH4 Area = ac, 21.7% Impervious, Depth > 2.13" for 1 Year St event = hrs, Volume=.978 af = hrs, Volume=.978 af, Atten= %, Lag=. min Primary = hrs, Volume=.978 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 191.7' Device Routing Invert Outlet Devices #1 Primary 18.' 48." Round Culvert L= 176.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 18.' / 18.1' S=.23 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 191.7' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=188.76' TW=188.31' (Dynamic Tailwater) 1=Culvert (Outlet Controls 3.89 fps) Secondary OutFlow hrs HW=18.3' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C4: DMH Area=314.7 ac Peak Elev=19.8' Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 2 Summary for Pond C: DMH- [8] Warning: Exceeded Pond C hrs ( af) Area = ac, 21.7% Impervious, Depth > 2.13" for 1 Year St event = hrs, Volume=.978 af = hrs, Volume=.978 af, Atten= %, Lag=. min Primary = hrs, Volume=.978 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 19.9' Device Routing Invert Outlet Devices #1 Primary 18.' 48." Round Culvert L= 128.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 18.' / 184.6' S=.31 '/' Cc=.9 n=.12, Flow Area= 12.7 sf #2 Secondary 191.3' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=188.31' TW=187.63' (Dynamic Tailwater) 1=Culvert (Outlet Controls fps) Secondary OutFlow hrs HW=18.3' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C: DMH Area=314.7 ac Peak Elev=189.8' Primary Secondary

135 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 3 Summary for Pond C6: DMH-6 [8] Warning: Exceeded Pond C 12.1 hrs ( af) Area = ac, 21.7% Impervious, Depth > 2.13" for 1 Year St event = hrs, Volume=.978 af = hrs, Volume=.978 af, Atten= %, Lag=. min Primary = hrs, Volume=.978 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 19.9' Device Routing Invert Outlet Devices #1 Primary 184.' 48." Round Culvert L= 164.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 184.' / 182.6' S=.116 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 19.9' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=187.63' TW=186.38' (Dynamic Tailwater) 1=Culvert (Outlet Controls 6.49 fps) Secondary OutFlow hrs HW=184.2' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C6: DMH Area=314.7 ac Peak Elev=189.77' Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 4 Summary for Pond C6a: CB [8] Hint: Peaked.' above defined flood level [8] Warning: Exceeded Pond C hrs ( af) Area = 317. ac, 22.13% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume= af = hrs, Volume= af, Atten= %, Lag=. min Primary = hrs, Volume= 6.96 af Secondary = hrs, Volume=.22 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 189.' Device Routing Invert Outlet Devices #1 Primary 182.6' 48." Round Culvert L= 6.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 182.' / 182.6' S= -.18 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 189.' 24." x 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=187.' TW=187.27' (Dynamic Tailwater) 1=Culvert ( Controls. ) Secondary OutFlow hrs HW=188.66' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C6a: CB Area=317. ac Peak Elev=189.' Primary Secondary

136 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page Summary for Pond C7: DMH-7 [8] Warning: Exceeded Pond C6a hrs ( af) Area = 317. ac, 22.13% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume= 6.96 af = hrs, Volume= 6.96 af, Atten= %, Lag=. min Primary = hrs, Volume= 6.96 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.2 hrs Flood Elev= 194.' Device Routing Invert Outlet Devices #1 Primary 182.' 48." Round Culvert L= 132.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 182.' / 181.' S=.76 '/' Cc=.9 n=.13, Flow Area= 12.7 sf #2 Secondary 191.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=187.27' TW=187.39' (Dynamic Tailwater) 1=Culvert ( Controls. ) Secondary OutFlow hrs HW=182.2' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C7: DMH Area=317. ac Peak Elev=189.22' Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Summary for Pond C8: DMH-8 [8] Warning: Exceeded Pond C hrs ( af) Area = 317. ac, 22.13% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume= 6.96 af = hrs, Volume= 6.96 af, Atten= %, Lag=. min Primary = hrs, Volume= 6.96 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.2 hrs Flood Elev= 191.' Device Routing Invert Outlet Devices #1 Primary 18.8' 48." W x 44." H Box Culvert L= 219.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 18.8' / 179.1' S=.78 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 191.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=187.39' TW=186.3' (Dynamic Tailwater) 1=Culvert (Outlet Controls 4. fps) Secondary OutFlow hrs HW=18.81' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C8: DMH Area=317. ac Peak Elev=189.21' Primary Secondary

137 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Summary for Pond C9: DMH-9 [8] Warning: Exceeded Pond C hrs ( af) Area = 32.9 ac, 22.79% Impervious, Depth > 2.17" for 1 Year St event = hrs, Volume= 8.42 af = hrs, Volume= 8.42 af, Atten= %, Lag=. min Primary = hrs, Volume= 8.42 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.1 hrs Flood Elev= 188.' Device Routing Invert Outlet Devices #1 Primary 179.3' 48." W x 44." H Box Culvert L= 88.' RCP, groove end w/headwall, Ke=.2 Inlet / Outlet Invert= 179.3' / 179.' S=.34 '/' Cc=.9 n=.2, Flow Area= sf #2 Secondary 188.' 24." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads Primary OutFlow hrs HW=187.83' TW=186.91' (Dynamic Tailwater) 1=Culvert (Outlet Controls 4.1 fps) Secondary OutFlow hrs HW=179.31' TW=.' (Dynamic Tailwater) 2=Orifice/Grate ( Controls. ) Pond C9: DMH-9 Primary Secondary Area=32.9 ac Peak Elev=188.3' Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 8 Summary for Pond DRP: RDP Area = 3.7 ac, 42.2% Impervious, Depth = 3.21" for 1 Year St event = hrs, Volume= 8.2 af = hrs, Volume= 8.2 af, Atten= 1%, Lag= 21.3 min Discarded = hrs, Volume= af Primary = hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area= 37,6 sf Storage= 11,663 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time=.6 min ( ) Volume Invert Avail.Storage Storage Description #1 268.' 273,27 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , ,624 6,14 6, ,29 1,13 21, ,12 3,842 2, ,32 119, , ,312 89, , , 38,92 273,27 Device Routing Invert Outlet Devices #1 Primary 26.9' 24." Round Culvert L= 7.' CPP, square edge headwall, Ke=. Inlet / Outlet Invert= 26.9' / 26.' S=.12 '/' Cc=.9 n=.12, Flow Area= 3.14 sf #2 Device ' 8." Vert. Orifice/Grate X 4. C=.6 #3 Device ' 48." x 48." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads #4 Primary 27.' 3." Round Culvert L= 7.' CPP, square edge headwall, Ke=. Inlet / Outlet Invert= 27.' / 269.8' S=.1 '/' Cc=.9 n=.12, Flow Area= 4.91 sf # Device 4 27.' 1." Vert. Orifice/Grate X 2. C=.6 #6 Device ' 1. deg x 3.' rise Sharp-Crested Vee/Trap Weir Cv= 2.49 (C= 3.11) #7 Device ' 48." x 48." Horiz. Orifice/Grate C=.6 Limited to weir flow at low heads #8 Secondary 276.' 3.' long x 2.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) #9 Discarded 268.' 2.41 in/hr Exfiltration over Surface area

138 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 9 Discarded OutFlow hrs HW=272.92' (Free Discharge) 9=Exfiltration (Exfiltration Controls 2.1 ) Primary OutFlow hrs HW=272.92' TW=2.8' (Dynamic Tailwater) 1=Culvert (Passes 13.8 of potential flow) 2=Orifice/Grate (Orifice Controls 9.37 fps) 3=Orifice/Grate ( Controls. ) 4=Culvert (Passes 22.4 of 2.13 potential flow) =Orifice/Grate (Orifice Controls 6.81 fps) 6=Sharp-Crested Vee/Trap Weir (Weir Controls 3.4 fps) 7=Orifice/Grate ( Controls. ) Secondary OutFlow hrs HW=268.' TW=248.98' (Dynamic Tailwater) 8=Broad-Crested Rectangular Weir ( Controls. ) Pond DRP: RDP Area=3.7 ac Peak Elev=272.92' Storage=11,663 cf Discarded Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Summary for Pond DS1: Lorraine Detention Area = 22.3 ac, 2.72% Impervious, Depth = 2.39" for 1 Year St event = hrs, Volume= 4.44 af = hrs, Volume= 4.44 af, Atten= 36%, Lag= 14.1 min Discarded hrs, Volume=.249 af Primary = hrs, Volume= af Secondary = hrs, Volume=.36 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area= 8,27 sf Storage= 33,938 cf Plug-Flow detention time= 2.2 min calculated for 4.44 af (1% of inflow) Center-of-Mass det. time= 2.2 min ( ) Volume Invert Avail.Storage Storage Description #1 27.' 9,638 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ,7 1,388 1, , 7,7 9, , 27, 36, , 23, 9, ' Device #1 #2 #3 Coef. (English) Head (feet) Outlet Devices 12." Round Culvert L= 1.' RCP, square edge headwall, Ke= Inlet / Outlet Invert= 27.3' / 274.' S=.13 '/' Cc=.9 n=.13, Flow Area=.79 sf 1." Round Culvert L= 1.' RCP, square edge headwall, Ke= Inlet / Outlet Invert= ' / 276.' S=.163 '/' Cc=.9 n=.13, Flow Area= 1.23 sf 12." Round Culvert L= 2.' RCP, square edge headwall, Ke= Inlet / Outlet Invert= 277.2' / 277.' S=.26 '/' Cc=.9 n=.13, Flow Area=.79 sf Discarded OutFlow hrs HW=281.74' (Free Discharge) =Exfiltration (Exfiltration Controls.46 ) Primary OutFlow hrs HW=281.74' TW=229.' (Dynamic Tailwater) 1=Culvert (Barrel Controls 9.67 fps) 2=Culvert (Barrel Controls 8.68 fps) 3=Culvert (Inlet Controls 9.28 fps) Secondary OutFlow hrs HW=281.74' TW=233.36' (Dynamic Tailwater) 4=Broad-Crested Rectangular Weir (Weir Controls 1.22 fps)

139 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 61 Pond DS1: Lorraine Detention Area=22.3 ac Peak Elev=281.74' Storage=33,938 cf Discarded Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 62 Summary for Pond DS2: Middle School Culvert Area = 63. ac, 1.24% Impervious, Depth =.8" for 1 Year St event = hrs, Volume= af = hrs, Volume= 4.14 af, Atten= 31%, Lag= 2.6 min Primary = hrs, Volume= 4.14 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area=.77 ac Storage=.629 af Plug-Flow detention time= 2.1 min calculated for 4.14 af (98% of inflow) Center-of-Mass det. time= 42. min ( ) Volume Invert Avail.Storage Storage Description #1 232.' af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) Device Routing Invert Outlet Devices #1 Primary 233.' 36." Round Culvert L=.' RCP, square edge headwall, Ke=. Inlet / Outlet Invert= 233.' / 231.9' S=.22 '/' Cc=.9 n=.13, Flow Area= 7.7 sf Primary OutFlow hrs HW=234.43' TW=229.6' (Dynamic Tailwater) 1=Culvert (Inlet Controls 4.7 fps)

140 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 63 Pond DS2: Middle School Culvert Area=63. ac Peak Elev=234.43' Storage=.629 af 36." Round Culvert n=.13 L=.' S=.22 '/' Primary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 64 Summary for Pond DS3: Nyanza South Area = 23.6 ac,.% Impervious, Depth = 1.41" for 1 Year St event = 12.8 hrs, Volume= 2.76 af = 12.9 hrs, Volume= 2.76 af, Atten= %, Lag=.8 min Discarded 12.9 hrs, Volume=.48 af Primary = 12.9 hrs, Volume= af Secondary = 12.9 hrs, Volume=.868 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.9 hrs Surf.Area= 1,486 sf Storage= 1,414 cf Plug-Flow detention time= 3.1 min calculated for af (1% of inflow) Center-of-Mass det. time= 3.1 min ( ) Volume Invert Avail.Storage Storage Description #1 198.' 124,8 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ,2 1,2 1, , 39,6 4, , 84, 124,8 Device Routing Invert Outlet Devices #1 Primary 198.6' 24." Round Culvert L= 33.' RCP, sq.cut end projecting, Ke=. Inlet / Outlet Invert= 198.6' / 197.4' S=.36 '/' Cc=.9 n=.13, Flow Area= 3.14 sf #2 Secondary 199.1' 32." W x 22." H Box Culvert L=.' Box, headwall w/3 square edges, Ke=. Inlet / Outlet Invert= 199.1' / 197.9' S=.24 '/' Cc=.9 n=.2, Flow Area= 4.89 sf #3 Discarded 198.' 2.41 in/hr Exfiltration over Surface area Discarded OutFlow 12.9 hrs HW=2.16' (Free Discharge) 3=Exfiltration (Exfiltration Controls.8 ) Primary OutFlow 12.9 hrs HW=2.16' TW=192.47' (Dynamic Tailwater) 1=Culvert (Barrel Controls 4.46 fps) Secondary OutFlow 12.9 hrs HW=2.16' TW=192.99' (Dynamic Tailwater) 2=Culvert (Inlet Controls 3.3 fps)

141 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 6 Pond DS3: Nyanza South Area=23.6 ac Peak Elev=2.16' Storage=1,414 cf Discarded Primary Secondary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 66 Summary for Pond DS4: East Wetlands Area = 12.8 ac, 16.99% Impervious, Depth > 2.1" for 1 Year St event = hrs, Volume= af, Incl. 2. Base Flow = hrs, Volume= 2.71 af, Atten= 68%, Lag= min Primary = hrs, Volume= 2.71 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Starting Elev= 192.' Surf.Area=.44 ac Storage= 8.1 af Peak Elev= hrs Surf.Area= ac Storage= 14.4 af (6.3 af above start) Plug-Flow detention time= 1,348.8 min calculated for af (64% of inflow) Center-of-Mass det. time= min ( 1, ,93. ) Volume Invert Avail.Storage Storage Description # ' af Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) ' Device #1 #2 #3 Coef. (English) Head (feet) Outlet Devices 36." Round Culvert L= 7.' CPP, square edge headwall, Ke= Inlet / Outlet Invert= 191.3' / 19.4' S=.129 '/' Cc=.9 n=.12, Flow Area= 7.7 sf 6.1' long x 3.' rise Sharp-Crested Rectangular Weir 2 End Contraction(s) 12." Round Culvert L= 3.' RCP, sq.cut end projecting, Ke= Inlet / Outlet Invert= 192.6' / 192.' S=.33 '/' Cc=.9 n=.12, Flow Area=.79 sf Primary OutFlow hrs HW=193.43' TW=191.93' (Dynamic Tailwater) 1=Culvert (Passes of potential flow) 2=Sharp-Crested Rectangular Weir (Weir Controls 3.16 fps) 3=Culvert (Barrel Controls 3.2 fps) Secondary OutFlow hrs HW=192.' TW=189.78' (Dynamic Tailwater) 4=Broad-Crested Rectangular Weir ( Controls. )

142 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 67 Pond DS4: East Wetlands Primary Secondary Area=12.8 ac Peak Elev=193.43' Storage=14.4 af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 68 Summary for Pond DS: Settle Ponds Area = 2.2 ac, 9.9% Impervious, Depth = 1.31" for 1 Year St event = hrs, Volume=.24 af hrs, Volume=. af, Atten= 1%, Lag=. min Primary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area=.27 ac Storage=.24 af Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 21.' 1.92 af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) Device Routing Invert Outlet Devices #1 Primary 219.7'.' long x 2.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=21.' TW=189.78' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir ( Controls. ) Pond DS: Settle Ponds Primary Area=2.2 ac Peak Elev=216.' Storage=.24 af 1.

143 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 69 Summary for Pond DS6: Trolley Brook Area = ac, 1.6% Impervious, Depth > 2.84" for 1 Year St event = hrs, Volume= 4.48 af, Incl. 2. Base Flow = 12. hrs, Volume= af, Atten= 22%, Lag= 19.3 min Primary = 12. hrs, Volume= af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12. hrs Surf.Area= 21,2 sf Storage= 2,418 cf Flood Elev= 19.8' Surf.Area= 98,3 sf Storage= 218,928 cf Plug-Flow detention time= 6. min calculated for af (1% of inflow) Center-of-Mass det. time= 4.2 min ( 1, ,811.8 ) Volume Invert Avail.Storage Storage Description # ' 48,63 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , 4,12 4, , 8,7 13, , 226, 239, , 111, 3, , 13, 48, ' Device #1 Coef. (English) Head (feet) Outlet Devices 24." Round Culvert X 2. L= 7.' CPP, projecting, no headwall, Ke=.9 Inlet / Outlet Invert= 189.7' / 189.4' S=.4 '/' Cc=.9 n=.12, Flow Area= 3.14 sf Primary OutFlow 12. hrs HW=192.47' TW=188.7' (Dynamic Tailwater) 1=Culvert (Inlet Controls fps) Secondary OutFlow hrs HW=189.78' TW=188.' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir ( Controls. ) Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Pond DS6: Trolley Brook Area=191.6 ac Peak Elev=192.47' Storage=2,418 cf Primary Secondary

144 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 71 Summary for Pond DW1: Nyanza-W Ret/Det Area = 13.7 ac, 7.3% Impervious, Depth = 1.9" for 1 Year St event = hrs, Volume= af hrs, Volume= 1.81 af, Atten= 97%, Lag= min Primary hrs, Volume= 1.81 af Secondary hrs, Volume=. af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area= 4,423 sf Storage= 77,12 cf Plug-Flow detention time= 1,33. min calculated for 1.81 af (% of inflow) Center-of-Mass det. time= 9.6 min ( 1, ) Volume Invert Avail.Storage Storage Description #1 199.' 299,7 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , 2. 2, 17,7 17, , 67, 84, , 96, 18, , 119, 299,7 24.7' Device #1 Coef. (English) Head (feet) Limited to weir flow at low heads Outlet Devices 24." Round Culvert L= 2.' CPP, square edge headwall, Ke= Inlet / Outlet Invert= 199.' / 196.2' S=.137 '/' Cc=.9 n=.12, Flow Area= 3.14 sf Primary OutFlow hrs HW=21.81' TW=197.7' (Dynamic Tailwater) 1=Culvert (Passes.48 of 2.38 potential flow) 2=Orifice/Grate (Orifice 4.3 fps) Secondary OutFlow hrs HW=199.' TW=196.' (Dynamic Tailwater) 3=Broad-Crested Rectangular Weir ( Controls. ) Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 72 Pond DW1: Nyanza-W Ret/Det Area=13.7 ac Peak Elev=21.81' Storage=77,12 cf Primary Secondary

145 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 73 Summary for Pond DW2: MBTA Culverts Area = 33.2 ac, 38.86% Impervious, Depth = 2.4" for 1 Year St event = hrs, Volume= 7.21 af = hrs, Volume= 7.21 af, Atten= %, Lag=. min Primary = hrs, Volume= 7.21 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Flood Elev= 24.' Device Routing Invert Outlet Devices #1 Primary ' 36." Round Culvert L=.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= ' / ' S=.6 '/' Cc=.9 n=.13, Flow Area= 7.7 sf #2 Primary 249.2' 36." Round Culvert L=.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= 249.2' / ' S=.94 '/' Cc=.9 n=.13, Flow Area= 7.7 sf Primary OutFlow hrs HW=2.8' TW=197.39' (Dynamic Tailwater) 1=Culvert (Inlet Controls fps) 2=Culvert (Inlet Controls 4.92 fps) Pond DW2: MBTA Culverts Primary Area=33.2 ac Peak Elev=2.8' Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 74 Summary for Pond DW3: MBTA Detention Area = 4. ac,1.% Impervious, Depth =.1" for 1 Year St event = hrs, Volume= 1.88 af = hrs, Volume= af, Atten= 81%, Lag= 28.7 min Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area=.4 ac Storage=.927 af Plug-Flow detention time= min calculated for af (99% of inflow) Center-of-Mass det. time= min ( 1, ) Volume Invert Avail.Storage Storage Description #1 197.' 2.47 af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) ' Device #1 Coef. (English) Head (feet) Outlet Devices Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet). 4. Width (feet).. Primary OutFlow hrs HW=199.28' TW=197.36' (Dynamic Tailwater) 1=Custom Weir/Orifice (Weir Controls 4.37 fps) 2=Broad-Crested Rectangular Weir ( Controls. )

146 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 7 Pond DW3: MBTA Detention Area=4. ac Peak Elev=199.28' Storage=.927 af Primary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 76 Summary for Pond DW4: No. Wetlands Area = 89.2 ac, 21.86% Impervious, Depth > 1.87" for 1 Year St event = 12.2 hrs, Volume= af = hrs, Volume= af, Atten= 76%, Lag= 14.4 min Primary = hrs, Volume= af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= hrs Surf.Area=.362 ac Storage= 6.3 af Plug-Flow detention time= 438. min calculated for af (74% of inflow) Center-of-Mass det. time= min ( 1, ) Volume Invert Avail.Storage Storage Description #1 196.' 19.3 af Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) Device Routing Invert Outlet Devices #1 Primary 197.' 12.' long x.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Primary OutFlow hrs HW=198.1' TW=196.8' (Dynamic Tailwater) 1=Broad-Crested Rectangular Weir (Weir Controls 2.9 fps)

147 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 77 Pond DW4: No. Wetlands Primary Area=89.2 ac Peak Elev=198.1' Storage=6.3 af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 78 Summary for Pond ND1: NW MBTA Wetlands Area = 8.3 ac, 37.98% Impervious, Depth = 1.31" for 1 Year St event = 12.3 hrs, Volume=.9 af 1.78 hrs, Volume=.791 af, Atten= 91%, Lag= 28.4 min Discarded 1.78 hrs, Volume=.32 af Primary 1.78 hrs, Volume=.29 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 1.78 hrs Surf.Area= 32,76 sf Storage= 23,92 cf Plug-Flow detention time= min calculated for.791 af (87% of inflow) Center-of-Mass det. time= 88.6 min ( 1, ) Volume Invert Avail.Storage Storage Description #1 194.' 69, cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) , , 69, 69, Device Routing Invert Outlet Devices #1 Discarded 194.' 1.2 in/hr Exfiltration over Horizontal area from 194.' - 19.' Excluded Horizontal area = 2, sf #2 Primary 194.7'.' long x 2.' breadth Broad-Crested Rectangular Weir Head (feet) Coef. (English) Discarded OutFlow 1.78 hrs HW=194.82' (Free Discharge) 1=Exfiltration (Exfiltration Controls.18 ) Primary OutFlow 1.78 hrs HW=194.82' TW=192.1' (Dynamic Tailwater) 2=Broad-Crested Rectangular Weir (Weir fps)

148 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 79 Pond ND1: NW MBTA Wetlands Area=8.3 ac Peak Elev=194.82' Storage=23,92 cf Discarded Primary Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=.2" Printed 6/17/216 Page 8 Summary for Pond ND2: 24" RCP Pipe [7] Hint: Peaked at ' (Flood elevation advised) [63] Warning: Exceeded Reach RN1 INLET depth 12.1 hrs Area = 13.4 ac, 4.31% Impervious, Depth = 1.17" for 1 Year St event = hrs, Volume= 1.32 af = hrs, Volume= 1.32 af, Atten= %, Lag=. min Primary = hrs, Volume= 1.32 af Routing by Dyn-Stor-Ind method, Time Span=.-72. hrs, dt=.1 hrs / 3 Peak Elev= 12.1 hrs Device Routing Invert Outlet Devices #1 Primary 19.' 24." Round Culvert L= 33.' RCP, groove end projecting, Ke=.2 Inlet / Outlet Invert= 19.' / 189.' S=.3 '/' Cc=.9 n=.13, Flow Area= 3.14 sf Primary OutFlow hrs HW=192.89' TW=191.82' (Dynamic Tailwater) 1=Culvert (Outlet Controls 3.9 fps) Pond ND2: 24" RCP Pipe Primary Area=13.4 ac Peak Elev=193.27' 24." Round Culvert n=.13 L=33.' S=.3 '/' 2

149 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 81 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=.19" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=.61" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=.74" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=.84" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=.17" Tc=1. min CN=7 Runoff=.21.4 af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=1.66" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=1.66" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=1.66" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=.6" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=." Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=6.6 ac.% Impervious Runoff Depth=.13" Flow Length=1,98' Tc=38.8 min CN= Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=." Flow Length=1,8' Tc=41.2 min CN=33 Runoff=.. af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=." Flow Length=9' Tc=37.7 min CN=38 Runoff=.. af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=.27" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=.17" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=.84" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=.19" Flow Length=1' Tc=13.8 min CN=8 Runoff=.1.3 af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 82 Subcatchment W1: MBTA CB-2-Direct Runoff Area=2. ac.% Impervious Runoff Depth=." Flow Length=1,31' Tc=19.4 min CN=37 Runoff=.. af Subcatchment W2: RDAP Development Runoff Area=3.7 ac 42.2% Impervious Runoff Depth=1.11" Tc=2.7 min CN=81 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=.8 ac.% Impervious Runoff Depth=.2" Flow Length=' Tc=1.4 min CN=47 Runoff=.1.9 af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=2." Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=.42" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=.22" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=.94" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=1.11" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff=3..3 af Reach CB1: Chemical Brook Avg. Flow Depth=.6' Max Vel=1.83 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding =.. af =.. af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.11' Max Vel=1.4 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.1' Max Vel=.1 fps =.1.9 af n=.4 L=1,.' S=.2 '/' Capacity=27.3 =..7 af Reach SR1: To East Wetlands Avg. Flow Depth=.29' Max Vel=2.87 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.39' Max Vel=1.88 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=189.' = af Primary= af Secondary=.. af = af Pond C1: DMH - 1 Peak Elev=189.2' = af Primary= af Secondary=.. af = af Pond C1: DMH-1 Peak Elev=182.4' = af Primary= af Secondary=.. af = af

150 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 83 Pond C11: DMH-11 Peak Elev=181.3' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=18.83' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=18.11' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=188.63' = af Primary= af Secondary=.. af = af Pond C3: DMH-3 Peak Elev=188.8' = af Primary= af Secondary=.. af = af Pond C4: DMH4 Peak Elev=187.73' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=187.3' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=186.28' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=184.91' = af Primary= af Secondary=.. af = af Pond C7: DMH-7 Peak Elev=184.44' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=183.29' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=182.43' = af Primary= af Secondary=.. af = af Pond DRP: RDP Peak Elev=27.89' Storage=33,872 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=277.9' Storage=8,884 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS2: Middle School Culvert Peak Elev=233.18' Storage=.11 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=199.18' Storage=416 cf = af Discarded=.4.3 af Primary= af Secondary=.18.6 af = af Pond DS4: East Wetlands Peak Elev=192.82' Storage=1.287 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=21.67' Storage=.3 af =.1.3 af =.. af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=2.73" Printed 6/17/216 Page 84 Pond DS6: Trolley Brook Peak Elev=191.1' Storage=4,42 cf = af Primary= af Secondary=.. af = af Pond DW1: Nyanza-W Ret/Det Peak Elev=2.13' Storage=2,97 cf = af Primary=.. af Secondary=.. af =.. af Pond DW2: MBTA Culverts Peak Elev=249.8' = af = af Pond DW3: MBTA Detention Peak Elev=198.48' Storage=.1 af = af = af Pond DW4: No. Wetlands Peak Elev=197.48' Storage=3.24 af = af =.. af Pond ND1: NW MBTA Wetlands Peak Elev=194.18' Storage=4,3 cf = af Discarded=.4.11 af Primary=.. af =.4.11 af Pond ND2: 24" RCP Pipe Peak Elev=19.86' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = ac Runoff Volume = af Average Runoff Depth =.41" 77.% Pervious = ac 22.9% Impervious = ac

151 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 8 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=.4" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=.98" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=1.14" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=1.26" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=.36" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=2.23" Tc=1. min CN=89 Runoff=6.3.2 af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=2.23" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=2.23" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=1.3" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=.16" Flow Length=2,3' Tc=4.2 min CN= Runoff=1.6.8 af Subcatchment S3: MBTA RD. CB-3 Runoff Area=6.6 ac.% Impervious Runoff Depth=.3" Flow Length=1,98' Tc=38.8 min CN= Runoff=.9.16 af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=." Flow Length=1,8' Tc=41.2 min CN=33 Runoff=.. af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=." Flow Length=9' Tc=37.7 min CN=38 Runoff=.1.1 af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=.1" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=.36" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=1.26" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=.4" Flow Length=1' Tc=13.8 min CN=8 Runoff=.4.73 af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 86 Subcatchment W1: MBTA CB-2-Direct Runoff Area=2. ac.% Impervious Runoff Depth=." Flow Length=1,31' Tc=19.4 min CN=37 Runoff=.. af Subcatchment W2: RDAP Development Runoff Area=3.7 ac 42.2% Impervious Runoff Depth=1.6" Tc=2.7 min CN=81 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=.8 ac.% Impervious Runoff Depth=.1" Flow Length=' Tc=1.4 min CN=47 Runoff=.8.48 af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=3.13" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=.73" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=.44" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=1.39" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=1.6" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=.7' Max Vel=2.8 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding =.77.8 af =.77.8 af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.16' Max Vel=1.3 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.3' Max Vel=.2 fps =.8.48 af n=.4 L=1,.' S=.2 '/' Capacity=27.3 =.2.39 af Reach SR1: To East Wetlands Avg. Flow Depth=.4' Max Vel=3.47 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.48' Max Vel=2.13 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=191.2' = af Primary= af Secondary=.77.8 af = af Pond C1: DMH - 1 Peak Elev=19.67' = af Primary= af Secondary=.. af = af Pond C1: DMH-1 Peak Elev=183.6' = af Primary= af Secondary=.. af = af

152 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 87 Pond C11: DMH-11 Peak Elev=183.13' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=182.16' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=18.79' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=19.7' = af Primary= af Secondary=.. af = af Pond C3: DMH-3 Peak Elev=189.1' = af Primary= af Secondary=.. af = af Pond C4: DMH4 Peak Elev=188.36' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=187.66' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=186.92' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=18.8' = af Primary= af Secondary=.. af = af Pond C7: DMH-7 Peak Elev=18.37' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=184.62' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=183.98' = af Primary= af Secondary=.. af = af Pond DRP: RDP Peak Elev=271.47' Storage=1,392 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=278.72' Storage=12,941 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS2: Middle School Culvert Peak Elev=233.42' Storage=.176 af =1.6.8 af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=199.42' Storage=64 cf = af Discarded=..39 af Primary= af Secondary=1..11 af = af Pond DS4: East Wetlands Peak Elev=192.93' Storage=1.974 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=21.8' Storage=.73 af =.4.73 af =.. af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=3.36" Printed 6/17/216 Page 88 Pond DS6: Trolley Brook Peak Elev=191.33' Storage=6,894 cf = af Primary= af Secondary=.. af = af Pond DW1: Nyanza-W Ret/Det Peak Elev=2.66' Storage=36,79 cf = af Primary=.. af Secondary=.. af =.. af Pond DW2: MBTA Culverts Peak Elev=2.1' = af = af Pond DW3: MBTA Detention Peak Elev=198.69' Storage=.612 af = af = af Pond DW4: No. Wetlands Peak Elev=197.6' Storage=4.29 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=194.3' Storage=9,273 cf = af Discarded= af Primary=.. af = af Pond ND2: 24" RCP Pipe Peak Elev=191.24' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = ac Runoff Volume = af Average Runoff Depth =.6" 77.% Pervious = ac 22.9% Impervious = ac

153 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 89 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=.8" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=1.67" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=1.9" Tc=1. min CN=74 Runoff=..48 af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=2." Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=.8" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=3.2" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=3.2" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=3.2" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=1.7" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=.46" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=6.6 ac.% Impervious Runoff Depth=.7" Flow Length=1,98' Tc=38.8 min CN= Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.1" Flow Length=1,8' Tc=41.2 min CN=33 Runoff=.3.1 af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.7" Flow Length=9' Tc=37.7 min CN=38 Runoff=.16.1 af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=1.2" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=.8" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=2." Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=.8" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 9 Subcatchment W1: MBTA CB-2-Direct Runoff Area=2. ac.% Impervious Runoff Depth=." Flow Length=1,31' Tc=19.4 min CN=37 Runoff=.2.11 af Subcatchment W2: RDAP Development Runoff Area=3.7 ac 42.2% Impervious Runoff Depth=2.46" Tc=2.7 min CN=81 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=.8 ac.% Impervious Runoff Depth=.34" Flow Length=' Tc=1.4 min CN=47 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=4.16" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=1.33" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=.91" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=2.21" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=2.46" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=.96' Max Vel=2.38 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.23' Max Vel=1.64 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.9' Max Vel=.3 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 =.9.12 af Reach SR1: To East Wetlands Avg. Flow Depth=.' Max Vel=3.9 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.62' Max Vel=2.49 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=191.88' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=191.94' = af Primary= af Secondary=.2. af = af Pond C1: DMH-1 Peak Elev=186.3' = af Primary= af Secondary=.. af = af

154 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 91 Pond C11: DMH-11 Peak Elev=18.36' = af Primary= af Secondary=.. af = af Pond C12: DMH-12 Peak Elev=184.3' = af Primary= af Secondary=.. af = af Pond C13: DMH-13 Peak Elev=181.63' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.3' = af Primary= af Secondary=2.. af = af Pond C3: DMH-3 Peak Elev=189.97' = af Primary= af Secondary=.. af = af Pond C4: DMH4 Peak Elev=189.18' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=188.82' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=188.7' = af Primary= af Secondary=.. af = af Pond C6a: CB Peak Elev=188.2' = af Primary= af Secondary=.. af = af Pond C7: DMH-7 Peak Elev=187.86' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=187.68' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=186.83' = af Primary= af Secondary=.. af = af Pond DRP: RDP Peak Elev=272.34' Storage=8,472 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=28.3' Storage=22,947 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS2: Middle School Culvert Peak Elev=233.9' Storage=.33 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=199.82' Storage=999 cf = af Discarded=.6.44 af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=193.18' Storage=12.66 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=216.21' Storage=.17 af = af =.. af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=4.4" Printed 6/17/216 Page 92 Pond DS6: Trolley Brook Peak Elev=191.92' Storage=12,227 cf = af Primary= af Secondary=.. af = af Pond DW1: Nyanza-W Ret/Det Peak Elev=21.32' Storage=8,2 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=2.3' = af = af Pond DW3: MBTA Detention Peak Elev=199.2' Storage=.788 af = af = af Pond DW4: No. Wetlands Peak Elev=197.91' Storage=.34 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=194.7' Storage=19,842 cf = af Discarded= af Primary=.. af = af Pond ND2: 24" RCP Pipe Peak Elev=192.41' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = ac Runoff Volume = af Average Runoff Depth = 1.14" 77.% Pervious = ac 22.9% Impervious = ac

155 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 93 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=2.3" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=3.2" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=3." Tc=1. min CN=74 Runoff=1..88 af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=3.7" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=1.94" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=.1" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=.1" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=.1" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=3.3" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=1.36" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=6.6 ac.% Impervious Runoff Depth=1.77" Flow Length=1,98' Tc=38.8 min CN= Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.2" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.1" Flow Length=9' Tc=37.7 min CN=38 Runoff= af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=2.3" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=1.94" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=3.7" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=2.3" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 94 Subcatchment W1: MBTA CB-2-Direct Runoff Area=2. ac.% Impervious Runoff Depth=.46" Flow Length=1,31' Tc=19.4 min CN=37 Runoff=.37.9 af Subcatchment W2: RDAP Development Runoff Area=3.7 ac 42.2% Impervious Runoff Depth=4.28" Tc=2.7 min CN=81 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=.8 ac.% Impervious Runoff Depth=1.13" Flow Length=' Tc=1.4 min CN=47 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=6.19" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=2.76" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=2.12" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=3.96" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=4.28" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.4' Max Vel=2.93 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.3' Max Vel=2.1 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.23' Max Vel=.6 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 =.4.29 af Reach SR1: To East Wetlands Avg. Flow Depth=.72' Max Vel=4.92 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.77' Max Vel=2.82 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.14' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=192.1' = af Primary= af Secondary= af = af Pond C1: DMH-1 Peak Elev=188.46' = af Primary= af Secondary= af = af

156 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 9 Pond C11: DMH-11 Peak Elev=187.' = af Primary= af Secondary= af = af Pond C12: DMH-12 Peak Elev=18.7' = af Primary= af Secondary=2.2.2 af = af Pond C13: DMH-13 Peak Elev=182.2' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.74' = af Primary= af Secondary= af = af Pond C3: DMH-3 Peak Elev=191.31' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=19.96' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=191.2' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=19.71' = af Primary= af Secondary=.97.1 af = af Pond C6a: CB Peak Elev=19.28' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=19.62' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=189.96' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=189.1' = af Primary= af Secondary= af = af Pond DRP: RDP Peak Elev=273.7' Storage=132,239 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=282.4' Storage=4,33 cf = af Discarded=.6.28 af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=23.17' Storage=1.431 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=2.63' Storage=2,317 cf = af Discarded=.13.6 af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=193.96' Storage= af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=217.4' Storage=.372 af = af =.. af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 2 Year St Rainfall=6.43" Printed 6/17/216 Page 96 Pond DS6: Trolley Brook Peak Elev=193.16' Storage=4,37 cf = af Primary= af Secondary=.. af = af Pond DW1: Nyanza-W Ret/Det Peak Elev=22.6' Storage=11,944 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=2.8' = af = af Pond DW3: MBTA Detention Peak Elev=199.63' Storage=1.114 af = af = af Pond DW4: No. Wetlands Peak Elev=198.39' Storage=8.13 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=194.96' Storage=28,32 cf = af Discarded=.21.7 af Primary= af = af Pond ND2: 24" RCP Pipe Peak Elev=194.6' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = ac Runoff Volume = 62.2 af Average Runoff Depth = 2.33" 77.% Pervious = ac 22.9% Impervious = ac

157 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 97 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=2.64" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=4.1" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=4.34" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=4.6" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=2.4" Tc=1. min CN=7 Runoff=9.4.8 af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=6.4" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=6.4" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=6.4" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=4.12" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=1.86" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=6.6 ac.% Impervious Runoff Depth=2.34" Flow Length=1,98' Tc=38.8 min CN= Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.46" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=.82" Flow Length=9' Tc=37.7 min CN=38 Runoff= af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=2.9" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=2.4" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=4.6" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=2.64" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 98 Subcatchment W1: MBTA CB-2-Direct Runoff Area=2. ac.% Impervious Runoff Depth=.74" Flow Length=1,31' Tc=19.4 min CN=37 Runoff= af Subcatchment W2: RDAP Development Runoff Area=3.7 ac 42.2% Impervious Runoff Depth=.12" Tc=2.7 min CN=81 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=.8 ac.% Impervious Runoff Depth=1.8" Flow Length=' Tc=1.4 min CN=47 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=7.1" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=3.47" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=2.74" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=4.78" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=.12" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.64' Max Vel=3.2 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.4' Max Vel=2.26 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.3' Max Vel=.7 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.79' Max Vel=.2 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.82' Max Vel=2.93 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.24' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=192.1' = af Primary= af Secondary=7..7 af = af Pond C1: DMH-1 Peak Elev=188.74' = af Primary= af Secondary= af = af

158 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 99 Pond C11: DMH-11 Peak Elev=187.61' = af Primary= af Secondary= af = af Pond C12: DMH-12 Peak Elev=18.1' = af Primary= af Secondary= af = af Pond C13: DMH-13 Peak Elev=182.4' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=191.79' = af Primary= af Secondary= af = af Pond C3: DMH-3 Peak Elev=191.2' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=191.11' = af Primary= af Secondary=.. af = af Pond C: DMH- Peak Elev=191.28' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=19.8' = af Primary= af Secondary=1..1 af = af Pond C6a: CB Peak Elev=19.29' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=19.69' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=19.2' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=189.1' = af Primary= af Secondary= af = af Pond DRP: RDP Peak Elev=274.36' Storage=16,262 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=282.83' Storage=44,28 cf = af Discarded= af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=23.73' Storage=2.37 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=21.4' Storage=3,48 cf = af Discarded= af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=194.6' Storage=21.99 af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=217.42' Storage=.48 af = af =.. af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr Year St Rainfall=7.34" Printed 6/17/216 Page 1 Pond DS6: Trolley Brook Peak Elev=193.78' Storage=67,764 cf = af Primary= af Secondary=.. af = af Pond DW1: Nyanza-W Ret/Det Peak Elev=23.23' Storage=14,748 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=2.99' = af = af Pond DW3: MBTA Detention Peak Elev=199.88' Storage=1.2 af = af = af Pond DW4: No. Wetlands Peak Elev=198.62' Storage=9.38 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=19.12' Storage=33,847 cf = af Discarded= af Primary= af = af Pond ND2: 24" RCP Pipe Peak Elev=196.1' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = ac Runoff Volume = af Average Runoff Depth = 2.94" 77.% Pervious = ac 22.9% Impervious = ac

159 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 11 Time span=.-72. hrs, dt=.1 hrs, 721 points x 3 Runoff by SCS TR-2 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment N1: NW MBTA Runoff Area=8.3 ac 37.98% Impervious Runoff Depth=3.29" Flow Length=7' Tc=19. min CN=8 Runoff= af Subcatchment N2: Metcalf Ave Runoff Area=2.2 ac 4.91% Impervious Runoff Depth=4.8" Tc=1. min CN=71 Runoff= af Subcatchment N3: Foster Ave Runoff Area=2.9 ac 9.3% Impervious Runoff Depth=.1" Tc=1. min CN=74 Runoff= af Subcatchment N4: 6 Pleasant Runoff Area=3. ac 62.4% Impervious Runoff Depth=.39" Tc=1. min CN=76 Runoff= af Subcatchment N: Tilton Ave Runoff Area=3.8 ac 3.% Impervious Runoff Depth=3.18" Tc=1. min CN=7 Runoff= af Subcatchment N6: Police/Fire Runoff Area=2.8 ac 8.% Impervious Runoff Depth=6.93" Tc=1. min CN=89 Runoff= af Subcatchment N7: Downtown Runoff Area=3.4 ac 8.% Impervious Runoff Depth=6.93" Tc=1. min CN=89 Runoff= af Subcatchment N8: Library Runoff Area=.8 ac 8.% Impervious Runoff Depth=6.93" Tc=1. min CN=89 Runoff= af Subcatchment S1: Lorraine Dr Runoff Area=22.3 ac 2.72% Impervious Runoff Depth=4.91" Flow Length=2,' Tc=16.3 min CN=72 Runoff= af Subcatchment S2: Middle School Runoff Area=63. ac 1.24% Impervious Runoff Depth=2.4" Flow Length=2,3' Tc=4.2 min CN= Runoff= af Subcatchment S3: MBTA RD. CB-3 Runoff Area=6.6 ac.% Impervious Runoff Depth=2.96" Flow Length=1,98' Tc=38.8 min CN= Runoff= af Subcatchment S4: South Wetlands Runoff Area=22.4 ac 4.46% Impervious Runoff Depth=.72" Flow Length=1,8' Tc=41.2 min CN=33 Runoff= af Subcatchment S: SE Wetlands Runoff Area=17. ac 2.94% Impervious Runoff Depth=1.17" Flow Length=9' Tc=37.7 min CN=38 Runoff= af Subcatchment S6: Nyanza south Runoff Area=17. ac.% Impervious Runoff Depth=3.64" Flow Length=1,3' Tc=36.4 min CN=61 Runoff= af Subcatchment S7: East Wetlands Runoff Area=28.1 ac 36.44% Impervious Runoff Depth=3.18" Flow Length=8' Tc=32.7 min CN=7 Runoff= af Subcatchment S8: Nyanza east Runoff Area=13. ac 29.3% Impervious Runoff Depth=.39" Flow Length=9' Tc=1.3 min CN=76 Runoff= af Subcatchment S9: Settle Ponds Runoff Area=2.2 ac 9.9% Impervious Runoff Depth=3.29" Flow Length=1' Tc=13.8 min CN=8 Runoff= af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 12 Subcatchment W1: MBTA CB-2-Direct Runoff Area=2. ac.% Impervious Runoff Depth=1.7" Flow Length=1,31' Tc=19.4 min CN=37 Runoff= af Subcatchment W2: RDAP Development Runoff Area=3.7 ac 42.2% Impervious Runoff Depth=.98" Tc=2.7 min CN=81 Runoff= af Subcatchment W3: MBTA CB-1 Runoff Area=.8 ac.% Impervious Runoff Depth=2.8" Flow Length=' Tc=1.4 min CN=47 Runoff= af Subcatchment W4: MBTA Park Runoff Area=4. ac 1.% Impervious Runoff Depth=8.1" Tc=1. min CN=98 Runoff= af Subcatchment W: Nyanza West Runoff Area=13.7 ac 7.3% Impervious Runoff Depth=4.21" Flow Length=9' Slope=.1 '/' Tc=26.3 min CN=66 Runoff= af Subcatchment W6: No. Wetlands Runoff Area=32. ac 3.44% Impervious Runoff Depth=3.41" Flow Length=1,' Tc=2.1 min CN=9 Runoff= af Subcatchment W7: Chemical Brook Runoff Area=9.9 ac 66.91% Impervious Runoff Depth=.62" Flow Length=1,8' Tc=26.9 min CN=78 Runoff= af Subcatchment W8: Megunko Road Runoff Area=3.3 ac 72.% Impervious Runoff Depth=.98" Flow Length=9' Slope=. '/' Tc=17.3 min CN=81 Runoff= af Reach CB1: Chemical Brook Avg. Flow Depth=1.86' Max Vel=3.44 fps = af n=.22 L=1,.' S=.23 '/' Capacity=64.47 = af Reach FL: Flooding = af = af Reach RC1: To Sudbury River = af = af Reach RN1: Swale Avg. Flow Depth=.44' Max Vel=2.4 fps = af n=.22 L=42.' S=.48 '/' Capacity= = af Reach RW1: Thru North Wetlands Avg. Flow Depth=.37' Max Vel=.8 fps = af n=.4 L=1,.' S=.2 '/' Capacity=27.3 = af Reach SR1: To East Wetlands Avg. Flow Depth=.83' Max Vel=.37 fps = af n=.3 L=1,.' S=.33 '/' Capacity= = af Reach TB1: Trolley Brook Avg. Flow Depth=.86' Max Vel=3.1 fps = af n=.3 L=18.' S=.6 '/' Capacity=1, = af Pond C: Inlet to Culvert Peak Elev=192.27' = af Primary= af Secondary= af = af Pond C1: DMH - 1 Peak Elev=193.12' = af Primary= af Secondary= af = af Pond C1: DMH-1 Peak Elev=188.' = af Primary= af Secondary= af = af

160 Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 13 Pond C11: DMH-11 Peak Elev=188.1' = af Primary= af Secondary=12.3. af = af Pond C12: DMH-12 Peak Elev=18.9' = af Primary= af Secondary=.4.38 af = af Pond C13: DMH-13 Peak Elev=182.9' = af Primary= af Secondary=.. af = af Pond C2: DMH-2 Peak Elev=192.37' = af Primary= af Secondary= af = af Pond C3: DMH-3 Peak Elev=191.6' = af Primary= af Secondary= af = af Pond C4: DMH4 Peak Elev=191.71' = af Primary= af Secondary=.3. af = af Pond C: DMH- Peak Elev=191.3' = af Primary= af Secondary=.. af = af Pond C6: DMH-6 Peak Elev=19.77' = af Primary= af Secondary= af = af Pond C6a: CB Peak Elev=19.8' = af Primary= af Secondary= af = af Pond C7: DMH-7 Peak Elev=19.94' = af Primary= af Secondary=.. af = af Pond C8: DMH-8 Peak Elev=19.18' = af Primary= af Secondary=.. af = af Pond C9: DMH-9 Peak Elev=189.' = af Primary= af Secondary=8.77. af = af Pond DRP: RDP Peak Elev=27.' Storage=19,31 cf = af Discarded= af Primary= af Secondary=.. af = af Pond DS1: Lorraine Detention Peak Elev=283.1' Storage=48,19 cf = af Discarded= af Primary= af Secondary= af = af Pond DS2: Middle School Culvert Peak Elev=236.32' Storage=3.642 af = af 36." Round Culvert n=.13 L=.' S=.22 '/' = af Pond DS3: Nyanza South Peak Elev=21.76' Storage=6,82 cf = af Discarded= af Primary= af Secondary= af = af Pond DS4: East Wetlands Peak Elev=19.27' Storage= af = af Primary= af Secondary=.. af = af Pond DS: Settle Ponds Peak Elev=217.8' Storage=.64 af = af =.. af Trolley Brook Culvert - PROPOSED Condition Type III 24-hr 1 Year St Rainfall=8.2" Printed 6/17/216 Page 14 Pond DS6: Trolley Brook Peak Elev=194.31' Storage=98,19 cf = af Primary= af Secondary=.. af = af Pond DW1: Nyanza-W Ret/Det Peak Elev=23.8' Storage=172,768 cf = af Primary= af Secondary=.. af = af Pond DW2: MBTA Culverts Peak Elev=21.11' = af = af Pond DW3: MBTA Detention Peak Elev=2.13' Storage=1.394 af = af = af Pond DW4: No. Wetlands Peak Elev=198.8' Storage=1.998 af = af = af Pond ND1: NW MBTA Wetlands Peak Elev=19.29' Storage=4,96 cf = af Discarded= af Primary= af = af Pond ND2: 24" RCP Pipe Peak Elev=197.9' = af 24." Round Culvert n=.13 L=33.' S=.3 '/' = af Total Runoff Area = ac Runoff Volume = af Average Runoff Depth = 3.9" 77.% Pervious = ac 22.9% Impervious = ac

161

162 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX E NRCS Soils Data

163 Hydrologic Soil Group Middlesex County, Massachusetts (Trolley Brook Culvert Watershed) ' 2'' W ' 33'' W 42 1' 47'' N 42 1' 47'' N ' 6'' N ' 2'' W 71 27' 33'' W 42 14' 6'' N N Map Scale: 1:11,1 if printed on A landscape (11" x 8.") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 19N WGS84 Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/14/216 Page 1 of 4

164 MAP LEGEND MAP INFORMATION Hydrologic Soil Group Middlesex County, Massachusetts (Trolley Brook Culvert Watershed) Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:2,. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:387) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Middlesex County, Massachusetts Survey Area Data: Version 1, Sep 28, 21 Soil map units are labeled (as space allows) for map scales 1:, or larger. Date(s) aerial images were photographed: Sep 12, 214 Sep 28, 214 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/14/216 Page 2 of 4

165 Hydrologic Soil Group Middlesex County, Massachusetts Trolley Brook Culvert Watershed Hydrologic Soil Group 3A 73B 14C 16C 37B 37D 312B Hydrologic Soil Group Summary by Map Unit Middlesex County, Massachusetts (MA17) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Freetown muck, ponded, to 1 percent slopes Whitman fine sandy loam, to percent slopes, extremely stony Hollis-Rock outcrop- Charlton complex, 3 to 1 percent slopes Narragansett-Hollis- Rock outcrop complex, 3 to 1 percent slopes Paxton fine sandy loam, to 8 percent slopes, extremely stony Paxton fine sandy loam, 1 to 2 percent slopes, extremely stony Woodbridge fine sandy loam, to 8 percent slopes, extremely stony 41B Narragansett silt loam, 3 to 8 percent slopes 416B Narragansett silt loam, 3 to 8 percent slopes, very stony 416C Narragansett silt loam, 8 to 1 percent slopes, very stony 416D 626B Narragansett silt loam, 1 to 2 percent slopes, very stony Merrimac-Urban land complex, to 8 percent slopes B/D % D % A.7 1.6% A % C % C % C/D % A 2.4.7% A % A % A % A % 64 Udorthents, loamy % 6 Udorthents, wet substratum 66 Udorthents-Urban land complex 1.9.% % Totals for Area of Interest % Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/14/216 Page 3 of 4

166 Hydrologic Soil Group Middlesex County, Massachusetts Trolley Brook Culvert Watershed Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/14/216 Page 4 of 4

167

168 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX F Rainfall data obtained from NOAA Atlas 14

169 Precipitation Frequency Data Server Page 1 of 4 6/8/216 NOAA Atlas 14, Volume 1, Version 2 ASHLAND Station ID: Location name: Ashland, Massachusetts, US* Latitude: 42.2, Longitude: Elevation: Elevation (station metadata): 23 ft* * source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Sandra Pavlovic, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Orlan Wilhite NOAA, National Weather Service, Silver Spring, Maryland PF_tabular PF_graphical Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 9% confidence intervals (in inches) 1 Duration -min 1-min 1-min 3-min 6-min 2-hr 3-hr 6-hr 12-hr 24-hr 2-day 3-day 4-day 7-day 1-day 2-day 3-day 4-day 6-day Average recurrence interval (years) ( ).473 ( ).6 ( ).763 ( ).969 ( ) 1.23 ( ) 1.42 ( ) 1.82 ( ) 2.3 ( ) 2.73 ( ) 3.4 ( ) 3.28 ( ) 3.2 ( ) 4.22 ( ) 4.89 ( ) 6.89 ( ) 8.3 ( ) 1. ( ) 12.2 ( ).41 ( ).68 ( ).669 ( ).917 ( ) 1.17 ( ) 1.49 ( ) 1.72 ( ) 2.21 ( ) 2.8 ( ) 3.36 ( ) 3.8 ( ) 4.1 ( ) 4.36 (3.-.33).1 ( ).8 ( ) 7.87 ( ) 9. ( ) 11.6 ( ) 13.3 ( ).11 ( ).724 ( ).82 ( ) 1.17 (.96-1.) 1.48 ( ) 1.91 ( ) 2.21 ( ) 2.84 ( ) 3.62 ( ) 4.4 ( ).4 ( ).42 ( ).73 ( ) 6. ( ) 7.3 ( ) 9.48 ( ) 11.2 ( ) 13.3 ( ) 1.1 ( ).63 ( ).84 ( ) 1.1 ( ) 1.38 ( ) 1.7 ( ) 2.2 ( ) 2.61 ( ) 3.37 ( ) 4.3 ( ).2 ( ) 6.7 ( ) 6.2 ( ) 6.87 ( ) 7.7 ( ) 8. ( ) 1.8 ( ) 12.6 ( ) 14.8 ( ) 16.6 ( ).729 ( ) 1.3 ( ) 1.21 ( ) 1.66 ( ) 2.11 ( ) 2.73 ( ) 3.17 ( ) 4.1 ( ).24 ( ) 6.43 ( ) 7.49 ( ) 8.3 ( ) 8.44 ( ) 9.41 ( ) 1.3 ( ) 12.7 ( ) 14. ( ) 16.8 ( ) 18.6 ( ).826 ( ) 1.17 ( ) 1.38 ( ) 1.89 ( ) 2.39 ( ) 3.1 ( ) 3.6 ( ) 4.66 ( ).96 ( ) 7.34 (.-9.89) 8.8 ( ) 9.2 ( ) 9.64 ( ) 1.7 ( ) 11.6 ( ) 14.1 ( ) 16. ( ) 18.3 ( ) 2.2 ( ).922 ( ) 1.31 ( ) 1.4 ( ) 2.11 (1.-3.1) 2.68 ( ) 3.47 ( ) 4.3 ( ).22 ( ) 6.69 ( ) 8.2 ( ) 9.67 ( ) 1.4 ( ) 1.9 ( ) 12. ( ) 12.9 ( ) 1. ( ) 17. ( ) 19.8 ( ) 21.7 ( ) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). 1.4 ( ) 1.48 ( ) 1.74 ( ) 2.38 ( ) 3.2 ( ) 3.99 ( ) 4.67 ( ) 6.8 ( ) 7.77 ( ) 9.64 ( ) 11.4 ( ) 12.3 ( ) 12.8 ( ) 13.9 ( ) 14.8 ( ) 17.2 ( ) 19.1 ( ) 21.2 ( ) 23. ( ) 1.2 ( ) 1.7 ( ) 2.1 ( ) 2.74 ( ) 3.48 ( ) 4.67 ( ).2 ( ) 7.21 ( ) 9.21 ( ) 11. ( ) 13.8 ( ) 14.8 ( ) 1.4 ( ) 16. ( ) 17.3 ( ) 19. ( ) 21.2 ( ) 23.1 ( ) 24.6 ( ) 1.32 ( ) 1.88 ( ) 2.21 ( ) 3.2 ( ) 3.83 ( ).19 ( ) 6.1 ( ) 8.6 ( ) 1.3 (6.9-1.) 12.9 ( ) 1.6 ( ) 16.7 ( ) 17.3 ( ) 18.4 ( ) 19.2 ( ) 21.2 ( ) 22.7 ( ) 24. ( ) 2.8 ( ) Numbers in parenthesis are PF estimates at lower and upper bounds of the 9% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is %. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical

170 Precipitation Frequency Data Server Page 2 of 4 6/8/216 Back to Top Maps & aerials Small scale terrain km Map data 216 Google

171 Precipitation Frequency Data Server Page 3 of 4 6/8/216 2 km Map data Report 216 a map Google error Large scale map 2 km Map data Report 216 a map Google error Large scale aerial 2 km Imagery 216 Report TerraMetrics a map error Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 132 East West Highway Silver Spring, MD 291

172 Precipitation Frequency Data Server Page 4 of 4 6/8/216 Questions?: HDSC.Questions@noaa.gov Disclaimer

173 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX G TROLLEY BROOK CULVERT PLAN AND PROFILE

174

175

176

177 HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA APPENDIX H OBSERVATION PHOTOS

178 Trolley Brook Culvert, Ashland Observation Photos Trolley Brook looking upstream from inlet Culvert inlet with bars off Megunko Road

179 Trolley Brook Culvert, Ashland Observation Photos Small manholes and connecting drain pipes extend into trunck lines reducing capacity

180 Trolley Brook Culvert, Ashland Observation Photos 4 x4 stone box culvert 36 HDPE Pipe

181 Trolley Brook Culvert, Ashland Observation Photos 4 x4 stone box culvert outlet

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT 1. Call To Order 2. Roll Call of Members 3. Introduction of Staff 4. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting March

More information

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CFR 257.82(c) Bottom Ash Complex Mitchell Power Plant Marshall County, West Virginia October, 2016 Prepared for: Wheeling Power Company & Kentucky Power Company

More information

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics

More information

STATE OF NEW HAMPSHIRE Inter-Department Communication

STATE OF NEW HAMPSHIRE Inter-Department Communication STATE OF NEW HAMPSHIRE Inter-Department Communication DATE: February 11, 2010 AT (OFFICE): NHPUC FROM: Torn Frantz Director, Electric Division SUBJECT: DE 09-277: Petition by Public Service Company of

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO PREPARED FOR: SHEA HOMES 9380 STATION ST., SUITE 600 LONE TREE, CO 80124 PHONE: 303-791-8180 CONTACT: RYAN MCDERMED PREPARED BY:

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Swale Storage/ Length Between Ditch Blocks

Swale Storage/ Length Between Ditch Blocks Swale Storage/ Length Between Ditch Blocks Input: Roadway Grade 1.00 % Front Slope 4 :1 Bottom Width 0 ft Back Slope 3 :1 Swale Depth 1.50 ft Calculations: Cross-Sectional Swale Area = 7.88 ft 2 DITCH

More information

CULVERT DESIGN WITH HY-8

CULVERT DESIGN WITH HY-8 Back to the Basics CULVERT DESIGN WITH HY-8 Purdue University Road School 2006 Your Presenters... Merril Dougherty INDOT, Hydraulics Unit Supervisor David Finley CTE Engineers, Inc. 1 Part One: Culvert

More information

OVERVIEW OPERATION. 2 Stormceptor EF Technical Manual

OVERVIEW OPERATION. 2 Stormceptor EF Technical Manual EF Technical Manual OVERVIEW Stormceptor EF is a continuation and evolution of the most globally recognized oil-grit separator (OGS) stormwater treatment technology - Stormceptor. Also known as a hydrodynamic

More information

A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT

A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT Highway and Floodplain Cochise County Grant Grant amount- up to $1,693,265 over 3 years Components:

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site Snow Dump Sites Understanding What to Do with Collected Snow Québec City Among cities with a population of 500,000 or more, Québec City ranks second in the world for the highest snowfall, behind Sapporo,

More information

1075 CENTRAL AVE SURFACE WATER MANAGEMENT ENGINEERING REPORT. R&B NAPLES HOLDINGS 2, LLC th Street, S. Naples, FL OCTOBER 2014

1075 CENTRAL AVE SURFACE WATER MANAGEMENT ENGINEERING REPORT. R&B NAPLES HOLDINGS 2, LLC th Street, S. Naples, FL OCTOBER 2014 1075 CENTRAL AVE SURFACE WATER MANAGEMENT ENGINEERING REPORT FOR: NEW INDIVIDUAL ERP OCTOBER 2014 PREPARED FOR: R&B NAPLES HOLDINGS 2, LLC 2002 4 th Street, S. Naples, FL 34102 AND SOUTH FLORIDA WATER

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

A Salt Marsh Advancement Zone Assessment of Greenwich, Connecticut

A Salt Marsh Advancement Zone Assessment of Greenwich, Connecticut A Salt Marsh Advancement Zone Assessment of Greenwich, Connecticut Front cover image: Open space and unprotected parcels critical to the conservation of marsh advancement corridors in Greenwich; from the

More information

DESIGN RAINFALL DATA

DESIGN RAINFALL DATA Unit 4: Design Rainfall Data Page 4-1 DESIGN RAINFALL DATA For stormwater management system design purposes, most engineers use point rainfall. Design rainfall data typically is given in terms of accumulated

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE 07-071 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Petition for License to Construct and Maintain Electric Lines and a Fiber Optic Communications Cable

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Figure 1. Southern Chesapeake 2 & 3 Watershed MDPU Map Southern Chesapeake Watershed MDPU Study Areas 2 & 3 City of Chesapeake, Virginia 17

Figure 1. Southern Chesapeake 2 & 3 Watershed MDPU Map Southern Chesapeake Watershed MDPU Study Areas 2 & 3 City of Chesapeake, Virginia 17 Hydraulic Connection with Cooper's Ditch Hydraulic Connection with Cooper's Ditch Homestead Outfall Subcatchments 0,750 3,500 Figure. Southern Chesapeake 2 & 3 Watershed MDPU Map City of Chesapeake, Virginia

More information

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson

More information

Appendix I. Canning River Fan Stream Data

Appendix I. Canning River Fan Stream Data Appendix I Canning River Fan Stream Data Table 1: Available Stream Width and Bankfull Data Collected on the Canning River Fan Within 5 Miles of the Coast Stream Width (ft) Ordinary Top of Flood- Site

More information

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT

More information

STRUCTURE S-13. Revised 2/21/02

STRUCTURE S-13. Revised 2/21/02 STRUCTURE S-13 This structure is a pumping station with a gated spillway which can control flows which bypass the pumps. The structure is located in Canal 11 (South New River Canal) about 300 feet west

More information

Projected 2011 Missouri River Flood Elevations

Projected 2011 Missouri River Flood Elevations Projected 2011 Missouri River Flood Elevations Kansas City District, US Army Corps of Engineers The following table presents two water surface profiles based on the likely range of flows that are expected

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

10 May 14, 2014 Public Hearing

10 May 14, 2014 Public Hearing 10 May 14, 2014 Public Hearing APPLICANT: PROPERTY OWNER: AEGEAN ASSOCIATES CUP-Truck and Trailer Rentals STAFF PLANNER: Kristine Gay REQUEST: Conditional Use Permit for Truck and Trailer Rentals ADDRESS

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

PARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2

PARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2 PRELIMINARY ENGINEERING REPORT PARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2 October 215 Project No. 22223 Prepared by STEGER BIZZELL Texas Registered Engineering Firm F-181 Consulting Engineers - Georgetown,

More information

Appendix G Aquilla Lake Pool Rise Recreational Resources

Appendix G Aquilla Lake Pool Rise Recreational Resources Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative

More information

CHINO DESALTER PHASE 3

CHINO DESALTER PHASE 3 CHINO DESALTER PHASE 3 Comprehensive Predesign Report Prepared for Jurupa Community Services District, City of Ontario, and Western Municipal Water District REVISED FINAL December 2010 Jurupa Community

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT Appendices Appendix F Parking Study April 2016 CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT

More information

Operations Center FAQs

Operations Center FAQs RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue

More information

Transportation Land Development Environmental S e r v i c e s

Transportation Land Development Environmental S e r v i c e s Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA 01803 Date: September 23, 2013 Project

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES

DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES These guidelines are provided to assist you in the construction of your driveway to help you determine: The best location on your property. What you need to

More information

CSO/STORMWATER MANAGEMENT. Hydrovex VHV / SVHV Vertical Vortex Flow Regulator

CSO/STORMWATER MANAGEMENT. Hydrovex VHV / SVHV Vertical Vortex Flow Regulator CSO/STORMWATER MANAGEMENT Hydrovex VHV / SVHV Vertical Vortex Flow Regulator HYDROVEX VHV / SVHV VERTICAL VORTEX FLOW REGULATOR INTRODUCTION One of the major problems of urban wet weather flow management

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : June,

More information

Minimization 36 CFR (b)

Minimization 36 CFR (b) Rico West Dolores Roads and Trails (Travel Management) Project Draft Record of Decision, Attachment 6 Travel Rule for Motor Vehicle designations of trails and areas (Minimization ) As described in the

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

2005 City of Santa Paula Potable Water System Master Plan Amendment

2005 City of Santa Paula Potable Water System Master Plan Amendment 2005 City of Santa Paula Potable Water System Master Plan Amendment City of Santa Paula Project Engineer Randy Toedter, PE Brian Yanez June, 2012 970 Ventura Street Santa Paula, CA 93060 PURPOSE OF THE

More information

ORIGINAL AND REVISED DEVELOPMENT CONCEPTS

ORIGINAL AND REVISED DEVELOPMENT CONCEPTS Reference No.: 141-24579 Mr. Tyson Simms, MCIP, LPP Planner II Rural Policy and Applications Current Planning Planning and Development P.O. Box 1749 Halifax, NS B3J 3A5 Re: : (WSP Canada Inc, March 2015)

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended

More information

DS Preliminary Hydrology Report EAST CAT CANYON FIELD REDEVELOPMENT PROJECT

DS Preliminary Hydrology Report EAST CAT CANYON FIELD REDEVELOPMENT PROJECT DS-13186-117 Preliminary Hydrology Report For EAST CAT CANYON FIELD REDEVELOPMENT PROJECT Prepared for: Aera Energy LLC 10000 Ming Avenue Bakersfield, CA 93311-1302 661-665-5000 Project Address: Sections

More information

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

4.2 Series Station Option Description

4.2 Series Station Option Description 4.2 Series Station Option Description The series station proposal features a new set of side platforms constructed approximately 250 feet north of the existing platforms. The two new platforms would extend

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Public Information Centre

Public Information Centre Junction Street Wastewater Pumping Station & Forcemain Schedule B Municipal Class Environmental Assessment Study Public Information Centre June 28, 2017. 6:00 to 8:00 pm. The Burlington Performing Arts

More information

Request Conditional Use Permit (Motor Vehicle Rentals) Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Conditional Use Permit (Motor Vehicle Rentals) Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant & Property Owner Public Hearing August 9, 2017 City Council Election District Centerville Agenda Item 1 Request Conditional Use Permit (Motor Vehicle Rentals) Staff Recommendation Approval Staff

More information

Final Technical. Memorandum

Final Technical. Memorandum Federal Emergency Management Agency Task Or rder #34 Final Technical Memorandum HYDROLOGIC REVIEW FOR THE VENTURA RIVER WATERSHED AND SEVERAL TRIBUTARY STREAMS FLOOD INSURANCE STUDY Ventu ra County, CA

More information

The remainder of this memorandum contains the details of our peer review findings.

The remainder of this memorandum contains the details of our peer review findings. REF: MAX-2014067.00 DATE: June 20, 2014 TO: FROM: RE: Mr. Leo Bartolini, Jr. Chairman, Zoning Board of Appeals 17 Common Street Southborough, MA 01772 Mr. Jason DeGray, P.E., PTOE Proposed Residence at

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

STRUCTURE 5A PURPOSE

STRUCTURE 5A PURPOSE STRUCTURE 5A This structure is a six unit pumping plant located on the south side of U.S. Highway 441 and Canal 51 (West Palm Beach Canal) between the canal and the borrow canals of Levees 7 and 40 about

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT MICHIGAN OHIO UNIVERSITY TRANSPORTATION CENTER Alternate energy and system mobility to stimulate economic development. Report No: MIOH UTC TS41p1-2 2012-Final TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION

More information

RCFC & WCD RATIONAL METHOD CALCULATION FORM

RCFC & WCD RATIONAL METHOD CALCULATION FORM RCFC & WCD RATIONAL METHOD CALCULATION FORM HYDROLOGY MANUAL PROJECT: Tentative Tract Map No. 36952 Calculated by: TL Group Corp. Date: 7/2/2015 FREQUENCY: EXISTING 2 - YR STORM Checked by: Date: Drainage

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

COMMERCIAL SCHEME Approval No

COMMERCIAL SCHEME Approval No COMMERCIAL SCHEME Approval No. 12806 MADE at the City of Calgary, in the Province of Alberta, on ALBERTA ENERGY REGULATOR IN THE MATTER of a commercial scheme of Imperial Oil Resources Ventures Limited

More information

REPORT N O AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017

REPORT N O AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017 REPORT N O 171-00556-00 AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017 JUNE 2017 AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017 Lafarge Canada Inc. Project no: 171-00556-00 Date: June 2017 WSP Canada Inc.

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8 FINAL REPORT FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT Project Number: #W08-5107A August 28, 2008 SUBMITTED TO: Tara Erwin itrans Consulting Inc 100 York Boulevard Richmond Hill,

More information

City of Meridian - Limited Parking Supply and Demand Analysis

City of Meridian - Limited Parking Supply and Demand Analysis City of Meridian - Limited Parking Supply and Demand Analysis Prepared for: City of Meridian, Idaho Planning and Zoning 660 East Watertower, Ste. 202 Meridian, ID 83642 Prepared by: Carl Walker, Inc. 4

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY Final Report Washington Metropolitan Area Transit Authority Office of Real Estate and Station Planning April 2016 [This page intentionally left blank]

More information

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,

More information

OFF-PEAK DELIVERIES. Ontario Trucking Association June 26 th, Goods Movement Office Transportation Policy Branch Ministry of Transportation

OFF-PEAK DELIVERIES. Ontario Trucking Association June 26 th, Goods Movement Office Transportation Policy Branch Ministry of Transportation OFF-PEAK DELIVERIES Ontario Trucking Association June 26 th, 2015 Goods Movement Office Transportation Policy Branch Ministry of Transportation 2 Outline Off-Peak Deliveries Pilot Background Phase One

More information

GATTIS SCHOOL RD / SH 130 SUBDIVISION

GATTIS SCHOOL RD / SH 130 SUBDIVISION AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4

More information

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre Waste Management of Canada Corporation Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre ATMOSPHERIC PARTICULATE MATTER EXISTING CONDITIONS REPORT Prepared

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Taylor s Falls Business Park

Taylor s Falls Business Park Site Information Taylor s Falls Business Park County Road 37, Taylors Falls, MN Chisago County HRA-EDA 12/23/2014 Taylors Falls Business Park County Road 37 Taylors Falls, MN 55084 PROPERTY FEATURES: Zoned

More information

Request Modification of Conditions (Motor Vehicle Rentals) Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Modification of Conditions (Motor Vehicle Rentals) Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant & Owner Public Hearing March 14, 2018 City Council Election District Centerville Agenda Item 4 Request Modification of Conditions (Motor Vehicle Rentals) Staff Recommendation Approval Staff Planner

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information