Swale Storage/ Length Between Ditch Blocks
|
|
- Cecil Webb
- 5 years ago
- Views:
Transcription
1 Swale Storage/ Length Between Ditch Blocks Input: Roadway Grade 1.00 % Front Slope 4 :1 Bottom Width 0 ft Back Slope 3 :1 Swale Depth 1.50 ft Calculations: Cross-Sectional Swale Area = 7.88 ft 2 DITCH BLOCK SPACING DITCH BLOCK TOP AT SHOULDER ELEV. DEPTH Ditch Block Spacing ft Volume Behind One Ditch Block = ft 3 PLAN VIEW Total Volume Per Roadway Section 1, ft 3 (Both Sides of Roadway) DITCH BLOCK ROADWAY GRADE SWALE FLOWLINE PROFILE VIEW 1720 SE 16th Avenue, Bldg. 100, Ocala, FL Page 1 of 7
2 Project: Road A Stormwater Calculations Total Storage Volume Behind Ditch Blocks 7,404 cf Input: ROW Length = ROW Width = Roadway Width = 1, ft ft 20 ft Calculations: Total ROW Area = 58,597 sf = ac Treatment Volume Reqd = 4,883 cf 1" over ROW Area Treatment Volume Provided = 7,404 cf Tillman and Associates Engineering, LLC 1720 SE 16th Ave., Bldg 100, Ocala, Florida of 7
3 Project: Road B Stormwater Calculations Total Storage Volume Behind Ditch Blocks 7,843 cf Input: ROW Length = ROW Width = Roadway Width = 1, ft ft 20 ft Calculations: Total ROW Area = 71,746 sf = ac Treatment Volume Reqd = 5,979 cf 1" over ROW Area Treatment Volume Provided = 7,843 cf Tillman and Associates Engineering, LLC 1720 SE 16th Ave., Bldg 100, Ocala, FL Page 3 of 7
4 Project: Road C Stormwater Calculations Total Storage Volume Behind Ditch Blocks 4,288 cf Input: ROW Length = ROW Width = Roadway Width = ft ft 20 ft Calculations: Total ROW Area = 31,592 sf = ac Treatment Volume Reqd = 2,633 cf 1" over ROW Area Treatment Volume Provided = 4,288 cf 1720 SE 16th Ave., Bldg 100, Ocala, FL Page 4 of 7
5 Maximum Impervious Area Calculation Project: Roadway Length = 3, ft Roadway Width = 50 ft Roadway Impervious = 161,935 sf = ac Total Site Area = acres Maximum Impervious Area = 5% = acres Maximum Lot Impervious Area = acres = 235,246 sf Lot Impervious Calculation Area (ac) % of Total Max. Lot Impervious Area (acres) Max. Lot Impervious Area (sf) Tract % ,002 Tract % ,481 Tract % ,823 Tract % ,810 Tract % ,571 Tract % ,558 Total % , SE 16th Ave., Bldg 100, Ocala, FL Page 5 of 7
6 Project: Road A Culvert 1 Drainage Area 1.96 acres C Value 0.43 Intensity 6.0 in/hr Q p = 5.06 cfs Invert Up ft Invert Down Pipe Size 18" RCP Pipe Length LF Pipe Slope ft/ft Pipe Slope 0.49 % Road Low Point Elev ft See Culvert Master Analysis Culvert Hydraulics Road B Culvert 2 Drainage Area acres C Value 0.33 Intensity 4.8 in/hr Q p = cfs Invert Up ft Invert Down Pipe Size 24" RCP Pipe Length LF Pipe Slope ft/ft Pipe Slope 0.50 % Road Low Point Elev ft See Culvert Master Analysis 1720 SE 16th Ave., Bldg 100, Ocala, FL Page 6 of 7
7 Floodplain Calculations Elevation Fill Volume Cut Volume Net Volume Running (cf) (cf) (cf) Total (cf) ,385-6,385-6, , ,814-4, , , Total 6,287 6, Grading on each culvert end is proposed lower than the minimum floodplain elevation in this area. All excavation between elevation 65 and 69 is totaled at elevation 69. The running total column demonstrates that the at each incremental elevation the result is a net cut with the total resulting cut being 98 cf more than the total fill SE 16th Avenue, Bldg 100, Ocala, Florida Page 7 of 7
8 Culvert Calculator Report Road A Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation ft Headwater Depth/Height 1.01 Computed Headwater Eleva ft Discharge 5.06 cfs Inlet Control HW Elev ft Tailwater Elevation ft Outlet Control HW Elev ft Control Type Outlet Control Grades Upstream Invert ft Downstream Invert ft Length ft Constructed Slope ft/ft Hydraulic Profile Profile CompositePressureProfileM1 Depth, Downstream 1.51 ft Slope Type N/A Normal Depth 0.91 ft Flow Regime Subcritical Critical Depth 0.87 ft Velocity Downstream 2.86 ft/s Critical Slope ft/ft Section Section Shape Circular Mannings Coefficient Section Material Concrete Span 1.50 ft Section Size 18 inch Rise 1.50 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev ft Upstream Velocity Head 0.14 ft Ke 0.20 Entrance Loss 0.03 ft Inlet Control Properties Inlet Control HW Elev ft Flow Control Unsubmerged Inlet Type Beveled ring, 45 bevels Area Full 1.8 ft² K HDS 5 Chart 3 M HDS 5 Scale A C Equation Form 1 Y untitled.cvm Barrineau Ginn & Associates CulvertMaster v3.1 [ ] 08/14/14 06:33:23 PM Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT USA Page 1 of 1
9 Culvert Calculator Report Road B Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation ft Headwater Depth/Height 2.02 Computed Headwater Eleva ft Discharge cfs Inlet Control HW Elev ft Tailwater Elevation ft Outlet Control HW Elev ft Control Type Outlet Control Grades Upstream Invert ft Downstream Invert ft Length ft Constructed Slope ft/ft Hydraulic Profile Profile PressureProfile Depth, Downstream 3.23 ft Slope Type N/A Normal Depth N/A ft Flow Regime N/A Critical Depth 1.57 ft Velocity Downstream 6.04 ft/s Critical Slope ft/ft Section Section Shape Circular Mannings Coefficient Section Material Concrete Span 2.00 ft Section Size 24 inch Rise 2.00 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev ft Upstream Velocity Head 0.57 ft Ke 0.20 Entrance Loss 0.11 ft Inlet Control Properties Inlet Control HW Elev ft Flow Control Submerged Inlet Type Beveled ring, 33.7 bevels Area Full 3.1 ft² K HDS 5 Chart 3 M HDS 5 Scale B C Equation Form 1 Y c:\...\bginn.barry\desktop\castro 182.cvm Barrineau Ginn & Associates CulvertMaster v3.1 [ ] 08/15/14 10:12:35 PM Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT USA Page 1 of 1
CULVERT DESIGN WITH HY-8
Back to the Basics CULVERT DESIGN WITH HY-8 Purdue University Road School 2006 Your Presenters... Merril Dougherty INDOT, Hydraulics Unit Supervisor David Finley CTE Engineers, Inc. 1 Part One: Culvert
More informationPARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT
1. Call To Order 2. Roll Call of Members 3. Introduction of Staff 4. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting March
More informationHydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E
Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian
More informationCity of St. Pete Beach Model Capacity Report Addendum
Model Capacity Report - Addendum City of St. Pete Beach Model Capacity Report Addendum Prepared for: City of St. Pete Beach 155 Corey Avenue St. Pete Beach, FL 33706 Prepared By: Kimley-Horn and Associates,
More informationATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)
ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics
More informationRCFC & WCD RATIONAL METHOD CALCULATION FORM
RCFC & WCD RATIONAL METHOD CALCULATION FORM HYDROLOGY MANUAL PROJECT: Tentative Tract Map No. 36952 Calculated by: TL Group Corp. Date: 7/2/2015 FREQUENCY: EXISTING 2 - YR STORM Checked by: Date: Drainage
More informationEastcreek Farm Thornton, CO
FINAL UTILITY REPORT Eastcreek Farm Tornton, CO November 27, 27 JN: 349 Prepared for: York, LLC 246 First Street Eastelake, CO 64 P: 33.457.2966 Prepared by: Ware Malcomb Engineering and Surveying 99 S.
More informationHYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA
HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA Prepared for: THE TOWN OF ASHLAND BOARD OF SELECTMEN AND PLANNING DEPARTMENT Prepared by: June 3, 216 Hydrologic/Hydraulic
More informationHydraulics Guide. Table 1: Conveyance Factors (English Units)... 7 Table 2: Conveyance Factors (Metric Units)... 8
Table of Contents 1.1 Index of Tables... 1 1.2 Index of Figures... 1 1.3 Overview of Hydraulic Considerations... 2 1.4 Discharge Curves... 2 1.5 Conveyance Method... 5 1.6 Flow Velocity Considerations...
More informationAluminum Box Culverts
Steel and Aluminum s The Solution for Small Bridge Replacement: s Contech s are a practical and costefficient solution for small bridge replacement. They have a lower installed cost because they are faster
More informationSTRUCTURE S-13. Revised 2/21/02
STRUCTURE S-13 This structure is a pumping station with a gated spillway which can control flows which bypass the pumps. The structure is located in Canal 11 (South New River Canal) about 300 feet west
More informationCSO/STORMWATER MANAGEMENT. Hydrovex VHV / SVHV Vertical Vortex Flow Regulator
CSO/STORMWATER MANAGEMENT Hydrovex VHV / SVHV Vertical Vortex Flow Regulator HYDROVEX VHV / SVHV VERTICAL VORTEX FLOW REGULATOR INTRODUCTION One of the major problems of urban wet weather flow management
More informationFINAL UTILITY REPORT Eastcreek Farm Thornton, CO
FINAL UTILITY REPORT Eastcreek Farm Thornton, CO October 14, 2016 JN: 13049 Prepared for: York 80, LLC 12460 1 st Street Eastelake, CO 80614 P: 303.457.2966 Prepared by: Jansen Strawn Consulting Engineers
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationOVERVIEW OPERATION. 2 Stormceptor EF Technical Manual
EF Technical Manual OVERVIEW Stormceptor EF is a continuation and evolution of the most globally recognized oil-grit separator (OGS) stormwater treatment technology - Stormceptor. Also known as a hydrodynamic
More information1075 CENTRAL AVE SURFACE WATER MANAGEMENT ENGINEERING REPORT. R&B NAPLES HOLDINGS 2, LLC th Street, S. Naples, FL OCTOBER 2014
1075 CENTRAL AVE SURFACE WATER MANAGEMENT ENGINEERING REPORT FOR: NEW INDIVIDUAL ERP OCTOBER 2014 PREPARED FOR: R&B NAPLES HOLDINGS 2, LLC 2002 4 th Street, S. Naples, FL 34102 AND SOUTH FLORIDA WATER
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationAPPENDIX A Basis of Design and Design Criteria Memorandum
APPENDIX A Basis of Design and Design Criteria Memorandum Job No: Y01-500 Files are stored in: Engineering / Client / Yolo/Y01500 Buckeye and Rumsey/Rumsey CR 41 over Cache Creek, CAD files stored in:
More informationPARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2
PRELIMINARY ENGINEERING REPORT PARMER RANCH NORTHWEST WILLIAMSON COUNTY MUD #2 October 215 Project No. 22223 Prepared by STEGER BIZZELL Texas Registered Engineering Firm F-181 Consulting Engineers - Georgetown,
More information44
44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 WETLAND IMPACTS Wetland No. 1 Approximate Station Cowardin Class 2 WESPAK-SE Wetland Type 3 Temporary Impact Area (acres) 4 Permanent
More informationCHAPTER 140 DRIVEWAYS
CHAPTER 140 DRIVEWAYS 140.01 Purpose 140.10 Driveway Location 140.02 Definitions 140.11 Driveway Maintenance 140.03 Driveway Construction 140.12 Failure To Maintain 140.04 Driveway Surfaces 140.13 Permit
More informationDRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED
DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018
TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.
More informationPRELIMINARY UTILITY REPORT FOR TOPGOLF INTERNATIONAL, INC.
PRELIMINARY UTILITY REPORT FOR TOPGOLF INTERNATIONAL, INC. THORNTON, COLORADO Prepared for: ARCO Murray Contact: Rachel Bohac Phone: 331.251.2726 Prepared by: 1225 17 th Street, Suite 514 Denver, CO 80202
More informationCSO/STORMWATER MANAGEMENT. HYDROVEX FluidGate Control Valve
CSO/STORMWATER MANAGEMENT HYDROVEX FluidGate Control Valve HYDROVEX FLUIDGATE CONTROL VALVE APPLICATION The flow regulation at storm overflows or retention facilities is usually performed with by a flow
More informationDRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES
DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES These guidelines are provided to assist you in the construction of your driveway to help you determine: The best location on your property. What you need to
More informationA George & Associates
PLANS PREPARED FOR: SHEET 6 INDEX OF SHEETS SHEET UNDERROUND UTILITIES & PUBLIC INFRASTRUCTURE DEPARTMENT WATER RESOURCES MANAEMENT C.O.T. WORK ORDER NO. 008 Sheet Number Sheet Title Cover Sheet Drainage
More informationFINAL UTILITY REPORT
RIVER VALLEY VILLAGE SUBDIVISION, AMD NO. 3 CORNERSTONE TOWNHOMES II NEC THORNTON PARKWAY & COLORADO BOULEVARD CITY OF THORNTON, STATE OF COLORADO SITUATED IN THE SOUTHWEST ¼ OF SECTION 18, TOWNSHIP 2
More informationPage 1 of 7 UPPER MILFORD TOWNSHIP LEHIGH COUNTY P.O. Box 210, Old Zionsville, PA Phone (610) DRIVEWAY PERMIT APPLICATION
Page 1 of 7 UPPER MILFORD TOWNSHIP LEHIGH COUNTY P.O. Box 210, Old Zionsville, PA 18068 Phone (610) 966-3223 DRIVEWAY PERMIT APPLICATION DRIVE AND/OR ACCESS PERMIT NO. DATE FEE $45.00 THIS CERTIFIES THAT
More informationINFRASTRUCTURE DESIGN STANDARDS FIGURES SECTION 2 SANITARY SEWER COLLECTION SYSTEMS
INFRASTRUCTURE DESIGN STANDARDS FIGURES SECTION 2 SANITARY SEWER COLLECTION SYSTEMS 2.1 Sanitary Sewer Design Sheet 2.2 Hydraulic Elements Graph for Circular Sewers 2.3 Standard Servicing Locations for
More informationTYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES
TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended
More informationHIGH PRESSURE CONTROL VALVES
1 & 2 HPCV APPLICATIONS: For discharge of liquid or gas from vessels, separators, treaters, knockouts and other similar liquid accumulators. For back pressure or pressure reducing applications with pressure
More informationDrag Factors in Spins and on Hills
Drag Factors in Spins and on Hills John Daily Jackson Hole Scientific Investigations, Inc. Box 2206 Jackson, WY 83001 (307) 733-4559 jhsi@rmisp.com Drag Factor Adjustment Adjusting the drag factor for
More informationCSO/STORMWATER MANAGEMENT. HYDROVEX FluidHook Control Gate Valve
CSO/STORMWATER MANAGEMENT HYDROVEX FluidHook Control Gate Valve HYDROVEX FLUIDHOOK CONTROL GATE VALVE APPLICATION The flow regulation at storm overflows or retention facilities is usually performed with
More informationAMENDED CULVERT POLICY WITH MAIL BOX POLICY
AMENDED CULVERT POLICY WITH MAIL BOX POLICY REVISED MARCH 28, 2017 COMMISSIONERS COURT ORDER NO. 17-03-168 POLICY ACCEPTANCE AGREEMENT This page is to be signed by the Requesting Party and returned in
More informationPAK BENG HYDROPOWER PROJECT
PAK BENG HYDROPOWER PROJECT Hydrodynamic Characteristics Research on Valve and Culvert at Valve Section for Pak Beng Ship Lock September 2015 CONTENTS Page 1 FOREWORD... - 1-2 RESEARCH CONTENTS AND EXPERIMENT
More informationMark Howell Florida Crystals September 26, 2013
Flat Land, Low Level Farm Drainage Mark Howell Florida Crystals September 26, 2013 Pumping Head Pump Size Power Discharge Arrangement Problems To Avoid Pump Stations Head From The Field To The Pump Start
More informationDUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS
PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationCROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION
CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION Crow Wing County Highway Department 16589 CR 142 Brainerd, MN 56401 Crow Wing
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationTaylor s Falls Business Park
Site Information Taylor s Falls Business Park County Road 37, Taylors Falls, MN Chisago County HRA-EDA 12/23/2014 Taylors Falls Business Park County Road 37 Taylors Falls, MN 55084 PROPERTY FEATURES: Zoned
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationCITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES
CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required
More informationMemorandum October 5, 2017
614 Magnolia Avenue Ocean Springs, Mississippi 39564 228.818.9626 Memorandum October 5, 2017 To: Gary Miller, U.S. Environmental Protection Agency From: David Keith, John Laplante, Matt Henderson, and
More informationSTRUCTURE 5A PURPOSE
STRUCTURE 5A This structure is a six unit pumping plant located on the south side of U.S. Highway 441 and Canal 51 (West Palm Beach Canal) between the canal and the borrow canals of Levees 7 and 40 about
More informationHARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit
1 HARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit The word Applicant shall mean Person or Persons as defined per Hardee County Ordinance No. 2010-09, as individuals, firms,
More informationB E C K E R & F R O N D O R F Construction Cost Consulting Project Management
Project: Okehocking Nature Center Number: 07142E2 Client: M2 Architecture Date: June 5, 2009 Phase: DD B E C K E R & F R O N D O R F Construction Cost Consulting Project Management ESTIMATE SUMMARY CODE
More informationHIGH PRESSURE CONTROL VALVES
1 & 2 HPCV APPLICATIONS: For discharge of liquid or gas from vessels, separators, treaters, knockouts and other similar liquid accumulators. For back pressure or pressure reducing applications with pressure
More informationWOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing
WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: 424009-3 Public Hearing May 9, 2013 This Public Hearing is being held in accordance with the Federal-aid
More informationSubmerged Jump Remediation at Low-Head Dams: The Multiple Staggered Deflector Design
Brigham Young University BYU ScholarsArchive All Theses and Dissertations 2016-12-01 Submerged Jump Remediation at Low-Head Dams: The Multiple Staggered Deflector Design Ronald Francis McGhin Brigham Young
More informationCSO/STORMWATER MANAGEMENT. HYDROVEX CCV Check Valve
CSO/STORMWATER MANAGEMENT HYDROVEX CCV Check Valve HYDROVEX CCV CIRCULAR CHECK VALVE APPLICATION The HYDROVEX CCV Check Valve is designed for use in water and sewage. It has no reinforcement and is especially
More informationSANITARY SCHEDULE ALIGNMENT CODES: 'ES'= EAU CLAIRE AVENUE SB UTILITY REPLACEMENT WITH STREET RESURFACING - 2015 PROJECT NO. 53W1793 EAU CLAIRE AVE SANITARY SEWER SCHEDULE SHEET NO. U-6 CITY OF MADISON
More informationRegular inspections are recommended to ensure that the system is functioning as designed.
SiteSaver Manufacturer s Instruction Manual Regular inspections are recommended to ensure that the system is functioning as designed. Please contact your Authorized SiteSaver Representative if you have
More informationBARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY
IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE
More informationCity of Houston Fondren Road Paving and Drainage
City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial
More informationhttp://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-102-1.pdf http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-63-1.pdf. COST ESTIMATE FOR PACIFICA QUARRY
More informationHIGH PRESSURE CONTROL VALVES
1 & 2 HPCV APPLICATIONS: For discharge of liquid or gas from vessels, separators, treaters, knockouts and other similar liquid accumulators. For back pressure or pressure reducing applications with pressure
More informationGRAF EcoBloc Stormwater Management System
GRAF EcoBloc Stormwater Management System Scan for more information Technical Guide D9.4 High performance system for managing rain water infiltration, stormwater attenuation and rain water harvesting.
More informationCP #CP218 NAIL SOFT GROUND N= E= ELEV= GUY WIRE. + WV CP #CP175 Old Magnail N= E= ELEV=858.
O R IG IN A T O R : C IT Y OF M A D IS O N, S T R E E T S DIV IS IO N 805 4906 802 813 4910 821 825 DELAWARE LN 1 2 3 EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY
More informationTransportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.
Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,
More informationEXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY
EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110
More informationCOURSE # 343 UNIT 4: ADVANTEX WASTEWATER TREATMENT SYSTEM. What you will learn in this lesson
What you will learn in this lesson IN THIS LESSON, YOU WILL LEARN... Installation steps for an AdvanTex Treatment System Important inspection points for installation inspection UNIT 4-1 Installation Steps
More informationPrecision Cooling For Business-Critical Continuity. Liebert CW. System Design Manual kW, 50 & 60Hz
Precision Cooling For Business-Critical Continuity Liebert CW System Design Manual - 26-181kW, 50 & 60Hz TABLE OF CONTENTS LIEBERT CW MODEL NUMBER NOMENCLATURE....................................1 1.0
More informationExperiment (4): Flow measurement
Introduction: The flow measuring apparatus is used to familiarize the students with typical methods of flow measurement of an incompressible fluid and, at the same time demonstrate applications of the
More informationPFS-FN FEATURES: * ASME & ISO RECOGNIZED * * WIDELY ACCEPTED TEST STANDARD * * RELIABLE PERFORMANCE HISTORY * * ACCURATE METERING SOLUTION *
FEATURES: * ASME & ISO RECOGNIZED * * WIDELY ACCEPTED TEST STANDARD * * RELIABLE PERFORMANCE HISTORY * * ACCURATE METERING SOLUTION * * FLEXIBLE DESIGN & MATERIALS * 2 PFS FLOW NOZZLE TYPES PFS-NZF PFS-NZFT
More informationAppendix G Aquilla Lake Pool Rise Recreational Resources
Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative
More informationDRAINAGE. December
DRAINAGE December 2017-1 TAB - 2501 STATEMENT OF ESTIMATED QUANTITIES TAB SHT NO ITEM DESCRIPTION UNITS ARPONS TOTAL ESTIMATED QUANTITY D 25 2104.502 CATCH BASIN EACH 1 D 25 2104.502 S EACH 9 D 25 2104.503
More informationFUNDAMENTALS OF ORIFICE METERING Ken Embry FMC Measurement Solutions
FUNDAMENTALS OF ORIFICE METERING Ken Embry FMC Measurement Solutions 6677 N. Gessner, Houston, Texas 77040 Throughout the oil and gas industry, there stems the need for accurate, economical measurement
More informationFOR SALE OR LEASE PORTLAND PORTAL INDUSTRIAL CENTER - PHASE II SITE. NE 172nd Place & NE 170th Place, Gresham, Oregon
NE Sandy Blvd PORTLAND PORTAL INDUSTRIAL CENTER - PHASE II NE 7nd Place & NE 7th Place, Gresham, Oregon SITE NE 7th Pl NE 7nd Pl NE 8st Ave FOR SALE OR LEASE FOR MORE INFORMATION, NTACT: Rod Brokenshire
More informationADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18
November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CFR 257.82(c) Bottom Ash Complex Mitchell Power Plant Marshall County, West Virginia October, 2016 Prepared for: Wheeling Power Company & Kentucky Power Company
More informationOn-the-Job Training Program. Overview of Training Programs
On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete
More informationTHE HEMSIL POWER PLANT
THE HEMSIL POWER PLANT s" ' r- A.S.KMERNER BRUG.OSLO Kvaernervn. 10 - Postal Address: Box 3610 - Cable Address: Kvaerner - Telephone: 68181O - Telex: 1650 NORWAY C. HEMSEDAL Hallingdalselvcn I i i i i
More informationAir Handling Unit Fan Selection Guide
KEES Air Handling Unit Fan Selection Guide This document applies to models: DFG Direct Fired Gas Heater IFG Indirect Fired Gas Heater MUA Tempered Air NTS Non-Tempered Supply Table of Contents: Page 2-4
More informationVALUE ENGINEERING STUDIES FINAL REPORT. Portsmouth Bypass, Phase 1 SCI PID 19415
VALUE ENGINEERING STUDIES FINAL REPORT Portsmouth Bypass, Phase 1 SCI-823-6.81 PID 19415 PREPARED FOR: Ohio Department of Transportation District 9 650 Eastern Avenue Chillicothe, Ohio 45601 PREPARED BY:
More informationLake County Building Department
Lake County Building Department P.O. Box 513 505 Harrison Avenue Leadville, CO 80461 (719) 486-2875 Fax (719) 486-4179 Driveway Permit (Resolutions 98-15 and 98-35) PERMIT: To connect a driveway or parking
More informationSTI Project: Barrier Systems, Inc. RTS-QMB Longitudinal Barrier. Page 38 of 40 QBOR1. Appendix F (Continued) Figure F-3
Barrier Systems, Inc. RTS-QMB Longitudinal Barrier STI Project: QBOR1 Page 38 of 40 Appendix F (Continued) Figure F-3 t=.500sec 115 meters overall 37.1 Impact Severity (kj).. 141.6 Angle (deg).. 25 Speed
More informationA new in-chamber double longitudinal culverts filling and emptying system for high head and large navigation lock by
A new in-chamber double longitudinal culverts filling and emptying system for high head and large navigation lock by LI Jun 1, LIU Ben-qin 2, ZHAO Gen-sheng 3 and XUAN Guo-xiang 4 ABSTRACT Xijin hydro-junction
More informationFLUID FLOW. Introduction
FLUID FLOW Introduction Fluid flow is an important part of many processes, including transporting materials from one point to another, mixing of materials, and chemical reactions. In this experiment, you
More informationMarion County Board of County Commissioners
Marion County Board of County Commissioners Office of the County Engineer 412 SE 25th Ave. Ocala, FL 34471 Phone: 352-671-8686 Fax: 352-671-8687 DEVELOPMENT REVIEW COMMITTEE WAIVER REQUEST FORM Date: 08/04/2016
More informationCONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO
CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO PREPARED FOR: SHEA HOMES 9380 STATION ST., SUITE 600 LONE TREE, CO 80124 PHONE: 303-791-8180 CONTACT: RYAN MCDERMED PREPARED BY:
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE
More informationUNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE Centrifugal Pump(Armfield)
UNIVERSITY OF MINNESOTA DULUTH DEPARTMENT OF CHEMICAL ENGINEERING ChE 3211-4211 Centrifugal Pump(Armfield) OBJECTIVE The objective of this experiment is to investigate the operating characteristics of
More informationINTERACTIVE WASTEWATER TREATMENT DISPLAY. Cole Niblett Olivia Broussard Brandy Parks Abigail Parnell
INTERACTIVE WASTEWATER TREATMENT DISPLAY Cole Niblett Olivia Broussard Brandy Parks Abigail Parnell GROUP PICTURE AGENDA Problem Statement and Background Objectives and Project Scope Conceptual Designs
More information3. Application Fees, Certificate Of Insurance & Performance Bond
SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner
More informationSECTION 9 STORM SEWER INLETS
SECTION 9 STORM SEWER INLETS CITY OF WESTMINSTER STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 9 STORM SEWER INLETS 9.1 INTRODUCTION There are three types of inlets: curb opening, grated, and combination
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationWater Supply & Fire Apparatus Access Requirements
Moses Lake Fire Department rd 701 E 3 AVE Moses Lake WA 98837 www.cityofml.com Water Supply & Fire Apparatus Access Requirements This brochure is provided as a resource only. The items listed are the requirements
More informationCHAPTER 7 PUMPING SYSTEM DESIGN
CHAPTER 7 PUMPING SYSTEM DESIGN 7-1. FORCE MAIN HYDRAULICS. a. General. The pipeline which receives waste-water from a pumping station, and conveys it to the point of discharge, is called a force main.
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationPolicy No As of February 20, Carbon Canal Company Supplemental Field Policies and Procedures
Policy No. 2014-1 As of February 20, 2014 Carbon Canal Company Supplemental Field Policies and Procedures Requesting Irrigation Water Our goal is to do our best to deliver the irrigation water that each
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationGATTIS SCHOOL RD / SH 130 SUBDIVISION
AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4
More informationJCE4600 Fundamentals of Traffic Engineering
JCE4600 Fundamentals of Traffic Engineering Introduction to Geometric Design Agenda Kinematics Human Factors Stopping Sight Distance Cornering Intersection Design Cross Sections 1 AASHTO Green Book Kinematics
More informationWorkshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion
Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide
More informationU:\0-PROJECT\Groton - sidewalk\main STREET\MAIN ST CONST-PLAN.dwg, 4/26/ :07:22 AM, AutoCAD PDF (General Documentation).pc3
' MIN 1.0% FROM STA 8+80 TO STA 9+0 STA 1+40 TO STA 11+00 STA 119+0 TO STA 10+4 CURB TYPE OVER H BINDER VARIED PROP.." H OVER 8" GRAVEL TYPE C 1:1. :1 PROP. GRANITE CURB TYPE VA, IN REVEAL OVER MIN. DEPTH
More informationTown of Vermont Driveway Permit Ordinance
Town of Vermont Driveway Permit Ordinance 4.00 TITLE AND PURPOSE The title of this ordinance is the Town of Vermont Driveway Permit Ordinance. The purpose is to regulate the establishment, repair, construction,
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationGRAF EcoBloc Stormwater Management System
GRAF EcoBloc Stormwater Management System Scan for more information Technical Guide EVS 21 High performance system for managing rain water infiltration, stormwater attenuation and rain water harvesting.
More information