1 WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing May 9, 2013
2 This Public Hearing is being held in accordance with the Federal-aid Highway Act of 1968, amended, 23 USC 128, 40 CFR , 23 CFR 771; Section , Florida Statute; and Executive Order 11988, Floodplain Management and Executive Order 11990, Protection of Wetlands of the Constitution of the United States of America. This Public Hearing was advertised consistent with the federal and state requirements and is being conducted consistent with the Americans with Disabilities Act of 1990.
3 This Public Hearing is being held relative to State Project Number The proposed improvements involve widening SR 363 (Woodville Highway) to four lanes from Capital Circle to Gaile Avenue and providing circulation improvements from Gaile Avenue to Paul Russell Road. In addition to new travel lanes, the improvements will provide for access management measures, pedestrian and bicycle facilities, relocation of the St. Marks Trail within FDOT Rightof-Way, as well as aesthetic improvements.
4 This project meets the maximum air quality standards established by the U.S. Environmental Protection Agency (EPA).
5 This hearing is being held to give all interested persons the right to understand the project and comment on their concerns to the Capital Region Transportation Planning Agency and the Florida Department of Transportation. Public participation at this hearing is encouraged and solicited without regard to race, color, creed, religion, sex, age, national origin, disability or family status. This information is also provided in the project brochure and on a sign displayed at this hearing.
6 TOPICS TO DISCUSS... Project Timeline Review of the Alternatives Considered Presentation of the Recommended Alternative Public Comments
7 PROJECT TIMELINE Start of Woodville Highway Corridor Master Plan March 2010 PD&E Study Begins May 2011 Public Hearing Today September October 2010 Stakeholder Meetings and 2 day Charrette April 2012 Public Alternatives Meeting Fall 2013 Anticipated FHWA approval of the PD&E
8 SEGMENT 1 From Capital Circle Southeast to Gaile Avenue Four separate Build alternatives were considered
9 SEGMENT 1 Alternatives 4-lane Urban Curb & Gutter Typical Section No new ROW needed for the 4-lane roadway Requires ROW for stormwater ponds (locations to be finalized during Design phase) 135 RIGHT-OF-WAY 12 ST. MARKS TRAIL EXTENSION TRAVEL LANE TRAVEL LANE MEDIAN TRAVEL LANE TRAVEL LANE SIDE- WALK
10 SEGMENT 1 Alternatives 4-lane Rural 3 options (Left, Right, Center) Requires an additional 45-ft of ROW Stormwater management needs addressed in adjacent swales 180 RIGHT-OF-WAY 12 ST. MARKS TRAIL EXTENSION Varies Varies TRAVEL LANE TRAVEL LANE 20 MEDIAN 12 TRAVEL LANE 12 TRAVEL LANE SIDE- WALK
11 POTENTIAL STORMWATER POND LOCATIONS
12 SEGMENT 1 Alternatives Comparison PD&E Considerations Urban Rural (Left) Rural (Right) Rural (Center) No Build Potential ROW Acquisition (parcels) Potential Relocations Cultural Resources Impact? No No Yes Yes No Potential Contamination Parcels for ROW Total Project Cost $17.8M* $25.1M* $27.6M* $31.6M* $0 * Includes estimated cost for stormwater treatment ponds.
13 ACCESS MANAGEMENT... involves the careful planning of the location, design, and operation of driveways, median openings, interchanges, and street connections in order to preserve safety and efficiency of the transportation system.
14 ACCESS MANAGEMENT CHANGE IN SEGMENT 1 The recommended improvements would change the Access Classification in Segment 1 from a Class 4 to a Class 5.
15 ACCESS MANAGEMENT CHANGE IN SEGMENT 1 Access Management Standards from F.A.C. Rule Class Medians Median Openings Signal Connection Current 4 Non Restrictive Proposed 5 Restrictive Full Directional 2,640 at greater than 45 MPH Posted Speed 660 1,320 at 45 MPH or less Posted Speed More than 45 MPH Posted Speed 45 MPH and less Posted Speed 2, ,640 at greater than 45 MPH Posted Speed 1,320 at 45 MPH or less Posted Speed
16 SEGMENT 2 Gaile Avenue to Paul Russell Road Two separate Build alternatives proposed
17 SEGMENT 2 Alternatives Tram + Gaile Extend Tram Road to Crawfordville/Adams and construct additional left-turn lanes on Gaile Avenue
18 SEGMENT 2 Tram Road Alternatives
19 SEGMENT 2 Gaile Avenue Alternatives
20 SEGMENT 2 Alternatives Loop Tram and Gaile improvements with the elimination of a travel lane on Woodville Highway and Crawfordville Road and conversion to one-way traffic flow
21 SEGMENT 2 Alternatives Loop North End
22 SEGMENT 2 Alternatives Loop - South End
23 SEGMENT 2 Alternatives Comparison PD&E Considerations Tram + Gaile Loop No Build Potential ROW Acquisition (parcels) Potential Relocations Potential Contamination Parcels for ROW Avg. System Delay (per user) 2 minutes 19 seconds 2 minutes 2 seconds 2 minutes 24 seconds Total Delay (all users) 47.5 hours 38 hours 48 hours Total Project Cost $6.0M $8.4M $0
24 RECOMMENDED ALTERNATIVE Build vs. No Build Comparison PD&E Considerations Overall Recommended Alternative No Build Potential ROW Acquisition (parcels) 6 0 Potential Relocations 1 0 Cultural Resources Impact? No No Potential Contamination Parcels for ROW Level of Service Meets Standard Does Not Meet Standard Total Project Cost $26.2M $0
25 ROW ACQUISITION AND RELOCATION On this project, it is anticipated that ROW will be purchased from 6 parcels and will result in the relocation of 1 business. The next phase of the project is Design, and ROW acquisition typically follows the Design phase. FDOT ROW acquisition brochures are available at tonight s meeting.
26 WHAT S NEXT AFTER TONIGHT? Public Comment Period Now thru May 20, 2013 Type 2 CE submitted to FHWA July 2013 Location Design Concept Acceptance Fall 2013
27 2 minute break before the Public Comment period begins If you would like to speak, please complete a Speaker s Card.
28 Public Comments
29 PD&E STUDY CONTACTS Greg Vaughn Richard Barr, AICP horn.com Wiatt Bowers, AICP Ryan Wetherell, PE (904) horn.com
30 PUBLIC COMMENTS All comments postmarked by May 20, 2013 will be included in the Public Hearing record. Jack Kostrzewa CRTPA 300 South Adams Street, A-19 Tallahassee, FL
31 !
Public Information Workshop
Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationI-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019
I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationMAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina
Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationUS 81 Bypass of Chickasha Environmental Assessment Public Meeting
US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments
More informationBusiness Advisory Committee. November 3, 2015
Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior
More informationW&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)
W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE
More informationSH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD
SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD Lone Star College, Tomball Campus December 8, 2015 Open House 5:30-7:30 pm National Environmental Policy Act The environmental review,
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationThe Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit
The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,
More informationWelcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -
Highway Gap New London to Paynesville Welcome Highway Gap New London to Paynesville Open House - Please Sign In - There is no formal presentation, but representatives are available to answer your questions.
More information2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016
2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The
More informationAPPENDIX A INTENT-TO-STUDY LETTER
APPENDIX A INTENT-TO-STUDY LETTER APPENDIX B COMMENTS AND RESPONSES COMMENTS AND RESPONSES A public information meeting was held on May 5, 2005. Comments and responses are summarized for this
More informationLocation Concept Plan Amendment Recommendation Approved 2011 Concept Plan
Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West
More informationConventional Approach
Session 6 Jack Broz, PE, HR Green May 5-7, 2010 Conventional Approach Classification required by Federal law General Categories: Arterial Collector Local 6-1 Functional Classifications Changing Road Classification
More informationAASHTO Policy on Geometric Design of Highways and Streets
AASHTO Policy on Geometric Design of Highways and Streets 2001 Highlights and Major Changes Since the 1994 Edition Jim Mills, P.E. Roadway Design Office 605 Suwannee Street MS-32 Tallahassee, FL 32399-0450
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationSummary of the Alcoa Highway Redevelopment Project
Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)
More informationTransportation Committee Revised Project Scope and Cost Estimate. November 23, 2015
Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project
More informationProject Working Group Meeting #5
September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com
More informationChallenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007
EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component
More informationWe Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:
We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationtraversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.
County of San Mateo Department of Public Works Residential Speed Control Device Program PURPOSE The purpose of the Residential Speed Control Devices 1 Program is to provide a consistent, fair and cost-effective
More informationBroward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA
Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional
More informationHighway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary
Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared
More informationPublic Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY
Public Meeting SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Neil Schochenmaier, PE Road Design Engineering Supervisor March 16, 2017 Purpose of the Meeting
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationRailroad Impact Study
Railroad Impact Study Ryan Huebschman, PE, PTOE Jason O Neill November 21, 2016 Study Impetus CSXT to lease and improve rail line between Louisville and Indianapolis Rail improvements will allow CSXT to
More informationSTATE LOOP 195 PUBLIC MEETING. Footer Text
STATE LOOP 195 PUBLIC MEETING STATE LOOP 195 From FM 755 to 1 mile west of Loma Blanca Rd Public Meeting Agenda Welcome & Introductions Octavio Saenz TxDOT Public Information Officer Technical Overview
More informationWest Broadway Reconstruction/LRT Design. March 19, 2015
West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationCommittee Report. Transportation Committee. Business Item No
Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationDixie Transportation Planning Office
A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation
More informationCorridor Management Committee. March 7, 2012
Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationMETRO Light Rail Update
American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations
More informationCROSSING RAIL PROJECT (P4) RAIL
GRAND CROSSING RAIL PROJECT (P4) Community Advisory Group October 10, 2012 1:30 pm Grand Crossing Park Field House 7655 S. Ingleside Avenue, Chicago GRAND CROSSING RAIL PROJECT (P4) Community Advisory
More informationI-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018
I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationSC Highway 41 Existing Conditions
SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next
More informationCITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN
Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add
More informationPUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm
PUBLIC MEETING Bear Creek Park Community Center January 24, 2017 5:30 pm to 7:30 pm PURPOSE OF THE MEETING This is an open House No formal presentation Introduce the project to the public Present existing
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationWorkshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion
Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide
More informationCR 510/85 Street from CR 512 to 58 Avenue
Date: November 14, 2017 To: CR 510/ 85 Street PD& Project File From: Metric ngineering, Inc. Subject: FM No.: 405606-2-22-02 Air Quality Screening Test CR 510/85 Street from CR 512 to 58 Avenue Indian
More informationRocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017 PROJECT OVERVIEW Environmental Impact Statement (EIS) Project divided into 3 Segments Segment 1: Beltway 8
More informationITEM 13 - NOTICE May 20, 2009
ITEM 13 - NOTICE May 20, 2009 Notice of Proposed Amendment to the 2009 CLRP and FY 2010-2015 TIP to include the Closure of the I-395 Southbound Exit Ramp to 3rd Street NW, the Reconfiguration of the Southbound
More information3/16/2016. How Our Cities Can Plan for Driverless Cars April 2016
How Our Cities Can Plan for Driverless Cars April 2016 1 They re coming The state of autonomous vehicle technology seems likely to advance with or without legislative and agency actions at the federal
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:
More informationTraffic Impact Statement (TIS)
Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205
More informationRoundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS
Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety
More information1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON
CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently
More informationThe Eastern Connector Study November, 2007 planning for the future
The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team
More informationHighway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM
Public Open House #2 October 3, 2017 5:00 to 7:00 PM Highway 9 OVERVIEW OF ASSESSMENT Assessment Limits Highway 23 from County Road 40 to North Shore Dr Purpose: Identify opportunities to reduce serious
More information50TH STREET CONCEPTUAL DESIGN
NUE NUE NUE 51 AVE REET 5.49 A-A SECTION 50TH STREET - STA 0+560 1.2 33.46 19.10 8.75 1.00 3.00 3.00 1.00 CN SPUR IF NECESSARY, GRADING ON PRIVATE TO BE BUS STOP 3697 IVE IVE BUS STOP 2279 4.25 REET REMOVE
More informationHarlem Avenue between 63 rd and 65 th
Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43
More informationLOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA)
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA) NOTICE OF PREPARATION (NOP)/NOTICE OF INTENT (NOI) OF AN ENVIRONMENTAL IMPACT STATEMENT (EIS)/ENVIRONMENTAL
More informationLacey Gateway Residential Phase 1
Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3
More informationMaintaining Pavement Marking Retroreflectivity
Supplemental Notice of Proposed Amendment: Maintaining Pavement Marking Retroreflectivity Kyle Armstrong, P.E., PTOE Acting Engineer of Traffic Operations https://safety.fhwa.dot.gov/ Rule Making Process
More informationALTERNATIVE PROJECT DELIVERY
ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to
More informationSound Transit East Link: Bus/LRT System Integration Study
Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES
More informationClick to edit Master title style
P3s Come In All Shapes And Sizes Mr. Greg Slater, Administrator 7/26/2018 1 1 Customer-Driven Customer First TODAY S DISCUSSION Introduction to MDOT MDOT P3 Experience Full Delivery Stream Restoration
More informationDecision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016
Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth
More informationAppendix 3 Traffic Technical Memorandum
Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:
More informationKALAMAZOO AREA TRANSPORTATION STUDY (KATS) CITIZEN ADVISORY COMMITTEE JUNE 6, :00 P.M. KALAMAZOO METRO TRANSIT 530 N. ROSE STREET AGENDA
1) CALL TO ORDER 2) INTRODUCTIONS KALAMAZOO AREA TRANSPORTATION STUDY (KATS) CITIZEN ADVISORY COMMITTEE 3) CHANGES/ADDITIONS TO THE AGENDA 4) APPROVAL OF THE AGENDA (ACTION) JUNE 6, 2018-4:00 P.M. KALAMAZOO
More informationDenver Metro Association of Realtors
Denver Metro Association of Realtors North Metro Rail Line October 2, 2014 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;
More informationCOMMISSION WORKSHOP Tuesday, May 12, :00 a.m. 12:00 p.m.
COMMISSION WORKSHOP Tuesday, 9:00 a.m. 12:00 p.m. AGENDA 1. Approval of the April 30, 2009 Workshop Minutes 2. Community Redevelopment Agency a. CRA Master Plan Update b. Downtown Parking Study 3. Economic
More informationMountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012
Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated
More information1 Downtown LRT Connector: Draft Concept
Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future
More informationTable Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily
5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation
More informationBuilding our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013
Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,
More informationStation Evaluation Summary
Station Evaluation Summary Preferred Site Location 10/1/00 Loop 1 Station Points 70 Key Issues: Potential Master Plan Development suggests a strong economic development potential for the larger property
More informationANDERSON PROPERTY SITE ANALYSIS
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion
More informationAgenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan
Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.
More informationUS 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT
US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT April 25, 2012 Tahoe Transportation District (TTD) Tahoe Transportation District (TTD) established 1980 as Bi-State Agency TTD Goals Implement Transportation
More informationTable of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...
Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...
More informationPurple Line Functional Master Plan Advisory Group (MPAG)
Purple Line Functional Master Plan Advisory Group (MPAG) Tonight s Agenda Schedule Update MTA Additional Studies Comments On Functional Plan Format County Zoning Code Re-Write Takoma Langley Crossroads
More information2017 MAX Program. Red & Blue Line Platform Extension. John Rhone Vice President, Capital Design & Construction June 22, 2017
2017 MAX Program Red & Blue Line Platform Extension John Rhone Vice President, Capital Design & Construction June 22, 2017 Project Goals and Objectives Increase capacity: Move more passengers by 2021 with
More informationDecision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82
Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,
More informationContinued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.
Project Manager Ed Collins LJA Engineering, Inc. Transportation Planning Manager 5316 Highway 290 West Austin Public Infrastructure Group Austin, TX 78735 (512) 762-6301 cell (512) 439-4757 office CARTS
More informationRichmond Area MPO Regional Priority Transportation Projects
Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia
More informationJTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design
JTA S MOBILITY CORRIDORS Improving System Performance Through Urban Design Overview Agenda Overview of Jacksonville & JTA Catalysts for a Transit Driven Complete Streets Program Process Countermeasures
More informationCommunity Advisory Committee. October 5, 2015
Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical
More informationRestricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO
Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide 2015 ITE Midwest Annual Meeting June 30, 2015 Branson, MO Wei Zhang, Ph.D., P.E. Program Manager, Intersection Safety
More informationMETRO Orange Line BRT American Boulevard Station Options
METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN
More informationRequest for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV
Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,
More informationSOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009
DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road
More information