1 On-the-Job Training Program Overview of Training Programs

2 The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough Concrete Finisher (Paving) Concrete Finisher (Structures) Form Builder (Structures) Form Setter (Structures) Piledriver Pipe Layer Asphalt Paving Machine Bulldozer, Over 150 H.P Concrete Paving Finishing Machine Backhoe Crane or Excavator Front End Loader (2½ C.Y. and Less) Front End Loader (Over 2 1/2 C.Y.) Motor Grader Operator Roller, Steel Wheel (Plant Mix Pavements) Roller, Steel Wheel (Other-Flatwheel or Tamping) Roller, Pneumatic (Self-Propelled) Scrapers (Over 17 C.Y.) Tractor Operator (80 H.P. and Less) Tractor Operator (Over 80 H.P.) Trenching Machine, Heavy Reinforcing Steel Setter (Structures) Steel Worker (Structural) Foundation Drill Operator Mechanic Welder Crusher or Screening Plant Operator Truck Driver Asphalt Distributor Asphalt Raker Blaster Spreaderbox Person Sign Erector Oiler Utility Operator Service Person Electrician Batching Plant Scaleperson Wagon Drill, Boring Machine or Post Hole Driller Operator Reinforcing Steel Setter (Paving) Form Setter (Paving) Self Propelled Sweeper Operator Bulldozer, Under 150 H.P Scrapers (Under 17 C.Y.) 520 2

3 CARPENTER, ROUGH Code 901 I. Orientation and Safe Use of Tools of the Trade A. Power and hand tools hours B. Materials selection hours II. Applied Techniques of Highway Construction Carpentry B. Pier, pile and cap formwork hours C. Decking formwork hours D. Parapet and hand railing formwork hours E. Endwall formwork hours F. Box culverts, inlets and headwall formwork hours III. Blueprint or Construction Plans Reading and Application hours IV. Basic Form Design Familiarity hours V. Stripping and Salvage of Forms for Re-use hours A. Safety Procedures... 5 hours Total hours 3

4 CONCRETE FINISHER (Paving) Code 902 B. Observation of use of straight edges and steel trowels hours C. Observation of forming a finishing of edges and joints hours B. Routine cleaning work area and materials, holding materials, tools and handling canvas belting or burlap strips hours A. Safe operating procedures hours B. Basic operation of tools hours C. Use of straight edges or steel trowels hours D. Forming and finishing edges, joints, curbs and gutters hours Total hours 4

5 CONCRETE FINISHER (Structures) Code 903 B. Observation of use of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures hours B. Basic operation of machine hours C. Use of trowels or floats hours D. Operation of trowels or floats or finishing machine hours Total hours 5

6 FORM BUILDER (Structures) Code 904 I. Orientation and Safe Use of Tools of the Trade A. Power and hand tools hours B. Materials selection hours II. Applied Techniques of Highway Construction Carpentry B. Pier, pile and cap formwork hours C. Decking formwork hours D. Parapet and hand railing formwork hours E. Endwall formwork hours F. Box culverts, inlets and headwall formwork hours III. Blueprint or Construction Plans Reading and Application hours IV. Basic Form Design Familiarity hours V. Stripping and Salvage of Forms for Re-use hours A. Safety Procedures... 5 hours Total hours 6

7 FORM SETTER (Structures) Code 905 B. Observation of placing of forms hours C. Observation of form stripping and setting of precast concrete hours B. Help strip forms and clean work area hours III. Actual Operation of Form Setting A. Safe operating procedures... 5 hours B. Hold and help align forms. Drive stakes for braces and help erect scaffolding hours C. Observe and assist in setting precast concrete hours D. Measure space between forms, fit together, line, plumb vertically, set to elevation hours E. Check forms while concrete is being poured hours Total hours 7

8 PILEDRIVER Code 906 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures hours B. Basic operation of crane or pile driving rig in hoisting and moving hours C. Placement of pile in preparation for driving hours D. Seating of pile hammer on pile in preparation for driving hours E. Driving of pile hours Total hours 8

9 PIPE LAYER - Code 907 B. Observation of spade operation and laying of pipe hours C. Study of various types of pipe and related materials... 5 hours B. Ditch preparation, handle materials and tools hours III. Actual Handling of Pipe and Spade A. Ditch grading with compressed air driven or hand spade hours B. Handle materials, assist in lowering pipe hours C. Work with pipe layer in laying all types of pipe and duct. Adjust pipe to elevation insert spigot end of pipe into bell end of last laid pipe hours Total hours 9

10 ASPHALT PAVING MACHINE - Code 908 B. Observation of machine in operations hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safety operating procedures... 5 hours B. Observation of machine in operations hours C. Operating of machine hours Total hours 10

11 BULLDOZER, over 150 H.P. - Code 909 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Movement and stockpiling of material hours C. Pushing and rough grading hours D. Clearing and grubbing hours E. Finish grading hours F. Special applications hours Total hours 11

12 CONCRETE PAVING FINISHING MACHINE - Code 910 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Screed regulation indoctrination and operation hours C. Operation of machine hours Total hours 12

13 BACKHOE Code 911 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Trenching operations (for Pipe laying, etc.) hours C. Excavation (for structures, footings, etc.) hours D. Special applications and functions hours Total hours 13

14 CRANE OR EXCAVATOR Code 912 A. Safety procedures hours B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours A. Safety procedures hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures hours B. Excavation for footings and removal of unsuitable materials hours C. Loading and unloading materials hours D. Trenching for pipe, etc hours E. Hoisting materials hours F. Placement of beams, pipe, girders, piles, etc hours Total hours 14

15 FRONT END LOADER (2½ C.Y. and less) Code 913 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Loading materials hours C. Excavation hours D. Special applications hours Total hours 15

16 FRONT END LOADER (Over 2 1/2 C.Y.) Code 914 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Loading materials hours C. Excavation hours D. Charge hoppers with materials on asphalt and concrete plants hours E. Special applications hours Total hours 16

17 MOTOR GRADER OPERATOR Code 915 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Scraping and leveling dirt on roadway hours C. Spreading and mixing materials on roadway hours D. Shaping and blading subgrades hours E. Balancing and rough shaping base course materials hours F. Fine grading and dressing of shoulders and slopes hours Total hours 17

18 ROLLER, STEEL WHEEL (Plant Mix Pavements) - Code 916 B. Observation of machine in operation hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Roll base course to desired compaction hours C. Roll asphalt surfaces to desired compaction and smoothness and assure proper sealing of joints hours Total hours 18

19 ROLLER, STEEL WHEEL (Other-Flatwheel or Tamping) Code 917 B. Observation of machine in operation hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Roll base course to desired compaction hours C. Roll asphalt surfaces to desired compaction and smoothness and assure proper sealing of joints hours Total hours 19

20 ROLLER, PNEUMATIC (Self-Propelled) Code 918 B. Observation of machine in operation hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Roll base course to desired compaction hours C. Roll asphalt surfaces to desired compaction and smoothness and assure proper sealing of joints hours Total hours 20

21 SCRAPERS (Over 17 C.Y.) Code 919 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Loading hours C. Spreading material hours D. Rough roadway grading hours E. Compaction of embankment hours Total hours 21

22 TRACTOR OPERATOR (80 H.P. and less) Code 920 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Pulling compaction implements hours C. Pull graders for dressing operations hours D. Ground clearing assistance hours Total hours 22

23 TRACTOR OPERATOR (Over 80 H.P.) Code 921 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Pushing other equipment to aid in loading or unloading operations hours C. Pulling compaction and mixing implements hours D. Ground clearing assistance hours Total hours 23

24 TRENCHING MACHINE, HEAVY Code 922 A. Safety procedures hours B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours A. Safety procedures hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures hours B. Excavation for footing and removal of unsuitable materials hours C. Trenching for pipe, etc hours Total hours 24

25 REINFORCING STEEL SETTER (Structures) Code 923 B. Observation of steel being set and welding of rods hours B. Steel bar placement hours III. Actual Steel Setting A. Rod fastening hours B. Rod cutting hours C. Rod welding hours D. Rod placement hours E. Fabrication of reinforcement assembly hours Total hours 25

26 STEEL WORKER (Structural) Code 924 B. Observation of steel worker hours B. Tool Review... 5 hours III. Operating with Steel Workers A. Raise and place fabricated structural steel hours B. Emphasis on girders, plates and columns hours C. Fasten steel members together by welding or bolting hours D. Signal erection crane, rig equipment hours Total hours 26

27 FOUNDATION DRILL OPERATOR Code 925 A. Orientation and observation... 5 hours B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Small hole drilling hours C. Large hole drilling hours D. Casing operation hours E. General operating hours Total hours 27

28 MECHANIC Code 926 A. Safety procedures hours B. Cleaning, disassembling and inspection of engine parts hours C. Installation and adjustment of minor parts hours A. Safety procedures hours B. Engine reconditioning hours C. Clutch installation hours D. Transmission reconditioning hours A. Safe operating procedures hours B. Electrical systems hours C. Hydraulic systems hours D. Final drive and track assemblies hours E. Welding and fabrication hours F. General field maintenance hours Total hours 28

29 WELDER Code 927 B. Welding equipment hours C. Materials selection hours D. Observation of welder hours II. Applied Techniques of Welding B. Acetylene-cutting, brazing and welding hours C. Electric-cutting and welding hours III. Actual Welding Operations B. Cut, lay out, fit and weld sheet metal, cast iron and other metal parts hours C. Fabricate and repair equipment hours Total hours 29

30 CRUSHER OR SCREENING PLANT OPERATOR - Code 928 B. Observation of machine in operation hours C. Starting of crusher operating conveyors hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Operation of conveyors and crusher operations hours C. Operation of crusher hours Total hours 30

31 TRUCK DRIVER Code 929 A. Safety procedures hours B. Observation (as a passenger) of vehicle in operation hours C. Starting and manipulating vehicle hours A. Safety procedures hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures hours B. Loading and unloading materials and operation of vehicle hours Total hours 31

32 ASPHALT DISTRIBUTOR Code 930 A. Safety procedures hours B. Observation of vehicle in operation hours C. Starting and manipulating valves and levers to distribute material and move equipment hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Regulates valves and levers to distribute oil or bituminous liquid for highway surfacing hours C. Operation of equipment hours Total hours 32

33 ASPHALT RAKER Code 931 B. Observation of placement of materials... 5 hours C. Perform duties of asphalt shoveler hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Adjustment of screed to regulate width and depth of material hours C. Distribution of material hours Total hours 33

34 BLASTER Code 932 B. Observation of work of Powder man hours C. Assist Powder man by carrying explosives, placing in holes, connecting lead wires hours II. Applied Techniques of Powder man A. Safety procedures hours B. Storage, transporting, placing and discharging of explosives hours III. Actual Blasting Operations A. Safe operating procedures hours B. Use of detonators and explosives hours C. Storage, movement and placing of explosives hours D. Placing wires, detonators and explosives, tamping and discharging hours Total hours 34

35 SPREADERBOX PERSON Code 933 B. Observation of machine in operation hours C. Starting, stopping and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Selection and loading of materials hours B. Spreading of stone or other granular materials on spread way sub-base or base hours Total hours 35

36 SIGN ERECTOR Code 934 I. Orientation and Safe Use of Tools and Equipment A. Power and hand tools hours B. Special fittings and hardware hours C. Specifications or design for concrete mixer hours II. Applied Techniques of Sign Erection A. Preparation of layout for signs hours B. Cuts, ties and sets reinforcing steel for footings hours C. Sets forms for, places concrete and sets anchor bolts hours D. Erects wood or metal structures hours E. Places clamps, brackets or other required hardware on structures hours III. Blueprint or Construction Plans Reading hours IV. Basic Design Familiarity V. Stripping and Salvage of Forms for Re-use hours Total hours 36

37 OILER Code 935 I. Orientation and Safe Use of Tools of the Trade A. Lubrication requirements of mechanical equipment hours B. Materials selection hours II. Applied Techniques of the Oiler B. Equipment characteristics and lubrication points hours C. Oil changes, filter changes, grease guns, hard packing of grease, greasing bearings hours D. Minor adjustments to drive chains and clutches hours III. Shop and Field Practices hours IV. Equipment Operation and Operation of Oil, Grease and Fuel Service Truck hours A. Safety procedures hours Total hours 37

38 UTILITY OPERATOR Code 936 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Operation of various equipment hours C. Special applications and functions hours Total hours 38

39 SERVICE PERSON - Code 937 A. Safety procedures hours B. Observing fueling, greasing and cleaning filters hours C. Fuel and grease used for different types of equipment hours II. Actual Operation A. Servicing all types of equipment hours B. Installation and adjustment of minor parts hours C. General field maintenance and operation of service truck hours Total hours 39

40 ELECTRICIAN Code 942 I. Orientation A. Safety procedures hours B. Basic rules of National Electrical Code hours C. Basic tools their care and uses hours II. Applied Techniques of Electrical Construction A. Wire ways types, uses and methods of installation hours B. Circuit wiring hours C. Protective equipment switches, panels, etc hours D. Feeders and services hours E. Lighting fixtures and wall outlets hours F. Control wiring hours G. Testing of completed work hours III. Technical Studies and Review A. Advance study of National Electrical Code hours B. Construction blueprints, reading and application hours IV. Underground Construction and Outside Lighting A. Underground conduit and wire hours B. Installation of outside lighting, maintenance and repairs hours V. Care and Maintenance of Trade Tools and Equipment hours Total hours 40

41 BATCHING PLANT SCALEPERSON Code 943 A. Safety Procedures... 5 hours B. Observation of equipment in operation hours C. Adjustment of scales, operation of controls and weighing hours B. Routine cleaning, lubrication and servicing hours A. Safe operating procedures hours B. Operating controls and scales for measurement and discharge of concrete or asphaltic materials into trucks, carriers or mixer hours Total hours 41

42 WAGON DRILL, BORING MACHINE OR POST HOLE DRILLER OPERATOR Code 944 A. Orientation and Observation... 5 hours B. General drilling procedures and operation hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Small hole drilling hours C. Large hole drilling hours D. Casing operation hours E. General operating hours Total hours 42

43 REINFORCING STEEL SETTER (Paving) Code 945 A. Safety Procedures... 5 hours B. Observation of steel being set hours B. Steel bar placement hours III. Actual Steel Setting A. Rod tying hours B. Rod cutting hours C. General rod placement hours Total hours 43

44 FORM SETTER (Paving) Code 946 B. Observation of setting grade line hours C. Observation of pulling, loading, hauling and placing forms hours B. Routine cleaning of forms and care of air and hand tools hours III. Actual Operation of Form Setting A. Safe operating procedures... 5 hours B. Set grade line hours C. Pull, load, haul and place forms hours D. Set forms to finish grade hours E. Drive pins hours F. Check alignment hours G. Spray forms hours H. Check forms while pouring concrete hours Total hours 44

45 SELF PROPELLED SWEEPER OPERATOR Code 947 B. Observation of machine in operation... 5 hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours Note: Point out necessity to wear eye protection while operating the sweeper B. Proper start-up, proper engagement and position of broom and proper sweeping technique hours C. Removal and replacement of broom wafers hours D. Operation of sweeper in cleaning of pavements hours Total hours 45

46 BULLDOZER, UNDER 150 H.P. - Code 948 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Movement and stockpiling of material hours C. Pushing and rough grading hours D. Clearing and grubbing hours E. Finish grading hours F. Special applications hours Total hours 46

47 SCRAPERS (Under 17 C.Y.) Code 949 B. Observation of machine in operation hours C. Starting and manipulating levers for moving equipment and attachments hours B. Routine fueling, lubricating and servicing hours A. Safe operating procedures... 5 hours B. Loading hours C. Spreading material hours D. Rough roadway grading hours E. Compaction of embankment hours Total hour 47

Kansas Department of Transportation

Kansas Department of Transportation Kansas Department of Transportation STANDARD JOB CLASSIFICATIONS AND DESCRIPTIONS ASPHALT PAVER SCREED OPERATOR (Power Equipment Operator) Makes sure paver is in proper position before moving off the joint.

More information

T.A.T Minimum Wage Scale

T.A.T Minimum Wage Scale T.A.T Minimum Wage Scale General Construction: Construction projects that are funded by the Three Affiliated Tribes or an Enrolled member of the Fort Berthold Reservation. Rates Fringes Electrician $29.24

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014 OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014 A Frame $43.48 B Asphalt Curbing Machine $41.57 C Asphalt Plant Engineer $41.57 C Asphalt Spreader

More information

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017 OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017 A Frame $48.98 B Asphalt Curbing Machine $47.07 C Asphalt Plant Engineer $47.07 C Asphalt Spreader

More information

Why? Faster To reduce the duration of the process

Why? Faster To reduce the duration of the process BUTE Department of Construction Management and Technology 20.10.2015 Why? Faster To reduce the duration of the process Cheaper To reduce costs (where labour is expensive) Easier To reduce (heavy) manual

More information

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate AIR EQUIPMENT & TOOLS: Compressors: Gas or Diesel, cfm @ 100 psi Gas or Diesel, cfm @ 100 psi 85-150 cfm $27,272.70 7% $1,909.09 $13.00 $130.00 151-175 cfm $34,848.45 7% $2,439.39 $13.50 $135.00 176-250

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06 2018 SPOKANE TRIBAL WAGE RATES FOR CONTRACTORS All rates are based on 100% of Washington State prevailing wage rates for Stevens County All wage rates are subject to annual adjustments by the TERO Commission

More information

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway 1of 5 General Decision Number: MN100015 02/04/2011 MN15 State: Minnesota Construction Type: Highway Counties: Dodge, Fillmore, Freeborn, Goodhue, Houston, Mower, Olmsted, Rice, Steele, Wabasha and Winona

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

St. Cloud State University St. Cloud, MN

St. Cloud State University St. Cloud, MN ADDENDUM # 1 REQUEST FOR PROPOSAL: Elevator Maintenance Services RFP St. Cloud State University St. Cloud, MN 56301-4498 ORIGINAL PUBLICATION : June 23 2014 ADDENDUM # 1 ISSUE : July 8, 2014 REVISED 1.

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway Page 1 of 5 > General Decision Number: MN120010 06/15/2012 MN10 Superseded General Decision Number: MN20100020 State: Minnesota Construction Type: Highway Counties: Anoka, Carver, Chisago, Dakota, Hennepin,

More information

Highway and Heavy Master Job Classifications OLD versus NEW

Highway and Heavy Master Job Classifications OLD versus NEW Highway and Heavy Master Job Classifications OLD versus NEW Position Title Old Number New Number Laborer, common (general labor work) 101 101 Laborer, skilled (assisting skilled craft journeyman) 102 102

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

This appendix describes various types of equipment that can

This appendix describes various types of equipment that can Appendix GENERAL ENGINEER SUPPORT EQUIPMENT This appendix describes various types of equipment that can be used to support general engineer missions. This information is provided to help planners choose

More information

Appendix H: Construction Impacts H-3 Air Quality

Appendix H: Construction Impacts H-3 Air Quality Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263

More information

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER BULLETIN Associated General Contractors of New Jersey Raritan Center Raritan Plaza II Fieldcrest Avenue Edison, NJ 08837 TELEPHONE: 732-738-9454 / FAX: 732-738-8722 L A B O R U P D A T E DATE: JUNE 11,

More information

SEWER AND WATERMAIN CONSTRUCTION

SEWER AND WATERMAIN CONSTRUCTION Corporate Services Fair Wage Office 18 th Floor, West Tower, City Hall Tel: 416-392-7300 Fax: 416-392-0801 Hotline: 416-392-FAIR E-mail: fairwage@toronto.ca Visit us at www.toronto.ca/fairwage FAIR WAGE

More information

Teacher Assessment Blueprint. Heavy Equipment. Test Code: 5913 / Version: 01. Copyright 2007 NOCTI. All Rights Reserved.

Teacher Assessment Blueprint. Heavy Equipment. Test Code: 5913 / Version: 01. Copyright 2007 NOCTI. All Rights Reserved. Teacher Assessment Blueprint Heavy Equipment Test Code: 5913 / Version: 01 Copyright 2007 NOCTI. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information Written

More information

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy

More information

Appendix D. Noise Calculations

Appendix D. Noise Calculations Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with

More information

Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE * I.C.I. WORK

Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE * I.C.I. WORK Corporate Services * Industrial, Commercial, Institutional Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE 2003-2004 * I.C.I. Tel: 416-392-7300 Fax: 416-392-0801 Hotline: 416-392-FAIR

More information

MAINTENANCE WORKER I/II

MAINTENANCE WORKER I/II MAINTENANCE WORKER I/II DEFINITION To perform a variety of semi-skilled and skilled tasks in the construction, maintenance, and repair of streets, sidewalks, signs, sewers, storm drains, pump stations,

More information

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1 *Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1 SCHEDULE A CLASSIFICATIONS AND WAGE SCALES On all work covered by this Agreement, and in all instances

More information

SMALL CONSTRUCTION EQUIPMENTS

SMALL CONSTRUCTION EQUIPMENTS SMALL CONSTRUCTION EQUIPMENTS SR NO CONCRETE MIXERS 1 [CM-1] FULL BAG CONCRETE MIXER WITH MECHANICAL HOPPER MOUNTED ON [500 19] TYRES CONCRETE MIX 200 LTS A] 6 HP AIR COOLED DIESEL B] 3PH 5 HP ELECTRIC

More information

FEMA's Schedule of Equipment Rates

FEMA's Schedule of Equipment Rates DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY DISASTER ASSISTANCE DIRECTORATE PUBLIC ASSISTANCE DIVISION WASHINGTON, D.C. 20472 www.fema.gov/government/grant/pa/eqrates.shtm (May

More information

FAIR WAGE SCHEDULE Road Building

FAIR WAGE SCHEDULE Road Building City Manager's Office Fair Wage Office Human Resources Division 100 Queen treet West City Hall, 18 th Floor, West Tower Toronto, Ontario M5H 2N2 Tel: 416-392-7300 Fax: 416-392-0801 fairwage@toronto.ca

More information

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT 86-29 S.A.P. 019-686-016 PROPOSAL ATTACHMENTS 1. The Attachment MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

More information

GREASE TIME RATE SINGULARLY OPERATED MACHINES

GREASE TIME RATE SINGULARLY OPERATED MACHINES LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS SCHEDULE A Heavy & Highway Construction GREASE TIME RATE SINGULARLY OPERATED MACHINES Period June 1, 2017 thru May 31, 2018 HEAVY & HIGHWAY CONSTRUCTION

More information

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT . POTENTIAL CONSTRUCTION EQUIPMENT Table B-1. Alternative 1 (Options A and B) and Alternative 3 Alternative 1 (Options A and B) and Alternative 3 Overhead Transmission Line and Poles Removal of conductors

More information

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018 LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS SCHEDULE B Building Construction GREASE TIME RATE SINGULARLY OPERATED MACHINES Period June 1, 2017 thru May 31, 2018 BUILDING CONSTRUCTION DIVISION

More information

SEWER AND WATERMAIN CONSTRUCTION

SEWER AND WATERMAIN CONSTRUCTION Fair Wage Office 100 Queen Street West City Hall, 18 th Floor, West Tower Toronto, ON M5H 2N2 Tel: 416-392-7300 Fax: 416-392-0801 Hotline: 416-392-FAIR E-mail: fairwage@toronto.ca Visit us at www.toronto.ca/fairwage

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Province of Prince Edward Island 2017

Province of Prince Edward Island 2017 Province of Prince Edward Island 2017 Standard Negotiated Rates A B C Trucking Rates Standard Prices - Unbid Jobs Machinery Rental Rates August 16, 2017 Department of Transportation, Infrastructure and

More information

All Users of the City of Denver Prevailing Wage Schedules

All Users of the City of Denver Prevailing Wage Schedules Career Service Authority Denver s Human Resource Agency 201 W. Colfax, Department 412 Denver, CO 80202 p: 720.913.5751 f: 720.913.5720 www.denvergov.org/csa TO: FROM: All Users of the City of Denver Prevailing

More information

FAIR WAGE SCHEDULE Sewer and Watermain

FAIR WAGE SCHEDULE Sewer and Watermain City Manager's Office Fair Wage Office Human Resources Division 100 Queen Street West City Hall, 18 th Floor, West Tower Toronto, Ontario M5H 2N2 Tel: 416-392-7300 Fax: 416-392-0801 fairwage@toronto.ca

More information

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

Side Cutter Kit (Left and Right - fits all 68, 72, 80 Buckets) 48 Pallet Fork Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) These Bolt On Side Cutters (BOSC) greatly extend bucket service life and improve penetration power into hard packed soil or stock piled

More information

Occupations (Construction)

Occupations (Construction) Qualification Title: Level 2 NVQ Diploma in Sub-structure Work Occupations (Construction) Pathway 1: Level 2 NVQ Diploma in Sub-structure Work Occupations (Underpinning Operations Excavated Underpinning)

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

ATTACHMENT A. Construction Project Safety Checklist

ATTACHMENT A. Construction Project Safety Checklist ATTACHMENT A Construction Project Safety Checklist Public Works Safety Office Construction Project Safety Checklist The contractor shall use a checklist/plan to identify and address health, safety and

More information

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL 303378 HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, 303379 HOUR BACKHOE,Z54,W OP OTHER CONTROLLED EQUIPMENT, BACKHOE, WITH OPERATOR, 303381 HOUR BROOM,ROTARY,UNDER,SELF-PROPELLED,F52 303383 HOUR

More information

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT FOREWARD This edition of the Nova Scotia Road Builders Association Suggested Schedule of Rental Rates for Construction Equipment is presented for the information

More information

CONSTRUCTION and OFF ROAD EQUIPMENT

CONSTRUCTION and OFF ROAD EQUIPMENT CONSTRUCTION and OFF ROAD EQUIPMENT QUICK REFERENCE GUIDE Vehicle Valuation Services, Inc. 1 South 450 Summit Avenue Suite 185 Oakbrook Terrace, IL 60181 888.475.9975 Fax: 888.475.9935 www.vvsi.com Vehicle

More information

FEMA's Schedule of Equipment Rates

FEMA's Schedule of Equipment Rates DEPARTMENT OF HOMELAND SECURITY EMERGENCY PREPAREDNESS AND RESPONSE DIRECTORATE RECOVERY DIVISION PUBLIC ASSISTANCE BRANCH WASHINGTON, D.C. 20472 The rates on this Schedule of Equipment Rates are for applicant-owned

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

EXPERI MENTAL PROJECTS

EXPERI MENTAL PROJECTS EXPERI MENTAL PROJECTS PROVIDING SMOOTH RAILROAD GRADE CR"OSSINGS USING ASPHALT CONCRETE PAVEMENT Report Numbe r: DEPARTMENTAL I NFORMAT JON EXCHANGE STAT E AND D EPA RTM ENT P UB L IC OF HIGHWAYS T R

More information

CEM 417 WEEK 6. CONSTRUCTION TECHNOLOGY & maintenance. Construction Plants 22/02/2011 WEEK 6 CONSTRUCTION PLANTS

CEM 417 WEEK 6. CONSTRUCTION TECHNOLOGY & maintenance. Construction Plants 22/02/2011 WEEK 6 CONSTRUCTION PLANTS CONSTRUCTION TECHNOLOGY & maintenance CEM 417 SOURCES FROM slide: MOHD AMIZAN MOHAMD MOHD FADZIL ARSHAD SITI RASHIDAH MOHD NASIR FKA, UiTM Shah Alam. WEEK 6 Construction Plants WEEK 6 CONSTRUCTION PLANTS

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) 1. Personal Info: Ensure your legal company name is on the form. 2. Equipment Info: Ensure you complete all

More information

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE Department of Aviation Airport Office Building 8500 Peňa Boulevard Denver, Colorado (303) 342-2200 www.flydenver.com April 25, 2017 Roadway Erosion Control 2017 CONTRACT NO. 201732622 ADDENDUM NUMBER ONE

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

Hennepin County Transportation Department ADDENDUM

Hennepin County Transportation Department ADDENDUM Hennepin County Transportation Department ADDENDUM TO PLANS, SPECIFICATIONS AND SPECIAL PROVISIONS FOR BRIDGE 27B86, GRADING, AND BITUMINOUS PAVEMENT HENNEPIN COUNTY TRANSPORTATION DEPARTMENT (To be opened

More information

FAIR WAGE SCHEDULE HEAVY CONSTRUCTION

FAIR WAGE SCHEDULE HEAVY CONSTRUCTION City Manager's Office Fair Wage Office Human Resources Division 100 Queen Street West City Hall, 18 th Floor, West Tower Toronto, Ontario M5H 2N2 Tel: 416-392-7300 Fax: 416-392-0801 fairwage@toronto.ca

More information

A maximum of power with a minimum investment the economical solution for road construction.

A maximum of power with a minimum investment the economical solution for road construction. PAVING MACHINERY MADE IN GERMANY A maximum of power with a minimum investment the economical solution for road construction. an ASTEC Industries Company EQUIPMENT 01 02 10 09 08 07 01 02 03 Well-arranged

More information

Landscaping Attachments

Landscaping Attachments Landscaping Attachments Skid Steer Compact Track Backhoe Compact Wheel Wheel SINCE 1842 AUGER Tackle fence work, foundations, and drainage work with a versatile auger. + + Auger options include various

More information

Pearson Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF) 601/6018/4

Pearson Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF) 601/6018/4 Amendment Notification May 2015 CITB, the Sector Skills Council (SSC) for Construction, in consultation with the industry, have changed the National Occupational Standards (NOS) so it is important we update

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Auction Ring 1 -Ramp - North Auction Theatre

Auction Ring 1 -Ramp - North Auction Theatre Edmonton, AB, CAN - Jun 12, 2018 - Index Summary All times listed are approximate. Day 1 - Tuesday June 12 2018 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction 1-52

More information

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer.

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. DOZERS Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. Blade is lowered to cut the soil and push the soil in front of blade. It unloads the soil by pushing it over

More information

NOTICE TO BIDDERS ADDENDUM NO. 2. Dated: November 16, 2018 SAP & CP

NOTICE TO BIDDERS ADDENDUM NO. 2. Dated: November 16, 2018 SAP & CP Public Works Department Donald J. Theisen, P.E. Director NOTICE TO BIDDERS Wayne H. Sandberg, P.E. Deputy Director/County Engineer Type of Work: ADDENDUM NO. 2 Dated: November 16, 2018 SAP 082-617-011

More information

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway General Decision Number: AZ130008 02/22/2013 AZ8 Superseded General Decision Number: AZ20120013 State: Arizona Construction Type: Highway Counties: Coconino, Maricopa, Mohave, Pima, Pinal, Yavapai and

More information

Hennepin County Transportation Department ADDENDUM

Hennepin County Transportation Department ADDENDUM Hennepin County Transportation Department ADDENDUM TO PLANS, SPECIFICATIONS AND SPECIAL PROVISIONS FOR CSAH 135 BRIDGE REPLACEMENT HENNEPIN COUNTY TRANSPORTATION DEPARTMENT (To be opened Tuesday, April

More information

FarmSmart January 20,2018

FarmSmart January 20,2018 FarmSmart 2018 January 20,2018 NEW HTA subsection 1(1) definition: road-building machine means a self-propelled vehicle of a design commonly used in the construction or maintenance of highways that, (a)

More information

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION

More information

B.6 Construction Equipment Utilization and Workforce

B.6 Construction Equipment Utilization and Workforce Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction

More information

INDUSTRIAL CONSTRUCTION: A Comprehensive Guide to the Heavy Equipment and Tools of the Trade

INDUSTRIAL CONSTRUCTION: A Comprehensive Guide to the Heavy Equipment and Tools of the Trade INDUSTRIAL CONSTRUCTION: A Comprehensive Guide to the Heavy Equipment and Tools of the Trade Table of Contents If you know where you re going, go ahead and click on a chapter. Introduction/Chapter 1: Understanding

More information

Meredith Creme, Associate Human Resource Professional

Meredith Creme, Associate Human Resource Professional Career Service Authority Denver s Human Resource Agency 201 W. Colfax, Department 412 Denver, CO 80202 p: 720.913.5751 f: 720.913.5720 www.denvergov.org/csa TO: FROM: All Users of the City of Denver Prevailing

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

Schedule of Equipment Rates

Schedule of Equipment Rates SCHEDULE OF EQUIPMENT RATES FEDERAL EMERGENCY MANAGEMENT AGENCY RESPONSE AND RECOVERY DIRECTORATE INFRASTRUCTURE DIVISION WASHINGTON, D.C. 20472 The rates on this Schedule of Equipment s are for equipment

More information

Aluminum Box Culverts

Aluminum Box Culverts Steel and Aluminum s The Solution for Small Bridge Replacement: s Contech s are a practical and costefficient solution for small bridge replacement. They have a lower installed cost because they are faster

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

Attachment Lineup. You have a lot of choices in attachments; they re all in here. Make more money with your compact equipment.

Attachment Lineup. You have a lot of choices in attachments; they re all in here. Make more money with your compact equipment. Attachment Lineup You have a lot of choices in attachments; they re all in here. Make more money with your compact equipment. Find products you didn t know existed. Compact Excavators Augers Breakers Quick

More information

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park Contact Us: T: +27 (0)86 196 1177 E: training@fezamax.co.za FTTA Building C5, Denel North, Atlas Rd, Kempton Park www.buildmax.co.za Training Academy Fezamax is a wholly owned subsidiary of Buildmax Limited

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information