UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL
|
|
- Coral Norman
- 6 years ago
- Views:
Transcription
1 HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, HOUR BACKHOE,Z54,W OP OTHER CONTROLLED EQUIPMENT, BACKHOE, WITH OPERATOR, HOUR BROOM,ROTARY,UNDER,SELF-PROPELLED,F HOUR BROOM,ROTY,UNDER,SELF-PROPELLED,F52,W OP HOUR CHIPPER,STONE,SELF-PROPELLED,C HOUR CHIPPER,STONE,SELF-PROPELLED,C95,W OP HOUR CHIPPER,WOOD,ROTARY CUTTER,MOUNTED,D HOUR CHIPPER,WOOD,ROTARY CUTTER,TOWED,D64 EARTH MOVING EQUIPMENT, ROTARY BROOM, UNDER BODY MOUNTED, SELF PROPELLED, EARTH MOVING EQUIPMENT, ROTARY BROOM, UNDER BODY MOUNTED, SELF PROPELLED, WITH OPERATOR, ROAD SURFACE MAINTENANCE EQUIPMENT, STONE CHIPPER, STONE, SELF PROPELLED, ROAD SURFACE MAINTENANCE EQUIPMENT, STONE CHIPPER, STONE, SELF PROPELLED, WITH OPERATOR, VEGETATION CONTROL EQUIPMENT, WOOD CHIPPER, ROTARY CUTTER, MOUNTED, VEGETATION CONTROL EQUIPMENT, WOOD CHIPPER, ROTARY CUTTER, TOWED, HOUR CLEANER,BLASTER,WATER,PORTABLE,F06 EARTH MOVING EQUIPMENT, CLEANER, WATER BLASTER, PORTABLE, HOUR CLEANER,BLASTER,WATER,TOWED,F06,W OP EARTH MOVING EQUIPMENT, CLEANER, WATER BLASTER, TOWED, WITH OPERATOR, HOUR CLEANER,FLUSHER,PIPE,TOWED,F06 EARTH MOVING EQUIPMENT, CLEANER, PIPE FLUSHER, TOWED, HOUR CLEANER,FLUSHER,PIPE,TOWED,F06,W OP EARTH MOVING EQUIPMENT, CLEANER, PIPE FLUSHER, TOWED, WITH OPERATOR, HOUR CLEANER,SEWER,ZFW,W OP OTHER CONTROLLED EQUIPMENT, SEWER CLEANER, WITH OPERATOR, HOUR CLEANER,VACUUM,PIPE,TOWED,F06,W OP EARTH MOVING EQUIPMENT, CLEANER, PIPE VACUUM, TOWED, WITH OPERATOR, HOUR COMPRESSOR,AIR,C08 ROAD SURFACE MAINTENANCE EQUIPMENT, COMPRESSOR, AIR, HOUR CONVEYOR,SPEC PURP,PORTABLE,B94 WINTER CONTROL EQUIPMENT, SPECIAL PURPOSE, CONVEYOR, PORTABLE, HOUR CRANE,HYDRAULIC,ZE9,W OP OTHER CONTROLLED EQUIPMENT, CRANE, HYDRAULIC, WITH OPERATOR, HOUR CRANE,LATTICE,ZE9,W OP OTHER CONTROLLED EQUIPMENT, CRANE, LATTICE, WITH OPERATOR, HOUR CUTTER,STUMP,ZG1,W OP OTHER CONTROLLED EQUIPMENT, STUMP CUTTER, WITH OPERATOR, DAY DEVICES,TRAFFIC CONTROL,MISC,Z54 OTHER CONTROLLED EQUIPMENT, MISC TRAFFIC CONTROL DEVICES,
2 DAY DEVICES,TRAFFIC CONTROL,MISC,Z54,W OP HOUR DISTRIBUTOR,BITUMINOUS,TOWED,CA6,W OP HOUR DISTRIBUTOR,OIL,BITUMINOUS,TOWED,CA6 OTHER CONTROLLED EQUIPMENT, MISC TRAFFIC CONTROL DEVICES, WITH OPERATOR, ROAD SURFACE MAINTENANCE EQUIPMENT, DISTRIBUTOR, OIL BITUM, TOWED, WITH OPERATOR, ROAD SURFACE MAINTENANCE EQUIPMENT, DISTRIBUTOR, OIL BITUM, TOWED, HOUR DOZER,RIGID,CRAWLER,E14 EARTH MOVING EQUIPMENT, DOZER, RIGID, CRAWLER, HOUR DOZER,RIGID,CRAWLER,E14,W OP EARTH MOVING EQUIPMENT, DOZER, RIGID, CRAWLER, WITH OPERATOR, HOUR DRILL,CORE,OTHER,M10 OTHER CONTROLLED EQUIPMENT, CORE DRILL, OTHER, HOUR DRILL,CORE,OTHER,PORTABLE,M10 OTHER CONTROLLED EQUIPMENT, CORE DRILL, OTHER, PORTABLE, HOUR EQUIPMENT,BRUSHING,Z03,W OP OTHER CONTROLLED EQUIPMENT, BRUSHING EQUIPMENT, WITH OPERATOR, HOUR EQUIPMENT,RECYCLING,Z74 OTHER CONTROLLED EQUIPMENT, RECYCLING EQUIPMENT, HOUR EQUIPMENT,RECYCLING,Z74,W OP HOUR EXCAVATOR,DUAL,AWD,E18,W OP HOUR EXCAVATOR,HYDRAULIC,AWD,E HOUR EXCAVATOR,HYDRAULIC,AWD,E18,W OP HOUR EXCAVATOR,HYDRAULIC,CRAWLER,ED9,W OP OTHER CONTROLLED EQUIPMENT, RECYCLING EQUIPMENT, WITH OPERATOR, EARTH MOVING EQUIPMENT, EXCAVATOR, DUAL WHEEL, ALLWHEEL DRIVE, WITH OPERATOR, EARTH MOVING EQUIPMENT, EXCAVATORATOR, HYDRAULIC, ALLWHEEL DRIVE, EARTH MOVING EQUIPMENT, EXCAVATOR, HYDRAULIC, ALLWHEEL DRIVE, WITH OPERATOR, EARTH MOVING EQUIPMENT, MINI EXCAVATORATOR, HYDRAULIC, CRAWLER, WITH OPERATOR, HOUR EXCAVATOR,HYDRAULIC,TANDEM,E18 EARTH MOVING EQUIPMENT, EXCAVATORATOR, HYDRAULIC, TANDEM, HOUR EXCAVATOR,HYDRAULIC,TANDEM,E18,W OP HOUR EXCAVATOR,MINI,HYDRAULIC,CRAWLER,ED HOUR EXCAVATOR,MINI,HYDRAULIC,CRAWLR,ED9,W OP HOUR EXCAVATOR,TRACK,HYDRAULIC,CRAWLER,EET HOUR EXCAVATOR,TRACK,HYDRAULIC,CRWLR,EET,W OP EARTH MOVING EQUIPMENT, EXCAVATOR, HYDRAULIC, TANDEM, WITH OPERATOR, EARTH MOVING EQUIPMENT, MINI EXCAVATORATOR, HYDRAULIC, CRAWLER, EARTH MOVING EQUIPMENT, MINI EXCAVATORATOR, HYDRAULIC, CRAWLER, WITH OPERATOR, EARTH MOVING EQUIPMENT, TRACK EXCAVATORATOR, HYDRAULIC, CRAWLER, EARTH MOVING EQUIPMENT, TRACK EXCAVATORATOR, HYDRAULIC, CRAWLER, WITH OPERATOR,
3 HOUR FORKLIFT,GENERAL PURPOSE,MOUNTED,M19 OTHER CONTROLLED EQUIPMENT, FORKLIFT, GENERAL PURPOSE, MOUNTED, HOUR GRADER,ARTICULATED,AWD,E21 EARTH MOVING EQUIPMENT, GRADER, ARTICULATED, ALLWHEEL DRIVE, HOUR GRADER,ARTICULATED,AWD,E21,W OP EARTH MOVING EQUIPMENT, GRADER, ARTICULATED, ALLWHEEL DRIVE, WITH OPERATOR, HOUR GRADER,ARTICULATED,TANDEM,E21 EARTH MOVING EQUIPMENT, GRADER, ARTICULATED, TANDEM, HOUR GRADER,ARTICULATED,TANDEM,E21,W OP HOUR HAMMER,UNIVERSAL,GENERAL PURPOSE,M HOUR HYDROGRASSER,EROS CTRL,TOWED,D HOUR HYDROGRASSER,EROS CTRL,TOWED,MOUNTED,D HOUR KETTLE,BITUMINOUS,TOWED,C HOUR KETTLE,PARA PLASTIC,TOWED,C25 EARTH MOVING EQUIPMENT, GRADER, ARTICULATED, TANDEM, WITH OPERATOR, OTHER CONTROLLED EQUIPMENT, HAMMER UNIVERSAL, GENERAL PURPOSE, VEGETATION CONTROL EQUIPMENT, EROSION CONTROL EQUIPMENT, HYDROGRASSER, TOWED, VEGETATION CONTROL EQUIPMENT, EROSION CONTROL EQUIPMENT, HYDROGRASSER, MOUNTED, ROAD SURFACE MAINTENANCE EQUIPMENT, KETTLE, BITUMINOUS, TOWED, ROAD SURFACE MAINTENANCE EQUIPMENT, KETTLE, PARA PLASTIC, TOWED, HOUR KETTLE,TACK COAT,TOWED,C25 ROAD SURFACE MAINTENANCE EQUIPMENT, KETTLE, TACK COAT, TOWED, HOUR LIGHT,ARROW DIRECTIONAL,TOWED,F26 EARTH MOVING EQUIPMENT, LIGHT, ARROW DIRECTIONAL, TOWED, HOUR LIGHT,FLOOD,TOWED,F26 EARTH MOVING EQUIPMENT, LIGHT, FLOOD, TOWED, HOUR LIGHT,SIGNAL,TRAFFIC,TOWED,F26,W OP EARTH MOVING EQUIPMENT, LIGHT, TRAFFIC SIGNAL, TOWED, WITH OPERATOR, HOUR LIGHT,TRAFFIC,TOWED,F26 EARTH MOVING EQUIPMENT, LIGHT, TRAFFIC SIGNAL, TOWED, HOUR LOADER,ARTICULATED,AWD,E27 EARTH MOVING EQUIPMENT, LOADER, ARTICULATED, ALLWHEEL DRIVE, HOUR LOADER,ARTICULATED,AWD,E27,W OP HOUR LOADER,ARTICULATED,CONVENTIONAL,E27,W OP EARTH MOVING EQUIPMENT, LOADER, ARTICULATED, ALLWHEEL DRIVE, WITH OPERATOR, EARTH MOVING EQUIPMENT, LOADER, ARTICULATED, CONVENTIONAL, WITH OPERATOR, HOUR LOADER,BELT,SELF-PROPELLED,EB1 EARTH MOVING EQUIPMENT, BELT, LOADER, SELF PROPELLED, HOUR LOADER,RIGID,CRAWLER,E27 EARTH MOVING EQUIPMENT, LOADER, RIGID, CRAWLER,
4 HOUR LOADER,RIGID,CRAWLER,E27,W OP EARTH MOVING EQUIPMENT, LOADER, RIGID, CRAWLER, WITH OPERATOR, HOUR MACHINE,MILLING,Z29 OTHER CONTROLLED EQUIPMENT, MILLING MACHINE, HOUR MACHINE,MILLING,Z29,W OP OTHER CONTROLLED EQUIPMENT, MILLING MACHINE, WITH OPERATOR, HOUR MACHINE,WELDING, MOUNTED,M62,W OP HOUR MACHINE,WELDING,PORTABLE,M62,W OP OTHER CONTROLLED EQUIPMENT, WELDING MACHINE, MOUNTED ON EQUIPMENT, WITH OPERATOR, OTHER CONTROLLED EQUIPMENT, WELDING MACHINE, PORTABLE, WITH OPERATOR, HOUR MACHINE,WELDING,Z62,W OP OTHER CONTROLLED EQUIPMENT, WELDING UNIT, WITH OPERATOR, HOUR MILLING,COLD PLANER,SELFPROPEL,C29,W OP ROAD SURFACE MAINTENANCE EQUIPMENT, MILLING, COLD PLANER, SELF PROPELLED, WITH OPERATOR, HOUR MIXER,CONCRETE,TOWED,M30 OTHER CONTROLLED EQUIPMENT, MIXER, CONCRETE, TOWED, HOUR MOWER,TRACTOR,BOOM,CONVENTIONAL,D HOUR MOWER,TRACTOR,BOOM,CONVENTIONAL,D55,W OP HOUR MOWER,TRACTOR,BOOM,SELF-PROPEL,D55,W OP HOUR MOWER,TRACTOR,FLAIL,AWD,D55,W OP HOUR MOWER,TRACTOR,FLAIL,SELF-PROPEL,D55,W OP HOUR MOWER,TRACTOR,FLAIL,SELF-PROPELLED,D HOUR MOWER,TRACTOR,ROTARY,CONV,D55,W OP HOUR MOWER,TRACTOR,ROTARY,SELFPROPEL,D55,W OP HOUR PATCHER,BITUMINOUS,TOWED,CA HOUR PATCHER,POTHOLE,PREMIX,PORTABLE,C84,W OP HOUR PAVER,BITUMINOUS,SELF-PROPELLED,C HOUR PAVER,BITUMINOUS,SELF-PROPELLED,C34,W OP VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, BOOM, CONVENTIONAL, VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, BOOM, CONVENTIONAL, WITH OPERATOR, VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, BOOM, SELF PROPELLED, WITH OPERATOR, VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, FLAIL, ALLWHEEL DRIVE, WITH OPERATOR, VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, FLAIL, SELF PROPELLED, WITH OPERATOR, VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, FLAIL, SELF PROPELLED, VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, ROTARY, CONVENTIONAL, WITH OPERATOR, VEGETATION CONTROL EQUIPMENT, TRACTOR MOWER, ROTARY, SELF PROPELLED, WITH OPERATOR, ROAD SURFACE MAINTENANCE EQUIPMENT, PATCHER, BITUMINOUS, TOWED, ROAD SURFACE MAINTENANCE EQUIPMENT, POTHOLE PATCHER, ASPHALT PREMIX, PORTABLE, WITH OPERATOR, ROAD SURFACE MAINTENANCE EQUIPMENT, PAVER, BITUMINOUS FINISHER, SELF PROPELLED, ROAD SURFACE MAINTENANCE EQUIPMENT, PAVER, BITUMINOUS FINISHER, SELF PROPELLED, WITH OPERATOR,
5 HOUR PAVER,MAINTAINER,SELF-PROPELLED,C34,W OP HOUR PAVER,MIXER,SELF-PROPELLED,C HOUR PLANER,COLD,MILLING,SELF-PROPELLED,C HOUR PLANT,MIXING,UTILITY,TOWED,CC HOUR PLANT,MIXING,UTILITY,TOWED,CC4,W OP HOUR PROFILER,SPECIAL PURPOSE,F94,W OP ROAD SURFACE MAINTENANCE EQUIPMENT, PAVER, MAINTAINER, SELF PROPELLED, WITH OPERATOR, ROAD SURFACE MAINTENANCE EQUIPMENT, PAVER, MIXER PAVER, SELF PROPELLED, ROAD SURFACE MAINTENANCE EQUIPMENT, MILLING, COLD PLANER, SELF PROPELLED, ROAD SURFACE MAINTENANCE EQUIPMENT, MIXING PLANT, UTILITY, TOWED, ROAD SURFACE MAINTENANCE EQUIPMENT, MIXING PLANT, UTILITY, TOWED, WITH OPERATOR, EARTH MOVING EQUIPMENT, SPECIAL PURPOSE, PROFILER, WITH OPERATOR, HOUR PUMP,CONCRETE,Z40 OTHER CONTROLLED EQUIPMENT, CONCRETE PUMP, HOUR PUMP,CONCRETE,Z40,W OP OTHER CONTROLLED EQUIPMENT, CONCRETE PUMP, WITH OPERATOR, HOUR PUMP,WATER,M40 OTHER CONTROLLED EQUIPMENT, PUMP, WATER, HOUR RECLAIMER,ROAD,ZE8,W OP OTHER CONTROLLED EQUIPMENT, ROAD RECLAIMER, WITH OPERATOR, HOUR ROLLER,PATCH,VIBRATORY,CRP HOUR ROLLER,PATCH,VIBRATORY,WALK BEHIND,CC HOUR ROLLER,PAVING,TANDEM,STACTIC,CRA HOUR ROLLER,RUBBER TIRE,RUBBER/STEEL COMB,CRT HOUR ROLLER,RUBBER TIRE,TANDEM,STACTIC,CRT ROAD SURFACE MAINTENANCE EQUIPMENT, PATCH ROLLER, RIDING, VIBRATORY, ROAD SURFACE MAINTENANCE EQUIPMENT, PATCH ROLLER, VIBRATORY, WALK BEHIND, ROAD SURFACE MAINTENANCE EQUIPMENT, PAVING ROLLER, TANDEM, STACTIC, ROAD SURFACE MAINTENANCE EQUIPMENT, RUBBER TIRE ROLLER, RUBBER/STEEL COMB, STACTIC, ROAD SURFACE MAINTENANCE EQUIPMENT, RUBBER TIRE ROLLER, TANDEM, STACTIC, HOUR SAW,CONCRETE,OPERATOR HELD,M44 OTHER CONTROLLED EQUIPMENT, SAW, CONCRETE, OPERATOR HELD, HOUR SAW,CONCRETE,PORTABLE,M44 OTHER CONTROLLED EQUIPMENT, SAW, CONCRETE, PORTABLE, HOUR SAW,CONCRETE,SELF-PROPELLED,M44 OTHER CONTROLLED EQUIPMENT, SAW,CONCRETE, SELF PROPELLED, HOUR SAW,CONCRETE,SELF-PROPELLED,M44,W OP OTHER CONTROLLED EQUIPMENT, SAW, CONCRETE, SELF PROPELLED, WITH OPERATOR, HOUR SKID STEER,RIGID,AWD,EB2 EARTH MOVING EQUIPMENT, SKID STEER, RIGID, ALLWHEEL DRIVE,
6 HOUR SKID STEER,RIGID,CONVENTIONAL,EB2 EARTH MOVING EQUIPMENT, SKID STEER, RIGID, CONVENTIONAL, HOUR SKID STEER,RIGID,CRAWLER,EB2 EARTH MOVING EQUIPMENT, SKID STEER, RIGID, CRAWLER, HOUR SNOWPLOW,V-TYPE,MOUNTED,B47,W OP HOUR SWEEPER,BROOM TRUCK,3 WHEEL,F53,W OP HOUR SWEEPER,MECHANICAL,TOWED,F53,W OP WINTER CONTROL EQUIPMENT, SNOW PLOW, V-TYPE PLOW, MOUNTED, WITH OPERATOR, EARTH MOVING EQUIPMENT, SWEEPER, BROOM TRUCK, THREE WHEEL, WITH OPERATOR, EARTH MOVING EQUIPMENT, SWEEPER, MECHANICAL, TOWED, WITH OPERATOR, HOUR SWEEPER,ROTARY,MOUNTED,F53 EARTH MOVING EQUIPMENT, SWEEPER, ROTARY, MOUNTED, HOUR SWEEPER,ROTARY,MOUNTED,F53,W OP EARTH MOVING EQUIPMENT, SWEEPER, ROTARY, MOUNTED, WITH OPERATOR, HOUR TRAILER,AERIAL LIFT,MOUNTED,MAD OTHER CONTROLLED EQUIPMENT, AERIAL LIFT, TRAILER, MOUNTED, HOUR TRAILER,BRIDGE INSPECTION,TOWED,MA2,W OP OTHER CONTROLLED EQUIPMENT, BRIDGE INSPECTION, TRAILER MOUNTED, TOWED, WITH OPERATOR, HOUR TRAILER,FLATBED,TOWED,MBP OTHER CONTROLLED EQUIPMENT, FLAT BED, TRAILER, TOWED, HOUR TRAILER,WATER,TOWED,MFO OTHER CONTROLLED EQUIPMENT, WATER, TRAILER, TOWED, HOUR TRUCK,1-AXLE,DUMP,GEN PURP,CONV,A15 TRUCK, SINGLE AXLE DUMP, GENERAL PURPOSE, CONVENTIONAL, HOUR TRUCK,1-AXLE,DUMP,GEN PURP,CONV,A15,W/OP TRUCK, SINGLE AXLE DUMP, GENERAL PURPOSE, CONVENTIONAL, WITH OPERATOR, HOUR TRUCK,1-AXLE DUMP,GEN PURP,AWD,A15 TRUCK, SINGLE AXLE DUMP, GENERAL PURPOSE, ALLWHEEL DRIVE, HOUR TRUCK,1-AXLE DUMP,GEN PURP,AWD,A15,W OP TRUCK, SINGLE AXLE DUMP, GENERAL PURPOSE, ALLWHEEL DRIVE, WITH OPERATOR, HOUR TRUCK,AERIAL LIFT,SELF-CONT,CONV,AD8 TRUCK, AERIAL LIFT, SELF CONTAINED, CONVENTIONAL, HOUR TRUCK,BROOM,SELF-CONTAINED,CONV,FD HOUR TRUCK,BROOM,SELF-CONTAINED,CONV,FD6,W OP EARTH MOVING EQUIPMENT, BROOM TRUCK, SELF CONTAINED, CONVENTIONAL, EARTH MOVING EQUIPMENT, BROOM TRUCK, SELF CONTAINED, CONVENTIONAL, WITH OPERATOR, HOUR TRUCK,DIST,OIL BITUM,CONV,AA6,W OP TRUCK, DISTRIBUTOR, OIL BITUM, CONVENTIONAL, WITH OPERATOR, HOUR TRUCK,DISTRIBUTOR,OIL BITUM,CONV,AA6 TRUCK, DISTRIBUTOR, OIL BITUM, CONVENTIONAL,
7 HOUR TRUCK,DUMP UTIL,GEN PURP,AWD,AB9,W OP TRUCK, DUMP-UTILITY, GENERAL PURPOSE, ALLWHEEL DRIVE, WITH OPERATOR, HOUR TRUCK,DUMP,GEN PURPOSE,TAN,AA1 TRUCK, TANDEM DUMP, GENERAL PURPOSE, TANDEM, HOUR TRUCK,DUMP,GEN PURPOSE,TAN,AA1,W OP TRUCK, TANDEM DUMP, GENERAL PURPOSE, TANDEM, WITH OPERATOR, HOUR TRUCK,TRIAX DUMP,GEN PURP,CONV,AA4,W OP TRUCK, TRI AXLE DUMP, GENERAL PURPOSE, CONVENTIONAL, WITH OPERATOR, HOUR TRUCK,TRI-AXLE DUMP,GEN PURP,CONV,AA4 TRUCK, TRI AXLE DUMP, GENERAL PURPOSE, CONVENTIONAL, HOUR TRUCK,WRECKER,GEN PURP,CONV,ACG,W OP TRUCK, HIGHWAY WRECKER, GENERAL PURPOSE, CONVENTIONAL, WITH OPERATOR, HOUR WASHER,PRESSURE,Z06 OTHER CONTROLLED EQUIPMENT, PRESSURE WASHER, HOUR WIDENER,GEN PURPOSE,SELF-PROPEL,C63,W OP HOUR WIDENER,GEN PURPOSE,SELF-PROPELLED,C63 ROAD SURFACE MAINTENANCE EQUIPMENT, WIDENER, GENERAL PURPOSE, SELF PROPELLED, WITH OPERATOR, ROAD SURFACE MAINTENANCE EQUIPMENT, WIDENER, GENERAL PURPOSE, SELF PROPELLED, HOUR CRUSHER, PORTABLE, Z81 OTHER CONTROLLED EQUIP, MISC SIZE AND TYPE PORTABLE CRUSHER HOUR CRUSHER, PORTABLE, Z81, W OP OTHER CONTROLLED EQUIP, MISC SIZE AND TYPE PORTABLE CRUSHER W OP EACH TRENCHER,WITH OPERATOR TRENCHER, WITH OPERATOR
Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010
Fleet Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010 Each year the City of Milwaukee Fleet Services Section submits at least three replacement equipment budget scenarios, which provide
More informationFEMA's Schedule of Equipment Rates
DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY DISASTER ASSISTANCE DIRECTORATE PUBLIC ASSISTANCE DIVISION WASHINGTON, D.C. 20472 www.fema.gov/government/grant/pa/eqrates.shtm (May
More informationNSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate
AIR EQUIPMENT & TOOLS: Compressors: Gas or Diesel, cfm @ 100 psi Gas or Diesel, cfm @ 100 psi 85-150 cfm $27,272.70 7% $1,909.09 $13.00 $130.00 151-175 cfm $34,848.45 7% $2,439.39 $13.50 $135.00 176-250
More informationDefense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017
Defense Logistics Agency Troop Support Construction and Equipment Heavy Equipment Procurement Program HEPP Customer Handbook March 2017 HEPP Table of Contents 1. Introduction... 3 2. HEPP Program... 3
More informationCONSTRUCTION and OFF ROAD EQUIPMENT
CONSTRUCTION and OFF ROAD EQUIPMENT QUICK REFERENCE GUIDE Vehicle Valuation Services, Inc. 1 South 450 Summit Avenue Suite 185 Oakbrook Terrace, IL 60181 888.475.9975 Fax: 888.475.9935 www.vvsi.com Vehicle
More informationFEMA's Schedule of Equipment Rates
DEPARTMENT OF HOMELAND SECURITY EMERGENCY PREPAREDNESS AND RESPONSE DIRECTORATE RECOVERY DIVISION PUBLIC ASSISTANCE BRANCH WASHINGTON, D.C. 20472 The rates on this Schedule of Equipment Rates are for applicant-owned
More informationSchedule of Equipment Rates
SCHEDULE OF EQUIPMENT RATES FEDERAL EMERGENCY MANAGEMENT AGENCY RESPONSE AND RECOVERY DIRECTORATE INFRASTRUCTURE DIVISION WASHINGTON, D.C. 20472 The rates on this Schedule of Equipment s are for equipment
More informationAuction Ring 1 -Ramp - North Auction Theatre
Edmonton, AB, CAN - Jun 12, 2018 - Index Summary All times listed are approximate. Day 1 - Tuesday June 12 2018 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction 1-52
More informationAuction Ring 1 -Ramp - North Auction Theatre
Edmonton, AB, CAN - Oct 24, 2017 - Index Summary All times listed are approximate. Day 1 - Tuesday October 24 2017 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction
More informationTEXAS DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2005 FUEL REPORTS EQUIPMENT FUEL USAGE
TABLE 1 FUEL IA TEXAS DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2005 FUEL REPORTS AUTOMOBILES & STATION WAGONS Gasoline Waived 53,298 1,703 1,304,498 23.7 98 Electric/Hybrid 7,631 330,138 43.3 29 LPG/Gasoline
More informationHeavy Equipment Operator
Heavy Equipment Operator This section contains a list of equipment used by the Equipment Operator Specialist classification. This classification is in the Maintenance and Operations pay schedule at the
More informationInstructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)
Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) 1. Personal Info: Ensure your legal company name is on the form. 2. Equipment Info: Ensure you complete all
More informationComplete Equipment Fleet
Complete Equipment Fleet Construction ARTICULATED DUMP TRUCKS CRAWLER DOZERS EXCAVATORS 260E 321 hp Rated payload: 53,334 lbs. Heaped capacity: 19.6 cu. yd. 310E 354 hp Rated payload: 62,005 lbs. Heaped
More information2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT
SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT FOREWARD This edition of the Nova Scotia Road Builders Association Suggested Schedule of Rental Rates for Construction Equipment is presented for the information
More informationATTACHMEMT I. VEHICLE AND EQUIPMENT LIFE CYCLE CRITERIA (Usage or Months Whichever Comes First)
FLEET CODE ATTACHMEMT I RFP-DOT-17/18-4011JR VEHICLE AND EQUIPMENT LIFE CYCLE CRITERIA (Usage or Months Whichever Comes First) FLEET CODE DESCRIPTION Page 1 of 8 USEAGE ( Miles or Hours ) MONTHS 0010 WTS.
More information*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1
*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1 SCHEDULE A CLASSIFICATIONS AND WAGE SCALES On all work covered by this Agreement, and in all instances
More informationBulldozer Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour
6100 Wedgwood Road, Medina, Ohio 44256 mark@albrechttrucking.com Belsole3@frontier.com jeremy@crossroadsasphalt.com jhowell806@aol.com marksconstruction@zoominternet.net terry.triner@melwaypaving.com treemasters.jeff@gmail.com
More informationT.A.T Minimum Wage Scale
T.A.T Minimum Wage Scale General Construction: Construction projects that are funded by the Three Affiliated Tribes or an Enrolled member of the Fort Berthold Reservation. Rates Fringes Electrician $29.24
More informationEmissions Tier (EPA) Tier 4. Number of Cylinders 4. Rated Operating Capacity (SAE) Trav el Speed (2-speed option) Engine Oil with Filter
Specifications Bobcat S770 Engine Emissions Tier (EPA) Tier 4 Engine Cooling Engine Fuel Horsepow er Liquid Diesel 92 hp Turbocharged Engine Engine Model Engine Make Cooling System Gross HP 3.4L Bobcat
More informationAppendix H: Construction Impacts H-3 Air Quality
Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263
More informationEquipment Rental Costs
Estimating Tips This section contains the average costs to rent and operate hundreds of pieces of construction equipment. This is useful information when estimating the time and material requirements of
More informationEmissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option)
Specifications Bobcat S740 Engine Emissions Tier (EPA) Tier 4 Engine Cooling Engine Fuel Horsepow er Liquid Diesel 74 hp Turbocharged Engine Engine Model Engine Make Cooling System Gross HP Net HP 3.4L
More informationKansas Department of Transportation
Kansas Department of Transportation STANDARD JOB CLASSIFICATIONS AND DESCRIPTIONS ASPHALT PAVER SCREED OPERATOR (Power Equipment Operator) Makes sure paver is in proper position before moving off the joint.
More informationCONSTRUCTION EQUIPMENT
Your Preferred One Stop Shop for over 43 Years CONSTRUCTION EQUIPMENT CONCRETE POWER & AIR MATERIAL HANDLING QUARRYING WASTE MANAGEMENT SERVICE & PARTS DUBAI ABU DHABI AL-AIN BASRA - IRAQ cmcgulf.com CONSTRUCTION
More informationGeneral Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway
1of 5 General Decision Number: MN100015 02/04/2011 MN15 State: Minnesota Construction Type: Highway Counties: Dodge, Fillmore, Freeborn, Goodhue, Houston, Mower, Olmsted, Rice, Steele, Wabasha and Winona
More information2019 County Joint Bid Program Heavy Equipment Bid Award List for Houston County
2019 County Joint Bid Program Heavy Equipment Bid Award List for Houston County Note: Dump Bodies, Heavy Duty Dump Chassis, Lowboy Tractors are old Format Note: red letter items were renewed Heavy Equipment
More informationMACHINE CONTROLLER CRANE CONTROLLER KEY POINT CARDS ATTACHMENT GROUPINGS
MACHINE CONTROLLER AND CRANE CONTROLLER KEY POINT CARDS FOR ATTACHMENT GROUPINGS Page 1 of 20 Contents Page 3. Machine Controller HPV 4. Machine Controller MEWP 5. MC DM-RMMM 6. MC Material Handler 7.
More information6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.
PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck
More informationTRIP Equipment Requirements
TRIP Requirements Recovery Wrecker Specifications All eligible COMPANIES must have either one 50-Ton Recovery Truck OR one 40-Ton Rotator AND One 30-Ton Heavy Duty Wrecker. The qualifications listed below
More informationPhone: Web: Fax: TITLE MAINTENANCE OPERATOR 2017
JOB POSTING JOB POSTING E-Mail: snelson@ci.hutchinson.mn.us Phone: 320.234.4497 Web: www.ci.hutchinson.mn.us Fax: 320.234.4240 Apply By Friday, June 29 th, 2018 TITLE MAINTENANCE OPERATOR 2017 DEPARTMENT
More informationEmissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option)
Specifications Bobcat S850 Engine Emissions Tier (EPA) Tier 4 Engine Cooling Engine Fuel Horsepow er Liquid Diesel 92 hp Turbocharged Engine Engine Model Engine Make Cooling System Gross HP Net HP V3800-CR-TE4CB-BC-2
More informationAlquiler y venta de maquinaria para la construcción. products catalogue
products catalogue 1 Index 3 Air compresors and accesories Drilling equipment 11 Transport service Diverse equipment 4 5 6 Electric Hammers Lifting equipment Mixers Generators Lightning towers Water pumps
More informationHeavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017
OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017 A Frame $48.98 B Asphalt Curbing Machine $47.07 C Asphalt Plant Engineer $47.07 C Asphalt Spreader
More information2015 FEMA Schedule of Equipment Rates
2015 FEMA Schedule of Equipment Rates Cost Code Equipment Specifications Capacity or Size HP Notes Unit 2015 Rates 8010 Air Compressor Air Delivery 41 CFM to 10 Hoses included. hour $1.25 8011 Air Compressor
More informationThis appendix describes various types of equipment that can
Appendix GENERAL ENGINEER SUPPORT EQUIPMENT This appendix describes various types of equipment that can be used to support general engineer missions. This information is provided to help planners choose
More informationSPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT
SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,
More informationProvince of Prince Edward Island 2017
Province of Prince Edward Island 2017 Standard Negotiated Rates A B C Trucking Rates Standard Prices - Unbid Jobs Machinery Rental Rates August 16, 2017 Department of Transportation, Infrastructure and
More informationThe following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin
The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.
More informationHeavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014
OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014 A Frame $43.48 B Asphalt Curbing Machine $41.57 C Asphalt Plant Engineer $41.57 C Asphalt Spreader
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationAttachment Lineup. You have a lot of choices in attachments; they re all in here. Make more money with your compact equipment.
Attachment Lineup You have a lot of choices in attachments; they re all in here. Make more money with your compact equipment. Find products you didn t know existed. Compact Excavators Augers Breakers Quick
More informationAPPENDIX H-2 CONSTRUCTION NOISE ANALYSES
APPENDIX H-2 CONSTRUCTION NOISE ANALYSES H-2 Construction Noise Analyses APPENDIX H2: CONSTRUCTION NOISE ANALYSES This appendix provides a database of construction equipment noise generation estimates
More informationGeneral Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway
Page 1 of 5 > General Decision Number: MN120010 06/15/2012 MN10 Superseded General Decision Number: MN20100020 State: Minnesota Construction Type: Highway Counties: Anoka, Carver, Chisago, Dakota, Hennepin,
More informationGREASE TIME RATE SINGULARLY OPERATED MACHINES
LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS SCHEDULE A Heavy & Highway Construction GREASE TIME RATE SINGULARLY OPERATED MACHINES Period June 1, 2017 thru May 31, 2018 HEAVY & HIGHWAY CONSTRUCTION
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationSTATE OF MINNESOTA PRICING PAGE - FIXED PRICE (Typed Responses Required)
SEQ # 725-1112 November, 2012 (Typed Responses Required) 1 of 3 Price quote for: MUNICIPAL UTILITY TRACTOR Vendor Name: SCHARBER & SONS Contact Person: JOHN BRAUNSHAUSEN Street Address: 13725 MAIN ST P.O.
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationWhatcom County Invitation to Bid Bid #17-09
Invitation to Bid NOTICE IS HEREBY GIVEN that sealed bids will be received by Purchasing at their fice in the Whatcom County Administrative Services Finance Office in Whatcom County Courthouse, 311 Grand
More informationSCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018
LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS SCHEDULE B Building Construction GREASE TIME RATE SINGULARLY OPERATED MACHINES Period June 1, 2017 thru May 31, 2018 BUILDING CONSTRUCTION DIVISION
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationLapeer County Road Commission EQUIPMENT RENTAL RATE PROPOSAL
Lapeer County Road Commission 2013-11 EQUIPMENT RENTAL RATE PROPOSAL $WITH $W/OUT COMPANY PHONE # EQUIPMENT TYPE MAKE MODEL CAPACITY/SIZE OPER. OPER. DAILY WEEKLY MONTHLY LONGER Latigo 810-724-0006 Dozer
More informationWhere Quality makes the Difference...
Concept/Design/Photography : Intelligent E-Business Solutions Where Quality makes the Difference... P.O. Box: 5723-Manama - Kingdom of Bahrain, Tel.: 17 62 0551, Fax: 17 62 0833 Instagram: @ALHAIDARIYA,
More informationOn-the-Job Training Program. Overview of Training Programs
On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete
More informationFarmSmart January 20,2018
FarmSmart 2018 January 20,2018 NEW HTA subsection 1(1) definition: road-building machine means a self-propelled vehicle of a design commonly used in the construction or maintenance of highways that, (a)
More informationSide Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork
Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) These Bolt On Side Cutters (BOSC) greatly extend bucket service life and improve penetration power into hard packed soil or stock piled
More informationSt. Cloud State University St. Cloud, MN
ADDENDUM # 1 REQUEST FOR PROPOSAL: Elevator Maintenance Services RFP St. Cloud State University St. Cloud, MN 56301-4498 ORIGINAL PUBLICATION : June 23 2014 ADDENDUM # 1 ISSUE : July 8, 2014 REVISED 1.
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County
More informationSTATE OF MINNESOTA PRICING PAGE - FIXED PRICE (Typed Responses Required)
SEQ # 725417 April, 2017 STATE OF MINNESOTA PRICING PAGE FIXED PRICE (Typed Responses Required) 1 of 6 Price quote for: MUNICIPAL UTILITY TRACTOR Vendor Name: Minnesota Equipment Contact Person: Dan Scharber
More information(Construction) Level 2 NVQ Certificate in Plant Operations (Road/Rail)
Qualification Title: Level 2 NVQ Certificate in Plant Operations (Construction) Pathway 1: Pathway 2: Pathway 3: Pathway 4: Pathway 5: Pathway 6: Pathway 7: Pathway 8: Pathway 9: Pathway 10: Pathway 11:
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationFAIR WAGE SCHEDULE Road Building
City Manager's Office Fair Wage Office Human Resources Division 100 Queen treet West City Hall, 18 th Floor, West Tower Toronto, Ontario M5H 2N2 Tel: 416-392-7300 Fax: 416-392-0801 fairwage@toronto.ca
More informationS770 - T770 - A770. New Generation Loaders
S770 - T770 - A770 New Generation Loaders Power meets comfort With the new Bobcat 770 loader range there is a difference you can see and a difference you'll experience on the job. They have been completely
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationFEMA s SCHEDULE OF EQUIPMENT RATES
FEMA s SCHEDULE OF EQUIPMENT RATES DEPARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY RECOVERY DIRECTORATE PUBLIC ASSISTANCE DIVISION WASHINGTON, DC 20472 The rates on this Schedule of
More informationEQUIPMENT LINE CARD RENT-CAT
EQUIPMENT LINE CARD 1-800-RENT-CAT WE RENT MORE THAN JUST CAT You work hard to run your business. Let us work hard to help you. Our machines have the productivity, durability and safety you need to get
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationAPPENDIX C AIR QUALITY
C.1 CONSTRUCTION APPENDIX C AIR QUALITY Construction activities associated with the Proposed Action are set to begin July 2020 and be completed by May 2023. Potential sources of construction emissions
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationCapacity or Size. hour $ Automobile to 130 Transporting people. mile $ Automobile to 130 Transporting cargo. hour $14.
FEMA Updated: 8/5/15 Schedule of Equipment Rates Main Content The rates on this Schedule of Equipment Rates are for applicant-owned equipment in good mechanical condition, complete with all required attachments.
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationWhy? Faster To reduce the duration of the process
BUTE Department of Construction Management and Technology 20.10.2015 Why? Faster To reduce the duration of the process Cheaper To reduce costs (where labour is expensive) Easier To reduce (heavy) manual
More informationRENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. Self Priming Pumps. farismachinery.com
Self Priming Pumps TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE RENTAL RATES Effective September 1, 2016 RENTAL SALES MUNICIPAL OIL & GAS SERVICE Self Priming Pumps ABOUT
More informationCT DEMHS ESF #3 Quick Reference Guide for Public Works Resource Typing
State of Connecticut CT DEMHS ESF #3 Quick Reference Guide for Public Works Resource Typing Rev 1.0 11-20-2007 Resource Name: 4X4 Pickup Ford Ford Ford Chevrolet Chevrolet Chevrolet Dodge Dodge Dodge F-150
More information2018 Rental Rate Guide
2018 Rental Rate Guide Check the back cover for special rental offers! 1 NEW! www.martinimplement.com L221/SSV65-74/64 hp diesel engine, 2,100/1950 lb. operating capacity, 72"/68" bucket with 17.1/18 cu.ft.
More informationEQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)
EQUIPMENT HIRE INTRODUCTION CONTENTS Millers are a long established plant hire company with a solid foundation in Victoria. We have become established from over 2 generations and 40 years in the industry.
More informationHighway and Heavy Master Job Classifications OLD versus NEW
Highway and Heavy Master Job Classifications OLD versus NEW Position Title Old Number New Number Laborer, common (general labor work) 101 101 Laborer, skilled (assisting skilled craft journeyman) 102 102
More informationCOMPACT EARTH + UTILITY EQUIPMENT Compact Utility Loaders, Skid Steers, Compact Trackloaders and Compact Excavators
COMPACT EARTH + UTILITY EQUIPMENT Compact Utility Loaders, Skid Steers, Compact Trackloaders and Compact Excavators 82 Call 888-777-2700 for rates and reservations COMPACT UTILITY LOADERS TORO/TX1000 Fits
More informationNACA WWTP. Bid Tabulation on Skid Steer Loader. Belva Plumlee. December 13, Springdale Tractor. Kubota SVL75 Skid Steer Loader
NACA WWTP Bid Tabulation on Skid Steer Loader Belva Plumlee December 13, 2010 Springdale Tractor Kubota SVL75 Skid Steer Loader $38,000 + tax Bobcat of NWA/Williams Tractor Bobcat S300 Skid Steer Loader
More informationEquipment Differential Guide
City and County of Denver Office of Human Resources If you have questions or concerns regarding the Equipment Differential Guide or criteria, contact John Hoffman, Human Resources Analyst at 720.913.5296
More informationCOMPACT EARTH + UTILITY EQUIPMENT Compact Utility Loaders, Skid Steers, Compact Trackloaders and Compact Excavators
COMPACT EARTH + UTILITY EQUIPMENT Compact Utility Loaders, Skid Steers, Compact Trackloaders and Compact Excavators HercRentals.com 77 COMPACT UTILITY LOADERS TORO/TX1000 Fits through standard 36 gate
More informationACCESS EQUIPMENT 1ST DAY 2ND DAY 5 DAYS
ARCO TOOL HIRE Feb-18 Tel: 01485 571789 Fax: 01485 571916 PRICES DO NOT INCLUDE VAT All diesel machines include full fuel tanks - THERE IS NO CHARGE FOR FUEL USED Fuel in petrol driven machines is not
More informationEQUIPMENT. Lawn & Garden. Land Surveying Equipment
Lawn & Garden EQUIPMENT LG010 Gas Aerator $45.00 $60.00 LG899 Aerator Tow Plugger 40 $25.00 $34.00 LG006 Blower Leaf Back $32.00 $43.00 LG001 Chain Saw 2855-14 $41.00 $54.00 LG002 Chain Saw 357-14 $41.00
More informationMINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Highway and Heavy
More informationCompact Tracked Loaders. Product Range
Compact Tracked Loaders Product Range More productivity, less effort n Get more done in a day The undercarriage of our compact tracked loaders provides high pushing force and large lifting capabilities,
More information