Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Size: px
Start display at page:

Download "Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director"

Transcription

1 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID FRA-IR Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion Date: 11/30/2020 Contract Awarded To: RUHLIN COMPANY Award Amount: $12,090, Engineer's Estimate: Bidder 1 RUHLIN COMPANY P O BOX 190 Medina SHARON CENTER, OH Bid $12,090, Bidder 3 SHELLY & SANDS INC 1515 HARMON AVE Franklin COLUMBUS, OH Bid $12,591, Bidder 5 MILLER BROS CONST INC 1613 S DEFIANCE ST P O BOX 30 Fulton ARCHBOLD, OH Bid $13,620, Bidder 2 KOKOSING CONSTRUCTION COMPANY INC 6235 WESTERVILLE RD Franklin WESTERVILLE, OH Bid $12,473, Bidder 4 EAGLE BRIDGE CO 800 S VAN DEMARK RD Shelby SIDNEY, OH Bid $13,555, Bidder 6 COMPLETE GENERAL CONSTRUCTION COMPANY 1221 EAST FIFTH AVE Franklin COLUMBUS, OH Bid $13,741, Bidder 7 GEORGE J IGEL & CO INC 2040 ALUM CREEK DR Franklin COLUMBUS, OH Bid $13,947, Page 1

2 Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $50, $50, $99, $99, $80, $80, $62, $62, $175, $175, $90, $90, $125, $125, Ref #2 202E23001 PAVEMENT REMOVED, AS PER PLAN, (9899 SY) Awd $10.00 $98, $8.00 $79, $10.00 $98, $10.00 $98, $9.50 $94, $11.00 $108, $14.00 $138, Ref #3 202E23010 PAVEMENT REMOVED, ASPHALT, (5827 SY) Awd $5.00 $29, $4.77 $27, $4.00 $23, $6.00 $34, $5.00 $29, $6.50 $37, $8.00 $46, Ref #4 202E30700 CONCRETE BARRIER REMOVED, (167 FT) Awd $10.00 $1, $11.00 $1, $11.00 $1, $20.00 $3, $22.00 $3, $23.00 $3, $48.00 $8, Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (403 FT) Awd $10.00 $4, $9.00 $3, $12.00 $4, $15.00 $6, $7.00 $2, $18.00 $7, $16.00 $6, Ref #6 202E38000 GUARDRAIL REMOVED, (2728 FT) Awd $2.00 $5, $1.80 $4, $1.90 $5, $1.80 $4, $3.00 $8, $2.00 $5, $2.00 $5, Page 2

3 Ref #7 202E58100 CATCH BASIN REMOVED, (6 EACH) Awd $ $1, $ $2, $ $ $ $1, $ $1, $ $2, $ $1, Ref #8 202E75000 FENCE REMOVED, (498 FT) Awd $2.15 $1, $3.00 $1, $2.00 $ $2.00 $ $2.00 $ $3.70 $1, $5.00 $2, Ref #9 203E10000 EXCAVATION, (10696 CY) Awd $10.00 $106, $14.75 $157, $14.75 $157, $10.00 $106, $14.50 $155, $17.00 $181, $13.00 $139, Ref #10 203E20000 EMBANKMENT, (3610 CY) Awd $8.00 $28, $2.76 $9, $11.00 $39, $7.00 $25, $14.50 $52, $12.00 $43, $7.00 $25, Ref #11 204E10000 SUBGRADE COMPACTION, (5075 SY) Awd $3.00 $15, $1.60 $8, $2.50 $12, $1.00 $5, $1.00 $5, $3.00 $15, $3.00 $15, Ref #12 204E13000 EXCAVATION OF SUBGRADE, (1365 CY) Awd $20.00 $27, $17.00 $23, $14.50 $19, $12.00 $16, $18.00 $24, $20.00 $27, $13.00 $17, Page 3

4 Ref #13 204E30010 GRANULAR MATERIAL, TYPE B, (1365 CY) Awd $40.00 $54, $44.00 $60, $38.00 $51, $36.00 $49, $45.00 $61, $42.00 $57, $35.50 $48, Ref #14 204E45000 PROOF ROLLING, (10 HOUR) Awd $ $5, $ $1, $ $3, $ $1, $ $1, $ $2, $ $1, Ref #15 204E50000 GEOTEXTILE FABRIC, (1245 SY) Awd $1.00 $1, $1.05 $1, $0.40 $ $1.00 $1, $1.00 $1, $2.00 $2, $1.00 $1, Ref #16 206E10500 CEMENT, (43 TON) Awd $ $6, $ $7, $ $7, $ $6, $ $7, $ $7, $ $8, Ref #17 206E11000 CURING COAT, (1426 SY) Awd $0.90 $1, $1.24 $1, $0.99 $1, $0.90 $1, $1.24 $1, $0.99 $1, $1.25 $1, Ref #18 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP, (1426 SY) Awd $6.50 $9, $3.75 $5, $2.67 $3, $6.00 $8, $3.50 $4, $5.06 $7, $7.00 $9, Page 4

5 Ref #19 606E15050 GUARDRAIL, TYPE MGS, ( FT) Awd $16.40 $38, $16.00 $37, $16.00 $37, $16.04 $37, $17.75 $41, $16.40 $38, $16.00 $37, Ref #20 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS, (687.5 FT) Awd $27.20 $18, $27.50 $18, $27.50 $18, $27.56 $18, $30.00 $20, $27.20 $18, $27.50 $18, Ref #21 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (1 EACH) Awd $1, $1, $1, $1, $1, $1, $1, $1, $2, $2, $1, $1, $1, $1, Ref #22 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (3 EACH) Awd $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, Ref #23 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH) Awd $2, $4, $1, $3, $1, $3, $1, $3, $2, $4, $2, $4, $1, $3, Ref #24 606E35006 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, BARRIER DESI, (2 EACH) Awd $3, $6, $2, $5, $2, $5, $2, $5, $2, $5, $3, $6, $2, $5, Page 5

6 Ref #25 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH) Awd $ $1, $ $ $ $ $ $ $ $ $ $1, $ $ Ref #26 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL), (2 EACH) Awd $4, $8, $6, $13, $4, $8, $4, $8, $3, $7, $4, $8, $4, $8, Ref #29 607E15100 FENCE, TYPE 47RA, (282 FT) Awd $23.65 $6, $22.00 $6, $22.00 $6, $22.05 $6, $27.00 $7, $23.65 $6, $22.00 $6, Ref #30 623E40500 REFERENCE MONUMENT, (4 EACH) Awd $ $ $ $1, $ $1, $ $2, $ $1, $ $2, $1, $4, Ref #31 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM) Awd $25, $25, $10, $10, $20, $20, $60, $60, $10, $10, $50, $50, $62, $62, Section 1 - ROADWAY - Totals Awd $562, $598, $622, $582, $735, $745, $755, Page 6

7 Ref #32 206E10500 CEMENT, (698 TON) Awd $ $108, $ $118, $ $118, $ $108, $ $121, $ $118, $ $125, Ref #33 206E11000 CURING COAT, (23480 SY) Awd $0.90 $21, $0.91 $21, $0.99 $23, $0.90 $21, $0.91 $21, $0.99 $23, $1.00 $23, Ref #34 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP, (23480 SY) Awd $3.75 $88, $3.00 $70, $2.67 $62, $6.00 $140, $3.50 $82, $4.05 $95, $2.80 $65, Section 2 - ROADWAY OPTION A - ASPHALT - Totals Awd $217, $210, $204, $270, $224, $236, $214, Ref #38 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (55.8 SY) Awd $ $6, $75.00 $4, $ $7, $ $7, $ $15, $ $6, $ $6, Ref #39 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (272.8 SY) Awd $60.00 $16, $55.00 $15, $40.00 $10, $45.00 $12, $32.23 $8, $65.00 $17, $60.00 $16, Page 7

8 Ref #40 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER, (1151 CY) Awd $70.00 $80, $ $120, $55.00 $63, $85.00 $97, $ $124, $64.00 $73, $ $126, Ref #41 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (2.6 CY) Awd $ $ $ $ $ $ $ $ $1, $2, $ $ $ $1, Ref #42 659E00100 SOIL ANALYSIS TEST, (2 EACH) Awd $ $ $ $ $88.00 $ $ $ $ $ $50.00 $ $ $ Ref #43 659E00300 TOPSOIL, (2111 CY) Awd $5.00 $10, $16.00 $33, $5.00 $10, $10.00 $21, $11.00 $23, $18.00 $37, $20.00 $42, Ref #44 659E10000 SEEDING AND MULCHING, (19020 SY) Awd $0.71 $13, $0.74 $14, $0.63 $11, $1.25 $23, $0.71 $13, $0.65 $12, $3.00 $57, Ref #45 659E14000 REPAIR SEEDING AND MULCHING, (951 SY) Awd $0.50 $ $0.50 $ $0.68 $ $2.00 $1, $0.50 $ $0.50 $ $0.50 $ Page 8

9 Ref #46 659E15000 INTER-SEEDING, (951 SY) Awd $0.50 $ $0.50 $ $0.68 $ $2.00 $1, $0.50 $ $0.01 $ $0.50 $ Ref #47 659E20000 COMMERCIAL FERTILIZER, (2.65 TON) Awd $ $1, $ $1, $ $1, $1, $3, $ $1, $ $1, $ $1, Ref #48 659E31000 LIME, (3.93 ACRE) Awd $65.00 $ $65.00 $ $ $ $10.00 $ $65.00 $ $50.00 $ $65.00 $ Ref #49 659E35000 WATER, (106 MGAL) Awd $1.00 $ $1.00 $ $1.00 $ $10.00 $1, $1.00 $ $1.00 $ $1.00 $ Ref #50 659E40000 MOWING, (43 MSF) Awd $33.00 $1, $33.00 $1, $10.00 $ $15.00 $ $33.00 $1, $1.00 $ $33.00 $1, Ref #51 659E98000 SEEDING, MISC.:NATIVE SEED MIX, (1460 SY) Awd $2.00 $2, $2.00 $2, $2.05 $2, $4.25 $6, $2.00 $2, $3.50 $5, $2.00 $2, Page 9

10 Ref #52 670E00700 DITCH EROSION PROTECTION, (1434 SY) Awd $2.26 $3, $2.26 $3, $1.70 $2, $3.00 $4, $2.26 $3, $2.25 $3, $2.26 $3, Ref #53 832E15001 STORM WATER POLLUTION PREVENTION PLAN, AS PER PLAN, (LUMP SUM) Awd $1, $1, $2, $2, $1, $1, $15, $15, $2, $2, $1, $1, $2, $2, Ref # E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM) Awd $40, $40, $51, $51, $38, $38, $25, $25, $40, $40, $40, $40, $40, $40, Section 4 - EROSION CONTROL - Totals Awd $180, $253, $154, $222, $240, $200, $302, Ref #54 602E20000 CONCRETE MASONRY, (1.35 CY) Awd $1, $2, $3, $4, $1, $2, $2, $2, $1, $2, $4, $6, $2, $2, Ref #55 605E " CONSTRUCTION UNDERDRAINS, (19179 FT) Awd $8.50 $163, $7.65 $146, $9.50 $182, $9.50 $182, $7.25 $139, $11.00 $210, $7.00 $134, Page 10

11 Ref #56 605E " SHALLOW PIPE UNDERDRAINS, (5221 FT) Awd $8.50 $44, $10.50 $54, $11.00 $57, $6.50 $33, $12.00 $62, $11.00 $57, $9.00 $46, Ref #57 605E " SHALLOW PIPE UNDERDRAINS, AS PER PLAN, (1620 FT) Awd $9.89 $16, $29.50 $47, $24.00 $38, $27.00 $43, $12.65 $20, $22.00 $35, $18.00 $29, Ref #58 605E " UNCLASSIFIED PIPE UNDERDRAINS, (984 FT) Awd $10.00 $9, $17.00 $16, $10.00 $9, $6.50 $6, $12.65 $12, $14.00 $13, $10.00 $9, Ref #59 605E " BASE PIPE UNDERDRAINS, (6970 FT) Awd $7.00 $48, $9.00 $62, $7.50 $52, $4.50 $31, $8.00 $55, $8.50 $59, $7.00 $48, Ref #60 611E " CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (1136 FT) Awd $13.00 $14, $20.60 $23, $22.00 $24, $16.00 $18, $25.00 $28, $26.00 $29, $14.00 $15, Ref #61 611E " CONDUIT, TYPE C, , (45 FT) Awd $65.00 $2, $68.00 $3, $70.00 $3, $75.00 $3, $66.00 $2, $62.00 $2, $90.00 $4, Page 11

12 Ref #62 611E " CONDUIT, TYPE B, (111 FT) Awd $95.00 $10, $ $18, $ $11, $ $24, $46.00 $5, $ $26, $ $14, Ref #63 611E " CONDUIT, TYPE C, (940 FT) Awd $50.00 $47, $64.00 $60, $58.00 $54, $50.00 $47, $46.00 $43, $75.00 $70, $60.00 $56, Ref #64 611E " CONDUIT, TYPE C, , (29 FT) Awd $80.00 $2, $ $3, $85.00 $2, $ $3, $80.00 $2, $ $2, $ $4, Ref #65 611E " CONDUIT, TYPE F, (139 FT) Awd $50.00 $6, $ $18, $75.00 $10, $85.00 $11, $58.00 $8, $ $15, $85.00 $11, Ref #66 611E " CONDUIT, TYPE C, FOR DRAINAGE CONNECTION, (50 FT) Awd $70.00 $3, $84.00 $4, $75.00 $3, $70.00 $3, $45.00 $2, $ $6, $59.00 $2, Ref #67 611E96600 CONDUIT, BORED OR JACKED, 15", TYPE B, (249 FT) Awd $ $87, $ $64, $ $62, $ $68, $ $58, $ $99, $ $89, Page 12

13 Ref #68 611E98150 CATCH BASIN, NO. 3, (1 EACH) Awd $3, $3, $5, $5, $3, $3, $3, $3, $3, $3, $3, $3, $3, $3, Ref #69 611E98180 CATCH BASIN, NO. 3A, (5 EACH) Awd $2, $11, $4, $20, $2, $14, $2, $13, $2, $11, $2, $14, $2, $11, Ref #70 611E98410 CATCH BASIN, NO. 8, (10 EACH) Awd $3, $30, $3, $38, $5, $50, $3, $30, $4, $42, $4, $40, $3, $30, Ref #71 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (10 EACH) Awd $ $5, $1, $16, $3, $35, $1, $10, $ $6, $3, $33, $ $6, Ref #72 611E99574 MANHOLE, NO. 3, (3 EACH) Awd $3, $9, $3, $9, $3, $9, $3, $10, $2, $7, $2, $7, $1, $5, Ref #73 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (28 EACH) Awd $ $5, $ $8, $ $7, $ $7, $ $5, $ $7, $ $6, Page 13

14 Section 5 - DRAINAGE - Totals Awd $523, $626, $634, $555, $521, $742, $533, Ref #74 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2", (1483 SY) Awd $4.50 $6, $6.50 $9, $17.00 $25, $14.09 $20, $14.25 $21, $14.25 $21, $15.00 $22, Ref #75 302E46000 ASPHALT CONCRETE BASE, PG64-22, (389 CY) Awd $ $42, $ $41, $ $48, $ $42, $ $42, $ $42, $ $42, Ref #76 304E20000 AGGREGATE BASE, (228 CY) Awd $65.00 $14, $48.50 $11, $50.00 $11, $44.00 $10, $60.00 $13, $70.00 $15, $61.00 $13, Ref #77 407E20000 NON-TRACKING TACK COAT, (201 GAL) Awd $3.85 $ $3.10 $ $2.70 $ $3.86 $ $3.85 $ $3.85 $ $4.00 $ Ref #78 442E00100 ANTI-SEGREGATION EQUIPMENT, (100 CY) Awd $15.25 $1, $0.50 $ $25.00 $2, $15.29 $1, $15.25 $1, $15.25 $1, $15.00 $1, Page 14

15 Ref #79 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE, (59 CY) Awd $ $8, $ $9, $ $10, $ $8, $ $8, $ $8, $ $8, Ref #81 609E24510 CURB, TYPE 4-C, (252 FT) Awd $30.00 $7, $44.00 $11, $28.00 $7, $40.00 $10, $45.00 $11, $55.00 $13, $47.00 $11, Ref #82 806E00101 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A, A, (150 CY) Awd $ $27, $ $28, $ $28, $ $27, $ $27, $ $27, $ $27, Section 6 - PAVEMENT - Totals Awd $110, $111, $134, $122, $127, $132, $129, Ref #83 302E46000 ASPHALT CONCRETE BASE, PG64-22, (6627 CY) Awd $ $728, $ $709, $ $861, $ $730, $ $728, $ $728, $ $728, Ref #84 304E20000 AGGREGATE BASE, (3854 CY) Awd $55.00 $211, $48.50 $186, $44.50 $171, $44.00 $169, $45.00 $173, $51.00 $196, $52.00 $200, Page 15

16 Ref #85 407E20000 NON-TRACKING TACK COAT, (2466 GAL) Awd $3.85 $9, $3.10 $7, $2.70 $6, $3.86 $9, $3.85 $9, $3.85 $9, $4.00 $9, Ref #86 442E00100 ANTI-SEGREGATION EQUIPMENT, (1164 CY) Awd $15.25 $17, $0.50 $ $13.00 $15, $15.29 $17, $15.25 $17, $15.25 $17, $15.00 $17, Ref #87 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE, (1036 CY) Awd $ $150, $ $160, $ $129, $ $150, $ $150, $ $150, $ $150, Ref #88 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (6313 FT) Awd $0.95 $5, $0.95 $5, $0.92 $5, $1.50 $9, $0.88 $5, $0.88 $5, $0.88 $5, Ref #89 618E40200 RUMBLE STRIPS, (CONCRETE), (240 FT) Awd $0.95 $ $0.95 $ $0.92 $ $2.50 $ $23.00 $5, $23.00 $5, $23.00 $5, Ref #90 806E00101 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A, A, (888 CY) Awd $ $164, $ $168, $ $159, $ $164, $ $164, $ $164, $ $164, Page 16

17 Section 7 - PAVEMENT OPTION A - ASPHALT - Totals Awd $1,288, $1,239, $1,350, $1,252, $1,255, $1,278, $1,283, Ref #94 620E00500 DELINEATOR, POST GROUND MOUNTED TYPE C, (33 EACH) Awd $55.00 $1, $45.00 $1, $40.00 $1, $45.10 $1, $45.00 $1, $55.00 $1, $45.00 $1, Ref #95 621E00100 RPM, (111 EACH) Awd $31.50 $3, $49.55 $5, $31.50 $3, $31.57 $3, $31.50 $3, $31.50 $3, $31.50 $3, Ref #96 626E00102 BARRIER REFLECTOR, TYPE 1, 1-WAY, (60 EACH) Awd $7.40 $ $10.00 $ $10.00 $ $10.02 $ $10.00 $ $7.40 $ $10.00 $ Ref #97 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (121.4 FT) Awd $12.50 $1, $9.50 $1, $9.50 $1, $9.52 $1, $8.00 $ $12.50 $1, $9.50 $1, Ref #98 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (29 FT) Awd $15.00 $ $10.00 $ $10.00 $ $10.02 $ $10.25 $ $15.00 $ $10.00 $ Page 17

18 Ref #99 630E08600 SIGN POST REFLECTOR, (2 EACH) Awd $45.00 $ $38.00 $ $38.00 $ $38.09 $ $45.00 $ $45.00 $ $38.00 $76.00 Ref # E80100 SIGN, FLAT SHEET, (65.5 SF) Awd $25.00 $1, $17.50 $1, $17.50 $1, $17.54 $1, $16.00 $1, $25.00 $1, $17.50 $1, Ref # E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (8 EACH) Awd $10.00 $ $15.00 $ $15.00 $ $15.04 $ $25.00 $ $10.00 $ $15.00 $ Ref # E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (8 EACH) Awd $15.00 $ $15.00 $ $15.00 $ $15.04 $ $40.00 $ $15.00 $ $15.00 $ Ref # E30000 REMOVAL OF PAVEMENT MARKING, (14565 FT) Awd $0.40 $5, $0.35 $5, $0.40 $5, $0.40 $5, $0.45 $6, $0.45 $6, $0.45 $6, Section 9 - TRAFFIC CONTROL - Totals Awd $15, $15, $14, $14, $15, $16, $15, Page 18

19 Ref # E00104 EDGE LINE, 6", (4.24 MILE) Awd $3, $15, $3, $15, $3, $15, $3, $15, $3, $15, $3, $15, $3, $15, Ref # E00204 LANE LINE, 6", (2.32 MILE) Awd $2, $5, $1, $3, $1, $3, $1, $3, $2, $5, $2, $5, $2, $5, Ref #106 AA1 646E10010 EDGE LINE, 6" (ALTERNATE 1), (0.28 MILE) Awd $26, $7, $19, $5, $19, $5, $19, $5, $26, $7, $26, $7, $26, $7, Ref #107 AA1 646E10110 LANE LINE, 6" (ALTERNATE 1), (0.14 MILE) Awd $16, $2, $18, $2, $18, $2, $18, $2, $16, $2, $16, $2, $16, $2, Ref #108 AA2 646E10010 EDGE LINE, 6" (POLYCARB MARK 55.4) (ALTERNATE 2), (0.28 MILE) Awd $30, $8, $30, $8, $23, $6, $23, $6, $30, $8, $30, $8, $30, $8, Ref #109 AA2 646E10110 LANE LINE, 6" (POLYCARB MARK 55.4) (ALTERNATE 2), (0.14 MILE) Awd $21, $3, $25, $3, $22, $3, $22, $3, $21, $3, $21, $3, $21, $3, Page 19

20 Section 10 - TRAFFIC CONTROL OPTION A - ASPHALT - Totals Awd $41, $38, $36, $36, $41, $41, $41, Ref # E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (320 HOUR) Awd $65.00 $20, $70.00 $22, $65.00 $20, $80.00 $25, $65.00 $20, $85.00 $27, $73.50 $23, Ref # E11500 WORKSITE TRAFFIC SUPERVISOR, (20 MNTH) Awd $5, $107, $3, $60, $12, $250, $7, $150, $9, $190, $3, $60, $ $14, Ref # E12484 WORK ZONE INCREASED PENALTIES SIGN, (2 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $ Ref # E12500 REPLACEMENT SIGN, (10 EACH) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $3, $ $1, Ref # E12600 REPLACEMENT DRUM, (40 EACH) Awd $50.00 $2, $50.00 $2, $50.00 $2, $45.00 $1, $50.00 $2, $70.00 $2, $50.00 $2, Page 20

21 Ref # E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY) Awd $ $2, $ $3, $ $1, $1, $11, $1, $11, $ $7, $ $4, Ref # E18000 MAINTAINING TRAFFIC, MISC.: BRIDGE DECK AND PAVEME, (18800 EACH) Awd $1.00 $18, $1.00 $18, $1.00 $18, $1.00 $18, $1.20 $22, $1.00 $18, $1.00 $18, Ref # E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT, (1.1 MILE) Awd $ $ $ $ $ $ $ $ $ $ $ $ $ $ Ref # E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT, (3.5 MILE) Awd $1, $4, $1, $4, $1, $4, $1, $4, $1, $4, $ $2, $ $2, Ref # E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN, (3800 FT) Awd $0.60 $2, $0.60 $2, $0.60 $2, $0.60 $2, $0.60 $2, $0.55 $2, $0.55 $2, Ref # E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM) Awd $330, $330, $90, $90, $165, $165, $135, $135, $65, $65, $200, $200, $150, $150, Page 21

22 Ref # E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER, (75 SY) Awd $40.50 $3, $99.00 $7, $ $15, $40.59 $3, $40.50 $3, $40.50 $3, $39.00 $2, Ref # E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER, (1550 SY) Awd $38.00 $58, $34.00 $52, $30.00 $46, $38.09 $59, $38.00 $58, $38.00 $58, $38.00 $58, Ref # E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER, (125 SY) Awd $71.00 $8, $52.00 $6, $ $19, $71.16 $8, $71.00 $8, $71.00 $8, $73.00 $9, Ref # E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER, (125 SY) Awd $52.00 $6, $82.00 $10, $ $19, $52.12 $6, $52.00 $6, $52.00 $6, $62.00 $7, Ref # E10000 WATER, (26 MGAL) Awd $55.00 $1, $50.00 $1, $45.00 $1, $10.00 $ $ $5, $80.00 $2, $43.00 $1, Ref # E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY, (40 SNMT) Awd $ $24, $ $11, $ $28, $ $32, $ $28, $ $16, $ $30, Page 22

23 Section 13 - MAINTENANCE OF TRAFFIC - Totals Awd $593, $295, $597, $461, $431, $420, $331, Ref # E10000 STABILIZED CRUSHED AGGREGATE, (330 CY) Awd $75.00 $24, $75.00 $24, $58.00 $19, $75.00 $24, $62.00 $20, $63.00 $20, $60.00 $19, Ref # E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (10 EACH) Awd $1, $19, $2, $23, $1, $19, $2, $20, $2, $20, $3, $30, $2, $20, Ref # E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (1 EACH) Awd $1, $1, $5, $5, $2, $2, $2, $2, $2, $2, $5, $5, $2, $2, Ref # E12800 WORK ZONE RAISED PAVEMENT MARKER, (3864 EACH) Awd $12.00 $46, $15.75 $60, $4.95 $19, $4.50 $17, $21.25 $82, $7.15 $27, $5.00 $19, Ref # E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (1382 EACH) Awd $5.00 $6, $41.00 $56, $22.10 $30, $31.28 $43, $22.10 $30, $32.65 $45, $15.00 $20, Page 23

24 Ref # E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY), (1699 EACH) Awd $10.00 $16, $4.50 $7, $5.00 $8, $6.00 $10, $8.00 $13, $7.45 $12, $9.00 $15, Ref # E13312 BARRIER REFLECTOR, TYPE 2 (ONE-WAY), (94 EACH) Awd $10.00 $ $9.00 $ $8.00 $ $6.00 $ $9.00 $ $10.00 $ $13.00 $1, Ref # E13350 OBJECT MARKER, ONE WAY, (913 EACH) Awd $8.00 $7, $10.00 $9, $12.00 $10, $8.00 $7, $11.00 $10, $12.00 $10, $13.00 $11, Ref # E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT, (4.09 MILE) Awd $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, Ref # E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT, (13.96 MILE) Awd $ $13, $ $13, $ $13, $ $13, $ $13, $ $9, $ $9, Ref # E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN, (18550 FT) Awd $0.65 $12, $0.65 $12, $0.65 $12, $0.65 $12, $0.65 $12, $0.55 $10, $0.55 $10, Page 24

25 Ref # E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER, (12759 SY) Awd $30.00 $382, $29.50 $376, $34.50 $440, $30.07 $383, $30.00 $382, $30.00 $382, $31.00 $395, Ref # E41000 PORTABLE BARRIER, 32", (18370 FT) Awd $8.00 $146, $7.00 $128, $8.00 $146, $10.00 $183, $10.00 $183, $11.00 $202, $12.00 $220, Ref # E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (760 FT) Awd $13.00 $9, $25.00 $19, $20.00 $15, $25.00 $19, $20.00 $15, $28.00 $21, $26.00 $19, Ref # E01000 PAVEMENT PLANING, ASPHALT CONCRETE(9" THICK), (12759 SY) Awd $8.50 $108, $6.00 $76, $10.00 $127, $6.16 $78, $6.15 $78, $6.15 $78, $7.00 $89, Ref # E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER, (12961 SY) Awd $30.00 $388, $42.00 $544, $38.00 $492, $42.25 $547, $40.00 $518, $41.00 $531, $30.00 $388, Ref # E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT, (1.65 MILE) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $ $ $ Page 25

26 Ref # E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT, (1.65 MILE) Awd $1, $2, $1, $2, $1, $2, $1, $2, $1, $2, $ $1, $ $1, Section 14 - MAINTENANCE OF TRAFFIC OPTION A - ASPHAL - Totals Awd $1,192, $1,364, $1,363, $1,369, $1,389, $1,393, $1,248, Ref # E70000 SPECIAL - ENVIRONMENTAL, SECTION 4F, IDENTIFIED S, (LUMP SUM) Awd $25, $25, $8, $8, $1, $1, $190, $190, $6, $6, $15, $15, $5, $5, Ref # E30000 EROSION CONTROL, ( EACH) Awd $1.00 $120, $1.00 $120, $1.00 $120, $1.00 $120, $1.00 $120, $1.00 $120, $1.00 $120, Ref # E70000 SPECIAL - ENVIRONMENTALSTREAM SURVEY, (LUMP SUM) Awd $5, $5, $20, $20, $4, $4, $9, $9, $8, $8, $4, $4, $6, $6, Section 16 - ENVIRONMENTAL / REMEDIATION - Totals Awd $150, $148, $126, $320, $136, $139, $131, Page 26

27 Ref # E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN, (LUMP SUM) Awd $225, $225, $130, $130, $100, $100, $200, $200, $250, $250, $250, $250, $407, $407, Ref # E22900 APPROACH SLAB REMOVED, (187 SY) Awd $30.00 $5, $35.00 $6, $25.00 $4, $35.00 $6, $35.00 $6, $45.00 $8, $40.00 $7, Ref # E23500 WEARING COURSE REMOVED, (1227 SY) Awd $5.00 $6, $4.50 $5, $3.00 $3, $5.00 $6, $10.00 $12, $10.00 $12, $7.50 $9, Ref # E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM) Awd $75, $75, $140, $140, $125, $125, $200, $200, $250, $250, $275, $275, $200, $200, Ref # E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM) Awd $125, $125, $100, $100, $115, $115, $135, $135, $125, $125, $140, $140, $130, $130, Ref # E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM) Awd $20, $20, $20, $20, $19, $19, $20, $20, $25, $25, $17, $17, $25, $25, Page 27

28 Ref # E00200 STEEL PILES HP12X53, FURNISHED, (1920 FT) Awd $35.00 $67, $30.00 $57, $27.00 $51, $40.00 $76, $40.00 $76, $40.00 $76, $42.00 $80, Ref # E00250 STEEL PILES HP12X53, DRIVEN, (1600 FT) Awd $9.00 $14, $10.00 $16, $23.00 $36, $5.00 $8, $10.00 $16, $10.00 $16, $12.00 $19, Ref # E93300 STEEL POINTS OR SHOES, (64 EACH) Awd $ $8, $ $7, $95.00 $6, $ $8, $ $8, $93.00 $5, $ $7, Ref # E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, ( LB) Awd $1.05 $302, $1.03 $296, $1.00 $288, $1.00 $288, $1.10 $317, $1.00 $288, $1.10 $317, Ref # E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (849 CY) Awd $ $466, $ $598, $ $615, $ $657, $ $573, $ $662, $ $636, Ref # E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH) Awd $4, $8, $3, $6, $2, $5, $4, $8, $4, $8, $3, $7, $3, $7, Page 28

29 Ref # E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS, (64 CY) Awd $ $41, $ $49, $1, $80, $ $54, $ $54, $1, $64, $1, $64, Ref # E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD, (212 CY) Awd $ $116, $ $143, $ $127, $ $137, $ $132, $ $180, $ $122, Ref # E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (276 CY) Awd $ $82, $ $96, $ $96, $ $96, $ $89, $ $88, $ $93, Ref # E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1228 SY) Awd $22.50 $27, $20.00 $24, $21.00 $25, $22.50 $27, $22.50 $27, $20.00 $24, $20.00 $24, Ref # E33000 TYPE 2 WATERPROOFING, (11 SY) Awd $25.00 $ $50.00 $ $50.00 $ $50.00 $ $40.00 $ $40.00 $ $42.00 $ Ref # E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX, ( LB) Awd $1.58 $1,254, $1.65 $1,310, $1.64 $1,302, $1.85 $1,469, $1.85 $1,469, $1.65 $1,310, $1.85 $1,469, Page 29

30 Ref # E20000 WELDED STUD SHEAR CONNECTORS, (7665 EACH) Awd $3.05 $23, $4.25 $32, $3.00 $22, $3.10 $23, $3.25 $24, $3.25 $24, $3.00 $22, Ref # E " PREFORMED EXPANSION JOINT FILLER, (18 SF) Awd $6.00 $ $5.00 $ $10.00 $ $6.00 $ $5.50 $ $12.00 $ $19.00 $ Ref # E " PREFORMED EXPANSION JOINT FILLER, (366 SF) Awd $8.00 $2, $6.00 $2, $7.00 $2, $11.00 $4, $7.00 $2, $13.00 $4, $10.00 $3, Ref # E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (162 FT) Awd $35.00 $5, $26.00 $4, $27.00 $4, $26.00 $4, $27.00 $4, $45.00 $7, $33.00 $5, Ref # E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (7 EACH) Awd $2, $18, $2, $16, $2, $17, $2, $17, $2, $16, $1, $13, $2, $18, Ref # E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (14 EACH) Awd $1, $26, $1, $24, $1, $26, $2, $28, $2, $32, $1, $22, $2, $30, Page 30

31 Ref # E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (193 CY) Awd $75.00 $14, $70.00 $13, $78.00 $15, $90.00 $17, $80.00 $15, $75.00 $14, $ $20, Ref # E " PERFORATED CORRUGATED PLASTIC PIPE, (181 FT) Awd $15.00 $2, $9.00 $1, $4.00 $ $10.00 $1, $7.00 $1, $6.00 $1, $9.00 $1, Ref # E " NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (20 FT) Awd $15.00 $ $19.00 $ $11.00 $ $10.00 $ $22.00 $ $35.00 $ $15.00 $ Ref # E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK, (50 FT) Awd $1, $56, $ $30, $ $32, $1, $62, $1, $76, $1, $55, $ $40, Ref # E94906 DRILLED SHAFTS, 54" DIAMETER, ABOVE BEDROCK, (70 FT) Awd $ $45, $ $28, $ $21, $ $28, $ $28, $ $49, $ $44, Ref # E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (449 SY) Awd $ $101, $ $101, $ $101, $ $105, $ $112, $ $125, $ $116, Page 31

32 Ref # E90030 TYPE C INSTALLATION, (135 FT) Awd $ $20, $ $29, $ $19, $ $30, $ $27, $ $27, $ $27, Ref # E00400 SPECIAL - STRUCTURES PILOT EXPLORATION HOLES, (5 EACH) Awd $2, $12, $2, $13, $3, $18, $2, $10, $4, $21, $3, $15, $3, $15, Ref # E13000 SPECIAL - FORM LINER, (2172 SF) Awd $6.50 $14, $10.00 $21, $4.00 $8, $16.00 $34, $10.75 $23, $14.00 $30, $15.00 $32, Ref # E10010 ARMORLESS PREFORMED JOINT SEAL(TYPE C), (135 FT) Awd $35.00 $4, $44.00 $5, $45.00 $6, $45.00 $6, $30.00 $4, $38.00 $5, $52.00 $7, Section 17 - STRUCTURE OVER 20 FOOT SPAN (FRA Totals Awd $3,197, $3,335, $3,301, $3,775, $3,832, $3,823, $4,008, Ref # E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN, (LUMP SUM) Awd $225, $225, $130, $130, $96, $96, $200, $200, $250, $250, $250, $250, $407, $407, Page 32

33 Ref # E22900 APPROACH SLAB REMOVED, (187 SY) Awd $30.00 $5, $35.00 $6, $25.00 $4, $35.00 $6, $35.00 $6, $45.00 $8, $40.00 $7, Ref # E23500 WEARING COURSE REMOVED, (1227 SY) Awd $5.00 $6, $4.50 $5, $3.00 $3, $5.00 $6, $10.00 $12, $10.00 $12, $9.00 $11, Ref # E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM) Awd $70, $70, $140, $140, $145, $145, $200, $200, $250, $250, $275, $275, $200, $200, Ref # E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM) Awd $130, $130, $100, $100, $100, $100, $135, $135, $125, $125, $140, $140, $130, $130, Ref # E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM) Awd $20, $20, $20, $20, $20, $20, $20, $20, $25, $25, $17, $17, $25, $25, Ref # E00200 STEEL PILES HP12X53, FURNISHED, (1760 FT) Awd $35.00 $61, $30.00 $52, $27.00 $47, $40.00 $70, $40.00 $70, $40.00 $70, $42.00 $73, Page 33

34 Ref # E00250 STEEL PILES HP12X53, DRIVEN, (1440 FT) Awd $9.00 $12, $10.00 $14, $25.00 $36, $5.00 $7, $10.00 $14, $10.00 $14, $12.00 $17, Ref # E93300 STEEL POINTS OR SHOES, (64 EACH) Awd $ $8, $ $6, $95.00 $6, $ $8, $ $8, $93.00 $5, $ $7, Ref # E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, ( LB) Awd $1.05 $303, $1.03 $297, $0.97 $280, $1.00 $289, $1.10 $318, $1.00 $289, $1.10 $318, Ref # E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (849 CY) Awd $ $466, $ $598, $ $615, $ $657, $ $573, $ $662, $ $636, Ref # E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH) Awd $4, $8, $3, $6, $2, $4, $4, $8, $4, $8, $3, $7, $3, $7, Ref # E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS, (64 CY) Awd $ $41, $ $49, $1, $80, $ $54, $ $54, $1, $64, $1, $64, Page 34

35 Ref # E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD, (214 CY) Awd $ $117, $ $144, $ $133, $ $139, $ $133, $ $181, $ $124, Ref # E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (273 CY) Awd $ $81, $ $95, $ $88, $ $95, $ $88, $ $87, $ $92, Ref # E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1269 SY) Awd $22.50 $28, $20.00 $25, $21.00 $26, $22.50 $28, $22.50 $28, $20.00 $25, $20.00 $25, Ref # E33000 TYPE 2 WATERPROOFING, (11 SY) Awd $25.00 $ $50.00 $ $50.00 $ $50.00 $ $40.00 $ $40.00 $ $42.00 $ Ref # E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX, ( LB) Awd $1.58 $1,254, $1.65 $1,310, $1.64 $1,302, $1.85 $1,469, $1.85 $1,469, $1.65 $1,310, $1.85 $1,469, Ref # E20000 WELDED STUD SHEAR CONNECTORS, (7665 EACH) Awd $3.05 $23, $4.25 $32, $3.00 $22, $3.10 $23, $3.25 $24, $3.25 $24, $3.00 $22, Page 35

36 Ref # E " PREFORMED EXPANSION JOINT FILLER, (18 SF) Awd $6.00 $ $5.00 $ $6.00 $ $6.00 $ $5.50 $ $12.00 $ $19.00 $ Ref # E " PREFORMED EXPANSION JOINT FILLER, (366 SF) Awd $8.00 $2, $6.00 $2, $8.00 $2, $11.00 $4, $7.00 $2, $13.00 $4, $10.00 $3, Ref # E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (162 FT) Awd $35.00 $5, $26.00 $4, $27.00 $4, $26.00 $4, $27.00 $4, $45.00 $7, $33.00 $5, Ref # E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (7 EACH) Awd $2, $18, $2, $16, $2, $17, $3, $21, $2, $16, $1, $13, $2, $18, Ref # E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (14 EACH) Awd $1, $26, $1, $24, $1, $26, $2, $28, $2, $32, $1, $22, $2, $30, Ref # E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (193 CY) Awd $75.00 $14, $70.00 $13, $75.00 $14, $90.00 $17, $80.00 $15, $75.00 $14, $ $20, Page 36

37 Ref # E " PERFORATED CORRUGATED PLASTIC PIPE, (181 FT) Awd $15.00 $2, $9.00 $1, $3.00 $ $10.00 $1, $7.00 $1, $6.00 $1, $9.00 $1, Ref # E " NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (20 FT) Awd $15.00 $ $19.00 $ $11.00 $ $10.00 $ $22.00 $ $35.00 $ $15.00 $ Ref # E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK, (50 FT) Awd $1, $56, $ $30, $ $37, $1, $62, $1, $76, $1, $55, $ $40, Ref # E94906 DRILLED SHAFTS, 54" DIAMETER, ABOVE BEDROCK, (70 FT) Awd $ $45, $ $28, $ $24, $ $28, $ $28, $ $49, $ $44, Ref # E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (449 SY) Awd $ $101, $ $101, $ $104, $ $105, $ $112, $ $125, $ $116, Ref # E90030 TYPE C INSTALLATION, (135 FT) Awd $ $20, $ $29, $ $19, $ $30, $ $27, $ $27, $ $27, Page 37

38 Ref # E00400 SPECIAL - STRUCTURES PILOT EXPLORATION HOLES, (5 EACH) Awd $2, $12, $2, $13, $4, $20, $2, $10, $4, $21, $3, $15, $3, $15, Ref # E13000 SPECIAL - FORM LINER, (2172 SF) Awd $6.50 $14, $10.00 $21, $4.00 $8, $16.00 $34, $10.75 $23, $14.00 $30, $15.00 $32, Ref # E10010 ARMORLESS PREFORMED JOINT SEAL(TYPE C), (135 FT) Awd $35.00 $4, $44.00 $5, $45.00 $6, $45.00 $6, $30.00 $4, $38.00 $5, $52.00 $7, Section 18 - STRUCTURE OVER 20 FOOT SPAN (FRA Totals Awd $3,192, $3,330, $3,301, $3,773, $3,826, $3,817, $4,003, Ref # E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $75, $75, $55, $55, $60, $60, $110, $110, $60, $60, $70, $70, $60, $60, Ref # E10000 CPM PROGRESS SCHEDULE, (LUMP SUM) Awd $2, $2, $10, $10, $20, $20, $7, $7, $4, $4, $4, $4, $5, $5, Page 38

39 Ref # E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM) Awd $197, $197, $203, $203, $125, $125, $200, $200, $270, $270, $150, $150, $250, $250, Ref # E16021 FIELD OFFICE, TYPE C, AS PER PLAN, (20 MNTH) Awd $3, $60, $8, $170, $3, $60, $2, $52, $3, $70, $4, $80, $4, $80, Ref # E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM) Awd $100, $100, $80, $80, $95, $95, $39, $39, $50, $50, $60, $60, $165, $165, Ref # E10000 MOBILIZATION, (LUMP SUM) Awd $400, $400, $400, $400, $400, $400, $400, $400, $400, $400, $400, $400, $400, $400, Section 19 - INCIDENTALS - Totals Awd $834, $918, $760, $808, $854, $764, $960, Page 39

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

The Tulalip Tribes of Washington

The Tulalip Tribes of Washington The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

PAGE 1 of 18 WEIGHTED AVERAGE

PAGE 1 of 18 WEIGHTED AVERAGE UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201

More information

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND 1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

Schedule of Pay Items

Schedule of Pay Items Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All

More information

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia,

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY (1) McKenna General Engineering, (2) Zusser Company, (3) Palp, (4) C. W. Crosser Construction, 1,155,777.00 1,306,820.00 1,439,957.00 1,461,985.00 1 IMPLEMENTATION OF THE SWP 1 15,000.00 LS 15,000.00 2

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

DURISOL ANCHORED RETAINING WALL SYSTEM (DARWS)

DURISOL ANCHORED RETAINING WALL SYSTEM (DARWS) DURISOL ANCHORED RETAINING WALL SYSTEM (DARWS) Project - DeWitt and Ridge Roads Intersection, Stoney Creek, Ontario Located on the slope of the Niagara Escarpment 11 meter wall heights with Durisol s Traffic

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

OTTAWA COUNTY ROAD COMMISSION Bid Comparison OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary Construction Contract Bid Evaluation Summary I. Lowest responsive, responsible bidder: Eastman Aggregate Enterprises, LLC (Primary) and Rio Bak Corporation (Secondary) II. Bidders, ranked from lowest to

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information