1

2

3

4 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component Qnty Cost Notes Track 1 $ 300, Bogies Frame & Wheels 6 $ 900, Added 2 bogies to distribute load every 60 degress Center Post 1 $ 100, Added centering post to ensure rotation point Rack (90 degrees) 1 $ 400, Friction drive bogie does not have enough friction Turning Machinery 1 $ 600, End Lift Machinery 2 $ 600, Rim Girder Structure 1 $ 80, To support swing span DL Electrical Work 3 $ 575, Motors, conduit, controls Total: $ 3,555, Alternative 2 Center Pivot Bearing Support Alternative Based on Simplicity Component Qnty Cost Notes Center Bearing (1) $ 250, Balance Wheels (8) $ 400, To meet AASHTO code Track (1) $ 200, Rack (1) $ 400, Turning Machinery $ 600, Span drive motor 20 HP End Lift Machinery $ 600, End lift motors 10 HP Center Bearing Support $ 50, Transfer DL to center pivot bearing Electric Motors / Conduit $ 575, Motors, conduit, controls Total: $ 3,075, Alternative 3 Bogie Lift and Turn Alternative Notes: 1. Eliminated due to cost of lifting 6 bogies 2. Advantage eliminate end lifts and costs 3. Disadvantage complex synchronizing system at 6 bogies and power to raise entire DL of swing span General Notes and Assumptions: 1. Electrical power and control supplied by 2" PVC coated RGS conduits and conductors installed from the control house on east approach to the pivot pier and from the pivot pier to the ends of the swing span. 2. Wireless ccommunication from the control house to the west approach for control of west gate. Power supplied to west gate from west approach. 3. Simple PLC control with safety interlocks between lifts and turning systems. Cost does not include control house to be provided by AW Cost does not include utility bridge from approach to pivot pier to be provided by AW. Cost does not include bridge lighting or navigation lighting cost to be provided by AW. Cost does not include pedestrian gates cost to be provided by AW.

5 AMERICAN STREET IMPROVEMENT PROJECT PRELIMINARY CONSTRUCTION ESTIMATE ITEM NO. DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST CONCRETE BASE COURSE, 8" (Full Dp Restoration for curb where the new Footway is to be built to remove lay by) SY , CONCRETE CURB (Where the new Footway is to be built to remove lay by) LF , CONCRETE FOOTWAY PAVING ( New FTWY to remove lay by) SY , RESET MANHOLE EA , BUMPOUTS (Including Drainage) INT , ,540, MOBILIZATION LS 1 100, , PROJECT VEHICLE MON 12 1, , MATERIAL TESTING EQUIPMENT, MATERIALS & SERVICE LS 1 5, , INSPECTOR'S FIELD OFFICE, TYPE A LS 1 50, , MAINTENANCE & PROTECTION OF TRAFFIC LS 1 50, , REMOVE TREE EA , MILLING SY , REMOVE TRACK STRUCTURE (Footway & Roadway & restoration of both) SY , LATEX MODIFIED EMULSION PAVING SYSTEM (Track area ) SY , SAW CUTTING, CONCRETE FOOTWAY- (To remove track & Lay by) LF , SAW CUTTING,CONCRETE ROADWAY-(To remove track & Lay by) LF , SUPERPAVE WEARING COURSE, pg, 1 1/12" Dp., SRL-H SY , SUPERPAVE BINDER COURSE, PG, Variable Depth TON , SUPERPAVE LEVELING COURSE (Track Area) TON , TOPSOIL SY SEEDING & SOIL SUPPLEMENTS SY TREE (2.5" TO 3.0" DIAM.) EA , PRUNING HR " SUBABSE INCLUDING SUBGRADING(Full Dp Restoration where the new Footway is to be built to remove lay by SY , SUBTOTAL HIGHWAY ITEMS 3,121, PECO SERVICES, STREET LIGHTING LS 1 50, , STREET LIGHT WIRING - # 2 AWG LF STREET LIGHTING CONDUIT, 2 INCH LF , STREET LIGHT LUMINARE, 250-W HPS EA , REMOVAL OF EXISTING STREET LIGHT ARM AND LUMINARE FROM EXISTING WOOD UTILITY POLE EA REMOVAL OF STREET LIGHT FOUNDATION EA , STREET LIGHT POLE FOUNDATION, 15 INCH BOLT CIRCLE EA , REMOVAL OF EXISTING LIGHT POLE AND LUMINARE EA , STREET LIGHT POLE AND 6 FT BRACKET, 30 FEET EA 80 1, , FURNISH AND INSTALL 6' BRACKET ON WOOD UTILITY POLE EA SUBTOTAL STREET LIGHTING ITEMS 216, TRAFFIC SIGNS, POST MOUNTED EA ,100.00

6 TRAFFIC SIGNS, OVERHEAD MOUNTED EA BREAKAWAY STEEL SQUARE POST EA REMOVALTRAFFIC SIGN POLES EA , THERMOPLASTIC PAVEMENT MARKINGS, 4" WHITE (Parking lanes & Angle Parking & Bus & Parking Box) LF 40, , THERMOPLASTIC PAVEMENT MARKINGS, 24" WHITE (all continentals) LF , THERMOPLASTIC PAVEMENT MARKINGS, 4" YELLOW LF , SUBTOTAL TRAFFIC ITEMS 72, SUB TOTAL-CONSTRUCTION ITEMS: 3,410, INSPECTION-12% 409, CONTINGENCY-10% 341, GRAND TOTAL 4,160,919.80

7

8

9 AMERICAN STREET IMPROVEMENT PROJECT PRELIMINARY CONSTRUCTION ESTIMATE ITEM NO. DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST LAYBY CONCRETE BASE COURSE, 8" SY , CONCRETE CURB LF , CONCRETE FOOTWAY PAVING SY , " SUB BASE INCLUDING SUBGRADING SY , STREET LIGHT WIRING - # 2 AWG (Move Street lights close to the curb) LF STREET LIGHTING CONDUIT, 2 INCH (Move Street lights close to the curb) LF , REMOVAL OF STREET LIGHT FOUNDATION (Remove Street lights close to the curb) EA , STREET LIGHT POLE FOUNDATION, 15 INCH BOLT CIRCLE (Move Street lights close to the curb) EA 5 1, , REMOVALTRAFFIC SIGN POLES (remove existing layby sign poles) EA , , BUMPOUTS / ADA BUMPOUTS (Including Drainage) INT , ,960, SIDING REMOVAL REMOVE TRACK STRUCTURE (Footway & Roadway & restoration of both) SY ,400, SAW CUTTING, CONCRETE FOOTWAY- (To remove track & Lay by) LF , SAW CUTTING,CONCRETE ROADWAY-(To remove track & Lay by) LF , ,478, RESURFACING RESET MANHOLE EA , MILLING SY , LATEX MODIFIED EMULSION PAVING SYSTEM (Track area ) SY , SUPERPAVE WEARING COURSE, pg, 1 1/12" Dp., SRL-H SY , SUPERPAVE BINDER COURSE, PG, Variable Depth TON , SUPERPAVE LEVELING COURSE (Track Area) TON , THERMOPLASTIC PAVEMENT MARKINGS, 4" WHITE (Parking lanes & Angle Parking & Bus & Parking Box) LF 40, , THERMOPLASTIC PAVEMENT MARKINGS, 24" WHITE (all continentals) LF , THERMOPLASTIC PAVEMENT MARKINGS, 4" YELLOW LF , ,141, STREET LIGHTING PECO SERVICES, STREET LIGHTING LS 1 50, , STREET LIGHT LUMINARE, 250-W HPS EA , REMOVAL OF EXISTING STREET LIGHT ARM AND LUMINARE FROM EXISTING WOOD UTILITY POLE EA REMOVAL OF EXISTING LIGHT POLE AND LUMINARE EA , STREET LIGHT POLE AND 6 FT BRACKET, 30 FEET EA 80 1, , FURNISH AND INSTALL 6' BRACKET ON WOOD UTILITY POLE EA ,090.00

10 LANDSCAPING REMOVE TREE EA 5 1, , TOPSOIL SY , SEEDING & SOIL SUPPLEMENTS SY TREE (2.5" TO 3.0" DIAM.) EA , PRUNING CH , TRAFFIC 2 SIGNALIZED INTERSECTIONS EA 2 150, , TRAFFIC SIGNS, POST MOUNTED EA , TRAFFIC SIGNS, OVERHEAD MOUNTED EA , BREAKAWAY STEEL SQUARE POST EA , MISCELLANEOUS MOBILIZATION LS 1 500, , PROJECT VEHICLE DAY , MATERIAL TESTING EQUIPMENT, MATERIALS & SERVICE LS 1 7, , INSPECTOR'S FIELD OFFICE, TYPE A LS 1 32, , MAINTENANCE & PROTECTION OF TRAFFIC LS 1 500, , ,058, SUB TOTAL-CONSTRUCTION ITEMS: 7,821, INSPECTION-15% 1,173, GRAND TOTAL 8,994,887.73

11

12

13 AMERICAN STREET IMPROVEMENT PROJECT PRELIMINARY CONSTRUCTION ESTIMATE ITEM NO. DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST BUMPOUT CONCRETE CURB LF , CONCRETE CURB FOR CURB CUT RAMP LF , SAWCUTTING FOR CURB CUT RAMP LF , " CONCRETE FOOTWAY PAVING SY , " VIRTIFIED CLAY PIPE LF , REBUILD MANHOLE VF , ' CITY INLET EA 2 4, , SEWER VENT BOX EA REBUILD 7" WATER VALVE BOX EA ' OPEN MOUTH GRATE INLET, BICYCLE SAFE EA 4 4, , ' GRATE INLET, BICYCLE SAFE EA 1 5, , REMOVE BITUMINOUS PAVING SY , SAWCUTTING ROADWAY, FULL DEPTH LF , CURB SAWING LF , REMOVE AND SEAL INLET EA , " SUB BASE INCLUDING SUBGRADING SY , RELOCATE FIRE HYDRANT EA 1 3, , , RESURFACING RESET MANHOLE EA , MILLING SY , LATEX MODIFIED EMULSION PAVING SYSTEM (Track area ) SY , SUPERPAVE WEARING COURSE, pg, 1 1/12" Dp., SRL-H SY , SUPERPAVE BINDER COURSE, PG, Variable Depth TON , SUPERPAVE LEVELING COURSE (Track Area) TON , THERMOPLASTIC PAVEMENT MARKINGS, 4" WHITE ( Angle Parking all along & Bus & Parking Box) LF 60, , THERMOPLASTIC PAVEMENT MARKINGS, 24" WHITE (all continentals) LF , THERMOPLASTIC PAVEMENT MARKINGS, 4" YELLOW LF , THERMOPLASTIC PAVEMENT MARKINGS, 24" YELLOW LF , THERMOPLASTIC PAVEMENT MARKINGS, LEFT ARROW EA , THERMOPLASTIC PAVEMENT MARKINGS, BUS LEGEND EA , , STREET LIGHTING PECO SERVICES, STREET LIGHTING LS 1 50, , STREET LIGHT LUMINARE, 250-W HPS EA , REMOVAL OF EXISTING STREET LIGHT ARM AND LUMINARE FROM EXISTING WOOD UTILITY POLE EA REMOVAL OF STREET LIGHT FOUNDATION (Remove Street lights) EA , STREET LIGHT POLE FOUNDATION, 15 INCH BOLT CIRCLE (Move Street lights close to the curb) EA , REMOVAL OF EXISTING LIGHT POLE AND LUMINARE EA , STREET LIGHT POLE AND 6 FT BRACKET, 30 FEET EA 80 1, ,000.00

14 FURNISH AND INSTALL 6' BRACKET ON WOOD UTILITY POLE EA STREET LIGHT WIRING - # 2 AWG (Move Street lights close to the curb) LF STREET LIGHTING CONDUIT, 2 INCH (Move Street lights close to the curb) LF , , MISCELLANEOUS MOBILIZATION LS 1 50, , PROJECT VEHICLE MON 5 1, , MATERIAL TESTING EQUIPMENT, MATERIALS & SERVICE LS 1 5, , INSPECTOR'S FIELD OFFICE, TYPE A LS 1 25, , MAINTENANCE & PROTECTION OF TRAFFIC LS 1 25, , , SUB TOTAL-CONSTRUCTION ITEMS: 1,260, INSPECTION-12% 151, CONTINGENCY-10% 126, GRAND TOTAL 1,537,688.00

15 Copy of American St. GSI Cost Analysis_final.xlsx American Street GSI Planning Cost Estimate By: Paul Hildebrand Checked: K. Drake Date: 6/10/2015 Cambria to Somerset Somerset to Lehigh Lehigh to Huntingdon Huntingdon to Cumberland Cumberland to York York to Dauphin ITEM # ITEM DESCRIPTION UNIT COST SURFACE FEATURE UNIT COSTS G1100 Excavation and disposal of material, without $48.00 CY classification 2,403 2,403 2,403 2,403 2,403 2,403 2,552 2,403 2,403 2,403 5,018 2,302 1,923 1,942 $1,697, G9301 Seeding and Sodding (Bulk) $11.00 SY 1,505 1,505 1,505 1,505 1,505 1,505 1,614 1,505 1,505 1,505 3,430 1,430 1,151 1,165 $245, G9306 Trees, planted as specified $ EACH $101, G9309 Bioretention Soil $52.00 CY 1,003 1,003 1,003 1,003 1,003 1,003 1,076 1,003 1,003 1,003 2, $774, PIPING, INLETS, STRUCTURES, ETC COST G1120 Excavation, without classification (for pipe) $50.00 CY $24, G3009 8" perforated HDPE pipe including bedding and fittings $50.00 LF $43, W inch DI pipe $ LF $294, G3000 HDPE anti seep collars $ EACH $72, S8250 PVC cleanouts $ EACH $21, S " inlet connections $ LF $55, G8156 4' Highway inlet with orifice $5, EACH $162, G8106 4' Highway inlet with permanent inlet protection $6, EACH $558, XXXXX Flared End Section (8" 12") $ EACH $65, G2550 Concrete splash pad, with stone surface as specified $95.00 SY (ONLY for off street work) $8, G9400 Plain Cement Concrete Base Course, 8in Depth $70.00 SY (Including Subgrading) $33, G9411 Superpave Binder course, PG, Type A $ TON $14, G9418 Superpave Wearing Course, PG,1 1/2" depth, $25.00 SY Type A $12, G9000 Concrete Curb $40.00 LF , , $576, CSX TRACK REMOVAL XXXX Track Removal (Provided by SEPTA) $ TF 1, , , $1,214, Total GSI Construction Cost $4,761, Total Track Removal Cost $1,214, Contingency (20%) $1,195, TOTAL PROJECT COST $7,170, Cost per DA ($/ac) $339, Dauphin to Susquehanna Susquehanna to Diamond Diamond to Norris Norris to Berks Berks to Cecil B. Moore Cecil B. Moore to Oxford Oxford to Jefferson Jefferson to Master Total Cost Total Costs Final

16 Westmoreland Pedestrian Bridge cost estimate ITEM QUANT Unit Unit Price Total Mobilization 1 LS $300, Clearing & Grubbing 1 LS $100, Demolition 1 LS $150, Excavation 3000 CY 75 $225, Structure backfill - #1 stone 3000 CY 50 $150, Structure backfill - #57 stone 2000 CY 50 $100, Cement Concrete Base Course 1800 SY 75 $135, Bit binder course 1800 SY 30 $54, Bit Wearing course 1800 SY 30 $54, Tack Coat 1800 SY 5 $9, Plain Cement Concrete Curb 1200 LF 75 $90, Concrete sidewalk 1600 SY 90 $144, ADA Ramps 8 Quad $240, Linestriping 1 LS $10, Street lighting 7 EA $140, Storm Sewer 600 LF 300 $180, Foreign Borrow 1000 CY 20 $20, Landscaping 1 LS $100, Ornamental Fence 300 LF 100 $30, Green Stormwater facility 1 LS $250, Driveway grade modifications 1 LS $99, Inlet relocation 1 LS $20, Design - 20% $500, Const Insp - 17% $400, $3,500,000.00

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

Oaks Commerce Center

Oaks Commerce Center Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110

More information

County of Santa Cruz 0579

County of Santa Cruz 0579 County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

B E C K E R & F R O N D O R F Construction Cost Consulting Project Management

B E C K E R & F R O N D O R F Construction Cost Consulting Project Management Project: Okehocking Nature Center Number: 07142E2 Client: M2 Architecture Date: June 5, 2009 Phase: DD B E C K E R & F R O N D O R F Construction Cost Consulting Project Management ESTIMATE SUMMARY CODE

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

SITE PLANS ASSISTED LIVING REDEVELOPMENT

SITE PLANS ASSISTED LIVING REDEVELOPMENT SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

DOCUMENTATION WORKBOOK FY 2017

DOCUMENTATION WORKBOOK FY 2017 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC , IA - 2017 DIVISION 1 - GENERAL 1.01 TRAFFIC CONTROL LS 1 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 DIVISION 2 - EARTHWORK 2.01 CLEARING

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING

More information

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

ESTIMATE PREPARATION ASSISTANCE

ESTIMATE PREPARATION ASSISTANCE S T I P D i s t r i c t 1 C l a r k N o ESTIMATE PREPARATION ASSISTANCE PROJECT ESTIMATE INFORMATION TP a. Estimate prepared by (user's name): Paul H. Judd b. Date of initial estimate: 8/11/2010 c. Date

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

City of Grand Island Tuesday, June 26, 2018 Council Session

City of Grand Island Tuesday, June 26, 2018 Council Session City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A

More information

ENGINEERING & ENVIRONMENTAL

ENGINEERING & ENVIRONMENTAL 1-800-292-8989 www.iowaonecall.com CITY OF WEST BRANCH, IOWA THIS ENGINEERING DOCUMENT HAS BEEN REVIEWED BY THE JURISDICTION AND IS RECOMMENDED FOR FILING WITH THE CITY CLERK ENGINEERING & ENVIRONMENTAL

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

Appendix C Preferred Solution

Appendix C Preferred Solution Appendix C Preferred Solution C.1 Conceptual Design Drawings C.2 Preferred Option Ideas and Inspiration C.3 Concept Renderings C.4 Cost Estimate Appendix C.1 Conceptual Design Drawings Plan View Brock

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION