1 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014 Contract Awarded To: APBN INC Award Amount: $1,958, Engineer's Estimate: $3,030, Bidder 1 APBN INC 670 ROBINSON RD Mahoning CAMPBELL, OH Bid $1,958, Bidder 3 M & J PAINTING COMPANY 2 SHORT ST Mahoning CAMPBELL, OH Bid $2,096, Bidder CONSTRUCTION COMPANY INC 1252 INDUSTRIAL PARKWAY NORTH SUITE 1 Medina BRUNSWICK, OH Bid $2,639, Bidder 7 CORROSION RESISTANCE LTD 4524 HUDSON DR Summit STOW, OH Bid $2,852, Bidder 2 VIMAS PAINTING COMPANY INC 4328 MC CARTNEY RD Mahoning LOWELVILLE, OH Bid $2,078, Bidder 4 COSMOS COMPREHENSIVE CONSTRUCTION INC 816 MILAN RD Stark CANAL FULTON, OH Bid $2,397, Bidder 6 UCL INC 2025 STAPLETON CT CINCINNATI, OH Bid $2,767, Bidder 8 ATSALIS BROTHERS PAINTING CO GROESBECK HIGHWAY WARREN, MI Bid $2,958, Bidder 9 M & J CONSTRUCTION CO OF PINELLAS COUNTY INC 809 S SAFFORD AVE TARPON SPRINGS, FL Bid $3,571, Page 1

2 Ref #1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR) Awd $0.50 $ $60.00 $12, $60.00 $12, $65.00 $13, $59.00 $11, $80.00 $16, $60.00 $12, $30.00 $6, $70.00 $14, Ref #2 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) (WT:, (21 EACH) Awd $1.00 $ $1.00 $ $1, $37, $1, $37, $1, $37, $1, $37, $1, $37, $1, $37, $2, $45, Ref #3 614E12500 REPLACEMENT SIGN (WT: 39), (10 EACH) Awd $1.00 $ $1.00 $ $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Ref #4 614E12600 REPLACEMENT DRUM (WT: 39), (20 EACH) Awd $1.00 $ $1.00 $ $50.00 $1, $50.00 $1, $50.00 $1, $50.00 $1, $50.00 $1, $50.00 $1, $60.00 $1, Ref #5 614E13300 BARRIER REFLECTOR, TYPE B (WT: NR), (185 EACH) Awd $0.10 $ $1.00 $ $6.00 $1, $6.00 $1, $6.00 $1, $6.00 $1, $6.00 $1, $6.00 $1, $7.20 $1, Page 2

3 Ref #6 614E13350 OBJECT MARKER, ONE WAY (WT: NR), (185 EACH) Awd $0.10 $ $1.00 $ $11.00 $2, $11.00 $2, $11.00 $2, $11.00 $2, $12.00 $2, $11.00 $2, $13.20 $2, Ref #7 614E22200 WORK ZONE EDGE LINE, CLASS I, , TYPE I, (3.36 MILE) Awd $1.00 $ $1.00 $ $6, $20, $6, $20, $7, $23, $6, $20, $5, $17, $6, $20, $7, $24, Ref #8 622E41000 PORTABLE BARRIER, 32" (WT: 39), (7828 FT) Awd $0.01 $ $0.10 $ $11.00 $86, $11.00 $86, $11.00 $86, $11.00 $86, $4.00 $31, $11.00 $86, $13.20 $103, Section 1 - MAINTENANCE OF TRAFFIC - Totals Awd $ $13, $161, $162, $164, $165, $104, $155, $193, Ref #9 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (42685 SF) Awd $6.25 $266, $7.00 $298, $3.50 $149, $6.50 $277, $7.00 $298, $7.79 $332, $8.50 $362, $9.85 $420, $7.00 $298, Page 3

4 Ref #10 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (42685 SF) Awd $1.00 $42, $1.00 $42, $1.50 $64, $2.00 $85, $2.00 $85, $2.00 $85, $1.50 $64, $1.00 $42, $3.00 $128, Ref #11 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (42685 SF) Awd $1.00 $42, $1.00 $42, $1.50 $64, $1.50 $64, $1.50 $64, $1.00 $42, $1.70 $72, $1.90 $81, $3.00 $128, Ref #12 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (42685 SF) Awd $1.00 $42, $1.00 $42, $1.50 $64, $1.50 $64, $1.00 $42, $2.00 $85, $1.45 $61, $1.00 $42, $3.00 $128, Ref #13 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (60 MNHR) Awd $50.00 $3, $ $6, $ $6, $ $7, $ $6, $75.00 $4, $60.00 $3, $85.00 $5, $ $7, Ref # E10000 FINAL INSPECTION REPAIR, (28 EACH) Awd $ $5, $ $5, $ $9, $ $4, $ $5, $ $7, $ $4, $ $14, $1, $28, Page 4

5 Section 2 - STRUCTURE REPAIR BRIDGE NO. AUG Totals Awd $403, $438, $357, $502, $502, $557, $569, $606, $718, Ref #14 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (42685 SF) Awd $6.25 $266, $7.00 $298, $3.50 $149, $6.50 $277, $7.00 $298, $7.79 $332, $8.50 $362, $9.85 $420, $7.00 $298, Ref #15 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (42685 SF) Awd $1.00 $42, $1.00 $42, $1.50 $64, $2.00 $85, $2.00 $85, $2.00 $85, $1.50 $64, $1.00 $42, $3.00 $128, Ref #16 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (42685 SF) Awd $1.00 $42, $1.00 $42, $1.50 $64, $1.50 $64, $1.50 $64, $1.00 $42, $1.70 $72, $1.90 $81, $3.00 $128, Ref #17 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (42685 SF) Awd $1.00 $42, $1.00 $42, $1.50 $64, $1.50 $64, $1.00 $42, $2.00 $85, $1.45 $61, $1.00 $42, $3.00 $128, Page 5

6 Ref #18 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (60 MNHR) Awd $50.00 $3, $ $6, $ $6, $ $7, $ $6, $75.00 $4, $60.00 $3, $85.00 $5, $ $7, Ref # E10000 FINAL INSPECTION REPAIR, (28 EACH) Awd $ $5, $ $5, $ $9, $ $4, $ $5, $ $7, $ $4, $ $14, $1, $28, Section 3 - BRIDGE NO. AUG R - Totals Awd $403, $438, $357, $502, $502, $557, $569, $606, $718, Ref #19 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (213 SY) Awd $20.00 $4, $25.00 $5, $47.00 $10, $13.75 $2, $15.00 $3, $25.00 $5, $20.00 $4, $35.00 $7, $27.00 $5, Ref #20 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (213 SY) Awd $20.00 $4, $25.00 $5, $28.00 $5, $15.00 $3, $15.00 $3, $25.00 $5, $45.00 $9, $35.00 $7, $63.00 $13, Page 6

7 Ref #21 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (39163 SF) Awd $6.50 $254, $7.00 $274, $3.50 $137, $6.50 $254, $7.00 $274, $7.79 $305, $8.00 $313, $9.85 $385, $6.00 $234, Ref #22 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (39163 SF) Awd $1.00 $39, $1.00 $39, $1.50 $58, $2.00 $78, $2.00 $78, $2.00 $78, $1.00 $39, $1.00 $39, $3.00 $117, Ref #23 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (39163 SF) Awd $1.00 $39, $1.00 $39, $1.50 $58, $1.50 $58, $1.50 $58, $1.00 $39, $1.50 $58, $1.90 $74, $3.00 $117, Ref #24 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (39163 SF) Awd $1.00 $39, $1.00 $39, $1.50 $58, $1.50 $58, $1.00 $39, $2.00 $78, $1.25 $48, $1.00 $39, $3.00 $117, Ref #25 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (50 MNHR) Awd $50.00 $2, $ $5, $ $5, $ $6, $ $5, $75.00 $3, $60.00 $3, $85.00 $4, $ $6, Page 7

8 Ref # E10000 FINAL INSPECTION REPAIR, (35 EACH) Awd $ $7, $ $8, $ $12, $ $5, $ $7, $ $8, $ $6, $ $17, $1, $35, Section 4 - BRIDGE NO. AUG Totals Awd $390, $416, $346, $468, $468, $524, $483, $575, $647, Ref #26 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (99 SY) Awd $20.00 $1, $25.00 $2, $67.00 $6, $13.75 $1, $15.00 $1, $25.00 $2, $20.00 $1, $35.00 $3, $27.00 $2, Ref #27 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (99 SY) Awd $20.00 $1, $25.00 $2, $48.00 $4, $15.00 $1, $15.00 $1, $25.00 $2, $45.00 $4, $35.00 $3, $63.00 $6, Ref #28 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (14933 SF) Awd $6.50 $97, $7.00 $104, $3.50 $52, $6.50 $97, $10.00 $149, $7.79 $116, $9.00 $134, $7.75 $115, $6.00 $89, Page 8

9 Ref #29 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (14933 SF) Awd $1.00 $14, $1.00 $14, $1.50 $22, $2.00 $29, $2.00 $29, $2.00 $29, $1.50 $22, $1.00 $14, $3.00 $44, Ref #30 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (14933 SF) Awd $1.00 $14, $1.50 $22, $1.50 $22, $1.50 $22, $1.00 $14, $1.00 $14, $2.00 $29, $1.50 $22, $3.00 $44, Ref #31 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (14933 SF) Awd $1.00 $14, $1.50 $22, $1.50 $22, $1.50 $22, $1.00 $14, $2.00 $29, $1.50 $22, $1.00 $14, $3.00 $44, Ref #32 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (40 MNHR) Awd $ $4, $ $4, $ $4, $ $4, $ $4, $75.00 $3, $60.00 $2, $85.00 $3, $ $5, Ref #33 516E31000 JOINT SEALER, (92 FT) Awd $40.00 $3, $50.00 $4, $ $13, $35.00 $3, $30.00 $2, $30.00 $2, $25.00 $2, $25.00 $2, $45.00 $4, Page 9

10 Ref # E10000 FINAL INSPECTION REPAIR, (15 EACH) Awd $ $3, $ $3, $ $5, $ $2, $ $3, $ $3, $ $2, $ $7, $1, $15, Section 5 - BRIDGE NO. AUG Totals Awd $156, $180, $153, $185, $221, $205, $222, $188, $257, Ref #34 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1494 SY) Awd $15.00 $22, $15.00 $22, $15.00 $22, $11.50 $17, $13.00 $19, $12.00 $17, $7.00 $10, $9.95 $14, $18.00 $26, Ref #35 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (28757 SF) Awd $6.50 $186, $7.00 $201, $3.50 $100, $6.50 $186, $7.00 $201, $7.79 $224, $8.50 $244, $11.25 $323, $6.00 $172, Ref #36 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (28757 SF) Awd $1.00 $28, $1.00 $28, $1.50 $43, $2.00 $57, $2.00 $57, $2.00 $57, $1.50 $43, $1.00 $28, $3.00 $86, Page 10

11 Ref #37 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (28757 SF) Awd $1.00 $28, $1.00 $28, $1.50 $43, $1.50 $43, $2.00 $57, $1.00 $28, $1.70 $48, $1.50 $43, $3.00 $86, Ref #38 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (28757 SF) Awd $1.00 $28, $1.00 $28, $1.50 $43, $1.50 $43, $1.50 $43, $2.00 $57, $1.45 $41, $1.00 $28, $3.00 $86, Ref #39 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (40 MNHR) Awd $50.00 $2, $ $4, $ $4, $ $4, $ $4, $75.00 $3, $60.00 $2, $85.00 $3, $ $5, Ref # E10000 FINAL INSPECTION REPAIR, (19 EACH) Awd $ $3, $ $3, $ $6, $ $3, $ $3, $ $4, $ $3, $ $9, $1, $19, Section 6 - BRIDGE NO. AUG Totals Awd $301, $317, $263, $355, $386, $393, $394, $451, $482, Page 11

12 Ref #40 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (936 SY) Awd $10.00 $9, $20.00 $18, $27.00 $25, $13.75 $12, $15.00 $14, $18.00 $16, $20.00 $18, $24.95 $23, $27.00 $25, Ref #41 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (936 SY) Awd $10.00 $9, $20.00 $18, $18.00 $16, $15.00 $14, $15.00 $14, $18.00 $16, $45.00 $42, $14.95 $13, $63.00 $58, Ref #42 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (10451 SF) Awd $6.50 $67, $7.00 $73, $7.00 $73, $6.50 $67, $10.00 $104, $9.00 $94, $10.00 $104, $11.25 $117, $7.00 $73, Ref #43 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (10451 SF) Awd $1.00 $10, $1.00 $10, $2.50 $26, $2.00 $20, $2.00 $20, $2.00 $20, $1.50 $15, $1.00 $10, $3.00 $31, Ref #44 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (10451 SF) Awd $1.00 $10, $1.50 $15, $2.50 $26, $1.50 $15, $1.00 $10, $1.00 $10, $2.00 $20, $1.50 $15, $3.00 $31, Page 12

13 Ref #45 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (10451 SF) Awd $1.00 $10, $1.50 $15, $2.50 $26, $1.50 $15, $1.00 $10, $2.00 $20, $1.50 $15, $1.00 $10, $3.00 $31, Ref #46 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (40 MNHR) Awd $ $4, $ $4, $ $4, $ $4, $ $4, $75.00 $3, $80.00 $3, $85.00 $3, $ $5, Ref #47 516E31000 JOINT SEALER, (61 FT) Awd $40.00 $2, $50.00 $3, $ $9, $35.00 $2, $30.00 $1, $30.00 $1, $25.00 $1, $25.00 $1, $45.00 $2, Ref #48 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (49 SF) Awd $ $4, $ $7, $ $9, $ $12, $ $17, $ $14, $ $6, $ $9, $ $14, Ref # E10000 FINAL INSPECTION REPAIR, (12 EACH) Awd $ $2, $ $2, $ $4, $ $1, $ $2, $ $3, $ $2, $ $6, $1, $12, Page 13

14 Section 7 - BRIDGE NO. AUG Totals Awd $131, $169, $221, $168, $199, $202, $230, $212, $285, Ref #49 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $20, $20, $20, $20, $25, $25, $28, $28, $30, $30, $28, $28, $19, $19, $28, $28, $33, $33, Ref #50 108E10000 SPECIAL - CPM PROGRESS SCHEDULE (WT: NR), (LUMP SUM) Awd $2, $2, $5, $5, $10, $10, $1, $1, $8, $8, $2, $2, $15, $15, $9, $9, $5, $5, Ref #51 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM) Awd $135, $135, $60, $60, $100, $100, $5, $5, $80, $80, $85, $85, $143, $143, $99, $99, $158, $158, Ref #52 624E10000 MOBILIZATION (WT: NR), (LUMP SUM) Awd $15, $15, $20, $20, $100, $100, $17, $17, $75, $75, $45, $45, $100, $100, $27, $27, $70, $70, Page 14

15 Section 8 - INCIDENTALS - Totals Awd $172, $105, $235, $52, $193, $161, $277, $163, $267, Page 15

16 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID MIA-IR/SHE /0.00 Federal Type: MISCELLANEOUS Letting Date: 7/18/2013 Completion Date: 10/15/2013 Contract Awarded To: BARRETT PAVING MATERIALS INC Award Amount: $758, Engineer's Estimate: $714, Bidder 1 BARRETT PAVING MATERIALS INC 3751 COMMERCE DR Warren MIDDLETOWN, OH Bid $758, Bidder 2 JOHN R JURGENSEN COMPANY MOSTELLER RD Hamilton CINCINNATI, OH Bid $869, Page 16

17 Ref #1 253E01001 PAVEMENT REPAIR, AS PER PLAN(DEPTH = 2"), (37500 SY) Awd $15.10 $566, $17.22 $645, Ref #2 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (750 SF) Awd $65.00 $48, $50.00 $37, Ref #3 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR) Awd $60.00 $12, $55.01 $11, Ref #4 614E12600 REPLACEMENT DRUM, (20 EACH) Awd $50.00 $1, $96.43 $1, Ref #5 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (2 SNMT) Awd $ $1, $1, $3, Ref #6 614E20000 WORK ZONE LANE LINE, CLASS I, (2.5 MILE) Awd $ $2, $ $2, Ref #7 614E22000 WORK ZONE EDGE LINE, CLASS I, (2.5 MILE) Awd $ $2, $ $2, Ref #8 621E00100 RPM, (50 EACH) Awd $92.00 $4, $92.00 $4, Ref #9 621E54000 RAISED PAVEMENT MARKER REMOVED, (50 EACH) Awd $12.00 $ $30.66 $1, Ref #10 642E00094 EDGE LINE, 6", (20 MILE) Awd $ $10, $ $10, Ref #11 642E00194 LANE LINE, 6", (10 MILE) Awd $ $1, $ $1, Ref #12 642E00394 CHANNELIZING LINE, 12", (2500 FT) Awd $0.75 $1, $0.75 $1, Ref #13 642E01509 DOTTED LINE, 6", AS PER PLAN, (1200 FT) Awd $1.00 $1, $1.00 $1, Ref # E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY, (15 SNMT) Awd $3, $57, $3, $57, Section 1 - ITEMS OF WORK - Totals Awd $711, $782, Page 17

18 Ref #14 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $4, $4, $2, $2, Ref #15 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $27, $27, $64, $64, Ref #16 624E10000 MOBILIZATION, (LUMP SUM) Awd $16, $16, $20, $20, Section 2 - INCIDENTALS - Totals Awd $47, $87, Page 18

19 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID SUM-CR-STATE STREET (CR ) Federal Type: TWO LANE RESURFACING Letting Date: 7/18/2013 Completion Date: 10/4/2013 Contract Awarded To: NORTHSTAR ASPHALT INC Award Amount: $493, Engineer's Estimate: $544, Bidder 1 NORTHSTAR ASPHALT INC P O BOX 2646 Stark NORTH CANTON, OH Bid $493, Bidder 3 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH Bid $566, Bidder 5 SHELLY & SANDS INC 1515 HARMON AVE Franklin COLUMBUS, OH Bid $593, Bidder 2 KARVO PAVING COMPANY 4524 HUDSON DR STOW, OH Bid $565, Bidder 4 BARBICAS CONSTRUCTION COMPANY INC 124 DARROW RD Summit AKRON, OH Bid $580, Bidder 6 CHAGRIN VALLEY PAVING INC MUNN RD Geauga CHAGRIN FALLS, OH Bid $642, Page 19

20 Ref #1 202E23500 WEARING COURSE REMOVED, (970 SY) Awd $5.00 $4, $4.50 $4, $7.00 $6, $13.00 $12, $7.50 $7, $6.69 $6, Ref #2 202E30000 WALK REMOVED, (1980 SF) Awd $3.00 $5, $1.80 $3, $3.00 $5, $3.00 $5, $1.00 $1, $3.00 $5, Ref #3 202E32000 CURB REMOVED, (100 FT) Awd $12.00 $1, $15.00 $1, $12.00 $1, $12.00 $1, $5.00 $ $12.00 $1, Ref #4 203E10000 EXCAVATION(FOR PAVEMENT REPAIR), (100 CY) Awd $15.00 $1, $35.00 $3, $15.00 $1, $20.00 $2, $15.00 $1, $10.00 $1, Ref #5 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (136 STA) Awd $15.00 $2, $35.00 $4, $30.00 $4, $15.00 $2, $15.00 $2, $67.42 $9, Ref #6 608E " CONCRETE WALK, (1225 SF) Awd $6.00 $7, $6.00 $7, $5.00 $6, $7.65 $9, $4.50 $5, $5.00 $6, Ref #7 608E52000 CURB RAMP, (755 SF) Awd $14.00 $10, $11.35 $8, $18.00 $13, $14.80 $11, $15.00 $11, $18.00 $13, Page 20

21 Ref #8 623E38501 MONUMENT ASSEMBLY, AS PER PLAN, (2 EACH) Awd $ $1, $ $1, $ $1, $ $1, $1, $2, $1, $2, Ref #9 690E21000 SPECIAL - MISC.:PRECONSTRUCTION VIDEO TAPING, (LUMP SUM) Awd $ $ $ $ $1, $1, $1, $1, $1, $1, $ $ Section 1 - ROADWAY - Totals Awd $35, $35, $41, $46, $34, $46, Ref #10 832E30000 EROSION CONTROL, (1500 EACH) Awd $1.00 $1, $1.00 $1, $1.00 $1, $1.00 $1, $1.00 $1, $1.00 $1, Section 2 - EROSION CONTROL - Totals Awd $1, $1, $1, $1, $1, $1, Ref #11 611E98630 CATCH BASIN ADJUSTED TO GRADE, (7 EACH) Awd $ $3, $ $5, $ $3, $ $3, $ $3, $ $5, Ref #12 611E99654 MANHOLE ADJUSTED TO GRADE, (16 EACH) Awd $ $10, $ $8, $ $4, $ $1, $ $7, $ $12, Page 21

22 Ref #13 611E99820 SPECIAL - MISCELLANEOUS METAL, (1000 LB) Awd $0.90 $ $1.00 $1, $1.25 $1, $1.00 $1, $1.00 $1, $1.00 $1, Section 3 - DRAINAGE - Totals Awd $14, $14, $9, $6, $11, $18, Ref #14 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (1260 SY) Awd $20.00 $25, $21.00 $26, $20.00 $25, $22.35 $28, $30.00 $37, $23.35 $29, Ref #15 253E01000 PAVEMENT REPAIR, (1260 SY) Awd $40.00 $50, $58.00 $73, $50.00 $63, $63.00 $79, $65.00 $81, $78.51 $98, Ref #16 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (24263 SY) Awd $1.50 $36, $1.95 $47, $1.55 $37, $1.70 $41, $1.75 $42, $1.84 $44, Ref #17 304E20001 AGGREGATE BASE, AS PER PLAN(FOR PAVEMENT REPAIR), (100 CY) Awd $35.00 $3, $55.00 $5, $35.00 $3, $45.00 $4, $40.00 $4, $40.00 $4, Ref #18 407E10000 TACK COAT, (3785 GAL) Awd $2.00 $7, $1.75 $6, $1.75 $6, $2.25 $8, $2.00 $7, $3.12 $11, Page 22

23 Ref #19 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (1010 GAL) Awd $2.00 $2, $1.75 $1, $1.75 $1, $2.25 $2, $2.00 $2, $4.55 $4, Ref #20 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (1227 CY) Awd $ $122, $ $133, $ $126, $ $143, $ $134, $ $133, Ref #21 448E47021 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22,, (941 CY) Awd $ $112, $ $124, $ $133, $ $141, $ $141, $ $123, Ref #22 609E26000 CURB, TYPE 6, (100 FT) Awd $23.00 $2, $14.50 $1, $50.00 $5, $20.00 $2, $17.50 $1, $50.00 $5, Ref #23 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (177 CY) Awd $42.00 $7, $35.00 $6, $61.00 $10, $40.00 $7, $55.00 $9, $49.76 $8, Section 4 - PAVEMENT - Totals Awd $370, $426, $413, $457, $463, $464, Ref #24 638E10800 VALVE BOX ADJUSTED TO GRADE, (16 EACH) Awd $75.00 $1, $ $6, $ $5, $90.00 $1, $ $2, $ $6, Page 23

24 Section 5 - WATER WORK - Totals Awd $1, $6, $5, $1, $2, $6, Ref #25 642E00090 EDGE LINE, 4", (2.6 MILE) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Ref #26 642E00290 CENTER LINE, (1.3 MILE) Awd $ $1, $ $ $ $1, $ $ $ $1, $ $1, Ref #27 642E00390 CHANNELIZING LINE, 8", (265 FT) Awd $0.50 $ $0.75 $ $0.45 $ $0.75 $ $0.45 $ $0.50 $ Ref #28 642E00490 STOP LINE, (135 FT) Awd $3.00 $ $3.25 $ $2.00 $ $3.25 $ $2.00 $ $3.00 $ Ref #29 642E00590 CROSSWALK LINE, (245 FT) Awd $2.50 $ $1.75 $ $1.75 $ $1.75 $ $1.80 $ $2.50 $ Ref #30 642E01090 SCHOOL SYMBOL MARKING, 72", (2 EACH) Awd $ $ $ $ $ $ $ $ $ $ $ $ Page 24

25 Ref #31 642E01290 LANE ARROW, (4 EACH) Awd $45.00 $ $55.00 $ $40.00 $ $55.00 $ $42.00 $ $45.00 $ Ref #32 642E01390 WORD ON PAVEMENT, 72", (1 EACH) Awd $ $ $65.00 $ $50.00 $ $65.00 $ $52.00 $ $ $ Section 6 - TRAFFIC CONTROL - Totals Awd $4, $4, $3, $4, $4, $4, Ref #33 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY) Awd $ $7, $ $9, $ $6, $ $5, $ $8, $ $5, Ref #34 614E21000 WORK ZONE CENTER LINE, CLASS I, (2.6 MILE) Awd $ $2, $ $2, $ $2, $ $2, $ $2, $ $2, Ref #35 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (1.3 MILE) Awd $ $1, $ $ $ $ $ $ $ $ $ $1, Ref #36 614E22000 WORK ZONE EDGE LINE, CLASS I, (5.12 MILE) Awd $ $2, $ $2, $ $3, $ $2, $ $3, $ $2, Page 25

26 Ref #37 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (2.56 MILE) Awd $ $1, $ $1, $ $1, $ $1, $ $1, $ $1, Ref #38 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (360 FT) Awd $0.50 $ $0.60 $ $0.55 $ $0.60 $ $0.55 $ $0.50 $ Ref #39 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (180 FT) Awd $0.50 $ $0.60 $ $0.50 $ $0.60 $ $0.50 $ $0.50 $90.00 Ref #40 614E26000 WORK ZONE STOP LINE, CLASS I, (160 FT) Awd $2.50 $ $2.00 $ $2.50 $ $2.00 $ $2.50 $ $2.50 $ Ref #41 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (80 FT) Awd $2.00 $ $2.00 $ $2.40 $ $2.00 $ $2.50 $ $2.00 $ Ref #42 614E27000 WORK ZONE CROSSWALK LINE, CLASS I, (280 FT) Awd $2.50 $ $1.50 $ $2.00 $ $1.50 $ $2.00 $ $2.50 $ Ref #43 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (140 FT) Awd $2.00 $ $1.50 $ $1.95 $ $1.50 $ $2.00 $ $2.00 $ Page 26

27 Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $16, $17, $15, $14, $18, $14, Ref #44 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $2, $2, $5, $5, $1, $1, $4, $4, $1, $1, $5, $5, Ref #45 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $40, $40, $30, $30, $50, $50, $35, $35, $35, $35, $53, $53, Ref #46 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM) Awd $1, $1, $ $ $3, $3, $2, $2, $1, $1, $1, $1, Ref #47 624E10000 MOBILIZATION, (LUMP SUM) Awd $6, $6, $24, $24, $20, $20, $6, $6, $20, $20, $27, $27, Section 8 - INCIDENTALS - Totals Awd $49, $59, $75, $47, $57, $87, Page 27

28 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID ADA-SR Federal Type: TWO LANE RESURFACING Letting Date: 7/18/2013 Completion Date: 10/31/2013 Contract Awarded To: BROWN COUNTY CONSTRUCTION CO INC Award Amount: $1,074, Engineer's Estimate: $1,091, Bidder 1 BROWN COUNTY CONSTRUCTION CO INC 8108 US ROUTE 52 Brown ABERDEEN, OH Bid $1,074, Bidder 2 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH Bid $1,123, Page 28

29 Ref #1 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (14.92 MILE) Awd $ $8, $ $13, Ref #2 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (559 SY) Awd $31.59 $17, $37.00 $20, Ref #3 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(1., (434 SY) Awd $7.32 $3, $5.50 $2, Ref #4 254E01600 PATCHING PLANED SURFACE, (87 SY) Awd $11.37 $ $1.00 $87.00 Ref #5 407E10000 TACK COAT, (8866 GAL) Awd $3.72 $32, $2.00 $17, Ref #6 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (8376 GAL) Awd $3.71 $31, $2.00 $16, Ref #7 408E10000 PRIME COAT, (14 GAL) Awd $12.77 $ $3.50 $49.00 Ref #8 448E46021 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (1551 CY) Awd $ $185, $ $199, Ref #9 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (4961 CY) Awd $ $593, $ $637, Ref #10 617E10100 COMPACTED AGGREGATE, (958 CY) Awd $43.70 $41, $44.50 $42, Ref #11 617E25000 WATER, (10 MGAL) Awd $6.74 $ $1.00 $10.00 Section 1 - PAVEMENT - Totals Awd $916, $950, Ref #12 621E00100 RPM, (773 EACH) Awd $16.54 $12, $17.25 $13, Ref #13 621E54000 RAISED PAVEMENT MARKER REMOVED, (784 EACH) Awd $9.98 $7, $8.00 $6, Ref #14 646E10000 EDGE LINE, 4", (14.92 MILE) Awd $2, $36, $1, $28, Page 29

30 Ref #15 646E10200 CENTER LINE, (7.46 MILE) Awd $3, $22, $2, $22, Section 2 - TRAFFIC CONTROL - Totals Awd $79, $70, Ref #16 614E12460 WORK ZONE MARKING SIGN, (54 EACH) Awd $78.75 $4, $75.00 $4, Ref #17 614E21400 WORK ZONE CENTER LINE, CLASS II, (7.46 MILE) Awd $ $6, $ $1, Section 3 - MAINTENANCE OF TRAFFIC - Totals Awd $10, $5, Ref #18 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(1., (434 SY) Awd $7.32 $3, $5.50 $2, Ref #19 254E01600 PATCHING PLANED SURFACE, (87 SY) Awd $8.22 $ $1.00 $87.00 Ref #20 407E10000 TACK COAT, (33 GAL) Awd $4.02 $ $2.00 $66.00 Ref #21 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22(1, (19 CY) Awd $ $2, $ $2, Ref #22 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER, (728 SY) Awd $9.83 $7, $8.75 $6, Ref #23 617E10100 COMPACTED AGGREGATE, (2 CY) Awd $ $ $44.50 $89.00 Ref #24 617E25000 WATER, (1 MGAL) Awd $6.74 $ $1.00 $1.00 Ref #25 690E98300 SPECIAL - MISC.:ASPHALT CONCRETE MICRO-MILLING, (728 SY) Awd $15.99 $11, $13.50 $9, Section 4 - STRUCTURE REPAIR BRIDGE NO. ADA Totals Awd $25, $21, Page 30

31 Ref #26 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(1., (723 SY) Awd $6.92 $5, $5.50 $3, Ref #27 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(2., (69 SY) Awd $9.58 $ $5.50 $ Ref #28 407E10000 TACK COAT, (60 GAL) Awd $4.02 $ $2.00 $ Ref #29 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (33 CY) Awd $ $4, $ $4, Ref #30 617E10100 COMPACTED AGGREGATE, (4 CY) Awd $ $ $44.50 $ Ref #31 617E25000 WATER, (1 MGAL) Awd $6.74 $ $1.00 $1.00 Section 5 - BRIDGE NO. ADA Totals Awd $10, $8, Ref #32 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM) Awd $5, $5, $6, $6, Ref #33 614E11000 MAINTAINING TRAFFIC, (LUMP SUM) Awd $24, $24, $46, $46, Ref #34 624E10000 MOBILIZATION, (LUMP SUM) Awd $1, $1, $15, $15, Section 6 - INCIDENTALS - Totals Awd $31, $67, Page 31

32 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No PID ATB-US-322/7-8.11/18.10 Federal Type: TWO LANE RESURFACING Letting Date: 7/18/2013 Completion Date: 10/15/2013 Contract Awarded To: KOSKI CONSTRUCTION CO Award Amount: $1,887, Engineer's Estimate: $1,914, Bidder 1 KOSKI CONSTRUCTION CO P O BOX 1038 ASHTABULA, OH Bid $1,887, Bidder 3 KARVO PAVING COMPANY 4524 HUDSON DR STOW, OH Bid $2,032, Bidder 2 SHELLY & SANDS INC 1515 HARMON AVE Franklin COLUMBUS, OH Bid $1,992, Bidder 4 SHELLY COMPANY 80 PARK DR BOX 266 Perry THORNVILLE, OH Bid $2,072, Bidder 5 DIORIO PAVING CO INC 1200 SOUTH STATE ST Trumbull GIRARD, OH Bid $2,080, Page 32

33 Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $ $ $1, $1, $ $ $1, $1, $2, $2, Ref #2 202E23000 PAVEMENT REMOVED, (2 SY) Awd $ $ $ $ $ $ $ $ $40.00 $80.00 Ref #3 202E23500 WEARING COURSE REMOVED, (363 SY) Awd $1.00 $ $0.75 $ $1.95 $ $20.00 $7, $4.00 $1, Ref #4 202E32000 CURB REMOVED, (104 FT) Awd $10.00 $1, $9.00 $ $19.00 $1, $10.00 $1, $12.00 $1, Ref #5 202E38000 GUARDRAIL REMOVED, (5519 FT) Awd $1.20 $6, $1.25 $6, $1.50 $8, $1.50 $8, $1.20 $6, Ref #6 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (982 STA) Awd $6.00 $5, $6.00 $5, $18.75 $18, $35.00 $34, $19.50 $19, Ref #7 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (4332 FT) Awd $15.75 $68, $16.00 $69, $16.00 $69, $16.00 $69, $15.60 $67, Ref #8 606E17350 GUARDRAIL, TYPE MGS, 25' LONG - SPAN, (400 FT) Awd $21.00 $8, $22.00 $8, $23.50 $9, $23.50 $9, $20.80 $8, Page 33

34 Ref #9 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (1 EACH) Awd $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, Ref #10 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (17 EACH) Awd $1, $29, $1, $32, $1, $33, $1, $33, $1, $29, Ref #11 606E27820 ANCHOR ASSEMBLY, MGS TYPE T, (4 EACH) Awd $ $3, $ $3, $ $3, $ $3, $ $3, Ref #12 606E35050 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH) Awd $1, $7, $2, $8, $1, $7, $1, $7, $1, $7, Ref #13 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (8 EACH) Awd $ $5, $ $5, $ $5, $ $5, $ $5, Ref #14 608E53020 DETECTABLE WARNING, (8 SF) Awd $ $2, $ $1, $88.00 $ $ $1, $55.00 $ Ref #15 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (1 EACH) Awd $ $ $ $ $ $ $ $ $1, $1, Ref #16 690E50000 SPECIAL - MAILBOX SUPPORT, (1 EACH) Awd $ $ $ $ $ $ $ $ $ $ Page 34

35 Section 1 - ROADWAY - Totals Awd $142, $146, $160, $183, $155, Ref #17 832E30000 EROSION CONTROL, (1000 EACH) Awd $1.00 $1, $1.00 $1, $1.00 $1, $1.00 $1, $1.00 $1, Section 2 - EROSION CONTROL - Totals Awd $1, $1, $1, $1, $1, Ref #18 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (4000 SY) Awd $18.00 $72, $20.00 $80, $19.00 $76, $10.15 $40, $18.60 $74, Ref #19 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, ( SY) Awd $0.45 $68, $0.75 $113, $0.60 $91, $0.85 $129, $0.78 $118, Ref #20 304E20000 AGGREGATE BASE, (20 CY) Awd $50.00 $1, $ $2, $ $2, $65.00 $1, $54.00 $1, Ref #21 407E10000 TACK COAT, (22840 GAL) Awd $2.15 $49, $1.75 $39, $1.75 $39, $1.85 $42, $1.50 $34, Ref #22 446E47029 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M,, (6582 CY) Awd $ $909, $ $901, $ $993, $ $947, $ $969, Page 35

36 Ref #23 609E24510 CURB, TYPE 4-C, (72 FT) Awd $30.00 $2, $32.00 $2, $32.00 $2, $20.00 $1, $20.00 $1, Ref #24 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (1212 CY) Awd $26.50 $32, $40.00 $48, $25.00 $30, $46.00 $55, $29.45 $35, Section 3 - PAVEMENT - Totals Awd $1,134, $1,189, $1,235, $1,218, $1,235, Ref #25 621E10000 RPM, LOW PROFILE, YELLOW/YELLOW, (618 EACH) Awd $21.50 $13, $22.00 $13, $17.16 $10, $21.65 $13, $20.75 $12, Ref #26 621E54000 RAISED PAVEMENT MARKER REMOVED, (464 EACH) Awd $5.00 $2, $4.25 $1, $3.00 $1, $4.00 $1, $4.50 $2, Ref #27 626E00100 BARRIER REFLECTOR, (100 EACH) Awd $6.50 $ $8.00 $ $7.50 $ $7.50 $ $6.20 $ Ref #28 644E00100 EDGE LINE, 4", (18.72 MILE) Awd $1, $34, $1, $34, $2, $40, $1, $37, $1, $37, Ref #29 644E00300 CENTER LINE, (9.5 MILE) Awd $1, $16, $1, $16, $1, $16, $1, $12, $1, $12, Page 36

37 Ref #30 644E00400 CHANNELIZING LINE, 8", (192 FT) Awd $2.00 $ $2.00 $ $1.95 $ $5.80 $1, $6.00 $1, Ref #31 644E00500 STOP LINE, (156 FT) Awd $8.00 $1, $8.00 $1, $7.50 $1, $9.25 $1, $9.25 $1, Ref #32 644E00700 TRANSVERSE/DIAGONAL LINE, (260 FT) Awd $6.00 $1, $6.00 $1, $5.00 $1, $9.15 $2, $9.25 $2, Ref #33 644E00900 ISLAND MARKING, (114 SF) Awd $5.00 $ $5.00 $ $3.00 $ $7.15 $ $7.25 $ Ref #34 644E01300 LANE ARROW, (4 EACH) Awd $ $ $ $1, $90.00 $ $ $1, $ $1, Section 4 - TRAFFIC CONTROL - Totals Awd $71, $72, $73, $72, $72, Ref #35 614E12420 DETOUR SIGNING, (LUMP SUM) Awd $3, $3, $3, $3, $3, $3, $6, $6, $5, $5, Ref #36 614E12460 WORK ZONE MARKING SIGN, (24 EACH) Awd $85.00 $2, $85.00 $2, $80.00 $1, $60.00 $1, $80.00 $1, Page 37

38 Ref #37 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY) Awd $ $2, $ $3, $ $3, $ $2, $ $2, Ref #38 614E21400 WORK ZONE CENTER LINE, CLASS II, (9.5 MILE) Awd $ $4, $ $3, $ $4, $ $5, $ $3, Ref #39 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (9.5 MILE) Awd $ $9, $ $9, $ $8, $ $8, $ $8, Ref #40 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (18.72 MILE) Awd $ $7, $ $6, $ $9, $ $7, $ $6, Ref #41 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (192 FT) Awd $0.50 $ $1.00 $ $0.90 $ $0.55 $ $1.00 $ Ref #42 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (192 FT) Awd $0.50 $ $1.00 $ $0.76 $ $0.50 $ $1.00 $ Ref #43 614E26000 WORK ZONE STOP LINE, CLASS I, (156 FT) Awd $2.50 $ $2.60 $ $3.00 $ $2.50 $ $2.50 $ Ref #44 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (156 FT) Awd $2.50 $ $2.60 $ $3.00 $ $2.40 $ $2.50 $ Page 38

39 Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $29, $29, $32, $33, $29, Ref #45 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $2, $2, $1, $1, $2, $2, $2, $2, $2, $2, Ref #46 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (50 SY) Awd $60.00 $3, $53.00 $2, $50.00 $2, $50.00 $2, $35.00 $1, Ref #47 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (462 SY) Awd $18.00 $8, $16.00 $7, $15.00 $6, $15.00 $6, $18.00 $8, Ref #48 516E31300 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (72 FT) Awd $ $7, $ $10, $ $10, $ $10, $ $10, Ref #49 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF) Awd $ $12, $ $10, $ $10, $ $10, $75.00 $7, Ref #50 519E12304 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE C, (10 SY) Awd $ $5, $ $5, $ $5, $ $5, $ $5, Ref #51 530E00800 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (30 SY) Awd $60.00 $1, $53.00 $1, $50.00 $1, $50.00 $1, $ $3, Page 39

40 Ref #52 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT) Awd $14.00 $ $15.00 $ $15.00 $ $15.00 $ $15.00 $ Ref #53 630E80100 SIGN, FLAT SHEET, , (2 SF) Awd $25.00 $ $26.00 $ $30.00 $ $30.00 $ $25.00 $50.00 Ref #54 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH) Awd $10.00 $ $10.00 $ $15.00 $ $15.00 $ $10.00 $20.00 Ref #55 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF) Awd $ $9, $ $7, $ $7, $ $7, $75.00 $5, Section 6 - STRUCTURE REPAIR BRIDGE NO. ATB Totals Awd $49, $47, $46, $46, $44, Ref #56 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $2, $2, $1, $1, $2, $2, $2, $2, $2, $2, Ref #57 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (70 SY) Awd $50.00 $3, $53.00 $3, $50.00 $3, $50.00 $3, $35.00 $2, Ref #58 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (200 SF) Awd $ $25, $ $21, $ $20, $ $20, $75.00 $15, Page 40

41 Ref #59 530E00800 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (32 SY) Awd $60.00 $1, $53.00 $1, $50.00 $1, $50.00 $1, $ $3, Ref #60 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT) Awd $14.00 $ $15.00 $ $15.00 $ $15.00 $ $15.00 $ Ref #61 630E80100 SIGN, FLAT SHEET, , (2 SF) Awd $25.00 $ $26.00 $ $30.00 $ $30.00 $ $25.00 $50.00 Ref #62 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH) Awd $10.00 $ $10.00 $ $15.00 $ $15.00 $ $10.00 $20.00 Ref #63 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH) Awd $10.00 $ $10.00 $ $15.00 $ $15.00 $ $10.00 $20.00 Ref #64 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF) Awd $ $9, $ $7, $ $7, $ $7, $75.00 $5, Section 7 - BRIDGE NO. ATB Totals Awd $42, $36, $34, $34, $29, Ref #65 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $2, $2, $1, $1, $2, $2, $2, $2, $2, $2, Page 41

42 Ref #66 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (200 SF) Awd $ $25, $ $21, $ $20, $ $20, $75.00 $15, Ref #67 530E00800 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (30 SY) Awd $60.00 $1, $53.00 $1, $50.00 $1, $50.00 $1, $ $3, Ref #68 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT) Awd $14.00 $ $15.00 $ $15.00 $ $15.00 $ $15.00 $ Ref #69 630E80100 SIGN, FLAT SHEET, , (2 SF) Awd $25.00 $ $26.00 $ $30.00 $ $30.00 $ $25.00 $50.00 Ref #70 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH) Awd $10.00 $ $10.00 $ $15.00 $ $15.00 $ $10.00 $20.00 Ref #71 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH) Awd $10.00 $ $10.00 $ $15.00 $ $15.00 $ $10.00 $20.00 Ref #72 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF) Awd $ $9, $ $7, $ $7, $ $7, $75.00 $5, Section 8 - BRIDGE NO. ATB Totals Awd $38, $32, $31, $31, $26, Page 42

43 Ref #73 202E23500 WEARING COURSE REMOVED, (1000 SY) Awd $8.00 $8, $4.50 $4, $2.80 $2, $8.00 $8, $8.00 $8, Ref #74 407E10000 TACK COAT, (150 GAL) Awd $2.15 $ $2.00 $ $1.75 $ $1.85 $ $2.00 $ Ref #75 446E47029 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M,, (125 CY) Awd $ $23, $ $23, $ $24, $ $26, $ $19, Ref #76 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (60 SY) Awd $50.00 $3, $53.00 $3, $50.00 $3, $50.00 $3, $35.00 $2, Ref #77 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL, 705., (105 FT) Awd $75.00 $7, $53.00 $5, $50.00 $5, $50.00 $5, $75.00 $7, Ref #78 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF) Awd $ $12, $ $10, $ $10, $ $10, $75.00 $7, Ref #79 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT) Awd $14.00 $ $15.00 $ $15.00 $ $15.00 $ $15.00 $ Ref #80 630E80100 SIGN, FLAT SHEET, , (2 SF) Awd $25.00 $ $26.00 $ $30.00 $ $30.00 $ $25.00 $ Page 43

44 Ref #81 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH) Awd $10.00 $ $10.00 $ $15.00 $ $15.00 $ $10.00 $10.00 Ref #82 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH) Awd $10.00 $ $10.00 $ $15.00 $ $15.00 $ $10.00 $10.00 Ref #83 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF) Awd $ $9, $ $7, $ $7, $ $7, $75.00 $5, Ref #84 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (800 SY) Awd $60.00 $48, $79.00 $63, $75.00 $60, $75.00 $60, $59.00 $47, Ref #85 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (800 SY) Awd $70.00 $56, $ $84, $ $80, $ $80, $68.00 $54, Ref #86 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (35 CY) Awd $ $6, $ $9, $ $8, $ $8, $ $6, Ref #87 848E50000 HAND CHIPPING, (25 SY) Awd $ $2, $ $2, $ $2, $ $2, $ $2, Ref #88 848E50100 TEST SLAB, (LUMP SUM) Awd $1, $1, $ $ $ $ $ $ $1, $1, Page 44

45 Ref #89 848E50200 FULL-DEPTH REPAIR, (1 CY) Awd $1, $1, $ $ $ $ $ $ $1, $1, Ref #90 848E50300 WEARING COURSE REMOVED, ASPHALT, (1800 SY) Awd $8.00 $14, $7.00 $12, $4.53 $8, $1.35 $2, $8.00 $14, Ref #91 848E50320 EXISTING CONCRETE OVERLAY REMOVED(T=3"), (555 SY) Awd $10.00 $5, $16.00 $8, $15.00 $8, $15.00 $8, $10.00 $5, Ref #92 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (14 SY) Awd $ $1, $ $1, $ $1, $ $1, $ $1, Section 9 - BRIDGE NO. ATB Totals Awd $200, $239, $224, $226, $185, Ref #93 201E11000 CLEARING AND GRUBBING, (LUMP SUM) Awd $2, $2, $3, $3, $2, $2, $2, $2, $2, $2, Ref #94 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM) Awd $25, $25, $10, $10, $10, $10, $10, $10, $34, $34, Ref #95 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (1176 LB) Awd $3.00 $3, $2.00 $2, $2.00 $2, $2.00 $2, $3.00 $3, Page 45

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Page 1 of KA

Page 1 of KA Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

.MAINTENANCE. Strategic Initiative Four:

.MAINTENANCE. Strategic Initiative Four: The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

HMA Thin Lifts for Pavement Preservation in Tennessee

HMA Thin Lifts for Pavement Preservation in Tennessee HMA Thin Lifts for Pavement Preservation in Tennessee The Tennessee Program 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total* MARK WOODS, P.E. TDOT DIV. OF MATERIALS AND TESTS * As of 2008

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG. SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Strawser Construction Project Team Chris Anspaugh Regional

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

59-2 KA Page 1 of 16

59-2 KA Page 1 of 16 59-2 KA 4812-01 Page 1 of 16 Area office to Page 2 of 16 Rock Wedge TYPICAL SECTION C 2.0 in. Overlay 2.0 in. Mill Rock Wedge 1:1 @ edge of Asphalt Match Existing Surface 30.0 ft wedge 2.0ft+ not to scale

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15 COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

Schedule of Pay Items

Schedule of Pay Items Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation

More information

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross

More information

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal. ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois

More information

I.D.O.T. Update Version -

I.D.O.T. Update Version - I.D.O.T. Update - 2007 Version - RUBBLIZATION Rubblization with HMA Overlay Rehabilitation method for deteriorated concrete pavements Alternative to extensive patching or reconstruction Pavement in effect

More information

Interstate Drive Extension

Interstate Drive Extension Interstate Drive Extension Sponsor County Highway Project No. RB19-000004 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,700,000.00 $2,150,000.00 Project Description This project continues

More information

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND 1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING

More information

DOCUMENTATION WORKBOOK FY 2017

DOCUMENTATION WORKBOOK FY 2017 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Applicant Information Strawser Construction Inc. 1392 Dublin

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

Traffic Survey Report Page TRUMBULL COUNTY 1 AVERAGE 24-HR TRAFFIC VOLUME

Traffic Survey Report Page TRUMBULL COUNTY 1 AVERAGE 24-HR TRAFFIC VOLUME Traffic Survey Report Page 1 2011 TRUMBULL COUNTY 1 SR-5 00.00 PORTAGE CO. LINE 1.61 4910 680 5590 01.61 SR 534 1.47 6560 910 7470 03.08 OHIO TURNPIKE 1.56 10410 1520 11930 04.64 C-848 (RAVENNA-WARREN

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway