1 Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian A. Hintsala, P.E
2 AECOM i Contents 1.0 Introduction Method of Analysis Variables and Coefficients Starting Point Discussion Conclusion... 2 List of Appendices Appendix A HEC-RAS Computations Appendix B Profile Sheets Appendix C Topographic Map HEC-RAS River Sections Appendix D Bridge Plans Appendix E Cross Sections Appendix F Damage Waivers Appendix G Flow Rates Appendix H Site Photographs Appendix I USGS Topographical Map and River Gradient Calculations
3 AECOM Introduction This hydraulic report is being prepared for the Marquette County Road Commission concerning the proposed County Road 595 crossing of the Second River. The site is located in Section 25 of T48N, R29W, Quad Map Name - Diorite (Lat /Long ) in Champion Township, Marquette County. Multiple road alignments were investigated. The chosen alignment crosses the river at the site of an existing crossing composed of multiple culverts. The existing culverts are both structurally and geometrically inadequate for the projected road traffic and require replacement. 2.0 Method of Analysis The hydraulic analysis was performed using the HEC-RAS River Analysis System computer program, Version developed by the U.S. Army Corps of Engineers Hydraulic Engineering Center. The steady flow data for the flood events were obtained from the Michigan Department of Environmental Quality (MDEQ). 3.0 Variables and Coefficients The river sections near the bridge use an expansion coefficient of 0.30 and contraction coefficient of 0.50 which are suitable for a typical bridge per Table 3.3 of the HEC-RAS Hydraulic Reference Manual. The Manning s n-values for friction loss were selected using Table 3.1 of the HEC-RAS Hydraulic Reference Manual. The main channel is fairly uniform with some weeds so a value of was chosen. The overbanks are covered with medium brush so a value of was chosen. Representative photographs of the site are included in Appendix H. 4.0 Starting Point The starting point of the analysis was a surveyed river section about 227 feet downstream of the proposed road. This location was chosen because it was far enough downstream to be outside of the influence of the proposed bridge. The starting water surface elevation was calculated by HEC-RAS using the slope-conveyance method. An average channel slope of was estimated from a USGS quadrangle map and used for the normal depth boundary condition. The calculations are included in Appendix I. 5.0 Discussion The main channel of the Second River is variable in width and not well defined. At the 100-year flood event a large portion of the flow is carried by the overbank floodplain. The river gradient is relatively flat and the flow regime is sub-critical for all flood events. The existing crossing is composed of two 36" circular culverts and one 42" x 66" elliptical culvert. Because of the relatively low hydraulic capacity of the existing culverts, the road is overtopped during flood events. The proposed bridge will be placed directly over the location of the existing culverts. The proposed bridge has a span of 58 feet. The relatively large span is required to replace the culverts because the overtopping of the existing road during flood events. In addition, the proposed
4 AECOM 2 bridge is highly skewed (to align it to the river channel) which reduces its effective width. The proposed bridge is composed of a prestressed concrete box beam deck supported by concrete foundation walls on steel piles. The restored stream banks are protected with heavy riprap. The proposed bridge has a large enough hydraulic opening to reduce the water elevations upstream of the bridge without overtopping the proposed road. The river cross sections are placed in HEC-RAS at the distances measured along the center line of the channel. In some cases the surveyed sections on each side of the bridge were adjusted up or downstream as required to model the bridge using the standard bridge/culvert input section of HEC- RAS. This is required because the actual location of the bridge was not known when the survey was performed. The final positions of the sections are shown in the plan view in Appendix C. The existing road approaches cut off a portion of the overbank flow during the higher flow events. Ineffective flow areas were included in the overbank portions of the cross sections upstream and downstream of the bridge as suggested in chapter 5 of the HEC-RAS Hydraulic Reference Manual. The proposed bridge has a larger hydraulic opening than the existing culverts. This reduces the water velocity at the crossing as well as the water elevation upstream. Table 1 on the following page summarizes the key model results for two configurations: 1. The existing 3 culvert crossing. 2. The proposed 58 span bridge. 6.0 Conclusion Analysis results indicate that the proposed bridge decreases water surface elevations and channel velocities for all of the flow events compared to the existing bridge.
5 Hydraulic Comparison of Bridge Options County Road 595 over Second River 3/18/2011 Table 1 HEC-RAS Analysis Results Velocity in Channel at Bridge River Station 8.5 Flow thru Bridge Opening Water Surface Elevation at Upstream Face of Bridge River Station 9 Energy Gradient Elev at Upstream Face of Bridge River Station 9 Energy Gradient Elevation at 450' Upstream of Bridge River Station 11 (ft/sec) (cfs) (feet) (feet) (feet) Model Configuration 100 Year 10 Year 100 Year 100 Year 100 Year 100 Year (600 cfs) (220 cfs) (600 cfs) (600 cfs) Change (600 cfs) Change (600 cfs) Change Existing Culverts Proposed Bridge
6 AECOM Appendix A HEC-RAS Computations
7 AECOM Computations The HEC-RAS data files are included in a separate electronic folder named: HEC-RAS_CR 595 over Second River.zip In order to provide a brief summary of the analysis results, a Profile Output Table for both the existing and proposed conditions are included on the following pages.
8 HEC-RAS Plan: Ex Culverts River: Second Riv Reach: Main Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Culv Vel DS Culv Vel US Q Culv Group Q Weir (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) (ft/s) (ft/s) (cfs) (cfs) Main 11 Q Main 11 Q Main 11 Q Main 10 Q Main 10 Q Main 10 Q Main 9 Q Main 9 Q Main 9 Q Main 8.5 Culvert #2 Q Main 8.5 Culvert #1 Q Main 8.5 Culvert #3 Q Main 8.5 Culvert #2 Q Main 8.5 Culvert #1 Q Main 8.5 Culvert #3 Q Main 8.5 Culvert #2 Q Main 8.5 Culvert #1 Q Main 8.5 Culvert #3 Q Main 8 Q Main 8 Q Main 8 Q Main 7 Q Main 7 Q Main 7 Q
9 HEC-RAS Plan: New Bridge River: Second Riv Reach: Main Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Culv Vel DS Culv Vel US Q Culv Group Q Weir (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) (ft/s) (ft/s) (cfs) (cfs) Main 11 Q Main 11 Q Main 11 Q Main 10 Q Main 10 Q Main 10 Q Main 9 Q Main 9 Q Main 9 Q Main 8.5 BR U Q Main 8.5 BR U Q Main 8.5 BR U Q Main 8.5 BR D Q Main 8.5 BR D Q Main 8.5 BR D Q Main 8 Q Main 8 Q Main 8 Q Main 7 Q Main 7 Q Main 7 Q
10 AECOM Appendix B Profile Sheets
11 Wolf Lake Road over Second River Plan: Existing culverts 3/18/2011 Second Riv Main Legend EG Q100 WS Q100 EG Q50 WS Q50 Crit Q100 EG Q10 WS Q10 Crit Q50 Crit Q10 Ground Elevation (ft) Main Channel Distance (ft)
12 Wolf Lake Road over Second River Plan: New Bridge 3/18/2011 Second Riv Main Legend EG Q100 WS Q100 EG Q50 WS Q50 Crit Q100 EG Q10 WS Q10 Crit Q50 Crit Q10 Ground 1558 Elevation (ft) Main Channel Distance (ft)
13 AECOM Appendix C Topographic Map HEC-RAS River Sections
14
15 AECOM Appendix D Bridge Plans
16
17
18
19 AECOM Appendix E Cross Sections
20 AECOM Cross Section Cross sections are included for the existing condition and the proposed bridge condition.
21 AECOM Existing Channel Condition
22
23
24
25
26
27
28 AECOM Proposed Bridge Condition
29
30
31
32
33
34
35 AECOM Appendix F Damage Waivers
36 AECOM No Damage Waivers Required
37 AECOM Appendix G Flow Rates
38 DEQ - Flood Frequency Discharges Page 1 of 1 12/6/2011 Joint Permit Application DEQ Home CIWPIS Online Services Permits Programs Site Map Contact DEQ Flood Discharge Request Record /6/2011 Home Water Management Lowflows Discharge Requests Watersheds Map Discharge Information Watercourse: SECOND RIVER Location: Wolf Lake Road Drainage Area: 6.52 mi 2 Basin Name: 46 - Escanaba Contributing Area: 6.52 mi 2 County: Marquette Tn/Rng/Sec: 48N29W/25 Township: Champion Latitude: Quad Name: Champion Longitude: Quad ID: D11SW Requested By: Sheila Meier (DEQ-LWM- Received Date: 11/23/2011 Ishpeming) Request Type: Trans. - County Issued Date: 12/5/2011 File Number: Reference Number: Discharge Frequencies: Volume Frequencies: 10%: 220 cfs 2%: 460 cfs 1%: 600 cfs 1%: 750 acre-ft 0.5%: 800 cfs 0.5%: 900 acre-ft 0.2%: 1100 cfs Access to the Flood Flow Database is provided as a service to allow you to check the status of your flood flow requests or to view discharges from previous requests for preliminary design purposes. The discharges values are only valid for the original requestor and for one year after the original request date. To obtain discharge information from the Hydrologic Studies Program, a flood flow discharge request form may be submitted electronically to the DEQ. A written or response to your request will be returned to you and must accompany your permit application. Michigan.gov Home DEQ_Home Online Services Permits Programs Site Map Contact_DEQ State Web Sites Privacy Policy Link Policy Accessibility Policy Security Policy Copyright 2011 State of Michigan
39 AECOM Appendix H Photos
40 County Road 595 over Second River Existing Crossing Looking North Downstream End of Culverts
41 County Road 595 over Second River Looking Downstream from Existing Crossing Upstream End of Culverts
42 County Road 595 over Second River Looking Upstream from Existing Crossing
43 AECOM Appendix I USGS Topographical Map and River Gradient Calculations Map includes portions of Quadrangle maps: Champion Republic Diorite Greenwood
44 087 54' 0.00" W ' 0.00" W ' 0.00" W ' 0.00" N ' 0.00" N ' 0.00" N ' 0.00" N ' 0.00" N ' 0.00" N CR 595/Second Riv 20' Intv mi 20' diff = 20'/16,452'= or 0.12% W ' 0.00" W ' 0.00" W Copyright (C) 1999, Maptech, Inc ' 0.00" W
DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED
DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT
More informationATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)
ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics
More informationSwale Storage/ Length Between Ditch Blocks
Swale Storage/ Length Between Ditch Blocks Input: Roadway Grade 1.00 % Front Slope 4 :1 Bottom Width 0 ft Back Slope 3 :1 Swale Depth 1.50 ft Calculations: Cross-Sectional Swale Area = 7.88 ft 2 DITCH
More informationEAGLE RIVER and COLORADO RIVER
FLOODPLAIN INFORMATION REPORT EAGLE RIVER and COLORADO RIVER EAGLE COUNTY, COLORADO PREPARED FOR: EAGLE COUNTY, COLORADO and the COLORADO WATER CONSERVATION BOARD This Floodplain Information Report of
More informationMemorandum October 5, 2017
614 Magnolia Avenue Ocean Springs, Mississippi 39564 228.818.9626 Memorandum October 5, 2017 To: Gary Miller, U.S. Environmental Protection Agency From: David Keith, John Laplante, Matt Henderson, and
More informationAppendix I. Canning River Fan Stream Data
Appendix I Canning River Fan Stream Data Table 1: Available Stream Width and Bankfull Data Collected on the Canning River Fan Within 5 Miles of the Coast Stream Width (ft) Ordinary Top of Flood- Site
More informationCULVERT DESIGN WITH HY-8
Back to the Basics CULVERT DESIGN WITH HY-8 Purdue University Road School 2006 Your Presenters... Merril Dougherty INDOT, Hydraulics Unit Supervisor David Finley CTE Engineers, Inc. 1 Part One: Culvert
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CFR 257.82(c) Bottom Ash Complex Mitchell Power Plant Marshall County, West Virginia October, 2016 Prepared for: Wheeling Power Company & Kentucky Power Company
More informationAppendix G Aquilla Lake Pool Rise Recreational Resources
Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative
More informationApproximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders.
BRIDGE INSPECTION BRIDGE NO./NAME SI - 3041: Mt. Brenton FSR (2.00 KM) Inspection Date: October 31 st 2012 Inspected By: D. Chen, D. Harrison Year Built: 1995 Number of Spans: 1 Span Lengths: Superstructure
More informationPurpose and Need Report
Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental
More informationMDOT Load Rating Program
Presentation Outline FHWA Audit & Action Plan Prioritization list Announcements and updates Bridge load rating assistance program Virtis load rating software MDOT Load Rating Program 2009 FHWA Audit, Final
More informationSTATE OF NEW HAMPSHIRE Inter-Department Communication
STATE OF NEW HAMPSHIRE Inter-Department Communication DATE: February 11, 2010 AT (OFFICE): NHPUC FROM: Torn Frantz Director, Electric Division SUBJECT: DE 09-277: Petition by Public Service Company of
More informationRCFC & WCD RATIONAL METHOD CALCULATION FORM
RCFC & WCD RATIONAL METHOD CALCULATION FORM HYDROLOGY MANUAL PROJECT: Tentative Tract Map No. 36952 Calculated by: TL Group Corp. Date: 7/2/2015 FREQUENCY: EXISTING 2 - YR STORM Checked by: Date: Drainage
More informationFinal Technical. Memorandum
Federal Emergency Management Agency Task Or rder #34 Final Technical Memorandum HYDROLOGIC REVIEW FOR THE VENTURA RIVER WATERSHED AND SEVERAL TRIBUTARY STREAMS FLOOD INSURANCE STUDY Ventu ra County, CA
More informationPARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT
1. Call To Order 2. Roll Call of Members 3. Introduction of Staff 4. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting March
More informationAPPENDIX A Basis of Design and Design Criteria Memorandum
APPENDIX A Basis of Design and Design Criteria Memorandum Job No: Y01-500 Files are stored in: Engineering / Client / Yolo/Y01500 Buckeye and Rumsey/Rumsey CR 41 over Cache Creek, CAD files stored in:
More informationBacteria TMDLs for Halls Bayou November 10, 2008
Bacteria TMDLs for Halls Bayou November 10, 2008 PARSONS Outline Watershed Overview Pollutant Pollutant Source Assessment Technical Approach: Load Duration Curves TMDL TMDL Calculations Halls Bayou Watershed
More informationBacteria TMDLs for Brays Bayou November 11, 2008
Bacteria TMDLs for Brays Bayou November 11, 2008 PARSONS Outline Watershed Overview Pollutant Pollutant Source Assessment Technical Approach: Load Duration Curves TMDL TMDL Calculations Brays Bayou Watershed
More informationF:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter
F:\PROJ\55211014\dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/2002 03:22:17 PM, saamhu, Acrobat PDFWriter MERRIFIELD RIVER CROSSING METHOD OF CHANGE FROM ID# ISSUES MEASUREMENT UNITS VALUE BASE CONDITIONS
More informationAppendix E Water Supply Modeling
Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over
More informationUpper Mississippi River System Flow Frequency Study. Hydrology & Hydraulics Appendix C Illinois River. Rock Island District
Upper Mississippi River System Flow Frequency Study Hydrology & Hydraulics Appendix C Illinois River Rock Island District August 2003 UPPER MISSISSIPPI RIVER SYSTEM FLOW FREQUENCY STUDY Rock Island District
More informationInitial Simulations of Flows and Water Quality in the San Joaquin River Using the DSM2-SJR Model
Introduction The California Department of Water Resources (DWR) created the DSM2-SJR model by modifying the DSM2 model of the Delta to represent the San Joaquin River from Stevinson to Vernalis. Tributaries
More informationHYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA
HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA Prepared for: THE TOWN OF ASHLAND BOARD OF SELECTMEN AND PLANNING DEPARTMENT Prepared by: June 3, 216 Hydrologic/Hydraulic
More informationSTRUCTURE 5A PURPOSE
STRUCTURE 5A This structure is a six unit pumping plant located on the south side of U.S. Highway 441 and Canal 51 (West Palm Beach Canal) between the canal and the borrow canals of Levees 7 and 40 about
More informationGATTIS SCHOOL RD / SH 130 SUBDIVISION
AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4
More informationPHYSICAL MODEL TESTS OF ICE PASSAGE AT LOCKS
Ice in the Environment: Proceedings of the 16th IAHR International Symposium on Ice Dunedin, New Zealand, 2nd 6th December 22 International Association of Hydraulic Engineering and Research PHYSICAL MODEL
More informationHydraulics Guide. Table 1: Conveyance Factors (English Units)... 7 Table 2: Conveyance Factors (Metric Units)... 8
Table of Contents 1.1 Index of Tables... 1 1.2 Index of Figures... 1 1.3 Overview of Hydraulic Considerations... 2 1.4 Discharge Curves... 2 1.5 Conveyance Method... 5 1.6 Flow Velocity Considerations...
More informationCover Sheet Drainage District 7 DSR Butler County, Missouri
Neelyville, MO ESTIMATED QUANTITIES ITEM DESCRIPTION QUANTITY Excavation 58,186 Spoil Spreading 58,186 Mobilization 1 UNITS CY CY LS The project begins at Latitude 36.4868, Longitude -0.46721 in Section
More informationTurnpike Mitigation Program Application
Ohio Department of Transportation - Ohio Turnpike Infrastructure Commission Turnpike Mitigation Program Application The application has been improved to enable project sponsors to save the application
More informationCOUNTY ROAD SPEED LIMITS. Policy 817 i
Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 1.2 APPLICABILITY... 1.3 DEFINITIONS... 1.4 STATE ENABLING LEGISLATION... 2.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 2.6 ESTABLISHING
More informationGlobal and China Camshaft Sensor Industry 2014 Market Research Report
2014 QY Research Reports Global and China Camshaft Sensor Industry 2014 Market Research Report QY Research Reports included market size, share & analysis trends on Global and China Camshaft Sensor Industry
More informationCity of Peachtree City
City of Peachtree City Lake Peachtree Spillway Replacement City Council Update September 15, 2016 Project Team Integrated Science & Engineering 1 Spillway Alternatives Analysis Spillway Alternatives Evaluated
More informationDRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:
1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,
More informationCROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION
CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION Crow Wing County Highway Department 16589 CR 142 Brainerd, MN 56401 Crow Wing
More informationConstruction Noise Memorandum
Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551
More informationTurnpike Mitigation Program Application
Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by
More informationCity of St. Pete Beach Model Capacity Report Addendum
Model Capacity Report - Addendum City of St. Pete Beach Model Capacity Report Addendum Prepared for: City of St. Pete Beach 155 Corey Avenue St. Pete Beach, FL 33706 Prepared By: Kimley-Horn and Associates,
More informationSTRUCTURE S-13. Revised 2/21/02
STRUCTURE S-13 This structure is a pumping station with a gated spillway which can control flows which bypass the pumps. The structure is located in Canal 11 (South New River Canal) about 300 feet west
More informationCHINO DESALTER PHASE 3
CHINO DESALTER PHASE 3 Comprehensive Predesign Report Prepared for Jurupa Community Services District, City of Ontario, and Western Municipal Water District REVISED FINAL December 2010 Jurupa Community
More informationSupplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado
Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Prepared for: Regional Transportation District 1560 Broadway, Suite 700 Denver, Colorado 80202 303-299-2426 Prepared by: Thomas
More informationTaylor s Falls Business Park
Site Information Taylor s Falls Business Park County Road 37, Taylors Falls, MN Chisago County HRA-EDA 12/23/2014 Taylors Falls Business Park County Road 37 Taylors Falls, MN 55084 PROPERTY FEATURES: Zoned
More informationGlobal and China EV Charging Equipment Industry 2014 Market Research Report
2014 QY Research Reports Global and China EV Charging Equipment Industry 2014 Market Research Report QY Research Reports included market size, share & analysis trends on Global and China EV Charging Equipment
More informationContract No: OASRTRS-14-H-MST (Missouri University of Science and Technology)
Smart Rock Technology for Real-time Monitoring of Bridge Scour and Riprap Effectiveness Design Guidelines and Visualization Tools (Progress Report No. 7) Contract No: OASRTRS-14-H-MST (Missouri University
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationNon-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer
Non-Destructive Pavement Testing at IDOT LaDonna R. Rowden, P.E. Pavement Technology Engineer Bureau of Materials and Physical Research Physical Research Section Bridge Investigations Unit Pavement Technology
More informationFINAL LICENSE APPLICATION Exhibit A Description of Project
FINAL LICENSE APPLICATION Exhibit A Description of Project PacifiCorp Portland, Oregon April 2004 Copyright 2004 by PacifiCorp Reproduction in whole or in part without the written consent of PacifiCorp
More informationSchedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES
Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION
More informationEARTHQUAKE ACTIVITY IN THE YELLOWSTONE REGION. Preliminary Epicenters. January 1 March 31, 2014
EARTHQUAKE ACTIVITY IN THE YELLOWSTONE REGION Preliminary Epicenters January 1 March 31, 2014 Prepared by the University of Utah Seismograph Stations and funded by the U.S. Geological Survey (Cooperative
More informationEXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No
EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270
More information44
44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 WETLAND IMPACTS Wetland No. 1 Approximate Station Cowardin Class 2 WESPAK-SE Wetland Type 3 Temporary Impact Area (acres) 4 Permanent
More informationAppendix D. List of Existing Structures
A120 Braintree to A12 Technical Appraisal Report Appendix D. List of Existing Structures B3553T41-JAC-HGN-00-REP-C-0002 Page 134 of 135 A120 Braintree to A12 - Existing Structures Existing Structure Name
More informationLAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS
LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...
More informationA demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT
A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT Highway and Floodplain Cochise County Grant Grant amount- up to $1,693,265 over 3 years Components:
More informationCITY of NOVI CITY COUNCIL
CITY of NOVI CITY COUNCIL Agenda Item N December 17,2012 SUBJECT: Approval of Traffic Control Orders 12-63 through 12-67 for traffic control signs within Orchard Hills West. I_ j /~ SUBMITTING DEPARTMENT:
More informationContract No: OASRTRS-14-H-MST (Missouri University of Science and Technology)
Smart Rock Technology for Real-time Monitoring of Bridge Scour and Riprap Effectiveness Design Guidelines and Visualization Tools (Progress Report No. 2) Contract No: OASRTRS-14-H-MST (Missouri University
More informationPERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL
PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee
More informationWildland Solutions RDM Monitoring Procedure Keith Guenther November 2007 version
Wildland Solutions RDM Monitoring Procedure Keith Guenther November 2007 version Annually create an RDM zone map and a pasture success map with supporting information collected at monitoring reference
More informationAPPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way
IONIA COUNTY ROAD COMMISSION 170 E. Riverside Drive; P.O. Box 76, Ionia MI 48846 (616) 527-1700 (office) or (616) 527-8848 (fax) APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove
More informationTransportation Engineering II UNIT - I
Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.
More informationTurbostroje 2015 Návrh spojení vysokotlaké a nízkotlaké turbíny. Turbomachinery 2015, Design of HP and LP turbine connection
Turbostroje 2015 Turbostroje 2015 Návrh spojení vysokotlaké a nízkotlaké turbíny Turbomachinery 2015, Design of HP and LP turbine connection J. Hrabovský 1, J. Klíma 2, V. Prokop 3, M. Komárek 4 Abstract:
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP
More informationAMENDED CULVERT POLICY WITH MAIL BOX POLICY
AMENDED CULVERT POLICY WITH MAIL BOX POLICY REVISED MARCH 28, 2017 COMMISSIONERS COURT ORDER NO. 17-03-168 POLICY ACCEPTANCE AGREEMENT This page is to be signed by the Requesting Party and returned in
More informationHydraulic Design of Navigation Locks
Hydraulic Design of Navigation Locks U.S. Army Corps of Engineers Navigation Systems Research Program U.S. Army Engineer Research & Development Center Coastal and Hydraulics Laboratory Navigation Branch
More informationCOUNTY ROAD SPEED LIMITS. Policy 817 i
Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 2.2 APPLICABILITY... 2.3 DEFINITIONS... 2.4 STATE ENABLING LEGISLATION... 3.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 3.6 ESTABLISHING
More information2018 LOUISIANA TRANSPORTATION CONFERENCE. Mohsen Shahawy, PHD, PE
2018 LOUISIANA TRANSPORTATION CONFERENCE Sunday, February 25 - Wednesday, February 28, 2018 DEVELOPMENT OF U-BEAM PRESTRESSED CONCRETE DESIGN STANDARDS Mohsen Shahawy, PHD, PE SDR Engineering Consultants,
More informationPUCO Case No EL-BLN In the Matter of the Letter of Notification for the Adjustment to Carrollton-Sunnyside 138kV Transmission Line
Legal Department American Electric Power 1 Riverside Plaza Columbus, OH 43215-2373 AEP.com December 28, 2018 Hector Garcia Christen M. Blend Senior Counsel Regulatory Services (614) 716-3410 (P) (614)
More informationWHITE POINT LANDSLIDE
Gary Lee Moore, PE, ENV SP Alfred L. Mata, P.E., Deputy City Engineer WHITE POINT LANDSLIDE Status Report Recommended Immediate Measures (Estimate $12.96 Million) FUNDING APPROVED BY CITY COUNCIL ON: AUGUST
More informationPlan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP
414 Nicollet Mall Minneapolis, MN 55401 March 13, 2017 Daniel P. Wolf Executive Secretary Minnesota Public Utilities Commission 121 7 th Place East, Suite 350 St. Paul, MN 55101 Via Electronic Filing RE:
More informationRosedale Sanitary Sewer Feasibility Review Report
Rosedale Sanitary Sewer Feasibility Review Report Submitted by: WEDLER ENGINEERING LLP 201 9300 Nowell Street Chilliwack BC V2P 4V7 Phone: 604 792 0651 Wedler File No: C13 5032/A December 6, 2013 STATEMENT
More informationCITY of NOVI CITY COUNCIL
CITY of NOVI CITY COUNCIL Agenda Item 3 July 9, 2018 ci tyofnovi.org SUBJECT: Approval to award design engineering services to AECOM Great Lakes, Inc., for the Flint Street Realignment and Reconstruction
More informationNOTICE OF TOTALIZING FLOW METER RE-VERIFICATION, INSTALLATION OR REPLACEMENT
Form 3.1 06/15/2014 www.water.state.co.us S. Platte River Division 1 970-352-8712 Fax 970-392-1816 810 9 th Street, 2 nd Floor, Greeley, CO 80631 dnr_div1spgwm@state.co.us Republican River Division 1 970-352-8712
More informationPRELIMINARY UTILITY REPORT FOR TOPGOLF INTERNATIONAL, INC.
PRELIMINARY UTILITY REPORT FOR TOPGOLF INTERNATIONAL, INC. THORNTON, COLORADO Prepared for: ARCO Murray Contact: Rachel Bohac Phone: 331.251.2726 Prepared by: 1225 17 th Street, Suite 514 Denver, CO 80202
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationmga research corporation
mga research corporation UNDERGROUND TECHNOLOGIES MAN-HOLE CONSTRUCTION VERTICAL STATIC LOAD TEST SERIES (PO# 11521) 446 executive drive troy, mi 48083 248 / 577-5001 fax 248 / 577-5025 www.mgaresearch.com
More informationSection 5. Manhole Inspection Report
Section 5 Inspection Report Ypsilanti Community Utilities Authority Huron River Interceptor I/I Study Inspection Report Technical Memorandum December, 2008 Introduction Several manholes within the Huron
More informationRevising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows
Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows 1961-2007 Background The Niagara River flow at Buffalo is currently computed
More informationAssisted Living / Memory Care - South Forsyth
! Assisted Living / Memory Care - South Forsyth LOCATION: 6388 Post Road, Cumming, GA 30040 - Forsyth County Parcel ID - 037-012 2 nd District, 1 st Section, Land Lot 317 SIZE: 5.4723 acres +/- ZONING:
More informationMore information at
Report Information More information at https://www.htfmarketreport.com/reports/1356357 Global and Chinese Automotive Twin Turbochargers Industry, 2018 Market Research Report Report Code: HTF1356357 Pages:
More informationINTERNATIONAL JOURNAL OF APPLIED ENGINEERING RESEARCH, DINDIGUL Volume 1, No 4, 2011
Numerical modal analysis of Howell Bunger valve using FEM method Farid Vakili Tahami, Mohammad Zehsaz, Mohammad Ali Saeimi Sadigh, Amin Paykani Department of Mechanical Engineering, University of Tabriz,
More informationONONDAGA LAKE PRE-DESIGN INVESTIGATION: WASTEBED 13 SETTLEMENT PILOT STUDY MONITORING DATA YEAR 2 Onondaga County, New York
ONONDAGA LAKE PRE-DESIGN INVESTIGATION: WASTEBED 13 SETTLEMENT PILOT STUDY MONITORING DATA YEAR 2 Onondaga County, New York Prepared For: 5000 Brittonfield Parkway Suite 700 East Syracuse, NY 13057 Prepared
More informationProject Description - 1 -
Project Description The Mother Ann Lee Hydroelectric Station is located at Lock and Dam 7 on the Kentucky River. This dam is part of a system of 14 lock and dams installed on the Kentucky River between
More informationAluminum Box Culverts
Steel and Aluminum s The Solution for Small Bridge Replacement: s Contech s are a practical and costefficient solution for small bridge replacement. They have a lower installed cost because they are faster
More informationSECTION 9 STORM SEWER INLETS
SECTION 9 STORM SEWER INLETS CITY OF WESTMINSTER STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 9 STORM SEWER INLETS 9.1 INTRODUCTION There are three types of inlets: curb opening, grated, and combination
More informationSMART ROCK TECHNOLOGY FOR REAL-TIME MONITORING OF BRIDGE SCOUR GUIDELINES AND VISUALIZATION AND RIPRAP EFFECTIVENESS
SMART ROCK TECHNOLOGY FOR REAL-TIME MONITORING OF BRIDGE SCOUR AND RIPRAP EFFECTIVENESS GUIDELINES AND VISUALIZATION Genda Chen, P.E., Ph.D., F.ASCE, F.SEI Professor and Abbett Distinguished Chair in Civil
More informationDRAINAGE. December
DRAINAGE December 2017-1 TAB - 2501 STATEMENT OF ESTIMATED QUANTITIES TAB SHT NO ITEM DESCRIPTION UNITS ARPONS TOTAL ESTIMATED QUANTITY D 25 2104.502 CATCH BASIN EACH 1 D 25 2104.502 S EACH 9 D 25 2104.503
More informationTechnical Information
Technical Information No. : 064-2016 1 August 2016 To Subject : Whom It May Concern : Summary Report of IMO Meetings of Sub-Committee on Implementation of IMO Instrument (III 3) 3 rd session Summary This
More informationWashtenaw County DESIGN PROCEDURES AND ENGINEERING STANDARDS FOR PRESSURE DISTRIBUTION NETWORKS
Washtenaw County Department of Planning & Environment Development Services Division DESIGN PROCEDURES AND ENGINEERING STANDARDS FOR PRESSURE DISTRIBUTION NETWORKS 705 N. Zeeb Road Phone: (734) 222-3800
More informationMissouri River Incremental Flows Below Gavins Point Technical Report
Missouri River Incremental Flows Below Gavins Point Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha, Nebraska July 214 Missouri
More informationPublic Information Workshop
Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)
More informationMissouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report
Missouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha,
More informationTurnpike Mitigation Program Application
Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by
More informationNote: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.
Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared
More informationAppendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension
Appendix C 5% Design Plan and Profile Drawings/ Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies
More informationCFIRE December 2009
i BRIDGE ANALYSIS AND EVALUATION OF EFFECTS UNDER OVERLOAD VEHICLES (PHASE 1) CFIRE 02-03 December 2009 National Center for Freight & Infrastructure Research & Education College of Engineering Department
More informationContract No: OASRTRS-14-H-MST (Missouri University of Science and Technology)
Smart Rock Technology for Real-time Monitoring of Bridge Scour and Riprap Effectiveness Design Guidelines and Visualization Tools (Progress Report No. 3) Contract No: OASRTRS-14-H-MST (Missouri University
More informationSITE VICINITY MAP SCALE: NONE
L:\Projects\75000\75200-75299\75271_AshGrove\75271.005 PT\CAD\Working\Sheets\Fender_Pile_Replacment\75271.005_PT_FENDER_PILE-COVER.dwg Kelly Clark 12/7/2018 11:03:55 AM PROJECT LOCATION OREGON SITE VICINITY
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More information1962: HRCS Circular 482 one-page document, specified vehicle mass, impact speed, and approach angle for crash tests.
1 2 3 1962: HRCS Circular 482 one-page document, specified vehicle mass, impact speed, and approach angle for crash tests. 1973: NCHRP Report 153 16-page document, based on technical input from 70+ individuals
More informationCONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO
CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO PREPARED FOR: SHEA HOMES 9380 STATION ST., SUITE 600 LONE TREE, CO 80124 PHONE: 303-791-8180 CONTACT: RYAN MCDERMED PREPARED BY: