1 Neelyville, MO ESTIMATED QUANTITIES ITEM DESCRIPTION QUANTITY Excavation 58,186 Spoil Spreading 58,186 Mobilization 1 UNITS CY CY LS The project begins at Latitude , Longitude in Section 3, Township 22 North, Range 6 East, in GENERAL PLANS SEET # Digitally signed by JON ESTER : :01:17-05'00' 1 EMERGENCY WATERSED PROGRAM INDEX OF DRAWING SEETS TITLE Cover Plan Views Cross Sections WB J SJ JON ESTER Cover Drainage District 7 DSR Department

2 31 30 AA UU OXIE SUB FISERY RD Sta Sta Sta Sta Sta Sta Ackerman Ditch Width Depth Co Road Co Road Co Road Ending sj sj Plan View Ackerman WB Sta Sta Sta Sta Sta N Ackerman Ditch 80,817 CY Excavation/ Spoil Spreading 1. This project is for removal Department 2

3 N 245 Sta Sta 7+30 Sta Sta Sta Sta Sta Black River Levee Ditch Width Depth Ending Black River Levee Ditch,527 CY Excavation/ Spoil Spreading 1. This project is for removal sj sj Plan View Black River Levee Ditch WB Department 3

4 EE 341 BB PRIVATE PRIVATE RD ART ST 340 Sta Sta Sta WARNING GAS PIPELINE Sta Cane Creek Width Depth Just north WY At CR Ending At CR sj sj Plan View Cane Creek WB CENTER ST 2671 OXIE SUB Sta Sta Cane Creek 114,355 CY Excavation/ Spoil Spreading 1. This project is for removal Department 278 Sta

5 WARNING GAS PIPELINE Sta 7+1 Sta ,44 Craven Quantities CY Excavation/ Spoil Spreading 1. This project is for removal sj WB sj Sta BB Plan View Craven Sta Craven Width Depth WARNING GAS PIPELINE At CRD At CRD Ending Department 31 Sta

6 Sta Sta SETTLEMENT DR 53 Sta Dan River Width Depth At CRD At wy At CRD Ending sj sj Plan View Dan River WB Sta Dan River 37,672 CY Excavation/ Spoil Spreading 1. This project is for removal Department Sta

7 Sta Sta This project is for removal Sta EE 246 Sta Main Ditch Quantities 135,2 CY Excavation/ Spoil Spreading Sta sj sj WB 344 Plan View Main Ditch UU 328 WARNING GAS PIPELINE Main Ditch Width Depth At CRD 341/ MO GAS PIPELINE CROSSING Ending at CRD 307 Department Sta BB IE S U B C FISERY RD Sta OX

8 N UU FISERY RD Sta WARNING Width GAS PIPELINE Sta Sta Sta Bottom Stillcamp Sediment Depth At CRD At CRD Ending SK SK Plan View Stillcamp WB 216 Sta Sta Stillcamp 85,437 CY Excavation/ Spoil Spreading 1. This project is for removal Department 8

9 Typical Cross Section DSR Drainage District 7 SK SK SK 1. This project is for removal existing sediment only. ROW from the ditch bank. 4. Channel grade shall be uniform from beginning to end.

Appendix I. Canning River Fan Stream Data

Appendix I. Canning River Fan Stream Data Appendix I Canning River Fan Stream Data Table 1: Available Stream Width and Bankfull Data Collected on the Canning River Fan Within 5 Miles of the Coast Stream Width (ft) Ordinary Top of Flood- Site

More information

PART A. INSTRUCTION SHEET FOR LOCK SERVICE PACK XW4Z CB, 5W4Z BB AND 4R3Z AA

PART A. INSTRUCTION SHEET FOR LOCK SERVICE PACK XW4Z CB, 5W4Z BB AND 4R3Z AA KIT, 5W4Z-5421991-BB AND 4R3Z-6321990-AB Item # Part Number Description Used In Package Quantity A SK 5W4A-5421991-BB Instruction Sheet (48387) All 1 B1 324341 Tumbler # 1 All 4 B2 324342 Tumbler # 2 All

More information

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian

More information

Riverside County Flood Control & Water Conservation District 1995 Market St. Riverside, CA Phone: Fax:

Riverside County Flood Control & Water Conservation District 1995 Market St. Riverside, CA Phone: Fax: Bid Abstract Riverside County Flood Control & Water Conservation District 1995 Market St. Riverside, CA 92501 Phone: 951.955.1200 Fax: 951.788.9965 Project Name: PALM CANYON WASH LEVEE REHABILITATION &

More information

A George & Associates

A George & Associates PLANS PREPARED FOR: SHEET 6 INDEX OF SHEETS SHEET UNDERROUND UTILITIES & PUBLIC INFRASTRUCTURE DEPARTMENT WATER RESOURCES MANAEMENT C.O.T. WORK ORDER NO. 008 Sheet Number Sheet Title Cover Sheet Drainage

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics

More information

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT

More information

CENTENNIAL PARK EXPANSION

CENTENNIAL PARK EXPANSION 2 working days CITY ELKO EXISTING LEGEND PROPOSED CENTENNIAL PARK EXPANSION SEET LIGHT POWER POLE ELECICAL BOX 1-800-227-2600 AVOID CUTTING UNDERGROUND UTILITIES WATER VALVE GAS VALVE FIRE HYDRANT OWNER/DEVELOPER:

More information

PART A. INSTRUCTION SHEET FOR LOCK SERVICE PACK 5F1Z AA, XL2Z AC, XL1Z AB, F7SZ CB, F8OZ AB,

PART A. INSTRUCTION SHEET FOR LOCK SERVICE PACK 5F1Z AA, XL2Z AC, XL1Z AB, F7SZ CB, F8OZ AB, 5F1Z-5421990-AA, XL2Z-7821990-AC, XL1Z-7843432-AB, F7SZ-6321990-CB, F8OZ-5421990-AB, F8LZ-6321990-AB, KIT - 5F1Z-5421990-AA. XL2Z-7821990-AC, XL1Z-7843432-AB, F7SZ-6321990-CB, F8OZ-5421990-AB, F8LZ-6321990-AB,

More information

UBC Watermain as shown on Sheet 202 : Sub total 97,050

UBC Watermain as shown on Sheet 202 : Sub total 97,050 Preliminary Cost Estimate Brock Commons Phase 1 Watermain replacement UBC Portion of Works only Replace existing 150mm dia CI and 200mm dia AC watermain with 200mm & 250mm dia DI (ductile iron) watermain

More information

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Prepared for: Regional Transportation District 1560 Broadway, Suite 700 Denver, Colorado 80202 303-299-2426 Prepared by: Thomas

More information

Plainfield, Indiana Speed Limit Study

Plainfield, Indiana Speed Limit Study March 21 st, 2017 Prepared on behalf of: Town of Plainfield Building and Engineering Department 206 W. Main Street Plainfield, IN 46168 (317) 839-2561 Prepared by: Thomas S. Vandenberg, PE, PTOE Matthew

More information

Summary of the Mineral Block

Summary of the Mineral Block Summary of the Mineral Block PART A GENERAL INFORMATION ABOUT MINERAL BLOCK Features Details 1. Location Mineral Block Mohra East Corner Points (Latitude, Longitude) See Appendix 1 Villages Mohra, Patharchua,

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway

More information

Technical Inputs to Dredging Estimates. Robert Ramsdell Manager of Production Engineering Great Lakes Dredge & Dock

Technical Inputs to Dredging Estimates. Robert Ramsdell Manager of Production Engineering Great Lakes Dredge & Dock Technical Inputs to Dredging Estimates Robert Ramsdell Manager of Production Engineering Great Lakes Dredge & Dock Production Engineering Estimate the productivity of dredging equipment Work to improve

More information

A REPORT TO. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution. Telecontrol. System Planning

A REPORT TO. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution. Telecontrol. System Planning A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical 4v ^c 0:01'1 S0^O c.. ^ '^ W E. G. PIERCY i^ x zoto/off/zq,.'ftrif4^#ft^^,' r Mechanical Civil Protection & Control Transmission &

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON -30,219.83 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 291 CONTRACT ID: 051002028 PROJECT: STP 2013(839) CONTRACT: 07133220 AWARD : $4,317,753.44 PROJECTED : $4,394,254.44 ADJ. PROJECTED : $4,364,034.61

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

BUTTE COUNTY DEPARTMENT OF PUBLIC WORKS

BUTTE COUNTY DEPARTMENT OF PUBLIC WORKS PROJECT: 2014 Slurry Seal PROJECT LOCATION: Various Roads in the Thermalito and Oroville Areas Retro-Reflective Pavement Markers. ADVERTISED: February 27, 2014 ENGINEER'S ESTIMATE = $213,700.00 BIDS OPENED:

More information

Supporting Information

Supporting Information Supporting Information van der Werf et al. 10.1073/pnas.0803375105 Fig. S1. Fire locations (number of detected fires during 2000 ) superimposed on a drainage map (blue). Note how most fires occur along

More information

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Philadelphia Regional Port Authority U.S. Army Corps of Engineers Philadelphia District DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Investigation of Submarine Utility Crossings Stations 249+000 to 515+000

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:

More information

Hydraulic power is the key to the utility of many excavators.

Hydraulic power is the key to the utility of many excavators. CHAPTER Construction Planning, Equipment, and Methods EXCAVATORS Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 8 By Dr. Ibrahim Assakkaf ENCE 420 Construction

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

Tamil Nadu Public Service Commission

Tamil Nadu Public Service Commission ASSISTANT CONSERVATOR OF FORESTS DOE :02.12.2014 TO 09.12.2014 _ Subjcct:AGRICULTURE ~ Codc:ACFAG ~........ B X 41 AX 81 DX 121 o A 161 c l< 2 cy 42 CY' 82 Dy 122 13 x 162 B ~ J ox 4J c \ 83 D..( 123 c

More information

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements The above titled solicitation is amended. All amendments must be acknowledged on the PROPOSAL ; failure to do so may be cause for rejection of

More information

ONONDAGA LAKE PRE-DESIGN INVESTIGATION: WASTEBED 13 SETTLEMENT PILOT STUDY MONITORING DATA YEAR 2 Onondaga County, New York

ONONDAGA LAKE PRE-DESIGN INVESTIGATION: WASTEBED 13 SETTLEMENT PILOT STUDY MONITORING DATA YEAR 2 Onondaga County, New York ONONDAGA LAKE PRE-DESIGN INVESTIGATION: WASTEBED 13 SETTLEMENT PILOT STUDY MONITORING DATA YEAR 2 Onondaga County, New York Prepared For: 5000 Brittonfield Parkway Suite 700 East Syracuse, NY 13057 Prepared

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: 60,795.01 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 58 CONTRACT ID: 092406377 PROJECT: NH 2013(045) CONTRACT: 09123218 AWARD : $340,789.00 PROJECTED : $362,789.00 ADJ. PROJECTED : $423,584.01

More information

http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-102-1.pdf http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-63-1.pdf. COST ESTIMATE FOR PACIFICA QUARRY

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Engineering Data Book

Engineering Data Book 40VMA Outside Air Processing Unit for Variable Refrigerant Flow (VRF) Systems Engineering Data Book Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60

More information

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR Ameren Missouri AMENDED Renewable Energy Standard Compliance Report 2015 Prepared in Compliance with 4 CSR 240-20.100 June 23, 2016 NP Table of Contents Page INTRODUCTION...4 SECTION (8) (A) 1 A: TOTAL

More information

LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.

LEGEND FULL DEPTH PAVEMENT 2 MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15. 0 5 10 Feet 15 MATCHLINE DELMAR BLVD. STA. 18+50.00 LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY MATCHLINE DELMAR BLVD. STA. 13+00.00 END NSTRUCTION 54.76 LT. MATCH EXISTING SIDEWALK PROPOSED CURB RAMP

More information

STOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A C H U R C H I L L OREY W H I T E P I N E L Y O N C A RSON C IT Y DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N

More information

HYDRAULIC EXCAVATOR. Super Long Front. Hydraulic Excavator Attachments PC200LC-8 PC220LC-8 PC270LC-8 PC350LC/HD-8 PC450LC-8

HYDRAULIC EXCAVATOR. Super Long Front. Hydraulic Excavator Attachments PC200LC-8 PC220LC-8 PC270LC-8 PC350LC/HD-8 PC450LC-8 PC200LC-8 PC220LC-8 PC270LC-8 PC350LC/HD-8 PC450LC-8 Super Long Front Hydraulic Excavator ttachments FRONT LENGTHS 15.2-19.8 m 50' - 65' HYDRULIC EXCVTOR Photo may include optional equipment PC200LC-8,

More information

Super Long Front. PC210LC-10 PC240LC-10 PC290LC-10 PC360LC-10 PC390LC-10 PC490LC-10 Hydraulic Excavator Attachments. FRONT LENGTHS 50' 65'

Super Long Front. PC210LC-10 PC240LC-10 PC290LC-10 PC360LC-10 PC390LC-10 PC490LC-10 Hydraulic Excavator Attachments. FRONT LENGTHS 50' 65' FRONT LENGTHS 50' 65' 15.2 19.8 m PHOTOS MY INCLUDE OPTIONL EQUIPMENT PC210LC-10 PC240LC-10 PC290LC-10 PC360LC-10 PC390LC-10 PC490LC-10 Hydraulic Excavator ttachments Super Long Front WLK-ROUND Super Long

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

Appendix 5 Sample Specifications. Specifications for Socioeconomic Survey in Rural Areas in Myanmar

Appendix 5 Sample Specifications. Specifications for Socioeconomic Survey in Rural Areas in Myanmar Part 6-2 Appendix 5 Appendix 5 Sample Specifications Appendix 5-1 Appendix 5-2 Appendix 5-3 Appendix 5-4 Appendix 5-5 Appendix 5-6 Specifications for Socioeconomic Survey in Rural Areas in Myanmar Technical

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

Projected 2011 Missouri River Flood Elevations

Projected 2011 Missouri River Flood Elevations Projected 2011 Missouri River Flood Elevations Kansas City District, US Army Corps of Engineers The following table presents two water surface profiles based on the likely range of flows that are expected

More information

SHEET # 48414AB1 CPR 2005 FORD MOTOR COMPANY DEARBORN, MICHIGAN

SHEET # 48414AB1 CPR 2005 FORD MOTOR COMPANY DEARBORN, MICHIGAN SERVICE PACK F7SZ-6343262-CB/DB; F8DZ-5443262-CB/DB; F8OZ-5443262-AE/BE; KIT - F7SZ-6343262-CB/DB; F8DZ-5443262-CB/DB; F8OZ-5443262-AE/BE; Item # Part Number Description Used in Package Quantity A SK 5F1A-5443262-AA

More information

ROW CROP MANAGER CONTENTS

ROW CROP MANAGER CONTENTS ROW CROP MANAGER CONTENTS Complete Parts Breakdown Section 1 Row Crop Manager (Exploded View)...4 Folding Wing (Exploded View)...8 Adjustable Row Module Section 2 Row Module (Exploded View)...12 V-Guide

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

Notice of the Maritime Safety Administration of the People s. Republic of China on Strengthening the Supervision and

Notice of the Maritime Safety Administration of the People s. Republic of China on Strengthening the Supervision and HCJ [2016] No.48 Notice of the Maritime Safety Administration of the People s Republic of China on Strengthening the Supervision and Administration on Emission Control Areas for Vessels All relevant units,

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011 I-405 Sepulveda Pass Improvements Project Community Advisory Committee July 28, 2011 1 Wilshire Segment 2 Wilshire Segment (National to Waterford) Ramp and Wall Construction at Sepulveda/Wilshire Intersection

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 9/13/2006 Control 0196-07-026 Project STP 2006(438)MM Highway SP 366 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

September 09, ASU Meat Goat Performance Test Consignors. Dr. Mike Salisbury. Final Performance Data and Report

September 09, ASU Meat Goat Performance Test Consignors. Dr. Mike Salisbury. Final Performance Data and Report September 09, 2013 To: From: Subject: 2013 ASU Meat Goat Performance Test Consignors Dr. Mike Salisbury Final Performance Data and Report Enclosed you will find the final data on the bucks entered in the

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

Jasper County Right of Way Management Policy DRIVEWAY PERMITS Adopted May 5, 2005

Jasper County Right of Way Management Policy DRIVEWAY PERMITS Adopted May 5, 2005 Jasper County Right of Way Management Policy DRIVEWAY PERMITS Adopted May 5, 2005 Driveway Permits - A permit issued to all applicants who wish to obtain access to, or improve an existing access, to a

More information

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara

More information

Excavation Equipment: Shovel

Excavation Equipment: Shovel Arab Academy for Science, Technology & Maritime Transport College of Engineering & Technology Construction & Building Engineering CB 524 Methods and Equipment for Construction 2 Excavation Equipment: Shovel

More information

6/ Lorraine Cassista. Paradise Ln. Oxford

6/ Lorraine Cassista. Paradise Ln. Oxford 6/15-16 Lorraine Cassista Paradise Ln Oxford Rip-Rap Cubic Yards 14 26.16 366.24 Erosion Control Mulch Cubic Yards 2 35.00 70.00 Bar Harbor Junipers 3 gallon 5 37.00 185.00 Bar Harbor Junipers 2 gallon

More information

Report on Removing Marine Debris from Beaches near Teller, Alaska in Fred Jay Ivanoff and Wesley W. Jones 1. January, 2011.

Report on Removing Marine Debris from Beaches near Teller, Alaska in Fred Jay Ivanoff and Wesley W. Jones 1. January, 2011. Report on Removing Marine Debris from Beaches near, Alaska in 2010 By Fred Jay Ivanoff and Wesley W. Jones 1 January, 2011 For Marine Conservation Alliance Foundation 431 N Franklin St Suite 305 Juneau,

More information

Regular Data Structures. 1, 2, 3, 4, N-D Arrays

Regular Data Structures. 1, 2, 3, 4, N-D Arrays Regular Data Structures 1, 2, 3, 4, N-D Arrays Popescu 2012 1 Data Structures Store and organize data on computers Facilitate data processing Fast retrieval of data and of related data Similar to furniture

More information

APPLICATION FOR PERMIT TO INSTALL A DRIVEWAY ON A COUNTY TRUNK HIGHWAY

APPLICATION FOR PERMIT TO INSTALL A DRIVEWAY ON A COUNTY TRUNK HIGHWAY APPLICATION FOR PERMIT TO INSTALL A DRIVEWAY ON A COUNTY TRUNK HIGHWAY Chapter 86.07(2) of Wisconsin State Statutes provides that the authority maintaining the highway issue a permit before any excavation

More information

B.6 Construction Equipment Utilization and Workforce

B.6 Construction Equipment Utilization and Workforce Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction

More information

Safety Sense Ballast Under Cutter

Safety Sense Ballast Under Cutter Ballast Under Cutter The Stobart Rail Ballast Under Cutters and the process in which they are used has been developed and improved so that ballast can be excavated and replenished without the requirement

More information

www. ElectricalPartManuals. com GENERAL. ELECTRIC RENEWAL PARTS CR7006-C100, -C101 AND -C102 MAGNETIC STARTERS

www. ElectricalPartManuals. com GENERAL. ELECTRIC RENEWAL PARTS CR7006-C100, -C101 AND -C102 MAGNETIC STARTERS RENEWAL PARTS CR7006-C100, -C101 AND -C102 MAGNETC STARTERS CR7006-C1 OOA, -C1 008, -C1 OOC, -C1 000, -C1 01 A, -C1 01 B, -C1 01 C, -C1 010, -C1 01 Q, -C1 02A, -C1 028, -C1 02C, -C1 020 and -C1 02Q GEF-3!5470

More information

National Association of Wastewater Transporters (NAWT) Onsite Treatment Tank Pumping & Cleaning Code of Practice

National Association of Wastewater Transporters (NAWT) Onsite Treatment Tank Pumping & Cleaning Code of Practice National Association of Wastewater Transporters (NAWT) Onsite Treatment Tank Pumping & Cleaning Code of Practice Safety At all times, the technician s personal safety, as well as protection of the environment

More information

Excavation Report. Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade. Excavation Report. Client: Anglian Water

Excavation Report. Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade. Excavation Report. Client: Anglian Water Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade Excavation Report Excavation Report July 2017 Client: Anglian Water OA East Report No: 1959 OASIS No: oxfordar3-263644

More information

Metrolinx Electrification Project

Metrolinx Electrification Project Metrolinx Electrification Project Metrolinx Contract No. RQQ-2011-PP-032 Metrolinx Project No. 109503 UP EXPRESS UTILITY REPORT Document Reference No. PB 1000 March 28, 2014 Submitted to Submitted by TABLE

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Engineering Data Book

Engineering Data Book 40VMH High Static Duct Indoor Unit for Variable Refrigerant Flow (VRF) Systems Engineering Data Book Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without

More information

INSTRUCTIONS 360 Y-DROP

INSTRUCTIONS 360 Y-DROP INSTRUCTIONS 60 Y-DROP INSTRUCTIONS 60 Y-DROP INTRODUCTION Before beginning, it s important to know where each mounting bracket fits relative to the row spacing involved. The 60 Y-DROP unit should be precisely

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Design Concept and Financing of the Light Rail Zagreb Project

Design Concept and Financing of the Light Rail Zagreb Project Davorin KOLIĆ ITA Croatia - - - Neuron Zagreb doo Design Concept and Financing of the Light Rail Zagreb Project Presentations Metro Zagreb HKIG, Zagreb September 7,, 2009 References D.Kolić 1992 Metro

More information

**Equipment production**

**Equipment production** Construction operations And methods **Equipment production** The Equipment that will be covered on the exam and in this section are; Dozers Graders Scrapers Loaders Excavators Cranes(will discuss another

More information

ROAD MASTER S REPORT

ROAD MASTER S REPORT ROAD MASTER S REPORT For the month of June 2016 Roadwork: 1. Mowed Pond Hill, Red Rock, Grimes, Fall Run, Harmony Hill, Dry Run, Sullivan, PA Ave, Old RT 6 and canal Street 2. Tree trimmers needed flaggers

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

I ADJUSTMENTS TO LEVIES I

I ADJUSTMENTS TO LEVIES I DISTRIBUTION GROSS ED REV CURRENT UNITARY CURRENT HOME- ADJUSTED HBS 33676 mb 33401 PROP TAX TRIPLE FLIP1 ADJUSTED NO SUBCLASS AGENCY NAME FACTOR LEW AUG SECURED SECURED UNSECURED IOWNERSI GROSS LEW CONTRIBUTION

More information

2. Katikati. 2.1 Infrastructure Schedule. Katikati Utilities. Project Number. Project Construction Year. Funding Source (percentage) Costs 2015 ($)

2. Katikati. 2.1 Infrastructure Schedule. Katikati Utilities. Project Number. Project Construction Year. Funding Source (percentage) Costs 2015 ($) 2. Katikati 2.1 Infrastructure Schedule Katikati Utilities Number Proposed Construction Year Costs 2015 ($) Funding Source (percentage) WS2 WS3 WS4 WS5 WS 9 WS 10 New Water supply (200mm dia) Tetley Rd

More information

I ADJUSTMENTS TO LEVIES I

I ADJUSTMENTS TO LEVIES I COUNTY OF FRESNO - SCHEDULE OF LEVIES 2007-2008 FUND DlSTRlBUTlOh GROSS ED REV CURRENT UNITARY CURRENT HOME- ADJUSTED H&S 33676 H&S 33401 PROP TAX VLF TRIPLE FLIP1 ADJUSTED NO SUBCLASS AGENCY NAME FACTOR

More information

BALLAST WATER RECORD BOOK

BALLAST WATER RECORD BOOK BALLAST WATER RECORD BOOK Name of ship: Distinctive no. or letters: M/V SAMPLE ABC1234 IMO Number: 1234567 Gross Tonnage: 10,000 Period: From to Page 1 of 9 The Ballast Water Record Book has been prepared

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

Design Criteria Data

Design Criteria Data LANDER/HUNT WY Latitude = 42.82 N WMO No. 72576 Longitude =18.7 W Elevation = 5558 feet Period of Record = 1973 to 1996 Average Pressure = 24.44 inches Hg Design Criteria Data Mean Coincident (Average)

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

F:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter

F:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter F:\PROJ\55211014\dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/2002 03:22:17 PM, saamhu, Acrobat PDFWriter MERRIFIELD RIVER CROSSING METHOD OF CHANGE FROM ID# ISSUES MEASUREMENT UNITS VALUE BASE CONDITIONS

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

NEW CONSTRUCTION GROUND DISTURBANCE PACKAGE REQUEST & DOCUMENTATION PACKAGE CHECKLIST

NEW CONSTRUCTION GROUND DISTURBANCE PACKAGE REQUEST & DOCUMENTATION PACKAGE CHECKLIST REQUEST INFORMATION NEW CONSTRUCTION GROUND DISTURBANCE PACKAGE REQUEST & DOCUMENTATION PACKAGE CHECKLIST E-Mail: gdp@abacusdatagraphics.com Phone #: 1-403-346-7551 Project #: EWR #: Dig Location (LSD,

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation - Ohio Turnpike Infrastructure Commission Turnpike Mitigation Program Application The application has been improved to enable project sponsors to save the application

More information

VALUE ENGINEERING STUDIES FINAL REPORT. Portsmouth Bypass, Phase 1 SCI PID 19415

VALUE ENGINEERING STUDIES FINAL REPORT. Portsmouth Bypass, Phase 1 SCI PID 19415 VALUE ENGINEERING STUDIES FINAL REPORT Portsmouth Bypass, Phase 1 SCI-823-6.81 PID 19415 PREPARED FOR: Ohio Department of Transportation District 9 650 Eastern Avenue Chillicothe, Ohio 45601 PREPARED BY:

More information

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer Non-Destructive Pavement Testing at IDOT LaDonna R. Rowden, P.E. Pavement Technology Engineer Bureau of Materials and Physical Research Physical Research Section Bridge Investigations Unit Pavement Technology

More information

Section 5. Manhole Inspection Report

Section 5. Manhole Inspection Report Section 5 Inspection Report Ypsilanti Community Utilities Authority Huron River Interceptor I/I Study Inspection Report Technical Memorandum December, 2008 Introduction Several manholes within the Huron

More information