Excavation Report. Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade. Excavation Report. Client: Anglian Water

Size: px
Start display at page:

Download "Excavation Report. Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade. Excavation Report. Client: Anglian Water"

Transcription

1 Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade Excavation Report Excavation Report July 2017 Client: Anglian Water OA East Report No: 1959 OASIS No: oxfordar NGR: TL to TL

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83 Notes:

84 Site Site 0 50 km Scale 1:3,000, km Scale 1:250, A1 BIGGLESWADE Area N Area 2 Area 3 Area 4 Area Sutton Lane A Watching Brief Edworth Road m Scale 1:20,000

85 east east east N EBD Area EBD672 EBD669 Area EBD671 Area 3 EBD Area Area Excavation areas Monuments Events Cropmarks m Scale 1: Figure 2: HER data Oxford Archaeology East Report Number 1959

86 east east east N AREA 1 N AREA 1 AREA 2 AREA Watching brief area AREA 5 AREA EBD672 EBD669 AREA EBD671 AREA 3 EBD AREA 4 Watching brief area 0 500m Scale 1:20, AREA 5 Monuments Events Cropmarks 0 250m Scale 1:2500 Figure 3: All area plan Oxford Archaeology East Report Number 1959

87 east east east N N AREA 1 AREA AREA S.113 AREA AREA 5 S Cremation S AREA m Scale 1:7500 Trackway S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Unphased 0 25m 344 Scale 1:250 Figure 4: Area 1 Oxford Archaeology East Report Number 1959

88 east east east N S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Post-Medieval AREA N AREA S S.119 Watering hole S.120 AREA 2 AREA Structure AREA 4 AREA m Scale 1: m Scale 1:250 Figure 5: Area 2 Oxford Archaeology East Report Number 1959

89 east east east S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Post-Medieval Unphased Structure S Pit Group Structure 6 S N S S S.88 Enclosure 1 AREA S Structure S Structure N AREA 1 S S AREA AREA S Structure 2 AREA Structure 3 AREA S m Scale 1: m Scale 1:7500 Figure 6: Area 3 Oxford Archaeology East Report Number 1959

90 Oxford Archaeology East Report Number Limit of excavation Projected feature S.1 Section 118 Cut number Late Iron Age / Early Roman Post-Medieval Unphased Enclosure S.18 AREA AREA AREA 2 AREA 3 AREA AREA m 0 50m Scale 1:7500 Scale 1:500 Figure 7: Area 4 N N east east east

91 east east east S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Post-Medieval Unphased N 106 AREA S.25 N 120 AREA AREA 2 AREA 3 39 AREA 4 41 AREA m Scale 1: m Scale 1:7500 Figure 8: Area 5 Oxford Archaeology East Report Number 1600

92 east east east N N AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 Watching brief area S S Limit of excavation Section Cut number Late Iron Age / Early Roman Watching brief area 0 500m Scale 1:20, m Scale 1:250 Figure 9: Watching brief area Oxford Archaeology East Report Number 1959

93 east east east AREA 1 Section 113 NW SE 44.25m OD Section 122 W E 44.48m OD Section 127 SW NE 44.47m OD Scale 1:20 1m AREA 2 Section 121 W E 44.23m OD Section 119 N S 44.23m OD Section 120 E W 45.43m OD Scale 1:40 2m AREA 3 Section 49 SE NW 45.40m OD Section 53 E W 46.01m OD Section 55 W E 46.01m OD Section 58 S 132 N 45.52m OD Section 73 SW NE 46.73m OD Cut Deposit horizon Top of surface/natural Limit of excavation Natural deposit Stone Bone Fired clay Burnt bone Pottery Cut number Deposit number 18.45m OD Ordnance datum Section 59 W E 46.25m OD Section 68 SW NE 46.21m OD Scale 1:20 1m Figure 10a: Selected sections Oxford Archaeology East Report Number 1959

94 east east east AREA 3 Section 62 S N 46.59m OD Section 88 SE NW 46.62m OD Section 66 N S 46.55m OD Scale 1:20 1m Section 91 SW Scale 1:40 NE 46.72m OD 2m AREA 4 AREA 5 Section 18 Section 25 W E NE 44.12m OD SW 44.97m OD Watching Brief Section 130 NW SE 46.55m OD Scale 1:20 1m # # # # # Cut Cut uncertain Deposit horizon Deposit horizon uncertain Top of surface/natural Limit of excavation Stone Chalk Charcoal Field drain Cut number Deposit number 18.45m OD Ordnance datum Figure 10b: Selected sections Oxford Archaeology East Report Number 1959

95 east east east Plate 1: Ditch 319, Area 1 (Phase 1), looking north-east Plate 2: Ditch 342, Area 1 (Phase 1), looking west Oxford Archaeology East Report Number 1959

96 east east east Plate 3: Cremation 332, Area 1 (Phase 1), looking north-west Plate 4: Ditches 309 and 311 (Phase 1) with furrow 307 (Phase 2) Area 2, looking south-west Oxford Archaeology East Report Number 1959

97 east east east Plate 5: Ditch 132, Area 3 (Phase 1), looking north-west Plate 6: Intercutting ditches 258, 262 and 266, Area 3 (Phase 1), looking west Oxford Archaeology East Report Number 1959

98 east east east Plate 7: Pit group 1 (207, 210, 223) Area 3 (Phase 1), looking north-west Plate 8: Pit 143, Area 3 (Phase 1), looking north-east Oxford Archaeology East Report Number 1959

99 east east east Plate 9: Pit 146, Area 3 (Phase 1), looking north-west Plate 10: Pits 196 and 181, Area 3 (Phase 1), looking east Oxford Archaeology East Report Number 1959

100 east east east Plate 11: Structure 2, Area 3 (Phase 1), looking north-west Plate 12: Structure 3, Area 3 (Phase 1), looking north-west Oxford Archaeology East Report Number 1959

101 east east east Plate 13: Ditch 48, Area 4 (Phase 1), looking east Plate 14: Cobbled surface 117, Area 4 (Phase 1), looking south-east Oxford Archaeology East Report Number 1959

102 east east east Plate 15: Pit 108, Area 5 (Phase 1), looking south-east Oxford Archaeology East Report Number 1959

103 Head Office/Registered Office/ OA South Janus House Osney Mead Oxford OX2 0ES t: +44 ( 0) f: +44 (0) e: info@oxfordarchaeology.com w: OA North Mill 3 Moor Lane Lancaster LA1 1QD t: +44 ( 0) f: +44 ( 0) e: oanorth@oxfordarchaeology.com w: OA East 15 Trafalgar Way Bar Hill Cambridgeshire CB23 8SQ t: +44 (0) e: oaeast@oxfordarchaeology.com w: Director: Gill Hey, BA PhD FSA MCIFA Oxford Archaeology Ltd is a Private Limited Company, N o : and a Registered Charity, N o :

Edmonton Region Commodity Flow Study

Edmonton Region Commodity Flow Study A Joint Alberta Transportation, City of Edmonton and Economic Development Edmonton Venture Supported by: Alberta Motor Transport Association (AMTA) Alberta Capital Region Alliance (ACRA) Page 1 27,748

More information

Route:130-AM-1 JOHN COSTELLO DiscoveryDriver:WILLCO, ( )

Route:130-AM-1 JOHN COSTELLO DiscoveryDriver:WILLCO, ( ) 12/20/2017 2:22:30 PM Route:130-AM-1 JOHN COSTELLO DiscoveryDriver:WILLCO, (403-242-1176) End Time:8:00 am 7:34 am (1) DISCOVERY RIDGE BV SW No Intersection @ CT ZONE AFTER THE TRAFFIC CIRCLE 7:37 am (2)

More information

Planning Application Drawings

Planning Application Drawings 17 July 2017 AJ38 Lillys Farm 00 rev E Sheet Index Layout ID 00 rev E 01 rev E 02 rev E 03 rev E 04 rev E 05 rev E 06 rev E 07 rev E 08 rev E 09 rev E 10 rev E 10.1 Rev E 11 rev E 12 rev E 13 rev E 14

More information

MEMOIRS 1974 MEMOIRS Bird, R.H Notes on the Rockley Mine Memoirs NCMRS, Vol.2 No.4, pp Published by the

MEMOIRS 1974 MEMOIRS Bird, R.H Notes on the Rockley Mine Memoirs NCMRS, Vol.2 No.4, pp Published by the MEMOIRS 1974 Bird, R.H. 1974 Notes on the Rockley Mine Memoirs NCMRS, Vol.2 No.4, pp.175-178 Published by the THE NORTHERN CAVERN & MINE RESEARCH SOCIETY SKIPTON U.K. N.C.M.R.S. & The Author(s) 1974. NB

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

NICHOLS CONFINED SPACE ENTRY LIST

NICHOLS CONFINED SPACE ENTRY LIST AREA NAME TYPE CONTENTS SIZE CONSTR-UCTION LINING/ COATING ENTRY OPENING SIZE CODE COOLER/DRYER SEAL TANKS TANK POND 6'X6' 316 SS NONE SIDE 2' DIAMETER S COOLER/DRYER VENTURI SCUBBERS PROCESS GASES 14'X26"

More information

Table 1. Arizona Game and Fish Department 16 Wildlife Water Catchments Project on the Tonto National Forest Proposed Access

Table 1. Arizona Game and Fish Department 16 Wildlife Water Catchments Project on the Tonto National Forest Proposed Access Table 1. Arizona Game and Fish Department 16 Wildlife Water s Project on the Tonto National Forest Proposed Access #69 Currie Wood or Globe #70 Silver King Globe WD71 Prop (*Priority is for 1, possibly

More information

LAWYERS' CREEK, HOLBEACH

LAWYERS' CREEK, HOLBEACH DEFENCE AREA 55 LAWYERS' CREEK, HOLBEACH 1. Area details: The defence area is 1 mile N of Holbeach St. Matthew and 7 miles from Holbeach. County: Lincolnshire. Parish: Holbeach. NGR: centre of area, TF

More information

SASKATOON STATION

SASKATOON STATION SRC CLIMATE REFERENCE STATION DAILY DATA REPORT SASKATOON STATION 45718 Saskatchewan 52 9' N 6 36' W 497 m asl Estab. 1963 JULY Preliminary 16 Day Temperature Degree-days Precipitation Relative Humidity

More information

NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE IS HEREBY GIVEN that construction activities are in progress at the Dudgeon Offshore Wind Farm. Wind turbine generators

More information

Danger CAUTION - RR tracks (2 sets) Food SERVICES - Quik Mart on left

Danger CAUTION - RR tracks (2 sets) Food SERVICES - Quik Mart on left Dist Day Leg PAC TOUR 600k Dist (km) Type Instruction ORGANIZER - Susan Notorangelo - (612) 804-9970 START - TUCSON 0.0 0.0 0.0 Country Inn and Suites - 6681 South Tucson Boulevard, Tucson, AZ 85756-0.0

More information

Total Days Doe 1 Point 2 Point 3 Point 4 + Point

Total Days Doe 1 Point 2 Point 3 Point 4 + Point Estimated 2013 Deer harvest by season/tag and Wildlife Management Unit in Oregon, based on Mandatory Survey Reports. s may be different due to rounding. 100M N Muzzleloader 14 108 559 9 3 10 9 17 39 47

More information

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017 FOR RELEASE AT 10:00 AM EDT, TUESDAY, MAY 23, MONTHLY NEW RESIDENTIAL SALES, APRIL Release Number: CB17-80 May 23, - The U.S. Census Bureau and the U.S. Department of Housing and Urban Development jointly

More information

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE IS HEREBY GIVEN that construction activities are in progress at the Dudgeon Offshore Wind Farm and Export Cable Corridor. Foundation

More information

Monthly data generated on Wednesday, July 31, 2013 at 13:04 UTC

Monthly data generated on Wednesday, July 31, 2013 at 13:04 UTC MESONET CLIMATOLOGICAL DATA SUMMARY May 2013 Time Zone: Midnight-Midnight CST 1 82 40 63.9 NA 4 0 NA NA NA 0.01 28.18 29.90 N 19.2 46.3 24.90 66.6 71.4 77 66 2 54 36 43.5 NA 20 0 NA NA NA 0.05 28.67 30.42

More information

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016) Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement s Awarded in Fiscal Year 2016 (July 2015 - June 2016) Region 1 STA 0703-426 20510 I-70:WB EJMT to MM 218 SMA PG 76-28 11930 N/A N/A ER 0703-424 20351

More information

Response to Grid Variability, or Flexible Operations for NPPs

Response to Grid Variability, or Flexible Operations for NPPs Response to Grid Variability, or Flexible Operations for NPPs Sherry Bernhoft EPRI Senior Program Manager WNA Workshop on Technical and Regulatory Issues Chicago, IL June 2016 The Power Grid is Changing!

More information

South West Victoria - Forage Value Index

South West Victoria - Forage Value Index South West Victoria - Forage Value Index Cultivar FVI SW Vic Autumn Winter Early Spring Late Spring Summer Endophyte Ploidy Heading Date Marketer No. of trials Base AR37 157 115 115 100 96 110 AR37 Tetraploid

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

London2Brighton Challenge 2019 CHALLENGE. Factsheet. organised by

London2Brighton Challenge 2019 CHALLENGE. Factsheet. organised by London2 Challenge 2019 CHALLENGE Factsheet organised by The London 2 Challenge will be in its 8th year in 2019! Over 2,500 adventurers of all experience levels and ages will take on this classic route

More information

Benton County Recycling Directory Note: Please call for hours of operation and a fee schedule

Benton County Recycling Directory Note: Please call for hours of operation and a fee schedule Benton County Recycling Directory Note: Please call for hours of operation and a fee schedule Recycling Facility Address City/Town Phone Materials Accepted Republic Service (fka) Allied 700 40 th Ave Sauk

More information

Cover Sheet Drainage District 7 DSR Butler County, Missouri

Cover Sheet Drainage District 7 DSR Butler County, Missouri Neelyville, MO ESTIMATED QUANTITIES ITEM DESCRIPTION QUANTITY Excavation 58,186 Spoil Spreading 58,186 Mobilization 1 UNITS CY CY LS The project begins at Latitude 36.4868, Longitude -0.46721 in Section

More information

M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT MANCHESTER ROAD DES PERES, MO 63131

M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT MANCHESTER ROAD DES PERES, MO 63131 M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT 11679 MANCHESTER ROAD DES PERES, MO 63131 N. BALLAS RD BOPP RD PRELIMINARY - NOT FOR CONSTRUCTION SHEET INDEX - SITEPLAN & CUP G-0

More information

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Prepared for: Regional Transportation District 1560 Broadway, Suite 700 Denver, Colorado 80202 303-299-2426 Prepared by: Thomas

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Martin County, Florida 2401 SE Monterey Road Stuart, Florida Address Changes created between 03/08/2019 and 04/08/2019

Martin County, Florida 2401 SE Monterey Road Stuart, Florida Address Changes created between 03/08/2019 and 04/08/2019 Page 1 of 8 ST LUCIE FALLS 12-39-40-002 Update 12-39-40-002-059-00150-0 8904 SW FISHERMANS WHARF DR Update 12-39-40-002-059-00150-0 8918 SW FISHERMANS WHARF DR 8918 SW FISHERMANS WHARF DR 8904 SW FISHERMANS

More information

South West of England Regional Development Agency

South West of England Regional Development Agency South West of England Regional Development Agency Wave Hub Development and Design Phase Wave Energy Converters Mooring System Study May 200 South West of England Regional Development Agency Wave Hub Development

More information

Certificate of Appropriateness Monthly Issuance Report March 2012

Certificate of Appropriateness Monthly Issuance Report March 2012 3/7/2012 852 East Ocean Blvd. Adelaide Tichenor House Upgrade electrical meter and place on west elevation of garage in a new enclosure using existing materials. 3/16/2012 5725 Corso di Napoli Replace

More information

SECONDARY ROAD CONSTRUCTION PROGRAM

SECONDARY ROAD CONSTRUCTION PROGRAM Iowa Department of Transportation SECONDARY ROAD CONSTRUCTION PROGRAM County: Linn County Fiscal : 2014 Version: Original COUNTY CERTIFICATION The detailed construction program for the secondary road system

More information

NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE

NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE Incident Spill New Gold or Contractor New Gold Spill Origin Mill Operations Date and Time Reported 2018-01-03 Product Spilled Reclaim Water Impact

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

BUS SERVICES IN CHAMBERLAYNE ROAD NW10 INTRODUCTION BUS SERVICES IN CHAMBERLAYNE ROAD NW10 1 LONDON BUSES 1. This note reviews the issues in Chamberlayne Road, Kensal Rise. It covers the range of bus routes in the area, their characteristics

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2017

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2017 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11

More information

CKI and HK Electric Completed Acquisition of. HK$70 Billion UK Electricity Distribution Asset

CKI and HK Electric Completed Acquisition of. HK$70 Billion UK Electricity Distribution Asset [Press release] CKI and HK Electric Completed Acquisition of HK$70 Billion UK Electricity Distribution Asset (1 November, 2010 Hong Kong) Following an irrevocable offer made on 30 July, 2010, a consortium

More information

U.S. Rail Traffic 1. Week 27, 2018 Ended July 7, 2018

U.S. Rail Traffic 1. Week 27, 2018 Ended July 7, 2018 U.S. Rail Traffic 1 240,514 5.4% 6,987,928 258,812 1.4% 30,160 3.2% 871,930 32,294 3.8% 76,562-0.5% 2,217,801 82,141-0.1% Farm Products excl., and Food 15,124 10.0% 436,221 16,156 1.5% 10,017 7.2% 275,445

More information

U.S. Rail Traffic 1. Week 42, 2018 Ended October 20, 2018

U.S. Rail Traffic 1. Week 42, 2018 Ended October 20, 2018 U.S. Rail Traffic 1 265,776-0.7% 11,047,756 263,042 1.8% 30,761-0.2% 1,352,962 32,213 4.1% 85,929-0.4% 3,546,082 84,431-0.9% Farm Products excl., and Food 16,808-4.1% 681,566 16,228 2.4% 9,845 2.3% 432,578

More information

U.S. Rail Traffic 1. Week 39, 2018 Ended September 29, 2018

U.S. Rail Traffic 1. Week 39, 2018 Ended September 29, 2018 U.S. Rail Traffic 1 272,306 0.5% 10,248,559 262,784 2.0% 33,047 4.4% 1,260,433 32,319 4.5% 89,445 1.5% 3,284,902 84,228-1.0% Farm Products excl., and Food 16,942 2.8% 631,634 16,196 2.7% 10,721-2.9% 402,632

More information

U.S. Rail Traffic 1. Week 44, 2018 Ended November 3, 2018

U.S. Rail Traffic 1. Week 44, 2018 Ended November 3, 2018 U.S. Rail Traffic 1 270,305 1.8% 11,586,596 263,332 1.9% 32,209 2.2% 1,416,860 32,201 4.1% 88,399 1.6% 3,722,456 84,601-0.7% Farm Products excl., and Food 17,133 2.8% 715,329 16,257 2.3% 10,357 3.2% 453,424

More information

U.S. Rail Traffic 1. Week 41, 2018 Ended October 13, 2018

U.S. Rail Traffic 1. Week 41, 2018 Ended October 13, 2018 U.S. Rail Traffic 1 263,787 10,781,980 262,975 1.9% 30,416-1.7% 1,322,201 32,249 4.2% 86,312 0.2% 3,460,153 84,394-0.9% Farm Products excl., and Food 16,355 664,758 16,214 2.5% 9,927-0.3% 422,733 10,311

More information

U.S. Rail Traffic 1. Week 46, 2018 Ended November 17, 2018

U.S. Rail Traffic 1. Week 46, 2018 Ended November 17, 2018 U.S. Rail Traffic 1 262,514-1.1% 12,110,985 263,282 1.8% 31,796-0.4% 1,480,087 32,176 4.0% 86,159-0.2% 3,893,147 84,634-0.7% Farm Products excl., and Food 16,141-3.7% 747,905 16,259 2.1% 9,541-5.4% 473,048

More information

U.S. Rail Traffic 1. Week 45, 2018 Ended November 10, 2018

U.S. Rail Traffic 1. Week 45, 2018 Ended November 10, 2018 U.S. Rail Traffic 1 261,875 0.1% 11,848,471 263,299 1.8% 31,431 1,448,291 32,184 4.1% 84,532-0.7% 3,806,988 84,600-0.7% Farm Products excl., and Food 16,435-1.3% 731,764 16,261 2.3% 10,083 2.5% 463,507

More information

U.S. Rail Traffic 1. Week 18, 2018 Ended May 5, 2018

U.S. Rail Traffic 1. Week 18, 2018 Ended May 5, 2018 U.S. Rail Traffic 1 265,563 6.4% 4,612,788 256,266 0.9% 33,807 9.5% 583,320 32,407 3.6% 77,468 5.5% 1,483,363 82,409 0.4% Farm Products excl., and Food 16,952 8.3% 290,667 16,148 0.6% 10,407 4.6% 181,165

More information

U.S. Rail Traffic 1. Week 17, 2018 Ended April 28, 2018

U.S. Rail Traffic 1. Week 17, 2018 Ended April 28, 2018 U.S. Rail Traffic 1 266,453 3.7% 4,347,225 255,719 0.6% 32,916 3.4% 549,513 32,324 3.2% 78,970 4.2% 1,405,895 82,700 0.1% Farm Products excl., and Food 16,221 4.5% 273,715 16,101 0.1% 10,563 4.7% 170,758

More information

U.S. Rail Traffic 1. Week 26, 2018 Ended June 30, 2018

U.S. Rail Traffic 1. Week 26, 2018 Ended June 30, 2018 U.S. Rail Traffic 1 270,916 0.7% 6,747,414 259,516 1.3% 33,563 5.5% 841,770 32,376 3.8% 83,214-5.3% 2,141,239 82,355-0.1% Farm Products excl., and Food 16,316 2.1% 421,097 16,196 1.3% 11,027 1.8% 265,428

More information

U.S. Rail Traffic 1. Week 24, 2018 Ended June 16, 2018

U.S. Rail Traffic 1. Week 24, 2018 Ended June 16, 2018 U.S. Rail Traffic 1 269,748 1.9% 6,208,034 258,668 1.3% 31,707 1.5% 775,785 32,324 3.7% 85,538-1.6% 1,975,019 82,292 0.3% Farm Products excl., and Food 16,717 6.2% 388,721 16,197 1.3% 10,837 7.4% 244,234

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2015

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2015 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11

More information

Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001

Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001 Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001 POLL NUMBER NAME OF POLL NAMES ON LIST BRENDA L. DYCK NDP RICHARD MARZ PC GAYLEEN ROELFSEMA LIB NICHOLAS SEMMLER

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2012

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2012 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11 12

More information

. DEFENCE AREA 59 FRILFORD / FYFIELD

. DEFENCE AREA 59 FRILFORD / FYFIELD . DEFENCE AREA 59 FRILFORD / FYFIELD 1. Area details: The defence area is 4 miles W of Abingdon and 9 miles ENE of Faringdon. County: Oxfordshire. Parishes: Frilford / Fyfield and Tubney. NGR: centre of

More information

Facility Conditions.

Facility Conditions. Facility Conditions Circle Interchange Under Construction Looking orth, Circa Late 1950s There have been no major improvements made to the Circle Interchange since its construction in the 1950s. Maintenance

More information

Northern Line Extension Project

Northern Line Extension Project 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer 2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story 3 Contents Project Background

More information

La Caserne. 103 Dalhousie Québec (Québec) Canada, G1K 4B9. Telephone : (418) Fax : (418) Telephone : (418)

La Caserne. 103 Dalhousie Québec (Québec) Canada, G1K 4B9. Telephone : (418) Fax : (418) Telephone : (418) La Caserne 103 Dalhousie Québec (Québec) Canada, G1K 4B9 Telephone : (418) 692-5323 Fax : (418) 692-2390 Internet : www.exmachina.qc.ca Technical director : Patrick Durnin Telephone : (418) 692-5353 Email

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Appendix V1a Coopers Field, Bute Park-CF10 3DX

Appendix V1a Coopers Field, Bute Park-CF10 3DX Appendix V1a Coopers Field, Bute Park-CF10 3DX Site-specific info Coopers Field is a green field event site set within Bute Park a 146 acre historic park and nationally-significant arboretum located in

More information

Crestmont Development Update 2017 AGM

Crestmont Development Update 2017 AGM Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home

More information

Major causes of road crashes in countries in the Asia-Pacific region

Major causes of road crashes in countries in the Asia-Pacific region https://twitter.com/shirleyeungccsi/status/748914589132165120 UNESCAP Regional Meeting on Renewing Regional Road Safety Goalsand Targets 28-29 July, 2016, Seoul, Republic of Korea Major causes of road

More information

Including. BRISTOL - Gloucester Tel: HARPENDEN - Herts/Beds Tel:

Including. BRISTOL - Gloucester Tel: HARPENDEN - Herts/Beds Tel: www.cwplant.co.uk Specialised ATTACHMENTS Including Rotating Pulverizers Compactors Hydraulic Breakers Hydraulic Magnets Piling Hammers Dedicated Steel Shears Digging Clamshell Grabs NATIONWIDE SERVICE

More information

Tramway, Tuam Street: A Report on Archaeological Investigations

Tramway, Tuam Street: A Report on Archaeological Investigations Lessons learned from one of New Zealand s most challenging civil engineering projects: rebuilding the earthquake damaged pipes, roads, bridges and retaining walls in the city of Christchurch 2011-2016.

More information

Facilities List Alberta Facilities that Accept Hydrovac Waste

Facilities List Alberta Facilities that Accept Hydrovac Waste Facilities List Alberta Facilities that Accept Hydrovac Waste Land Policy Information in this document may change. Please contact the facility directly for the most up to date information. Facilities with

More information

M773LW3. GEM Series Soundshield Assembly Instructions. Gulf Branch th Avenue NW. Southeastern U.S.A W Newport Center Dr

M773LW3. GEM Series Soundshield Assembly Instructions. Gulf Branch th Avenue NW. Southeastern U.S.A W Newport Center Dr M773LW3 GEM Series Soundshield Assembly Instructions Corporate Headquarters Alaska Branch Office Southeastern U.S.A. East Coast Branch Gulf Branch 4420 14th Avenue NW 1200 West International 1419 W Newport

More information

CENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018

CENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018 ASX / MEDIA ANNOUNCEMENT ASX: NCZ 02 July 2018 CENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018 New Century continues strong progress toward restarting Century operations, with planned refurbishment activities

More information

Westside Subway Extension Final EIS/EIR. January 2011 Community Update Meetings

Westside Subway Extension Final EIS/EIR. January 2011 Community Update Meetings Westside Subway Extension Final EIS/EIR January 2011 Community Update Meetings Purpose of Tonight s Meeting Background information on planning to date Clarify Locally Preferred Alternative (LPA) under

More information

Market Performance Standards Peer Comparison Report

Market Performance Standards Peer Comparison Report Market Performance Standards Peer Comparison Report Individual Retailer Analysis February 2017 The Market Performance Standards Peer Comparison Report This report covers all Retailers and Market Performance

More information

EV (Electric Vehicle) charging stations are available at all City parking structures (not available in the Santa Monica 5 metered parking

EV (Electric Vehicle) charging stations are available at all City parking structures (not available in the Santa Monica 5 metered parking EV (Electric Vehicle) charging stations are available at all City parking structures (not available in the Santa Monica 5 metered parking structures). Parking Authority of the City of Beverly Hills FISCAL

More information

Parking Authority. of the City of Beverly Hills FISCAL YEAR 2014/2015 SCHEDULE OF PARKING FACILITY RATES

Parking Authority. of the City of Beverly Hills FISCAL YEAR 2014/2015 SCHEDULE OF PARKING FACILITY RATES Parking Authority of the City of Beverly Hills FISCAL YEAR 2014/2015 SCHEDULE OF PARKING FACILITY S. Current INDEX SECTION PAGE PARKING FACILITY S Administrative Fee... 4 Daily Maximum... 3 Daily Parking

More information

Automotive Gas Oil (Diesel) Price Watch

Automotive Gas Oil (Diesel) Price Watch Automotive Gas Oil (Diesel) Price Watch (JANUARY 2018) Report Date: February 2018 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 PMS Prices Across States 2 PMS Prices Across

More information

Map 1: East Whiteland Township Trails Plan

Map 1: East Whiteland Township Trails Plan Map 1: Trails Plan!( 10 Lee Bl Bacton Hill d Conestoga d Phoenixville Pk!( 7!( 8a!( 9 Moores d Sidley d Flat d!( 13 ") 29 Bus Stops Active Inactive Chester alley Trail (Multi-se) Multi-se Facilities -

More information

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street

More information

Federal Way Link Extension

Federal Way Link Extension Federal Way Link Extension Draft EIS Summary Route & station alternatives and impacts Link Light Rail System Map Lynnwood Mountlake Terrace Lynnwood Link Extension Shoreline 14th Northgate 40 Northgate

More information

Name of Report: Car Club Strategy Technical Appendix

Name of Report: Car Club Strategy Technical Appendix Name of Report: Car Club Strategy Technical Appendix Author: James Duggan Date: 06 July 2016 Service / Dept: LB Barnet Environment Commissioning 1.1 Types of Charge Point There are three main Electric

More information

COTTER CORPORATION CANON CITY MILLING FACILITY

COTTER CORPORATION CANON CITY MILLING FACILITY CALENDAR YEAR 2004 APPENDIX C Water Quality Monitoring Report COTTER CORPORATION CANON CITY MILLING FACILITY Canon City, Colorado June 30, 2005 COTTER CORPORATION WATER SAMPLING LOCATIONS JUNE 30, 2005

More information

Single Phase Poultry Fan Motor, Standard Efficiency,TEAO, Squirrel Cage Rotor

Single Phase Poultry Fan Motor, Standard Efficiency,TEAO, Squirrel Cage Rotor No.: Date: 6/16/2011 Customer : TECHNICAL PROPOSAL Single Phase Poultry Fan Motor, Standard Efficiency,TEAO, Squirrel Cage Rotor Product line : Single-Phase : 48 & 56 TEAO Catalog Number :.3318ES1BRBPFC48

More information

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) INTRODUCTION The Ministry of Transportation (MoT), Region 2, Highway Engineering staff were

More information

SCAN Land Use and Transportation Committee Report June 10, 2015

SCAN Land Use and Transportation Committee Report June 10, 2015 DRAFT DRAFT DRAFT Exhibit A to SCAN Minutes - June 10, 2015 SCAN Land Use and Transportation Committee Report June 10, 2015 Gaiety Hollow In April the Committee provided testimony in support of the Lord

More information

Summary of the Mineral Block

Summary of the Mineral Block Summary of the Mineral Block PART A GENERAL INFORMATION ABOUT MINERAL BLOCK Features Details 1. Location Mineral Block Mohra East Corner Points (Latitude, Longitude) See Appendix 1 Villages Mohra, Patharchua,

More information

WILSHIRE/RODEO. Westside Subway Extension - DRAFT IMAGES FOR DISCUSSION PURPOSES ONLY. Torti Gallas and Partners, Inc. June SAAG Workshops 2011

WILSHIRE/RODEO. Westside Subway Extension - DRAFT IMAGES FOR DISCUSSION PURPOSES ONLY. Torti Gallas and Partners, Inc. June SAAG Workshops 2011 WILSHIRE/RODEO 1 WILSHIRE/RODEO: BANK OF AMERICA FULL PORTAL (OPTION A) Note for Option A: Beverly Drive: Retains 2 northbound & 2 southbound lanes Loss of 40 Bank of America underground parking spaces

More information

The Industrial and Agricultural Revolutions

The Industrial and Agricultural Revolutions The Industrial and Agricultural Revolutions Warmup What Do We Already Know about the Industrial Revolution? Agenda Warmup Industrial and Agricultural Revolutions PowerPoint with Notes Crash Course Industrial

More information

Your resource for finding Loudoun County Public School Facilities

Your resource for finding Loudoun County Public School Facilities Your resource for finding Loudoun County Public School Facilities Prepared by Loudoun County Public Schools Department of Planning and GIS Services (06.01.2017) CONTENTS Welcome...5 Loudoun County Public

More information

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Technical Note 02 - N2/M41 AIMSUN Micro-simulation Tongaat Hullette Developments Cornubia Phase 2 Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Prepared by: 18/11/14 Justin Janki Date Approvals

More information

October 12, 2012 FILES: 221-D, 221-M 25T NOTICE OF MUNICIPAL ADDRESSES. FOR REGISTERED PLAN 62M-1t80 "Paradise Meadows- Phase 3".

October 12, 2012 FILES: 221-D, 221-M 25T NOTICE OF MUNICIPAL ADDRESSES. FOR REGISTERED PLAN 62M-1t80 Paradise Meadows- Phase 3. Hamilton Mailing : Hamilton City Hall 71 Main Street West, 6th Floor Hamilton, ON L8P 4Y5 www.hamilton.ca Planning and Economic Development Department Growth Management Division Physical : 71 Main Street

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

Equity Title of Nevada March 2012 Greater Las Vegas Market Update

Equity Title of Nevada March 2012 Greater Las Vegas Market Update 90.0% Closed Trend by Type ruary Closings by Type 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 43% 0.0% 2009 2010 Greater Las Vegas Snapshot by Sale Type - SFR Only List LP/Sq Ft Pending ruary 30 Day

More information

Year to Date Summary. Average and Median Sale Prices

Year to Date Summary. Average and Median Sale Prices A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

APPENDIX C. Existing Utilities

APPENDIX C. Existing Utilities APPENDIX C Existing Utilities THIS PAGE INTENTIONALLY BLANK Existing Utilities Numerous utilities exist within the project area, including natural gas, sewer, water, electric, communications, and street

More information

MAYO COUNTY COUNCIL KILLALA WASTE WATER DISCHARGE LICENCE APPLICATION ATTACHMENT C

MAYO COUNTY COUNCIL KILLALA WASTE WATER DISCHARGE LICENCE APPLICATION ATTACHMENT C MAYO COUNTY COUNCIL KILLALA WASTE WATER DISCHARGE LICENCE APPLICATION ATTACHMENT C C.1 Operational Information C.2 Outfall Design and Construction Dwg. Title Dwg. No. Location of Proposed Primary Discharge

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left

More information

Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and

Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and wind power plants in Zhyvachiv, Tlumach district, Ivano-Frankivsk

More information

Garden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights

Garden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights 7 December 2010 ABN 28 009 174 761 www.regisresources.com Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 Level 1, 1

More information

AIRCRAFT HANGAR PINCHGUT LAKE

AIRCRAFT HANGAR PINCHGUT LAKE AIRCRAFT HANGAR PINCHGUT LAKE ABSTRACT Please find enclosed Environmental Assessment submission relating to a proposed Aircraft Hangar at Pinchgut Lake, File 200.20.2707. Calv Swift [Course title] File

More information

Design Criteria Data

Design Criteria Data PIERRE SD Latitude = 44.38 N WMO No. 726686 Longitude =1.2 W Elevation = 1742 feet Period of Record = 1973 to 1996 Average Pressure = 28.1 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work:

More information

Swaffham Bulbeck. Cashbook 1. Current Bank A/c Unity Trust

Swaffham Bulbeck. Cashbook 1. Current Bank A/c Unity Trust Page: 3 Receipts Receipt Ref Name of Payer Amnt Received Debtors VAT A/c Centre Amount Balance Brought Fwd : 36,041.44 36,041.44 Transaction Detail Banked: 01/04/2016 50.00 BBC 50.00 1250 401 50.00 BBC

More information

The Pure Play Tender Drilling Contractor Simplified Overview

The Pure Play Tender Drilling Contractor Simplified Overview Pareto Conference September 2015 1 The Pure Play Tender Drilling Contractor Simplified Overview Atlantica Tender Drilling Ltd (Bermuda) * 25.26% 100% 99%** BassDrill Alpha Ltd. (Bermuda) Tender barge BassDrill

More information

British Army 2nd Battle of Gaza April 1917

British Army 2nd Battle of Gaza April 1917 British Army 2nd Battle of Gaza 17-19 April 1917 Eastern Force: Lieutenant General C.M.Dobell 5th Wing Royal Flying Corps Organization unknown 52nd (Lowland) Division: Bt. Colonel W.E.B.Smith 155th (Seaforth

More information

Design Criteria Data

Design Criteria Data HONOLULU/OAHU HI Latitude = 21.35 N WMO No. 91182 Longitude =157.9 W Elevation = 16 feet Period of Record = 1967 to 1996 Average Pressure = 29.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PHILADELPHIA PA Latitude = 39.88 N WMO No. 7248 Longitude = 75.25 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data INDIANAPOLIS IN Latitude = 39.73 N WMO No. 72438 Longitude = 86.27 W Elevation = 87 feet Period of Record = 1973 to 1996 Average Pressure = 29.15 inches Hg Design Criteria Data Mean Coincident (Average)

More information

UBC Watermain as shown on Sheet 202 : Sub total 97,050

UBC Watermain as shown on Sheet 202 : Sub total 97,050 Preliminary Cost Estimate Brock Commons Phase 1 Watermain replacement UBC Portion of Works only Replace existing 150mm dia CI and 200mm dia AC watermain with 200mm & 250mm dia DI (ductile iron) watermain

More information