Excavation Report. Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade. Excavation Report. Client: Anglian Water
|
|
- Kevin Beverly Cobb
- 5 years ago
- Views:
Transcription
1 Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade Excavation Report Excavation Report July 2017 Client: Anglian Water OA East Report No: 1959 OASIS No: oxfordar NGR: TL to TL
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83 Notes:
84 Site Site 0 50 km Scale 1:3,000, km Scale 1:250, A1 BIGGLESWADE Area N Area 2 Area 3 Area 4 Area Sutton Lane A Watching Brief Edworth Road m Scale 1:20,000
85 east east east N EBD Area EBD672 EBD669 Area EBD671 Area 3 EBD Area Area Excavation areas Monuments Events Cropmarks m Scale 1: Figure 2: HER data Oxford Archaeology East Report Number 1959
86 east east east N AREA 1 N AREA 1 AREA 2 AREA Watching brief area AREA 5 AREA EBD672 EBD669 AREA EBD671 AREA 3 EBD AREA 4 Watching brief area 0 500m Scale 1:20, AREA 5 Monuments Events Cropmarks 0 250m Scale 1:2500 Figure 3: All area plan Oxford Archaeology East Report Number 1959
87 east east east N N AREA 1 AREA AREA S.113 AREA AREA 5 S Cremation S AREA m Scale 1:7500 Trackway S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Unphased 0 25m 344 Scale 1:250 Figure 4: Area 1 Oxford Archaeology East Report Number 1959
88 east east east N S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Post-Medieval AREA N AREA S S.119 Watering hole S.120 AREA 2 AREA Structure AREA 4 AREA m Scale 1: m Scale 1:250 Figure 5: Area 2 Oxford Archaeology East Report Number 1959
89 east east east S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Post-Medieval Unphased Structure S Pit Group Structure 6 S N S S S.88 Enclosure 1 AREA S Structure S Structure N AREA 1 S S AREA AREA S Structure 2 AREA Structure 3 AREA S m Scale 1: m Scale 1:7500 Figure 6: Area 3 Oxford Archaeology East Report Number 1959
90 Oxford Archaeology East Report Number Limit of excavation Projected feature S.1 Section 118 Cut number Late Iron Age / Early Roman Post-Medieval Unphased Enclosure S.18 AREA AREA AREA 2 AREA 3 AREA AREA m 0 50m Scale 1:7500 Scale 1:500 Figure 7: Area 4 N N east east east
91 east east east S Limit of excavation Projected feature Section Cut number Late Iron Age / Early Roman Post-Medieval Unphased N 106 AREA S.25 N 120 AREA AREA 2 AREA 3 39 AREA 4 41 AREA m Scale 1: m Scale 1:7500 Figure 8: Area 5 Oxford Archaeology East Report Number 1600
92 east east east N N AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 Watching brief area S S Limit of excavation Section Cut number Late Iron Age / Early Roman Watching brief area 0 500m Scale 1:20, m Scale 1:250 Figure 9: Watching brief area Oxford Archaeology East Report Number 1959
93 east east east AREA 1 Section 113 NW SE 44.25m OD Section 122 W E 44.48m OD Section 127 SW NE 44.47m OD Scale 1:20 1m AREA 2 Section 121 W E 44.23m OD Section 119 N S 44.23m OD Section 120 E W 45.43m OD Scale 1:40 2m AREA 3 Section 49 SE NW 45.40m OD Section 53 E W 46.01m OD Section 55 W E 46.01m OD Section 58 S 132 N 45.52m OD Section 73 SW NE 46.73m OD Cut Deposit horizon Top of surface/natural Limit of excavation Natural deposit Stone Bone Fired clay Burnt bone Pottery Cut number Deposit number 18.45m OD Ordnance datum Section 59 W E 46.25m OD Section 68 SW NE 46.21m OD Scale 1:20 1m Figure 10a: Selected sections Oxford Archaeology East Report Number 1959
94 east east east AREA 3 Section 62 S N 46.59m OD Section 88 SE NW 46.62m OD Section 66 N S 46.55m OD Scale 1:20 1m Section 91 SW Scale 1:40 NE 46.72m OD 2m AREA 4 AREA 5 Section 18 Section 25 W E NE 44.12m OD SW 44.97m OD Watching Brief Section 130 NW SE 46.55m OD Scale 1:20 1m # # # # # Cut Cut uncertain Deposit horizon Deposit horizon uncertain Top of surface/natural Limit of excavation Stone Chalk Charcoal Field drain Cut number Deposit number 18.45m OD Ordnance datum Figure 10b: Selected sections Oxford Archaeology East Report Number 1959
95 east east east Plate 1: Ditch 319, Area 1 (Phase 1), looking north-east Plate 2: Ditch 342, Area 1 (Phase 1), looking west Oxford Archaeology East Report Number 1959
96 east east east Plate 3: Cremation 332, Area 1 (Phase 1), looking north-west Plate 4: Ditches 309 and 311 (Phase 1) with furrow 307 (Phase 2) Area 2, looking south-west Oxford Archaeology East Report Number 1959
97 east east east Plate 5: Ditch 132, Area 3 (Phase 1), looking north-west Plate 6: Intercutting ditches 258, 262 and 266, Area 3 (Phase 1), looking west Oxford Archaeology East Report Number 1959
98 east east east Plate 7: Pit group 1 (207, 210, 223) Area 3 (Phase 1), looking north-west Plate 8: Pit 143, Area 3 (Phase 1), looking north-east Oxford Archaeology East Report Number 1959
99 east east east Plate 9: Pit 146, Area 3 (Phase 1), looking north-west Plate 10: Pits 196 and 181, Area 3 (Phase 1), looking east Oxford Archaeology East Report Number 1959
100 east east east Plate 11: Structure 2, Area 3 (Phase 1), looking north-west Plate 12: Structure 3, Area 3 (Phase 1), looking north-west Oxford Archaeology East Report Number 1959
101 east east east Plate 13: Ditch 48, Area 4 (Phase 1), looking east Plate 14: Cobbled surface 117, Area 4 (Phase 1), looking south-east Oxford Archaeology East Report Number 1959
102 east east east Plate 15: Pit 108, Area 5 (Phase 1), looking south-east Oxford Archaeology East Report Number 1959
103 Head Office/Registered Office/ OA South Janus House Osney Mead Oxford OX2 0ES t: +44 ( 0) f: +44 (0) e: info@oxfordarchaeology.com w: OA North Mill 3 Moor Lane Lancaster LA1 1QD t: +44 ( 0) f: +44 ( 0) e: oanorth@oxfordarchaeology.com w: OA East 15 Trafalgar Way Bar Hill Cambridgeshire CB23 8SQ t: +44 (0) e: oaeast@oxfordarchaeology.com w: Director: Gill Hey, BA PhD FSA MCIFA Oxford Archaeology Ltd is a Private Limited Company, N o : and a Registered Charity, N o :
Edmonton Region Commodity Flow Study
A Joint Alberta Transportation, City of Edmonton and Economic Development Edmonton Venture Supported by: Alberta Motor Transport Association (AMTA) Alberta Capital Region Alliance (ACRA) Page 1 27,748
More informationRoute:130-AM-1 JOHN COSTELLO DiscoveryDriver:WILLCO, ( )
12/20/2017 2:22:30 PM Route:130-AM-1 JOHN COSTELLO DiscoveryDriver:WILLCO, (403-242-1176) End Time:8:00 am 7:34 am (1) DISCOVERY RIDGE BV SW No Intersection @ CT ZONE AFTER THE TRAFFIC CIRCLE 7:37 am (2)
More informationPlanning Application Drawings
17 July 2017 AJ38 Lillys Farm 00 rev E Sheet Index Layout ID 00 rev E 01 rev E 02 rev E 03 rev E 04 rev E 05 rev E 06 rev E 07 rev E 08 rev E 09 rev E 10 rev E 10.1 Rev E 11 rev E 12 rev E 13 rev E 14
More informationMEMOIRS 1974 MEMOIRS Bird, R.H Notes on the Rockley Mine Memoirs NCMRS, Vol.2 No.4, pp Published by the
MEMOIRS 1974 Bird, R.H. 1974 Notes on the Rockley Mine Memoirs NCMRS, Vol.2 No.4, pp.175-178 Published by the THE NORTHERN CAVERN & MINE RESEARCH SOCIETY SKIPTON U.K. N.C.M.R.S. & The Author(s) 1974. NB
More informationRe: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario
April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:
More informationNICHOLS CONFINED SPACE ENTRY LIST
AREA NAME TYPE CONTENTS SIZE CONSTR-UCTION LINING/ COATING ENTRY OPENING SIZE CODE COOLER/DRYER SEAL TANKS TANK POND 6'X6' 316 SS NONE SIDE 2' DIAMETER S COOLER/DRYER VENTURI SCUBBERS PROCESS GASES 14'X26"
More informationTable 1. Arizona Game and Fish Department 16 Wildlife Water Catchments Project on the Tonto National Forest Proposed Access
Table 1. Arizona Game and Fish Department 16 Wildlife Water s Project on the Tonto National Forest Proposed Access #69 Currie Wood or Globe #70 Silver King Globe WD71 Prop (*Priority is for 1, possibly
More informationLAWYERS' CREEK, HOLBEACH
DEFENCE AREA 55 LAWYERS' CREEK, HOLBEACH 1. Area details: The defence area is 1 mile N of Holbeach St. Matthew and 7 miles from Holbeach. County: Lincolnshire. Parish: Holbeach. NGR: centre of area, TF
More informationSASKATOON STATION
SRC CLIMATE REFERENCE STATION DAILY DATA REPORT SASKATOON STATION 45718 Saskatchewan 52 9' N 6 36' W 497 m asl Estab. 1963 JULY Preliminary 16 Day Temperature Degree-days Precipitation Relative Humidity
More informationNOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS
NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE IS HEREBY GIVEN that construction activities are in progress at the Dudgeon Offshore Wind Farm. Wind turbine generators
More informationDanger CAUTION - RR tracks (2 sets) Food SERVICES - Quik Mart on left
Dist Day Leg PAC TOUR 600k Dist (km) Type Instruction ORGANIZER - Susan Notorangelo - (612) 804-9970 START - TUCSON 0.0 0.0 0.0 Country Inn and Suites - 6681 South Tucson Boulevard, Tucson, AZ 85756-0.0
More informationTotal Days Doe 1 Point 2 Point 3 Point 4 + Point
Estimated 2013 Deer harvest by season/tag and Wildlife Management Unit in Oregon, based on Mandatory Survey Reports. s may be different due to rounding. 100M N Muzzleloader 14 108 559 9 3 10 9 17 39 47
More informationMONTHLY NEW RESIDENTIAL SALES, APRIL 2017
FOR RELEASE AT 10:00 AM EDT, TUESDAY, MAY 23, MONTHLY NEW RESIDENTIAL SALES, APRIL Release Number: CB17-80 May 23, - The U.S. Census Bureau and the U.S. Department of Housing and Urban Development jointly
More informationNOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS
NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE IS HEREBY GIVEN that construction activities are in progress at the Dudgeon Offshore Wind Farm and Export Cable Corridor. Foundation
More informationMonthly data generated on Wednesday, July 31, 2013 at 13:04 UTC
MESONET CLIMATOLOGICAL DATA SUMMARY May 2013 Time Zone: Midnight-Midnight CST 1 82 40 63.9 NA 4 0 NA NA NA 0.01 28.18 29.90 N 19.2 46.3 24.90 66.6 71.4 77 66 2 54 36 43.5 NA 20 0 NA NA NA 0.05 28.67 30.42
More informationFiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)
Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement s Awarded in Fiscal Year 2016 (July 2015 - June 2016) Region 1 STA 0703-426 20510 I-70:WB EJMT to MM 218 SMA PG 76-28 11930 N/A N/A ER 0703-424 20351
More informationResponse to Grid Variability, or Flexible Operations for NPPs
Response to Grid Variability, or Flexible Operations for NPPs Sherry Bernhoft EPRI Senior Program Manager WNA Workshop on Technical and Regulatory Issues Chicago, IL June 2016 The Power Grid is Changing!
More informationSouth West Victoria - Forage Value Index
South West Victoria - Forage Value Index Cultivar FVI SW Vic Autumn Winter Early Spring Late Spring Summer Endophyte Ploidy Heading Date Marketer No. of trials Base AR37 157 115 115 100 96 110 AR37 Tetraploid
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationLondon2Brighton Challenge 2019 CHALLENGE. Factsheet. organised by
London2 Challenge 2019 CHALLENGE Factsheet organised by The London 2 Challenge will be in its 8th year in 2019! Over 2,500 adventurers of all experience levels and ages will take on this classic route
More informationBenton County Recycling Directory Note: Please call for hours of operation and a fee schedule
Benton County Recycling Directory Note: Please call for hours of operation and a fee schedule Recycling Facility Address City/Town Phone Materials Accepted Republic Service (fka) Allied 700 40 th Ave Sauk
More informationCover Sheet Drainage District 7 DSR Butler County, Missouri
Neelyville, MO ESTIMATED QUANTITIES ITEM DESCRIPTION QUANTITY Excavation 58,186 Spoil Spreading 58,186 Mobilization 1 UNITS CY CY LS The project begins at Latitude 36.4868, Longitude -0.46721 in Section
More informationM1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT MANCHESTER ROAD DES PERES, MO 63131
M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT 11679 MANCHESTER ROAD DES PERES, MO 63131 N. BALLAS RD BOPP RD PRELIMINARY - NOT FOR CONSTRUCTION SHEET INDEX - SITEPLAN & CUP G-0
More informationSupplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado
Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Prepared for: Regional Transportation District 1560 Broadway, Suite 700 Denver, Colorado 80202 303-299-2426 Prepared by: Thomas
More informationStatus of PNM s Completed Transmission Construction Projects 11/30/2017
Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information
More informationMartin County, Florida 2401 SE Monterey Road Stuart, Florida Address Changes created between 03/08/2019 and 04/08/2019
Page 1 of 8 ST LUCIE FALLS 12-39-40-002 Update 12-39-40-002-059-00150-0 8904 SW FISHERMANS WHARF DR Update 12-39-40-002-059-00150-0 8918 SW FISHERMANS WHARF DR 8918 SW FISHERMANS WHARF DR 8904 SW FISHERMANS
More informationSouth West of England Regional Development Agency
South West of England Regional Development Agency Wave Hub Development and Design Phase Wave Energy Converters Mooring System Study May 200 South West of England Regional Development Agency Wave Hub Development
More informationCertificate of Appropriateness Monthly Issuance Report March 2012
3/7/2012 852 East Ocean Blvd. Adelaide Tichenor House Upgrade electrical meter and place on west elevation of garage in a new enclosure using existing materials. 3/16/2012 5725 Corso di Napoli Replace
More informationSECONDARY ROAD CONSTRUCTION PROGRAM
Iowa Department of Transportation SECONDARY ROAD CONSTRUCTION PROGRAM County: Linn County Fiscal : 2014 Version: Original COUNTY CERTIFICATION The detailed construction program for the secondary road system
More informationNEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE
NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE Incident Spill New Gold or Contractor New Gold Spill Origin Mill Operations Date and Time Reported 2018-01-03 Product Spilled Reclaim Water Impact
More informationThis corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.
Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be
More informationBUS SERVICES IN CHAMBERLAYNE ROAD NW10
INTRODUCTION BUS SERVICES IN CHAMBERLAYNE ROAD NW10 1 LONDON BUSES 1. This note reviews the issues in Chamberlayne Road, Kensal Rise. It covers the range of bus routes in the area, their characteristics
More informationLOCAL CLIMATOLOGICAL DATA Monthly Summary April 2017
Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11
More informationCKI and HK Electric Completed Acquisition of. HK$70 Billion UK Electricity Distribution Asset
[Press release] CKI and HK Electric Completed Acquisition of HK$70 Billion UK Electricity Distribution Asset (1 November, 2010 Hong Kong) Following an irrevocable offer made on 30 July, 2010, a consortium
More informationU.S. Rail Traffic 1. Week 27, 2018 Ended July 7, 2018
U.S. Rail Traffic 1 240,514 5.4% 6,987,928 258,812 1.4% 30,160 3.2% 871,930 32,294 3.8% 76,562-0.5% 2,217,801 82,141-0.1% Farm Products excl., and Food 15,124 10.0% 436,221 16,156 1.5% 10,017 7.2% 275,445
More informationU.S. Rail Traffic 1. Week 42, 2018 Ended October 20, 2018
U.S. Rail Traffic 1 265,776-0.7% 11,047,756 263,042 1.8% 30,761-0.2% 1,352,962 32,213 4.1% 85,929-0.4% 3,546,082 84,431-0.9% Farm Products excl., and Food 16,808-4.1% 681,566 16,228 2.4% 9,845 2.3% 432,578
More informationU.S. Rail Traffic 1. Week 39, 2018 Ended September 29, 2018
U.S. Rail Traffic 1 272,306 0.5% 10,248,559 262,784 2.0% 33,047 4.4% 1,260,433 32,319 4.5% 89,445 1.5% 3,284,902 84,228-1.0% Farm Products excl., and Food 16,942 2.8% 631,634 16,196 2.7% 10,721-2.9% 402,632
More informationU.S. Rail Traffic 1. Week 44, 2018 Ended November 3, 2018
U.S. Rail Traffic 1 270,305 1.8% 11,586,596 263,332 1.9% 32,209 2.2% 1,416,860 32,201 4.1% 88,399 1.6% 3,722,456 84,601-0.7% Farm Products excl., and Food 17,133 2.8% 715,329 16,257 2.3% 10,357 3.2% 453,424
More informationU.S. Rail Traffic 1. Week 41, 2018 Ended October 13, 2018
U.S. Rail Traffic 1 263,787 10,781,980 262,975 1.9% 30,416-1.7% 1,322,201 32,249 4.2% 86,312 0.2% 3,460,153 84,394-0.9% Farm Products excl., and Food 16,355 664,758 16,214 2.5% 9,927-0.3% 422,733 10,311
More informationU.S. Rail Traffic 1. Week 46, 2018 Ended November 17, 2018
U.S. Rail Traffic 1 262,514-1.1% 12,110,985 263,282 1.8% 31,796-0.4% 1,480,087 32,176 4.0% 86,159-0.2% 3,893,147 84,634-0.7% Farm Products excl., and Food 16,141-3.7% 747,905 16,259 2.1% 9,541-5.4% 473,048
More informationU.S. Rail Traffic 1. Week 45, 2018 Ended November 10, 2018
U.S. Rail Traffic 1 261,875 0.1% 11,848,471 263,299 1.8% 31,431 1,448,291 32,184 4.1% 84,532-0.7% 3,806,988 84,600-0.7% Farm Products excl., and Food 16,435-1.3% 731,764 16,261 2.3% 10,083 2.5% 463,507
More informationU.S. Rail Traffic 1. Week 18, 2018 Ended May 5, 2018
U.S. Rail Traffic 1 265,563 6.4% 4,612,788 256,266 0.9% 33,807 9.5% 583,320 32,407 3.6% 77,468 5.5% 1,483,363 82,409 0.4% Farm Products excl., and Food 16,952 8.3% 290,667 16,148 0.6% 10,407 4.6% 181,165
More informationU.S. Rail Traffic 1. Week 17, 2018 Ended April 28, 2018
U.S. Rail Traffic 1 266,453 3.7% 4,347,225 255,719 0.6% 32,916 3.4% 549,513 32,324 3.2% 78,970 4.2% 1,405,895 82,700 0.1% Farm Products excl., and Food 16,221 4.5% 273,715 16,101 0.1% 10,563 4.7% 170,758
More informationU.S. Rail Traffic 1. Week 26, 2018 Ended June 30, 2018
U.S. Rail Traffic 1 270,916 0.7% 6,747,414 259,516 1.3% 33,563 5.5% 841,770 32,376 3.8% 83,214-5.3% 2,141,239 82,355-0.1% Farm Products excl., and Food 16,316 2.1% 421,097 16,196 1.3% 11,027 1.8% 265,428
More informationU.S. Rail Traffic 1. Week 24, 2018 Ended June 16, 2018
U.S. Rail Traffic 1 269,748 1.9% 6,208,034 258,668 1.3% 31,707 1.5% 775,785 32,324 3.7% 85,538-1.6% 1,975,019 82,292 0.3% Farm Products excl., and Food 16,717 6.2% 388,721 16,197 1.3% 10,837 7.4% 244,234
More informationLOCAL CLIMATOLOGICAL DATA Monthly Summary April 2015
Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11
More informationElectoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001
Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001 POLL NUMBER NAME OF POLL NAMES ON LIST BRENDA L. DYCK NDP RICHARD MARZ PC GAYLEEN ROELFSEMA LIB NICHOLAS SEMMLER
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationLOCAL CLIMATOLOGICAL DATA Monthly Summary April 2012
Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11 12
More information. DEFENCE AREA 59 FRILFORD / FYFIELD
. DEFENCE AREA 59 FRILFORD / FYFIELD 1. Area details: The defence area is 4 miles W of Abingdon and 9 miles ENE of Faringdon. County: Oxfordshire. Parishes: Frilford / Fyfield and Tubney. NGR: centre of
More informationFacility Conditions.
Facility Conditions Circle Interchange Under Construction Looking orth, Circa Late 1950s There have been no major improvements made to the Circle Interchange since its construction in the 1950s. Maintenance
More informationNorthern Line Extension Project
1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer 2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story 3 Contents Project Background
More informationLa Caserne. 103 Dalhousie Québec (Québec) Canada, G1K 4B9. Telephone : (418) Fax : (418) Telephone : (418)
La Caserne 103 Dalhousie Québec (Québec) Canada, G1K 4B9 Telephone : (418) 692-5323 Fax : (418) 692-2390 Internet : www.exmachina.qc.ca Technical director : Patrick Durnin Telephone : (418) 692-5353 Email
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationAppendix V1a Coopers Field, Bute Park-CF10 3DX
Appendix V1a Coopers Field, Bute Park-CF10 3DX Site-specific info Coopers Field is a green field event site set within Bute Park a 146 acre historic park and nationally-significant arboretum located in
More informationCrestmont Development Update 2017 AGM
Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home
More informationMajor causes of road crashes in countries in the Asia-Pacific region
https://twitter.com/shirleyeungccsi/status/748914589132165120 UNESCAP Regional Meeting on Renewing Regional Road Safety Goalsand Targets 28-29 July, 2016, Seoul, Republic of Korea Major causes of road
More informationIncluding. BRISTOL - Gloucester Tel: HARPENDEN - Herts/Beds Tel:
www.cwplant.co.uk Specialised ATTACHMENTS Including Rotating Pulverizers Compactors Hydraulic Breakers Hydraulic Magnets Piling Hammers Dedicated Steel Shears Digging Clamshell Grabs NATIONWIDE SERVICE
More informationTramway, Tuam Street: A Report on Archaeological Investigations
Lessons learned from one of New Zealand s most challenging civil engineering projects: rebuilding the earthquake damaged pipes, roads, bridges and retaining walls in the city of Christchurch 2011-2016.
More informationFacilities List Alberta Facilities that Accept Hydrovac Waste
Facilities List Alberta Facilities that Accept Hydrovac Waste Land Policy Information in this document may change. Please contact the facility directly for the most up to date information. Facilities with
More informationM773LW3. GEM Series Soundshield Assembly Instructions. Gulf Branch th Avenue NW. Southeastern U.S.A W Newport Center Dr
M773LW3 GEM Series Soundshield Assembly Instructions Corporate Headquarters Alaska Branch Office Southeastern U.S.A. East Coast Branch Gulf Branch 4420 14th Avenue NW 1200 West International 1419 W Newport
More informationCENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018
ASX / MEDIA ANNOUNCEMENT ASX: NCZ 02 July 2018 CENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018 New Century continues strong progress toward restarting Century operations, with planned refurbishment activities
More informationWestside Subway Extension Final EIS/EIR. January 2011 Community Update Meetings
Westside Subway Extension Final EIS/EIR January 2011 Community Update Meetings Purpose of Tonight s Meeting Background information on planning to date Clarify Locally Preferred Alternative (LPA) under
More informationMarket Performance Standards Peer Comparison Report
Market Performance Standards Peer Comparison Report Individual Retailer Analysis February 2017 The Market Performance Standards Peer Comparison Report This report covers all Retailers and Market Performance
More informationEV (Electric Vehicle) charging stations are available at all City parking structures (not available in the Santa Monica 5 metered parking
EV (Electric Vehicle) charging stations are available at all City parking structures (not available in the Santa Monica 5 metered parking structures). Parking Authority of the City of Beverly Hills FISCAL
More informationParking Authority. of the City of Beverly Hills FISCAL YEAR 2014/2015 SCHEDULE OF PARKING FACILITY RATES
Parking Authority of the City of Beverly Hills FISCAL YEAR 2014/2015 SCHEDULE OF PARKING FACILITY S. Current INDEX SECTION PAGE PARKING FACILITY S Administrative Fee... 4 Daily Maximum... 3 Daily Parking
More informationAutomotive Gas Oil (Diesel) Price Watch
Automotive Gas Oil (Diesel) Price Watch (JANUARY 2018) Report Date: February 2018 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 PMS Prices Across States 2 PMS Prices Across
More informationMap 1: East Whiteland Township Trails Plan
Map 1: Trails Plan!( 10 Lee Bl Bacton Hill d Conestoga d Phoenixville Pk!( 7!( 8a!( 9 Moores d Sidley d Flat d!( 13 ") 29 Bus Stops Active Inactive Chester alley Trail (Multi-se) Multi-se Facilities -
More informationWe Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:
We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street
More informationFederal Way Link Extension
Federal Way Link Extension Draft EIS Summary Route & station alternatives and impacts Link Light Rail System Map Lynnwood Mountlake Terrace Lynnwood Link Extension Shoreline 14th Northgate 40 Northgate
More informationName of Report: Car Club Strategy Technical Appendix
Name of Report: Car Club Strategy Technical Appendix Author: James Duggan Date: 06 July 2016 Service / Dept: LB Barnet Environment Commissioning 1.1 Types of Charge Point There are three main Electric
More informationCOTTER CORPORATION CANON CITY MILLING FACILITY
CALENDAR YEAR 2004 APPENDIX C Water Quality Monitoring Report COTTER CORPORATION CANON CITY MILLING FACILITY Canon City, Colorado June 30, 2005 COTTER CORPORATION WATER SAMPLING LOCATIONS JUNE 30, 2005
More informationSingle Phase Poultry Fan Motor, Standard Efficiency,TEAO, Squirrel Cage Rotor
No.: Date: 6/16/2011 Customer : TECHNICAL PROPOSAL Single Phase Poultry Fan Motor, Standard Efficiency,TEAO, Squirrel Cage Rotor Product line : Single-Phase : 48 & 56 TEAO Catalog Number :.3318ES1BRBPFC48
More informationAlignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)
Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) INTRODUCTION The Ministry of Transportation (MoT), Region 2, Highway Engineering staff were
More informationSCAN Land Use and Transportation Committee Report June 10, 2015
DRAFT DRAFT DRAFT Exhibit A to SCAN Minutes - June 10, 2015 SCAN Land Use and Transportation Committee Report June 10, 2015 Gaiety Hollow In April the Committee provided testimony in support of the Lord
More informationSummary of the Mineral Block
Summary of the Mineral Block PART A GENERAL INFORMATION ABOUT MINERAL BLOCK Features Details 1. Location Mineral Block Mohra East Corner Points (Latitude, Longitude) See Appendix 1 Villages Mohra, Patharchua,
More informationWILSHIRE/RODEO. Westside Subway Extension - DRAFT IMAGES FOR DISCUSSION PURPOSES ONLY. Torti Gallas and Partners, Inc. June SAAG Workshops 2011
WILSHIRE/RODEO 1 WILSHIRE/RODEO: BANK OF AMERICA FULL PORTAL (OPTION A) Note for Option A: Beverly Drive: Retains 2 northbound & 2 southbound lanes Loss of 40 Bank of America underground parking spaces
More informationThe Industrial and Agricultural Revolutions
The Industrial and Agricultural Revolutions Warmup What Do We Already Know about the Industrial Revolution? Agenda Warmup Industrial and Agricultural Revolutions PowerPoint with Notes Crash Course Industrial
More informationYour resource for finding Loudoun County Public School Facilities
Your resource for finding Loudoun County Public School Facilities Prepared by Loudoun County Public Schools Department of Planning and GIS Services (06.01.2017) CONTENTS Welcome...5 Loudoun County Public
More informationTongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis
Technical Note 02 - N2/M41 AIMSUN Micro-simulation Tongaat Hullette Developments Cornubia Phase 2 Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Prepared by: 18/11/14 Justin Janki Date Approvals
More informationOctober 12, 2012 FILES: 221-D, 221-M 25T NOTICE OF MUNICIPAL ADDRESSES. FOR REGISTERED PLAN 62M-1t80 "Paradise Meadows- Phase 3".
Hamilton Mailing : Hamilton City Hall 71 Main Street West, 6th Floor Hamilton, ON L8P 4Y5 www.hamilton.ca Planning and Economic Development Department Growth Management Division Physical : 71 Main Street
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:
More informationEquity Title of Nevada March 2012 Greater Las Vegas Market Update
90.0% Closed Trend by Type ruary Closings by Type 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 43% 0.0% 2009 2010 Greater Las Vegas Snapshot by Sale Type - SFR Only List LP/Sq Ft Pending ruary 30 Day
More informationYear to Date Summary. Average and Median Sale Prices
A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington
More informationMEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:
MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed
More informationAPPENDIX C. Existing Utilities
APPENDIX C Existing Utilities THIS PAGE INTENTIONALLY BLANK Existing Utilities Numerous utilities exist within the project area, including natural gas, sewer, water, electric, communications, and street
More informationMAYO COUNTY COUNCIL KILLALA WASTE WATER DISCHARGE LICENCE APPLICATION ATTACHMENT C
MAYO COUNTY COUNCIL KILLALA WASTE WATER DISCHARGE LICENCE APPLICATION ATTACHMENT C C.1 Operational Information C.2 Outfall Design and Construction Dwg. Title Dwg. No. Location of Proposed Primary Discharge
More informationPurple Line Extension, Section 2 Southern California Edison, Phase I
Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left
More informationBrief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and
Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and wind power plants in Zhyvachiv, Tlumach district, Ivano-Frankivsk
More informationGarden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights
7 December 2010 ABN 28 009 174 761 www.regisresources.com Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 Level 1, 1
More informationAIRCRAFT HANGAR PINCHGUT LAKE
AIRCRAFT HANGAR PINCHGUT LAKE ABSTRACT Please find enclosed Environmental Assessment submission relating to a proposed Aircraft Hangar at Pinchgut Lake, File 200.20.2707. Calv Swift [Course title] File
More informationDesign Criteria Data
PIERRE SD Latitude = 44.38 N WMO No. 726686 Longitude =1.2 W Elevation = 1742 feet Period of Record = 1973 to 1996 Average Pressure = 28.1 inches Hg Design Criteria Data Mean Coincident (Average) Values
More informationPurple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017
Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work:
More informationSwaffham Bulbeck. Cashbook 1. Current Bank A/c Unity Trust
Page: 3 Receipts Receipt Ref Name of Payer Amnt Received Debtors VAT A/c Centre Amount Balance Brought Fwd : 36,041.44 36,041.44 Transaction Detail Banked: 01/04/2016 50.00 BBC 50.00 1250 401 50.00 BBC
More informationThe Pure Play Tender Drilling Contractor Simplified Overview
Pareto Conference September 2015 1 The Pure Play Tender Drilling Contractor Simplified Overview Atlantica Tender Drilling Ltd (Bermuda) * 25.26% 100% 99%** BassDrill Alpha Ltd. (Bermuda) Tender barge BassDrill
More informationBritish Army 2nd Battle of Gaza April 1917
British Army 2nd Battle of Gaza 17-19 April 1917 Eastern Force: Lieutenant General C.M.Dobell 5th Wing Royal Flying Corps Organization unknown 52nd (Lowland) Division: Bt. Colonel W.E.B.Smith 155th (Seaforth
More informationDesign Criteria Data
HONOLULU/OAHU HI Latitude = 21.35 N WMO No. 91182 Longitude =157.9 W Elevation = 16 feet Period of Record = 1967 to 1996 Average Pressure = 29.96 inches Hg Design Criteria Data Mean Coincident (Average)
More informationDesign Criteria Data
PHILADELPHIA PA Latitude = 39.88 N WMO No. 7248 Longitude = 75.25 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident (Average)
More informationDesign Criteria Data
INDIANAPOLIS IN Latitude = 39.73 N WMO No. 72438 Longitude = 86.27 W Elevation = 87 feet Period of Record = 1973 to 1996 Average Pressure = 29.15 inches Hg Design Criteria Data Mean Coincident (Average)
More informationUBC Watermain as shown on Sheet 202 : Sub total 97,050
Preliminary Cost Estimate Brock Commons Phase 1 Watermain replacement UBC Portion of Works only Replace existing 150mm dia CI and 200mm dia AC watermain with 200mm & 250mm dia DI (ductile iron) watermain
More information