1 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer

2 2 Northern Line Extension Battersea part of the wider Northern Line story

3 3 Contents Project Background Design constraints Tunnels, Shafts and Station Design Railway Systems Current Status & Progress Questions

4 4 Background

5 5 Vauxhall, Nine Elms, Battersea VNEB An Opportunity area in SW London 195 hectares 3 km of Thames river frontage 18,000 new homes 5 hectares of public open space 24,000 new jobs 1 billion of infrastructure Local Transport improvements New schools / healthcare / community space

6 6 Battersea Power Station Opened 1933 Dormant from 1980s Poor transport links Many development proposals

7 7 TfL Transport Studies Transport studies in 2009 / 10 considered a number of options: Bus routes and segregation Light Rail London Underground extensions. Victoria Line (Vauxhall), Bakerloo Line (Elephant & Castle), District Line (Sloane Square), Northern Line (Kennington) Conclusion Level of development is such that a high level of public transport capacity is required best delivered through an extension of the tube. Extension of Northern Line Charing Cross branch reduces pressure on Vauxhall station and provide relief to the Victoria line and the existing Northern line south of Kennington

8 8 Key Programme Requirements Capability of up to 30 trains per hour Efficient, safe and reliable service Minimise environmental impacts Minimal impact on the existing railway Fully integrated with the urban design Fully integrated with other transport operators

9 9 Project Overview

10 10 Design Constraints

11 11 Local Geology Made ground Alluvium River Terrace Deposit London Clay Formation Lambeth Group River terrace deposit London Clay Lambeth Group

12 12 Challenges Tunnels Thames Water assets Power assets Victoria line Network Rail assets Existing Northern line including Oval station Existing properties Interfacing developments Encirclement at Kennington loop Battersea Dogs and Cats Home National Grid site Kennington Station New Cross passages within existing platforms Deep excavations Station boxes Noise & Vibration Schools Listed properties Local residents

13 13 Constraints Thames Water Ring Main Sewers Victoria Line EDF Cable Tunnel Kennington Loop Northern Line

14 14 Alignment

15 15 Tunnel Alignment Constrained by TWAO Limits of Deviation Minimise journey time Minimise ground borne noise and vibration Safety Quality of ride London Underground standards Curves - min radius 300m Concession from 400m. Gradients - max 2.00%, min 0.250%, level stations Cant - max 125mm, Speed - Vmax. 90km/h.

16 16 P&C and Junctions Kennington Step Plate Junctions Northbound Cv9.25 NLE 245m rad / NL (Loop) straight Southbound Cv9.25 equal split NLE 490m rad / NL (Loop) 490m rad

17 17 P&C and Junctions Battersea scissors crossover, - 4 Standard Straight Cv9.25, with large radius curves between turnouts, scissors crossover is slightly tapered, being wider at platform end. Crossover is level throughout.

18 18 Tunnel Design

19 19 Overview of Tunnelling Main TBM drives approx. 5.2km total TBM could not junction with the loop Shafts located 70m and 200m from junctions - SCL Difficult to mechanise excavation around existing tunnel - SGI

20 20 Tunnel Section Bolted RC Segmental Lining 5.2 Diameter I/D

21 21 EPBM Tunnelling 2 x TBMs (Amy & Helen) Reduces risks with ground conditions Reduced settlement - Predicted 0.5% vol. loss

22 22 Muck Removal

23 23 Muck Removal

24 24 Step Plate Junctions Interfaces with operational railway Interdependencies with various systems and disciplines Installation of new CMS Re-routing and relocation of services providing continuity. Removal of existing cast iron tunnel segments and support structure over weekend possessions Installation of new track and power assets Commissioning of new railway during a 10 day blockade

25 25 Step Plate Junctions

26 26 Step Plate Junctions

27 27 Tunnel and Station Cross Passages Three cross passages between the bored running tunnels were constructed to facilitate operational evacuation as agreed with LFB. Constructed in the London Clay and Lambeth Group using timber headings and SGI Segments Four new cross passages in Kennington Station between the existing platforms to facilitate congestion relief and station evacuation. Constructed in the London Clay and using timber headings and SGI Segments

28 28 Kennington Ventilation Shaft Designs

29 29 Kennington Shaft Structures Secant Piled Wall Construction SCL Shaft for tunnel interface Complex integration with multidiscipline services Kennington Green Kennington Park Two Permanent ventilations shafts at Kennington Green and Kennington Park to allow air in and out of the underground tunnels to help cool the Tube. It is also required to enable emergency intervention and evacuation from the tunnels.

30 30 Stations Design

31 31 Nine Elms Station

32 32 Nine Elms Station West End Entrance

33 33 Ticket Hall Level

34 34 Platform Concourse

35 35 Nine Elms Station Longitudinal Section

36 36 Battersea Power Station

37 37 Street Level Entrance

38 38 Ticket Hall Level

39 39 Platform Level

40 40 Battersea Power Station -Longitudinal Section

41 41 Railway Systems

42 42 Track Form The new track being installed is flat bottom rail 4800m of Sonneville LVT Block track form for the Tunnels First substantial use on Tube network Delkor RF167 base plates for 4NO. Platform safety pit areas in Battersea and Nine Elms

43 43 Plain Line Track Methodology LVT Blocks and rail delivered into tunnel Rail Installed onto Blocks and set on alignment jigs

44 44 Plain Line Track Methodology Stage 2 Concrete Pour Final alignment adjustment and clean

45 45 Plain Line Track Methodology Track Jigs removed and made good Thermit welding

46 46 Delivery of 91m Length Rail 7/10/18

47 47 Delivery of 91m Length Rail 7/10/18

48 48 Current Status

49 49 Status Overview All tunnelling work complete as of mid September 2018 Track installation has commenced. Works between the Step plate junction and shafts, plain line between Battersea Launch tunnels and Nine Elms box and platform areas to Battersea Power Station are all complete Excavation works to both Kennington Shafts are ongoing with construction of secondary structures. Nine Elms and Battersea Power stations secondary structures works are ongoing Design works for Signals and Systems ongoing with Thales (PFI Contract) Fit Out works have commenced - NLE due for completion 2020

50 50 Current Status - Photographs Battersea Power Station

51 51 Current Status - Photographs Battersea Power Station

52 52 Current Status - Photographs Nine Elms Station

53 53 Current Status - Photographs Nine Elms Station

54 54 Current Status - Photographs Kennington Shafts

55 55 Questions

NORTHERN LINE HEADING FOR A SPLIT

NORTHERN LINE HEADING FOR A SPLIT NORTHERN LINE HEADING FOR A SPLIT by John Hawkins After over 80 years together, separation looks increasingly likely for the Northern Line s branches, a long held idea whose time may now have come. With

More information

Smart Infrastructure and Construction. Kenichi Soga

Smart Infrastructure and Construction. Kenichi Soga Smart Infrastructure and Construction Kenichi Soga London Bridge Station 200,000-250,000 passengers/day 55 million passengers per year Oldest station in London First built in 1836 Five Year Improvement

More information

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD Delivering the North West Rail Link Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD November 26, 2013 The starting point Project overview $8.3 billion budget Open

More information

Modernising the Great Western railway

Modernising the Great Western railway Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western

More information

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada Converting BRT to LRT in the Nation s Capital Ottawa, Canada John Manconi City of Ottawa Ottawa, Canada 1 The Challenge *Mackenzie King Bridge Ottawa, AM peak period 2 The Challenge Ottawa s population

More information

Powering Sydney s Future

Powering Sydney s Future Powering Sydney s Future Frequently Asked Questions December 2017 Project background Q: Why is this project needed? A: Inner Sydney is one of the most critical parts of the NSW electricity network. However,

More information

Dallas CBD Second Light Rail Alignment (D2)

Dallas CBD Second Light Rail Alignment (D2) Dallas CBD Second Light Rail Alignment (D2) Subway Project Refinement Stakeholder Meeting December 7, 2016 Discussion Items Background Schedule Public/Stakeholder Involvement Comments/Questions from Audience

More information

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX Q SUBWAY OPERATIONS REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

More information

THE UK RAIL MARKET 2015

THE UK RAIL MARKET 2015 THE UK RAIL MARKET 2015 image: Ken Harris B R O O K S M A R K E T I N T E L L I G E N C E R E P O R T S THE UK RAIL MARKET 2015 Brooks Events Ltd 2015. All rights reserved. A Brooks Reports Publication

More information

Very Light Rail (VLR) as a means of delivering low-cost railways

Very Light Rail (VLR) as a means of delivering low-cost railways Very Light Rail (VLR) as a means of delivering low-cost railways Dr Nick Mallinson Programme Manager, WMG Centre High Value Manufacturing Catapult LCV2018 Event Sponsor: Very Light Rail (VLR) as a means

More information

02 BUILDING ACCESSIBILITY STATEMENT

02 BUILDING ACCESSIBILITY STATEMENT 01 02 BUILDING ACCESSIBILITY STATEMENT Prince Philip House, 3 Carlton House Terrace is a Grade 1, 1800s Regency Building designed by John Nash. The building is an outstanding venue for events boasting

More information

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

BUS SERVICES IN CHAMBERLAYNE ROAD NW10 INTRODUCTION BUS SERVICES IN CHAMBERLAYNE ROAD NW10 1 LONDON BUSES 1. This note reviews the issues in Chamberlayne Road, Kensal Rise. It covers the range of bus routes in the area, their characteristics

More information

CTA Capital Construction Update May 17, 2007

CTA Capital Construction Update May 17, 2007 Block 37 Signals Project Brown Line Howard CTA Capital Construction Update May 17, 2007 1 Capital Construction Update Agenda Howard Station Reconstruction Brown Line Capacity Expansion Project Block 37

More information

Appendix 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

Appendix 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes Appendix 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes Introduction 4.1 This appendix considers the planned utilisation

More information

High Speed S&C Design and Maintenance

High Speed S&C Design and Maintenance High Speed S&C Design and Maintenance Dr Sin Sin Hsu Head of Track Engineering, NRHS 1 st March 2018 What is a High Speed Turnout? Three main parts: Switch Geometry, profile, components Intermediate Part

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Multi Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling

Multi Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling Multi Mode TBMs Shawn Hourtovenko Herrenknecht Tunnelling Systems Canada, Inc. October 5 th, 2015 Tunnelling

More information

4. Good Practice Example: Automatic light metro system (Brescia, Italy)

4. Good Practice Example: Automatic light metro system (Brescia, Italy) 4. Good Practice Example: Automatic light metro system (Brescia, Italy) Keywords Sustainable mobility, automatic light metro system Name and location Automatic light metro system, Brescia, Italy Brescia

More information

Chapter 3 Route Window C2 Paddington station. Transport for London

Chapter 3 Route Window C2 Paddington station. Transport for London Chapter 3 Route Window C2 Paddington station PADDINGTON STATION 3 Route Window C2 Paddington station Red Star Deck worksite Eastbourne Terrace worksite Circle Line Link worksite The Red Star Parcel site

More information

ASHPRINGTON ROAD Part 1

ASHPRINGTON ROAD Part 1 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD Part 1 By Graham Plowman Photographed by Paul Plowman 2 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD A 00 layout based on the Western Region Main Line between Exeter

More information

Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes Chapter 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes 4.1 This chapter relates to the following questions listed

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 SUBMISSION TO METROLINK PUBLIC CONSULTATION From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 Suggested Route Map including stations Rathmines, Terenure, Rathfarnham INTRODUCTION

More information

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS BARKING GOSPEL OAK RAIL USER GROUP F O U N D E D 1 9 6 4 Chair: Graham Larkbey Secretary: Glenn Wallis (020) 8529 2361; 07789 791224 www.barking-gospeloak.org.uk info@barking-gospeloak.org.uk @RidingtheGoblin

More information

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 SPEED LIMIT CHANGE ON KĀPITI ROAD PURPOSE OF REPORT Meeting Status: Public Purpose of Report: For Decision 1 The purpose

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Program Overview. February 2018

Program Overview. February 2018 Program Overview February 2018 Nashville is growing 2 and traffic is getting worse 5 Nashville spoke; we listened Transit Improvement Program Frequent Transit Bus AccessRide and Mobility on Demand Neighborhood

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Retrofitting of Automatic Platform Gates along the East Rail Line and Ma On Shan Line CB(1)308/13-14(03) Purpose 1. This

More information

High Speed 2- engineering, benefits & challenges. Prof Roderick A Smith

High Speed 2- engineering, benefits & challenges. Prof Roderick A Smith South Yorkshire I Mech E, Sheffield, 3 October 2013 High Speed 2- engineering, benefits & challenges Prof Roderick A Smith Chief Scientific Advisor Department for Transport & Imperial College London Lecture

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM California High-Speed Train Project TECHNICAL MEMORANDUM TM 1.1.0 Prepared by: Mike Hawkins, PE Checked by: Christian Schang Approved by: Signed document on file 16 Mar 07_ Ken Jong, PE, Engineering Manager

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Chapter 11 Route Window NE10 Gidea Park station. Transport for London

Chapter 11 Route Window NE10 Gidea Park station. Transport for London Chapter 11 Route Window NE10 Gidea Park station Transport GIDEA PARK STATION 11 Route Window NE10 Gidea Park station Transport Introduction 11.1 The construction activities in this route window are associated

More information

BRAYBROOK STREET SHAFT

BRAYBROOK STREET SHAFT the Capital, Connecting the UK BRAYBROOK STREET SHAFT CROSSRAIL PROPOSALS Old Oak School Wulfstan Braybrook Wormwood Scrubs Park Braybrook Shaft HM Prison Wormwood Scrubs Intermediate shafts are required

More information

Epping to Chatswood Railway Temporary Transport Plan

Epping to Chatswood Railway Temporary Transport Plan Transport for NSW Epping to Chatswood Railway Temporary Transport Plan 10 October 2014 Contents Page number Glossary and acronyms Executive summary ix x 1. Introduction 1 1.1 Background 1 1.2 Project

More information

NORTH RINGROAD OF VALENCIA (CV30) BENIMAMET TO CIUTAT FALLERA AND CONNECTIONS TO BURJASSOT, BENIMAMET, CV30 AND THE FUTURE NORTH PARK ROAD CIT-01

NORTH RINGROAD OF VALENCIA (CV30) BENIMAMET TO CIUTAT FALLERA AND CONNECTIONS TO BURJASSOT, BENIMAMET, CV30 AND THE FUTURE NORTH PARK ROAD CIT-01 CIT-01 NORTH RINGROAD OF VALENCIA (CV30) BENIMAMET TO CIUTAT FALLERA AND CONNECTIONS TO BURJASSOT, BENIMAMET, CV30 AND THE FUTURE NORTH PARK ROAD ADMINISTRATIVE DATA MANAGEMENT DATA PROCUREMENT PROJECT

More information

presented by Y. C. Lam & Tim Leung 21 May 2005

presented by Y. C. Lam & Tim Leung 21 May 2005 Ground Investigation by Horizontal Directional Drilling presented by Y. C. Lam & Tim Leung 21 May 2005 2 Horizontal Directional Drilling (HDD) Working Principle Construction Procedure Recent Application

More information

70 YEARS OF 1938 TUBE STOCK

70 YEARS OF 1938 TUBE STOCK 70 YEARS OF 1938 TUE STOCK Thursday 30 June 1938 was the date that the first train of 1938 Tube Stock ran in service on the orthern Line 70 years ago. To mark the event, the London Transport Museum s 1938

More information

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7)

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7) Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7) Deviation Number: 14/078/DEV 1. Start and End Date: From 26/06/2014 to 22/10/2018 2. Details

More information

INTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation.

INTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation. Brescia Subway INTRODUCTION The origin of the project Metro Brescia comes from a decision of Brescia city council in 1987, when in accordance with the technical and economic examination of the various

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland. 17 th November

Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland. 17 th November Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland 17 th November 2004 www.irishrail.ie Contents Overview of current suburban rail network Projects underway

More information

Central London Plan Update

Central London Plan Update Central London Plan Update 2017 1 Background to the Central London Plan Introduction to the Central London network and our plans for it over the coming years. PAGE 4 Increasing capacity Our plans to increase

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017 West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million

More information

ASSESSMENT OF THE UPPERLEVELLOOP ALTERNATIVE FORTHE MANHATTANPORTION OF THEEASTSIDE ACCESSPROJECT

ASSESSMENT OF THE UPPERLEVELLOOP ALTERNATIVE FORTHE MANHATTANPORTION OF THEEASTSIDE ACCESSPROJECT ASSESSMENT OF THE UPPERLEVELLOOP ALTERNATIVE FORTHE MANHATTANPORTION OF THEEASTSIDE ACCESSPROJECT Preparedfor: Institute for Rational Urban Mobility, Inc. New York Preparedby: Delcan Corporation Toronto,Canada

More information

1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion?

1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion? 16 September 2016 Georgina Wells London Assembly City Hall The Queen s Walk London SE1 2AA Submitted electronically to: georgina.wells@london.gov.uk Institution of Civil Engineers One Great George Street

More information

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN WELCOME TO OUR PUBLIC OPEN HOUSE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) Preliminary Planning for a Transit Project Assessment June 15, 17, 18, 23, 24 and 25, 2009 PLEASE SIGN IN Members of the Project

More information

Domain Station? A smart alternative.

Domain Station? A smart alternative. Melbourne Metro Rail Domain Station? A smart alternative. By William McIntosh B.E. (Hons), M.Sc, MAusIMM(CP) The Background Domain Station is proposed to be built via a 'cut and cover' method, with the

More information

Presentation of the Baltimore Metro System

Presentation of the Baltimore Metro System Presentation of the Baltimore Metro System Presenter: Michael S. Davis Deputy Administrator, Transit Operations Division March 2, 2010 Topics Early Planning for Rapid Rail Transit System Overview Section

More information

Proposed Dounreay - Mybster 275 kv / 132 kv

Proposed Dounreay - Mybster 275 kv / 132 kv Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Confederation Line West Queensway Terrace North. May 27, 2017

Confederation Line West Queensway Terrace North. May 27, 2017 Confederation Line West Queensway Terrace North May 27, 2017 Agenda Background Lincoln Fields Station Concept LRT alignment, southwest of Lincoln Fields to Queensway, including: Pedestrian bridge replacement

More information

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS) A: 2014 SFMTA TRANSIT SERVICE INFORMATION B: SFMTA TRAFFIC COUNT DATA C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS) E: LAND USE AND VALUE

More information

How our experience could serve your ambitions Lessons learnt

How our experience could serve your ambitions Lessons learnt London Sept 11, 2014 How our experience could serve your ambitions Lessons learnt Pierre-Etienne Gautier, VP Innovation, SYSTRA 1. hs2 Challenges HS2 project sets ambitious targets V360 70 M.ton/year in

More information

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL APPENDIX 7.1 Annex E South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL Ref: 402-03640-00006 March 2013 VATTENFALL i Ref: 402.03640.00006 CONTENTS 1.0 INTRODUCTION... 2 1.1 Proposed

More information

CPG is pleased to report the following accomplishments this quarter:

CPG is pleased to report the following accomplishments this quarter: MEMORANDUM To: From: Metrolinx Board of Directors Matthew Clark Chief Capital Officer (A), Capital Projects Group Date: February 7, 2019 Re: Capital Projects Group Quarterly Report Recommendation That

More information

BLOTTMATTHEWS 2016/17 COMPETITION: AIRPORT TO AIRPORT (A2A)

BLOTTMATTHEWS 2016/17 COMPETITION: AIRPORT TO AIRPORT (A2A) BLOTTMATTHEWS 2016/17 COMPETITION: AIRPORT TO AIRPORT (A2A) Competition Submission from Therfield School, Leatherhead Iain Cheverton Elizabeth Cole Fred Donlan Elliot Skey Ross Turner Table of Contents

More information

JRC. Beyond the Elephant. Extending the Bakerloo. Jonathan Roberts, JRC At Lewisham Council Sustainable Development Select Committee 15 March 2012

JRC. Beyond the Elephant. Extending the Bakerloo. Jonathan Roberts, JRC At Lewisham Council Sustainable Development Select Committee 15 March 2012 Beyond the Elephant Extending the Bakerloo Jonathan Roberts, At Lewisham Council Sustainable Development Select Committee 15 March 2012 Beyond the Elephant June 1949 tube map Topics in report Sept 2010

More information

Island Smart Grid Model in Hawaii Incorporating EVs

Island Smart Grid Model in Hawaii Incorporating EVs Hitachi Review Vol. 63 (214), No. 8 471 Featured Articles Island Smart Grid Model in Hawaii Incorporating EVs Koichi Hiraoka Sunao Masunaga Yutaka Matsunobu Naoya Wajima OVERVIEW: Having set a target of

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5Ã)Ã Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5) 52$'6,'()$&,/,7,(6 7$%/(2)&217(176 Section Subject Page Number Page Date F.1 VEHICLE INSPECTION STATIONS... F-3 April

More information

CIGEO Preparing for construction

CIGEO Preparing for construction CIGEO Preparing for construction EDRAM WINTER MEETING, NOV. 19 TH, 2013 Marie-Claude DUPUIS & Gérald Ouzounian XXX.YY.AZZZ.AA.NNNN Presentation and organisation of the CIGEO project Ramp zone Shaft zone

More information

Alconbury Weald: the story so far

Alconbury Weald: the story so far Alconbury Weald: the story so far The development of Alconbury Weald is a 20 year project, which will be rolled out with a series of phased investments in new infrastructure on site and across the local

More information

Attachment E3 Vibration Technical Memorandum

Attachment E3 Vibration Technical Memorandum Attachment E3 Technical Memorandum 77 South Bedford Street Burlington, MA 01803 T 781.229.0707 F 781.229.7939 E jross@hmmh.com W www.hmmh.com TECHNICAL MEMORANDUM To: Alisa Swank, CH2M HILL Jodi Ketelsen,

More information

ACEforward. Livermore Valley Chamber of Commerce Business Alliance Meeting. September 6, 2017

ACEforward. Livermore Valley Chamber of Commerce Business Alliance Meeting. September 6, 2017 ACEforward Livermore Valley Chamber of Commerce Business Alliance Meeting September 6, 2017 Current ACE Connectivity Map WESTBOUND TRAINS ACE 1 ACE 3 ACE 5 ACE 7 Stockton 4:20AM 5:35AM 6:40AM 7:05AM Tracy

More information

Low Impact Light Rail Update

Low Impact Light Rail Update Low Impact Light Rail Update Forward plan: All contracts to be signed up by end of August 2014. All feasibility to be completed by end of 2014/14 financial year. Down selection to those projects to be

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form. Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form. THE PROBLEM LIGHT RAIL THE SOLUTION? INTRODUCTION Light rail transit (LRT) provides the opportunity

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Three ULTra Case Studies examples of the performance of the system in three different environments

Three ULTra Case Studies examples of the performance of the system in three different environments Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel

More information

Submission to Greater Cambridge City Deal

Submission to Greater Cambridge City Deal What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a

More information

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016 Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

HSR Vancouver WA to Camas Commuter Des, by R.N.

HSR Vancouver WA to Camas Commuter Des, by R.N. This plan will show the new route for the Portland-Vancouver Junction Railroad. Remove the existing Portland-Vancouver Junction Railroad leg from the Northeast Hazel Dell Avenue curve to the Burlington

More information

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line. Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March

More information

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road

More information

Transportation Engineering II UNIT - I

Transportation Engineering II UNIT - I Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.

More information

TER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein,

TER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein, TER WP2 Transport Challenges and Global Crisis Dr. Klaus Schierhackl, CFO Bad Gastein, 23.4.2009 1 ASFINAG Group is the 3rd largest concessionaire in Europe responsible for a network of more than 2.100

More information

UNION STATION MASTER PLAN STUDY

UNION STATION MASTER PLAN STUDY UNION STATION MASTER PLAN STUDY The Chicago Department of Transportation has begun a comprehensive study of issues related to Chicago s Union Station, the Union Station Master Plan. Opened in 1925, Union

More information

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June

More information

Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center

Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center 11 Operation & Maintenance Business Department, Land Transportation Systems & Components

More information

Presentation to the Portfolio Committee on Transport Gautrain Update. Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009

Presentation to the Portfolio Committee on Transport Gautrain Update. Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009 Presentation to the Portfolio Committee on Transport Gautrain Update Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009 Gautrain in a nutshell Scope Currently the largest Greenfields

More information

BART Wheel Profile Change

BART Wheel Profile Change BART Wheel Profile Change Cylindrical to Modified Tapered Ben Holland, P.E., Manager Vehicle Systems Engineering Rolling Stock & Shops Gregory Shivy Principal Track Engineer Maintenance & Engineering 1

More information

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018 Confederation Line Stage 1 and 2 Our Lady of Fatima Church May 10 th, 2018 Agenda Confederation Line Stage 1 Overview project, consortium, vehicles Confederation Line Stage 2 Overview project, benefits

More information

SOUTH TEXAS COMMISSION MEETING

SOUTH TEXAS COMMISSION MEETING SOUTH TEXAS COMMISSION MEETING September 26, 2013 Pharr District Commission Meeting Pharr District: Overview The Pharr District plans, designs, builds, operates and maintains the state transportation system

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Product Data SingleVario 2061

Product Data SingleVario 2061 inglevario 206 50 50 50 Cutting through Grounding 4 teel pillar base 6 520 (for vehicle up to 5.00 m = 6 4 long)»540 (for vehicle up to 5.20 m long)«garage with door in front of the car parking system

More information

SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR

SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR INDEX Sl No Description Remarks 1 Index 2 Specification of TBM- Robbins 3 List of Rolling Stock attached to TBM & Other Equipments SPECIFICATION OF TBM ROBBINS f 6550

More information

Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety

Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety 1 Where are we? Hinkley Point 2 EDF Energy s Nuclear New Build Projects February 2018 EDF Energy plc. All rights Reserved

More information

CREATING CONNECTIONS IN THE CITY OF KITCHENER

CREATING CONNECTIONS IN THE CITY OF KITCHENER CREATING CONNECTIONS IN THE CITY OF KITCHENER GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS KITCHENER CITY COUNCIL SEPTEMBER 25, 2017 CONGESTION

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

CREATING HIGH-SPEED RAILWAYS. Track, Overhead Catenary and Substations. A MAJOR RAIL INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE COMPANY

CREATING HIGH-SPEED RAILWAYS. Track, Overhead Catenary and Substations. A MAJOR RAIL INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE COMPANY CREATING HIGH-SPEED RAILWAYS Track, Overhead Catenary and Substations. East-European high-speed line A MAJOR RAIL INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE COMPANY EXPERIENCE MAKES THE DIFFERENCE Colas

More information

Appendix E: Basis for Comparative Cost Analysis

Appendix E: Basis for Comparative Cost Analysis DRAFT Technical Report RAILYARD ALIGNMENT AND BENEFITS STUDY Appendix E: Basis for Comparative Cost Analysis Estimated Probable Construction Costs DTX Future with Surface Rail (2026) Pennsylvania Avenue

More information

NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA

NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA Who we are? Eskom Uganda Limited is a whole owned subsidiary of Eskom Enterprises South Africa. Took over the operations of the complex on

More information

The $600 Million Rebirth of San Diego Trolley

The $600 Million Rebirth of San Diego Trolley The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and

More information

The Confederation Line Ottawa LRT Project

The Confederation Line Ottawa LRT Project The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development Canada Dragados Canada Project Stakeholders Sponsors Project Co Equity Developers Design Build

More information