1 CREATING HIGH-SPEED RAILWAYS Track, Overhead Catenary and Substations. East-European high-speed line A MAJOR RAIL INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE COMPANY

2 EXPERIENCE MAKES THE DIFFERENCE Colas Rail has more than 25 years experience in designing, maintaining and renewing High-speed Lines around the world France South East high-speed line 1st section : at 260 km/h operating speed & 2nd section : Paris/Lyon in 2 hours Atlantic high-speed line: Paris/Le Mans/Tours at 300 km/h operating speed / 1990: railway track, overhead contact wires and Northern high-speed line: Paris/Lille/Calais : railway track, overhead contact wires and Mediterranean high-speed line: Lyon/Marseille : railway track, overhead contact wires and East European high-speed line, 1 st & 2 nd sections: railway track, overhead contact wires and Rhine-Rhône high-speed line: design studies and execution, supplies, installation and putting traction power equipment into service Brittany-Loire high-speed line: a new line between Le Mans and Rennes (overhead line works) 185 km of double track / 45 km of connecting lines Nîmes Montpellier rail link (CNM): 60 km of new line; 20 km of connecting lines; a 20-year maintenance contract. Working with Oc Via, Colas Rail is responsible for the design and construction of the line, and ensuring its running, upkeep, maintenance and renewal programmes until km/hour is the latest world speed record performed on an infrastructure installed by Colas Rail, on LGV East European Line. Belgium Line 1 Brussels/France 1997 Line 2 Brussels/Liege 2002 Line 3 Liege/Germany 2007 United Kingdom High-speed 1 (Channel Tunnel Rail Link Section 1) 2003: railway track, overhead contact wires and Germany Frankfort/Cologne 2002 Nuremberg/Ingolstadt 2006 Korea KTX Seoul/Daegu 2004 Morocco Colas Rail is playing an active role in the construction of the first high-speed line on the African continent, on the Casablanca to Tangiers section. 180 km of double track at 320 km/h 400 km of 25 KV overhead lines Workshop & maintenance Concrete track Colas Rail has made a substantial contribution to the development of concrete track techniques, notably on the German market, a precursor in the field. As early as 1972, Colas Rail worked on the Rheda station site during the first concrete track experiment. In 2002 Colas Rail completed the Cologne-Frankfurt line, and went on to produce concrete tracks in the UK and France. Colas Rail has always been involved in discussions and improvements on one of the world s highest-performance systems.

3 East-European high-sp DESIGN Performance, System Integrity and Safety Colas Rail has a long established design process that has resulted through its vast experience in high-speed Lines (TGV) with the knowledge of different technologies. This allows Colas Rail to develop detailed designs that fully integrate the various subsystems with physical and functional interface management down to individual components. Colas Rail has developed simulation tools (overhead catenary pantograph current collection ) and computer-aided design programmes that not only ensure that safety and required performance is achieved, but also allow the application of standards and components to produce systems that are specific to a particular country. For example the design of ballasted and non-ballasted (concrete slab) track. CONSTRUCTION Precision, Logistics and Methodology Track and overhead catenary are installed with great precision to tight tolerances to achieve performance and safe operation. Proven construction methods use road and rail supply systems for handling major bulk and high volume products (ballast, sleepers, stanchions, long welded rails ). These can require complex site facilities such as railheads for storage capacity, preassembly workshops and train marshalling. Methods and staging of the work to optimise construction logistics such as, laying signalling cables in troughs before the installation of overhead catenary stanchions. Nîmes Montpellier high-speed line

4 COMMISSIONING Verification, Testing and Validation The testing from individual components to a full transportation system with many trains running is carried out by phasing the commissioning of the various sub systems and a ramping up of capacity. The thoroughness and traceability of the testing and validation process is the key to determining the system performances and safety of the high-speed lines. eed line Nîmes Montpellier high-speed line Brittany-Loire high-speed line

5 SAFETY Safety is paramount while operating the high-speed line during the construction and commissioning phases (25 KV electrification and train management) and requires a robust construction & commissioning set of rules. Marocco high-speed line RENEWALS Brittany-Loire high-speed line Fast Removal and Renewal. Specialised plant and equipment allows highly mechanised and rapid renewals of the High-speed Lines. The use of high output track renewal trains optimises short possessions for the total replacement of the track with hand back of a fully operational railway. Renewal of contact wires and overhead catenary uses dedicated specialised engineering trains.

6 Channel Tunnel Rail Link Photos : photothèque Colas Rail Colas Rail 44, rue Jean Mermoz Maisons-Laffitte - France Tel.: +33(0) communication@colasrail.com

How our experience could serve your ambitions Lessons learnt

How our experience could serve your ambitions Lessons learnt London Sept 11, 2014 How our experience could serve your ambitions Lessons learnt Pierre-Etienne Gautier, VP Innovation, SYSTRA 1. hs2 Challenges HS2 project sets ambitious targets V360 70 M.ton/year in

More information

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy Electrification and Power Supply Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy 1 RAILWAY POWER SUPPLY Electrification systems in Europe Electrification design criteria

More information

ISAF S.A. involvement in a High Speed Rail Line Project. Railway Pro Investment Summit 7 th of October 2015

ISAF S.A. involvement in a High Speed Rail Line Project. Railway Pro Investment Summit 7 th of October 2015 ISAF S.A. involvement in a High Speed Rail Line Project Railway Pro Investment Summit 7 th of October 2015 Agenda ISAF Introduction Colas Rail Group High-Speed Rail Line Project: LGV Bretagne Pays de la

More information

Requirements on High Speed Trains from DB AG s Point of View

Requirements on High Speed Trains from DB AG s Point of View Fast track to Sustainable Mobility Requirements on High Speed Trains from DB AG s Point of View 1 DB Fernverkehr s Rolling Stock Fleets 63 x ICE 3 2 x TGV PBKA 1997 2000 / 2005 59 x ICE 1 1991 44 x ICE

More information

Fast track to Sustainable Mobility. SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE

Fast track to Sustainable Mobility. SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE Fast track to Sustainable Mobility SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE 1 The French Railway Network 3630 km of highspeed tracks 300 km at 270km/h 2730 km at 300km/h 600 km at 320km/h

More information

1 - Hydraulic Crane 5 tm 80 tm 2 - Aerial lift 265 kg 365 kg 3 - Lifting platform 265 kg 1500 kg 4 - Winding-Unrolling 400 dan

1 - Hydraulic Crane 5 tm 80 tm 2 - Aerial lift 265 kg 365 kg 3 - Lifting platform 265 kg 1500 kg 4 - Winding-Unrolling 400 dan 1 Superstructures 1 - Hydraulic Crane mini : 5 tm 2 maxi : 80 tm 2 - Aerial lift Capacity mini : 265 kg 3 maxi : 365 kg 3 - Lifting platform Capacity mini : 265 kg maxi : 1500 kg 4 - Winding-Unrolling

More information

Innovative track systems for mainline and urban rail transportation

Innovative track systems for mainline and urban rail transportation Presseinformation Press release Information de presse Pfleiderer AG Postfach 1480 D-92304 Neumarkt Telefon +49 (0) 9181 28 8044 Telefax +49 (0) 9181 28 606 Pfleiderer track systems at InnoTrans 2004, from

More information

Research Brief. Simulation and verification of results from 125mph current collection modelling for two pantographs. T841 - January 2011.

Research Brief. Simulation and verification of results from 125mph current collection modelling for two pantographs. T841 - January 2011. Research Brief Simulation and verification of results from 125mph current collection modelling for two pantographs Overview On behalf of the Vehicle / Train Energy System Interface Committee (V/TE SIC),

More information

Regenerative braking and the different traction systems

Regenerative braking and the different traction systems Energy Recovery Workshop Madrid, September, 29, 2015 Regenerative braking and the different traction systems Ignacio González and Eduardo Pilo Spanish Railways Foundation Index 1. Introduction 2. Traction

More information

Why the original concept of HSL adopted in different countries has. differentiated situation.

Why the original concept of HSL adopted in different countries has. differentiated situation. Why the original concept of HSL adopted in different countries has evolved towards a more differentiated situation. Content Brief overview of the different HSL concepts throughout the world. Why departing

More information

DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA

DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE Jean-Pierre ORSI Director Europe SYSTRA 1 Fundamental parameters of the Trans-European high speed railway system. Speed increase on conventional

More information

Electrification Clearance Solutions

Electrification Clearance Solutions Electrification Clearance Solutions Electrification Clearance Solutions Overhead line electrification of an existing railway often presents problems at structures where the available space is limited.

More information

Accredited competence for measurements in railway operations: Aerodynamics Test Laboratory. DB Systemtechnik

Accredited competence for measurements in railway operations: Aerodynamics Test Laboratory. DB Systemtechnik Accredited competence for measurements in railway operations: Aerodynamics Test Laboratory DB Systemtechnik Our products Test expertise: for rolling stock, components, infrastructure and interfaces As

More information

Railway noise mitigation factsheet 01: Overview of railway noise

Railway noise mitigation factsheet 01: Overview of railway noise Railway noise mitigation factsheet 01: Overview of railway noise 1.1 Noise sources and indicative noise levels Exterior noise sources on high-speed trains can be broadly categorised as follows and are

More information

Improvements of Existing Overhead Lines for 180km/h operation of the Tilting Train

Improvements of Existing Overhead Lines for 180km/h operation of the Tilting Train Improvements of Existing Overhead Lines for 180km/h operation of the Tilting Train K. Lee, Y.H. Cho, Y. Park, S. Kwon Korea Railroad Research Institute, Uiwang-City, Korea Abstract The purpose of this

More information

WCTRS International Conference: Transport, Climate Change and Clean Air, Paris, June 21, 2018

WCTRS International Conference: Transport, Climate Change and Clean Air, Paris, June 21, 2018 THE POTENTIAL ENERGY USE & CO 2 EMISSION REDUCTIONS OF ELECTRIC TRUCKS POWERED BY OVERHEAD LINES P a t r i c k P l ö t z, T i l l G n a n n a n d M a r t i n W i e t s c h e l F r a u n h o f e r I n s

More information

Research Brief. Feasibility study into raising and lowering pantographs while trains are in motion. T778 - July Overview. Aims.

Research Brief. Feasibility study into raising and lowering pantographs while trains are in motion. T778 - July Overview. Aims. Research Brief Feasibility study into raising and lowering pantographs while trains are in motion Overview Currently, raising the pantograph on the move on the GB railway is not standard practice, being

More information

From vision to reality

From vision to reality OFFER From vision to reality TABLE OF CONTENTS About us 03 Railway construction industry 05 ABOUT US Railway construction industry Catenary system 07 Railway construction industry Engineering objects 09

More information

RENEWAL OF ELECTRIFICATION SYSTEMS

RENEWAL OF ELECTRIFICATION SYSTEMS RENEWAL OF ELECTRIFICATION SYSTEMS Electrification Infrastructure Congress 2012 Ir R. Marcelis Head of Power Engineering Departement October,17 th, London, UK Content // Introduction // Organization chart

More information

Semester master's program «Railway electro supply in Russia»

Semester master's program «Railway electro supply in Russia» Semester master's program «Railway electro supply in Russia» Semester program Railway electro supply in Russia is prepared by the chair "Power of railway transport" of Omsk State Transport University.

More information

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims Research Brief Impact of higher 25kV fault currents Background Increasing the maximum fault levels at traction feeder stations has the potential to reduce the costs of electrification schemes. The potential

More information

The Whispering Train Programme. The search for effective and cost neutral noise reduction measures for existing freight wagons.

The Whispering Train Programme. The search for effective and cost neutral noise reduction measures for existing freight wagons. The Whispering Train Programme The search for effective and cost neutral noise reduction measures for existing freight wagons. Ir. Jasper Peen & Ing. Wil van Roij, Lloyd s Register Rail, Utrecht, the Netherlands

More information

UIC/ UNIFE Technical Recommendations (TecRec)

UIC/ UNIFE Technical Recommendations (TecRec) UIC/ UNIFE Technical Recommendations (TecRec) An Introduction and Overview Enno Wiebe, Manager Research Projects and Programmes, UIC European Standardisation and Regulation 2 11th UIC Sustainability Conference,

More information

Simulation of railway track maintenance trains at MATISA

Simulation of railway track maintenance trains at MATISA Simulation of railway track maintenance trains at MATISA MultiBody Simulation User Group Meeting Rémi ALLIOT, Solution Consultant, Dassault Systèmes SE Jacques ZUERCHER, Head of Calculation Department,

More information

SYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions

SYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions SYSTEM INTEGRATION Railway and urban transport electrification Energy-efficient and reliable solutions 2 R A I LWAY & U R B A N T R A N S P O R T E L E C T R I F I C AT I O N S O L U T I O N S ABB s substation

More information

Council of the European Union Brussels, 18 July 2014 (OR. en)

Council of the European Union Brussels, 18 July 2014 (OR. en) Council of the European Union Brussels, 18 July 2014 (OR. en) 11932/14 ADD 1 TRANS 367 COVER NOTE From: European Commission date of receipt: 9 July 2014 To: General Secretariat of the Council No. Cion

More information

Seremban Gemas Electrified Double Track Project, Malaysia

Seremban Gemas Electrified Double Track Project, Malaysia Seremban Gemas Electrified Double Track Project, Malaysia Electrification Works at a Glance Electrification, the need of time. The need for efficient, eco-friendly and well-integrated public transport

More information

The R&S Group Reliable products for grid systems Hannover Messe companies of Rauscher & Stoecklin SERW ZREW Tesar

The R&S Group Reliable products for grid systems Hannover Messe companies of Rauscher & Stoecklin SERW ZREW Tesar The R&S Group Reliable products for grid systems Hannover Messe 2017 At a glance R&S Group has the ambition to form a leading international organization in selected niches in the area of electrical products

More information

Experience in the construction of the HS trains and the newest train AGV

Experience in the construction of the HS trains and the newest train AGV Experience in the construction of the HS trains and the newest train AGV TRANSPORT The Alstom Products Range 1 The High Speed in Alstom TRANSPORT Pendolino and High Speed EMUs An International success

More information

Adress: Benjamín Palencia Square nº2, Mezzanine nº5, Albacete (Spain)

Adress: Benjamín Palencia Square nº2, Mezzanine nº5, Albacete (Spain) www.e2f.es Adress: Benjamín Palencia Square nº2, Mezzanine nº5, 02002 Albacete (Spain) Contact: jmontesinos@e2f.es atebar@e2f.es Tlf: +34 967 523 924 +34 628 238 004 1. ABOUT US E2F, Electrificación y

More information

Reference List Floating Trackbed Systems

Reference List Floating Trackbed Systems Brazil Metro Brasilia Line 1 Subway tunnel underneath buildings completion 2000 Line 2 completion 2006-2010 Line 4-2010 Line 5 completion 2002 Line 11 Subway tunnel underneath residential buildings completion

More information

Force Based Condition Monitoring of Railway Infrastructure

Force Based Condition Monitoring of Railway Infrastructure Force Based Condition Monitoring of Railway Infrastructure Abstract: A South African transportation company has implemented a force based condition monitoring system to reduce the infrastructure / vehicle

More information

National implementation plan for France. (Version as of 27 June 2017) 1. General description of the signalling systems on the French network in 2017

National implementation plan for France. (Version as of 27 June 2017) 1. General description of the signalling systems on the French network in 2017 Regulation (EU) 2016/919 from the Commission of 27 May 2016 on the technical specification for interoperability relating to the control-command and signalling subsystems of the railway system in the European

More information

Product presentation RAILWAY

Product presentation RAILWAY Product presentation RAILWAY About us Success needs a strong driving force and a reliable partner: Hiarom Railway and Hiarom Superstructure offer you the best dynamics and optimum efficiency to that you can

More information

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface English version of Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr. 1127 af 30. november 2012) Preface Please note that the English version is for informational

More information

Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC

Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC Dr. Magnus Callavik, Power Systems HVDC, Aug 29, 2011 Developments in Multiterminal HVDC Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC EPRI s High Voltage

More information

COMPLETE RAIL SOLUTIONS. Overhead Electrification Infrastructure. e: p: w: ar-tech.com.au

COMPLETE RAIL SOLUTIONS. Overhead Electrification Infrastructure. e: p: w: ar-tech.com.au Overhead Electrification Infrastructure TABLE OF CONTENTS COMPLETE RAIL SOLUTIONS PRODUCT PAGE 1500VDC 3000Amp Wall Mount Sub Station isolating and rail connecting switch... 3-4 600VDC, 750VDC, 1000VDC

More information

Highspeed Rail -an international outlook

Highspeed Rail -an international outlook Highspeed Rail -an international outlook Nordic Infrastructure Conference Helsingborg, 25 January 2018 Professor Otto Anker Nielsen head of Transport DTU The high- and semihigh speed map Long-distance

More information

COMPANY MAIN TOPIC [ PRODUCT ] TracFeed OSS. English. Overhead Conductor Rail. Made in Germany

COMPANY MAIN TOPIC [ PRODUCT ] TracFeed OSS. English. Overhead Conductor Rail. Made in Germany COMPANY MAIN TOPIC [ PRODUCT ] TracFeed OSS English Overhead Conductor Rail Made in Germany 2 3 OVERHEAD CONDUCTOR RAILS BY RAIL POWER SYSTEMS THE SOLUTION FOR TIGHT SPOTS Offering significantly lower

More information

Reliable, economical and safe siemens.com/rail-electrification

Reliable, economical and safe siemens.com/rail-electrification AC Traction Power Supply Reliable, economical and safe siemens.com/rail-electrification More people, new challenges, one solution: Integrated mobility. Demographic change, urbanization and climate change:

More information

Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection

Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection Slide 1 Integrity, Health, Safety and Environment Always most important our core values Integrity Code of

More information

Innovative electric road freight transport. siemens.com/mobility

Innovative electric road freight transport. siemens.com/mobility ehighway Innovative electric road freight transport. siemens.com/mobility Road freight challenges Transport remains the last sector where fossil fuel dependency has not been substantially mitigated, which

More information

Powering the world s high-speed rail networks

Powering the world s high-speed rail networks Background information ABB and the railway industry Powering the world s high-speed rail networks The high-speed rail sector is undergoing huge and rapid growth. Widespread traffic congestion and concerns

More information

Shinkansen Technology Exportation

Shinkansen Technology Exportation Fast track to Sustainable Mobility Shinkansen Technology Exportation Taiwan High Speed Rail 7T Ministry of Railway of China CRH2 Kwasaki Heavy Industries, Ltd. Rolling Stock Company 18 March 28 1 Taiwan

More information

The reliable and modular solution for your transfers

The reliable and modular solution for your transfers CHANGEOVER SWITCHES 35A-3200A The reliable and modular solution for your transfers INS-IN-DO-EN-61 CHANGEOVER SWITCHES SDMO CHANGEOVER SWITCHES ARE PERFECTLY SUITED TO ALL POWER FAILURE SITUATIONS Thanks

More information

TSG15B Pantograph technical document. Pantograph 25 kv TSG15B

TSG15B Pantograph technical document. Pantograph 25 kv TSG15B Pantograph 25 kv TSG15B 1 1 Purpose / function The pantograph is articulated machine system, which install in roof of locomomtive with insulators. It maintains the power supply from an overhead line on

More information

ENE Standards Committee Chairman s presentation. Presented by David Knights 25 th January 2018

ENE Standards Committee Chairman s presentation. Presented by David Knights 25 th January 2018 ENE Standards Committee Chairman s presentation Presented by David Knights 25 th January 2018 1. Key issues from the last six months (UK standards) 1. Electrical clearances remain an issue: RSSB has agreed

More information

Guide for the application of the CR ENE TSI

Guide for the application of the CR ENE TSI European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.00 Date: 26 August 2011 Document prepared by Document type:

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Pantograph Clearance Envelopes TM 3.2.3 Prepared by: Signed document on file 21 Mar 08 Xavier de Vimal Checked by: Signed document on file 15 July 09 Richard Schmedes Approved by:

More information

The Project North West Electrification Programme

The Project North West Electrification Programme Assessment of Technical Specifications for Interoperability on Projects Background The European Union has mandated moving towards interoperable railways to lower boundaries for cross-eu running of trains.

More information

WELCOME. Lohr Railway System

WELCOME. Lohr Railway System WELCOME Lohr Railway System 75% of russian car-carrier market Headquarterand principal idustrialsite in Alsace Industrial site - Duppigheim An industrial holding constituted of 85 000 m² factories on 65

More information

Enclosed switches. from 20 to 1600 A

Enclosed switches. from 20 to 1600 A Enclosed switches from 20 to 1600 A Why do you need an enclosed switch? Switchgear systems are an essential part of your electrical system. Present at all levels of your electrical distribution, they allow

More information

Northern Line Extension Project

Northern Line Extension Project 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer 2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story 3 Contents Project Background

More information

WBSA Railway Summit. Club Feroviar Romanian Railway Industry Association. Bucharest, /0605/06

WBSA Railway Summit. Club Feroviar Romanian Railway Industry Association. Bucharest, /0605/06 WBSA Railway Summit Club Feroviar Romanian Railway Industry Association Bucharest, 2010-10 10-05/0605/06 EUROPEAN STANDARDIZATION RAILWAY APPLICATIONS INFRASTRUCTURE European Committee for Standardization

More information

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0 Annex 1: Amendments to the technical specification for interoperability relating to the rolling stock locomotives and passenger rolling stock subsystem of the rail system in the European Union (Annex to

More information

Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes Chapter 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes 4.1 This chapter relates to the following questions listed

More information

Hywind Scotland status and plans

Hywind Scotland status and plans Hywind Scotland status and plans EERA DeepWind 2015, Trondheim Rune Yttervik, Statoil Building the Portfolio: Material positions in fixed offshore wind Project execution to operations: Sheringham Shoal,

More information

Intermediate results

Intermediate results Intermediate results 11th UIC Sustainability Conference Madrid June 17th 2010 17.06.2010 1 Mads Bergendorff Macroplan Consulting Presentation overview Latest results of the project Simulation and evaluation

More information

THORNE & DERRICK UK TEL FAX TEL FAX

THORNE & DERRICK UK TEL FAX TEL FAX Rail solutions Powering the Railway Here at Schneider Electric we understand that secure power supplies are essential to the modern railway. That s why making us your supply partner will keep you on the

More information

LESJÖFORS. Spring manufacturing since 1852.

LESJÖFORS. Spring manufacturing since 1852. LESJÖFORS Spring manufacturing since 1852. Global manufacturer and supplier with the market s widest range of springs, gas springs and stampings and pressings. Complete production system adjusted to customer

More information

Appendix 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

Appendix 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes Appendix 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes Introduction 4.1 This appendix considers the planned utilisation

More information

Selection of Technologies to Integrate Urban and Suburban Public Rail Transport

Selection of Technologies to Integrate Urban and Suburban Public Rail Transport Selection of Technologies to Integrate Urban and Suburban Public Rail Transport Kurt Rieckhoff 22 nd Metros & Railways Technology Meeting Instructons for presentation The presentation must be in English

More information

INTERIOR NOISE OF A KOREAN HIGH-SPEED TRAIN IN TUNNELS

INTERIOR NOISE OF A KOREAN HIGH-SPEED TRAIN IN TUNNELS INTERIOR NOISE OF A KOREAN HIGH-SPEED TRAIN IN TUNNELS Sunghoon Choi, Chan-Woo Lee, Jae-Chul Kim, and Joon-Ho Cho Noise and Vibration Research Group, Korea Railroad Research Institute, Woulam-dong, Uiwang-city,

More information

Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E)

Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E) Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E) 1. Context: ENTSO-E, 10/20/40 year views, network codes 2.

More information

TALENT 3 BATTERY TRAIN

TALENT 3 BATTERY TRAIN TALENT 3 BATTERY TRAIN BOMBARDIER BATTERY BRIDGING SOLUTION TALENT 3 BATTERY TRAIN OVERVIEW 1. Why Battery Trains? 2. Battery Technology at Bombardier 3. Launch Plan 4. Conclusion and next steps BATTERY

More information

CHOOSE A COST EFFECTIVE ALTERNATIVE FOR MOBILITY, A WINNING STRATEGY

CHOOSE A COST EFFECTIVE ALTERNATIVE FOR MOBILITY, A WINNING STRATEGY CHOOSE A COST EFFECTIVE ALTERNATIVE FOR MOBILITY, A WINNING STRATEGY www.otokareurope.com Over more than 50 years of business, Otokar has become a versatile manufacturer capable of meeting the needs of

More information

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized General. Project information Country: Borrower: Loan number: Project Implementation Agency

More information

Technological expertise and all-in-one competence for all areas of application

Technological expertise and all-in-one competence for all areas of application Presseinformation Press release Information de presse RAIL.ONE GmbH Pfleiderer track systems Postfach 14 80 D-92304 Neumarkt Germany Tel +49 9181 28-693 Fax +49 9181 28-646 RAIL.ONE at InnoTrans 2008,

More information

Switzerland: Public Transport Investments and Pay-Backs in General. Gotthard Base Tunnel in particular

Switzerland: Public Transport Investments and Pay-Backs in General. Gotthard Base Tunnel in particular /1 Switzerland: Public Transport Investments and Pay-Backs in General Gotthard Base Tunnel in particular /2 Inhabitants GDP (per capita) 309 millions (est. 2010) 281 421 906 (Census 2000) 46 381 USD (2009)

More information

PREPARING TODAY THE ELECTRICAL SYSTEMS OF TOMORROW

PREPARING TODAY THE ELECTRICAL SYSTEMS OF TOMORROW CONCEPT GRID PREPARING TODAY THE ELECTRICAL SYSTEMS OF TOMORROW A UNIQUE TESTING FACILITY SERVING INDUSTRIAL AND ACADEMIC RESEARCH MULTIPLE KEY CAPABILITIES A CENTRE OPEN TO EDF S PARTNERS A UNIQUE TESTING

More information

High Speed Rail Regional Impact

High Speed Rail Regional Impact Tony Lennon High Speed Rail: Regional Impact Page 1 High Speed Rail: A Global Trend HSR implemented or being considered in most developing countries Europe and Japan over 30 years experience in design

More information

The criteria of choice for new High Speed fleet

The criteria of choice for new High Speed fleet Amsterdam, March 17-19th, 2008 The criteria of choice for new High Speed fleet Emilio Maestrini CONTENTS 1. DRIVERS 2. MAIN FACTORS ON HIGH SPEED MARKET 3. EVOLUTION OF HIGH SPEED SYSTEM 4. INTEROPERABILITY

More information

E-mobility for heavy duty vehicles

E-mobility for heavy duty vehicles E-mobility for heavy duty vehicles The Siemens ehighway System H.G. Grünjes, Siemens AG Siemens AG 2012 Infrastructure & Cities Sector, Mobility and Logistics Division Motivation Explanation ENUBA 1 Freight

More information

Tailor-Made Roof Jumper Assemblies Rolling Stock

Tailor-Made Roof Jumper Assemblies Rolling Stock Tailor-Made Roof Jumper Assemblies Rolling Stock The Quality Connection Roof jumper assemblies High-speed trains Regional trains Locomotives Diesel and electrical multiple units Our expertise in assemblies

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Pantograph Clearance Envelopes TM 3.2.3 Prepared by: Signed document on file 21 Mar 08 Xavier de Vimal Date Checked by: Signed document on file 15 July 09 Richard Schmedes Date Approved

More information

HVTT12 Electro mobility for heavy duty vehicles (HDV): The Siemens ehighway System

HVTT12 Electro mobility for heavy duty vehicles (HDV): The Siemens ehighway System HVTT12 Electro mobility for heavy duty vehicles (HDV): The Siemens ehighway System Obtained Dipl.-Ing. (FH) from the FH Oldenburg, Germany, B.Sc. from the Högskolan i Halmstad, Sweden and a M.A. from the

More information

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding 2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding By George Ardavanis, PhD Keywords: overhead catenary system (OCS), electric multiple unit (EMU), grounding and bonding (G&B), overhead contact line (OCL),

More information

National Conference on Latest Trends in Design & Testing of Transmission Line Components

National Conference on Latest Trends in Design & Testing of Transmission Line Components Book-Post National Conference on Latest Trends in Design & Testing of Transmission Line Components 22-23 November 2010 To, Mr. M. Selvaraj Engineering Officer / Co-ordinator Mechanical Engineering Division

More information

POSITION PAPER Version 3.0

POSITION PAPER Version 3.0 POSITION PAPER Version 3.0 Revision of the Technical Specification for Interoperability / Energy (ENE) Brussels, September 26 th, 2012 1. REFERENCE DOCUMENT UNION RAIL SYSTEM - SUBSYSTEM Energy - TSI Energy

More information

LightRail Overhead contact lines for urban rail systems, tramways and trolley buses

LightRail Overhead contact lines for urban rail systems, tramways and trolley buses LightRail Overhead contact lines for urban rail systems, tramways and trolley buses LightRail For more than 90 years, Furrer+Frey has been developing, planning and constructing overhead contact line systems

More information

THE UK RAIL MARKET 2015

THE UK RAIL MARKET 2015 THE UK RAIL MARKET 2015 image: Ken Harris B R O O K S M A R K E T I N T E L L I G E N C E R E P O R T S THE UK RAIL MARKET 2015 Brooks Events Ltd 2015. All rights reserved. A Brooks Reports Publication

More information

Power Supply Systems in Spain

Power Supply Systems in Spain New developments in High Speed Power Supply Systems in Spain Carlos RABANOS Rail Energy Systems Deputy Director High Speed Operations and Engineering Directorate, ADIF, Spain July 12th 2012, Session: Infrastructure

More information

General approach to High Speed Rail. Iñaki Barrón de Angoiti UIC, Director of Passengers Department Paris, France

General approach to High Speed Rail. Iñaki Barrón de Angoiti UIC, Director of Passengers Department Paris, France General approach to High Speed Rail Iñaki Barrón de Angoiti UIC, Director of Passengers Department Paris, France Summary High speed is expanding dramatically around the world A highly beneficial transport

More information

How do you make your vehicles fit for the future?

How do you make your vehicles fit for the future? How do you make your vehicles fit for the future? Refurbishment and accident repair Enhancing the attractiveness of your vehicles Answers for mobility. 1 2 Today and tomorrow: Guaranteed availability Reduced

More information

Council of the European Union Brussels, 18 July 2014 (OR. en)

Council of the European Union Brussels, 18 July 2014 (OR. en) Council of the European Union Brussels, 18 July 2014 (OR. en) 11933/14 ADD 1 TRANS 368 COVER NOTE From: European Commission date of receipt: 9 July 2014 To: General Secretariat of the Council No. Cion

More information

Jang-ho Yun & Hee-seung Na Korea Railroad Research Institute

Jang-ho Yun & Hee-seung Na Korea Railroad Research Institute Technology Development to Improve the Eurasian Freight Transportation in KOREA 2017. 9. 19 Jang-ho Yun & Hee-seung Na Korea Railroad Research Institute Contents Overview on KRRI Mission and Roles Mission

More information

Railways DETECTION, SWITCHING & MOTION CONTROL SOLUTIONS

Railways DETECTION, SWITCHING & MOTION CONTROL SOLUTIONS SWITCHES & POSITION SENSORS I MOTION AUTOMATION & CONTROL Railways DETECTION, SWITCHING & MOTION CONTROL SOLUTIONS www.crouzet.com WWW.CROUZET.COM 5 RAILWAYS ABOUT CROUZET Since 1921, Crouzet has been

More information

Bild : Bernhard Mühr German Aerospace Center Flight Operations

Bild : Bernhard Mühr  German Aerospace Center Flight Operations German Aerospace Center Flight Operations Bild : Bernhard Mühr www.wolkenatlas.de Introduction DLR is Germany s aerospace research center and space agency with about 4700 employees in 31 research institutes

More information

Efficient Electrification Initiative Update

Efficient Electrification Initiative Update Efficient Electrification Initiative Update NSTF Discussion Forum SE4All in South Africa April 17, 2018 Barry MacColl https://www.epri.com/#/pages/sa/us_national_electrification_assessment Three Key Aspects

More information

Haramain High Speed Rail

Haramain High Speed Rail Presented by: Mahmoud Cheikh 8 th th UIC-World Congress on High Speed Rail Philadelphia, United States 11 th 13 th July 2012 1 Haramain High Speed Rail The location 2 3 Short History of the Project Haramain

More information

ITER Magnets Update European perspective

ITER Magnets Update European perspective ITER Magnets Update European perspective Hannu Rajainmaki, Boris Bellesia, Alessandro Bonito-Oliva, Eva Boter, Thierry Boutboul, Eugen Bratu, Marc Cornelis, John Fanthome, Robert Harrison, Peter Readman,

More information

Using OpenTrack to determine the electrical load on the network

Using OpenTrack to determine the electrical load on the network The OpenTrack rail network simulation software is used by railways, the railway supply industry, consultancies and universities to model rail infrastructure, rolling stock and timetabling. OpenTrack can

More information

LIQUID PETROLEUM GAS TANKS. Specialist for liquid petroleum gas tanks 2/3. Production and quality 4/5. Heavy-duty and liquid gas tanks 6

LIQUID PETROLEUM GAS TANKS. Specialist for liquid petroleum gas tanks 2/3. Production and quality 4/5. Heavy-duty and liquid gas tanks 6 DESIGN MANUFACTURE SUPPLY ABOVE GROUND CONTENTS PAGE Flamco Specialist for liquid petroleum gas tanks 2/3 Production and quality 4/5 Heavy-duty and liquid gas tanks 6 Standard range 7 SEMI SUBMERGED BELOW

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 14.5.2011 Official Journal of the European Union L 126/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 26 April 2011 concerning a technical specification for interoperability relating to the

More information

Business Area Power Supply

Business Area Power Supply Business Area Power Supply 1 Our competence areas Alternating current supply for Main line railways Feeder stations (16.7 Hz, 25 Hz and 50 Hz) Transformer stations Substations Sectioning stations Switchgear

More information

Railway Engineering: Track and Train Interaction COURSE SYLLABUS

Railway Engineering: Track and Train Interaction COURSE SYLLABUS COURSE SYLLABUS Week 1: Vehicle-Track Interaction When a railway vehicle passes over a track, the interaction between the two yields forces on both vehicle and track. What is the nature of these forces,

More information

Feeder systems. A schematic diagram. for renewable energies

Feeder systems. A schematic diagram. for renewable energies Competence... With over 60 employees the department Energy distribution and infrastructure has an experienced core of installers, foremen and engineers for the realisation of the most diverse customer

More information

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector HVDC Innovative Technology for Smart Grids and Super Grids CEO Power Transmission Solutions, Siemens Energy Sector BritNed: Pre-launch Press Event Maasvlakte, March 31, 2011 Siemens AG 2011 Energy Sector

More information

COMMUNICATING THE DIFFERENCES: THE CONTRIBUTION OF NEW MARKET ENTRANTS TO MODERN REGIONAL RAILWAY OPERATIONS

COMMUNICATING THE DIFFERENCES: THE CONTRIBUTION OF NEW MARKET ENTRANTS TO MODERN REGIONAL RAILWAY OPERATIONS UIC / CER / EIM - Annual meeting of Communications Directors Zagreb, Croatia 23-24 October 2008 COMMUNICATING THE DIFFERENCES: THE CONTRIBUTION OF NEW MARKET ENTRANTS TO MODERN REGIONAL RAILWAY OPERATIONS

More information

SISTEMAS DE ENERGÍA PARA EL FERROCARRIL. Energy for the Railway Sie trakcyjna i zasilanie linii kolejowych Systèmes d energie pour le chemin de fer

SISTEMAS DE ENERGÍA PARA EL FERROCARRIL. Energy for the Railway Sie trakcyjna i zasilanie linii kolejowych Systèmes d energie pour le chemin de fer SISTEMAS DE ENERGÍA PARA EL FERROCARRIL Energy for the Railway Sie trakcyjna i zasilanie linii kolejowych Systèmes d energie pour le chemin de fer www.electren.com ACTIVITIES DESIGN CONSTRUCTION PRIVATE

More information