NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

Size: px
Start display at page:

Download "NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006"

Transcription

1 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 9/13/2006 Control Project STP 2006(438)MM Highway SP 366 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned project. Included in the attachment is an adendum notification which details the changes the respective proposal pages which were added / or changed. Except for new bid insert pages, it is unnecessary to return any of the pages attached. Bid insert pages must be returned with the bid proposal submitted to the Department, unless your firm is submitting a bid using a computer print out. The computer print out must be changed to reflect the new bid item information. Contractors material suppliers, etc. who have previously been furnished informational proposals are not being furnished a copy of the addendum. If you have a subcontractor on the above project, please advise them of this addendum. Acknowledgment of this addendum is not requested if your company has been issued a proposal stamped This Proposal Issued for Informational Purposes. You are required to acknowledge receipt of this addendum by entering the date, which appears at the top of this letter on the Addendum Acknowledgement Form, contained in your bid proposal. Failure to Acknowledge receipt of this addendum in your bid proposal will result in your bid not being read. 04/99

2 SUBJECT: PLANS AND PROPOSAL ADDENDUMS PROJECT: STP 2006(438)MM CONTROL: COUNTY: DALLAS LETTING: 10/04/2006 REFERENCE : 0913 PROPOSAL ADDENDUMS _ PROPOSAL COVER X BID INSERTS (SH..: 2 through 4 of 10 ) _ GENERAL TES (SH..: ) _ SPEC LIST (SH..: ) _ SPECIAL PROVISIONS: ADDED: DELETED: _ SPECIAL SPECIFICATIONS: ADDED: DELETED: X OTHER: See changes below RIPTION OF ABOVE CHANGES (INCLUDING PLANS SHEET CHANGES) Bid Inserts: Sheet 2: changed quantity for item from 1, CY to 1, CY. Deleted Item this quantity now included under Item Sheets 3 4 of 10 - text shifted. Plan Sheets: Sheet 2 Index: Revised due to sheets added, shown below. Sheets 6, 6A, 9, 95 & 96 revised due to above changes. Sheets 141A - 141Z, 141AA-141AR added to provide for Circular Arch Pylon option for Signature Span. Sheets 213A - 213S added to provide for Central Box Girder Trapezoidal Diaphragm option. 1-1

3 PREPARING ROW STA BROADCAST SEED (PERM) (URBAN) (CLAY) AC VEGETATIVE WATERING MG 4, SOIL RETENTION BLANKETS (CL 1) (TY A) SY 1, TEMPORARY SPL SHORING DRILL SHAFT (18 IN) DRILL SHAFT (36 IN) DRILL SHAFT (48 IN) DRILL SHAFT (54 IN) DRILL SHAFT (84 IN) CL C CONC (ABUT) SF 9, LF LF LF 3, LF 2, LF CY

4 CL C CONC (BENT) CY CL C CONC (BENT)(MASS PLACEMENT) CY 1, CL E CONC (SEAL) CY CL F CONC (BENT)(MASS PLACEMENT) CL F CONC (FOOTING)(MASS PLACEMENT) CY CY 1, REINF CONC SLAB PRESTR CONC U-BEAM (U54) POST-TENSIONING (GROUTED) CONC SURF TREAT (CLASS I) SF 234, LF 6, MKF SY 23, STR STL (ROLLED BEAM)(DOMESTIC) STR STL (MISCELLANEOUS)(DOMESTIC) LB 1,842, LB 162,

5 STR STL (CENTRAL BOX GIRDER)(DOMES- TIC) STR STL (EXTERIOR BOX GIRDER)(DOMES- TIC) STR STL (TY A FLOORBEAM)(DOMESTIC) STR STL (TY B FLOORBEAM)(DOMESTIC) STR STL (TY C FLOORBEAM)(DOMESTIC) STR STL (ARCH PYLON)(DOMESTIC) LB 3,771, LB 627, LB 453, LB 1,518, LB 240, LB 3,064, RAIL (TY T501) RAILING T401(MOD) RAIL (TY HT)(MOD) LF LF LF 3, RAIL (TY T77)(MOD)(DOMESTIC) LF 3,

6 SEALED EXPANSION JOINT (4 IN)(SEJ-A) LF INLET (COMP)(GRATE)(SPL) PVC PIPE (SCH 80)(8 IN) PVC PIPE (SCH 80)(10 IN) PVC PIPE (SCH 80)(12 IN) PVC PIPE (SCH 80)(14 IN) PVC PIPE (SCH 80)(16 IN) MOBILIZATION EA LF LF LF LF LF LS CONSTRUCTION EXITS (REMOVE) TEMPORARY SEDIMENT CONTROL FENCE SY LF 1,

7 BIODEGRADABLE EROSION CONTROL LOGS(18") LF 2, CRASH CUSH ATTEN (INSTL) CONDT (HDPE) (4") CONDT (PVC) (SCHD 40) ( 2") EA LF 5, LF 5, CONDT (PVC) (SCHD 80) (2") (BORE) LF CONDT (HDPE) (4") BORE ELEC CONDR (. 4) BARE LF 7, LF 5, ELEC CONDR (. 4) INSULATED ELEC CONDR (. 6) INSULATED GROUND BOX TY A (122311) W/APRON LF 11, LF 40, EA

8 ELC SRV TY C 240/ (NS)AL(E)GC(U) IOSS (125 BRG)(CIR TUBE)(LUM)(DOMESTIC) BRIDGE EXPANSION JOINT (SPL)(DOMESTIC) HIGH LOAD MULT-ROTA BEAR TY 1 DOMES- TIC HIGH LOAD MULT-ROTA BEAR TY 2 DOMES- TIC HIGH LOAD MULT-ROTA BEAR TY 3 DOMES- TIC HIGH LOAD MULT-ROTA BEAR TY 4 DOMES- TIC LADDERS AND PLATFORMS (DOMESTIC) EA EA LF EA EA EA EA LS ACCESS HATCH (DOMESTIC) EA

9 FLAGPOLE (DOMESTIC) EA STAY CABLE TESTING (DOMESTIC) LS STAY CABLES (DOMESTIC) LS ARCHITECT LIGHTING RED AIRCRAFT BEA- CON ARCHITECT LIGHTING SPECIAL TYPE A EA EA ARCHITECT LIGHTING TYPE A ARCHITECT LIGHTING TYPE B ARCHITECT LIGHTING TYPE C ARCHITECT LIGHTING TYPE D ARCHITECT LIGHTING TYPE E EA EA EA EA EA

10 ARCHITECT LIGHTING TYPE F ARCHITECT LIGHTING TYPE G ARCHITECT LIGHTING TYPE H ARCHITECT LIGHTING TYPE I EA EA EA EA MULTICONDUCTOR CABLE CLX TYPE MC #6 EA 9, ERNATE. 1A STR STL (ROLLED BEAM)(FOREIGN) STR STL (MISCELLANEOUS)(FOREIGN) STR STL (CENTRAL BOX GIRDER)(FOREIGN) STR STL (EXTERIOR BOX GIRDER)(FOR- EIGN) LB 1,842, LB 162, LB 3,771, LB 627,

11 STR STL (TY A FLOORBEAM)(FOREIGN) STR STL (TY B FLOORBEAM)(FOREIGN) STR STL (TY C FLOORBEAM)(FOREIGN) STR STL (ARCH PYLON)(FOREIGN) LB 453, LB 1,518, LB 240, LB 3,064, RAIL (TY T77)(MOD)(FOREIGN) LF 3, IOSS (125 BRG)(CIR TUBE)(LUM)(FOREIGN) BRIDGE EXPANSION JOINT (SPL)(FOREIGN) HIGH LOAD MULT-ROTA BEAR TY 1 FOR- EIGN HIGH LOAD MULT-ROTA BEAR TY 2 FOR- EIGN HIGH LOAD MULT-ROTA BEAR TY 3 FOR- EIGN EA LF EA EA EA

12 HIGH LOAD MULT-ROTA BEAR TY 4 FOR- EIGN LADDERS AND PLATFORMS (FOREIGN) EA LS ACCESS HATCH (FOREIGN) FLAGPOLE (FOREIGN) EA EA STAY CABLE TESTING (FOREIGN) LS STAY CABLES (FOREIGN) LS

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003 TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 3/28/2003 Control 0027-12-119 Project NH 2003(385) Highway US 59 County FORT BEND Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/02/2004

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/02/2004 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 7/02/2004 Control 0009-02-049, ETC. Project CM 97(89) Highway SH 78, ETC. County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 6/04/2014

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 6/04/2014 TIFICATION OF ADDENDUM ADDENDUM 1 DATED 6/04/2014 Control 1378-02-040 Project STP 2013(297) Highway RM 1431 County WILLIAMSON Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 Control 6237-93-001 Project RMC - 623793001 Highway US0075 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 7/09/2013

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 7/09/2013 TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 7/09/2013 Control 0200-11-100, ETC. Project NH 2013(224) Highway US 69 County JEFFERSON Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements The above titled solicitation is amended. All amendments must be acknowledged on the PROPOSAL ; failure to do so may be cause for rejection of

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/28/2015

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/28/2015 TIFICATION OF ADDENDUM ADDENDUM 1 DATED 4/28/2015 Control 0535-01-072 Project C 535-1-72 Highway IH 10 County GUADALUPE Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: 60,795.01 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 58 CONTRACT ID: 092406377 PROJECT: NH 2013(045) CONTRACT: 09123218 AWARD : $340,789.00 PROJECTED : $362,789.00 ADJ. PROJECTED : $423,584.01

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16 17,810.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16-65.00 125 CONTRACT ID: 118802088 PROJECT: STP 2014(614)G CONTRACT: 05143227 AWARD AMOUNT: $600,782.63 PROJECTED AMOUNT: $632,782.63 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 287,585.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 184 38.00 CONTRACT ID: 004301079 PROJECT: NH 2016(310) CONTRACT: 11153208 AWARD : $1,893,993.41 PROJECTED : $1,893,993.41 ADJ. PROJECTED :

More information

APPROACH SLAB (HPC) CY RETAINING WALL (MSE) SF 52, RETAINING WALL (CONC BLOCK) SF 493.

APPROACH SLAB (HPC) CY RETAINING WALL (MSE) SF 52, RETAINING WALL (CONC BLOCK) SF 493. COUNTY: COLLIN HIGHWAY: US 75 LENGTH: 1.3910 MI CONTROL NUMBER: 0047-06-133 DBE GOAL: 11.0 % PROJECT NUMBER: STP 1502(083)MM TYPE: STR, PVMT, SIGNS, PVMT MKGS TIME FOR COMPLETION: 750 WORKING DAYS GUARANTY:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:

More information

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON -30,219.83 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 291 CONTRACT ID: 051002028 PROJECT: STP 2013(839) CONTRACT: 07133220 AWARD : $4,317,753.44 PROJECTED : $4,394,254.44 ADJ. PROJECTED : $4,364,034.61

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

ADDENDUM 3 - JULY 24, 2015

ADDENDUM 3 - JULY 24, 2015 FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affecting the cost of work and with the Request for Proposals

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 HIGHWAY: LP 289 COUNTY: 06/09/2009 ESTIMATE PAID: AWARD DATE: 06/25/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 HIGHWAY: LP 289 COUNTY: 06/09/2009 ESTIMATE PAID: AWARD DATE: 06/25/2009 ESTIMATE PERIOD: 1,297,105.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 466 186.00 CONTRACT ID: 078302064 PROJECT: STP 2009(104)ES CONTRACT: 06093001 AWARD : 25,867,573.35 PROJECTED : 25,867,573.35 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 423 COUNTY: 05/06/2014 ESTIMATE PAID: AWARD DATE: 05/29/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 423 COUNTY: 05/06/2014 ESTIMATE PAID: AWARD DATE: 05/29/2014 ESTIMATE PERIOD: 4,177,077.12 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 810 54.00 CONTRACT ID: 156702032 PROJECT: C 1567-2-32 CONTRACT: 05143001 AWARD : 57,943,494.30 PROJECTED : 59,102,084.30 ADJ. PROJECTED

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT ADDENDUM NO. 2 DATE: March 30, 2017 REVISIONS TO: Request for Bids Specification No. ES17-0020F METAL SOLID WASTE AND RECYCLING CONTAINERS NOTICE TO ALL

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 07/07/2011 ESTIMATE PAID: AWARD DATE: 07/28/2011 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 07/07/2011 ESTIMATE PAID: AWARD DATE: 07/28/2011 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 1,322,035.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 1,103 CONTRACT ID: 001507065 PROJECT: C 15-7-65 CONTRACT: 07113001 AWARD : $70,449,357.13 PROJECTED : $72,387,266.12 ADJ. PROJECTED : $73,709,301.31

More information

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD: 209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal. ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

CIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001

CIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001 MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT 323216 MGR.NO. 55 PAGE 1 CONT 1 SEC 13 JOB 76 RES ENGR ICENHOWER, KENNETH PROJ MG 22(313) HWY US 67 BOX 538 TEXARKANA CNTY BOWIE DIST 19 CONTRACT PRICE

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

San Antonio, Texas 78222

San Antonio, Texas 78222 1.01 3 EA Pump Removal $1,125.00 $3,375.00 1.02 3 EA Pump Installation $1,200.00 $3,600.00 1.03 1 EA Downhole Video Survey $2,000.00 $2,000.00 1.04 1 EA Geophysical Logging $2,500.00 $2,500.00 2.01 50

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications.

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications. ADDENDUM 2 PROJECT: POKAGONEK AWAT HARTFORD CLIENT: ISSUE DATE: JUL 1, 2015 The following clarifications and changes shall be included in the Plans and Specifications for the above referenced project,

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

County of Santa Cruz 0579

County of Santa Cruz 0579 County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701

More information

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15 COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING

More information

The Tulalip Tribes of Washington

The Tulalip Tribes of Washington The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

Whitley & Siddons Bid Tabulations

Whitley & Siddons Bid Tabulations Whitley & Siddons Bid Tabulations LOCAL LET TABULATIONS FOR OCTOBER, 2011 1402 BASTROP SH0021 6231-41-001 $235,694.01 1901 BOWIE US0059 6230-06-001 $251,000.00 1905 BOWIE US0059 6232-99-001 $31,000.00

More information

City of Grand Island Tuesday, June 26, 2018 Council Session

City of Grand Island Tuesday, June 26, 2018 Council Session City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A

More information

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 DECEMBER 6, 2018 ADDENDUM 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 ADDITIONAL INFORMATION DOCUMENTS The following document: Questions and Responses

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia,

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

365, , , A Total of Schedule I and II 530, , A 702, A

365, , , A Total of Schedule I and II 530, , A 702, A BID ABSTRACT COUNTY OF VENTURA - PUBLIC WORKS AGENCY Page 1 of 3 Bids opened on April 2, 2019 ENGINEER'S ESTIMATE LOW BIDDER 2nd Bidder Project Name Piru Stormwater Capture For Groundwater Recharge Project

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

PAGE 1 of 18 WEIGHTED AVERAGE

PAGE 1 of 18 WEIGHTED AVERAGE UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201

More information

ANNE ARUNDEL COUNTY, MARYLAND Annapolis, Maryland ADDENDUM NO. 4 June 8, 2017

ANNE ARUNDEL COUNTY, MARYLAND Annapolis, Maryland ADDENDUM NO. 4 June 8, 2017 ANNE ARUNDEL COUNTY, MARYLAND Annapolis, Maryland ADDENDUM NO. 4 June 8, 2017 TO ALL BIDDERS: Please see the following for the above-mentioned IFB: 1. Q: The Bid Response Form shows a column for estimated

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY (1) McKenna General Engineering, (2) Zusser Company, (3) Palp, (4) C. W. Crosser Construction, 1,155,777.00 1,306,820.00 1,439,957.00 1,461,985.00 1 IMPLEMENTATION OF THE SWP 1 15,000.00 LS 15,000.00 2

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids County Estimate Adame Landscape, Inc. Murrieta, CA 92562 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 1,000.00 1,000.00

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

HAMPTON INN AND SUITES

HAMPTON INN AND SUITES SUITES, /7/08 5:0:0 PM Z:\808 Montpelier Garage\0. REVIT FILES\808 - Montpelier Parking Garage - 0--8.rvt ADD ADDITIONAL A/C AIR CONDITION(ING) AT ACOUSTIC TILE ADJ ADJUSTABLE AFF ALUM ABOVE FINISH FLOOR

More information

Page 1 of 6 ADDENDUM NO. 1. January 11, Shuttle Bus Service RFP # H General

Page 1 of 6 ADDENDUM NO. 1. January 11, Shuttle Bus Service RFP # H General ADDENDUM NO. 1 January 11, 2018 Shuttle Bus Service RFP # H18-0002 1. This addendum revises RFP documents. This addendum is issued to respondents of record prior to execution of contract, and forms a part

More information