1 UNIVERSITY AI/UWI ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2, roperty Sub TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion Summary - Ascending BTD (All) (ftkb) - 19,40.0 Operator IOER NATURAL RESRC USA, INC State TEXAS County ANDREWS Surface Legal Location 00' SL/ 1' EL, SEC: 5, BLK:, TW:, SVY: University Lands Drilling Rig Release rac On roduction Initial otential 1/16/2015 Total Depth (All) (ftkb) Total Depth All (TVD) (ftkb) - 19, ,99. Report #: 1 Daily Operation: 12/11/2014 1:00-12/12/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) Days on Location (days) End Depth (ftkb) End Depth (TVD) (ftkb) Dens Last Mud (lb/gal) Rig Check re Skid check list; Rig down & prepare to skid; Skid f/ University to University -4 22; Rigging up & preparing to spud; Install conductor & lowline Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: hrs 12/12/2014 Spud hrs 12/12/2014 Intermediate TD Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 0% Surface hole drilled Completion ercentage: 0 % Intermediate drilled, Water 6,469 bbls Used 625 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 No accidents, Incidents or spills reported last 24hrs. 0.0 MD 12/11/2014 1:00 12/11/ :00 12/12/ :0 12/11/ :00 12/12/ :0 12/12/ LAN MOB MIRU JSM on re skid; Go over reskid check list; Knock std pipe loose; Clean skid rails, Knock pins out of BOE traveler, Remove low line; Begin skidding rig 22'; Rig over University :00 hrs 12/11/ LAN MOB MIRU Install Extentions to choke; add mud line extentions; Install safety cables on mud lines; Set in flow line stands, Install flow line extentions 4.5 LAN EQUI WLEAD Install Conductor; Connect flow line to conductor; Install turnbuckles age 1/92

2 Report #: 2 Daily Operation: 12/12/ /1/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) 0 Days on Location (days) 2 End Depth (ftkb) 1,600.0 End Depth (TVD) (ftkb) 1,599.8 Dens Last Mud (lb/gal) 8.0 Rig &, 6 repare to Spud; respud inspection; 18:0 hrs 12/12/2014. Drld surf 12' to 1600' 128 fph); 85% complete. RR to spud 29.5 hrs (1.2 days). Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 01:0 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Intermediate TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 85% Surface hole drilled Completion ercentage: 0 % Intermediate drilled, Water bbls Used 626 bbls Total used: 1251 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 No accidents, Incidents or spills reported last 24hrs. 129` MD_1.08 INC_16.48 AZM_128' TVD_DLS: 0.24_' /Center_5' /21 12/12/ /12/ :00 12/12/ :0 12/12/ :00 12/12/ :0 12/1/ MOBILIZATION MIRU MIRU inish R/U flowline, center over hole & tie down conductor, R/U fill up line, put mouse hole, hook up cellar jet hoses, cellar covers around conductors. test mud lines, R/U elevators on & re Sud Inspection check list, 4.5 LAN EQUI BA JSA/ Layout direction BA & /U 1 1/2" Ulterra bit. Scrib mtr. instal MWD, Tool, M/U bit. & / U D.C. tag 120'. ; Test MWD 11.5 SUR-DRILL DRILL SURACE DRL Rotate from 120' to 1600' ( 128 fph ) WOB 20k, 0 rpm, S 2200, motor diff 588, 800 GM, torque 18 k age 2/92

3 Report #: Daily Operation: 12/1/ /14/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) 1 Days on Location (days) End Depth (ftkb) 1,859.0 End Depth (TVD) (ftkb) 1,858.5 Dens Last Mud (lb/gal) 8.60 Rig &, 6 Drld. Surface f/1600' to 1859' 09: , TOO SLM ( No Corrections) L/D Direct. BA & BIT, Clean floor, install bails ext. & C/O elevators. S/M, R/U csg running equip & Run 45 jts. of 1 /8" 54.5 J-55 Butt. csg to 1,859'; CBU; S/M, R/U Basic Cmt. Tools Surface loat 1,85.5' Surface loat 1,81.9' Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/2014 Intermediate TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 0 % Intermediate drilled, Water bbls Used 615 bbls Total used: 1866 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85.5' loat 1,81.9' 12/1/ /1/ :00 12/1/ :00 12/1/ :00 12/1/ :00 12/1/2014 1:0 12/1/ :00 12/1/ :0 12/1/2014 2:0 12/14/ :0 12/14/2014 0:0 12/14/ :0 12/1/ :00 12/1/ :00 12/1/ :00 12/1/ :00 12/1/2014 1:0 12/1/ :00 12/1/ :0 12/1/2014 2:0 12/14/ :0 12/14/2014 0:0 12/14/ :0 12/14/2014 SUR-DRILL DRILL SURACE DRL Rotate from 1600' to 1859' 8 fph). WOB 5 k, 0 rpm, S 200, motor diff 650, 800 GM, torque 18k. (T.D. 09: ) 2 SUR-CIRC CIRCULATE CIRC ump 2-50 bbl hi vis sweep; Circulate to surface SUR-TRI TOO TRI TOO (Slick off bottom) f/1859' to 108' (SLM) No Correction / ole taking correct fill 2 LAN EQUI BA JSA - Break bit & L/D directional BA, clean floor & install bail ext. 1.5 LAN DRLG CSG TJSA / R/U ipe ros.csg. tools / TJSA on run ning 1 /8" csg. 0.5 LAN DRLG CSG Make up 1 /8 Gemco DC drillable float shoe; 1 jt 1 /8" J ppf BTC; 0.5 LAN ERS STY JSM with Morning tour crew, ipe ro casing crew & NR 5 LAN DRLG CSG Make up 1 /8" DC drillable float collar onto shoe track that day crew had made up;followed by 1 jt of 1 /8" J BTC csg; Test float equip; Continue M/U 1 /8" J BTC csg f/ 0 to1,601'; 2 SUR-CIRC CIRCULATE CIRC JSM on oisting personal; Make up Swedge in casing & begin washing csg down f/ 1,601' to 1,69' GM: LAN DRLG CSG Run 1 /8"J BTC f/ 1,69' to 1,819'; Washed f/ Tagged bttm;total of 45 jts of 1 /8" J-55 1 SUR-CIRC CIRCULATE CIRC Circulate Bttms up while Rigging down csg crew equip 1.5 SUR-CMT CEMENT SURACE CASING CMT JSM w/ Basic Cementer, & rig crew & NR; Disconnect Mud pump, Install Cementing head; Connect lines to ump truck & prepare to cement age /92

4 Report #: 4 Daily Operation: 12/14/ /15/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) 2 Days on Location (days) 4 End Depth (ftkb) 1,859.0 End Depth (TVD) (ftkb) 1,858.5 Dens Last Mud (lb/gal) 8.0 Rig &, 6 Cemented 1 /8" Surface csg; ( ull Returns & 41 bbls of Cement to Surface ) WOC; N/D conductor; Weld on wellhead; N/U BOE; Test BOE Surface Cmt.- Testl lines to 2500 psi, ump 20 bbls of fresh water spacer, Lead Cmt. 0 sx (12.80 ppg. 1.9 yield) / Tail Cmt. 50 sx.(1.60 ppg yield) / Drop plug - Displace 281bbls of fresh water, land plug, pressure up 500 psi over, hold 5 min., check float / ULL CIRC. through out job, circulated 41 bbls./119 sks to surface. Tail Cement to 150' ( 620 lift psi inal psi & 1 bbl back) loat 1,85' loat 1,818' Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/2014 Intermediate TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 0 % Intermediate drilled, Water 8,19 bbls Used 609 bbls Total used: 245 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' ull Returns during Surface Cement job / Lead Cement to Surface 41 bbls of Cement to Surface -Tail Cement to 1,50' 12/14/ /14/ :0 12/14/ :0 12/14/ :0 12/14/ :0 12/14/ :0 12/15/2014 0:00 12/14/ :0 12/14/ :0 12/14/ :0 12/14/ :0 12/14/ :0 12/15/2014 0:00 12/15/ SUR-CMT CEMENT SURACE CASING CMT Surface Cmt.- Testl lines to 2500 psi, ump 20 bbls of fresh water spacer, Lead Cmt. 0 sx (12.80 ppg. 1.9 yield) / Tail Cmt. 50 sx.(1.60 ppg yield) / Drop plug - Displace 281bbls of fresh water, land plug, pressure up 500 psi over, hold 5 min., check float / ULL CIRC. through out job, circulated 41 bbls./119 sks to surface. Tail Cement to 150' ( 620 lift psi inal psi & 1 bbl back) 1 LAN DRLG CMTRI Safety Meeting W/ Basic Cementers, Rig down Cement ead & all Basic Cmt. Tools 2 LAN EQUI BOS JSM - N/D low line Conductor, Turn buckles on conductor 4 LAN EQUI WLEAD /U conductor, Rough cut 1 /8" Surface casing; L/D cut off 1 /8" csg & Conductor; inal cut on 1 /8" csg; Install well head; & weld same; Test well head to 500 psi 1 LAN EQUI WLEAD Remove Casing elevators, Extension bailes, & Casing bowl 10.5 LAN EQUI BOS JSM w/ & rig crew, Mid Central N/U crew & NR: Nipple up BOE, Rotaing ead, Orbit valve; All Related Equip. LAN EQUI BOS JSM; w/ & rig crew, Mid Central Testing & NR; Test BOE 250 psi Low on all test; 1500 psi igh on Annular, 2500 psi igh on all other Test ; Test Casing 500 psi igh on casing for 0 min, 250 psi low for 5 mins/ rep- to test Rams age 4/92

5 Report #: 5 Daily Operation: 12/15/ /16/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) Days on Location (days) 5 End Depth (ftkb) 2,520.0 End Depth (TVD) (ftkb) 2,519.2 Dens Last Mud (lb/gal) 9.0 Rig &, 6 Testing BOE; icking up BA # 2; TI; Slip & Cut Drill Line; Drill loat Equip; Start 22:0 hrs 12/15/2014. Drld int 1859' to 2520' 88 fph ); 10% complete 84% Rot, 1% sldg JSM; w/ & rig crew, Mid Central Testing & NR; Test BO Rams, CR, Manifold, Upper/Lower Kelly Valves, & TIW Safety/Dart 250 psi Low/ 2500 psi igh Annular test 1500 psi igh /250 low;( GoodTest) Test Csg.@ 250 low f/ 5 Mins. & 500 psi f/ 0 Mins. w/ Mid-Central Tester. (No Leak) Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 10 % Intermediate drilled, Water 8,92 bbls Used 608 bbls Total used: 08 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' ull Returns during Surface Cement job / Lead Cement to Surface 41 bbls of Cement to Surface -Tail Cement to 1,50' Survey: MD: Inc: 1.5 Azm: /15/ /15/ :00 12/15/ :0 12/15/ :0 12/15/2014 1:00 12/15/ :00 12/15/ :0 12/15/ :0 12/16/ :00 12/16/ :00 12/15/ :00 12/15/ :0 12/15/ :0 12/15/2014 1:00 12/15/ :00 12/15/ :0 12/15/ :0 12/16/ :00 12/16/ :00 12/16/2014 LAN EQUI BOS JSM; w/ & rig crew, Mid Central Testing & NR; Test BO Rams, CR, Manifold, Upper/Lower Kelly Valves, & TIW Safety/Dart 250 psi Low/ 2500 psi igh Annular test 1500 psi igh /250 low; GoodTest 0.5 SUR-TST CSG/DO/IT TEST CSG/DRILL OUT/IT TEST CSG/DRI LL OUT/IT Test Csg.@ 250 low f/ 5 Mins. & 500 psi f/ 0 Mins. w/ Mid- Central Tester. (No Leak) 1 LAN EQUI BOS Rig Down BO Testing Equip; Install Wear Bushing: repare floor for icking up BA # LAN EQUI BA ick up Mud motor IBS, NMDC, Scribe Mud motor, Install MWD, M/U 12 1/4" bit INT-TRI IN OLE TRI IN OLE TI Trip in hole to 1,588' 4.5 LAN DRLG CUTDL Install Rotaing head; JSM with & rig crew SLip & Cut drill Line; Check Crown saver, Calibrate Drawworks, ( Took longer to slip & cut drill line due to inexperence personel ) 2 LAN DRLG DRLCMT Drill f/ 1,588' to1,818'; Drill float 1,81, loat 1,85-1,859' 1.5 INT-DRILL-VERT DRILL INT VERT- 1 INT-DRILL-VERT DRILL INT VERT- 5 INT-DRILL-VERT DRILL INT VERT- DRL- DRL- DRL- Rotate from 1859' to 1961' 108 fph). WOB 10k50 rpm, motor diff 5, 655 GM, torque 8.5k. Slide from 1961' to 1991' 0 fph). 180 GT, WOB 18k, motor diff 15, 0 GM. Rotate from 1991' to 2520' 106 fph). WOB 28k, 60 rpm, motor diff 400, 800 GM, torque 9.5.k. age 5/92

6 Report #: 6 Daily Operation: 12/16/ /1/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) 4 Days on Location (days) 6 End Depth (ftkb) 4,611.0 End Depth (TVD) (ftkb) 4,609. Dens Last Mud (lb/gal) 9.40 Rig &, 6 Drld int 2520' to 4611' 89 fph); 4% complete; 94% rot, 6% sldg.; Ser Rig; (StartDisplace hole to 9.6 to 40 vis w/prehydrated gel@ 4450') Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 4% Intermediate drilled, Water 9,99 bbls Used 42 bbls Total used: 555 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 461` MD_1.29 INC_ AZM_459' TVD_DLS: 0.09_5' /Center 12/16/ /16/ :0 12/16/ :00 12/16/ :0 12/16/2014 1:00 12/16/ :0 12/16/ :00 12/16/ :0 12/16/2014 1:00 12/1/ INT-DRILL-VERT DRILL INT VERT- 1.5 INT-DRILL-VERT DRILL INT VERT- 0.5 INT-DRILL-VERT DRILL INT VERT- DRL- Rotate from 2520' to 45' 111 fph). WOB 0 k, 0 rpm, motor diff 480, 801 GM, torque 10. k. DRL- DRL- 0.5 LAN EQUI RIGSER Lubricate Rig 1 INT-DRILL-VERT DRILL INT VERT- DRL- Slide from 45' to 510' 2. fph). WOB 18k, motor diff 290, 800 GM. Rotate from 510' to 562' 104 fph). WOB 18k, 0 rpm, motor diff 500, 801 GM, torque 12k. Rotate from 562' to 4611' 81 fph). WOB 0k, 60 rpm, motor diff 400, 800 GM, torque 10k. age 6/92

7 Report #: Daily Operation: 12/1/ /18/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) 5 Days on Location (days) End Depth (ftkb) 5,616.0 End Depth (TVD) (ftkb) 5,614.4 Dens Last Mud (lb/gal) 9.60 Rig &, 6 Drld int 4611' to 5616' 4. fph); 59% complete; 89% rot, 11% sldg.; Ser Rig; ( Displaced hole with 9.6 ppg 40 vis w/ pre hydrated 4450') Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 59% Intermediate drilled, Water 9,58 bbls Used 188 bbls Total used: 4 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 549` MD_0.4 INC_24.02 AZM_5495' TVD_DLS:.5_100' /Center 12/1/ /1/ :00 12/1/ :00 12/1/2014 1:0 12/1/ :00 12/1/ :0 12/1/2014 2:00 12/18/ :0 12/18/ :00 12/18/ :00 12/1/ :00 12/1/ :00 12/1/2014 1:0 12/1/ :00 12/1/ :0 12/1/2014 2:00 12/18/ :0 12/18/ :00 12/18/ :00 12/18/ INT-DRILL-VERT DRILL INT VERT- 4 INT-DRILL-VERT DRILL INT VERT-.5 INT-DRILL-VERT DRILL INT VERT- DRL- Rotate from 4611' to 469' 9.5 fph). WOB 28k, 55 rpm, motor diff 400, 844 GM, torque 11k. DRL- Rotate from 469' to 4960' 4.8 fph). WOB 28k, 50 rpm, motor diff 450, 614 GM, torque 11k. DRL- 0.5 LAN EQUI RIGSER Lubricate Rig.5 INT-DRILL-VERT DRILL INT VERT- 1.5 INT-DRILL-VERT DRILL INT VERT- 1.5 INT-DRILL-VERT DRILL INT VERT- DRL- DRL- DRL- Rotate from 4960' to 5148' 54 fph). WOB 0k, 50 rpm, motor diff 400, 614 GM, torque 11k. Rotate from 5148' to 568' 55 fph). WOB 0k, 50 rpm, motor diff 40, 614 GM, torque 1k. Slide from 568' to 540' 2. fph). 20 GT, WOB 0k, motor diff 0, 614 GM. Rotate from 540' to 546' 60 fph). WOB 5k, 50 rpm, motor diff 460, 614 GM, torque 12k. 0.5 INT-CIRC CIRCULATE CIRC Wash out mouse hole : Get Slow pump rates 1 INT-DRILL-VERT DRILL INT VERT- 4 INT-DRILL-VERT DRILL INT VERT- DRL- Slide from 546' to 549' 0 fph). WOB 5k, motor diff 460, 614 GM. DRL- Rotate from 549' to 5616' 0.8 fph). WOB 5k, 40 rpm, motor diff 50, 614 GM, torque 10.5k. age /92

8 Report #: 8 Daily Operation: 12/18/ /19/2014 rimary Job ORIG DRILLING ODR Days rom Spud (days) Days on Location (days) End Depth (ftkb) End Depth (TVD) (ftkb) 6 8 6, ,40.2 Drld int 5616' to 6409' fph); 2% complete; 89% rot, 11% sldg. Dens Last Mud (lb/gal) 9.60 Rig &, Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 2% Intermediate drilled, Water 9,6 bbls Used 90 bbls Total used: 8 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 6254` MD_1.49 INC_41.6 AZM_6252' TVD_DLS: 0.0_100' /Center 12/18/ /18/ :00 12/18/2014 1:0 12/18/ :00 12/18/ :0 12/18/ :00 12/18/2014 1:0 12/18/ :00 12/18/ :0 12/19/ INT-DRILL-VERT DRILL INT VERT- 2.5 INT-DRILL-VERT DRILL INT VERT- 4.5 INT-DRILL-VERT DRILL INT VERT- DRL- Rotate from 5616' to 596' 5.6 fph). WOB 40k, 50 rpm, motor diff 00, 652 GM, torque 10k. DRL- 0.5 LAN EQUI RIGSER Lubricate Rig.5 INT-DRILL-VERT DRILL INT VERT- Slide from 596' to 596' 10.8 fph). WOB 0k, motor diff 15, 800 GM, torque 2k. DRL- Rotate from 596' to 6126' 6.2 fph). WOB 40k, 55 rpm, motor diff 00, 652 GM, torque 12k. DRL- Rotate from 6126' to 6409' fph). WOB 40k, 55 rpm, motor diff 00, 652 GM, torque 12k. age 8/92

9 Report #: 9 Daily Operation: 12/19/ /20/2014 rimary Job ORIG DRILLING ODR 0402 Days rom Spud (days) Days on Location (days) 9 End Depth (ftkb) 6,841.0 End Depth (TVD) (ftkb) 6,89.0 Dens Last Mud (lb/gal) 9.60 Rig &, 6 Drld int 6409' to 6841' 26.2 fph); 9% complete; 91% rot, 9% sldg. Circulate and condition mud. ump slug. Trip out of hole for slow penetration rate. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 9% Intermediate drilled, Water 9,6 bbls Used 0 bbls Total used: 8 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 66` MD_1.1 INC_0.10 AZM_661' TVD_DLS: 0.0_100' /Center 12/19/ /19/ :0 12/19/ :00 12/19/2014 1:0 12/19/ :00 12/19/2014 2:00 12/20/ :0 12/20/ :00 12/19/ :0 12/19/ :00 12/19/2014 1:0 12/19/ :00 12/19/2014 2:00 12/20/ :0 12/20/ :00 12/20/2014 DRL-.5 INT-DRILL-VERT DRILL INT VERT- 1.5 INT-DRILL-VERT DRILL INT VERT- 6.5 INT-DRILL-VERT DRILL INT VERT- DRL- 0.5 LAN EQUI RIGSER Lubricate Rig 5 INT-DRILL-VERT DRILL INT VERT- Rotate from 6409' to 6504' 2.1 fph). WOB 40k, 50 rpm, S 1900, motor diff 500, 58 GM, torque 12k. Slide from 6504' to 654' 20 fph). WOB 40k, 0 rpm, S 2200, motor diff 600, 840 GM, torque 0k. DRL- Rotate from 654' to 615' 2.8 fph). WOB 40k, 55 rpm, S 1900, motor diff 500, 58 GM, torque 14k. DRL- Rotate from 615' to 6841' 25.2 fph). WOB 40k, 50 rpm, S 2100, motor diff 85, 615 GM, torque 1k. 1.5 LAN WLCOND CIRC Circulate and condition mud. ump 11.0ppg slug..5 INT-TRI TOO TRI OO from 6,841' to 200' hole slick and taking proper fill. 2 LAN EQUI BA old psjm and OO racking back drill 200' age 9/92

10 Report #: 10 Daily Operation: 12/20/ /21/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 8 Days on Location (days) 10 End Depth (ftkb),511.0 End Depth (TVD) (ftkb),508.8 Dens Last Mud (lb/gal) 9.60 Rig &, 6 Lay out motor and bit, clean floor, ick up new motor and bit #, Scribe motor and install survey tool, Trip in hole to 1860, install rotating head, test MWD tool, TI to 6841', Drld int. 6841' to 511' 52 fph); 89% complete, % rot, 2% sldg. Water meter was run over by construction crew, Butches replaced meter. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: TD: Released Rig RIG NT: 0 hours for previous 24 hrs., 0 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 89% Intermediate drilled, Water 5 bbls Used 14 bbls Total used: 482 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 200` MD_0.1 INC_22.96 AZM_19' TVD_DLS: 0.95_100' /Center 12/20/ /20/ :0 12/20/2014 0:0 12/20/ :00 12/20/2014 1:00 12/20/ :0 12/20/ :00 12/20/ :0 12/21/ :00 12/20/ :0 12/20/2014 0:0 12/20/ :00 12/20/2014 1:00 12/20/ :0 12/20/ :00 12/20/ :0 12/21/ :00 12/21/ LAN EQUI RIGSER Rig service. 1 INT-TRI TOO TRI OO from 200' to bit. Drain mud motor, break off bit. Retrive MWD. Lay down mud motor..5 LAN EQUI BA old pjsm with directional, & and ioneer rep. Clean and organize rig floor for safety. ick up Scientific 8'' 1.5 fixed /8lobe 4.0stage 0.16rpg mud motor, install MWD, scribe & test. Make up 12 1/4'' Ulterra U16M DC bit ( 4x18's, X1's) 6 INT-TRI IN OLE 1.5 INT-DRILL-VERT DRILL INT VERT- 1.5 INT-DRILL-VERT DRILL INT VERT- 2.5 INT-DRILL-VERT DRILL INT VERT- 1.5 INT-DRILL-VERT DRILL INT VERT- 6 INT-DRILL-VERT DRILL INT VERT- TRI IN OLE TI TI from 0' to 6,840' hole is slick and getting proper displacement. ( Install rotating 1800') Test MWD 1,800'. DRL- DRL- DRL- DRL- DRL- Rotate from 6841' to 6886' 0 fph). WOB 25k, 0 rpm, S 00, motor diff 165, 95 GM, torque 11k. Slide from 6886' to 6921' 2. fph). WOB k, S 00, motor diff 10, 844 GM. Rotate from 6921' to 05' 62 fph). WOB 5k, 60 rpm, S 400, motor diff 15, 844 GM, torque 11k. Slide from 05' to 105' 20 fph). WOB k, S 00, motor diff 10, 844 GM. Rotate from 105' to 511' 68 fph). WOB 5k, 60 rpm, S 500, motor diff 00, 844 GM, torque 1k. age 10/92

11 Report #: 11 Daily Operation: 12/21/ /22/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 9 Days on Location (days) 11 End Depth (ftkb) 8,140.0 End Depth (TVD) (ftkb) 8,1.8 Dens Last Mud (lb/gal) 9.60 Rig &, 6 Drld int 511' to 548' 4'fph); Replace Standpipe O-ring on ammer Union: Drld int 548' to 82' 5 fph): Rig Service: Drld int 82' to 8140' 51 fph): 100% 180 hrs 12/21/2014. Circulate, pump sweeps to clean hole. ump slug, Trip out of hole, Laydown BA. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT:.5 hours for previous 24 hrs.,.5 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Water 5 bbls Used 0 bbls Total used: 482 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 806` MD_0..66 INC_18.40 AZM_80' TVD_DLS: 0._100' /Center 12/21/ /21/ :0 12/21/2014 0:00 12/21/ :00 12/21/ :0 12/21/ :0 12/21/ :00 12/22/ :0 12/21/ :0 12/21/2014 0:00 12/21/ :00 12/21/ :0 12/21/ :0 12/21/ :00 12/22/ :0 12/22/2014 DRL- 0.5 INT-DRILL-VERT DRILL INT VERT- Rotate from 511' to 548' 4 fph). WOB 5k, 60 rpm, S 000, motor diff 400, 844 GM, torque 1k. 0.5 UNLAN EQUI U_RIG Replace Stand pipe O-ring on ammer Union 5 INT-DRILL-VERT DRILL INT VERT- DRL- 0.5 LAN EQUI RIGSER Lubricate Rig 6 INT-DRILL-VERT DRILL INT VERT- DRL- Rotate from 548' to 82' 5 fph). WOB 5k, 60 rpm, S 000, motor diff 400, 844 GM, torque 1k. Rotate from 82' to 8140' 51 fph). WOB 5k, 60 rpm, S 000, motor diff 400, 844 GM, torque 1k. TD intermediate 18:0.5 INT-CIRC CIRCULATE CIRC Circulate, pumped sweeps to clean hole for intermediate casing run. 4.5 INT-TRI TOO TRI Trip out of hole, remove rotating head..5 LAN EQUI BA Laydown jars, - 6.5" drill collars, 2-8" drill collars, NM drill collars, IBS, float sub, downhole motor and bit. age 11/92

12 Report #: 12 Daily Operation: 12/22/ /2/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 10 Days on Location (days) 12 End Depth (ftkb) 8,140.0 End Depth (TVD) (ftkb) 8,1.8 Dens Last Mud (lb/gal) 9.60 Rig &, 6 Remove wear bushing, prep floor to run casing and have safety meeting to rig up casing crew, Rig up casing crew, safety meeting on running casing, run casing, Install CRT tool, run casing, Safety Stand down, run casing to TD 8140, Circulate bottoms up waiting on Schlumberger orders on lead cement. Received orders, CRT tool would not dis-engage, waiting on ipe ros. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 6 hours for previous 24 hrs., 6.5 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Water 5 bbls Used 0 bbls Total used: 482 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 806` MD_0..66 INC_18.40 AZM_80' TVD_DLS: 0._100' /Center 12/22/ /22/2014 0:0 12/22/ :00 12/22/ :0 12/22/ :00 12/22/ :0 12/22/ :00 12/2/2014 0:00 12/2/ :00 12/22/2014 0:0 12/22/ :00 12/22/ :0 12/22/ :00 12/22/ :0 12/22/ :00 12/2/2014 0:00 12/2/ :00 12/2/ INT-TRI TOO TRI ull wear bushing and lay down same. Remove elevators, install bales extensions. Clean and organize rig floor for safety. 1.5 LAN DRLG CSG old pjsm with ipe ro, & and ioneer rep. Rig up casing related equipment. 1.5 LAN DRLG CSG Make up loat Shoe, 2 jt 9 5/8'' 4.5ppf L80IC BTC csg. shoe track, loat Collar, 1 jt. of casing. Rig up Valant CRT. ump through float equipment. All good..5 LAN DRLG CSG Run 10 jts. 9 5/8'', 4.5ppf, L80IC, BTC intermediate casing to 4' hole slick no problems. 0.5 LAN ERS STY Safety meeting with all personel on location on resposibilities on and off location..5 LAN DRLG CSG Run 1 jts. 9 5/8'', 4.5ppf, L80IC, BTC intermediate casing to 4' hole slick no problems. 5 UNLAN ERS U_CMTR S Circulate with CRT while Waiting on cement lab reports results on Lead cement from Schlumberger. 1 LAN ERS STY Safety meeting with third party on cementing with high pressure lines. Schlumberger 2 UNLAN OTR U_OTR Unable to release CRT tool, troubleshoot CRT with ipe ro tech. age 12/92

13 Report #: 1 Daily Operation: 12/2/ /24/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 11 Days on Location (days) 1 End Depth (ftkb) 8,140.0 End Depth (TVD) (ftkb) 8,1.8 Dens Last Mud (lb/gal) 9.0 Rig &, 6 Rig up cementers, set cement head on casing, land casing, hold safety meeting on cementing with DV tool, test lines, shut down, Schlumbergers pump truck stopped working, waiting on pump truck, rig connected to cement head and pumped with rig pumps while waiting for cement pump truck. Third party truck arrived, connected lines, test lines, Bumped 1:0. Dropped DV tool bomb, Safety meeting with all personnel on location on pressuring up lines and circulating with rig pumps. ressure up and open DV tool, circulate with rig pumps, hold safety meeting with all personnel on cementing 2nd stage. Cement 2nd stage, drop plug, dispalce with 524.8bbls. lug Safety meeting with all personnel on rigging down cementers, rig down cementers. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 4.5 hours for previous 24 hrs., 11 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Water 5 bbls Used 44 bbls Total used: 556 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 1,85' loat 1,818' 806` MD_0..66 INC_18.40 AZM_80' TVD_DLS: 0._100' /Center 12/2/ /2/ :00 12/2/ :00 12/2/ :00 12/2/ :00 12/2/ :00 12/2/ :00 12/2/ :00 2 LAN DRLG CSG Unsting CRT tool & release. Set down hanger in wellhead and verify with Seaboard rep. old pjsm with cementers and finish rigging up Schlumberger cement crew. 6 UNLAN EQUI U_CMT Circulate with waiting on back up ump truck. pump truck down due to Deck Engine antifreeze leak. Replacement ump Truck on location & 100% rigged 14:00pm 4 INT-CMT CEMENT INTERMEDIATE CSG CMT old pjsm with Schlumberger, Weatherford, & & ioneer rep. Test cement lines to 1000psi low/5000psi high. Start Stage #1. ump 50bbls vis water 10lb/10bbl D208, pump 0bbls 9.5ppg Mudpush. ump Lead: 12bbls/220 11ppg, 2.95cu.ft/sack, 1. gal/sk water with 5.01 lb/sk D049, 5 lb/sk B056 ressure Seal LCMB56, 6.0 lb/sk B288/B289 Mica, 0.1% D208 Viscosifier, 10% D020 Extender, 6% D18 Silica, 0.2% D046 Anti oam, 0.% D01 Retarder, 0.5% D16 luid Loss, D % Dispersant. ump Tail: 41bbls/ ppg, 1.6 cu.ft/sk, 8.8gal/sk water with 5 lb/sk D049, 0.1% D065 Dispersant, 0.2% D046 Antioam, 5% D020 Extender. 0.5% D20 luid Loss, 0.2% D01 Retarder. Displacement 601bbls. ull returns throughout the whole job. Bump plug 500psi over psi. Test float float held, 4bbls back after bleed off. Top Of Lead: 6,864', Top Of Tail:,900' 4 LAN ERS STY Safety meeting with all personnel and drop DV tool opening cone for 45 min, pressure up to 50psi & open DV Tool. Switch to rig pump & circulate 25gpm. age 1/92

14 12/2/ :00 12/24/2014 0:00 12/24/2014 0:0 12/24/2014 0:00 12/24/2014 0:0 12/24/ :00 Drilling & Completion Summary - Ascending 5 LAN DRLG CMTRI old pjsm with Schlumberger cement crew, Weatherford DV tool hand, & rig crew & ioneer reps on 2nd Stage cement. Switch lines to Schlumberger cement truck, 50bbls Visc water/10bbl D208, 0bbls Mudpush 9.5ppg. ump Lead: 544bbls/1040sacks 11ppg, 2.95cu.ft/sk, 1. gal/sk water with5lb/sk D049, 5lb/sk B056 ressure Seal LCM B56, 6lb/sk B288/B289 Mica, 0.1% D208 Viscosifier, 10% D020 Extender, 6% D18 Silica, 0.2% D046 Antifoam, 0.% D01 Retarder, 0.5% D16 luid Loss, 0.1% D065 Dispersant. ump Tail: 61bbls/ ppg 1.6 cu.ft/sk. 8.8 gal/sk water with 5 lb/sk D049, 0.1% D065 Dispersant, 0.2% D046 Anti foam, 5% D020 Extender, 0.5% D20 luid Loss, 0.2% D01 Retarder. ull returns while cementing during 2nd stage. Displacement 512bbls, bump plug 1500psi over psi. Test floats, float held. 5bbls back after bleed off. Top Of Lead:,1', Top Of Tail: 6,564' 0.5 LAN ERS STY Safety meeting with all personnel on rigging down cementers. 0.5 LAN DRLG CMTRI Rig down Schlumberger. Report #: 14 Daily Operation: 12/24/ /25/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 12 Days on Location (days) 14 End Depth (ftkb) 8,140.0 End Depth (TVD) (ftkb) 8,1.8 Dens Last Mud (lb/gal) 9.0 Rig &, 6 lush out flow line, choke lines and BO valves with sugar water to remove cement, Safety meeting on landing pack off tool, Landed pack off tool, verified proper landing, tightened bolts, tested to 5000psi, good test, owered down rig to troubleshoot electrical problem with generators. Main breaker for #1 generator is faulty, waiting for a new breaker. Install wear bushing, cut drilling line, Change out breaker on generator. Generator not working properly after breaker changed out, Wait on mechanic for further trouble shooting. ick up BA, trip in hole to 100'. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 1 hours for previous 24 hrs., 24 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Completion ercentage: 0% roduction drilled. Water 5 bbls Used 44 bbls Total used: 556 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 8,18' loat 8,045' 806` MD_0..66 INC_18.40 AZM_80' TVD_DLS: 0._100' /Center 12/24/ /24/2014 0:0 12/24/ :00 12/24/2014 0:0 12/24/ :00 12/24/ : LAN DRLG CMT Clean out all cement from flow line, choke manifold and BO valves. 0.5 LAN ERS STY Safety meeting with all personel on location on setting pack off tool and testing same. 4 LAN EQUI WLEAD Set pack off tool, rd party verified propper setting of tool, bolted down. Tested to 5000psi, good test, spun out landing joint and laid out. age 14/92

15 12/24/ :00 12/24/ :0 12/24/ :00 12/24/ :00 12/25/ :0 12/25/ :00 12/24/ :0 12/24/ :00 12/24/ :00 12/25/ :0 12/25/ :00 12/25/2014 Drilling & Completion Summary - Ascending 2.5 UNLAN OTR U_OTR Rigs generator and electrical components not working properly, trouble shoot problems with light plant and generators. 0.5 LAN EQUI WLEAD Install wear bushing and tighten lock down screws on well head. LAN DRLG CUTDL Cut drilling line, 6 wraps 10.5 UNLAN OTR U_OTR Wait on Breaker for generator house, Replaced breaker, generator did not work properly, called for mechanic to assist in trouble shooting generator/breaker issues. 0.5 ROD-TRI BA TRI OR BA TRI ickup BA BA 1 ROD-TRI TRI TRI Strap in hole to 100' Report #: 15 Daily Operation: 12/25/ /26/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 1 Days on Location (days) 15 End Depth (ftkb) 8,150.0 End Depth (TVD) (ftkb) 8,14.8 Dens Last Mud (lb/gal) 9.0 Rig &, ', Test DV tool to 2000psi, test good, drill out DV tool, Trip in hole to 8045', Tagged float collar, Test casing to 2000psi, test good, Drill out float collar, drill out cement and float shoe, drill 10' formation, erform 8150', Test 9.4ppg EMW 8150' = 12psi, test good, CBU. Trip out of hole rom 8150' to 90', lay down BA and Mill tooth bit. ick up Curve BA, 200' ART Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 0 hours for previous 24 hrs., 24 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Completion ercentage: 0% roduction drilled. Water 5 bbls Used 44 bbls Total used: 556 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 8,18' loat 8,045' 806` MD_0..66 INC_18.40 AZM_80' TVD_DLS: 0._100' /Center 12/25/ /25/ :0 12/25/ :00 12/25/ :00 12/25/2014 1:00 12/25/ :00 12/25/ :0 12/25/ :00 12/25/ :00 12/25/2014 1:00 12/25/ :00 12/25/ :0 4.5 ROD-TRI TRI TRI TI 1,00' to 5,950' fill up pipe every 0 stands. 0.5 ROD-TRI TRI TRI Install rotating head 1 ROD-TRI TRI TRI TI from 5,950' to 6,850'. Tag Stage 6,850'. Set 50K twice without pumps and verfiy tool is closed. All good. 1 LAN DRLG CSG Test casing above Stage tool 2000psi for 10 min. Test good. 4bbls in & out. 1 LAN DRLG DRLCMT Drill out Stage tool /6850 to 685, wipe DV tool clean. 1.5 ROD-TRI TRI TRI TI from 6,850' to 8,045' fill up pipe every 0 stands. Tag loat 8,045' age 15/92

16 12/25/ :0 12/25/ :00 12/25/ :00 12/25/ :0 12/25/ :00 12/25/2014 2:00 12/26/ :00 12/26/ :00 12/26/ :0 12/26/ :00 12/25/ :00 12/25/ :00 12/25/ :0 12/25/ :00 12/25/2014 2:00 12/26/ :00 12/26/ :00 12/26/ :0 12/26/ :00 12/26/2014 Drilling & Completion Summary - Ascending 0.5 LAN DRLG CSG Test casing above loat Collar 2000psi for 0 min, test good. 4bbls in & out. LAN DRLG DRLCMT Drill loat Collar, shoe track, loat Shoe and 10' new formation from 8,045' to 8,150'. loat 8, 045', loat 8,140' 0.5 LAN GEO LKO erform IT test with 9.4 ppg EMW with ' = 12psi, Test Good. 0.5 ROD-CIRC CIRCULATE CIRC CBU, get trip tanks full & mix slug. Check flow, well static. ROD-TRI TRI TRI OO from 8150' to 90' hole taking proper fill. Start cleaning mud pits for OBM prep. 1 LAN EQUI BA Lay down -6.5'' Drill Collars, bit sub, 8.5'' Mill Tooth Bit. Continue celaning mud pits for OBM. 1 LAN EQUI BA Safety mtg on picking up BA, clean floor, continue clean pits for OBM..5 LAN EQUI BA ick Scientific 2.12 deg. fixed /8 lobe 5.0stage 0.28rpg mud motor, NMDC, pulser sub, NM flex, X-over. Install MWD, scrobe & test surface tools. All good. Make Up 8.5'' MM64D DC bit. Continue cleaning pits for OBM. 0.5 LAN EQUI BOS Install Rotaing head. Continue cleaning pits for OBM. 1 ROD-TRI TRI TRI Trip in hole to 200' Report #: 16 Daily Operation: 12/26/ /2/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 14 Days on Location (days) 16 End Depth (ftkb) 8,49.0 End Depth (TVD) (ftkb) 8,48.6 Dens Last Mud (lb/gal) 8.60 Rig &, 6 Trip in hole to 485', Service Rig, Trip in hole to 956', Change out rotating head rubber for OBM, Trip in hole to 8150', Displace hole with Oil Base Mud, Started 1500hrs 12/26/14. Drld vert 8150' to 8209' 118 fph); 100% 150 hrs 12/26/14. Built curve 8209' to 849' 19.6 fph); 8% complete; % rot, 9% sldg. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 0 hours for previous 24 hrs., 24 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Completion ercentage: 15% roduction drilled. Water 5 bbls Used 44 bbls Total used: 556 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 8,18' loat 8,045' 8409` MD_15.12 INC_1.4 AZM_8404' TVD_DLS:.00_100' /Center 12/26/ /26/ :0.5 ROD-TRI TRI TRI TI from 200' to 4,84' fill up pipe every 0 stands. age 16/92

17 12/26/ :0 12/26/ :00 12/26/ :00 12/26/ :00 12/26/ :00 12/26/ :0 12/26/ :0 12/26/ :00 12/2/ :0 12/26/ :00 12/26/ :00 12/26/ :00 12/26/ :00 12/26/ :0 12/26/ :0 12/26/ :00 12/2/ :0 12/2/2014 Drilling & Completion Summary - Ascending 0.5 LAN EQUI RIGSER Rig service. 2 ROD-TRI TRI TRI TI from 4,84' to,50' fill up pipe every 0 stands 2 LAN EQUI DIE ick up 5'' drill pipe & TI from,50' to 8,150'. Install rotating head. 1 ROD-CIRC CIRCULATE CIRC Displace hole with 8.ppg OBM mud, swap over to the shakers. 0.5 ROD-DRILL CURVE 4 ROD-DRILL CURVE 0.5 ROD-DRILL CURVE 6.5 ROD-DRILL CURVE.5 ROD-DRILL CURVE DRILL CURVE- DRILL CURVE- DRILL CURVE- DRILL CURVE- DRILL CURVE- Report #: 1 Daily Operation: 12/2/ /28/2014 ORIG DRILLING rimary Job ODR Days rom Spud (days) Days on Location (days) End Depth (ftkb) End Depth (TVD) (ftkb) , ,.0 Built curve 849' to 880' 14.8 fph); 84% complete; 100% sldg. Rig Service. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 0 hours for previous 24 hrs., 24 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Completion ercentage: 84% roduction curve drilled. Water 11 bbls Used 11 bbls Total used: 5689 bbls DRL CURVE- DRL CURVE- DRL CURVE- DRL CURVE- DRL CURVE- Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 8,18' loat 8,045' 8809` MD_8.2 INC_1.86 AZM_852' TVD_DLS: 5.0_100' /Center 8808: 90% S, 10% LS 12/2/ /2/ :00 Dens Last Mud (lb/gal) 8.60 Rotate from 8150' to 8209' 118 fph)., WOB 20k, 5 rpm, S 1240, motor diff 150, 6 GM, torque 9k. Slide from 8209' to 824' 16. fph). 18L GT, WOB 5k, S 1155, motor diff 220, 6 GM, torque 0k. Rotate from 824' to 8290' 2 fph)., WOB 10k, 5 rpm, S 1450, motor diff 450, 6 GM, torque 9k. Slide from 8290' to 8428' 21.2 fph). 180L GT, WOB 5k, S 180, motor diff 220, 44 GM. Slide from 8428' to 849' 18.6 fph). WOB 9k, S 115, motor diff 185, 400 GM. Rig &, 6 DRILL CURVE- 8 ROD-DRILL CURVE DRL CURVE Slide from 849' to 8620' 15.9 fph). WOB 20k, S 2050, motor diff 280, 550 GM. age 1/92

18 12/2/ :00 12/2/ :0 12/28/ :00 12/2/ :0 12/28/ :00 12/28/2014 Drilling & Completion Summary - Ascending 0.5 LAN EQUI RIGSER Rig service. 9.5 ROD-DRILL CURVE 6 ROD-DRILL CURVE DRILL CURVE- DRILL CURVE- DRL CURVE- DRL CURVE- Slide from 8620' to 884' 1. fph). WOB 22k, S 2140, motor diff 165, 546 GM. Slide from 884' to 8841' 9.5 fph). WOB 25k, S 1525, motor diff 1, 46 GM. Report #: 18 Daily Operation: 12/28/ /29/2014 ORIG DRILLING rimary Job ODR 0402 Days rom Spud (days) 16 Days on Location (days) 18 End Depth (ftkb) 8,904.0 End Depth (TVD) (ftkb) 8,822.5 Dens Last Mud (lb/gal) 8.60 Rig &, 6 Slide from 8841' to 8904' fph). CBU, OO due to build rates 8904' to 100'. Change out BA. TI 100'- 000' with BA #6 ART Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 1.5 hours for previous 24 hrs., 25.5 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Completion ercentage: 6% roduction curve drilled. Water 11 bbls Used 0 bbls Total used: 5689 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 8,18' loat 8,045' 8851` MD_41.4 INC_1.46 AZM_884' TVD_DLS: 5.2_100' /Center 8808: 80% S, 10% LS, 10% SD 12/28/ /28/2014 0:0 12/28/ :0 12/28/2014 1:00 12/28/ :00 12/28/ :00 12/28/ :0 12/28/2014 0:0 12/28/ :0 12/28/2014 1:00 12/28/ :00 12/28/ :00 12/28/ :0 12/28/ : ROD-CIRC CIRCULATE CIRC Slide from 8841' to 8850' 6 fph). WOB 20k, S 1900, motor diff 250, 450 GM. 1 ROD-CIRC CIRCULATE CIRC Wait on orders from drilling engineer & geology, decision made to continue drilling and monitor motor yields. 4.5 ROD-DRILL CURVE DRILL CURVE- DRL CURVE- Slide from 8850' to 88' 5.1 fph). WOB 20k, S 1900, motor diff 250, 450 GM. 1 UNLAN EQUI U_RIG Change out leaking swivel packing on top drive. 1 ROD-DRILL CURVE DRILL CURVE- DRL CURVE- 0.5 LAN EQUI RIGSER Rig Service Slide from 88' to 889' 6 fph). WOB 20k, S 1900, motor diff 250, 450 GM. 0.5 UNLAN EQUI U_RIG Replace "O" ring in goose neck age 18/92

19 12/28/ :00 12/28/ :00 DRILL CURVE- 2 ROD-DRILL CURVE DRL CURVE- Slide from 889' to 8904' 12.5 fph). WOB 25k, S 1650, motor diff 250, 460 GM. Decision made to OO due to build rates. 12/28/ :00 12/28/ :00 12/29/ :0 12/29/ :00 12/29/2014 0:00 12/28/ :00 12/29/ :0 12/29/ :00 12/29/2014 0:00 12/29/2014 Note: Last survey 8851' MD 41.4 deg 1.46 azim. DLS 5.. DLN to land on line- 1.2 DLN to land 10' low DLN to land 15' low DLN to land 25' low ROD-CIRC CIRCULATE CIRC CBU, ( decision made to OO for build rates), pump 0bbls hi vis sweep, circulate till shakers clean. 4.5 ROD-TRI BA TRI OR BA TRI BA Check flow, well static. ump slug. OO from 8904' to 200' hole slick and taking proper fill. Remove rotating 200' 0.5 LAN EQUI BA Drain mud motor, break off bit. Lay down same. 2 LAN EQUI BA ick up Scientific 2.8deg. adj. /8lobe 5.0stage 0.28rpg mud motor, install MWD. Scribe & test surface tools, all good. Make up ughes 8.5'' GX-28 ( x24's). ROD-TRI TRI TRI Trip in hole rom 100' to 000' with BA #6. ill up every stands. Report #: 19 Daily Operation: 12/29/ /0/2014 ORIG DRILLING rimary Job ODR Days rom Spud (days) Days on Location (days) End Depth (ftkb) End Depth (TVD) (ftkb) Dens Last Mud (lb/gal) ,12.0 8, TI, Ream /8428' - T/8904', Built curve 8904' to 912' 19 fph); 9% complete; 100% sldg. Rig (& 6), Well (University -4 # 22) Rig started Rigging down & preparing to 1:00 12/11/14 Accepted rig on day work: 1:00 hrs 12/12/2014 Spud 18:0 hrs 12/12/2014 Surface TD: 09:00 12/1/ :0 12/15/2014: 18:0 12/21/2014 Released Rig RIG NT: 0 hours for previous 24 hrs., 25.5 hours for the month of December 2014 Completion ercentage: 100% Surface hole drilled Completion ercentage: 100% Intermediate drilled, Completion ercentage: 9% roduction curve drilled. Water 496 bbls Used 8 bbls Total used: 656 bbls Note: Notified Texas RRC 12/11/14 with intent to spud well and run and cement 1 /8'' casing. Operator: Angela, Operator # 6 Notified Texas RRC 08:46 hrs to Run 1 /8" csg to 1,859' & cement Spoke to Linda, Operator # 8 Notified Texas RRC 19:08hrs to Run 9 5/8 csg to 8140' & cement Spoke to Cindy, Operator #4 No accidents, Incidents or spills reported last 24hrs loat 8,18' loat 8,045' 902` MD_68.46 INC_16.1 AZM_8914' TVD_DLS: 16.60_100' /Center 9100': 90% S, 10% LS 12/29/ /29/ :00 12/29/ :00 12/29/ :00 Rig &, ROD-TRI TRI TRI TI from 000' to 8428' fill up pipe every 0 stands 4 ROD-CIRC CIRCULATE CIRC ole taking on 8428', pipe will no go down on elevators. Wash down 8428' to 8904' age 19/92

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Superintendent Rig Checklist

Superintendent Rig Checklist Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves,

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8 -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8 12UNF Each 6 Vendor Item UOM Qty Uniexcel Sumitomo Sumitomo 7" OD Pup Joint 35 PPF P110-5 ft Long PTB007 Pin X Box Ea 9 7" Integral Cross Over 24" OAL 35ppf VAM TOP Pin x NSCC Box materal AISI Ea 1 USED ITEM 7" Integral

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

Casing Cementation Equipment

Casing Cementation Equipment Casing Cementation Equipment Float Equipment Cementing Plugs Casing Centralizers Stage Tools Inflatable Casing Packers Extended Reach Casing Equipment Swellable Casing Packers Liner Equipment Quality Control/Assurance

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #: MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

Highlights of Achievements at Loc. TU

Highlights of Achievements at Loc. TU Highlights of Achievements at Loc. TU Planned-80 days / Actual-74 days. Different BHAs for drilling in rotary mode designed by in-house expertise. Sliding was limited to

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM 750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM PAGE 1 OF 7 DRAWWORKS: TSM 7000 Drawworks, 750hp, grooved f/1-1/8 Drill Line, p/b 540HP CAT C-15, w/allison CLT- 6061 Automatic Transmission, Right Angle Drive,

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS DRAWWORKS/POWER NATIONAL T 32 Single Drum Drawworks, S/N N/A, 400 HP, LEBUS Grooved f/1 1/8 Line, AMERICAN Makeup & Breakout Catheads, Rotary Table Drive, Quad Water Brake, Driller s Control Console w/air

More information

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information