US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative

Size: px
Start display at page:

Download "US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative"

Transcription

1 US 69/75 Controlled Access Highway and Grade Separations Introduction The Oklahoma Department of Transportation (ODOT) proposes to improve safety and efficiency of high volume freight traffic along the US 69/75 corridor in southern Oklahoma (Bryan County) by upgrading an existing 4.2-mile arterial highway with numerous access points and three signalized intersections to a fully controlled access facility with grade separations and functional frontage roads. The proposed project will be within the existing right-of-way. The project is bordered on the north by a fully controlled access facility (US 70), and on the south by an additional four miles of US 69/75 arterial highway. Beyond this four mile buffer to the south, US 69/75 is a fully controlled access facility in southern Oklahoma and Texas. US 69/75 runs parallel to the Union Pacific Railroad through the Town of Calera, and the two are separated by a 200-foot buffer. These two infrastructure elements conflict with highway traffic in this rural southeast Oklahoma community, resulting in significant traffic delays. The project proposes to eliminate the at-grade railroad/local street crossing conflict at Main Street in Calera, and replace it with a highway and rail grade separation south of McKennon Road. The US 69/US 75 freight corridor project will significantly reduce freight delay and congestion, improve travel time reliability, enhance safety, improve economic vitality, and promote environmental sustainability. A benefit-cost analysis (BCA) was developed for ODOT s proposed project. The benefits of the project were evaluated quantitatively in terms of the following characteristics: 1. State of Good Repair Avoided maintenance costs of the existing US 69/75 corridor. 2. Economic Competitiveness Travel time and fuel cost savings through reduced delay and congestion from removal of three traffic signals along US 69/75, elimination of traffic backups on US 69/75 at two locations resulting from at-grade railroad/local street crossing conflicts, and speed limit increase on US 69/75 once the project is completed. 3. Sustainability 4. Safety Reduced carbon dioxide (CO2) emissions due to reduced vehicle delay on US 69/75. Crashes and injuries avoided through safety improvements such as traffic signal removal and grade separation along US 69/75. A fifth category of benefits was evaluated qualitatively and includes: 5. Quality of Life Improvements 1

2 Improved accessibility for local traffic and diversion off of US 69/75 due to the construction of grade separations and frontage roads. Costs associated with ODOT s project include the following: 1. Pre-construction costs, 2. Construction costs, 3. Annual maintenance costs, and 4. Vehicle delay during construction. The following sections provide details on how benefits and costs were calculated in the BCA. All spreadsheet references in quotations refer to tabs in the Model_OKDOT FASTLANE BCA_V2 Excel spreadsheet (BCA spreadsheet) and cell references in parentheses refer to cells or tables within the referenced tabs. The 30 Year BCA Summary tab provides a summary of all benefits and costs evaluated quantitatively in the BCA. As presented on this tab, 2015 is the base year for the BCA, with the analysis period extending through 2044 for a total of 30 years. All monetary values in the BCA are expressed in 2015 dollars. State of Good Repair State of good repair was quantified in terms of avoided costs associated with maintaining the US 69/75 corridor within the proposed project area if the project were not built. The avoided maintenance cost estimates for the highway corridor were provided by ODOT and included costs for road surface rehabilitation and reconstruction. On the State of Good Repair tab, highway improvement and preservation costs per lane mile (Q:67; Q78; R67; and R78) were summed to arrive at a total cost of $1.09 million per lane mile for a 30-year period (W:70). Dividing $1.09 million by 30 years yields an average annual cost of $36,574 per lane mile (W:72). Multiplying $36,574 by the proposed project length of 4.2 miles and by four lanes yields an average annual maintenance cost of $614,448 (W:78). The state of good repair benefits amount to a non-discounted value of $14.13 million in avoided maintenance costs during the BCA analysis period of 2015 to Economic Competitiveness Economic competitiveness benefits were derived from travel time savings assumed to arise from three sources: 1. Elimination of traffic backups on US 69/75 at two locations resulting from at-grade railroad/local street crossing conflicts (south to north): McKennon Road and Union Pacific Railroad crossing, and Main Street and Union Pacific Railroad crossing. 2. Removal of three traffic signals (south to north): US 69/75 and Main Street, US 69/75 and McKinley Ave, and 2

3 US 69/75 and Choctaw Road. 3. Increase the speed limit on the US 69/75 corridor within the project area from 55 miles per hour to 70 miles per hour once construction is complete. The methodologies for calculating travel time savings associated with these sources are discussed below. At-Grade Railroad/Local Street Crossing Conflicts Currently, vehicles traveling on US 69/75 are subject to delay when trains move through the at-grade crossings at McKennon Road and Main Street. The trains cause traffic on the local roads to back up onto US 69/75. Calculation of this delay is found on the McKennon Rd-VOT-RR Crossing and Main St-VOT-RR Crossing tabs in the BCA spreadsheet. For discussion purposes, the methodology used for calculating vehicle delay savings at the Main Street railroad crossing on the Main St-VOT-RR Crossing tab is presented below, although the methodology for the McKennon Road crossing is the same. According to ODOT, the average daily vehicle count on US 69/75 at the Main Street intersection in the base year of 2015 is 26,500 (N:11) and is projected to increase to approximately 41,800 (AQ:11) by The truck factor is 22 percent (B:13; C:13; D:13) and remains constant throughout the BCA analysis period. Data regarding train activity on the Union Pacific Railroad was obtained from ODOT s discussions with the Town of Calera and Bryan County (Table A:96). The analysis assumed 20 trains per day with two hours of inactivity from 5:00 AM to 7:00 AM and again from 5:00 PM to 7:00 PM. Trains were assumed to be 138 cars in length. The number of cars was obtained from ODOT s discussions with the Town of Calera and Bryan County, who estimated the trains range from 130 to 145 cars (138 on average). The length of each car was estimated based on the Town of Calera and Bryan County s knowledge that the trains are carrying large volumes of hazardous cargo. Because tank cars are typically used to haul hazardous cargo, the analysis assumed the trains are comprised of tank cars measuring 49 feet in length. 1 The Town of Calera and Bryan County indicated trains traveling at night are traveling at an estimated 60 miles per hour, and trains traveling during the day are traveling at an estimated 40 miles per hour. This analysis assumed nighttime hours are 9:00 PM to 5:00 AM and daytime hours are 5:00 AM to 9:00 PM. Gate-down time per train was calculated based on the length and speed of the train. Because trains are traveling at 60 miles per hour at night and 40 miles per hour during the day, two gate-down time calculations were made (Table A:116; Table A:130). For trains traveling during the day, the speed of 40 miles per hour was converted to 3,520 feet per minute. Based on ratios, it is estimated that the trains take 1 minute and 54 seconds to pass through the crossing at Main Street. Thirty seconds are then added to this calculation, with 25 seconds accounting for the gates going down prior to the train s arrival at the crossing and five seconds accounting for a delay before the gates go back up after the train has passed. 2 Total gate-down time for the daytime trains is therefore two minutes and 24 seconds in the analysis. The same process was used to estimate gate-down time for the trains 1 Page 36 - For hauling hydrochloric acid 2 Based on Page 13 and Page

4 traveling at night. Total gate-down time for nighttime trains is estimated at one minute and 48 seconds. To calculate vehicle delay per hour arising from the trains, traffic count data from September 2014 for the US 69/75 and Main Street intersection provided by ODOT was used. The focus of this data was northbound traffic on US 69/75 turning right onto Main Street and southbound traffic on US 69/75 turning left onto Main Street, since this traffic is currently delayed by train blockages and would no longer be able to make these turns once an overpass at the US 69/75 and Main Street intersection is constructed. The following process was used to estimate average vehicle volumes per hour making these right and left turns from US 69/75: 1. The percentage of northbound volumes on US 69/75 from the 2014 traffic count data were used to estimate northbound volumes for the 2015 base year (B:24 through K:24) through 2044 (N:18 through AQ:18). 2. The percentage of southbound volumes on US 69/75 from the 2014 traffic count data were used to estimate southbound volumes for the 2015 base year (B:24 through K:24) through 2044 (N:57 through AQ:57). 3. The percentage of traffic turning right from northbound US 69/75 onto Main Street (1.9 percent) from the September 2014 traffic count data (D:20) was applied to the 2015 through 2044 northbound traffic volumes (N:26 through AQ:26). 4. The percentage of traffic turning left from southbound US 69/75 onto Main Street (5.3 percent) from the September 2014 traffic count data (D:59) was applied to the 2015 through 2044 northbound traffic volumes (N:64 through AQ:64). 5. Vehicle volumes per hour from the 2014 traffic count data were used to calculate hourly percentages of total daily traffic for northbound (D:26 through D:49) and southbound (D:64 through D:87) vehicles on US 69/ The hourly percentages of total daily traffic were applied to the daily traffic volumes making right and left turns from US 69/75 for 2015 through For example, on the Main St-VOT- RR Crossing tab, average vehicle volumes for northbound traffic turning right onto Main Street during the 7:00 AM to 8:00 AM hour increase from 13 vehicles in 2015 (N:215) to 21 in 2044 (AQ:215). To calculate vehicle delay for traffic turning from US 69/75 and passing through the railroad crossing, the formula below was used: 3 where: V = vehicle delay q = arrival rate in vehicles per minute V = (1/2) ((qtg 2 )/(1-q/d)) 3 The analysis used the methodology at: %20At%20Grade%20Crossing%20Memo.pdf 4

5 TG = gate-down time d = departure rate in vehicles per minute The following formula was used to calculate q: q = y/t where: q = arrival rate in vehicles per minute y = cumulative number of vehicles arriving at the crossing during the hour t = time in minutes For example, on the Main St-VOT-RR Crossing tab, the arrival rate in passenger vehicles per minute in 2015 for northbound traffic on US 69/75 turning right onto Main Street during the 7:00 AM to 8:00 AM hour is passenger vehicles (N:220). The following formula was used to calculate d: where: d = departure rate in vehicles per minute d = y/(t TG) y = cumulative number of vehicles departing the crossing during the hour after the gates are up t = time in minutes TG = gate-down time For example, on the Main St-VOT-RR Crossing tab, the departure rate in passenger vehicles per minute in 2015 for northbound traffic on US 69/75 turning right onto Main Street during the 7:00 AM to 8:00 AM hour is passenger vehicles (N:224). The calculations for the vehicle arrival and departure rates as well as the gate-down time were used in the vehicle delay formula to calculate total vehicle delay for northbound and southbound traffic on US 69/75 making turns onto Main Street during each hour. For example, on the Main St-VOT-RR Crossing tab, the passenger vehicle delay in minutes in 2015 for northbound traffic on US 69/75 turning right onto Main Street during the 7:00 AM to 8:00 AM hour is 12.2 minutes (N:228). Northbound and southbound vehicle delay in minutes was converted to delay in hours for each hour of the day and then summed to estimate total passenger vehicle and truck delay per day for 2015 through 2044 (N:1551 through AQ:1551 and N:1552 through AQ:1552). Passenger vehicle and truck delay per day was then converted to total annual passenger vehicle and truck delay for 2015 through 2044 (N:1555 through AQ:1555 and N:1556 through AQ:1556). The results of the analysis were transferred to the 30 Year BCA Summary tab for the years in which benefits are accrued (Rows 16 21). The monetized values of travel time savings are calculated (Rows 5

6 23 24) using the rates of $13.43 per hour for passenger vehicles and $26.63 per hour for trucks. 4 The time savings benefits associated with the elimination of the at-grade railroad/local street crossing conflicts at both Main Street and McKennon Road amount to a total non-discounted value of $3.87 million during the BCA analysis period of 2015 to Traffic Signals In addition to the delay resulting from train activity on the Union Pacific Railroad corridor, vehicles traveling on US 69/75 are subject to delay arising from traffic signals at the Main Street, McKinley Avenue, and Choctaw Road intersections. These traffic signals would be removed as part of the proposed project. Calculation of this delay is found on the Main St-VOT-Traffic Signal, McKinley Ave-VOT-Traffic Signal, and Choctaw Rd-VOT-Traffic Signal tabs in the BCA spreadsheet. The methodology for calculating vehicle delay resulting from the traffic signals is nearly the same as the methodology used for the railroad crossings. For discussion purposes, the methodology for the Main Street traffic signal on the Main St-VOT-Traffic Signal tab is presented below, although the methodology for all of the traffic signals is the same. As discussed in the section on at-grade railroad/local street crossing conflicts, ODOT data indicates the average daily vehicle count on US 69/75 at the Main Street intersection in the base year is 26,500 vehicles (N:11) and is projected to increase to approximately 41,800 (AQ:11) by The truck factor is 22 percent (B:13; C:13; D:13) and remains constant throughout the BCA analysis period. Data regarding traffic signal phases and September 2014 traffic volumes at the Main Street intersection were obtained from ODOT. Average daily traffic delay experienced at the Main Street traffic signal was then analyzed in terms of percent of red time displayed on northbound and southbound US 69/75 through movements. The existing signal at the Main Street intersection is operating in free mode with Max 1 time values programmed in the signal controller. Max timing values only occur during the peak hour operations with significant traffic volumes to require maximum signal timing values on all phases. However, the off peak hours will dwell in green for US 69/75 for the larger portion of the cycle. Synchro 9.0, developed by Trafficware, was the software utilized to determine a modelled cycle split needed to satisfy all traffic demand on the signal approaches. The measured optimized timing was calculated as a percentage of red time plus the 2 seconds all red on phases 2 and 6. From this analysis, an average percentage of time per hour that the signal is red on northbound and southbound US 69/75 was calculated. The analysis showed that the signal is red 34 percent of the time each hour (B:97), or 20.5 minutes per hour (B:99). To calculate vehicle delay per hour arising from the traffic signal, traffic count data from September 2014 for the US 69/75 and Main Street intersection provided by ODOT was used. The focus of this data was northbound and southbound traffic on US 69/75, since this traffic is currently subject to delay at the traffic signal and would benefit from time savings once the signal is removed. The following process was used to estimate average vehicle volumes per hour traveling on US 69/75: 1. The percentage of northbound volumes on US 69/75 from the 2014 traffic count data were used to estimate northbound volumes for the 2015 base year (B:24 through K:24) through 2044 (N:18 through AQ:18). 4 These values were obtained from page 5 of the TIGER and FASTLANE BCA Resource Guide and converted to 2015$ based on the Value of Time and CPI tabs in the BCA spreadsheet. 6

7 2. The percentage of southbound volumes on US 69/75 from the 2014 traffic count data were used to estimate southbound volumes for the 2015 base year (B:24 through K:24) through 2044 (N:57 through AQ:57). 3. Vehicle volumes per hour from the 2014 traffic count data were used to calculate hourly percentages of total daily traffic for northbound (D:26 through D:49) and southbound (D:64 through D:87) vehicles on US 69/ The hourly percentages of total daily traffic were applied to the daily traffic volumes traveling on US 69/75 for 2015 through For example, on the Main St-VOT-Traffic Signal tab, average vehicle volumes for northbound traffic during the 7:00 AM to 8:00 AM hour increase from 698 in 2015 (N:184) to 1,102 in 2044 (AQ:184). To calculate vehicle delay for traffic traveling on US 69/75 and approaching the Main Street intersection, the same formulas used to calculate vehicle delay at the railroad crossings were used, since average delay for signalized intersections is computed in the same manner. 5 Gate-down time in the formulas was replaced with the average duration per hour of a red light at the traffic signal (20.5 minutes). As an example of the results of the calculations on the Main St-VOT-Traffic Signal tab, the total passenger vehicle delay in minutes in 2015 for northbound traffic on US 69/75 during the 7:00 AM to 8:00 AM hour is 5,580.5 minutes (N:197). Northbound and southbound vehicle delay in minutes was converted to delay in hours for each hour of the day and then summed to estimate total passenger vehicle and truck delay per day for 2015 through 2044 (N:1520 through AQ:1520 and N:1521 through AQ:1521). Passenger vehicle and truck delay per day was then converted to total annual passenger vehicle and truck delay for 2015 through 2044 (N:1524 through AQ:1524 and N:1525 through AQ:1524). The results of the analysis were transferred to the 30 Year BCA Summary tab for the years in which benefits are accrued (Rows 27 35) and monetized (Rows 37 38) using the same process described for the railroad crossings. The time savings benefits associated with the removal of the traffic signals at Main Street, McKinley Avenue, and Choctaw Road amount to a total non-discounted value of approximately $3.09 billion during the BCA analysis period of 2015 to Speed Limit Increase The current speed limit on the US 69/75 corridor through the proposed project area is 55 miles per hour. It is anticipated that the speed limit will be increased to 70 miles per hour once the project is complete, since the highway traffic will be separated from local traffic due to the construction of grade separations and frontage roads. Time savings benefits for US 69/75 traffic will be realized once the speed limit is increased. Calculations for these benefits are found on the Segment 1-Speed Limit, Segment 2-Speed Limit, Segment 3-Speed Limit, Segment 4-Speed Limit, and Segment 5-Speed Limit tabs in the BCA spreadsheet. For discussion purposes, the methodology for Segment 2 (presented on the Segment 2-Speed Limit tab), which extends from the intersection of US 69/75 and 5 %20At%20Grade%20Crossing%20Memo.pdf Page 3 7

8 McKennon Road to the US 69/75 and Main Street intersection, is presented below, although the methodology for all of the highway segments is the same. As discussed in the sections above, ODOT data indicates the average daily vehicle count on US 69/75 at the Main Street intersection in the base year is 26,500 (K:11) and is projected to increase to approximately 41,800 (AN:11) by The truck factor is 22 percent (B:13; C:13; D:13) and remains constant throughout the BCA analysis period. The length of the highway segment (B:19) was measured in Google Earth, with average speeds traveled by passenger vehicles (64 miles per hour) and trucks (60 miles per hour) in 2015 obtained for TMC 50 in the National Performance Management Research Data Set (B:21 through B:27). Estimates of vehicle speeds once the speed limit is increased to 70 miles per hour were taken from Table 1 (OK I-40) on page 6 of Empirical Analysis of Truck and Automobile Speeds on Rural Interstates: Impact of Posted Speed Limits by Steven Johnson and Daniel Murray. These travel speeds were converted into miles per minute (C:26 through C:29), which were used to determine the segment travel time in minutes per vehicle type (D:26 through D:29). The speed limit analysis calculated time savings for three hour periods. To calculate vehicle time savings per 3-hour period arising from the speed limit increase, traffic count data from September 2014 for the US 69/75 and Main Street intersection provided by ODOT was used. The focus of this data was northbound and southbound traffic on US 69/75, since this traffic is currently subject to a 55 miles per speed limit and would benefit from time savings once the speed limit is increased to 70 miles per hour. The following process was used to estimate average vehicle volumes per 3-hour period traveling on US 69/75: 1. The northbound and southbound vehicle volumes on US 69/75 approaching the Main Street intersection from the 2014 traffic count data (E:40 through E:63) were used to calculate hourly percentages of total daily traffic on US 69/75 in 2015 (F:40 through F:63). 2. The hourly percentages of total daily traffic were added to calculate percentages for 3-hour periods (H:40 through H:61). 3. The percentages of total daily traffic during the 3-hour periods from the 2014 traffic count data were applied to the daily vehicle volumes traveling on the segment for 2015 through 2044 to estimate vehicle volumes during the 3-hour periods. For example, on the Segment 2- Speed Limit Increase tab, total vehicle volumes traveling on the segment during the 6:00 AM to 9:00 AM period increase from 2,923 vehicles in 2015 (K:41) to 4,615 vehicles in 2044 (AN:41). To calculate time savings for vehicles, the volume by vehicle type per three-hour period was multiplied by the difference between the average vehicle speed with a 55 miles per hour speed limit and the average vehicle speed with a 70 miles per hour speed limit. For example, passenger vehicles during the 6:00 AM to 9:00 AM period realize a total time savings of 93 minutes in 2015 (K:50). Time savings in minutes was converted to time savings in hours for each 3-hour period of the day and then summed to estimate total passenger vehicle and truck time savings per day for 2015 through 2044 (K:353 through AN:353 and K:354 through AN:354). Time savings per day was then converted to total annual passenger vehicle and truck time savings for 2015 through 2044 (K:357 through AN:357 and K:358 through AN:358). 8

9 The results of the analysis were transferred to the 30 Year BCA Summary tab for the years in which benefits are accrued (Rows 41 55) and monetized (Rows 57 58) using the same process described for the railroad crossings and traffic signals. The time savings benefits associated with the speed limit increase amount to a total non-discounted value of approximately $ million during the BCA analysis period of 2015 to Economic Savings from Reduced Fuel Consumption The proposed project would also produce economic savings from reduced fuel consumption arising from the reduction in vehicle idling. Vehicle idling would be reduced from the removal of the traffic signals and the at-grade railroad/local street crossing conflicts. These savings are calculated on the 30 Year BCA Summary tab (Rows 61 69) using the following data on the Fuel Consumption Data tab: 1. Average price of gasoline: $2.41 per gallon (D:91) 6 2. Average price of diesel fuel: $2.64 per gallon (Q:53) 7 3. Gasoline fuel consumed at idle: gallons per hour (H:6) 8 4. Diesel fuel consumed at idle: 0.65 gallons per hour (H:8) 9 Time savings in hours for passenger vehicles and trucks arising from the elimination of the at-grade railroad/local street crossing conflicts and the removal of the traffic signals were multiplied on the 30 Year BCA Summary tab by the gallons of fuel consumed per hour figures to calculate fuel savings in gallons for the years in which benefits are accrued (K:62 through AG:62 and K:67 through AG:67). These estimates were then multiplied by the average price per gallon of fuel figures, which were assigned a 2 percent annual price escalation factor. The economic savings from reduced fuel consumption amount to a total non-discounted value of $ million during the BCA analysis period. Sustainability For sustainability, benefits from reduced carbon dioxide emissions were calculated based on the time savings benefits in the Economic Competitiveness analysis. Emissions reductions per gallon of gasoline or diesel fuel saved were calculated for the years in which benefits are accrued using estimates of vehicle emissions from the US EPA in the Sustainability tab (H:5 and H:7). The emissions reduction figures were then monetized on the 30 Year BCA Summary tab (K:81 through AG:81 and K:82 through AG:82) based on the social cost of carbon values on page 7 of the TIGER and FASTLANE BCA Resource Guide. The economic savings from reduced carbon dioxide emissions amount to a total value of $38.40 million during the BCA analysis period, which is pre-discounted at 3 percent Ibid. 9

10 Safety An economic benefit of ODOT s proposed project is the reduction in fatal, injury, and property damage crashes as a result of traffic signal removal and grade separation. Crashes are often extremely costly in terms of loss of life, lost productivity due to injury, and vehicle or other property damage. To compute crash benefits associated with the proposed project, the average number of crashes on US 69/75 were calculated using data obtained from ODOT. In the BCA spreadsheet, the safety analysis calculations are found on the Safety-Severity and Safety-Monetized Benefits tabs. The average crash rate was calculated on the Safety-Severity tab for five consecutive years between 2010 and 2014 (M:13 through Q:13), the latest years complete data were available. Vehicle miles traveled (VMT) values were calculated using the project length and average daily vehicle data obtained from ODOT. Using the five year average number of crashes and the VMT, the accident rates were calculated for the existing US 69/75 project area between Chickasaw Road to US 70. The five year average crash rates per 100 million vehicle-miles traveled are: 1. Property Damage Only (PDO) Non-Incapacitating Injury Incapacitating Injury Fatal Total To compare the beneficial crash reductions of the project, the estimated 2044 crashes for the project area if the project is not constructed and if the project is constructed were calculated. The estimated number and severity of crashes for the project at completion and a no build condition were calculated based on the estimated change in vehicle miles traveled and the change in roadway type to a controlled access facility. On the Safety-Severity tab, the existing crash rates above were used for the no-build estimates with the 2044 volume projections (Table A:22). The estimated crash rate for the build condition used the existing crash rate for a similar section (a full access controlled highway) of US 69/75 in Pittsburg County (Table A:33). The estimated crashes were calculated using the 2044 VMT and the crash rates for the comparable US 69/75 segment. The total crash rate for this comparable segment of US 69/75 is (fatality rate 0.80, visible injury 7.60, and property damage only 28.54) per 100 million vehicle miles traveled. The visible injury rate was divided into possible injuries and incapacitating injuries using the existing ratio of these crash severity types. The year by year crash reductions by severity category are shown on the Safety-Crash Valuation tab (B:27 through AI:32). The crash reduction is a result of the improved facility type. To monetize the crash savings, the total costs associated with each type of accident were obtained from the TIGER and FASTLANE BCA Resource Guide, which uses the Abbreviated Injury Scale (AIS). The TIGER and FASTLANE BCA Resource Guide also provided the conversion factors, methodology to convert the available project crash data into seven crash severity tiers of the AIS, and monetized values for the seven severity tiers, which appear on the Safety-Crash Valuation tab (A:37 to C:77). The total costs ranged from $9.6 million for a fatal crash to $28,800 for an AIS 1 minor injury crash. 10

11 The monetized costs for each AIS crash severity category are shown on the Safety-Crash Valuation tab (A:81 to AI:93). The results of the analysis were transferred to the 30 Year BCA Summary tab for the years in which benefits are accrued (Rows 89 97). The safety benefits associated with the project include the following: 1. 1,970 total vehicle crashes avoided during the BCA analysis period, which includes 46 fatalities (K:88 through AH:92), and 2. Total non-discounted value of $ million during the BCA analysis period. Quality of Life Improvements There are several qualitative benefits related to the US 69/75 Controlled Access Highway and Grade Separations project which would significantly impact the quality of life for residents of the Town of Calera. Currently Calera is a community divided by US 69/75 infrastructure as well as Union Pacific Railroad s single track corridor. The majority of the residents and commercial enterprises are located on the west side of US 69/75, with 90 of the city s 116 developed city blocks located on the west side of the thoroughfare. It is noteworthy to point out that two subdivisions east of Calera city limits were developed in 2006 and are the equivalent of six city blocks. One of the most significant improvements to the community related to the US 69/75 Controlled Access Highway and Grade Separations project is the McKennon Road and Union Pacific Railroad overpass. The benefits of this section of the project will include: 1. Provide an alternative route for 11,700 daily vehicle trips which currently transit across and onto US 69/ The overpass will give drivers options to reach both sides of the community without directly crossing the rail or highway. 2. Provide an alternate route for two of four school bus routes which cross US 69/75 each day for 180 school days per year. 3. Provide continuous access for EMS and law enforcement to reach both sides of the community without negotiating through traffic signals or potential railroad crossing blockages. An overpass at the intersection of US 69/75 and Choctaw Road will also provide significant access improvements. These include: 1. Improved access to Eaker Field in Durant the local airport which provides air ambulance activity on the regular basis for trauma and critically ill patients. 2. Improved access to the Oklahoma National Guard armory in Durant. This facility is home to the 1st Squadron of the 180th Cavalry Regiment, 45th Infantry Brigade Combat Team. Additional benefits to the Town of Calera include ease of access to the community via the frontage roads. One advantage of frontage roads is to separate local traffic from through traffic. Another advantage occurs when the highway is closed or obstructed. This pushes traffic off the highway. 10 Based on ODOT traffic count data for the project area from September

12 Where an urban area has no frontage road, traffic congests local roads searching for that elusive passage around the obstruction or closure, since there is no formal (frontage road) alternative. Finally, improvements generated by the project will ease Native American resident s commutes to work at the Choctaw Casino Resort and other Choctaw Nation employment centers. According to U.S. Census Bureau data, 13.5 percent of the residents of Bryan County, OK are Native American. Costs Costs associated with ODOT s project include the following: 1. Pre-construction costs 2. Construction costs 3. Annual maintenance costs 4. Vehicle delay during construction. Data sources for these costs, or the methodologies used to calculate them, are described below. Pre-Construction Costs ODOT provided costs for surveying, engineering, and environmental studies, as well as right-of-way and utilities work that would need to be completed in 2019 prior to construction. These costs are shown on the 30 Year BCA Summary tab and amount to a total non-discounted value of $10.75 million (AH:125) during the BCA analysis period. Construction Costs ODOT provided costs for construction, which would occur begin during the summer of 2019 and finish in the fall of These costs are shown on the 30 Year BCA Summary tab and amount to a total non-discounted value of $ million (AH:126). Annual Maintenance Costs ODOT estimates that annual maintenance costs for the proposed project will be $22,000 per centerline mile for the 4.2-mile section of highway. Maintenance projects would include bridge preventative maintenance and roadway repair. Multiplying $22,000 by 4.2 miles yields a total annual cost of $92,400, presented on the 30 Year BCA Summary tab (B:129). The annual maintenance costs amount to a total non-discounted value of $2.13 million (AH:129) during the BCA analysis period. Vehicle Delay During Construction ODOT s proposed project will create vehicle delay during the construction phase. Calculations of this delay are found on the Segment 1-Construct Delay, Segment 2-Construct Delay, Segment 3- Construct Delay, Segment 4-Construct Delay, and Segment 5-Construct Delay tabs in the BCA spreadsheet. The methodology for calculating vehicle delay during project construction is essentially the same as the methodology used for the analysis of the speed limit increase. Therefore, please refer to that section for a discussion of the methodology for calculating vehicle delay during construction. The only difference is that the spreadsheet analysis of vehicle delay during construction calculates travel time savings for a speed limit increase from 30 miles per hour to 55 miles per hour, and considers the time savings on the Segment 1-Construct Delay, Segment 2-Construct Delay, 12

13 Segment 3-Construct Delay, Segment 4-Construct Delay, and Segment 5-Construct Delay tabs as costs on the 30 Year BCA Summary tab to show that traffic will be moving at an average of 30 miles per hour (rather than 55 miles per hour) through the corridor. The results of the analysis were transferred to the 30 Year BCA Summary tab for the years during which construction is in progress (Rows ) and monetized (Rows ) using the same process described for the railroad crossings, traffic signals, and speed limit increase. The vehicle delay costs associated with the reduced speed in construction zones amount to a total non-discounted value of $30.38 million during the BCA analysis period. BCA Results Table 1 presents the results of the BCA, expressed in terms of net present value (NPV) and benefitcost ratio (BCR), using a discount rate of 7 percent. NPV is calculated as follows: A BCR is calculated as follows: Benefits Costs = NPV Benefits Costs = BCR Table 1 BCA Results Benefits with 7% Discount Rate $1,233,397,000 Costs with 7% Discount Rate $106,514,000 NPV $1,126,883,000 BCR Source: CDM Smith As shown in Table 1, the BCA achieves an NPV of $1.13 billion and a BCR of

U.S. 81 Realignment Around Chickasha, Oklahoma Benefit-Cost Analysis Narrative

U.S. 81 Realignment Around Chickasha, Oklahoma Benefit-Cost Analysis Narrative U.S. 81 Realignment Around Chickasha, Oklahoma Benefit-Cost Analysis Narrative Introduction U.S. 81 is part of the National Highway System. It runs north-south, from Texas to the Canadian border and passes

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT April 2016 I. COST-EFFECTIVENESS ANALYSIS A Benefit-Cost Analysis (BCA) was conducted in conformance

More information

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis prepared for Kansas City, Missouri prepared by Burns & McDonnell

More information

Benefit Cost Analysis

Benefit Cost Analysis Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance with the

More information

US 377 Relief Route Appendix C: Benefit Cost Analysis

US 377 Relief Route Appendix C: Benefit Cost Analysis US 377 Relief Route Appendix C: Benefit Cost Analysis TIGER FY17 Grant Application October 2017 Table of Contents 1.0 Executive Summary... 1 2.0 Purpose... 8 3.0 Benefits and Disbenefits... 8 3.1 Detours

More information

Benefit-Cost Analysis Technical Memo

Benefit-Cost Analysis Technical Memo I-40 Douglas Boulevard Interchange Reconstruction and Related Widening Oklahoma County, OKLAHOMA INFRA Grant Application Benefit-Cost Analysis Technical Memo November 2017 Submitted by: Oklahoma Department

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Bella Vista Bypass Benefit Cost Analysis

Bella Vista Bypass Benefit Cost Analysis Bella Vista Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

3.17 Energy Resources

3.17 Energy Resources 3.17 Energy Resources 3.17.1 Introduction This section characterizes energy resources, usage associated with the proposed Expo Phase 2 project, and the net energy demand associated with changes to the

More information

Road User Cost Analysis

Road User Cost Analysis Road User Cost Analysis I-45 Gulf Freeway at Beltway 8 Interchange CSJ #500-03-382 1994 Texas Transportation Institute ROAD USER COST ANALYSIS CSJ #500-03-382 The Texas Department of Transportation (TxDOT)

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

Central Park Drives Traffic Management Overview

Central Park Drives Traffic Management Overview Central Park Drives Traffic Management Overview Spring 2015 New York City Department of Transportation Existing Traffic Management From Labor Day thru Last Day of NYC Public School: 8-10 AM weekdays (Southbound)

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT

2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT 2 VALUE PROPOSITION The purpose of the Value Proposition is to define a number of metrics or interesting facts that clearly demonstrate the value of the existing Xpress system to external audiences including

More information

Purpose and Need Report

Purpose and Need Report Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental

More information

Railroad Impact Study

Railroad Impact Study Railroad Impact Study Ryan Huebschman, PE, PTOE Jason O Neill November 21, 2016 Study Impetus CSXT to lease and improve rail line between Louisville and Indianapolis Rail improvements will allow CSXT to

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

BCA Benefits and Assumptions Summary

BCA Benefits and Assumptions Summary 2016 TIGER Application - Plymouth Multimodal BCA Benefits and Assumptions Summary The Plymouth Multimodal generates a variety of benefits, ranging from monetary such as increased transit fare revenue,

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Port of South Louisiana. Benefit Cost Analysis. Globalplex Intermodal Efficiency Improvements Project

Port of South Louisiana. Benefit Cost Analysis. Globalplex Intermodal Efficiency Improvements Project October 2017 Port of South Louisiana Benefit Cost Analysis Globalplex Intermodal Efficiency Improvements TIGER IX Grant Cost-Benefit Analysis in Support of the Globalplex Intermodal Efficiency Improvements

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY APPENDIX 1 DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY INTRODUCTION: This Appendix presents a general description of the analysis method used in forecasting

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

Performance Measure Summary - Oklahoma City OK. Performance Measures and Definition of Terms

Performance Measure Summary - Oklahoma City OK. Performance Measures and Definition of Terms Performance Measure Summary - Oklahoma City OK There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7.

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. 6.7 TRAFFIC 6.7.1 Affected Environment Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. Local Transportation System The proposed Dillingham Trail

More information

Public Transportation Problems and Solutions in the Historical Center of Quito

Public Transportation Problems and Solutions in the Historical Center of Quito TRANSPORTATION RESEARCH RECORD 1266 205 Public Transportation Problems and Solutions in the Historical Center of Quito JACOB GREENSTEIN, Lours BERGER, AND AMIRAM STRULOV Quito, the capital of Ecuador,

More information

Request for Design Exception (#1) S.M. Wright Phase IIB

Request for Design Exception (#1) S.M. Wright Phase IIB Request for Design Exception (#1) S.M. Wright Phase IIB County: Dallas CSJ s: 0092-01-059, 0092-14-088 Project Limits: From Pennsylvania Avenue to North of Al Lipscomb Way Date: June 28, 2016 Proposed

More information

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015 Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections Prepared by Texas A&M Transportation Institute August 2015 This memo documents the analysis

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

Facts and Figures. October 2006 List Release Special Edition BWC National Benefits and Related Facts October, 2006 (Previous Versions Obsolete)

Facts and Figures. October 2006 List Release Special Edition BWC National Benefits and Related Facts October, 2006 (Previous Versions Obsolete) Facts and Figures Date October 2006 List Release Special Edition BWC National Benefits and Related Facts October, 2006 (Previous Versions Obsolete) Best Workplaces for Commuters - Environmental and Energy

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Metropolitan Freeway System 2007 Congestion Report

Metropolitan Freeway System 2007 Congestion Report Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

TIGER VI Discretionary Grant Program. Project Name: Highway 67 Interchange

TIGER VI Discretionary Grant Program. Project Name: Highway 67 Interchange Department of Transportation s National Infrastructure Investments under the Consolidated Appropriations Act, 2014 TIGER VI Discretionary Grant Program Project Name: Highway 67 Interchange Project Location:

More information

Simulating Trucks in CORSIM

Simulating Trucks in CORSIM Simulating Trucks in CORSIM Minnesota Department of Transportation September 13, 2004 Simulating Trucks in CORSIM. Table of Contents 1.0 Overview... 3 2.0 Acquiring Truck Count Information... 5 3.0 Data

More information

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Annie Nam Southern California Association of Governments September 24, 2012 The Goods Movement

More information

11 October 12, 2011 Public Hearing APPLICANT:

11 October 12, 2011 Public Hearing APPLICANT: 11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /

More information

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting PORTS-TO-PLAINS Corridor Planning Stakeholder Workshop - Agenda 1 Purpose of Stakeholder Workshops 3 2 Rural Transportation System Overview 4 3 Ports-to-Plains 8 4 5 6 7 I-27 Expansion Key Considerations

More information

F:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter

F:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter F:\PROJ\55211014\dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/2002 03:22:17 PM, saamhu, Acrobat PDFWriter MERRIFIELD RIVER CROSSING METHOD OF CHANGE FROM ID# ISSUES MEASUREMENT UNITS VALUE BASE CONDITIONS

More information

Appendix A: Executive Summary of the Benefit-Cost Analysis for Glacier Rail Park/Kalispell Core Area Development and Trail Project Table of Contents

Appendix A: Executive Summary of the Benefit-Cost Analysis for Glacier Rail Park/Kalispell Core Area Development and Trail Project Table of Contents P a g e 1 Appendix A: Executive Summary of the Benefit-Cost Analysis for Glacier Rail Park/Kalispell Core Area Development and Trail Project Table of Contents Summary and Findings... 3 Introduction...

More information

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7.

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. 6.7 TRAFFIC 6.7.1 Affected Environment Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. Local Transportation System The proposed Dillingham Trail

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

CHAPTER 7: EMISSION FACTORS/MOVES MODEL

CHAPTER 7: EMISSION FACTORS/MOVES MODEL CHAPTER 7: EMISSION FACTORS/MOVES MODEL 7.1 Overview This chapter discusses development of the regional motor vehicle emissions analysis for the North Central Texas nonattainment area, including all key

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

Performance Measures and Definition of Terms

Performance Measures and Definition of Terms Performance Measure Summary - All 471 Areas Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Troost Corridor Transit Study

Troost Corridor Transit Study Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit

More information

TAP PHASE 3.2 EXECUTIVE SUMMARY

TAP PHASE 3.2 EXECUTIVE SUMMARY TAP PHASE 3.2 EXECUTIVE SUMMARY Introduction In 2002 the North Central Texas Council of Governments (NCTCOG) launched the Thoroughfare Assessment Program (TAP), the goal of which has been to reduce vehicular

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

A IR Q UALITY A PPENDIX

A IR Q UALITY A PPENDIX A P P E N D I X B A IR Q UALITY A PPENDIX... CO EWP Petaluma East Washington Place, Petaluma CARBON MONOXIDE ANALYSIS PM Peak Hour Assumes worst case of all intersections based on total volume, LOS and

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

MPO Staff Report Technical Advisory Committee: July 12, 2017

MPO Staff Report Technical Advisory Committee: July 12, 2017 MPO Staff Report Technical Advisory Committee: July 12, 2017 RECOMMENDED ACTION: 2 nd TAC Meeting with Kimley-Horn/WSB in Updating the Street/Highway Element of 2045 Metropolitan Transportation Plan. Matter

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

Missouri Seat Belt Usage Survey for 2017

Missouri Seat Belt Usage Survey for 2017 Missouri Seat Belt Usage Survey for 2017 Conducted for the Highway Safety & Traffic Division of the Missouri Department of Transportation by The Missouri Safety Center University of Central Missouri Final

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

BENEFIT COST ANALYSIS OF RANDOLPH ROAD: HIGHWAY 87 TO VAIL ROAD TIGER II GRANT APPLICATION

BENEFIT COST ANALYSIS OF RANDOLPH ROAD: HIGHWAY 87 TO VAIL ROAD TIGER II GRANT APPLICATION BENEFIT COST ANALYSIS OF RANDOLPH ROAD: HIGHWAY 87 TO VAIL ROAD TIGER II GRANT APPLICATION Prepared for: City of Coolidge, Arizona August 20, 2010 4701 Sangamore Road, Suite S240 Bethesda, MD 301.320.6900

More information

Performance Measure Summary - Louisville-Jefferson County KY-IN. Performance Measures and Definition of Terms

Performance Measure Summary - Louisville-Jefferson County KY-IN. Performance Measures and Definition of Terms Performance Measure Summary - Louisville-Jefferson County KY-IN There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information