1 Request for Design Exception (#1) S.M. Wright Phase IIB County: Dallas CSJ s: , Project Limits: From Pennsylvania Avenue to North of Al Lipscomb Way Date: June 28, 2016

2 Proposed Project The proposed S.M. Wright Phase IIB project includes improvements to IH 45 from Pennsylvania Avenue to north of Al Lipscomb Way (approximately 1 mile). The existing interchange between IH 45, S.M. Wright, Cesar Chavez Boulevard, and Good Latimer Expressway would be reconfigured under the proposed improvements, and the existing IH 45 frontage roads would be extended to Martin Luther King Jr. Boulevard (MLK). The existing ramps connecting IH 45 to MLK would be relocated to connect to the proposed MLK/frontage road intersection. Additional improvements to IH 45 include a northbound exit ramp to Al Lipscomb Way and a southbound entrance ramp from Al Lipscomb Way. To provide auxiliary lanes between the proposed ramps, the existing IH 45 bridge would be widened in both directions near the MLK overpass. The S.M. Wright Phase IIB project also proposes improvements to S.M. Wright for approximately 0.5 miles, from Pennsylvania Avenue to north of Al Lipscomb Way. The proposed project would connect S.M. Wright directly to Cesar Chavez Boulevard. Additionally, the existing S.M. Wright underpass of MLK would be converted to an at-grade signalized intersection. The connection between Edgewood St. and Good Latimer Expressway would also be eliminated. Similarly, Colonial Avenue would be reconfigured at the proposed southbound IH 45 frontage road/pennsylvania Avenue intersection. For a general location map of the proposed project, see Figure 1. Figure 1 - Project Location Map 2

3 Justification 1. *What are the minimum design values that cannot be attained? The 12-foot lane widths on IH 45 cannot be obtained. A minimum inside shoulder width of 10-feet on IH 45 cannot be obtained. A previous design exception (Appendix A) was requested and approved in 2012 for these design values which will be constructed as part of the SM Wright Phase I project. These widths will be existing conditions that will be unaffected by the SM Wright Phase IIB project. A technical memorandum (Appendix B) was developed to document minor revisions to the design exception after it had previously been approved. FHWA provided an approval letter (Appendix C) to document final approval of the SM Wright Phase I Design Exception. 2. Why can the minimum design values not be attained? The inside shoulder width and lane widths are existing conditions that will be constructed as part of the SM Wright Phase I project, currently under construction. These will remain in place upstream, adjacent to, and downstream of the proposed improvements associated with the SM Wright Phase IIB project. 3. What are the values that can be attained by the proposed design? Existing lane widths of 11 and an existing inside shoulder width of 2 will be maintained by the proposed design. 4. What is the accident history at this location? An accident analysis was conducted on IH 45 for the limits of the requested design exception. IH 45 Accident Analysis Within the Limits of the Requested Design Exception Crash data from 2010 through 2015 was analysed along IH 45 within the limits of the design exception, which is from Pennsylvania Avenue to South Boulevard (mile points ). Table 1 below summarizes this data. Year Table 1 - Accidents Summary by Year along IH 45 within Limits of Design Exception Total Crashes Non- Serious / Serious * 2+ Vehicles (Rear End) 2+ Vehicles (Angle/Sdswipe) 1 Vehicle (Fixed Object) 1 Vehicle (Pedestrian) Veh. Mil. Traveled (100 Mil VMT) Crash Rate (per 100 Mil VMT) / / / / / / Average / * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes 3

4 Table 1 shows the ratio of serious to non-serious accidents, summarizes the accidents by type, gives the vehicle miles traveled, and analyzes crash rate for accidents along IH 45 between 2010 and The crash data recorded 19 accidents over the 6-year period of recordings along IH 45. A breakdown of accident type shows that 47% of these accidents consisted of 2+ vehicles in a rear end type collision, 21% consisted of 2+ vehicles in an angle/sideswipe collision, 32% consisted of 1 vehicle in a collision with a fixed object, and 0% consisted of 1 vehicle in a collision with a pedestrian. Of these 19 total recorded accidents, 89% (17 accidents) were considered non-serious while 11% (2 accidents) were considered serious. The accidents along IH 45 within the limits of the design exception were also analysed by day of the week. The results are shown in Table 2 below. The data shows accidents along IH 45 were spread fairly evenly throughout the week. Wednesday recorded the fewest accidents with 1 accident (5%) over the 6 year period while Tuesday and Thursday recorded the most accidents with 4 total accidents (21%). Table 2 - Accidents Summary by Day of Week along IH 45 within Limits of Design Exception Day Total Crashes Non-Serious / Serious * 2+ Vehicles (Rear End) 2+ Vehicles (Angle/Sdswipe) 1 Vehicle (Fixed Object) 1 Vehicle (Pedestrian) Monday 2 2/ Tuesday 4 4/ Wednesday 1 1/ Thursday 4 3/ Friday 3 3/ Saturday 2 2/ Sunday 3 2/ Total 19 17/ * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. IH 45 Accident Analysis Comparative Data Texas statewide traffic crash rates for urban interstates have been provided in Table 3 below for the comparative years of 2010 through Based on this data, the 6-year average crash rate for an urban interstate in Texas is crashes per 100 million vehicle miles travelled. The accident summary along IH 45 within the limits of the design exception recorded an average crash rate of crashes per 100 million vehicle miles travelled, which is approximately 62% lower than the Texas statewide average over the same time period. 4

5 Table 3 - Statewide Traffic Crash Rates for Urban Interstates Year Traffic Crashes per 100 Mil VMT Average A Texas Roadway Safety Design (TRSD) analysis was performed on IH 45 to predict the number of expected crashes based on the proposed roadway geometry as compared to standard roadway geometry that meets or exceeds minimum design criteria. The TRSD results, provided in Appendix D, predicted approximately serious crashes per year for design year 2040 on IH 45 within the limits of the design exception (for 11 lanes and 2 inside shoulder). The same software predicted approximately serious crashes per year for 2040 on a facility that maintained 12 lanes and a 10 inside shoulder. The results show an increase of approximately 3.37 predicted serious crashes per year for the reduced lane and inside shoulder widths on IH Brief description of alternatives considered and the reasons for eliminating each alternative. Several alternatives regarding the reconstruction or widening of IH 45 were developed and evaluated during the SM Wright Phase I project. These alternatives are listed below: Build Alternative #1 Widen and Maintain the Existing Alignment An alternative of maintaining the existing mainlane alignment, pavement, and bridges along with outside widening was considered. This alternative would provide four 12-foot lanes (each direction) and 10-foot inside and outside shoulders. Widening about the centerline of IH 45 would require additional ROW and impact properties located within the Colonial Hill Historic District east of IH 45. As discussed above, this historic district is listed on the National Register of Historic Places and is considered a 4(f) resource. North of Pennsylvania Avenue, IH 45 is entirely on bridge. Outside widening of the existing bridge would require a design exception for minimum vertical clearance at 4 overpass locations between Pennsylvania Avenue and South Boulevard. Harwood Street would need to be realigned to fit between the extensions of existing bent locations. Widening the existing IH 45 bridge north of Pennsylvania Avenue would also require reconstructing the existing northbound entrance from S.M. Wright Freeway. This alternative was eliminated due to the potential ROW impacts and environmental constraints associated with the Colonial Hill Historic District. 5

6 Build Alternative #2 Widen and Reconstruct IH 45 on New Alignment In order to not impact the historic district, IH 45 would need to be widened to the west side from Lamar Street to north of Pennsylvania Avenue. This westerly widening would require complete reconstruction of the mainlanes, southbound frontage road, ramps, and a pedestrian bridge since the existing alignment would no longer be maintained. West of IH 45, it would require the acquisition of ROW from residences, businesses, and potentially a school as well as displace structures on some of these properties. North of the Pennsylvania Avenue overpass, the existing alignment could be maintained. However, maintaining desirable minimum vertical clearances over under passing roadways would require reconstructing the mainlane bridges and raising the profile from Pennsylvania Avenue to south of the existing S.M. Wright interchange. This alternative would require a substantial increase in the construction cost when compared with the proposed design. Due to existing funding constraints, this additional cost could indefinitely delay construction of the S.M. Wright project proposed improvements. No Build Alternative The Metropolitan Transportation Plan (MTP): Mobility 2035 is the current long-range transportation plan for the Dallas-Fort Worth Area. FHWA has determined that this plan meets all requirements for making a joint conformity determination under the Clean Air Act Amendments of Improvements associated with the S.M. Wright project are included in the Mobility 2035 plan and are scheduled to be open to traffic before A no build alternative was considered but was eliminated as it fails to comply with Mobility 2035 plan. The no build alternative does not address safety concerns associated with the existing US 175 geometry and does not address decisions and concerns expressed by the public and local policy makers. 6. What are the percentage and total dollar difference between the proposed construction cost and the cost of construction necessary to obtain minimum values? The proposed construction cost for the IH 45 improvements of SM Wright Phase IIB are approximately $23 million. As discussed in the SM Wright Phase I Design Exception, the construction cost to maintain minimum design values would cost an additional $37 million (excluding ROW, utility relocation and engineering costs). The cost difference to meet the minimum desired lane widths and shoulder widths would result in an approximate increase of 161% to the IH 45 construction costs. 7. Does the design conform with adjacent roadway sections? The limits of this design exception, which are existing conditions, extend beyond the limits of this project; therefore, the design does conform with adjacent roadway sections. 8. What would be the project delay and consequences as a result of meeting the minimum values? There is a substantial cost differential to construct IH 45 to meet minimum values. Due to this large cost differential, the SM Wright Phase I project received approval for these less than desirable design values. If the SM Wright Phase IIB project had to meet the minimum values, it would likely exceed any available funding for the project. If this occurred, SM Wright Phase II is expected to be constructed as a stand-alone project without incorporating SM Wright Phase IIB. 6

7 9. Short narrative of why you feel this design exception should be approved. TxDOT is moving forward with the SM Wright Project Phase I project (currently under construction) which creates a new IH 45 / US 175 interchange approximately 1.2 miles south of the existing interchange. SM Wright Phase II has received schematic approval and environmental clearance and is expected to be constructed as soon as Phase I is completed. Phase II will reconstruct SM Wright from a controlled-access freeway between IH 45 and US 175 to a six-lane divided arterial street that will be removed from TxDOT s roadway system. The Environmental Assessment for the overall SM Wright Project (Phases I and II) received a FONSI on September 13, SM Wright Phase IIB will provide better local access connectivity and circulation in the area. The project will provide the new access ramps that were committed to by TxDOT during the previous Environmental Document (Phases I and II). The revised access points and proposed improvements are consistent with the policies and goals set forth by NCTCOG in Mobility Amendment. The proposed improvements are also incorporated in all improvement plans for TxDOT and FHWA. The proposed project is currently included in the Transportation Improvement Program for North Central Texas. The project is also supported by the City of Dallas and adjacent neighbourhoods. No other future interchanges with IH 45 are proposed within or adjacent to the study area. The proposed improvements are significant improvements to the existing no build conditions and meet the purpose of providing additional access to the area. Furthermore, the proposed improvements do not have significant impacts to the operations and safety on the interstate. Design Exceptions for the inside shoulder width and lane widths were requested and approved as part of the SM Wright Phase I project. The SM Wright Phase IIB project will not affect these existing conditions; therefore, we feel these design exceptions should be approved, as previously proposed (and approved) with the SM Wright project. 7

8 APPENDIX A SM Wright Phase I Design Exception

9 S.M. Wright Project REQUEST FOR DESIGN EXCEPTION Number 1 County: Dallas CSJ's: , , Project: S.M. Wright Project Project Limits: US 175 from east of Bexar Street to IH 45 SH 310 from north of Budd Street to US 175 IH 45 from south of Lamar Street to US 175 Proposed Project The proposed S.M. Wright Project would include constructing improvements to IH 45 from existing S.M. Wright Freeway (US 175) to south of Lamar Street (2.3 miles); S.M. Wright Freeway (US 175/SH 310) from IH 45 to north of Budd Street (2.2 miles); and C.F. Hawn Freeway (US 175) from east of Bexar Street to IH 45 (1.5 miles), which would include the construction of a new interchange with IH 45. For clarification purposes, existing US 175 is named S.M. Wright Freeway from the existing IH 45 interchange to SH 310. Existing S.M. Wright Freeway includes segments of US 175 and SH 310. Existing US 175 is named C.F. Hawn Freeway south and east of SH 310. The proposed improvements would include converting S.M. Wright Freeway from an existing six - lane freeway to a low speed, signalized six-lane urban arterial. The existing S.M. Wright ramp access at IH 45 would be maintained, and the northbound entrance ramp to IH 45 would be restriped from two lanes to one lane. The gore at the existing two lane southbound exit ramp from IH 45 to S.M. Wright would be restriped from a two lane drop on IH 45 to a one lane drop plus an optional exit to the second ramp lane. Associated improvements would include extending proposed C.F. Hawn Freeway (US 175) westerly to overpass the proposed S.M. Wright parkway and Lamar Street. The C.F. Hawn frontage roads would be extended to Lamar Street to facilitate local access. The extension of C.F. Hawn Freeway (US 175) westerly would include constructing two-lane direct connecting (DC) ramps from northwest bound C.F. Hawn Freeway (US 175) to northbound IH 45 and two-lane DC ramps from southbound IH 45 to southeast bound C.F. Hawn Freeway (US 175). Upstream of the proposed DC ramp junctions, IH 45 would be widened to the inside to allow for the addition of a transition lane. This additional lane (each direction) would serve as a transition between the proposed C.F. Hawn Freeway and the existing IH 45 five lane section north of the existing S.M. Wright interchange. From south of Martin Luther King Jr. Boulevard to Lamar Street, existing IH 45 utilizes a double sided metal beam guard fence as the median barrier. The proposed project would replace this existing barrier with a concrete traffic barrier. Providing a direct link between IH 45 and C.F. Hawn Freeway (US 175) would remove freeway/commuter traffic from the communities adjacent to the S.M. Wright corridor and would improve the neighborhood environment. The proposed improvements would also eliminate the sharp, accident-prone curve along US 175 that currently connects C.F. Hawn Freeway and S.M. Wright Freeway. Page 1 of 13

10 S.M. Wright Project Justification 1. What are the minimum design values that cannot be attained? The 12-foot lane widths on IH 45 cannot be obtained. The minimum inside shoulder width of 10-feet on IH 45 cannot be obtained. 2. Why can the minimum design values not be attained? The study portion of IH 45 was constructed in the late 1960's to early 1970's. Existing IH 45 is a 6- lane urban freeway from the southern project limits south of Lamar Street to the interchange with existing US 175 (S.M. Wright Freeway). The existing interchange between IH 45 and US 175 consists of a northbound 2-lane DC entrance ramp from US 175 and a southbound 2-lane DC exit ramp to US 175. North of the existing US 175 interchange, IH 45 is a 10-lane section (6 mainlanes/ 4 auxiliary lanes) up to the southern half of the IH 30 interchange. North of the northbound exit to IH 30 and southbound entrance from IH 30, IH 45 returns to a 6-lane section. The IH 45 mainlanes are on structure from the southern project limits to Lamar Street and from Martin Luther King Jr. Boulevard to the northern project limits. The mainlanes consist of 12-foot wide travel lanes with 10-foot wide inside and outside shoulders. Existing frontage roads are present between Lamar Street and Pennsylvania Avenue. Identified deficiencies in the current roadway configuration include insufficient weaving distance between the US 175 and IH 30 DC ramps. The existing configuration provides approximately 2,400-feet (northbound) and 1,500-feet (southbound) of weaving distance between these DC ramps. These distances are insufficient to facilitate weaving volumes between the mainlanes and DC ramps, which negatively impacts traffic operations on IH 45. The Colonial Hill Historic District is located east of IH 45, and is directly adjacent to the existing IH 45 northbound frontage road from north of Lamar Street to Pennsylvania Avenue. This historic district is listed on the National Register of Historic Places and is considered a 4(f) resource. The proposed DC ramps between C.F. Hawn Freeway (US 175) and IH 45 would connect to the IH 45 mainlanes in the vicinity of the Lamar Overpass. The addition of these DC ramps would require adding a fourth transition lane in each direction from the DC gores up to the existing S.M. Wright interchange ramp gores, a distance of approximately 7,000-feet. Widening about the centerline of IH 45 would require additional right-of-way (ROW) and impact properties located within the Colonial Hill Historic District east of IH 45. Widening about the centerline would also require vertical clearance design exceptions at multiple overpass locations. A westerly widening would avoid the historic district and increase vertical clearances, but would require significant reconstruction of the mainlanes, frontage roads, and ramps since the existing alignment would no longer be maintained. A westerly widening would also require additional ROW from residences, businesses, and a school. Reconstruction of a pedestrian bridge would also be required. This reconstruction and widening of IH 45 to utilize 12-foot travel lanes and 10-foot inside and outside shoulders would increase the project cost substantially. Due to existing funding constraints, this additional cost would indefinitely delay construction of the proposed improvements. Page 2 of 13

11 S.M. Wright Project 3. What are the values that can be attained by the proposed design? The minimum values listed below would be applicable along IH 45 for approximately 1.2 miles along the northbound mainlanes and 1.5 miles along the southbound mainlanes (from south of Lamar Street to north of the S.M. Wright interchange): A 2-foot wide inside shoulder measured from the nominal face of the median CTB to the inside lane line on IH foot wide mainlanes along IH foot wide outside shoulder along IH 45. The remainder of IH 45 within the S.M. Wright project limits would not require a design exception for lane or shoulder widths. 4. What is the accident history at this location? As previously discussed, the project would relocate the existing US 175 interchange with IH 45 further south. This would eliminate the sharp, accident-prone curve along US 175 that currently connects C.F. Hawn Freeway and S.M. Wright Freeway. It would also increase the IH 45 weaving distance between the proposed US 175 interchange and the existing IH 30 interchange. Therefore, the accident analysis of IH 45 has been broken down into two segments which include the limits of the requested design exception and the weaving segment north of the existing US 175 interchange. An analysis of US 175 at the existing connection between S.M. Wright Freeway and C.F. Hawn Freeway has also been provided. IH 45 Accident Analysis Within the Limits of the Requested Design Exception Crash data from 2007 through 2010 was analyzed along IH 45 within the limits of the design exception, which is from south of Lamar Street to north of the existing S.M. Wright interchange (mile points ). Table 1 below summarizes this data. Year Table 1 Accidents Summary by Year along IH 45 within Limits of Design Exception 2+ Veh. Mil. Non- 2+ Vehicles 1 Vehicle Crash Rate Total Vehicles 1 Vehicle Traveled Serious / (Angle/ (Fixed Crashes (Rear (Pedestrian) (100 Mil (per 100 Mil Serious * Sdswipe) Object) End) VMT) VMT) / / / / Total / Average 47 41/ * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating injury crashes. Table 1 shows the ratio of serious to non-serious accidents, summarizes the accidents by type, gives the vehicle miles traveled, and analyzes crash rate for accidents along IH 45 between 2007 and Page 3 of 13

12 S.M. Wright Project The crash data recorded 188 accidents over the 4-year period of recordings along IH 45. A breakdown of accident type shows that 30% of these accidents consisted of 2+ vehicles in a rear end type collision, 39% consisted of 2+ vehicles in an angle/sideswipe collision, 30% consisted of 1 vehicle in a collision with a fixed object, and 1% consisted of 1 vehicle in a collision with a pedestrian. Of these 188 total recorded accidents, 87% (164 accidents) were considered non-serious while 13% (24 accidents) were considered serious. The accidents along IH 45 within the limits of the design exception were also analyzed by day of week. The results are shown in Table 2 below. The data shows accidents along IH 45 were spread fairly evenly throughout the week. Thursday recorded the fewest accidents with 22 total accidents (12%) over the 4 year period while Saturday recorded the most accidents with 32 total accidents (17%). Table 2 Accidents Summary by Day of Week along IH 45 within Limits of Design Exception 1 Vehicle Total Non-Serious / 2+ Vehicles 2+ Vehicles 1 Vehicle Day (Fixed Crashes Serious * (Rear End) (Angle/Sdswipe) (Pedestrian) Object) Monday 25 21/ Tuesday 29 28/ Wednesday 27 26/ Thursday 22 19/ Friday 25 21/ Saturday 32 27/ Sunday 28 22/ Total / Average 27 23/ < 1 * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating injury crashes. In Table 3 below, the accidents along IH 45 within the limits of the design exception were analyzed by time of day. The AM and PM peak hours combined account for 6 hours (25%) of every day. These combined peak periods account for approximately 33% of total crashes, which is fairly proportionate to the time period. The severity of accidents was also fairly proportionate to the time period. The results show there was a larger proportion (41%) of rear end accidents during the peak hour time frames. Time ** Table 3 Accidents Summary by Time of Day along IH 45 within Limits of Design Exception Total Crashes Non-Serious / Serious * 2+ Vehicles (Rear End) Page 4 of Vehicles (Angle/Sdswipe) 1 Vehicle (Fixed Object) 1 Vehicle (Pedestrian) AM Peak 31 25/ PM Peak 31 28/ Off Peak / Total / * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. ** AM Peak from 6:00 AM - 9:00 AM, PM Peak from 4:00 PM - 7:00 PM

13 S.M. Wright Project IH 45 Accident Analysis Weaving Segment between the S.M. Wright and IH 30 Interchanges Crash data from 2007 through 2010 was also analyzed along 0.34 miles of IH 45 at the 10-lane weaving segment starting at the northern limit of the design exception and ending at the IH 30 DC ramps (mile points ). Table 4 below summarizes this data. Year Table 4 Accidents Summary by Year along IH 45 at 10-Lane Weaving Segment Non Veh. Mil. 2+ Vehicles Total Serious / Vehicles Vehicle 1 Vehicle Traveled (Angle/ Crashes Serious (Rear (Fixed (Pedestrian) (100 Mil Sdswipe) * End) Object) VMT) Crash Rate (per 100 Mil VMT) / / / / Total 57 48/ Average 14 12/ < * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. The crash data recorded 57 accidents over the 4-year period of recordings along the weaving segment of IH 45. A breakdown of accident type shows that 21% of these accidents consisted of 2+ vehicles in a rear end type collision, 53% consisted of 2+ vehicles in an angle/sideswipe collision, 25% consisted of 1 vehicle in a collision with a fixed object, and 1% consisted of 1 vehicle in a collision with a pedestrian. This weaving segment of IH 45 has a higher percentage of sideswipe/angle collision when compared to the existing 6-lane segment within the design exception limits. Of the 57 total recorded accidents, 84% (48 accidents) were considered non-serious while 16% (9 accidents) were considered serious. The accident summary along IH 45 within the 10-lane weaving segment recorded an average crash rate of crashes per 100 million vehicle miles traveled. This relatively low crash rate is a result of the approximate 68,000 average daily traffic (ADT) that is added to IH 45 between the IH 30 and US 175 interchanges. This additional traffic between these two interchanges increases the IH 45 mainlane volumes to an approximately 139,000 ADT average over the 4-year analysis period within a relatively short analysis length of 0.34 miles. The accidents along IH 45 the 10-lane weaving segment were also analyzed by day of week. The results are shown in Table 5 below. The data shows a noticeably higher number of accidents for Friday and Saturday when compared to the remaining weekdays. Friday and Saturday combined accounted for 47% of the total accidents recorded in the 4-year period. Page 5 of 13

14 S.M. Wright Project Table 5 Accidents Summary by Day of Week along IH 45 at 10-Lane Weaving Segment Day Total Crashes Non-Serious / Serious * 2+ Vehicles (Rear End) 2+ Vehicles (Angle/Sdswipe) 1 Vehicle (Fixed Object) 1 Vehicle (Pedestrian) Monday 8 6/ Tuesday 5 4/ Wednesday 5 5/ Thursday 7 6/ Friday 16 13/ Saturday 11 9/ Sunday 5 5/ Total 57 48/ Average 8 7/ < 1 * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. In Table 6 below, the accidents along the IH lane weaving segment were also analyzed by time of day. The results show the number of accidents was spread fairly evenly throughout the day; however, the severity of accidents fluctuated. The results show there were no serious accidents during the peak hour time frames while there were 9 serious accidents during the off-peak hour time frames. The severity of accidents is often relative to the speed of the vehicles in the accidents. With the large amount of traffic in this weaving segment, traffic is often congested during the peak hours resulting in lower speeds. These lower speeds during the peak hours could result in more non-serious accidents and fewer serious accidents. Table 6 Accidents Summary by Time of Day along IH 45 at 10-Lane Weaving Segment Time ** Total Crashes Non-Serious / Serious * 2+ Vehicles (Rear End) 2+ Vehicles (Angle/Sdswipe) 1 Vehicle (Fixed Object) 1 Vehicle (Pedestrian) AM Peak 7 7/ PM Peak 8 8/ Off Peak 42 33/ Total 57 48/ * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. ** AM Peak from 6:00 AM - 9:00 AM, PM Peak from 4:00 PM - 7:00 PM IH 45 Accident Analysis Comparative Data Texas statewide traffic crash rates for urban interstates have been provided in Table 7 below for the comparative years of 2007 through Based on this data, the 4-year average crash rate for an urban interstate in Texas is crashes per 100 million vehicle miles traveled. The accident summary Page 6 of 13

15 S.M. Wright Project along IH 45 within the limits of the design exception recorded an average crash rate of crashes per 100 million vehicle miles traveled, which is approximately 17% higher than the Texas statewide average over the same time period. The 10-lane weaving segment between the existing IH 30 and S.M. Wright interchanges recorded an average crash rate of crashes per 100 million vehicle miles traveled, which is approximately 19% lower than the Texas statewide average over the same time period. Table 7 Texas Statewide Traffic Crash Rates for Urban Interstates Year Traffic Crashes per 100 Mil VMT Average A Texas Roadway Safety Design (TRSD) analysis was performed on IH 45 to predict the number of expected crashes based on the existing roadway geometry and to establish a baseline for the expected safety performance of existing IH 45 within the study limits. As shown in Table 8 below, the TRSD analysis predicted the 6-lane segment of IH 45 within the limits of the design exception would have approximately 17 serious crashes per year and the 10-lane weaving segment of IH 45 would have approximately 3 serious crashes per year. The accident data from 2007 to 2010 recorded an average of 6 accidents per year on the 6-lane segment of IH 45 within the limits of the design exception and an average of 2.25 serious accidents per year on the 10-lane weaving segment of IH 45. Both values are less than the predicted number of crashes from the TRSD Analysis. Table 8 TRSD Analysis for Serious Crashes IH 45 Segment Predicted # of Serious Crashes 6-Lane Segment (Design Exception Limits) Lane Weaving Segment 2.91 US 175 Accident Analysis Existing C.F. Hawn Freeway and S.M. Wright Freeway Interchange As previously discussed, the proposed improvements would realign US 175 westerly to construct a new interchange with IH 45. This realignment would in turn remove the 90 degree bend in the US 175 alignment that currently connects the C.F. Hawn Freeway segment of US 175 to the S.M. Wright Freeway segment of US 175. Crash data from 2007 through 2010 was also analyzed on US 175 within the limits of the existing S.M. Wright / C.F. Hawn interchange, which includes the 90 degree bend in mainlane alignment up to the connection between the two roadways (approximately 0.23 miles). The results are shown below in Table 9. Page 7 of 13

16 S.M. Wright Project Year Table 9 Accidents Summary by Year within the existing S.M. Wright/C.F. Hawn Interchange Non Veh. Mil. Crash 2+ Vehicles Total Serious / Vehicles Vehicle 1 Vehicle Traveled Rate (Angle/ Crashes Serious (Rear (Fixed (Pedestrian) (100 Mil (per 100 Sdswipe) * End) Object) VMT) Mil VMT) / / / / Total 42 33/ Average 11 8/ < * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. The accident summary recorded a total of 42 accidents over the 4-year recording period and an average crash rate of crashes per 100 million vehicle miles traveled on US 175 within the limits of the existing S.M. Wright / C.F. Hawn interchange. The analysis shows that every year for the analysis period the crash rate has increased by an average of crashes per 100 million vehicle miles travelled within the limits of the S.M. Wright and C.F. Hawn interchange, with a 2010 crash rate of crashes per 100 million vehicle miles travelled in The analysis also shows that: 21% of the accidents consisted of 2+ vehicles in a rear end type collision; 36% of the accidents consisted of 2+ vehicles in an angle/sideswipe collision; 38% of the accidents consisted of 1 vehicle in a collision with a fixed object; and 5% of the accidents consisted of 1 vehicle in a collision with a pedestrian. Of these 42 total accidents, 79% were considered non-serious while 21% were considered serious. Table 10 below analyzes the accidents within the existing S.M. Wright / C.F. Hawn interchange by day of week. The data shows a marked increase in overall accidents, rear end accidents, and angle/sideswipe accidents on Wednesdays, Thursdays, and Fridays. Table 10 Accidents Summary by Day of Week within the existing S.M. Wright/C.F. Hawn Interchange Day Total Crashes Non-Serious / Serious * 2+ Vehicles (Rear End) 2+ Vehicles (Angle/Sdswipe) 1 Vehicle (Fixed Object) 1 Vehicle (Pedestrian) Monday 4 3/ Tuesday 4 3/ Wednesday 12 9/ Thursday 9 9/ Friday 7 5/ Saturday 3 2/ Sunday 3 2/ Total 42 33/ Average 6 5/ < 1 * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. Page 8 of 13

17 S.M. Wright Project Table 11 below analyzes the accidents within the existing S.M. Wright / C.F. Hawn interchange by time of day. The AM and PM peak hours combined account for 6 hours (25%) of every day. These combined peak periods account for approximately 33% of total crashes, which is fairly proportionate to the time period. The severity of accidents was also fairly proportionate to the time period. The results show there was a disproportionate amount of rear end accidents (67%) and angle/sideswipe accidents (40%) during the peak hour time frames. This could be representative of congested conditions that occur in the vicinity of the interchange during peak periods. For the off peak hour time frame, there was a disproportionate amount of 1 vehicle fixed object accidents (94%). This could be representative of vehicle traveling in non-congested, time periods at a rate of speed that is too high to safely traverse the 90 degree bend in the alignment. Table 11 Accidents Summary by Tim of Day within the existing S.M. Wright/C.F. Hawn Interchange Non- Total 2+ Vehicles 2+ Vehicles 1 Vehicle 1 Vehicle Time ** Serious / Crashes (Rear End) (Angle/Sdswipe) (Fixed Object) (Pedestrian) Serious * AM Peak 6 5/ PM Peak 8 7/ Off Peak 28 21/ Total 42 33/ * Non-serious crashes include possibly injury, non-injury, and no information crashes. Serious crashes include fatal, incapacitating, and non-incapacitating crashes. ** AM Peak from 6:00 AM - 9:00 AM, PM Peak from 4:00 PM - 7:00 PM 5. Brief description of alternatives considered and the reasons for eliminating each alternative. Build Alternative #1 Widen and Maintain the Existing Alignment An alternative of maintaining the existing mainlane alignment, pavement, and bridges along with outside widening was considered. This alternative would provide four 12-foot lanes (each direction) and 10-foot inside and outside shoulders. Widening about the centerline of IH 45 would require additional ROW and impact properties located within the Colonial Hill Historic District east of IH 45. As discussed above, this historic district is listed on the National Register of Historic Places and is considered a 4(f) resource. North of Pennsylvania Avenue, IH 45 is entirely on bridge. Outside widening of the existing bridge would require a design exception for minimum vertical clearance at 4 overpass locations between Pennsylvania Avenue and South Boulevard. Harwood Street would need to be realigned to fit between the extensions of existing bent locations. Widening the existing IH 45 bridge north of Pennsylvania Avenue would also require reconstructing the existing northbound entrance from S.M. Wright Freeway. This alternative was eliminated due to the potential ROW impacts and environmental constraints associated with the Colonial Hill Historic District. Build Alternative #2 Widen and Reconstruct IH 45 on New Alignment In order to not impact the historic district, IH 45 would need to be widened to the west side from Lamar Street to north of Pennsylvania Avenue. This westerly widening would require complete reconstruction of the mainlanes, southbound frontage road, ramps, and a pedestrian bridge since the existing alignment would no longer be maintained. West of IH 45, it would require the acquisition Page 9 of 13

18 S.M. Wright Project of ROW from residences, businesses, and potentially a school as well as displace structures on some of these properties. North of the Pennsylvania Avenue overpass, the existing alignment could be maintained. However, maintaining desirable minimum vertical clearances over under passing roadways would require reconstructing the mainlane bridges and raising the profile from Pennsylvania Avenue to south of the existing S.M. Wright interchange. This alternative would require a substantial increase in the construction cost when compared with the proposed design. Due to existing funding constraints, this additional cost could indefinitely delay construction of the S.M. Wright project proposed improvements. No Build Alternative The Metropolitan Transportation Plan (MTP): Mobility 2035 is the current long-range transportation plan for the Dallas-Fort Worth Area. FHWA has determined that this plan meets all requirements for making a joint conformity determination under the Clean Air Act Amendments of Improvements associated with the S.M. Wright project are included in the Mobility 2035 plan and are scheduled to be open to traffic before A no build alternative was considered but was eliminated as it fails to comply with Mobility 2035 plan. The no build alternative does not address safety concerns associated with the existing US 175 geometry and does not address decisions and concerns expressed by the public and local policy makers. 6. What are the percentage and total dollar difference between the proposed construction cost and the cost of construction necessary to obtain minimum values? The proposed construction cost for the IH 45 improvements associated with the S.M. Wright project is approximately $17 million. The construction cost for alternative #2 which would maintain minimum design values would cost approximately $54 million (excluding ROW, utility relocation, and engineering costs). This cost difference of $37 million to meet the minimum desired lane widths and shoulder widths would result in an approximate increase of 218% to the IH 45 construction costs and an increase of approximately 31% to the total project construction costs ($119 million). 7. Does this design conform with adjacent roadway sections? The sections of IH 45 adjacent to the proposed project maintain 12-foot mainlanes and 10-foot inside and outside shoulders, which differs from the proposed 11-foot mainlanes and 2-foot inside shoulder. However, the proposed design does conform to adjacent roadway sections in terms of lane balance. At the north IH 45 project limit, the existing northbound S.M. Wright to IH 45 2-lane entrance ramp would be restriped to a 1-lane entrance ramp with a 1-lane add to IH 45 to match the existing 5-lane northbound section. The reduction in capacity of this northbound entrance ramp is possible because US 175 traffic entering IH 45 would be removed from this ramp and placed on the proposed northbound C.F. Hawn Freeway (US 175) to IH 45 DC ramp. The existing 2-lane exit ramp from southbound IH 45 to S.M. Wright would be maintained and striped so that the fifth IH 45 mainlane would be dropped at this ramp. At the south IH 45 project limit, the proposed C.F. Hawn Freeway (US 175) / IH 45 DC ramps would serve as a lane add and drop. IH 45 would remain a 6-lane facility (3- lanes each direction) south of these proposed DC ramps. Transitions between existing and proposed mainlane and inside shoulder widths would occur at the two interchanges discussed above. Page 10 of 13

19 S.M. Wright Project 8. What would be the project delay and consequences as a result of meeting the minimum values? There is sufficient funding to construct the project as proposed. However, there are currently no additional funds available that could be applied to the project. The substantial cost differential to construct IH 45 to meet minimum values is stated above. Current funding availability and constraints could conceivable delay the project indefinitely. 9. Short narrative of why you feel this design exception should be approved. Project Benefits The proposed design exception for IH 45 shoulder and lane widths would allow for the connection of new DC ramps between US 175 and IH 45 by facilitating the lane balance needed along IH 45. These proposed DC ramps would provide the following benefits. In the existing configuration, US 175 connects to IH 45 at the S.M. Wright interchange. This creates a weaving section between the US 175 and IH 30 ramps of approximately 1,500-feet (southbound) to 2,400-feet (northbound). This relatively short weaving segment is operationally constrained. Analysis of crash data from 2007 to 2010 shows that approximately 48% of the total accidents located within the design exception limits (1.5 miles long) occur within 2,600-feet of the S.M. Wright interchange. Further breakdown shows that 59% of the total rear-end accidents located within the design exception limits occur within 2,600-feet of the S.M. Wright interchange. It is reasonable to assume that the constrained operations of the weaving segment between the S.M. Wright and IH 30 interchanges play a factor in the occurrence of these accidents. Adding the proposed DC ramps between C.F. Hawn Freeway (US 175) and IH 45 would increase the weaving distance between US 175 and IH 30 to approximately 8,600-feet (southbound) and 8,000-feet (northbound). This increased distance would improve weaving operations on IH 45. Realigning C.F. Hawn Freeway (US 175) and constructing a new interchange with IH 45 would eliminate the sharp, accident-prone curve along US 175 that currently connects C.F. Hawn Freeway and S.M. Wright Freeway. This would in turn improve safety on US 175. In 2008, a gasoline tanker truck travelling along US 175 did not successfully traverse the 90 degree bend in the mainlane alignment. The explosion from the tanker crash required shutting down the interchange and reconstructing the SH 310 (S.M. Wright Freeway) bridge that overpasses US 175. The safety analysis performed in Section 4 shows that from 2007 through 2010 the crash rate increased every year by an average of crashes per 100 million vehicle miles travelled within the limits of the S.M. Wright and C.F. Hawn interchange. The 2010 crash rate was recorded at crashes per 100 million vehicle miles travelled. If the crash rate continues to increase by this average, the crash rate will exceed 350 crashes per 100 million vehicle miles travelled by the proposed construction letting date in This new interchange would allow traffic traveling between US 175 and IH 45 to bypass the S.M. Wright corridor. It would also facilitate the downsizing of S.M. Wright from a freeway to a local arterial, thereby reconnecting the adjacent residential communities and improving neighborhood environment. Page 11 of 13

20 S.M. Wright Project Previous Studies/Guidance REPORT NO. FHWA/TX-87/ : A 1987 technical report by the Texas Transportation Institute titled Safety and Operational Evaluation of Shoulders on Urban Freeways analyzed the safety and traffic operations performance of reducing inside shoulder widths and lane widths on existing freeways to increase the number of mainlanes and capacity. The report analyzed years of operational and safety data for multiple freeways where reductions in shoulder and/or lane widths were utilized to increase capacity and reduce congestion. In addition, several of the projects studied utilized reduced lane widths and shoulder reductions to add capacity between major interchanges. The report's findings determined that in study sections were inside shoulders were reduced to improve capacity (and reduce congestion) the overall safety either improved or was unchanged. The report notes that generally improved safety operations were not just short term benefits but appear to be permanent. Limited study data suggests that no increases in the severity of accidents were taking place in the study sections. In addition, the study indicates that 11-foot travel lanes do not create safety problems. The report's Implementation Statement is included below. "The study findings indicate that inside shoulder reductions (all but 2 feet) are a simple and safe method of reducing congestion on existing freeways. The safety benefits of removing inside shoulders suggest that spot improvement projects should be undertaken when bottlenecks exist and analysis suggests that congestion can be reduced. Initial evaluation also suggests that median transit ways involving inside shoulder removals are a simple and safe method of improving person movement in Texas freeway corridors experiencing congestion and for which right-of-way acquisition is not practical." As previously discussed, existing IH 45 provides 10-lanes (5-lanes each direction) between the existing S.M. Wright and IH 30 interchanges. Providing four 11-foot lanes in each direction with reduced, 2-foot inside shoulders from the proposed C.F. Hawn Freeway (US 175) interchange up to the existing 10-lane section (5-lanes each direction) north of the existing S.M. Wright interchange effectively serves as a bottleneck relief for IH 45. The design exceptions proposed for IH 45 are consistent with the TTI report's findings and Implementation Statement. REPORT NO. FHWA/TX-09/ P2: A 2009 technical report by the Texas Transportation Institute titled the Roadway Safety Design Workbook analyzed the relationship between various highway geometric design components and crash frequency. The Roadway Safety Design Workbook uses accident modification factors for specific geometric parameters associated with a particular roadway. The overall expected crash rate is determined by multiplying all the accident modification factors along with the base crash rate. From this analysis, it was determined that from 2007 to 2010, IH 45 recorded fewer serious accidents than the baseline projections developed from TRSD methodologies (see Section 4, Table 8 for details). TRSD guidance was also used to analyze the impacts of various inside and outside shoulder widths along IH 45 for the proposed improvements. TRSD guidance allows for different accident modification factors for varying inside and outside shoulder widths. An analysis was performed to determine how variations in the shoulder widths would affect the overall expected crash rate. Two specific alternatives were considered, a 2-foot inside shoulder / 10-foot outside shoulder, and a 4- foot inside shoulder / 8-foot outside shoulder. Both alternatives assumed 11-foot wide lanes and continuous traffic barriers along both the inside and outside shoulders. All other variables were not included as their accident modification factors would remain constant between both shoulder width Page 12 of 13

21 S.M. Wright Project alternatives. The results are listed in the Table 12 below. Table 12 TRSD Analysis of Proposed Shoulder Widths Inside Shoulder Width Outside Shoulder Width Inside Shoulder Width AMF Outside Shoulder Width AMF Combined Shoulder AMF The TRSD analysis results show that a 4-foot inside shoulder / 8-foot outside shoulder would provide a slight improvement (approximately 1%) in expected crashes as opposed to a 2-foot inside shoulder / 10-foot outside shoulder. However, either condition would require a traffic rail adjacent to both outside shoulders the entire length of the design exception due to existing structures or the proximity of parallel frontage roads. Since the difference is negligible, a 2-foot inside shoulder and a full 10-foot outside shoulder were utilized for the proposed improvements on IH 45 to maximize the available refuge between the face of the outside barrier and the outer lane line. Future Improvements The proposed design exceptions associated with IH 45 should be considered interim, although they could be in place for several years. Ultimate improvements to IH 45 that meet minimum design values are not included in the current MTP, "Mobility 2035" due to financial constraints. As previously discussed above, the Mobility 2035 plan is the long range planning document for the Dallas-Fort Worth area. The development of Mobility 2035 required a re-evaluation of expected funding sources that were included in previous MTPs for the Dallas-Fort Worth area. This re-evaluation resulted in the removal of nearly $45 billion of funding from the plan which required the prioritization of needed projects and the deferral of many key controlledaccess roadway projects necessary for the management of existing and future congestion. IH 45 was one of the corridors that was deferred from the previous MTP, "Mobility 2030". As noted in the current plan, "For the freeway and tollway corridors deferred from Mobility 2035, the reality that they cannot be incorporated into the plan based on projected financial constraints should not diminish the fact that significant congestion will increase in these corridors over time and large-scale improvements will be required at some point in the future These projects are still warranted and needed but must be deferred until additional regional funding can be identified." IH 45 from IH 30 to IH 20 is shown in the Mobility 2035 plan as a deferred project and is noted as a "corridor for future evaluation". IH 45 will be included in future MTP updates as funding is identified. Those future studies would reconstruct IH 45 to minimum values and would remove the design exceptions proposed by the S.M. Wright Project. Page 13 of 13

22 APPENDIX B SM Wright Phase Tech Memo

23 Halff Associates, Inc North Bowser Road Richardson, Texas (214) Fax (214) MEMORANDUM FROM: Halff Associates, Inc. TO: TxDOT, FHWA Chad Gardiner, PE SUBJECT: Request for Design Exceptions on IH 45 and Revisions to the Proposed IH 45 Ramping SM Wright Project, TxDOT Dallas District DATE: June 25, 2013 The purpose of this memorandum is to summarize recent design changes to the SM Wright Project design schematic and any potential impacts these revisions may have to the request for Design Exceptions along IH 45. The SM Wright Project is located in Dallas, TX and the proposed improvements would include: Removing the accident prone, 90 degree curve in the US 175 alignment at the SH 310 interchange. This would be accomplished by realigning US 175 (CF Hawn Freeway) westerly to overpass SH 310/SM Wright Parkway and Lamar Street and constructing a new interchange with IH 45. Widening the existing IH 45 main lanes to the inside upstream of the proposed US 175 two-lane DC ramp junctions to allow for an additional transition lane (each direction) that would serve traffic between the proposed US 175 interchange and the existing IH 45 ten-lane section north of the existing US 175 (SM Wright) interchange. Removing the existing IH 45 half diamond ramps south of Pennsylvania Avenue would also be required due to ramp spacing constraints. Converting existing US 175 north of the SH 310 interchange from an existing six-lane freeway with frontage roads to a low speed, signalized six-lane urban arterial. SUMMARY OF PREVIOUS COORDINATION The design schematic, IH 45 IAJR, and request for Design Exceptions (DE) were submitted and reviewed by TxDOT and FHWA in the first half of On July 9, 2012, FHWA stated that the project was satisfactory to proceed and granted preliminary approval of these documents. RECENT IH 45 RAMP REVISIONS TO THE DESIGN SCHEMATIC A Public Hearing for the SM Wright project was held on January 31, Draft design schematics were displayed at the public meeting. At the Public Hearing, citizens expressed concerns regarding the proposed elimination of the existing northbound exit ramp from IH 45 to Pennsylvania Avenue and Martin Luther King Jr. Boulevard. This ramp was eliminated due to spacing constraints with the proposed northbound direct connecting entrance ramp from US Page 1 of 3

24 Halff Associates, Inc North Bowser Road Richardson, Texas (214) Fax (214) (CF Hawn Freeway). The proposed schematic provided access from northbound IH 45 to Lamar Street, Pennsylvania Avenue, and Martin Luther King Jr. Boulevard from a one-lane exit ramp located south of Lamar Street. Traffic travelling to Pennsylvania Avenue and Martin Luther King Jr. Boulevard would be required to pass through the Lamar Street intersection. Due to the concerns expressed at the January Public Hearing, revisions were made to the proposed entrance and exit ramps on IH 45 south of Lamar Street. These changes will be presented in detail to the public at a second Public Hearing scheduled for June 27, 2013 at the Park South YMCA, 2500 Romine Avenue, Dallas, TX The revisions include the following: Revising the proposed northbound one-lane exit ramp located south of Lamar Street to a two-lane exit ramp. The two-lane exit ramp would split into two one-lane ramps approximately 1000 north of the main lane exit gore. One ramp drops down to provide access to Lamar Street. The other ramp overpasses Lamar Street and merges with the northbound frontage road north of Lamar Street. A third lane would be added to the frontage road downstream of the ramp gore. Adding a southbound entrance ramp north of Lamar Street. This entrance ramp would diverge from the southbound frontage road north of Lamar Street and overpass Lamar Street. The one-lane entrance ramp would merge with the proposed one-lane entrance located south of Lamar Street by utilizing a 50:1 taper. Downstream of the ramp merge, the one-lane entrance ramp would merge with the southbound main lanes. POTENTIAL IMPACTS TO THE APPROVED IH 45 DESIGN EXCEPTIONS The previous Request for Design Exceptions along IH 45 included the minimum values below. Minimum 12-foot wide lane widths could not be obtained on IH 45. Minimum 11-foot wide lane widths would be provided along IH 45. A Minimum 10-foot wide inside shoulder width could not be obtained on IH 45. A minimum 2-wide inside shoulder would be provided along IH 45. The schematic as shown at the January 2013 Public Hearing would maintain these minimum values for 1.2 miles along the northbound main lanes and 1.5 miles along the southbound main lanes. The recent ramp revisions would maintain these minimum values for 1.3 miles along the northbound main lanes and 1.5 miles along the southbound main lanes. Table 1 below provides a more detailed comparison of the design exception limits as shown on the January 2013 Public Hearing schematic (previously approved design exception request) and the currently revised schematic. Page 2 of 3

25 Halff Associates, Inc North Bowser Road Richardson, Texas (214) Fax (214) Table 1 Comparison of Design Exception Limits Schematic Version January 13 Public Hearing Schematic Current Revised Schematic Northbound Southbound From To From To 611 N. of Lamar (sta ) 215 N. of Lamar (sta ) SM Wright ramp (sta ) SM Wright ramp (sta ) 579 S. of Lamar (sta ) 875 S. of Lamar (sta ) SM Wright ramp (sta ) SM Wright ramp (sta ) As the table indicates, the northern limit of the design exception in both the northbound and southbound directions did not change. The revisions to the design exception limits occur at the southern limit. No additional design exceptions would be required for the recent ramp revisions. CONCLUSIONS REGARDING THE REQUEST FOR DESIGN EXCEPTIONS Based on the limits in Table 1, the recent ramp revisions increase the length of the northbound DE by approximately 396 feet and the southbound DE by approximately 296 feet. The analysis and conclusions presented in the 2012 IH 45 request for DEs remain valid. Page 3 of 3

26 APPENDIX C SM Wright Phase I Design Exception Approval Memo

27

28

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016 635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Road User Cost Analysis

Road User Cost Analysis Road User Cost Analysis I-45 Gulf Freeway at Beltway 8 Interchange CSJ #500-03-382 1994 Texas Transportation Institute ROAD USER COST ANALYSIS CSJ #500-03-382 The Texas Department of Transportation (TxDOT)

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Study Area and Location District PSA Ward ANC Phase Description

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

Summary of the Alcoa Highway Redevelopment Project

Summary of the Alcoa Highway Redevelopment Project Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

Metropolitan Freeway System 2007 Congestion Report

Metropolitan Freeway System 2007 Congestion Report Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT April 2016 I. COST-EFFECTIVENESS ANALYSIS A Benefit-Cost Analysis (BCA) was conducted in conformance

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting PORTS-TO-PLAINS Corridor Planning Stakeholder Workshop - Agenda 1 Purpose of Stakeholder Workshops 3 2 Rural Transportation System Overview 4 3 Ports-to-Plains 8 4 5 6 7 I-27 Expansion Key Considerations

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017 PROJECT OVERVIEW Environmental Impact Statement (EIS) Project divided into 3 Segments Segment 1: Beltway 8

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Southeastern Wisconsin Regional Freeway System Reconstruction Study

Southeastern Wisconsin Regional Freeway System Reconstruction Study Southeastern Wisconsin Regional Freeway System Reconstruction Study July 26, 2001 1 Agenda Item 3 Presentation of Projected Traffic Impacts of the Possible New Freeway Segment Connecting IH 43 and USH

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Benefit-Cost Analysis Technical Memo

Benefit-Cost Analysis Technical Memo I-40 Douglas Boulevard Interchange Reconstruction and Related Widening Oklahoma County, OKLAHOMA INFRA Grant Application Benefit-Cost Analysis Technical Memo November 2017 Submitted by: Oklahoma Department

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Purpose and Need Report

Purpose and Need Report Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June

More information

The Design-Builder shall meet local road criteria provided by the local governing agencies.

The Design-Builder shall meet local road criteria provided by the local governing agencies. 11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Evaluation of Renton Ramp Meters on I-405

Evaluation of Renton Ramp Meters on I-405 Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems

More information

Interchange Justification Report

Interchange Justification Report Interchange Justification Report Interstate 29 at 85 th Street- Exit 74 Sioux Falls, SD SEH No. 132589 October 1, 2018 Prepared by: Short Elliott Hendrickson Inc. Executive Summary The Interchange Justification

More information

Alternatives Considered

Alternatives Considered 0 0 0 SECTION Alternatives Considered This section describes the process used to develop and evaluate the range of alternatives for the I-0 North EA to correct the existing and future problems identified

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015 Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections Prepared by Texas A&M Transportation Institute August 2015 This memo documents the analysis

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section Median Barriers in North Carolina -- Long Term Evaluation Safety Evaluation Group Traffic Safety Systems Management Section Background In 1998 North Carolina began a three pronged approach to prevent and

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3600 Block Martin Luther King, Jr.

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3600 Block Martin Luther King, Jr. Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 36 Block Martin Luther King, Jr. Avenue SE Study Area and Location District PSA Ward ANC Phase Description

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Final Series of Public Meetings

Final Series of Public Meetings Final Series of Public Meetings Public Meeting Locations City Date Jasper Monday, September 26 Livingston Tuesday, September 27 Huntsville Wednesday, September 28 Bryan Thursday, September 29 Eldorado

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017 Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:

More information

CITY OF POWAY MEMORANDUM

CITY OF POWAY MEMORANDUM CITY OF POWAY MEMORANDUM TO: FROM: Traffic Safety Committee Steve Crosby P.E., City Engineer DATE: February 14, 2018 SUBJECT: Espola Road speeding concerns BACKGROUND In 2017, staff received a request

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Mobility Investment Priorities Project Houston US 59 US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Current Conditions From IH 610 West to SH 288, US 59 operates with four or five lanes

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay TO: FROM: Chair and Members Engineering and Public Works Committee Mark Misko, C.E.T. Manager, Roads Maintenance and Construction DATE: March 23, 2016 SUBJECT: REPORT NO: Designation of a Community Safety

More information

US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative

US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative US 69/75 Controlled Access Highway and Grade Separations Introduction The Oklahoma Department of Transportation (ODOT) proposes to improve safety and efficiency of high volume freight traffic along the

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 4 Block 4th Street SW Study Area and Location District PSA Ward ANC Phase Description 27 6 6D Existing

More information

U.S. 81 Realignment Around Chickasha, Oklahoma Benefit-Cost Analysis Narrative

U.S. 81 Realignment Around Chickasha, Oklahoma Benefit-Cost Analysis Narrative U.S. 81 Realignment Around Chickasha, Oklahoma Benefit-Cost Analysis Narrative Introduction U.S. 81 is part of the National Highway System. It runs north-south, from Texas to the Canadian border and passes

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

TXDOT PLANNING CONFERENCE. Quincy D. Allen, P.E. Houston District Engineer June 16, 2016

TXDOT PLANNING CONFERENCE. Quincy D. Allen, P.E. Houston District Engineer June 16, 2016 TXDOT PLANNING CONFERENCE Quincy D. Allen, P.E. Houston District Engineer June 16, 2016 Welcome to Houston Show video...http://youtu.be/knchpl8sdfu Population Growth in Texas Texas added 1.3 million people

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

Missouri Seat Belt Usage Survey for 2017

Missouri Seat Belt Usage Survey for 2017 Missouri Seat Belt Usage Survey for 2017 Conducted for the Highway Safety & Traffic Division of the Missouri Department of Transportation by The Missouri Safety Center University of Central Missouri Final

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Horizontal Sight Distance Considerations Freeway and Interchange Reconstruction

Horizontal Sight Distance Considerations Freeway and Interchange Reconstruction 80 TRANSPORTATION RESEARCH RECORD 1208 Horizontal Sight Distance Considerations Freeway and Interchange Reconstruction In JOEL p. LEISCH With improvements being made to freeways and expressways, the problem

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information