1 TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

2 Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic: Projected Carbon Dioxide (CO 2 ) Emissions 1.0 Introduction The purpose of this technical memorandum is to present the methodology and results of the analysis of potential change in carbon dioxide (CO 2 ) emissions in Year 2035 associated with each of the Build alternatives for the Michigan/Grand River Avenue. The estimated change in CO 2 emissions is one of the primary evaluation measures of the Study, with comparison made relative to the Baseline alternative. The following alternatives were evaluated: Baseline Light Rail Transit (LRT) Bus Rapid Transit (BRT) Modern Streetcar. As background, the Greater Lansing Go Green! Initiative has made reduction of greenhouse gas emissions, including CO 2, a goal of the Lansing Region. 1 Mobile sources, including vehicles, produce 31 percent of greenhouse gas. 2 According to the Environmental Protection Agency s (EPA) fuel economy compliance tests, CO 2 emissions represent 90 percent of all greenhouse gas emissions. 3 Therefore, reduction of greenhouse gas emissions of any transportation improvement in the Michigan/Grand River Avenue Corridor is an important in achieving this regional goal. 1 City of Lansing, 2010, About Go Green!, 2 Environmental Protection Agency, EPA and NHTSA Finalize Historic National Program to Reduce Greenhouse Gases and Improve Fuel Economy for Cars and Trucks. 3 Ibid. Projected Carbon Dioxide Emissions 1

3 2.0 Methodology 2.1 Criteria for Evaluating Alternatives This analysis entailed evaluation of each alternative at the Corridor level and per passenger mile. The change in CO 2 emissions at the Corridor level would assist in determining each alternative s ability to meet the Corridor and regional goals for CO 2 emissions established in the Greater Lansing Go Green! Initiative. The latter is a measure of an alternative s efficiency. Table 1 presents the thresholds used for the evaluation. Table 1: Evaluation Criteria: CO 2 Emissions Percent Change Annual in CO 2 Emissions Compared to the Baseline Grams of CO 2 Emissions per Passenger Mile Rating Definition More than 2 percent reduction Fewer than 300 grams Good Alternative meets criterion very well 1 to 2 percent reduction 300 to 400 grams Fair Alternative meets criterion sufficiently Less than 1 percent reduction More than 400 grams Poor Alternative significantly does not meet criterion 2.2 Estimating CO 2 Emissions Estimates of CO 2 emissions are developed using a two-step process: transit contribution vs. automobile contribution. For this Study, the first step determined CO 2 emissions for each of the transit vehicle types associated with each alternative. For purposes of this analysis, four types of transit vehicles were analyzed: Three types of buses - Forty-foot diesel - Sixty-foot diesel articulated - Sixty-foot diesel-hybrid articulated. This category also encompasses BRT vehicles. Projected Carbon Dioxide Emissions 2

4 Light rail and modern streetcars vehicles were grouped together based on reporting statistics from the American Public Transportation Association (APTA) Carbon Dioxide Emissions from Transit Vehicles Carbon dioxide emissions for each transit vehicle type were sourced from Journal of Public Transportation, 2006 BRT Special Edition The Potential for BRT to Reduce Transportation-Related CO 2. 5 Table 2 shows the weight of CO 2 emissions per vehicle mile in kilograms (kg), as identified in the reference document. These values are used to estimate annual CO 2 emissions by alternative based on transit vehicle miles. Table 2: CO 2 Emissions per Vehicle Mile by Vehicle Type 6 Vehicle Type 40-foot diesel bus 60-foot diesel bus 60-foot hybrid diesel bus and BRT vehicles Light rail vehicle/modern Streetcar 7 CO 2 Emissions per Vehicle Mile 2.942kg 4.617kg 3.080kg 4.883kg Transit vehicle miles were estimated based on inputs such as route length, hours of service, headways, and fleet size. This information is detailed Technical Memorandum #6: Transit Operating Plans Annual vehicle miles traveled by each type of transit vehicle were multiplied by the CO 2 emissions produced by each type of vehicle, and shown in Table 3. 4 Light Rail and Streetcar are considered to have the same CO 2 emissions per vehicle mile because the American Public Transportation Association (APTA) operating reports statistics for Light Rail and Streetcar as a single category. American Public Transportation Association, Public Transportation Fact Book, Appendix A: Historical Tables, 5 Vincent, William, Lisa Callaghan Jerram, Breakthrough Technologies Institute Journal of Public Transportation, 2006 BRT Special Edition The Potential for BRT to Reduce Transportation-Related CO 2. Tampa, FL. 6 Ibid. 7 Source: 2010 Public Transportation Fact Book, Appendix A: Historical Tables. Projected Carbon Dioxide Emissions 3

5 Table 3: Estimated Year 2035 Annual CO 2 Emissions from Transit Vehicles Alternative Transit Vehicle Type CO 2 Emission per Vehicle Mile Annual Transit Vehicle miles Annual CO 2 Emissions (Kilograms) Baseline Alternative 2,480,000 Route 1/Route 1 Ltd. 60-foot diesel bus kg 536,774 2,480,000 BRT Alternative 2,290,000 BRT 60-foot hybrid diesel bus kg 516,200 1,590,000 Route 1/Route 1 Ltd. 40-foot diesel bus kg 238, ,000 LRT Alternative 2,140,000 LRT Light rail vehicle kg 295,200 1,440,000 Route 1/Route 1 Ltd. 40-foot diesel bus kg 238, ,000 Modern Streetcar Alternative 3,030,000 Modern Streetcar Streetcar kg 607,000 2,960,000 Route 1/Route 1 Ltd. 40-foot diesel bus kg 24,174 70, Carbon Dioxide Emissions from Personal Vehicles In addition to examining the change in CO 2 emissions related to transit vehicles, implementing the transit improvements would result in a reduction in the vehicle miles traveled (VMT) by personal automobiles and small trucks within the Corridor. For the purposes of this analysis, the Corridor is being defined as the area within one-half mile of the proposed alignment. Personal vehicles in the United States average 20.3 miles per gallon (mpg) 8 based on the EPA s MOBILE6.2 model. 9 The EPA also reports that vehicles burning one gallon of gasoline emit kilograms of CO 2 gas U.S. Environmental Protection Agency, 2010, Emission Facts: Greenhouse Gas Emissions from a Typical Passenger Vehicle. 9 U.S. Environmental Protection agency s model used to estimate highway vehicle emissions. 10 Ibid. Projected Carbon Dioxide Emissions 4

6 Using these figures, the average personal vehicles in the United States would produce 473 grams of CO 2 gas per mile. The Tri-County Regional Planning Commission (TCRPC) travel demand model was used to estimate the VMT within the Corridor for each of the alternatives for personal vehicles. TCRPC s Wise Growth demographic data was used for the analysis. Table 4 presents the annual CO 2 emissions from personal vehicles in each of the alternatives in Table 4: Estimated Year 2035 Annual CO 2 Emissions from Personal Vehicles Alternative CO 2 Emission per Vehicle Mile Annual VMT from Annual CO 2 Personal Vehicles 11 Emissions Baseline kg million million kg BRT kg million million kg LRT kg million million kg Streetcar kg million million kg 2.3 CO 2 Emissions per Transit Passenger Mile The amount of CO 2 emissions per transit passenger mile is a measure of the efficiency of how each alternative would move people through the Michigan/Grand River Avenue Corridor. This was determined by dividing the annual transit related emissions for each of the alternatives by the annual projected ridership for that alternative. This provided CO 2 emissions per transit rider. A survey of transit riders in the Corridor in October 2009 determined that the average transit trip in the Corridor was 3.02 miles. 13 It was assumed that the average trip pattern in the Corridor would remain constant across all alternatives. Carbon dioxide emissions per transit rider were divided by 3.02 miles to 11 Source: TCRPC travel demand model estimates of average weekday VMT. Average weekday data was annualized at a rate of 300, consistent with FTA guidance. 12 Personal VMT for LRT was projected because ridership modeling for LRT had different demographic data built into the model. 13 Source: Michigan/Grand River Avenue : Technical Memorandum #4 Transit Rider Survey Final, URS Consultant Team, Projected Carbon Dioxide Emissions 5

7 determine CO 2 emissions per transit passenger mile. Table 5 presents CO 2 emissions per transit passenger mile by alternative. Table 5: Estimated CO 2 Emissions per Transit Passenger Mile Alternative Annual CO 2 Emissions Range of Annual Corridor Ridership 14 CO 2 Emissions per Transit Rider 15 CO 2 Emissions per Transit Passenger Mile 16 Rating Baseline 2.48 million kg 2.22 million million 1,125g - 1,225g 375kg - 400kg BRT 2.29 million kg 1.98 million million 975g - 1,150g 325kg - 375kg LRT 2.14 million kg 1.83 million million 1,025g - 1,175g 325kg - 375kg Modern Streetcar 3.03 million kg 2.34 million million 1,125g - 1,300g 375kg - 425kg The ridership estimates generated by the model for Route 1 in the Baseline and various Build alternatives are presented as a range to demonstrate variations between Base Year 2010 Route 1 s modeled and observed daily ridership. 3.0 Findings and Conclusions Based on the information on Table 6, which summarizes the estimated CO 2 emissions for each alternative, following are findings and conclusions of this analysis: In Year 2035, million grams of CO 2 for the Michigan/Grand River Avenue Corridor are associated with the Baseline alternative. Each of the Build alternatives would decrease CO 2 emissions relative to the Baseline. Each of the Build alternatives would result in relatively similar CO 2 emissions, and thus, reductions in CO 2 emissions vs. the Baseline alternative. 14 The TCRPC travel demand model estimates travel, on the average weekday. Average weekday data was annualized at an annualization rate of Rounded to the nearest 25g of CO 2 emissions. 16 Ibid. Projected Carbon Dioxide Emissions 6

8 The Modern Streetcar alternative would have the highest CO 2 emissions per passenger mile (see Table 5 between 375g and 425g), despite having the highest ridership. This is reflective of the higher CO 2 emissions per mile of a modern streetcar vehicle than a hybrid bus. (See Table 2 4.9kg and 3.1kg, respectively). In addition, the Modern Streetcar alternative would have more than twice as many vehicle miles as the LRT alternative because it has more stations (28 vs. 16), resulting in an increase in the travel time. The Modern Streetcar alternative would also have more frequent service than the LRT alternative (every six minutes during the peak vs. every 10 minutes), which would also increase the number of transit vehicle miles. Table 6: Summary of Estimated Year 2035 Annual CO 2 Emissions Alternative Transit Vehicles Annual CO 2 Emissions Personal Vehicles Total Percent Change 17 Rating Baseline 2.48 million kg million kg million kg Not applicable Not applicable BRT 2.29 million kg million kg million kg percent LRT 2.14 million kg million kg million kg percent Modern Streetcar 3.03 million kg million kg million kg percent 17 Relative to the Baseline alternative Projected Carbon Dioxide Emissions 7

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

5.6 ENERGY IMPACT DISCUSSION. No Build Alternative

5.6 ENERGY IMPACT DISCUSSION. No Build Alternative 5.6 ENERGY 5.6.1 IMPACT DISCUSSION No Build Alternative To determine the effects on energy resulting from the alternatives, vehicle miles traveled (VMT) was converted to energy use using fuel efficiency

More information

Air Quality Impacts of Advance Transit s Fixed Route Bus Service

Air Quality Impacts of Advance Transit s Fixed Route Bus Service Air Quality Impacts of Advance Transit s Fixed Route Bus Service Final Report Prepared by: Upper Valley Lake Sunapee Regional Planning Commission 10 Water Street, Suite 225 Lebanon, NH 03766 Prepared for:

More information

3.17 Energy Resources

3.17 Energy Resources 3.17 Energy Resources 3.17.1 Introduction This section characterizes energy resources, usage associated with the proposed Expo Phase 2 project, and the net energy demand associated with changes to the

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT

2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT 2 VALUE PROPOSITION The purpose of the Value Proposition is to define a number of metrics or interesting facts that clearly demonstrate the value of the existing Xpress system to external audiences including

More information

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for

More information

CO 2 Emissions from Cars, Trucks & Buses in the Metropolitan Washington Region

CO 2 Emissions from Cars, Trucks & Buses in the Metropolitan Washington Region CO 2 Emissions from Cars, Trucks & Buses in the Metropolitan Washington Region Presentation to the COG Climate Change Steering Committee Ronald F. Kirby Director of Transportation Planning June 27, 2007

More information

Stakeholders Advisory Working Groups (SAWGs) Traffic and Transit SAWG Meeting #7

Stakeholders Advisory Working Groups (SAWGs) Traffic and Transit SAWG Meeting #7 Presentation Tappan Zee Bridge/I-287 Corridor Environmental Review December 4, 2008 Slide 1 Title Slide Slide 2 This presentation discusses the contents of the Transit Mode Selection Report. Slide 3 The

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

San Diego Metropolitan Transit System. William R. Spraul Chief Operating Officer, Transit Services

San Diego Metropolitan Transit System. William R. Spraul Chief Operating Officer, Transit Services San Diego Metropolitan Transit System William R. Spraul Chief Operating Officer, Transit Services Overview of San Diego Metropolitan Transit System (MTS) MTS provides light rail and bus services through

More information

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

1 Faculty advisor: Roland Geyer

1 Faculty advisor: Roland Geyer Reducing Greenhouse Gas Emissions with Hybrid-Electric Vehicles: An Environmental and Economic Analysis By: Kristina Estudillo, Jonathan Koehn, Catherine Levy, Tim Olsen, and Christopher Taylor 1 Introduction

More information

CO 2 Emissions: A Campus Comparison

CO 2 Emissions: A Campus Comparison Journal of Service Learning in Conservation Biology 3:4-8 Rachel Peacher CO 2 Emissions: A Campus Comparison Abstract Global warming, little cash inflow, and over-crowded parking lots are three problems

More information

Appendix B CTA Transit Data Supporting Documentation

Appendix B CTA Transit Data Supporting Documentation RED ED-PURPLE BYPASS PROJECT ENVIRONMENTAL ASSESSMENT AND SECTION 4(F) EVALUATION Appendix B CTA Transit Data Supporting Documentation 4( Memorandum Date: May 14, 2015 Subject: Chicago Transit Authority

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority Summary of Proposed Award Vanpool Program Presented to: Operations Committee August 2, 2016 What is a Vanpool? A vanpool is a group of people (larger than 5)

More information

Greater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager

Greater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager Greater Cleveland Regional Transit Authority Joe Calabrese CEO/General Manager Greater Cleveland RTA Overview Service Area Population of 1.5 million Customers Served 200,000 on a typical weekday 1.6 million

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

Criteria. As background, the US Environmental Protection Agency s Green Vehicle Guide states that:

Criteria. As background, the US Environmental Protection Agency s Green Vehicle Guide states that: GREEN COMMUNITIES Fuel efficient 4 Vehicles GRANT PROGRAM GUIDANCE Criteria INTRODUCTION Criteria Four of the Green Communities Program states that communities must purchase only fuel-efficient vehicles

More information

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Prepared for Consumers Union September 7, 2016 AUTHORS Tyler Comings Avi Allison Frank Ackerman, PhD 485 Massachusetts

More information

Transit Access to the National Harbor

Transit Access to the National Harbor Transit Access to the National Harbor December 2014 Table of Contents Executive Summary... 3 Introduction and Project Purpose... 6 Methodology.. 9 Definition of Alternatives..... 9 Similar Project Implementation

More information

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who

More information

Midtown Corridor Alternatives Analysis Initial Screening Analysis

Midtown Corridor Alternatives Analysis Initial Screening Analysis Midtown Corridor Alternatives Analysis Initial Screening Analysis 7/24/2013 Prepared by the SRF Consulting Group Team for Table of Contents Purpose... 1 Initial Screening Analysis Methodology... 1 Screening...

More information

Travel Forecasting Methodology

Travel Forecasting Methodology Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

7 COMPARATIVE EVALUATION OF ALTERNATIVES

7 COMPARATIVE EVALUATION OF ALTERNATIVES 7 COMPARATIVE EVALUATION OF ALTERNATIVES 7.1 INTRODUCTION This chapter presents the comparative analysis of the four Level 2 build alternatives along with a discussion of the relative performance of the

More information

West Broadway Transit Study. Community Advisory Committee September 17, 2015

West Broadway Transit Study. Community Advisory Committee September 17, 2015 West Broadway Transit Study Community Advisory Committee September 17, 2015 Introductions Community Engagement Summer Outreach Fall Outreach Technical Analysis Process Update Alternatives Review Economic

More information

I-26 Fixed Guideway Alternatives Analysis

I-26 Fixed Guideway Alternatives Analysis I-26 Fixed Guideway Alternatives Analysis Steering & Technical Advisory Committees Joint Meeting January 15, 2016 @ 10:00 AM SC/TAC Meeting Winter 2016 Agenda I. Welcome & Introductions II. III. Project

More information

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period 8. Operating Plans The following Section presents the operating plans for the Short-List Alternatives. The modern streetcar operating plans are presented for Alternatives 2 and 3, followed by bus rapid

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority SUMMARY OF PROPOSED AWARD Furnishing up to Two Hundred Forty (240) Low Floor 40-ft. Coaches, Training, Special Tools and Spare Parts over a Five (5) Year Contract

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

Knoxville Area Transit (KAT) Transit Development Plan Downtown Transit Plan

Knoxville Area Transit (KAT) Transit Development Plan Downtown Transit Plan Knoxville Area Transit (KAT) Transit Development Plan Submitted to: Knoxville Area Transit and Knoxville Knox County Metropolitan Planning Commission Submitted by: Connetics Transportation Group Under

More information

The Screening and Selection of Regionally Significant Projects

The Screening and Selection of Regionally Significant Projects The Screening and Selection of Regionally Significant Projects UTC 2018 Seminar Series March 15, 2018 Claire Bozic Martin Menninger ON TO 2050 CMAP is the Region s MPO, seven county region Land use and

More information

REGIONAL GREENHOUSE GAS INVENTORY: TRANSPORTATION AND STATIONARY ENERGY

REGIONAL GREENHOUSE GAS INVENTORY: TRANSPORTATION AND STATIONARY ENERGY SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE REGIONAL GREENHOUSE GAS INVENTORY: TRANSPORTATION AND STATIONARY ENERGY METHODOLOGY REPORT Implementation support provided by: With funding support from:

More information

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs Peter Brown Project Manager, Long Range Planning Sustainable Streets Division 10 17 2011 Lake Arrowhead, California Outline of

More information

Fleet Options. Information and Comparison

Fleet Options. Information and Comparison Fleet Options Information and Comparison Topics for Discussion CNG vs. Diesel Costs, Tailpipe emissions, Training Bus Purchases New vs. Used New First Transit Management Structure Introducing Herold Humphrey

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

RECOMMENDED ALTERNATIVE REPORT

RECOMMENDED ALTERNATIVE REPORT DRAFT METROCENTER CORRIDOR STUDY RECOMMENDED ALTERNATIVE REPORT JULY 12, 2005 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 2.0 TIER 1 ALTERNATIVES EVALUATION... 1 3.0 TIER 2 ALTERNATIVES EVALUATION...

More information

Tier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis

Tier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis LAKE COUNTY ORANGE COUNTY Ticket and Transportation Center Walt Disney / Reedy Creek Improvement District CR 535 John Young Parkway 441 17 92 Florida s Turnpike VE 92 mee Hall JOHN YOUNG PKY 192 OAK ST

More information

Red Line/Healthline Extension Major Transportation Improvement Analysis Tier 2 Detailed Alternatives Screening Report

Red Line/Healthline Extension Major Transportation Improvement Analysis Tier 2 Detailed Alternatives Screening Report Greater Cleveland Regional Transit Authority August 2014 Red Line/Healthline Extension Major Transportation Improvement Analysis Tier 2 Detailed Alternatives Screening Report GREATER CLEVELAND REGIONAL

More information

METRO Light Rail Update

METRO Light Rail Update American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

state, and federal levels, complete reconstruction and expansion of I35 in the near future is not likely.

state, and federal levels, complete reconstruction and expansion of I35 in the near future is not likely. Project Summary Johnson County is an economic engine for the Kansas City metropolitan area and the State of Kansas. It s the fastest growing county in the state of Kansas and has the nation s third highest

More information

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018 UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms

More information

RTSP Phase II Update

RTSP Phase II Update Washington Metropolitan Area Transit Authority RTSP Phase II Update Presentation to the Technical Advisory Group July 18, 2013 Meeting 1 Presentation Outline RTSP Integration with Momentum RTSP Process

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Executive Summary: Metrobus Network Evaluation and Future Fleet Needs Presented to: Washington Metropolitan Area Transit Authority Submitted by: In Association with P 2 D Joint Venture Introduction Metrobus

More information

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives 3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation

More information

DRAFT Evaluation Scores. Transit

DRAFT Evaluation Scores. Transit DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

Performance Measure Summary - Grand Rapids MI. Performance Measures and Definition of Terms

Performance Measure Summary - Grand Rapids MI. Performance Measures and Definition of Terms Performance Measure Summary - Grand Rapids MI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs To Barrow Emerson, SamTrans Melissa Reggiardo, SamTrans Date 9/13/2014 Copies Reference number From Subject Corey Wong, Arup Steve Crosley, Fehr + Peers ECR BRT Phasing Plan File reference 1 Introduction

More information

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MOTION NO. M2018-161 Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION

More information

Background. ezev Methodology. Telematics Data. Individual Vehicle Compatibility

Background. ezev Methodology. Telematics Data. Individual Vehicle Compatibility Background In 2017, the Electrification Coalition (EC) began working with Sawatch Group to provide analyses of fleet vehicle suitability for transition to electric vehicles (EVs) and pilot the use of ezev

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

FINAL SECOND-PHASE GREENHOUSE GAS EMISSIONS STANDARDS FOR HEAVY-DUTY ENGINES AND VEHICLES IN CANADA

FINAL SECOND-PHASE GREENHOUSE GAS EMISSIONS STANDARDS FOR HEAVY-DUTY ENGINES AND VEHICLES IN CANADA INTERNATIONAL COUNCIL ON CLEAN TRANSPORTATION POLICY UPDATE SEPTEMBER 2018 FINAL SECOND-PHASE GREENHOUSE GAS EMISSIONS STANDARDS FOR HEAVY-DUTY ICCT POLICY UPDATES SUMMARIZE REGULATORY AND OTHER DEVELOPMENTS

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

BENEFITS OF RECENT IMPROVEMENTS IN VEHICLE FUEL ECONOMY

BENEFITS OF RECENT IMPROVEMENTS IN VEHICLE FUEL ECONOMY UMTRI-2014-28 OCTOBER 2014 BENEFITS OF RECENT IMPROVEMENTS IN VEHICLE FUEL ECONOMY MICHAEL SIVAK BRANDON SCHOETTLE BENEFITS OF RECENT IMPROVEMENTS IN VEHICLE FUEL ECONOMY Michael Sivak Brandon Schoettle

More information

ADDENDUM NO. 3 BID NO TRANSIT VEHICLE ADVERTISING

ADDENDUM NO. 3 BID NO TRANSIT VEHICLE ADVERTISING 600 S. Grand Central Parkway, Suite 350 Las Vegas, Nevada 89106-4512 702-676-1500 Fax: 702-676-1518 Tina Quigley, General Manager May 15, 2013 ADDENDUM NO. 3 BID NO. 13-053 TRANSIT VEHICLE ADVERTISING

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Caltrain Downtown Extension Study Ridership Forecast Summary

Caltrain Downtown Extension Study Ridership Forecast Summary Caltrain Downtown Extension Study Ridership Forecast Summary presented to Transbay Joint Powers Authority presented by Cambridge Systematics date: March 12, 2009 Transportation leadership you can trust.

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

Tier 3 Screening and Selection. of the Recommended Alternative KISSIMMEE CORRIDOR. June Downtown CRA. US 192 Alternatives Analysis

Tier 3 Screening and Selection. of the Recommended Alternative KISSIMMEE CORRIDOR. June Downtown CRA. US 192 Alternatives Analysis LAKE COUNTY ORANGE COUNTY Ticket and Transportation Center Walt Disney / Reedy Creek Improvement District CR 535 John Young Parkway 441 17 92 Florida s Turnpike VE 92 mee Hall JOHN YOUNG PKY 192 OAK ST

More information

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

King County Metro. Sustainably and equitably achieving a zero-emission fleet

King County Metro. Sustainably and equitably achieving a zero-emission fleet King County Metro Sustainably and equitably achieving a zero-emission fleet Agenda Background Purpose Service area Fleet size Climate goals Process Stakeholder engagement Analyses Service Equity Final

More information

Executive Summary. Light-Duty Automotive Technology and Fuel Economy Trends: 1975 through EPA420-S and Air Quality July 2006

Executive Summary. Light-Duty Automotive Technology and Fuel Economy Trends: 1975 through EPA420-S and Air Quality July 2006 Office of Transportation EPA420-S-06-003 and Air Quality July 2006 Light-Duty Automotive Technology and Fuel Economy Trends: 1975 through 2006 Executive Summary EPA420-S-06-003 July 2006 Light-Duty Automotive

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

Bella Vista Bypass Benefit Cost Analysis

Bella Vista Bypass Benefit Cost Analysis Bella Vista Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance

More information

THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES. Prepared By: Jacki Murdock Transportation and Environmental Planner

THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES. Prepared By: Jacki Murdock Transportation and Environmental Planner THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES Prepared By: Jacki Murdock Transportation and Environmental Planner December 13 th, 2012 Overview Characteristics of Wilshire Boulevard Overview of the

More information

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015 Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections Prepared by Texas A&M Transportation Institute August 2015 This memo documents the analysis

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N QUALITY OF LIFE EXECUTIVE SUMMARY REPORT UN I O N S TAT I O N T R AV E L by TR A I N Published September 2017 2015 PROGRESS MAP This document reports FasTracks progress through 2015 BACKGROUND RTD The

More information

Emission Rate Approach for Evaluating the Differences in Emissions Between CNG and Diesel Busses

Emission Rate Approach for Evaluating the Differences in Emissions Between CNG and Diesel Busses Emission Rate Approach for Evaluating the Differences in Emissions Between CNG and Diesel Busses By Joon H. Byun, Ph.D. Air Quality Modeling Specialist Federal Highway Administration Background Information

More information

3.15 SAFETY AND SECURITY

3.15 SAFETY AND SECURITY 3.15 SAFETY AND SECURITY Introduction This section describes the environmental setting and potential effects of the alternatives analyzed in this EIR with regard to safety and security in the SantaClara-Alum

More information

Operating and Maintenance Cost Methodology Report. Durham Orange Light Rail Transit Project

Operating and Maintenance Cost Methodology Report. Durham Orange Light Rail Transit Project Operating and Maintenance Cost Methodology Report Durham Orange Light Rail Transit Project September 2012 TABLE OF CONTENTS 1. Project Background... 1 1 2. Project Alternatives... 2 1 2.1. NO BUILD ALTERNATIVE...

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Car Economics Activity

Car Economics Activity Car Economics Activity INTRODUCTION Have you, or someone you know, bought a car recently? What factors were taken into consideration in choosing the car? Make and model, safety, reliability, -- how cool

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

ADVANTAGES OF USING SMARTWAY TECHNOLOGIES

ADVANTAGES OF USING SMARTWAY TECHNOLOGIES ADVANTAGES OF USING SMARTWAY TECHNOLOGIES Energy Center Workshop Tarrant County Community College April 28, 2016 Jasper Alve, Air Quality Planner North Central Texas Council of Governments 1 Structure

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information

Rapid Transit and Land-Use Integration a Reality

Rapid Transit and Land-Use Integration a Reality City of Charlotte Rapid Transit and Land-Use Integration a Reality Transportation Oversight Committee Carolyn Flowers CEO Charlotte Area Transit System April 29, 2010 Charlotte Region Statistics Mecklenburg

More information