1 CAPITAL IMPROVEMENT PROGRAM COMMITTEE RECOMMENDATION March 7, 2013
2 CIP Committee Members 2 Mal Leichter (Chairman) Anne Fitzpatrick (Vice-Chairman) Lorraine Davey Amy Lynch-Gracias Loreta McDonnell Mark Stuart Board of Finance Parks and Recreation Citizen-at-Large Board of Education Alternate Board of Selectmen Andy Tierney / Kevin Kelly Public Works Department Nick Wallick Fire / EMS Department William Witt Citizen-at-Large Natalie Wood Planning and Zoning
3 CIP A Look Back 3 History of low funding Improved by adoption of CIP Policy Funding target has been 5% of town budget Facilities / rolling stock continue to fall behind 5-year plan continues to be unachievable
4 Facts 4 Budgets remain tight Total Requests = $1,300,561 CIP Recommendation = $846,641 ($558,325 from general budget contribution) Funding in was 1.24% of the total town budget CIP recommendation moves back toward General budget contribution Road maintenance and vehicle replacement continue to fall behind
5 Budget Percent CIP is of Town Budget 7-Year Funding History 5 $40,000, % $35,000,000 $31,047,501 $32,763,370 $33,155,095 $33,659,115 $34,088,139 $33,776, % $30,000,000 $29,125, % $25,000, % 2.49% 2.43% 2.50% $20,000, % $15,000, % 1.86% 1.84% 1.50% $10,000, % 1.00% $5,000, % $0 $750,000 $773,000 $794,786 $626,627 $626,627 $626,627 $417, % Fiscal Year Total Town Budget CIP Budget CIP % of Total Budget
6 6 New Projects (Not Previously Funded)
7 Town Hall Generator Priority Tier1 Status Funding Complete Prev Approp. $0 7 Funding Request $58,400 Recommendation $58,400 Needed to support Town Hall in time of power outage Needed to support Emergency Operations Center during severe storms and power failures Upgrade 200 to 400 amp 3 phase electrical service Will apply for grant from Emergency Preparedness
8 8 HES Parking Lot (Engineering and Design ONLY) Priority Tier1 Status Partial Funding Prev Approp. $0 Funding Request $50,000 Recommendation $50,000 Creates safer parking lots Parking currently limited. Adds parking spaces Separates buses from cars Uses existing curb cuts Requires relocation of baseball field St Peter s land must be purchased prior to spending any dollars
9 Police Vehicle Priority Tier 2 Status Funding Complete Prev Approp. $0 9 Funding Request $22,500 Recommendation $45,000 Existing vehicle to be replaced is a 2005 Crown Victoria, 65,757 Miles Replacement vehicle would be a 4-wheel drive pursuit capable vehicle Plan to grow constable coverage with the hiring of new constables The old vehicle would replace a vehicle needed for the Building Department Purchase of this vehicle would eliminate a $20,000 request for a vehicle in the $ $25000 capital items portion of the general government budget
10 Horton House Electrical Priority Tier 2 Status Partial Funding Prev Approp. $0 10 Funding Request $33,050 Recommendation $12,350 Current electrical panel is old and not sufficient for the building (2 100Amp Panels) Taken on new loads (parking lot, records building) Electrical service upgrade and new 3 phase main panel. 325 Amp Service Would include a transfer switch and socket so a portable generator could be plugged in in the event of an extended outage Original request included a hard-wired generator May consider portable generator for support of other buildings in the future
11 Thermal Imaging Cameras Priority Tier3 Status Funding Complete Prev Approp. $0 11 Funding Request $30,000 Recommendation $30,000 Currently have one camera assigned at each station. One camera has failed other two last only 20 minutes on a charge. Replacement batteries are proprietary and expensive. Used by fire department personnel at structure fires and by police at accidents and in the case of missing persons New cameras use standard camcorder batteries and have standard data interfaces.
12 Wood Chipper (Replace #23) Priority Tier3 Status Funding Complete Prev Approp. $0 12 Funding Request $40,000 Recommendation $40, Model Year Used when trimming roads Used to assist CL&P in cleaning up major storms Significant hard use in the past two years
13 13 Previously Funded Projects
14 Road Re-surfacing Priority Status Tier1 Funding Complete 14 Funding Request $238,811 Recommendation $238,811 Safety issue state mandate for LOCIP Over 80 miles of roads and increasing Best practice - resurface 10% (8+ miles) per year Averaging 5-7 miles per year over the past 4 years Using stretch methods such as chip seal, micro-paving to reduce costs Target annual road upgrade is $500,000
15 Plow Truck (Replace #36) Priority Tier1 & 2 Status Funding Complete Prev Approp. $43, Tier 1 Funding Request $84,000 Tier 2 Funding Request $62,204 Total Funding Request $146,204 Recommendation $146,204 Front line heavy duty vehicle 1995 (18-years old) with 89,000 miles Rusting from the inside out Many welded patches and lots of paint
16 Bathroom Renovations Priority Tier1 Status Funding Complete Prev Approp. $50, Funding Request $50,000 Recommendation $50,000 Health and safety issue Original to the building construction In need of code and environmental updates
17 Replace ET 210 Priority Tier1 Status Funding Complete Prev Approp. $240, Funding Request $90,000 Recommendation $81,000 Safety issue Scheduled for replacement and 20 years old (model 1992) Electrical, mechanical, and water delivery issues Cost avoidance, mandated emissions controls Multi-year lease SEE ATTACHED DOCUMENT (Appendix)
18 Vehicle for Building Official Priority Tier1 Status Funding Complete Prev Approp. $10, Funding Request $17,876 Recommendation $17,876 Current vehicle is 12-years old (Ford Explorer) 2 ND year of two year funding. Total cost of project $28,645 Requires high clearance 4 WD vehicle to access building sites Needs room to store and transport equipment required for field use
19 19 Douglas Library Heating System Phase 2 Priority Tier 2 Status Partial funding Prev Approp. $30,000 Funding Request $77,000 Recommendation $77,000 Severity of need - Essential Project Second year of 3 phase Project Total cost - $150,720 Phase two replaces boiler and heating controls. Also demineralizes pipes. Study by Salamone & Assoc. indicates boiler must be replaced due to internal rusting.
20 TIERS (Priority within tiers) 20 TIER 1 Request FUNDING DEPARTMENT PROJECT RECOMMENDATION Public Works Road Resurfacing and Road Improvements $238,811 $238,811 Public Works Large Dump w/plow (replace 36) $146,204 $84,000 Board of Education GHS Bathroom Renovations $50,000 $50,000 Miscellaneous Town Office Building Generator/Electrical Service Upgrade $58,400 $58,400 Fire Department/EMS Replace ET210 $90,000 $81,000 Miscellaneous Vehicle for Building Official $17,876 $17,876 Board of Education HES Parking Lot Engineering and Design *** $150,000 $50,000 $751,291 $580,087 Total *** May NOT be expended until Hebron owns the Property TIER 2 TOTAL REQUESTS FUNDING DEPARTMENT PROJECT RECOMMENDATION Miscellaneous Douglas Library Mechanical System Upgrade $77,000 $77,000 Public Works Large Dump w/plow (replace 36) $146,204 $62,204 Miscellaneous Police Vehicle $22,500 $45,000 Miscellaneous HH Electrical Upgrade and Switchgear $33,050 $12,350 $278,754 $196,554
21 TIERS (Priority within tiers, Continued) 21 TIER 3 TOTAL REQUESTS FUNDING DEPARTMENT PROJECT RECOMMENDATION Fire Department/EMS Thermal Imaging Cameras (TIC) $30,000 $30,000 Public Works Wood Chipper (replace 23) $40,000 $40,000 $70,000 $70,000 NOT FUNDED TOTAL REQUESTS FUNDING DEPARTMENT PROJECT RECOMMENDATION Board of Education GHS Fire Rated Doors (2); HES Fire Rated Door (1) ***** $40,000 $0 Miscellaneous Douglas Library Roof Replacement $43,720 $0 Board of Education HES Roof (1988 wing) $150,000 $0 Fire Department/EMS Company # 1 Parking Lot Repaving ***** $68,000 $0 Miscellaneous Town Wide Telephone System (all Town buildings) $45,000 $0 $346,720 $0 ***** Project is not ready to be funded TOTAL REQUESTS FUNDING RECOMMENDATION GRAND TOTAL $1,300,561 $846,641 LEFT UNFUNDED 453,920
22 Recommendations (by Dept.) 22 Total CIP CIP CIP Requests Tier 1 Tier 2 Tier 3 Public Works Road Resurfacing and Road Improvements $238,811 $238,811 Large Dump w/plow (replace 36) $146,204 $84,000 $62,204 Wood Chipper (replace 23) $40,000 $40,000 Public Works Sub Total $425,015 $322,811 $62,204 $40,000 Board of Education GHS Bathroom Renovations $50,000 $50,000 HES Roof (1988 wing) $150,000 HES Parking Lot Engineering and Design $150,000 $50,000 GHS Fire Rated Doors (2); HES Fire Rated Door (1) $40,000 Board of Education Sub Total $390,000 $100,000 $0 $0 Fire Department/EMS Replace ET210 $90,000 $81,000 Company # 1 Parking Lot Repaving $68,000 Thermal Imaging Cameras (TIC) $30,000 $30,000 Fire Department Sub Total $188,000 $81,000 $0 $30,000 Miscellaneous Vehicle for Building Official $17,876 $17,876 Town Office Building Generator/Electrical Service Upg $58,400 $58,400 HH Electrical Upgrade and Switchgear $33,050 $12,350 Town Wide Telephone System (all Town buildings) $45,000 Douglas Library Mechanical System Upgrade $77,000 $77,000 Douglas Library Roof Replacement $43,720 Police Vehicle $22,500 $45,000 Dial-a-Ride Vehicle Replacement Miscellaneous Sub Total $297,546 $76,276 $134,350 $0 GRAND TOTAL $1,300,561 $580,087 $196,554 $70,000 TOTAL FUNDED $846,641
23 Funding of CIP 23 Funds released from previous projects, grant reimbursements misc. revenue FY Salt Shed $10, FY Street Signs $16, FY GHS 1970 Roof $1, FY 2011 Revaluation $9, FY Douglas Library - Fuel Storage Tank $ FY Large Dump Truck w/ Plow $ FY HES 1963 Roof $95, FY HES Modular Demolition $2, FY Town Office Parking Lot $7,773 Sale of Used/Surplus Equipment/Vehicles 1981 John Deere Tractor $2, GMC Brigadier Truck $ John Deere Backhoe $1, Ford F-350 $1, Compressor $950 $153,047
24 Funding of CIP 24 Approved Proposed Balance from Previous Appropriations $262,442 $153,047 LOCIP Funding $72,444 $103,269 DECD Historic Restoration Fund - Reimbursement - Horton House $0 $32,000 General Fund Contribution $417,647 $558,325 Total Revenues $752,533 $846,641 $68,302 Under General Fund contribution of $626,627
25 Five-Year Plan 25 Fiscal Year Funding Required $2,158,534 $1,662,249 $2,036,846 $849,423 $686,838 See Appendix for Detail
26 Review of CIP Policy 26 First formal policy adopted 2011 Review required every 2 years Review is complete Recommendations for changes will go to Board of Selectmen
27 CAPITAL IMPROVEMENT PROGRAM COMMITTEE APPENDIX March 7, 2013
28 Five-year Plan Detail 28 Public Works Road Resurfacing and Road Improvements $245,967 $253,346 $260,946 $268,775 $276,838 Large Dump w/plow (replace, 7) $95,000 $95,000 Replace 1978 CAT Loader $90,000 $90,000 GMC Flat Bed (replace 22) $65,000 Paving Box $70,000 Roll Off Truck (replace 15) $80,000 $80,000 Pavement Management System $41,800 Street Sweeper $85,000 Roadside Mower (replace 38) $90, Ton Trailer (replace 25) $32,000 Large Dump w/plow (replace 26) $200,000 Bucket Truck - International $160,000 New Public Works Facility - (to be bonded) ** Public Works Sub Total $565,967 $560,146 $547,946 $468,775 $436,838 Board of Education HES Roof (1988 wing) $150,000 GHS Fire Rated Doors (2); HES Fire Rated Door (1) $40,000 HES Roof (1947 wing) $225,000 GHS Air Handling and Energy Recovery Ventilators $150,000 GHS Energy Efficient Insulated Windows $52,000 GHS Activity Room Air Handling Unit and Air Conditioning $36,000 HES Air Handling and Energy Recovery Ventilators $120,000 GHS Multipurpose Room Air Handling Unit $70,000 GHS Pneumatic Control System $80,000 GHS Oil Tank Replacement $70,000 Board of Education Sub Total $415,000 $238,000 $270,000 $70,000 $0
29 Five-year Plan Detail (cont.) 29 Fire Department/EMS Replace ET210 $90,000 $90,000 $90,000 Company # 1 Parking Lot Repaving $68,000 Station Renovation/Maintenance (Station #1,#2,#3) $85,500 $30,000 $30,000 Replace Fire Police Vehicle $60,000 SCBA Replacement $150,000 $175,000 $175,000 Engine Tanker 310 $130,000 $130,000 $130,000 Replace S-110 $40,000 $90,000 Replace E110 $100,000 $100,000 $100,000 Command Vehicle $30,000 $30,000 Utility 110 Replacement $0 $11,000 Forestry 310 Replacement $95,000 Ambulance 510 $180,000 Fire Department Sub Total $763,500 $595,000 $691,000 $160,000 $0 Recreation Tractor $41,500 Burnt Hill Park - Upgrade Facilities $30,000 $500,000 Mason Dump Truck 4x4 w/ Plow and Sander (replace 44) $47,741 Mason Dump Truck 4x4 w/ Plow and Sander (replace 40) $50,648 Veteran's Park Toilet Facilities/Skatepark $250,000 Recreation Sub Total $71,500 $47,741 $500,000 $50,648 $250,000
30 Five-year Plan Detail (cont.) 30 Miscellaneous Town Wide Telephone System (all Town buildings) $45,000 Douglas Library Mechanical System Upgrade $47,000 Douglas Library Roof Replacement $43,720 MUNIS Software $128,000 Hebron Center Sidewalk Plan $30,000 $156,000 Dial-a-Ride Vehicle Replacement $48,847 Miscellaneous Sub Total $342,567 $221,362 $27,900 $100,000 $0
31 ET 210 Leasing Rates 31
Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested
AMOUNT SOURCE General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 0 155 MIS Technology Infrastructure 300,000 300,000 Tax Levy 300,000 300,000
More informationCITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description
2017 CAPITAL BUDGET FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153 - WINTER RECOVER/SNOW
More informationFY-15 FY-16 FY-17 CIP - CATEGORY/DESCRIPTION
Killington Capital Improvement Plan FY12-17 (Budget Year Plus Five) FY-11 FY-11 FY-12 FY-13 FY-14 FY-15 FY-16 FY-17 HIGHWAY DEPARTMENT EQUIPMENT Balance Forward 54,297 54,297 88,970 87,510 128,550 120,590
More informationTOWN OF NORTH BERWICK CAPITAL IMPROVEMENT PROGRAM
TOWN OF NORTH BERWICK CAPITAL IMPROVEMENT PROGRAM What is the Capital Improvement Program? The Capital Improvement Program (CIP) is a long range plan used in the development of annual operating budgets,
More informationCAPITAL IMPROVEMENT PROGRAM
The Capital Improvement Program provides the means through which the City of Palm Coast takes a planned and programmed approach to utilizing its financial resources in the most responsive and efficient
More informationBAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM
Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special
More informationROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN
ROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN 2017-2021 Table of Contents Schedules Page Proposed 2017-2021 Capital Improvement Plan Time Table 3 Summary by Major Category 4 Accompanying Chart 5 Summary
More informationThe meeting was called to order at 7:12 pm by Patrick Kinney, Acting Chairman.
TOWN OF GUILFORD PUBLIC WORKS COMMISSION SPECIAL MEETING THURSDAY December 17, 2015 7:00 PM-GUILFORD TOWN HALL Members Present: Members Excused: Members Absent: Town Officials: Patrick Kinney, Joe Travaglino,
More informationCAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment
CAPITAL OUTLAY Capital Outlay Item expenditures for fixed assets such as equipment, remodeling, minor building improvements, and vehicles may be funded from the operating budget or shortterm financing.
More informationPay Station EMV Chip Reader & Processor Upgrades
Agenda Item 8C CITY OF FERNDALE REQUEST FOR COUNCIL ACTION FROM: SUBJECT: Joseph Gacioch, Assistant City Manager Pay Station EMV Chip Reader & Processor Upgrades SUMMARY & BACKGROUND: A change in credit
More informationROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN
ROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN 2018-2022 Table of Contents Schedules Page Proposed 2018-2022 Capital Improvement Plan Time Table 3 Summary by Major Category 4 Accompanying Chart 5 Summary
More informationWRIGHTSTOWN TOWNSHIP 2016 DRAFT BUDGET
DRAFT Page 1 300.000.00 REVENUE 301.000.00 Real Estate Taxes 301.100.01 REAL ESTATE TAXES CURRENT (3.05) 192,465 190,213 197,464 199,461 204,637 204,970 202,791 205,276 206,545 206,545 206,545 206,545
More informationCity of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT
City of Monroe, Wisconsin Capital Improvement Plan FY '13 FY '17 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority Administration Replace Computer AD-15-01 3 Administration Administration
More informationCity of Brooklyn Park, Minnesota. Capital Equipment Plan Issued by:
City of Brooklyn Park, Minnesota Plan 2016-2020 Issued by: Finance Alan Rolek, Director Operations & Maintenance Dan Ruiz, Director Prepared by: Finance Korrie Johnson, Accountant Adopted December 7, 2015
More informationTown of Yarmouth Capital Improvement Plan FY FY2025
Town of Yarmouth Capital Improvement Plan FY2016 - FY2025 CONTENTS PAGE Narrative Overview 1 Recommendations for 2015 Annual Town Meeting 3 Facility Plan: Big Ticket Items FY2016 - FY2025 7 Capital Improvement
More informationFY 2012 PROPOSED BUDGET MOTOR POOL FUND SUMMARY
MOTOR POOL FUND SUMMARY OVERVIEW The Motor Pool Fund is an internal service fund established to account for the operations and maintenance of the city s fleet. Its customers are city departments, and its
More informationMUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION
REPORT NO. TS-07-15 MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION TO: Mayor and Members of Council FROM: Mike LeBlanc, Director of Operations DATE: March 23, 2015 SUBJECT:
More information2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE
TO CAPITAL REQUESTS SUMMARY Recomm ended /Grants/ Debt nded /Grants/ Debt GENERAL GOVERNMENT Server hardware replacement Server software replacement General Government Totals FIRE & EMERGENCY Erin Exhaust
More informationTo: Selectboard From: Charles Safford, Town Manager Date: December 18, 2017 Re: Capital Plan Letter of Transmittal The Town received $859,906 in local
To: Selectboard From: Charles Safford, Town Manager Date: December 18, 2017 Re: Capital Plan Letter of Transmittal The Town received $859,906 in local option taxes in FY 17 and over the last three completed
More informationBurlington Capital Improvement Plan: FY FY 2023
General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 145 Treasurer/Collector Printer Replacement 155 MIS Software Upgrade Information Systems
More informationCaldwell County, North Carolina Capital Improvement Plan BUILDING A BETTER FUTURE FOR THE CITIZENS OF CALDWELL COUNTY
Caldwell County, North Carolina Capital Improvement Plan BUILDING A BETTER FUTURE FOR THE CITIZENS OF CALDWELL COUNTY PROGRESS THROUGH PLANNING TABLE OF CONTENTS Water Fund Summary General Fund Summary
More informationPublic Works Department
Public Works Department Fleet Maintenance Mission: To establish and maintain efficient and effective delivery of fleet services by providing customer departments with safe, reliable, economical and environmentally
More informationBoard of Selectmen Special Meeting Minutes of November 20, 2014
BOARD OF SELECTMEN SPECIAL WORKSHOP MEETING THURSDAY, NOVEMBER 20, 2014 8:30 A.M. GUILFORD TOWN HALL First Selectman Joseph Mazza called the meeting to order at 8:40 a.m. Present: Board Members: Mazza,
More informationPresented to Council November 7, :30 p.m. More images
Presented to Council November 7, 2016 3:30 p.m. More images 1 1. Capital Projects - 25 Year Forecast 2. Public Works 3. Emergency Services 4. Library 5. Community Centre s 6. Parks & Recreation 7. Administration
More informationINCORPORATED VILLAGE OF ROCKVILLE CENTRE ADOPTED BUDGET
INCORPORATED VILLAGE OF ROCKVILLE CENTRE Page 1 ADOPTED BUDGET Fiscal Year June 1, 2018 thru May 31, 2019 Prepared In Compliance With Village Law, Tentative Budget filed March 5, 2018 Francis X. Murray,
More informationDenver Volunteer Fire Department. Insurance Services Office Rating: 5-9E. Number of Volunteers on Roster: 15
Denver Volunteer Fire Department Insurance Services Office Rating: 5-9E Number of Volunteers on Roster: 15 Number of Paid Staff (including Part-time): 42 Main Station Location: Sub-Station Location: Sub-Station
More informationCompressed Natural Gas (CNG) Fueling Station #
Compressed Natural Gas (CNG) Fueling Station # 2 01-180 New Facility Design and Construct a Compressed Natural Gas (CNG) vehicle fueling station. The station will be used for both City fleet and public
More informationCustom Budget Comp through FY18 Expenses
010:GENERAL 3000:SELECTBOARD 010-3000-10.00 Selectboard Salary 3,500 3,500 3,600 3,600-010-3000-10.01 Secretarial Services 2,100 2,416 2,220 2,400 180 010-3000-30.00 Advertising 1,200 2,045 1,200 1,500
More information10/24/17 CITY OF BOTTINEAU Page: 1 of 49 10:37:40 Expenditure Budget Report -- MultiYear Actuals Report ID: B240 For the Year: 2018
10/24/17 CITY OF BOTTINEAU Page: 1 of 49 1000 GENERAL FUND 411000 GOVERNING BOARD 110 SALARIES-PERMANENT EMP 23,000 24,000 24,000 20,000 24,000 83 24,000 24,000 100 Account: 23,000 24,000 24,000 20,000
More informationHENRY COUNTY GOVERNMENT CAPITAL IMPROVEMENT PLAN DISCUSSION
HENRY COUNTY GOVERNMENT CAPITAL IMPROVEMENT PLAN DISCUSSION OBJECTIVES 1. Review Capital Project List Maintenance and New 2. Determine if the direction is correct and add or delete any projects. 3. Discuss
More informationPUBLIC FACILITIES DIRECTORY
PUBLIC FACILITIES DIRECTORY PROPOSED TOWN INFRASTRUCTURE PROJECT DIRECTORY 2002 Town Beautification E 6 2105 Old Library Re-use E 8 2103 HVAC Upgrades Old Library E 10 2302 Building Replacement at Corporation
More informationCapital Improvement Plan
Capital Improvement Plan 2019 2023 City of Kaukauna December 17, 2018 Prepared By: John W. Sundelius, P.E., M.P.A. Director of Public Works/City Engineer Projects and items that appear in the CIP are not
More informationTOTAL CAPITAL EQUIPMENT REPLACEMENT PLAN 1,907, B1801 WSA TAX & SPECIAL BENEFITING LEVY 1,403, B1802 2,484,000.
Amount Grants s Grant / TOTAL NET OPERATING BEFORE COMMITTED (8,043,226.17) (8,043,226.17) CAPITAL EQUIPMENT PLAN CONTRIBUTION 1,907,621.83 (This is the annual funding contribution - new upfront purchases
More informationCITY OF NORWALK, CONNECTICUT
CITY OF NORWALK, CONNECTICUT April 15, 2015 Harry Rilling, Mayor Members of the Common Council Members of the Board of Estimate and Taxation Members of the Planning Commission I am pleased to present the
More informationClaremont Capital Improvement Program Summary Matrix
ASSESSING (Y-1, N- Improvement (Y- (Y-2, N- 1, N- 414-01 Assessing City Wide Revaluation 7/1/2019 5 GENERAL FACILITIES State required every 5 yrs to be 100%. Annual cyclical review allowed $100,000 25
More informationCity of El Paso de Robles Operating Capital Schedule Fiscal Year to New / Rep. Qty. Life (Yrs)
2011-12 to 2014-15 Personal Computer 110 101 Council 4 R 1 $ 1,300 ER Total City Council 1,300 - - - Personal Computer 130 103 CMO 4 R 1 1,300 1 1,200 ER Personal Computer 130 104 CMO 4 R 1 1,100 ER Personal
More informationFire Rescue Budget FY 18/19
Fire Rescue Budget FY 18/19 Fire Rescue has remained fiscally responsible over the last ten years Lost staff during the downturn No administrative support staff help (need several to catch up) No logistical
More informationCapital Improvement Program
Capital Improvement Program 20192023 Ontario, Oregon 20192023 Capital Improvement Program 1 Ontario, Oregon Ronald Verini, Mayor Norm Crume, Council President Thomas Jost Ramon Palomo Tessa Winebarger
More informationInstructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)
Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) 1. Personal Info: Ensure your legal company name is on the form. 2. Equipment Info: Ensure you complete all
More information(Q.5) Resulting Capital Asset Guide
(Q.5) Resulting Capital Asset Guide The guide below is intended to assist municipalities in selecting the most appropriate asset type, classification, and unit of measure under Question 5 of the MSI capital
More informationTOWNSHIP OF UPPER ST. CLAIR PROPOSED CAPITAL IMPROVEMENT PROGRAM
TOWNSHIP OF UPPER ST. CLAIR PROPOSED CAPITAL IMPROVEMENT PROGRAM 2019-2023 Table of Contents Schedules Page Summary by Major Category 3 Summary by Funding Source 4 Comparison of Current Plan to Previous
More informationTown of Stowe Equipment Fund PURCHASE Replacement REPLACEMENT LIFE ACTUAL DEPT VEHICLE MAKE VIN FY YEAR Fiscal Year VALUE CYCLE FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
More informationTown of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT
Town of Middletown, RI Capital Improvement Program FY '4 FY '8 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 0 - School Department FY '4 FY '5 FY '6 FY '7 FY '8 Floor Strippers/Burnishers
More informationCapital Improvement Plan
2017-22 Capital Improvement Plan Adopted: January 23, 2017(Planning Commission) February 6, 2017 (City Council) This document outlines planned capital improvement expenditures for the City of Springfield
More informationFY2018 Fleet Replacement & Augmentation Programs
FY2018 Fleet Replacement & Augmentation Programs Legislative Approval Nevada Legislature has approved a fleet procurement package for NDOT during the 2017 legislative session NDOT is requesting NDOT Board
More informationCITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.
CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM CITY PROPERTY DOWNTOWN (General Fund) 2010 2012 2010 PROJECTS 1) Replace bricked areas of sidewalks with stamped concrete. $ 10,000 SIDEWALK CONSTRCTION
More informationMayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator
City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement
More informationTown of Cohasset Alternative Energy Committee: Current Initiatives to Reduce Energy Costs While Promoting Energy Efficiency and Sustainability
Town of Cohasset : Current Initiatives to Reduce Costs While Promoting Efficiency and Sustainability Presentation by: Shaun Selha, Co-Chair February 11 th, 2015 Content Current Costs Status of AEC Initiatives
More information2019 CAPITAL BUDGET HIGH LEVEL RECAP
HIGH LEVEL RECAP 209 PROPOSED Jan 5th 209 March th Report TAX BASED 208 209 PROPOSED DRAFT 209 DRAFT FINAL REMOVE PROJECTS CONTINGENT ON SPECIAL FUNDING 208 PROPOSED excluding projects contingent on funding
More informationMilton Fire-Rescue Capital Improvement Plan
Milton Fire-Rescue 2018-2023 Capital Improvement Plan Capital Overview 2 Fire Stations 3 Engines 1 Ladder Truck 2 Ambulances 1 Forestry 2 Staff Vehicles 3 Sets of Extrication Tools 2 Thermal Imagers 2
More informationFleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010
Fleet Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010 Each year the City of Milwaukee Fleet Services Section submits at least three replacement equipment budget scenarios, which provide
More informationWAYNE COUNTY CAPITAL PLAN SUMMARY
WAYNE COUNTY CAPITAL PLAN SUMMARY 2019-2023 7/10/2018 TOTAL PROJECT TOTAL NON-LOCAL TOTAL COUNTY COUNTY DEPARTMENT COSTS FUNDING COSTS Buildings and Grounds 7,065,000 0 7,065,000 Highway (Equipment) 395,000
More informationQUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status
or) STREET RESURFACING, WATER MAIN AND SEWER 1 ERGB Construction Engr Phase III $ 150,000 $ 723,804 1/11/16 Const Phase Status 2 ERGB Improvements $ 150,000 $ 11,173,776 2016 1Q Const Finalizing lighting
More informationClarksville Street Department. Fiscal Year 2018 Budget Presentation
Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville
More informationCity of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT
City of Lawrence, Kansas Proposed Capital Improvement Plan 2019 2023 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project # City Manager's Office Affordable Housing General Fund Transfer CI05
More informationPublic Works Fleet Optimization Vehicle and Equipment Plan. 10/8/2013 City of Shawnee Caitlin Gard
Public Works Fleet Optimization Vehicle and Equipment Plan 10/8/2013 City of Shawnee Caitlin Gard Table of Contents Executive Summary... Introduction... Proper Asset Assignment... Update Replacement Schedule...
More informationWest Pikeland Township 2019 Budget
Carry Forward Fund Balances Infrastructure 1,445,000 1,445,000 1,445,000 Operating 2,210,000 2,210,000 2,210,000 Total 2,210,000 1,445,000 3,655,000 3,655,000 Liquid Fuels 220,000 220,000 Open Space 4,025,000
More informationCapital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget
Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is
More informationCOUNTY OF MONTGOMERY CAPITAL PLAN 2012 CAPITAL FUND BUDGET. Adopted April 19, 2012
2012 2016 CAPITAL PLAN Including 2012 CAPITAL FUND BUDGET Adopted April 19, 2012 2012 CAPITAL BUDGET SUMMARY ALL DEPARTMENTS 2012 Current 2012 Commitments 2013 2014 2015 2016 2012-2016 Public Property
More informationCITY OF NEWPORT CITY COUNCIL WORKSHOP NEWPORT CITY HALL July 19, 2018 IMMEDIATELY FOLLOWING THE REGUALAR COUNCIL MEETING
CITY OF NEWPORT CITY COUNCIL WORKSHOP NEWPORT CITY HALL July 19, 2018 IMMEDIATELY FOLLOWING THE REGUALAR COUNCIL MEETING MAYOR: Dan Lund City Administrator: Deb Hill COUNCIL: Bill Sumner Supt. of Public
More informationCity Budget Fleet Services Capital Budget Analyst Notes
City Budget Capital Budget Analyst Notes The City of Toronto's budget is presented by program and service, in Analyst Note format. The City's Capital Budget funds major infrastructure. -2022 Capital Program
More informationMONTHLY PERFORMANCE DASHBOARD
AUSTIN ENERGY MARCH 21 MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics for uary FY 21 FINANCIAL HEALTH Standard and Poor s Bond Rating Current AA AA Budget Based Revenues
More informationInformational Pre-Budget and CIP Council Workshop
Informational Pre-Budget and CIP Council Workshop Mike Tubbs June 20, 2012 Fleet and Facilities Maintenance Fleet Mission Statement To provide City departments with safe, reliable and economically sound
More informationThe purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:
Public Report To: From: Report Number: Community Services Committee Ron Diskey, Commissioner, Community Services Department CS-17-18 Date of Report: March 24, 2017 Date of Meeting: March 30, 2017 Subject:
More informationRevenue Source. Total $5,724,658. Expenditures
ADOPTED BUDGET PLAN FOR THE MOHAVE VALLEY FIRE DISTRICT Revenue Source Expenditures POSTED JULY 18, 2017 FISCAL YEAR 2015-2016 Levy Rate - $3.05 Reserved Revenue $900,000 Beginning Unreserved Balance $315,346
More informationMetropolitan Council Transit Capital Improvement Plan. September 23, 2009
1 Metropolitan Council 2010-2015 Transit Capital Improvement Plan September 23, 2009 2 Current Situation Capital facilities require longer range view Recent infusion of UPA, CTIB, and State funds have
More informationVILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL WORKSHOP APRIL 12, 2011 AGENDA
ITEM MOT 00-04483 VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL WORKSHOP APRIL 12, 2011 AGENDA SUBJECT: TYPE: SUBMITTED BY: Bid: Purchase of Replacement Vehicles and Equipment Resolution Ordinance
More informationMilton Fire-Rescue Capital Improvement Plan
Milton Fire-Rescue 2019-2024 Capital Improvement Plan Capital Overview 2 Fire Stations 3 Engines 1 Ladder Truck 2 Ambulances 1 Forestry 2 Staff Vehicles 3 Sets of Extrication Tools 2 Thermal Imagers 2
More informationC Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for
GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance
More informationCapital Equipment Program
Capital Equipment Program 2013-2017 2013 2017 Capital Equipment Program (CEP) Background The Capital Equipment Program (CEP) began in 1987. It was set up so Dakota County could better plan and manage all
More informationCity of Fernandina Beach, Florida Annual Budget
General Fund (001) Finance KRONOS PAYROLL SOFTWARE 100% 50,000 50,000 X Human Resources KRONOS HR MODULE 100% 50,000 50,000 X NEW PHONE SYSTEM-VARIOUS GENERAL FUND DEPARTMENTS Non-Departmental 100% 125,000
More informationCITY OF WEATHERFORD 2011 BUDGET
CITY OF WEATHERFORD 2011 BUDGET REVENUES GENERAL FUND 01-00-00-8110 SALES TAX - NON DEDICATED 3 PENNIES 4,964,472 4,852,315 5,100,000 4,950,000 5,194,000 01-00-00-8111 USE TAX 227,627 445,751 330,000 390,000
More informationmeet minimum industry standards. A new console has been funded thru a state grant in the amount of $48K
Priority by Department Item # year Description Cost 2011 Cost 2012 Cost 2013 Cost 2014 Cost 2015 Short Description Radio system dangerously deficient. Department needs to Radio Infrastructure meet minimum
More informationOffice of the Fire Chief City of Richland Hills, Texas
7A - 1 Office of the Fire Chief City of Richland Hills, Texas Memorandum To: Honorable Mayor Bill Agan and members of the Richland Hills City Council From: W. Bell, Fire Chief Date: May 14, 2014 Subject:
More informationPARKING SERVICES. Off-Street Parking Revenues
PARKING SERVICES Parking Services includes operation of two major Off- Street parking lots, all On- Street metered parking and parking enforcement activities. Off-Street Parking Off-Street Parking accounts
More informationTown of East Greenwich Adopted Fiscal Year 2019 Budget
Prior Year Tax Revenue 932,215 1,155,251 1,046,204 700,000 750,000 50,000 7.1% Current Year Tax Revenue 51,904,473 54,252,812 55,904,709 55,212,447 55,164,382 (48,065) -0.1% 03010 03010 TAX REVENUE 52,836,688
More informationHighlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024
8/18/14 CAPITAL BUDGET SUMMARY CAPITAL BUDGET * Local Option Infrastructure Sales Tax to expire October 31, 219 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-2 * FY2-21 FY21-22 FY22-23 FY23-24 AD VALOREM
More information2018 Capital Equipment Program (Fleet CEP) Operations Management - Fleet
2018 Capital Equipment Program (Fleet CEP) Operations Management - Fleet November 2017 1 FLEET CEP GOALS Replace vehicles and equipment according to life-cycle costs Reduce repair and maintenance costs
More informationOakland County Board of Commissioners General Government Committee April 23, SMART Services in Oakland County
Oakland County Board of Commissioners General Government Committee April 23, 2018 SMART Services in Oakland County Today s Presentation SMART in Oakland County Promises Kept Fixed Route Buses Small Buses
More informationPUBLIC WORKS COMMITTEE MEETING MONDAY, NOVEMBER 16, :00 P.M. CITY HALL COUNCIL CHAMBERS CONFERENCE ROOM MINUTES
PUBLIC WORKS COMMITTEE MEETING MONDAY, NOVEMBER 16, 2015 5:00 P.M. CITY HALL COUNCIL CHAMBERS CONFERENCE ROOM MINUTES I. ROLL CALL/CALL TO ORDER Chairman Cathy Waldeck called the meeting to order at 5:00
More informationDistrict of North Saanich STAFF REPORT
District of North Saanich STAFF REPORT To: From: Rob Buchan Chief Administrative Officer Theresa Flynn Director of Financial Services Ron Maylen Works Superintendent Date: March 4, 2014 File No. 1760 Re:
More informationTRANSPORTATION ENGINEERING SERVICES: Street Project Management
TRANSPORTATION ENGINEERING SERVICES: Street Project Management Mission Statement Street Project Management is a department within the Division of Public Works, Transportation Engineering section. The mission
More informationTRAFFIC CALMING PROGRAM
TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic
More informationSchedule of Equipment Rates
SCHEDULE OF EQUIPMENT RATES FEDERAL EMERGENCY MANAGEMENT AGENCY RESPONSE AND RECOVERY DIRECTORATE INFRASTRUCTURE DIVISION WASHINGTON, D.C. 20472 The rates on this Schedule of Equipment s are for equipment
More informationCapital Improvement Plan, Summary, All '10/'11. City of St. Albans, Vermont Contact Fire Chief. Fire -E-1. Description. Justification.
Department Fire Department City of St. Albans, Vermont Contact Fire Chief Fire -E-1 Useful Life 15 years Project Name Engine 1 Debt Service 1 Urgent Ongoing debt payments for Engine 1. Final payment 2014.
More informationTOWN OF SMITHFIELD CAPITAL IMPROVEMENTS PROGRAM. Fiscal Years
TOWN OF SMITHFIELD CAPITAL IMPROVEMENTS PROGRAM Fiscal Years 2019 2024 Proposed for Public Hearing and Approval December 19, 2017 Town of Smithfield PROPOSED CAPITAL IMPROVEMENT PROGRAM PLAN 2019-2024
More informationCapital Improvement Program (CIP) Fiscal Years 2017/ /2021
Capital Improvement Program (CIP) Fiscal Years 2017/2018-2020/2021 What is the Capital Improvement Program? The Capital Improvement Program (CIP) is the annual plan or schedule of project expenditures
More informationCapital Needs Assessment Riders Advisory Council July2, 2008
Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair
More informationCAPITAL IMPROVEMENT PLAN FISCAL YEARS
CAPITAL IMPROVEMENT PLAN FISCAL YEARS 2018-2022 Approved - February 13, 2017 Published - February 28, 2017 Salem Elementary Freedom Middle School Chancellor High School Joint Fleet Transportation Facility
More informationProposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1
Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation
More informationCapital Improvements Plan. Adopted January 2018
Capital Improvements Plan Adopted January 2018 Capital Improvement Plan 2019-2023 Fiscal Years Adopted - March 5, 2018 Resolution #18-082 Mayor and City Council City Staff - CIP Preparation Tim Moerman,
More informationDirector of Public Works. Administrative Assistant I
Director of Public Works Streets Foreman Administrative Assistant I Administrative Assistant I Sanitation Superintendent Streets Crew Sanitation Crew MISSION: The mission of the Department of the Public
More informationPurpose of Capital Improvement Program
1 Purpose of Capital Improvement Program o To identify capital projects and funding sources. o To strategically plan and prioritize projects within a budget to maximize the efficient use of funds. o Preserve
More informationWorking for Broward. Working for Coral Springs. September, 2016
Working for Broward. Working for Coral Springs. September, 2016 Outline What is the Surtax? Why a Surtax? Why Now? Infrastructure Projects Transportation Projects Oversight Committee Ballot Questions What
More informationGENERAL GOVERNMENT ~ Municipal Buildings
Department of Development Aeronautics Building Inspection Economic Development Geographic Information Systems Planning & Zoning Building Maintenance Building Inspector Superintendent Laborer Janitor Electrician
More informationActual Budgeted
DETAIL BREAKDOWN OF BUDGET 100 BOARD OF SELECTMEN 105,007 109,560 108,753 0 105,191-3,562-3.28% 100 First Selectman 49,788 48,849 49,150 0 49,338 188 0.38% 101 Selectman 3,244 3,244 3,266 0 3,277 11 0.34%
More informationMONTHLY PERFORMANCE DASHBOARD
AUSTIN ENERGY MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics FINANCIAL HEALTH Standard and Poor s Bond Rating Austin Energy Rating AA AA Budget Based Revenues and Expenses
More informationPARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR
CIP Title FINAL2:Layout 1 7/27/17 3:35 PM Page 9 PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 218 FY 218-222 Capital Improvement Program Description FY 217 FY 218 FY 219 FY 22 FY 221 FY 222
More informationCity of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt
Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year
More informationRURAL ROAD MAINTENANCE POLICY
Government of Yukon RURAL ROAD MAINTENANCE POLICY (Updated April 01, 2003 to reflect Department name change from Infrastructure to Highways and Public Works. No change to Policy.) November 1991 TABLE OF
More information