1 Capital Needs Assessment Riders Advisory Council July2,

2 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair Needs Enhancement Needs Capacity Needs IV. Next Steps 2

3 Capital Improvement Plan History 1998 F.R. Harris Report Twenty Year Capital Improvement Plan Capital asset database Infrastructure renewal requirements November Ten Year CIP (FY04 FY13), $12.2 billion MUST DO Infrastructure Renewal NEED TO DO Systems Access and Capacity SHOULD DO System Expansion System Access, $2.9 Infrastructure Renewal, $3.3 System Expansion, $6.0 3

4 Capital Improvement Plan History (-cont) October 2004 Metro Matters Fully funded MUST-DO Partially funded NEED-TO-DO No funding for SHOULD-DO ($2.7 Billion for FY05 FY10) January 2005 COG Blue Ribbon Panel (FY05 FY 15) Capital Needs: $800 Million per year Capital Revenue: $500 Million per year Shortfall: $300 Million per year 4

5 Why the Need for A New Capital Improvement Plan Supports efforts for increased funding Metro Matters Funding Agreement ends FY 2010 Federal funding bill SAFETEA-LU expires in September 2009 new bill to be developed Capital program management and budgeting Multi-year rail and bus vehicle procurements Communicate the Authority s transit vision by creating a link between capital investments and strategic goals Foundation for prioritizing investments 5

6 Capital Improvement Plan Inputs Long-range planning -Ridership/ Capacity forecast - Customer Service - Technology Asset Mgmt - Asset Condition -SOGR -Replacement cycles Capital Program Organization s Goals Org. Constraints - Financial - Procurement - Track Rights

7 Capital Planning Process Create Capital Capital Prioritization Programand Programming Capital Planning - Long-range plan - Asset Management - Organization s Goals - Organization s Constraints Capital Budgeting Monitoring Implementation

8 Capital Needs Assessment Overview What s included in the capital needs assessment: 10-year (2011 to 2020) focus Unconstrained by funding limits Improvements needed to keep the transit system in a state of good repair Improvements that will enhance service and the customer experience Increases in rail and bus capacity to meet demand and serve new markets What s not included in the capital needs assessment: System expansion projects: New rail lines including the Dulles Corridor extension New stations or station entrances Transit projects to be funded or implemented entirely by the jurisdictions

9 What is State of Good Repair? State of Good Repair is achieved when the infrastructure components are replaced on a schedule consistent with their life expectancy For example: Useful life of a bus is 15 years. In order to sustain a replacement of the fleet on an annual, prescribed, basis 1/15 of the fleet is replaced each year. Annual replacement will grow as fleet grows. 9

10 Future State of Good Repair The Metro Matters agreement established an average level of capital spending of about $500 million annually Going forward, a greater need exists just to keep the system in a Stateof-Good Repair The increased need is due to the following: For the first time, Metro is faced with the replacement of a series of railcars. Many assets have a 30-year life cycle. New or modified capital programs are included, i.e. IT, Metro Access, Employee Facilities. 10

11 State of Good Repair Asset Categories 1. Rail Fleet 2. Bus Fleet 3. Paratransit Fleet 4. Non-Revenue Fleet 5. Maintenance and Support Facilities 6. Passenger Facilities (Vertical Transportation) 7. Passenger Facilities (Station Facilities) 8. Track and Structures 9. Systems (ATC & Power) 10. Systems (Fare Payment) 11. Systems (Safety & Security) 12. Information Technology 11

12 State of Good Repair Needs - Highlights Replacement of Series Cars and Rehab of Series Cars plus Commissioning Facility Replace older buses (100 per year) to maintain an average fleet age of 7.5 years Maintain the structural integrity of Metrorail bridges, tunnels, platforms, and emergency exits Replace 52,800 linear feet of running rail and 30 switches per year, as well as the renewal of other critical track components Replace 4 bus garages Replace traction power switchgear Replace and upgrade AFC equipment system-wide Rehabilitate automatic train control Comprehensive upgrade of IT data centers and infrastructure

13 Enhancement Needs - Highlights Extending Platform Canopies provide coverage for full length of platform at all above ground stations (39) SmartTrip Dispenser Conversion enable an additional 500 machines to distribute SmartCards Camera Installation Program - install camera systems on all revenue buses increase safety and security Next Generation Web portal enhance portals navigation features, add security protection and improve translation capabilities. Additional metrorail station signage in stations improve pedestrian flow and safety within metrorail stations 13

14 Ridership Growth Trends Between 2005 and 2030, average daily rail ridership is expected to grow by over 40%, or 1.5% annually. Over the same period, average daily bus ridership is expected to grow by 26%, or 1% annually. (Thousands) 1,200 1, Projected Daily Ridership Rail Bus

15 Capacity Enhancement Needs - Rail Station Connection Tunnel Concept 100% 8-Car Trains Includes the purchase of 220 railcars Includes the power upgrades to support this capacity Capacity enhancements to nine Metrorail stations Two congestion-relieving pedestrian tunnels Maintenance and storage capacity enhancements at 4 rail yards NOTE: Parking garage expansion is not included in the CIP.

16 Capacity Enhancement Needs - Bus Construction of two new bus garages, and completion of bus facilities at the Carmen Turner Facility Addition of over 400 new buses to the fleet for seat replacement, impact of traffic congestion, and service expansion Implementation of priority bus treatments including transit signal priority implementation, queue jumpers, bus bulbs Improvements to bus stops and shelters to improve safety and provide real-time information to passengers

17 Next Steps Summer / Fall 2008 Present draft Capital Needs Assessment to JCC, RAC, and regional stakeholders Fall 2008: Board presentation of Capital Improvement Plan Regional discussions about funding and prioritization Develop capital funding agreement to begin July

18 Appendices

19 Metrorail Fleet Current Assets Rail Fleet by Age of Vehicles (FY2009) years 20+ years 15+ years 5+ years New Manufacturer Series Number Owned Years Purchased Rohr Breda 2000 / Breda CAF Alstom Total 1132* * Ten Rohr cars are no longer in revenue service. Fleet Size 1132 Useful Life (Rehab/Replace) Avg. Fleet Age 20/40 years 17 years 19

20 Metrobus Fleet Current Assets Bus Fleet by Age of Vehicles (FY2009) Years New Includes 225 buses in FY08-09 Fleet Size 1507 Useful Life (Rehab/Replace) Avg. Fleet Age % of Fleet > 15 years 7.5/15 years 8.1 years in FY years in FY09 10% 20

21 MetroAccess Fleet Current Assets Paratransit Fleet by Age of Vehicles (FY2009) # of paratransit vehicles by age Fleet Size Vans 351 Sedans Useful Life Avg. Fleet Age % of Fleet Exceeding Life 4 years 2.8 years 17% Years 21

22 Track and Structures - Current Assets Item Total in System Stations 86 Track Miles 212 Aerial Structures (in feet) 75,343 Bridges 47 Parking Garage Structures 21 Running Rail (in 1,119,360 feet) Cross Ties 102,667 Track Fasteners 330,512 Turnouts

23 State of Good Repair Needs Rolling Stock Metrorail Replacement of 1000-series rail cars Mid-life rehabilitation of the and 5000-Series railcars Railcar safety and reliability enhancements Metrobus Replacement of approximately 100 buses per year Mid-life rehabilitation programs including engine and component overhauls MetroAccess Purchase of roughly 300 vehicles annually for replacement and fleet expansion Capitalization of the fleet saves significant operating costs Fleet expansion is needed to meet rapid ridership growth and comply with federally-mandated service requirements Non-Revenue Vehicles Replacement of Metro s 800+ service vehicles Replacement of Metro Transit Police 90+ vehicles

24 State of Good Repair Needs Facilities Maintenance Facilities Rehabilitation of rail facilities including rail yard and shop buildings, lifts, and wheel truing machines Construction of a rail car test track & commissioning facility Replacement of more than 60 pieces of heavy rail work equipment, such as prime movers, flat cars, tampers, and cranes Complete replacement of two bus garages, rebuild-in-place for two others, and various major and minor rehabs for individual bus support buildings Rehabilitation several employee facilities including Revenue Collection Facility, Metro Supply Facility, CTF, and others Passenger Facilities Extension of 36 above ground station platform canopies Rehabilitation of 34 surface lots, 53 kiss and ride facilities, access roads and bus loops on a 5-year cycle Rehabilitation of 47 below ground rail station chillers

25 State of Good Repair Needs Facilities (-continued) Elevators and Escalators Rehabilitation and safety upgrades to 30 escalators per year Rehabilitation and safety upgrades to elevators and elevator head houses Track and Structures Replacement of over 10 miles of running rail, 8,000 crossties, 30 switches, and various critical track components annually Replacement of track fasteners and installation of concrete ties in the vicinity of stations with ballasted track Maintain structures including bridges Annual renewal of five miles of third rail Continuation of the station/tunnel leak program to combat water infiltration into the system

26 State of Good Repair Needs Systems Power and Train Control Systems Rehabilitation of the power system, including traction power switchgear renewal, the Rail Reliability Initiative, power mid-life rehab, electrical system rehab, and UPS renewal Rehabilitation of the train control (ATC) system Fare Payment Systems System-wide replacement and upgrade of automatic fare collection equipment including vending machines and Upgrades to electronic payment system software and other enhancements Information Technology Investment in enterprise architecture Investment in data centers and architecture Addition of software modules to support corporate operations and upgrade to new vendor versions Improvements to IT security infrastructure and monitoring

Proposed FY2015 Budget and Fare Increase

Proposed FY2015 Budget and Fare Increase Washington Metropolitan Area Transit Authority Proposed FY2015 Budget and Fare Increase Riders Advisory Council January 8, 2014 1 Washington Metropolitan Area Transit Authority What will riders see from

More information

Transit Maintenance Equipment. Maintenance Facilities FY

Transit Maintenance Equipment. Maintenance Facilities FY Transit Maintenance Equipment TIP ID: 5861 Fed/St/Loc Title: Maintenance Equipment 2015-2020 Local 0/0/100 4,300 e 42,635 e 58,414 e 41,428 e 35,820 e 15,805 e 198,401 PRIIA 50/0/50 24,290 e 27,144 e 20,409

More information

Briefing on Metro Matters Projects

Briefing on Metro Matters Projects Customer Services, Operations, and Safety Committee Board Information III-D March 13, 2008 Briefing on Metro Matters Projects Washington Metropolitan Area Transportation Authority Board Action/Information

More information

7000 Series Railcar Program Overview

7000 Series Railcar Program Overview Finance, Administration and Oversight Committee Information Item IV-B November 6, 2008 7000 Series Railcar Program Overview Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Briefing on Metro Matters Projects

Briefing on Metro Matters Projects Planning, Development and Real Estate Committee Board Information Item III-A March 27, 2008 Briefing on Metro Matters Projects Washington Metropolitan Area Transportation Authority Board Action/Information

More information

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Page 72 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan

Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan Page 54 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates Capital and Strategic Planning Committee Item III - A May 10, 2018 FY2018 Third Quarter Capital Program Updates Page 4 of 44 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

Metropolitan Council Transit Capital Improvement Plan. September 23, 2009

Metropolitan Council Transit Capital Improvement Plan. September 23, 2009 1 Metropolitan Council 2010-2015 Transit Capital Improvement Plan September 23, 2009 2 Current Situation Capital facilities require longer range view Recent infusion of UPA, CTIB, and State funds have

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

Transit in Bay Area Blueprint

Transit in Bay Area Blueprint Rail~Volution 2010 Click to edit Master title style Transit in Bay Area Blueprint October 21, 2010 0 Bottom Line State-of-Good Repair essential for reliable transit service large funding shortfalls BART

More information

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who

More information

PARTIAL PROGRAM OF PROJECTS FFY

PARTIAL PROGRAM OF PROJECTS FFY PARTIAL PROGRAM OF PROJECTS FFY 2016-17 The proposed Partial Program of Projects for FFY 2016-17 is attached. The proposed Partial Program of Projects was introduced at the SCTA Board at its meeting on

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT FISCAL YEAR 178 GOLD COAST TRANSIT DISTRICT COMMUNITY REPORT We are making progress, are you on board? OJAI OXNARD PORT HUENEME VENTURA COUNTY OF VENTURA GENERAL MANAGER S MESSAGE STEVEN P. BROWN DEAR

More information

Metropolitan Council Budget Overview SFY

Metropolitan Council Budget Overview SFY Metropolitan Council Budget Overview SFY 2016-2017 H T t ti C itt House Transportation Committee February 4, 2015 Transit connects us to the places that matter Transportation Needs Grow as the Region Grows

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

TESTIMONY of RICHARD SARLES Before the Council of the District of Columbia s Committee on Economic Development February 19, 2014

TESTIMONY of RICHARD SARLES Before the Council of the District of Columbia s Committee on Economic Development February 19, 2014 TESTIMONY of RICHARD SARLES Before the Council of the District of Columbia s Committee on Economic Development February 19, 2014 Good Morning, Chairperson Bowser and members of the Committee on Economic

More information

A Transit Plan for the Future. Draft Network Plan

A Transit Plan for the Future. Draft Network Plan A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year

More information

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning

More information

FOR IMMEDIATE RELEASE January 17, CONTACT: Mayor s Press Office

FOR IMMEDIATE RELEASE January 17, CONTACT: Mayor s Press Office FOR IMMEDIATE RELEASE January 17, 2012 CONTACT: Mayor s Press Office 312.744.3334 press@cityofchicago.org MAYOR EMANUEL OPENS NEWLY-RENOVATED GRAND AVENUE RED LINE STATION Announces New Green Line Station

More information

Precision Station Stopping Progress Update

Precision Station Stopping Progress Update Washington Metropolitan Area Transit Authority Precision Station Stopping Progress Update Presented to: The Board of Directors; Customer Service, Operations and Safety Committee By PlanninghDevelopmenthEngineeringhConstruction

More information

Overview of Transit Projects in the Transportation Investment Act in MARTA Jurisdictions. June 11, 2012

Overview of Transit Projects in the Transportation Investment Act in MARTA Jurisdictions. June 11, 2012 Overview of Transit Projects in the Transportation Investment Act in MARTA Jurisdictions June 11, 2012 TIA-023: I-20 East $ 225 million Project will construct bus P&R intended to be future rail stations

More information

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min. AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, 2016 5:30 P.M. CALL TO ORDER 1) APPROVAL OF AGENDA 1 min. 2) INTRODUCTIONS 5 min. A. Welcome City of Yelm Councilmember Molly Carmody B. Welcome

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Downtown Transit Connector. Making Transit Work for Rhode Island

Downtown Transit Connector. Making Transit Work for Rhode Island Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project

More information

SamTrans Business Plan Update May 2018

SamTrans Business Plan Update May 2018 SamTrans Business Plan Update May 2018 SamTrans Business Plan Core Principles: 1. Sustain and enhance services for the transit-dependent 2. Expand and innovate mobility services 3. Promote programs that

More information

Purple Line Light Rail P3 Project

Purple Line Light Rail P3 Project Purple Line Light Rail P3 Project TPB Meeting May 18, 2016 1 Topics General Project Overview The P3 Contract Details on The Successful Proposal 2 Recap of Purple Line P3 Events In November 2013 MTA initiated

More information

Colorado Association of Ski Towns August 26, 2016

Colorado Association of Ski Towns August 26, 2016 Colorado Association of Ski Towns August 26, 2016 1 Presentation RFTA Overview Long Range Forecast Integrated Transportation System Plan Questions Roaring Fork Transportation Authority (RFTA) RFTA Overview

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Presentation of the Baltimore Metro System

Presentation of the Baltimore Metro System Presentation of the Baltimore Metro System Presenter: Michael S. Davis Deputy Administrator, Transit Operations Division March 2, 2010 Topics Early Planning for Rapid Rail Transit System Overview Section

More information

ACT 89: THE FOUNDATION TO REBUILD SEPTA FOR THE FUTURE JOSEPH M. CASEY GENERAL MANAGER

ACT 89: THE FOUNDATION TO REBUILD SEPTA FOR THE FUTURE JOSEPH M. CASEY GENERAL MANAGER ACT 89: THE FOUNDATION TO REBUILD SEPTA FOR THE FUTURE JOSEPH M. CASEY GENERAL MANAGER MARCH 12, 2015 CAPITAL BUDGET TREND HISTORIC FUNDING SHORTFALLS $350 $300 PA ACT 26 (1991) $312 PA ACT 44 (2007) $293

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Executive Summary: Metrobus Network Evaluation and Future Fleet Needs Presented to: Washington Metropolitan Area Transit Authority Submitted by: In Association with P 2 D Joint Venture Introduction Metrobus

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION PROJECT TITLE U-MED DISTRICT MULTI-MODAL IMPROVEMENTS- PHASE II Transit Vehicles and Upgrades MUNICIPALITY OF ANCHORAGE Capital Improvement Program PROJECT LIST BY DEPARTMENT Public

More information

Capital Needs Inventory

Capital Needs Inventory 2011-2020 Capital Needs Inventory Washington Metropolitan Area Transit Authority Metro Capital Needs Inventory Table of Contents Contents Introduction 2 Metro s Role in the Region 2 Overview of Future

More information

METROPOLITIAN TRANSPORTATION AUTHORITY 2018 JULY and NOVEMBER FINANCIAL PLAN BUDGET REDUCTION PROGRAM (BRPs) ($ in millions) - Fav/(Unfav)

METROPOLITIAN TRANSPORTATION AUTHORITY 2018 JULY and NOVEMBER FINANCIAL PLAN BUDGET REDUCTION PROGRAM (BRPs) ($ in millions) - Fav/(Unfav) 2018 July Plan (as published/unadjusted)) 248 $81.192 468 $123.356 468 $123.872 468 $122.243 468 $111.773 468 $562.436 2018 July Plan (captures impact of adjustments) 242 $77.646 462 $111.875 462 $121.151

More information

ConnectGreaterWashington: Can the Region Grow Differently?

ConnectGreaterWashington: Can the Region Grow Differently? Washington Metropolitan Area Transit Authority ConnectGreaterWashington: Can the Region Grow Differently? Transportation Planning Board (TPB) Travel Forecasting Subcommittee July 17, 2015 1 Alternatives

More information

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit

More information

Improving Accessibility of Regional Bus Stops and Pathways

Improving Accessibility of Regional Bus Stops and Pathways Customer Service and Operations Committee Board Information Item III-A March 13, 2014 Improving Accessibility of Regional Bus Stops and Pathways Page 3 of 17 Washington Metropolitan Area Transit Authority

More information

Chapter 6 - Capital Improvement Program

Chapter 6 - Capital Improvement Program Chapter 6 - INTRODUCTION This chapter outlines the capital infrastructure projects needed to implement the service recommendations described in Chapter 5. The (CIP) provides the basis for CSPDC s requests

More information

Mississauga Transit 2009 Budget

Mississauga Transit 2009 Budget Mississauga Transit 2009 Budget Budget Committee Presentation December 2, 2008 Revenue Ridership Forecasted 2008 Total Rides Including transfers 11% growth in the last 24 months Transit Service Area Business

More information

Sustainability SFMTA Path to Platinum

Sustainability SFMTA Path to Platinum Sustainability SFMTA Path to Platinum Ed Reiskin San Francisco Municipal Transportation Agency, Director of Transportation San Francisco, CA Timothy Papandreou Deputy Director Strategic Planning & Policy

More information

Report by Planning, Development & Real Estate Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Planning, Development & Real Estate Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Planning, Development & Real Estate Committee (B) 06-26-08 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 100027 Resolution: Yes

More information

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Legislative Committee on Urban Growth and Infrastructure Carolyn Flowers CEO Charlotte Area Transit System March 23, 2010 Charlotte Region

More information

An Asset Management Plan for Transit And Access Transit Fleet

An Asset Management Plan for Transit And Access Transit Fleet Header Title ATTACHMENT 1 Building Better Transit: An Asset Management Plan for Transit And Access Transit Fleet 2 June 2016 Transit & Access Transit Fleet INTRODUCTION The Saskatoon Transit fleet is currently

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

ROCHESTER, MINNESOTA

ROCHESTER, MINNESOTA ROCHESTER, MINNESOTA Rochester Public Works TRANSIT AND PARKING DIVISION Transit and Parking Manager Tony Knauer tknauer@rochestermn.gov SERVICE ATTITUDE CONSISTENCY - TEAMWORK ROCHESTER TRANSIT & PARKING

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org Capital Metro Plans & Projects Update NASWC July 27, 2017 1 Capital Metro at a Glance Established in 1985 535 square mile service area 1,079,995 population 7 Member Cities Austin Leander Manor Lago Vista

More information

PUBLIC TRANSPORT MODAL CHARACTERISTICS AND ROLES

PUBLIC TRANSPORT MODAL CHARACTERISTICS AND ROLES PUBLIC TRANSPORT MODAL CHARACTERISTICS AND ROLES Outline 1. Range of Modes and Services 2. Modal Descriptions 3. Modal Comparisons and Performance Characteristics 4. Simple Capacity Analysis Nigel H.M.

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

Transit Access to the National Harbor

Transit Access to the National Harbor Transit Access to the National Harbor December 2014 Table of Contents Executive Summary... 3 Introduction and Project Purpose... 6 Methodology.. 9 Definition of Alternatives..... 9 Similar Project Implementation

More information

Oakland County Board of Commissioners General Government Committee April 23, SMART Services in Oakland County

Oakland County Board of Commissioners General Government Committee April 23, SMART Services in Oakland County Oakland County Board of Commissioners General Government Committee April 23, 2018 SMART Services in Oakland County Today s Presentation SMART in Oakland County Promises Kept Fixed Route Buses Small Buses

More information

Overview of Transit Funding and Planning in the PACTS Region

Overview of Transit Funding and Planning in the PACTS Region Overview of Transit Funding and Planning in the PACTS Region Presentation to PACTS Transit Committee and Federal Transit Administration Representatives February 8, 2018 Transit Agencies Agency Communities

More information

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes May 23, 2011 APTA Bus & Paratransit Conference Metro ExpressLanes Program Overview > Conversion of HOV lanes to HOT lanes on I-10 and I-110 > Multi-modal Integrated Corridor Emphasis > 1 of 6 Nationwide

More information

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion MOTION NO. M2016-66 Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee 07/07/16

More information

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016 MANASSAS PARK STATION PARKING EXPANSION Site Evaluation & Recommendation October 18, 2016 1 INFORMATION ITEM Project Overview Parking Demand Site Evaluation VRE Recommended Preferred Alternative Next Steps

More information

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS May 19, 2005 Department of Operations 100 95 90 85 80 75 70 65 A B C D RAIL PERFORMANCE INDEX FY

More information

Customer Service, Operations and Safety Committee. Rail Car Deployment Strategies

Customer Service, Operations and Safety Committee. Rail Car Deployment Strategies Customer Service, Operations and Safety Committee Rail Car Deployment Strategies July 21, 2005 Department of Operations Table of Contents Purpose Metro Matters Power Upgrade Schedule Current Service Possible

More information

FFYs Transportation Improvement Program

FFYs Transportation Improvement Program For Public Review Table 2: Draft Amendment One Summary: Five-Year MBTA Programming Overall Changes in Funding in TIP Project Proposed Change Explanation Section/Funding Source From To Difference Five Year

More information

Status Report Metrobus Capital Improvement Program FY06-11

Status Report Metrobus Capital Improvement Program FY06-11 Washington Metropolitan Area Transit Authority Status Report Metrobus Capital Improvement Program FY06-11 P D E C Presented to the Board of Directors: Planning & Development Committee September 8, 2005

More information

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION October 6, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 WELCOME 2 Item #4 TRAC ROADWAY RECOMMENDATIONS UPDATE Item #4 Completed Jurisdiction Presentations Boulder City August

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

CREATING CONNECTIONS IN RICHMOND HILL

CREATING CONNECTIONS IN RICHMOND HILL CREATING CONNECTIONS IN RICHMOND HILL Mohamed Alkoka, Director, Corridor Infrastructure Metrolinx Anthony Irving, Manager, Community Relations Metrolinx May 15, 2017 1 GRIDLOCK COSTS OUR ECONONY Residents

More information

PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015

PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015 PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015 Agenda A Introduction to PRASA B Funding Allocation and Spending Performance C Strategic Plan D Rail Modernisation

More information

Equipment Management Department. Council Budget Presentation

Equipment Management Department. Council Budget Presentation Equipment Management Department Council Budget Presentation Presented: March 15, 2012 Council Inquiries 1. Please provide a brief summary of shifts in your department s operating budget and staffing levels

More information

Metro Green Line to LAX Alternatives Analysis. March 2012

Metro Green Line to LAX Alternatives Analysis. March 2012 Metro Green Line to LAX Alternatives Analysis 1 2 The Crenshaw/LAX Project Foundation for Metro Green Line to LAX 8.5 mile extension Metro Exposition Line (Crenshaw Exposition) to Metro Green Line (Aviation/LAX

More information

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MOTION NO. M2018-161 Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION

More information

Safety and Operations Committee. Action Item III-A. December 13, 2018

Safety and Operations Committee. Action Item III-A. December 13, 2018 Safety and Operations Committee Action Item III-A December 13, 2018 Preventive Maintenance Update Page 3 of 46 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based

More information

Strategic Planning for Metro s Transition to Zero Emission Buses. October 2017

Strategic Planning for Metro s Transition to Zero Emission Buses. October 2017 Strategic Planning for Metro s Transition to Zero Emission Buses October 2017 Requirements and Guidelines/Guiding Principles Continue to replace Aging Bus Fleet (~200 Buses per Year) Upgrade current CNG

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Developing Toronto s Transit Network Plan to Public Information Meeting June 21, 2016

Developing Toronto s Transit Network Plan to Public Information Meeting June 21, 2016 Developing Toronto s Transit Network Plan to 2031 Public Information Meeting June 21, 2016 March 2016 City Council Direction SmartTrack: Approved SmartTrack/GO Regional Express Rail (RER) Integration options

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013 Regional Transit Extension Studies Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013 Topics Virginia Beach Transit Extension Study (VBTES) Naval Station

More information

USDOT CMAQ Program. Southeast Diesel Collaborative Annual Conference September, 2017

USDOT CMAQ Program. Southeast Diesel Collaborative Annual Conference September, 2017 USDOT CMAQ Program Southeast Diesel Collaborative Annual Conference September, 2017 1 CMAQ & Title 23: What and Why? Section 149: The CMAQ program is established for transportation projects that contribute

More information

Document 4 - Budget Adjustments Processed Under Delegated Authority

Document 4 - Budget Adjustments Processed Under Delegated Authority Supported Budget Adjustments Processed Under Delegated Departmental Requests: 900874 Bus Additions 4,384,000 - - (4,384,000) 901223 Smart Growth Transit-Transit Control Ctr 100,000 - - (100,000) 903401

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 MARTA s blueprint for the future COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 TODAY S AGENDA About MARTA Economic development/local impact More MARTA Atlanta program Program summary/timeline

More information

MTA Capital and Planning Review

MTA Capital and Planning Review MTA Capital and Planning Review The Bond Buyer's 5th Annual Metro Finance Conference November 15, 2007 Evolution of the Capital Plan 1 Plan Evolution First five-year plan approved in 1982 to rescue system

More information

Solano County Transit

Solano County Transit AGENDA ITEM: 9 BOARD MEETING DATE: FEBRUARY 18, 2016 Solano County Transit TO: PRESENTER: SUBJECT: ACTION: BOARD OF DIRECTORS ALAN PRICE, PROGRAM ANALYST II REVIEW AND APPROVE IMPLEMENTATION OF THE FUELING

More information

Strategic Plan

Strategic Plan 2005-2015 Strategic Plan SUMMARY OF THE REVISED PLAN IN 2011 A decade focused on developing mass transit in the Outaouais A updated vision of mass transit in the region The STO is embracing the future

More information

RTSP Phase II Update

RTSP Phase II Update Washington Metropolitan Area Transit Authority RTSP Phase II Update Presentation to the Technical Advisory Group July 18, 2013 Meeting 1 Presentation Outline RTSP Integration with Momentum RTSP Process

More information

Greater Cleveland Regional Transit Authority. Joe Calabrese - General Manager

Greater Cleveland Regional Transit Authority. Joe Calabrese - General Manager Greater Cleveland Regional Transit Authority Joe Calabrese - General Manager RTA Ridership by Mode! 500 Buses - 75 %! 60 Heavy Rail Vehicles - 10%! 24 RTV s (BRT) - 8%! 48 Light Rail Vehicles - 6%! Paratransit

More information

Transportation Infrastructure Investment Program moving

Transportation Infrastructure Investment Program moving moving CALGARY What is TIIP? Ten Year Transportation Capital Program Last approved by Council in 2005 Defines: Major infrastructure projects Lifecycle programs What is TIIP? Represents current planned

More information

Greater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager

Greater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager Greater Cleveland Regional Transit Authority Joe Calabrese CEO/General Manager Greater Cleveland RTA Overview Service Area Population of 1.5 million Customers Served 200,000 on a typical weekday 1.6 million

More information

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 Presentation Outline Context t of Mississauga i City Centre Implementing Paid Parking and TDM

More information

FY Capital Improvement Plan

FY Capital Improvement Plan FY2016-2025 Capital Improvement Plan June 2015 The Des Moines Area Regional Transit Authority s Capital Improvement Program (CIP) is a 10-year framework that provides direction and guidance for the agency

More information

San Francisco Transportation Plan Update

San Francisco Transportation Plan Update San Francisco Transportation Plan Update SPUR August 1, 2011 www.sfcta.org/movesmartsf twitter.com/sanfranciscota www.facebook.com/movesmartsf How does the RTP relate to the SFTP? Regional Transportation

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only METRONext Vision & Moving Forward Plans Board Workshop December 11, 2018 Disclaimer This presentation is being provided solely for discussion purposes by the Board of Directors of the Metropolitan Transit

More information

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Overview Commuter rail service between Lovejoy and Atlanta is ready for implementation: $87.08 Million is in

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

6 York Region Transit (YRT/Viva) On-board Security Camera System Upgrade Contract Award

6 York Region Transit (YRT/Viva) On-board Security Camera System Upgrade Contract Award Clause 6 in Report No. 11 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 25, 2015. 6 York Region Transit (YRT/Viva)

More information

Milwaukee County Transit System

Milwaukee County Transit System Milwaukee County Transit System 2018 Proposed Transit Budget for Paratransit and Fixed Route Transit Operations and Capital Projects August 2017 Total Transit Budget State $ Federal $ Transit Rev. $ Vehicle