Loop 375 Border Highway West Extension Project
|
|
- Maximilian Baker
- 5 years ago
- Views:
Transcription
1 Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\1_13_05_21_UPRR_Pinch_Pts_South_Asarco.mxd Date Saved: 5/31/13 PAISANO UPRR ExistingTrack 3 Aerial: NAIP, 08/30/12 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from Halff Engineering, UPRR Existing Track 1 UPRR Existing Track 2 BHW Right-of-Way Drainage Pond BNSF Existing Track UPRR Existin Track 1:3,600 1 " = 300 ' Loop Border Highway 85 ASARCO Area (PP1) RIIO GRANDE
2 UNIVERSITY ELECTRIC SUN BOWL WIGGINS RIM SCHUSTER Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\2_13_05_21_UPRR_Pinch_Pts_Rescue_Mission.mxd Date Saved: 5/31/13 UPRR Existing Track 1 UPRR Existing Track 2 Aerial: NAIP, 08/30/12 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from Halff Engineering, 13 Project Area Drainage Pond UP-FUTURE-REMOVAL RIO I GRANDE BNSF Track Removal BNSF Existing Track UPRR Existin Track 85 1:3,600 1 " = 300 ' RUHLEN RAMP Northwest of Rescue Mission (PP2) HART Loop Border Highway MAIN
3 YANDELL FERN PORFIRIO DIAZ MISSOURI LAWTON FEWEL MAIN RANDOLPH FRANKLIN SAN FRANCISCO ANTHONY WESTERN DURANGO SAN ANTONIO RAMP GATEWAY EAST PAISANO OVERLAND Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\3_13_05_21_UPRR_Pinch_Pts_Yandell_Bridge.mxd Date Saved: 5/31/13 Aerial: NAIP, 08/30/12 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from Halff Engineering, 13 BHW Project Area Proposed Side Remove Shift Existing Mainline Foreign Railroad RR Right of Way Former RR Right of Way RR Right of Way to be Acquired Sidewalk Removal Dock Retaining Wall RIIO GRANDE Amtrak Siding UPRR Main Track 1 UPRR Main Track 2 UPRR Main Track 3 1:3,600 1 " = 300 ' Loop Border Highway South of Yandell Bridge (PP3) CANAL
4 SANTA FE ALLEY E STANTON OREGON EIGHTH CHIHUAHUA NINTH CALLEROS 62 Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\4_13_05_30_UPRR_Pinch_Pts_Intern_Inspection.mxd Date Saved: 5/31/13 WB BHW BHW Median BHW ' Shoulder Aerial: TxDOT, 09 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from HDR Engineering, 13 EB BHW Project Area UP-FUTURE-REMOVAL UPRR Inspection Track Removal BNSF Track Removal BNSF Existing Track UPRR Existin Track SANTA FE BRIDGE RIO I GRANDE UPRR Relocated Inspection Track 1:3,000 1 " = 250 ' STANTON BRIDGE Loop Border Highway International Inspection Track (PP4)
5 ALLEY G KANSAS CAMPBELL FLORENCE OCHOA VIRGINIA SAINT VRAIN HILLS TAYS PARK SIXTH SEVENTH EIGHTH NINTH Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\5_13_05_30_UPRR_Pinch_Pts_Park_St.mxd Date Saved: 5/31/13 62 STANTON BRIDGE Median Shoulder Aerial: TxDOT, 09 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from HDR Engineering, 13 WB BHW EB BHW Proposed Track 0 RR ROW Proposed Track 2 Proposed Track 3 BHW Right-of-Way UPRR Existing Track UPRR Relocated Track Railroad Right-of-Way Concrete Apron Ditch Toe Ditch Top Traffic Rail UPRR Survey Construction Lines Wall RIO I GRANDE 1:3,000 1 " = 250 ' Loop Border Highway Park Street (PP5)
6 CYPRESS NOBLE SAN ANTONIO TORNILLO GREAT BEAR OVERLAND COTTON Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\6_13_05_31_UPRR_Pinch_Pts_Coles.mxd Date Saved: 5/31/13 PARK ALLEY P NINO AGUILERA Aerial: TxDOT, 09 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from HDR Engineering, 13 WARD ALLEY Q DELTA THIRD FOURTH UPRR Track Removal Project Area BNSF Track Removal UPRR Future Track BNSF Existing Track UPRR Relocated Track UPRR Existing Track COLES 1:3,000 1 " = 250 ' RIIO GRANDE Loop Border Highway Coles Overpass (PP6)
This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.
Alignment is double tracked for 80 mph commuter trains, 110 mph CHSR speeds between Bridgeport OR and 78 th Street in Vancouver WA. New alignment for freight trains will allow speeds up to 40 mph over
More informationSTATE LOOP 195 PUBLIC MEETING. Footer Text
STATE LOOP 195 PUBLIC MEETING STATE LOOP 195 From FM 755 to 1 mile west of Loma Blanca Rd Public Meeting Agenda Welcome & Introductions Octavio Saenz TxDOT Public Information Officer Technical Overview
More informationJune WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington
DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June
More informationPAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc
PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS Paul Mak, PE, SE HDR Inc 801 S. Grand Ave. Suite 500, Los Angeles, CA 90017. Tel
More informationIH 35 FEASIBILITY STUDY
IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE
More informationHighway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary
Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared
More informationsystem performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.
system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and
More informationThis corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.
Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be
More informationHSR Vancouver WA to Camas Commuter Des, by R.N.
This plan will show the new route for the Portland-Vancouver Junction Railroad. Remove the existing Portland-Vancouver Junction Railroad leg from the Northeast Hazel Dell Avenue curve to the Burlington
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More informationLEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.
0 5 10 Feet 15 MATCHLINE DELMAR BLVD. STA. 18+50.00 LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY MATCHLINE DELMAR BLVD. STA. 13+00.00 END NSTRUCTION 54.76 LT. MATCH EXISTING SIDEWALK PROPOSED CURB RAMP
More informationSOUTH TEXAS COMMISSION MEETING
SOUTH TEXAS COMMISSION MEETING September 26, 2013 Pharr District Commission Meeting Pharr District: Overview The Pharr District plans, designs, builds, operates and maintains the state transportation system
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationStation Evaluation. Durham-Orange Light Rail Transit Project Spring 2012
Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly
More information5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES
5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements
More informationChicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015
Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In
More informationProject: Borgfeld Dr Phase I (ROW )
Project: Borgfeld Dr Phase I (ROW ) Precinct: 3 From Timberline Dr US Hwy 281. Clear ROW and relocate fences necessary to facilitate utility relocation needed prior to the roadway reconstruction. Consultant:
More informationXI. W-3 TRINITY RAILWAY EXPRESS (WEST) CORRIDOR CONSIDERATIONS
XI. W-3 TRINITY RAILWAY EXPRESS (WEST) CORRIDOR CONSIDERATIONS CORRIDOR DESCRIPTION Rail Corridor W-3 is one of the ten rail corridors in the Dallas-Fort Worth area included in the initial scope of work
More informationPAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS
1 PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS Paul Mak, PE, SE - DMJM HARRIS 515 S. Flower Street 9th Floor, Los Angeles, CA 90071. Tel 213-593-8337 Fax 213-593-8622
More informationDRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED
DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT
More informationBrent Spence Bridge Design Exceptions - Alternative I
s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight
More informationThe range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:
Attachment 2 Boise Treasure Valley Phase 1 Alternatives Analysis August 14, 2009 Introduction The Treasure Valley High Capacity Transit Priority Corridor Phase 1 Alternatives Analysis is being prepared
More informationPort Terminal Railroad Association. Committed to Safety and Service
Port Terminal Railroad Association Committed to Safety and Service Port Terminal Railroad History Port Terminal Railroad History The Port Terminal Railroad Association (PTRA), formed in 1924, is the culmination
More informationII. PROJECT DESCRIPTION
II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,
More informationGATTIS SCHOOL RD / SH 130 SUBDIVISION
AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4
More informationCity of Denton On-system Project Status Report Prepared by ITS
City of Denton On-system Project Status Report Prepared by ITS April 2018 PROJECTS FM 2181 North-South... page 2 US 377/Fort Worth Drive... page 4 FM 2499, Section 5... page 6 I-35E/Mayhill Improvements...
More informationSPRINGWATER MISSING GAP Springwater Missing Gap Linking the Springwater on the Willamette Trail to the Springwater Corridor Trail June 2006
Springwater Missing Gap Linking the Springwater on the Willamette Trail to the Springwater Corridor Trail June 2006 METRO COUNCIL David ragdon, President Rex urkholder Carl Hostica Susan McLain Robert
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationHouston Region Freight Study. July 23, 2007
Houston Region Freight Study July 23, 2007 Regional Setting Purpose of the Study Analyze freight movement (truck and rail) within the Houston region Identify a slate of improvements for consideration Develop
More informationArizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora
Arizona-Sonora Border Master Plan Plan Maestro para la Frontera Arizona-Sonora Project Objectives Develop and implement a plan for identifying, prioritizing, and promoting land port of entry (LPOE), multi-modal
More informationI-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING
I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING DECEMBER 8, 2015 JACKSON MANN COMMUNITY CENTER Meeting Agenda Welcome & Introductions Introduce Concept 3K West Station
More informationMetro Highway Program
Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationAppendix G Aquilla Lake Pool Rise Recreational Resources
Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION
IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared
More informationDraft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20
Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 202 BRT 2030 BRT 2030 BRT Mitigation COMPARE Wed May 8 2:02: 20
More informationFRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)
FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST) The Fresno County subsection of the California High- Speed Train System (HST) is analyzed in two separate EIR/EISs the Merced-Fresno EIR/EIS
More informationI-84 Hartford Project Public Advisory Committee Meeting #19. March 28, 2019
I-84 Hartford Project Public Advisory Committee Meeting #19 March 28, 2019 Meeting Agenda 1. Welcome / Introduction of New Members (5 min) 2. Construction Staging (50 min) 3. Environmental Documentation
More informationWest Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017
West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million
More informationExisting Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.
High Plains ECONOMIC DEVELOPMENT D i s t r i c t Rail Transportation Southeast Wyoming Southeast Wyoming is served by both the Burlington Northern Santa Fe Railroad (BNSF) and the Union Pacific Railroad
More informationCommunity Meeting Station Elements
Community Meeting Station Elements North Metro Rail Line September 25, 2014 1 RRP Shawn Plichta Design Build Coordination Manager 2 RTD Jane Donovan Deputy Project Manager 3 The RTD FasTracks Plan 122
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationWestland No. 1 Mine (Bob Ciminel 2012)
Westland No. 1 Mine (Bob Ciminel 2012) Westland Mine No. 1 was owned by the Pittsburgh Coal Company and located at the eastern (timetable) end of the Montour Railroad s Midland Spur/Westland Branch, just
More information700 University Avenue Mixed-Use Development. Traffic Impact Analysis
700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...
More informationHudson-Bergen Light Rail Transit System Joint Occupancy-Joint Use
Hudson-Bergen Light Rail Transit System Joint Occupancy-Joint Use Richard F. Hernon, New Jersey Transit Light rail systems share their rights-of-way with most other modes of ground transportation. The
More informationSummary of the Alcoa Highway Redevelopment Project
Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)
More informationAdams County, Iowa ~ always creative
1. Site Information Blue Grass Industrial Park Corning, Iowa Maps: Site is zoned industrial There are no limiting factors (flood plain, creeks, wetlands, flight paths, easements, liens or other encumbrances,
More informationEvaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)
Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationDIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION
DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara
More informationMountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012
Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated
More informationExpo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014
Expo Line Project Westside/Central Metro Service Council November 2014 2 Expo Line Project Description Phase 2 Expo Line from Culver City to Santa Monica: 6.6 mile corridor 7 new Stations 64,000 Daily
More informationLocal Public Agency Obligated Projects SFY 2018
Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated
More informationPERFORMANCE ACTIVITY 603 SIGNS
PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace
More informationCity of Denton On-system Project Status Report Prepared by ITS
City of Denton On-system Project Status Report Prepared by ITS March 2018 PROJECTS FM 2181 North-South... page 2 US 377/Fort Worth Drive... page 4 FM 2499, Section 5... page 6 I-35E/Mayhill Improvements...
More informationI-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011
I-405 Sepulveda Pass Improvements Project Community Advisory Committee July 28, 2011 1 Wilshire Segment 2 Wilshire Segment (National to Waterford) Ramp and Wall Construction at Sepulveda/Wilshire Intersection
More informationAVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE
AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No
More informationTABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030
Station Volumes and Boardings/Alightings The stations proposed for the LRT Alternative were selected due to their proximity to population and employment centers, major existing transportation facilities,
More informationThe Eastern Connector Study November, 2007 planning for the future
The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team
More informationApril 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation
Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation
More informationDISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/03/19 to 03/09/19 Contact: Rick Estrada (209)
Additional formation C4KC 4 CC 48.34 48.39 03/03/19 03/09/19 19:01 5:01 EB/WB Begin: Old River Bridge : Old River Bridge Reason: Pile Driving P4AA 4 SJ 8.7 12.6 03/04/19 03/08/19 8:01 15:01 WB Begin: Whiskey
More informationCITY OF GILROY 2012 SPEED SURVEY
CITY OF GILROY 2012 SPEED SURVEY GILROY, CALIFORNIA Final Report Prepared For City of Gilroy Public Works Department Gilroy, California May 17, 2013 Adopted by City Council on July 13, 2013 8712 Report3-FINAL.doc
More informationFinal. Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development. In City of Berkeley. November 26, TJKM Transportation Consultants
TJKM Transportation Consultants Final Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development In City of Berkeley Pleasanton Fresno Sacramento Santa Rosa www.tjkm.com TJKM Transportation Consultants
More informationDenver Metro Association of Realtors
Denver Metro Association of Realtors North Metro Rail Line October 2, 2014 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationStation Evaluation Summary
Station Evaluation Summary Preferred Site Location 10/1/00 Loop 1 Station Points 70 Key Issues: Potential Master Plan Development suggests a strong economic development potential for the larger property
More informationMUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1
MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb
More informationSAN RAFAEL CITY COUNCIL AGENDA REPORT
Agenda Item No: 8.b Meeting Date: December 19, 2016 Department: PUBLIC WORKS SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Public Works Director City Manager Approval: File No.: 18.01.79
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More information30-Day Look Ahead Summary August 2011
Wilshire Segment 30-Day Look Ahead Summary August 2011 DWP and SCE Utility Relocation Sepulveda reduced to one lane in each direction, Constitution to Ohio, 9pm to 6am Westbound Wilshire reduced to one
More informationCountdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition
Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay
More informationSC Highway 41 Existing Conditions
SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next
More informationCRRMA BOARD PRESENTATION
CRRMA BOARD PRESENTATION El Paso Streetcar Construction Status Report Gilbert Gardner August 9, 2017 El Paso Streetcar Infrastructure Construction Status Report AGENDA Progress Summary SBE Progress Construction
More informationCTA Blue Line Study Area
CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationPUBLIC INFRASTRUCTURE PROJECTS
PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING
More informationCity of Pittsburg Five Year Capital Improvements Plan. Introduction
Introduction Hello, The attached documents represent the five year capital improvements plan for the City of Pittsburg. The City Commission adopted this plan through Resolution 1159 on September 9, 2014.
More informationStudy Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description
More informationMETRO Light Rail Update
American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations
More informationValidation Study. Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad. May 15, 2008.
Validation Study Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad May 15, 2008 Prepared for: City of Des Plaines Des Plaines Civic Center 1420 Miner Street Des
More informationI-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019
I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate
More informationCity of Houston Fondren Road Paving and Drainage
City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationCNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices
CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT Appendices Appendix F Parking Study April 2016 CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT
More informationDockless Mobility Transportation and Municipal Infrastructure Committee January 8, 2019
Dockless Mobility Transportation and Municipal Infrastructure Committee January 8, 2019 Next generation of last mile mobility Private companies provide electric scooters or bikes for public use No docking
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationChallenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007
EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component
More informationCONDUCTOR CONDUCTOR. Overhead Electric Distribution Standards INTRODUCTION
INTRODUCTION 1. In order to ensure safety, certain minimum clearances shall be maintained between various circuits of an overhead distribution system. Proper clearances from joint-use utilities, railroads,
More informationExhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup
Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationUS 67 WIDENING PROJECT
US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the
More informationCHAPTER 69 PARKING REGULATIONS
69.01 Parking Limited or Controlled 69.08 Persons with Disabilities Parking 69.02 Park Adjacent to Curb 69.09 Truck Parking Limited 69.03 Park Adjacent to Curb One-way Street 69.10 Snow Removal 69.04 Diagonal
More informationLandtech...a measure of excellence
Capital Improvements Plan Update Agenda: Review Recommended Changes Add New Year (2023) to the CIP Planning Window Alternative Projects & Other Needs Discussion & Questions Consensus (2018 & 2019 Projects)
More informationNew York Metropolitan Transportation Council. HUB Bound. Travel Data
New York Metropolitan Transportation Council HUB Bound Travel Data December 2016 2015 ACKNOWLEDGEMENTS The New York Metropolitan Transportation Council (NYMTC) wishes to thank the following agencies for
More information2017 Industrial Rail and Transportation Study. Becker, Minnesota
2017 Industrial Rail and Transportation Study Becker, Minnesota BECKR 140932 August 2, 2017 2017 Industrial Rail and Transportation Study Becker, Minnesota SEH No. BECKR 140932 August 2, 2017 I hereby
More informationDetailed Definition of Alternatives
West Broadway Transit Study Detailed Definition of Alternatives 9/4/2015 DRAFT Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 2040 No-Build Alternative... 1 Build Alternatives...
More informationPublic Works. Capital Projects FY
Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1
More information