DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/03/19 to 03/09/19 Contact: Rick Estrada (209)
|
|
- Derek Armstrong
- 5 years ago
- Views:
Transcription
1 Additional formation C4KC 4 CC /03/19 03/09/19 19:01 5:01 EB/WB Begin: Old River Bridge : Old River Bridge Reason: Pile Driving P4AA 4 SJ /04/19 03/08/19 8:01 15:01 WB Begin: Whiskey Slough : Port of Stockton Parkway P4AA 4 SJ /04/19 03/08/19 7:30 17:01 EB/WB Begin: Argonaut Street : Argonaut Street, left shoulder C4SB 4 SJ /03/19 03/08/19 21:01 5:01 EB/WB Begin: terstate 5/Crosstown Freeway : terstate 5/Crosstown Freeway Restriction: Full connector ramp closures M4JA 4 SJ /04/19 03/04/19 8:30 14:30 WB Begin: Main Street : Stanislaus Street Restriction: #1 of 3 lanes, left shoulder Reason: Guardrail Repair P4AA 4 SJ /04/19 03/08/19 8:01 17:01 WB Begin: Stagecoach Road : Stagecoach Road Reason: Shoulder Work M5OA 5 MER /04/19 03/04/19 7:01 15:01 SB Begin: State Route 152 : California Aqueduct Bridge Restriction: #2 of 2 lanes Reason: Roadway wash-out Page 1 of 11 4:01
2 Additional formation M5OA 5 MER /04/19 03/04/19 7:01 15:01 SB Begin: WB State Route 152 : WB State Route 152 Restriction: Connector Ramp Closure Reason: Roadway wash-out C5OB 5 SJ /03/19 03/08/19 20:01 6:01 NB/SB Begin: State Route 132 : STate Route 132 Restriction: Various off and on-ramp closures C5OB 5 SJ /04/19 03/08/19 7:01 17:01 NB/SB Begin: State Route 132 : State Route 132 Restriction: Various off and on-ramp closures C5BC 5 SJ /04/19 03/08/19 20:01 4:59 SB Begin: French Camp Road : Roth Road Restriction: #1, #2 of 3 lanes C5SB 5 SJ /03/19 03/08/19 20:01 7:01 NB Begin: Anderson Street : Weber Avenue Restriction: #3, #4 of 4 lanes P12BA 12 SJ /04/19 03/05/19 7:01 16:01 WB Begin: Guild Avenue : Tecklenburg Road P26CA 26 CAL /04/19 03/05/19 7:01 17:01 WB Begin: Nove Way : WB State Route 12 Restriction: Left shoulder Reason: Shoulder Work T26CA 26 CAL /14/19 Not determined 0:01 23:59 EB/WB Begin: Deardorff Road : Wood House Mine Road Restriction: Long-term full highway closure Reason: Slide Removal/Repair 30 mins Page 2 of 11 4:01
3 Additional formation P33EA 33 STA /07/19 03/07/19 8:30 16:01 NB/SB Begin: Orchard Road : Orchard Road M49VA 49 MPA /06/19 03/07/19 9:01 16:01 NB/SB Begin: WB State Route 140 : Mariposa/Tuolumne County Line Restriction: Moving closure Reason: Pavement Marker Replacement P49BA 49 TUO /05/19 03/08/19 7:01 16:01 NB/SB Begin: Moccasin Switchback Road : Marsh Flat Road C88XA 88 AMA /04/19 03/08/19 7:01 17:01 EB/WB Begin: State Route 124 : Ione-Buena Vista Road Reason: Shoulder Work P88UB 88 SJ /04/19 03/08/19 7:01 17:01 WB Begin: View Drive : View Drive Restriction: #1 of 2 lanes, right shoulder C99CC 99 SJ /03/19 03/08/19 21:01 5:01 NB Begin: Stanislaus/San Joaquin County Line : State Route 120/Yosemite Avenue Restriction: #1 or #3 of 3 Lanes C99CC 99 SJ /03/19 03/08/19 21:01 6:01 SB Begin: Stanislaus/San Joaquin County Line : State Route 120/Yosemite Avenue Restriction: #1 or #3 of 3 Lanes C99CC 99 SJ /03/19 03/08/19 21:01 6:01 SB Begin: Main Street : Main Street Page 3 of 11 4:01
4 Additional formation C99CC 99 SJ /03/19 03/08/19 21:01 5:01 NB Begin: Main Street : Main Street C99CC 99 SJ /03/19 03/08/19 20:01 5:01 NB Begin: Fulton Avenue : Fulton Avenue Restriction: Full on-ramp closure C99CC 99 SJ /03/19 03/08/19 20:01 6:01 NB/SB Begin: Jacktone Road : Jacktone Road Restriction: Full on-ramp closures C99CC 99 SJ /03/19 03/08/19 20:01 6:01 NB Begin: State Route 120/Yosemite Avenue : State Route 120/Yosemite Avenue Restriction: Full connector ramp closures P99AA 99 SJ /04/19 03/08/19 7:30 17:01 NB/SB Begin: Austin Road : State Route 120/Manteca Bypass Restriction: Left shoulder, right shoulder Reason: Core Drilling P99AA 99 SJ /04/19 03/08/19 8:01 17:01 SB Begin: Turner Rd. : Mokelumne River Bridge Reason: Survey Work C99ZC 99 STA /04/19 03/08/19 21:01 6:59 NB/SB Begin: Merced/Stanislaus County Line : ulumne Boulevard Restriction: #1, #3, #2 of 3 lanes, left shoulder C99ZC 99 STA /04/19 03/08/19 21:01 6:59 SB Begin: North Turlock Overhead (South of Taylor Road) : Merced/Stanislaus County Line Restriction: #2, #1, #3 of 3 lanes, left shoulder Page 4 of 11 4:01
5 Additional formation C99XC 99 STA /03/19 03/08/19 20:01 5:59 NB Begin: South Modesto Undercrosssing : Tuolumne Boulevard Restriction: #2, #1 of 3 lanes, left shoulder C99XC 99 STA /08/19 03/09/19 22:01 6:59 NB Begin: South Modesto Undercrosssing : Tuolumne Boulevard Restriction: #2, #1 of 3 lanes, left shoulder C99XC 99 STA /09/19 03/10/19 22:01 8:59 NB Begin: South Modesto Undercrosssing : Tuolumne Boulevard Restriction: #2, #1 of 3 lanes, left shoulder C99XC 99 STA /03/19 03/08/19 20:01 5:59 NB/SB Begin: Crows Landing Road : Crows Landing Road C99XC 99 STA /08/19 03/09/19 22:01 6:59 NB/SB Begin: Crows Landing Road : Crows Landing Road C99XC 99 STA /09/19 03/10/19 22:01 8:59 NB/SB Begin: Crows Landing Road : Crows Landing Road C99XC 99 STA /03/19 03/08/19 20:01 5:59 NB/SB Begin: Tuolumne Boulevard : Tuolumne Boulevard C99XC 99 STA /08/19 03/09/19 22:01 6:59 NB/SB Begin: Tuolumne Boulevard : Tuolumne Boulevard Page 5 of 11 4:01
6 Additional formation C99XC 99 STA /09/19 03/10/19 22:01 8:59 NB/SB Begin: Tuolumne Boulevard : Tuolumne Boulevard C99XC 99 STA /03/19 03/08/19 20:01 6:59 SB Begin: Tuolumne Boulevard : South Modesto Undercrosssing Restriction: #1, #2 of 3 lanes, left shoulder (alternately) C99XC 99 STA /08/19 03/09/19 22:01 6:59 SB Begin: Tuolumne Boulevard : South Modesto Undercrosssing Restriction: #1, #2 of 3 lanes, left shoulder (alternately) C99XC 99 STA /09/19 03/10/19 22:01 8:59 SB Begin: Tuolumne Bloulevard : South Modesto Undercrosssing Restriction: #1, #2 of 3 lanes, left shoulder (alternately) C99XC 99 STA /03/19 03/08/19 20:01 6:59 SB Begin: 5th Street/G Street : 5th Street/G Street Restriction: Full on-ramp closure C99XC 99 STA /08/19 03/09/19 22:01 6:59 SB Begin: 5th Street/G Street : 5th Street/G Street Restriction: Full on-ramp closure C99XC 99 STA /09/19 03/10/19 22:01 8:59 SB Begin: 5th Street/G Street : 5th Street/G Street Restriction: Full on-ramp closure C99CC 99 STA /03/19 03/08/19 21:01 5:01 NB Begin: Beckwith Road : Stanislaus/San Joaquin County Line Restriction: #1 of 3 lanes, left shoulder Page 6 of 11 4:01
7 Additional formation C99CC 99 STA /03/19 03/08/19 21:01 6:01 SB Begin: Beckwith Road : Stanislaus/San Joaquin County Line Restriction: #1 of 3 lanes, left shoulder,median C99CC 99 STA /03/19 03/08/19 21:01 5:01 NB/SB Begin: Sisk Road : Hammett Road Restriction: Full off and on-ramp closure P108BA 108 STA /07/19 03/07/19 9:01 15:01 WB Begin: Coolidge Avenue : Granger Avenue Restriction: #2 of 2 lanes, right shoulder C108ZA 108 STA /04/19 03/08/19 6:59 17:01 EB/WB Begin: First Street (Riverbank) : Fourth Street Reason: Curb/Gutter/Sidewalk Work C108UA 108 TUO /03/19 03/08/19 20:01 5:59 EB/WB Begin: State Route 120/Yosemite Junction : WB State Route 49 Reason: Shoulder Work P120CA 120 SJ /04/19 03/08/19 7:01 16:01 WB Begin: Vasconcellos Avenue : Vasconcellos Avenue Reason: Curb/Gutter/Sidewalk Work C120BB 120 STA /03/19 03/08/19 20:01 5:59 EB/WB Begin: Lancaste Road : Stanislaus/Tuolumne County Line C120BB 120 TUO /03/19 03/08/19 20:01 5:59 WB Begin: Stanislaus/Tuolumne County Line : Divided Highway Restriction: #2 of 2 lanes, right shoulder Page 7 of 11 4:01
8 Additional formation C120BB 120 TUO /04/19 03/08/19 6:01 17:59 EB Begin: Stanislaus/Tuolumne County Line : WB State Route 49 Restriction: #1 of 2 lanes, right shoulder C120BB 120 TUO /04/19 03/08/19 8:01 15:59 WB Begin: Stanislaus/Tuolumne County Line : Divided Highway Restriction: #2 of 2 lanes, right shoulder C120BB 120 TUO /03/19 03/08/19 20:01 5:59 EB/WB Begin: Divided Highway : Moccasin Creek Bridge C120BB 120 TUO /04/19 03/08/19 6:01 17:59 EB/WB Begin: Mountain Bluff Road : Moccasin Creek Bridge M132OA 132 MPA /04/19 03/07/19 9:01 16:01 EB/WB Begin: Shimer Drive Way : State Route 49/Coulterville Restriction: Moving closure Reason: Pavement Marker Replacement C132JA 132 SJ /24/19 03/15/19 0:01 12:59 EB/WB Begin: Chrisman Road : San Joaquin/Stanislaus County Line Restriction: Long-term #1 of 2 lanes, left shoulder C132JA 132 SJ /03/19 03/08/19 20:01 6:01 EB/WB Begin: Bird Road : Bird Road C132JA 132 SJ /04/19 03/08/19 7:01 17:01 EB/WB Begin: Bird Road : Bird Road Page 8 of 11 4:01
9 Additional formation C132JA 132 SJ /04/19 03/08/19 7:01 17:01 EB/WB Begin: terstate 5 : terstate 5 C132JA 132 SJ /03/19 03/08/19 20:01 6:01 EB/WB Begin: terstate 5 : terstate 5 M132OA 132 STA /04/19 03/07/19 9:01 16:01 EB/WB Begin: San Joaquin/Stanislaus County Line : State Route 99 Restriction: Moving closure Reason: Striping Operation C132SA 132 STA /03/19 03/08/19 20:01 5:59 EB/WB Begin: H Street/9th Street : Conejo Ave Restriction: #2 of 2 lanes Reason: Curb/Gutter/Sidewalk Work P132AA 132 STA /04/19 03/08/19 20:01 5:01 WB Begin: Empire Avenue : San Juan Drive/Daly Avenue Restriction: #2 of 2 lanes, right shoulder C140RA 140 MPA /04/19 03/08/19 7:30 19:01 EB/WB Begin: Slate Gulch : Yosemite National Park Boundary Reason: Slope Repair/Clearing C140BA 140 MER /04/19 03/08/19 6:01 14:59 EB/WB Begin: Moomjean Avenue : Kibby Road C140BA 140 MER /07/19 12/31/19 0:01 23:59 WB Begin: Kibby Road : Moomjean Avenue Restriction: Long-term right shoulder 1 Page 9 of 11 4:01
10 C140QA 140 MPA MER Additional formation 03/04/19 03/08/19 6:01 18:59 EB/WB Begin: 3rd Street : Santa Fe Ave Reason: Striping Operation P165EA 165 MER /04/19 03/08/19 7:01 17:01 NB/SB Begin: Pole Line Road : Pole Line Road C165GA 165 MER /04/19 03/08/19 8:01 15:59 NB/SB Begin: Del Rio Road : 3rd Avenue Reason: Striping Operation P580AA 580 SJ /04/19 03/08/19 21:01 4:01 WB Begin: East Midway Overhead : Patterson Pass Road Restriction: #2 of 2 lanes, right shoulder Reason: Sign Work P580AA 580 SJ /04/19 03/08/19 21:01 4:01 WB Begin: Patterson Pass Road. : Patterson Pass Road Restriction: Full off-ramp closure Reason: Sign Work P580AA 580 SJ /04/19 03/08/19 21:01 7:01 EB Begin: Patterson Pass Road. : Patterson Pass Road Restriction: Full off-ramp closure Reason: Sign Work P580AA 580 SJ /04/19 03/08/19 21:01 7:01 EB Begin: Alameda/San Joaquin County Line : Patterson Pass Road. Restriction: #2 of 2 lanes Reason: Sign Work C580UB 580 ALA /03/19 03/09/19 20:01 12:01 EB Begin: Midway Road : Greenville Road Restriction: #1, #2, #3 of 4 lanes lanes Reason: Pavement Works 1 Page 10 of 11 4:01
11 Additional formation C580UB 580 ALA /03/19 03/09/19 20:01 4:01 WB Begin: Midway Road : Greenville Road Restriction: #1, #2, #3 of 4 lanes lanes Reason: Pavement Works 1 NOTE: Unexpected schedule changes can occur due to weather, traffic, availability of equipment and material, and related issues. For updates on California State Highways, please visit the Caltrans Quickmap at or call ROAD. The Caltrans District 10 website is at Page 11 of 11 4:01
NEWS RELEASE November 8, 2017
NEWS RELEASE November 8, 2017 Contact: Marsha Roa Public Information Manager 909.839.7055 mroa@diamondbarca.gov GRAND AVENUE INTERCHANGE AT SR-57 (ORANGE) AND SR-60 (POMONA) MULTIPLE ROADWAY, RAMP AND
More informationA Cal Trans District 10 TANK(S) SIZE
Alpine Los Angeles 10 CHP Alpine Los Angeles 10 DOT Alpine Los Angeles 10 DOT Alpine Los Angeles 10 DOT Alpine Los Angeles 10 P/R Alpine Los Angeles 10 P/R Alpine Los Angeles 10 P/R Alpine Los Angeles
More informationCountdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition
Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationCONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT
Page 1 of 5 CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT ROUTES AUTHORIZED FOR ANNUAL TRANSPORTATION PERMITS Those County of Contra Costa maintained public roads listed in Column 1 of the following table
More informationF:\Application Forms & Handouts\Fire Forms and Handouts\Fire Road Handout.doc Revised ( )
FIRE APPARATUS ACCESS ROAD STANDARD SAN JOAQUIN COUNTY FIRE PREVENTION BUREAU 1810 E. HAZELTON AVENUE, STOCKTON, CA 95205 BUSINESS PHONE: (209)468-3380 The San Joaquin County Fire Chiefs Association has
More informationAPPENDIX H. Transportation Impact Study
APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett
More informationCITY OF BEVERLY HILLS STAFF REPORT
Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationSAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards
SAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards The California Fire Code, adopted by S.J.Co. Ordinance No. 4178 effective as of November 8, 2002 requires that fire apparatus
More informationEXHIBIT D. Fuel System Improvements Project Elements East Bay Fuel Facilities
Fuel System Improvements Project Elements East Bay Fuel Facilities 1.0. North Area Service Center Fuel System 3999 Lakeside Drive, Richmond, CA 94806 (Contra Costa County) Located in the City of Richmond
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationLacey Gateway Residential Phase 1
Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West
More informationProject Working Group Meeting #5
September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationMore than $9 Million coming to Central Valley for transportation
More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public
More informationFRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)
FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST) The Fresno County subsection of the California High- Speed Train System (HST) is analyzed in two separate EIR/EISs the Merced-Fresno EIR/EIS
More informationDecember 12, Dear Secretary Foxx:
Chair Pete White City Councilmember Vice-Chair Jay Adams Mustang Mayor Secretary/Treasurer Matt Dukes Midwest City Mayor association of central oklahoma governments Executive Director John G. Johnson December
More informationState Route 1 Auxiliary Lane Bus-on-Shoulder Concept of Operations DRAFT. Santa Cruz County Regional Transportation Commission
State Route 1 Auxiliary Lane Bus-on-Shoulder Concept of Operations Santa Cruz County Regional Transportation Commission March 14, 2019 Table of Contents Section 1 Introduction... 1-1 1.1 Purpose of this
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationWelcome. Please Sign In
Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal
More informationST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:
ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: TRAVEL DEMAND FORECASTS May 12, 2005 Prepared for Minnesota
More informationSTATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS
STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT
More informationTrunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.
TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions
More informationAVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE
AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No
More informationSTATE ROUTE 1 HOV LANE WIDENING PROJECT (FROM MORRISSEY BOULEVARD TO SAN ANDREAS ROAD)
STATE ROUTE 1 HOV LANE WIDENING PROJECT (FROM MORRISSEY BOULEVARD TO SAN ANDREAS ROAD) HOV REPORT Prepared for: Santa Cruz County Regional Transportation Commission September 2007 TABLE OF CONTENTS CHAPTER
More informationMountain Area Transportation Study Model Methodology and Assumptions Final
Model Methodology and Assumptions Final February 19, 2017 Submitted to: 17J17-1768.17 Prepared by Iteris, Inc. Innovating Through Informatics TABLE OF CONTENTS 1.0 OVERVIEW... 1 1.1 Project Objective and
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationMetro Highway Program
Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon
More informationChapter 7: Corridor Visions
Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United
More informationSection 5.0 ENVIRONMENTAL ANALYSIS
Section 5.0 ENVIRONMENTAL ANALYSIS 5.2 TRANSPORTATION/CIRCULATION/PARKING This section evaluates potential traffic-related and parking impacts associated with the proposed project. The following discussion
More informationAppendix H: Construction Impacts H-2 Transportation
Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction
More informationLee County DOT Traffic Section Design Standard for Sign Installation
Lee County DOT Traffic Section Design Standard for Sign Installation Traffic Section Table Of Contents Section Title 1. Sign Panel Material 2. Sign Shape 3. Posts 4. Fasteners 5. Retro reflectivity and
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationTraffic Study for Barstow 2014 General Plan Amendment. Prepared for: The City of Barstow. Prepared by: ADVANTEC Consulting Engineers
Traffic Study for Barstow 2014 General Plan Amendment Prepared for: The City of Barstow Prepared by: June 20, 2014 TABLE OF CONTENTS 1. Executive Summary... 1 2. Project Background & Description... 3 2.1
More informationPublic Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)
Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement
More informationTraffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT
Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main
More informationPG&E s 2012 Request Window Proposals
1 PG&E s 2012 Request Window Proposals Central Valley Patrick Tan Transmission System Planning PG&E September 27, 2012 Transmission Projects Overview 2 Projects Seeking CAISO Approval Pease 115/60 kv Transformer
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationACEforward. BART Connectivity Alternatives Preliminary Forecasts and Costs Altamont Regional Rail Working Group July 13, 2016
ACEforward ACEforward BART Connectivity Alternatives Preliminary Forecasts and Costs Altamont Regional Rail Working Group July 13, 2016 ACEforward Project Goals Tri-Valley BART Connection Union City BART
More informationClick to edit Master text styles
I-405 Sepulveda Pass Improvements Project Quarterly Community Meeting November 17, 2011 1 Wilshire Segment 2 Quarterly Community Meetings 2012 Month Meeting(s) February 16 May 17 Quarterly Quarterly August
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More information/13/D /14/W /14/D /12/D /16/D /15/D /14/D /18/D /15/D /11/W SR 18
Windfall Rd SI = 0.18 10-20-13/2/D 08-15-15/14/D 07-16-13/16/D 05-06-15/15/D 01-19-09/12/W 09-29-14/17/D 11-10-09/7/D 01-08-10/7/S 04-26-11/3/W 01-30-10/15/D 12-20-11/14/W 11-16-10/14/W 07-26-08/18/W 07-08-13/15/D
More informationThe major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:
3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown
More informationLCV Operating Conditions & Routes (August 2017) Page 1 of 5
Page 1 of 5 APPROVED ROUTES & CONDITIONS FOR LONG COMBINATION VEHICLES (LCV S) CVSE Permits are valid in British Columbia on highways under the jurisdiction of the Ministry of Transportation and Infrastructure
More informationDraft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20
Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 202 BRT 2030 BRT 2030 BRT Mitigation COMPARE Wed May 8 2:02: 20
More informationLEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.
0 5 10 Feet 15 MATCHLINE DELMAR BLVD. STA. 18+50.00 LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY MATCHLINE DELMAR BLVD. STA. 13+00.00 END NSTRUCTION 54.76 LT. MATCH EXISTING SIDEWALK PROPOSED CURB RAMP
More informationI-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011
I-405 Sepulveda Pass Improvements Project Community Advisory Committee July 28, 2011 1 Wilshire Segment 2 Wilshire Segment (National to Waterford) Ramp and Wall Construction at Sepulveda/Wilshire Intersection
More informationSepulveda Pass Corridor Systems Planning Study Update
Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Update June 20, 2012 Measure R Transit Corridors One of 12 Measure R Transit Corridors approved by
More information30-Day Look Ahead Summary August 2011
Wilshire Segment 30-Day Look Ahead Summary August 2011 DWP and SCE Utility Relocation Sepulveda reduced to one lane in each direction, Constitution to Ohio, 9pm to 6am Westbound Wilshire reduced to one
More informationChapter 7. Transportation Capital Improvement Projects. Chapter 7
Chapter 7 Transportation Capital Improvement Projects Chapter 7 81 Chapter 7 Transportation Capital Improvement Projects Local Transportation Sales Tax Programs For over three decades, Santa Clara County
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationAn Inside Look at Electric Reliability 2016 Electric Reliability Report
An Inside Look at Electric Reliability 2016 Electric Reliability Report Stockton, Bakersfield, California California November November 6, 2017 3, 2016 Welcome 2 David Meier Senior Manager, Stockton Division
More informationExpo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015
Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015 Meeting Purpose and Format Meeting Purpose and Format The purpose of tonight s meeting is to: Provide a final update
More informationImpacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.
4.7 Transportation and Circulation This report documents the results of a study of the potential traffic impacts created by the Whittier Main Oil Field Development Project. The study is included as Appendix
More informationIH 35 FEASIBILITY STUDY
IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationBrent Spence Bridge Design Exceptions - Alternative I
s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight
More informationUnified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report
Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations
More informationThe Design-Builder shall meet local road criteria provided by the local governing agencies.
11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary
More informationRural Planning. Highway Projects - CULLMAN COUNTY
4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION
More informationI-225 Rail Line Iliff and Florida Stations Information Meeting
I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project
More informationTRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:
TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,
More information2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary
8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.
More informationDIVISION V SURFACINGS AND PAVEMENTS
36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness
More informationAppendix G Traffic Study Methodology
REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Appendix G Traffic Forecasting Model Methodology In addition to the existing/baseline condition (year 2005), a level of service (LOS) analysis was conducted for
More informationMO 370 Interchange Ramp at Salt River Road - Phase 1
MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00
More informationNOISE ANALYSIS TECHNICAL REPORT. Route 58 Martin Luther King Freeway. Portsmouth Virginia
NOISE ANALYSIS TECHNICAL REPORT Route 58 Martin Luther King Freeway Portsmouth Virginia May 2008 Prepared for: Virginia Department of Transportation NOISE ANALYSIS TECHNICAL REPORT Route 58 Martin Luther
More information2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment
2.1.5 Traffic and Circulation This section addresses the potential impacts to traffic and circulation associated with construction and long-term operation of the proposed project. The traffic and circulation
More informationTraffic Feasibility Study
Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,
More informationSepulveda Pass Corridor Systems Planning Study
Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Streets and Freeways Subcommittee January 17, 2013 1 Sepulveda Pass Study Corridor Extends for 30
More informationWinter Maintenance on Provincial Highways. District Municipality of Muskoka Winter Maintenance Update December 14, 2015
Winter Maintenance on Provincial Highways District Municipality of Muskoka Winter Maintenance Update December 14, 2015 Outline 1. Auditor General s Report 2. MTO Action Plan 3. Recent Winter Maintenance
More informationSMOKY LAKE COUNTY IN THE PROVINCE OF ALBERTA BYLAW NO
SMOKY LAKE COUNTY IN THE PROVINCE OF ALBERTA BYLAW NO. 1149-07 A BYLAW OF THE MUNICIPALITY OF SMOKY LAKE COUNTY IN THE PROVINCE OF ALBERTA BEING A BYLAW FOR THE PURPOSE OF AUTHORIZING THE OPERATION OF
More informationPoint A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017
Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master
More informationLoop 375 Border Highway West Extension Project
Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\1_13_05_21_UPRR_Pinch_Pts_South_Asarco.mxd Date Saved: 5/31/13 PAISANO UPRR ExistingTrack 3 Aerial: NAIP, 08/30/12
More informationFiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)
Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement s Awarded in Fiscal Year 2016 (July 2015 - June 2016) Region 1 STA 0703-426 20510 I-70:WB EJMT to MM 218 SMA PG 76-28 11930 N/A N/A ER 0703-424 20351
More informationLocal Public Agency Obligated Projects SFY 2018
Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationProject Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements
Project Information During the summer of 2016, construction will begin on a three year project to reconstruct the interchanges on Highway 2 at Gaetz Avenue and Taylor Drive near the City of Red Deer. The
More informationMILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND
MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More informationnoise ContoURs C APPENDIX
NOISE CONTOURS APPENDIX C APPENDIX C Table 4.8-4 Noise Levels and Contours ( GP- El Centro Rd Hankview Rd Radio Rd 64.9 65.5 0.6 18 56 178 563 El Centro Rd/W El Camino Rd W Elkhorn Radio Rd I-80 61.4 64.6
More informationCITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN
Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add
More informationSANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT
SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT May 8, 2018 Page i TABLE OF CONTENTS Table of Contents... i 1. Introduction... 1 1.1 Summary... 1 2.
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationHighways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST
More informationPublic Works. Capital Projects FY
Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1
More informationTo: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015
Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry
More informationPASSED, APPROVED AND ADOPTED this 13 th day of November, Caretto, Jackowski, Putz, Herrick, Jahn. W.E. Jahn, Mayor ATTEST:
RESOLUTION NO. 2017-34 A RESOULTION OF THE CITY COUNCIL OF THE CITY OF BIG BEAR LAKE, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, REQUIRING NO PARKING SIGNS TO BE POSTED ON PORTIONS OF CERTAIN STREETS
More informationTable of Contents SR-91 IMPLEMENTATION PLAN i
Table of Contents TABLE OF CONTENTS...I SECTION 1: 2009 STATUS REPORT AND UPDATE...1 SECTION 2: IMPLEMENTATION PLAN...7 BY YEAR 2011...8 BY YEAR 2015...13 BY YEAR 2022...19 BY YEAR POST-2025/2030...23
More informationQuantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:
6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration
More informationEngineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79
Engineering Report: Shasta-Trinity National Forest Shasta McCloud Management Unit Analysis of National Forest System Road 37N79 (milepost 0.56 to 2.28) for Motorized Mixed Use Designation Forest: Shasta-Trinity
More informationLATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI
LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department
More informationMid-Coast Corridor Transit Project
San Diego Transportation Development Association Mid Coast Construction Update June 11, 2018 Mid-Coast Corridor Transit Project Mid-Coast Project 11-mile extension of Trolley Blue Line New LRT Infrastructure:
More informationEvaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)
Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline
More informationACEforward. ACEforward includes a range of potential near-term and longer-term improvements.
NOTICE OF AVAILABILITY OF A DRAFT ENVIRONMENTAL IMPACT REPORT ACEforward PUBLIC REVIEW PERIOD: WEDNESDAY MAY 31, 2017 MONDAY, JULY 31, 2017 DATE: TO: Responsible Agencies, Trustee Agencies, and Other Interested
More information4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS
4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS 4.1 SUMMARY The Arterial Intersection Congestion Analysis Report, dated May 29, 2012, was approved by the SR-91/I-605/I-405
More informationZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS
ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,
More information