1 Springwater Missing Gap Linking the Springwater on the Willamette Trail to the Springwater Corridor Trail June 2006

2 METRO COUNCIL David ragdon, President Rex urkholder Carl Hostica Susan McLain Robert Liberty rian Newman Rod Park METRO AUDITOR Alexis Dow, CPA METRO REGIONAL PARKS AND GREENSPACES DEPARTMENT Jim Desmond, Director Chris Carlson, Greenspaces Planning Manager Joel Morton, Office of Metro Attorney ALTA PLANNING + DESIGN George Hudson, Principal Karen Vitkay, Designer PROJECT MANAGER Mel Huie, Metro Regional Parks and Greenspaces Department For more information or copies of this report, contact: Mel Huie, Regional Trails Coordinator , huiem@metro.dst.or.us Metro Regional Services 600 NE Grand Ave. Portland, OR Alta Planning + Design 1638 NE Davis Portland, OR

3 TALE OF CONTENTS Executive Summary 1 Area Map 2 Section 1: SE Umatilla to SE Harney 3 Section 2: SE Harney to SE Clatsop 4 Section 3: SE Clatsop to SE Marion 5 Section 4: SE Marion to SE Linn 6 Section 5: SE Linn to SE 11th 7 Section 6: SE 11th to SE 13th 8 Section 7: SE 13th to Power Station 9 Section 8: Power Station to SE 16th 10 Section 9: SE 16th to SE 17th 11 Section 10: SE 17th to SE 19th 12 Intersection Figure 13 Typical Cross Sections 14 Appendix A: Cost Estimates 16 Recommended Alignment 17 Item Cost Sheet 21 Pole Summary 22

4 Executive Summary Presently, a gap exists between the Springwater on the Willamette Trail ending at SE Umatilla and the Three ridges portion of the Springwater Corridor Trail starting at SE 19th. The optimal alignment to connect the trail segments utilizes the same railroad corridor and provides a direct and seamless connection. A costalignment alternative was produced for the railroad corridor connection. The cost estimate does not include right-of-way acquisition costs or compensation for loss of future business due to the removal of sidings. Cost estimates for all intersections were developed by the Portland Office of Transportation PDOT. Recommended Alignment Green line on maps $3,090, The recommended alignment is a rail-with-trail shared-use 12 foot path on the southwest side of the mainline track from SE Umatilla to SE 13th. From SE Umatilla to SE Marion, the track is shifted to the northeast to provide space for the trail. At SE 13th, the alignment moves to the north of the mainline track for its duration. etween SE 13th and 17th, the railroad track and spur line are shifted to the south to accommodate the trail. etween SE 17th and SE 19th, the multi-use path is a 10 foot wide segment on the north side of SE Ochoco. The cost estimate does not include the sum necessary to acquire an easement through private property between 11th and 13th. Alternative Alignment Light green lines on map $3,084, An alternative is offered which incorporates trail deviations in order to minimize costs associated with moving power poles and easement acquisition. Deviations occur from SE Marion to 11th Street through Metro owned property and along 11th and Ochoco St. to avoid the acquisition of an easement on private property. In this scenario, no easement or property acquisition is required. 1

5 Springwater Missing Gap Study Area Linking the Springwater on the Willamette Trail to the Springwater Corridor Trail 2

6 Section 1: SE Umatilla to SE Harney LEGEND ManHoles UMATILLA AN 16'2 Relocate Pole Proposed Retaining Wall Existing RR Alignment 202 Sections Existing Conditions 10'0 RR shift Recommendations 6TH 291 Milliken Tower Alternative Trail Alignment Proposed RR Alignment 2'4 pole shift Electric Pole Proposed Trail Alignment D ES pump station GR 12'5 Track shift locator 2'1 min pole shift w 12' trail remove blackberries and shrubs 22'1 32'7 use fill to mitigate slope, need retaining wall ~4' Looking north from SE Umatilla 13'6 RR shift 8'11 2'1 min pole shift w 12' trail 17'6 relocate street signs 239 HARNEY 13' Feet Looking south from SE Umatilla

7 Section 2: SE Harney to SE Clatsop ail street signs LEGEND HARNEY 7TH 11 joint use private driveway: 36'0 to property fence Track shift locator Existing Conditions ManHoles Electric Pole Recommendations Milliken Tower Relocate Pole Proposed Retaining Wall Proposed Trail Alignment remove blackberries and shrubs Alternative Trail Alignment Proposed RR Alignment Existing RR Alignment 11'6 8'6 4'6 min pole shift w 12' trail Sections 11'6 RR shift 287 7'0 MH incorporate into trail SHERRETT 7'2 17'2 berm removal 8'10 ToS 8'8 max RR shift Looking north between SE Harney and SE Clatsop 17'1 76 9'11 5'11 min pole shift w 12' trail berm removal MARION 7'10 trail to err cl electrical box 14'0 1'10 min pole shift w 12' trail 78 Looking south between SE Harney and SE Clatsop 8'8 RR shift CLATSOP 0 7' Feet

8 Section 3: SE Clatsop to SE Marion 78 LEGEND Track shift locator ManHoles CLATSOP 7'4 Electric Pole Milliken Tower Relocate Pole Proposed Retaining Wall Proposed Trail Alignment Alternative Trail Alignment Proposed RR Alignment 9'1 19'4 erm removal Existing RR Alignment 8TH trail Sections Metro ond Property Existing Conditions 9'1 RR shift Recommendations 9'2 to toe of slope 7'5 trail cl 6'3 conflict with berm 7'3 RR shift 0 10'9 pole appears OK, must be 17'3 min from err, grading around pole needed Looking south from SE Clatsop MARION Feet Looking north from SE Marion 5

9 Section 4: SE Marion to SE Linn MARION 22'6 LEGEND Track shift locator ManHoles 88 2'0 min pole shift Electric Pole Milliken Tower Relocate Pole Proposed Retaining Wall Proposed Trail Alignment 9TH Alternative Trail Alignment Proposed RR Alignment Option 2: deviate trail & maintain pole locations. Existing RR Alignment Sections Metro ond Property Existing Conditions 22'10 Recommendations 94 too close to tower to move Uncontrolled intersection 22'0 LINN Install 4-way stop 2'6 min pole shift 92 Looking south from SE Marion Feet Looking north from SE Linn 6

10 Section 5: SE Linn to 11th LEGEND Uncontrolled intersection ManHoles Install 4-way stop Milliken Tower Relocate Pole Proposed Retaining Wall Alternative Trail Alignment Proposed RR Alignment Existing RR Alignment Sections Metro ond Property 2'3 min pole shift Existing Conditions '5 21'10 Option 2: deviate trail & maintain pole locations '8 min pole shift move RR sign to other side adjust catch basin 0 no field measurement assume 3' pole shift needed 10TH 2'8 min pole shift Recommendations 9'9 21'10 9TH Electric Pole Proposed Trail Alignment 11TH 22'3 LINN 130 Track shift locator trim vegetation 21'1 25'1 Looking southeast from SE Linn driveway 3'5 min pole shift Feet Looking northwest from SE 11th 7

11 Section 6: SE 11th to SE 13th sin LEGEND Track shift locator ManHoles 11TH approx 22'0 available by GIS for 14' trail 17'6 20'0 PRIVATE VACANT catch basin Electric Pole Milliken Tower Relocate Pole Proposed Retaining Wall Proposed Trail Alignment Alternative Trail Alignment Proposed RR Alignment Existing RR Alignment Sections '9 Existing Conditions Recommendations maintain min 8'6 bt trail edge & pole provide a break in RR tracks Option 2: deviate trail along street ROW. Metro ond Property 140 pole can not be moved, easement required 18'5 13'10 Train station rest stop 0 Looking southeast from SE 11th catch basin '0 OCHOCO RR shift beginning 125' west of 13th 13TH Pinch point: possible to acquire an easement? ~11'6 bt RR & prop line ~30'6 total available. Need additional 17' for 12' trail 11' min. 25'1 6 t Looking northwest from SE 13th Feet

12 Section 7: SE 13th to Power Station 13TH LEGEND ch in assume 12' existing bt rails, 14' proposed 65'6 from street to fence corner single track provides ample room for trail 11'0 from RR cl to fence catch basin maintain min 8' from retaining wall to trail cl 6'11 RR2 shift 12' separation ramping to 14' ~2.5' retaining wall for length of fence trail 3' from err cl 9'9 3'10 18'9 23'5 3'6 min pole shift 13'6 min RR shift 18'4 14'11 max RR shift to retain pole 6'6 max shift wo moving pole ~48'6 available 8'9 only gives 6'8 clearance begin RR split gr & re '5 0 Looking east from SE 13th 9 Relocate Pole Proposed Retaining Wall Proposed Trail Alignment Alternative Trail Alignment Proposed RR Alignment Existing Conditions Recommendations 6'10 max shift wo moving pole ~49' available 6'11 max RR shift wo moving pole ~49' available 9'10 max RR shift wo moving pole ~47' available Milliken Tower Sections 15'0 15'4 Electric Pole Existing RR Alignment Track shift locator ManHoles 4'6 spur shift min 8' from fence to trail cl 24' '10 tower shift north move pole 7'7 min 20'2 17'7 23'5 from green mark, ~27'10 from main RR cl Feet

13 2'3 tower shift north 12' trail with 6 buffers 26'2 il cl 16TH AVE n rom Remove 3 Miliken Towers & use as gateway features 15TH Section 8: Power Station to SE 16th Pinch point, 12' path with no shoulders provide ADA accessible ramp from neighborhood grading of berm & retaining wall required ft wo 15'4 7'4 max shift wo moving pole ~50' available 825' spur line length approx by GIS Electric Pole Milliken Tower Relocate Pole Proposed Retaining Wall Proposed Trail Alignment Alternative Trail Alignment Proposed RR Alignment Existing RR Alignment Sections Existing Conditions '10 Pinch point, 12' path with no shoulders Track shift locator ManHoles 3'9 tower shift north 12' trail with 6 buffers 25'1 LEGEND Recommendations 4'10 max RR shift wo moving pole ~50'6 available 15'1 5'4 max shift wo moving pole ~50' available 6'7 max RR shift wo moving pole ~50' available 6'10 max RR shift wo moving pole ~50'6 available Looking east from SE 15th Place 100 Feet Looking west from SE 15th Place 10

14 Section 9: SE 16th to SE 17th LEGEND 16TH AVE Track shift locator 28'3 from pole to toe of slope add ladder style crosswalks & caution signage 25'3 terminus of spur line 34'5 from pole to toe of slope provide ADA accessible ramp from neighborhood 8'6 min from tower 17TH ManHoles Alternative Trail Alignment Proposed RR Alignment 935 Recommendations '4 15'10 install pedestrian activated signal at intersection E W S 8'6 min from pole S T A N D R maintain 14'0 bt RR lines 0 Looking east from SE 16th Proposed Retaining Wall Existing Conditions 15'6 15'3 Relocate Pole Sections 1602 ~6'5 RR shift Milliken Tower Existing RR Alignment Electric Pole Proposed Trail Alignment 932 Looking west from SE 17th Feet

15 Section 10: SE 17th to SE 19th Track shift locator ManHoles Electric Pole Milliken Tower LEGEND Relocate Pole Proposed arrier Fencing Retaining Wall Proposed Trail Alignment Alternative Trail Alignment Proposed RR Alignment Existing RR Alignment Sections Existing Conditions Recommendations Looking east from SE 17th Looking west from SE 19th 12

16 SE Ochoco and SE 17th Intersection Improvements Figure 1: Improved intersection of SE Ochoco and SE 17th including: pedestrian activated signal, crossing arms, caution signs, ladder style crosswalks, shifting SE Ochoco and inclusion of a fence and remote control gated section of rail line. 13

17 Typical Section: Single Track Figure 2. Typical trail section: End fo spur line to SE 17th 14

18 Typical Section: Double Track 47-0 Figure 3. Typical trail section: Power station to end of spur line 15

19 Appendix A: Cost Estimates 16

20 17

21 18

22 19

23 20

24 Summary of Individual Costs 21

25 Summary of Power Poles Note: Costs to relocate poles obtained from PGE 22

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

South Lexington Transportation Study Lexington, Massachusetts

South Lexington Transportation Study Lexington, Massachusetts South Lexington Transportation Study Lexington, Massachusetts Preliminary Findings and Options for Consideration Businesses Meeting 10/10/13 Town of Lexington Engineering and Planning Departments Meeting

More information

APPENDIX C. Existing Utilities

APPENDIX C. Existing Utilities APPENDIX C Existing Utilities THIS PAGE INTENTIONALLY BLANK Existing Utilities Numerous utilities exist within the project area, including natural gas, sewer, water, electric, communications, and street

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue NORTHWEST HIGHWAY SCURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY Northwest Highway (US 14) From Seegers Road to Western Avenue Northwest Highway SCurve Pedestrian/Bicycle Access Feasibility Study City

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

Stormwater and sanitary sewer lines 8 inches in diameter or greater

Stormwater and sanitary sewer lines 8 inches in diameter or greater 3.8 UTILITIES 3.8.1 Affected Environment This section describes the utility crossings and utilities located in the vicinity of the Preferred Alternative. The utilities include electricity, communication,

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

This letter summarizes our observations, anticipated traffic changes, and conclusions.

This letter summarizes our observations, anticipated traffic changes, and conclusions. Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT Appendices Appendix F Parking Study April 2016 CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT

More information

the importance of its role in local economic business operations that these business operations pursuant

the importance of its role in local economic business operations that these business operations pursuant WHEREAS, City development; recognizes COUNCIL CHAMBER 27, 2018 importance its role in local economic WHEREAS, it is in interest City relocations economic vitality employment opportunities Dallas residents;

More information

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017 FEASIBILITY REPORT 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY October 2, 2017 Prepared for: City of Inver Grove Heights 8150 Barbara Avenue Inver Grove Heights,

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY Final Report Washington Metropolitan Area Transit Authority Office of Real Estate and Station Planning April 2016 [This page intentionally left blank]

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Detailed Definition of Alternatives

Detailed Definition of Alternatives West Broadway Transit Study Detailed Definition of Alternatives 9/4/2015 DRAFT Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 2040 No-Build Alternative... 1 Build Alternatives...

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

4 Circulation & Transportation

4 Circulation & Transportation 4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

DRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities

DRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities Appendix D Utilities This page intentionally left blank. Utilities There are numerous utilities present within the project area, including natural gas, sewer, water, electric, communications, and street

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction Public Meeting. August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction Public Meeting. August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Public Meeting August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

City of Lafayette Staff Report Circulation Commission

City of Lafayette Staff Report Circulation Commission City of Lafayette Staff Report Circulation Commission Meeting Date: September 5, 2016 Staff: Subject: James Hinkamp, Transportation Planner Consideration of a No Parking Zone on Victoria Avenue Summary

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

Hudson-Bergen Light Rail Transit System Joint Occupancy-Joint Use

Hudson-Bergen Light Rail Transit System Joint Occupancy-Joint Use Hudson-Bergen Light Rail Transit System Joint Occupancy-Joint Use Richard F. Hernon, New Jersey Transit Light rail systems share their rights-of-way with most other modes of ground transportation. The

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015 Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item 3 July 9, 2018 ci tyofnovi.org SUBJECT: Approval to award design engineering services to AECOM Great Lakes, Inc., for the Flint Street Realignment and Reconstruction

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

June 27, WHEREAS, the City recognizes the importance of its role in local economic development; and

June 27, WHEREAS, the City recognizes the importance of its role in local economic development; and COUNCIL CHAMBER 181001 June 27, 2018 WHEREAS, the City recognizes the importance its role local economic development; and WHEREAS, it is the terest the City Dallas to support and secure the expansions

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: August 21, 2017 Meeting Type: COW (Committee of the Whole) City Council Budget Workshop Item Title: Final approval of an Ordinance amending various sections of Article

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

3.14 Parks and Community Facilities

3.14 Parks and Community Facilities 3.14 Parks and Community Facilities 3.14.1 Introduction This section identifies the park and community facility resources in the study area and examines the potential impacts that the proposed Expo Phase

More information

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS Paul Mak, PE, SE HDR Inc 801 S. Grand Ave. Suite 500, Los Angeles, CA 90017. Tel

More information

Summary of the Alcoa Highway Redevelopment Project

Summary of the Alcoa Highway Redevelopment Project Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

engineering phase and during the procurement of design build contracts.

engineering phase and during the procurement of design build contracts. CONSIDERATION OF ALTERNATIVES Below-grade trench alignment along Aviation Boulevard, adjacent to LAX south runways. miles. MOS-Century would extend from the Metro Exposition Line to the Aviation/ Century

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed Monroe Street Northeast Eastbound at Rhode Island Avenue

Study Area and Location District PSA Ward ANC Phase Description A Proposed Monroe Street Northeast Eastbound at Rhode Island Avenue Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Monroe Street NE and Rhode Island Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

UBC Watermain as shown on Sheet 202 : Sub total 97,050

UBC Watermain as shown on Sheet 202 : Sub total 97,050 Preliminary Cost Estimate Brock Commons Phase 1 Watermain replacement UBC Portion of Works only Replace existing 150mm dia CI and 200mm dia AC watermain with 200mm & 250mm dia DI (ductile iron) watermain

More information

Validation Study. Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad. May 15, 2008.

Validation Study. Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad. May 15, 2008. Validation Study Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad May 15, 2008 Prepared for: City of Des Plaines Des Plaines Civic Center 1420 Miner Street Des

More information

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM 1 PURPOSE OF THIS OPEN HOUSE Present information about the proposed improvements

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7.

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. 6.7 TRAFFIC 6.7.1 Affected Environment Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. Local Transportation System The proposed Dillingham Trail

More information

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012 A5 ADMINISTRATIVE REPORT Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: 604.873.7214 RTS No.: 9587 VanRIMS No.: 08-2000-21 Meeting Date: June 12, 2012 TO: FROM: SUBJECT: Vancouver City Council

More information

CROSSING RAIL PROJECT (P4) RAIL

CROSSING RAIL PROJECT (P4) RAIL GRAND CROSSING RAIL PROJECT (P4) Community Advisory Group October 10, 2012 1:30 pm Grand Crossing Park Field House 7655 S. Ingleside Avenue, Chicago GRAND CROSSING RAIL PROJECT (P4) Community Advisory

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

The Design-Builder shall meet local road criteria provided by the local governing agencies.

The Design-Builder shall meet local road criteria provided by the local governing agencies. 11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44 Engineering Report: Shasta-Trinity National Forest South Fork Management Unit Analysis of National Forest System Road 30N44 (milepost 0.00 to 0.40) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

SKIFFES CREEK SPECIAL USE PERMIT AND REZONING APPLICATION

SKIFFES CREEK SPECIAL USE PERMIT AND REZONING APPLICATION SKIFFES CREEK SPECIAL USE PERMIT AND REZONING APPLICATION Background 1. The Property Virginia Electric and Power Company ( Dominion Virginia Power or the Company ) owns three parcels of land north of Route

More information

Pace Bus Depot Location Analysis

Pace Bus Depot Location Analysis Pace Bus Depot Location Analysis Key Notes 1. Options refer to conceptual sketches prepared by Kimley Horn. 2. The depot is assumed to accommodate Pace routes as they currently exist: 17 routes on the

More information

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7.

Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. 6.7 TRAFFIC 6.7.1 Affected Environment Regional Transportation System The regional transportation system is discussed in Chapter 5, Section 5.7. Local Transportation System The proposed Dillingham Trail

More information

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030 Station Volumes and Boardings/Alightings The stations proposed for the LRT Alternative were selected due to their proximity to population and employment centers, major existing transportation facilities,

More information

ROAD SAFETY AUDIT. Salem Road at South Street. Town of Tewksbury. October 3, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Salem Road at South Street. Town of Tewksbury. October 3, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Salem Road at South Street Town of Tewksbury October 3, 2016 Prepared For: Massachusetts Department of Transportation Town of Tewksbury, Massachusetts Prepared By: TEC, Inc. 65 Glenn

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process Extending TRACKS Issue 5 Spring 2014 Preliminary design plan review underway Public comment and approval process in May & June Residents and businesses along the Southwest LRT (METRO Green Line Extension)

More information

Project Status Update January 2017

Project Status Update January 2017 Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

Brent Spence Bridge Design Exceptions - Alternative I

Brent Spence Bridge Design Exceptions - Alternative I s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight

More information

WARES. October, 2018

WARES. October, 2018 WARES October, 2018 1 Project Overview A new 16 mile east-west light rail line between Bethesda in Montgomery County and New Carrollton in Prince George s County Operates mostly on the surface with 21

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014 Aurora Line/I-225 Rail Project Update Public Meeting June 4, 2014 FasTracks and I-225 Rail Line Update Danielle Smith I-225 Rail Line Design/Build Coordination Manager 2 The RTD FasTracks Plan 122 miles

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

Current Corridor Characteristics. MN 62 Corridor Performance

Current Corridor Characteristics. MN 62 Corridor Performance Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Purpose of Tonight s Meeting

Purpose of Tonight s Meeting Purpose of Tonight s Meeting Point Dume Neighborhood Traffic Calming Project background, goals Resident Safety Concerns Existing Conditions Fact Sheets Map of Proposed Improvements Discussion Next Steps

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit 1. Plan It Calgary the new Municipal Development Plan and Calgary

More information